RESOLUTION NO BUILDING, ZONING, AND SEWAGE ENFORCEMENT FEE SCHEDULE

Similar documents
PERMIT FEES DOUBLED FOR CONSTRUCTION WITHOUT THE BENEFIT OF A PERMIT

a. Test well for the purpose of community water supply or any other investigatory purpose per Ordinance 124 b. Monitoring Well

TATAMY BOROUGH 2018 FEE SCHEDULE ADOPTED 1/2/18 EFFECTIVE 1/1/18

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

A RESOLUTION AMENDING THE FEE SCHEDULE OF THE TOWNSHIP OF AMITY, PENNSYLVANIA

MUDDY CREEK TOWNSHIP 2018 FEE SCHEDULE RESOUTION #

Allen Township Northampton County, Pennsylvania TOWNSHIP S GENERAL FEE SCHEDULE FOR 2018

Location in Code Subject Fees

TOWNSHIP OF WEST EARL LANCASTER COUNTY, PENNSYLVANIA RESOLUTION

UPPER SAUCON TOWNSHIP DEPARTMENT OF COMMUNITY DEVELOPMENT COMPREHENSIVE FEE SCHEDULE (Per Resolution )

Land Use Permit Fee Residential Commercial/Industrial Cost per $1, $ 6.00 $ 6.00

West Earl Township 2016 Fee Schedule Item Description Fee

MUDDY CREEK TOWNSHIP 2019 FEE SCHEDULE RESOUTION #

PALMER TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA RESOLUTION#

West Earl Township 2017 Fee Schedule Item Description Fee

$ $ $ $ $ Failed Inspection... Residential...$ must be paid prior to re-inspection Miscellaneous $ 146.

WHEREAS, it is necessary that an appropriate Fee Schedule be established sufficient to

New Hanover Township

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

West Earl Township 2015 Fee Schedule Item Description Fee

FEES AND COST DEPOSITS FOR SUBDIVISIONS, LAND DEVELOPMENTS AND DEVELOPMENT MATTERS SKETCH PLANS

EAST WHITELAND TOWNSHIP FEE SCHEDULE 2018

Minor Subdivision or Annexation Plans... $1,500.00

RESOLUTION NO

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

WEST MANHEIM TOWNSHIP FEE SCHEDULE FOR SERVICES & PERMITS. Resolution #

TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

NEWLIN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

FORKS TOWNSHIP FEE SCHEDULE AS AMENDED 11/2017

Land Use Application Fees

City of High Point Development Fee Schedule

Springfield Township Bucks County SCHEDULE OF FEES AND CHARGES RESOLUTION #

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

Rules and Regulations. for. Building Control Fees. Revised January 2, 2018

BUILDING PERMIT SUBMITTAL REQUIREMENTS

RESOLUTION PERMIT FEE SCHEDULE

NOTICE. Valuations for determining the building permit fee shall be set by the Building Official per International Building Code Section

Application for a Building/Zoning Permit

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

RESOLUTION NO. 778 BOROUGH OF MALVERN CHESTER COUNTY, PENNSYLVANIA

Worcester Township Fee Schedule

BUILDING SERVICES ~ FEE SCHEDULE

DEMOLITION REQUIREMENTS

Towamencin Township Fee Schedule

RESOLUTION NO

AGENDA REPORT SUMMARY. Resolution No : 2017/18 Community Development Fee Schedule

LINCOLN COUNTY, NORTH CAROLINA PLANNING & INSPECTIONS DEPARTMENT FEE SCHEDULE ADOPTED AUGUST 15, 2016 EFFECTIVE SEPTEMBER 6, 2016

RESOLUTION NO. 701 BOROUGH OF MALVERN CHESTER COUNTY, PENNSYLVANIA

Commissioners to enact, amend, and enforce technical construction and building codes; and,

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

East Vincent Township Chester County, Pennsylvania

Town of Walworth Fee Schedule 2019

Administration Fees Photocopies $ Returned Checks $ Credit Card Convenience Fee $ 1.50 minimum OR 2.45%

TOWN OF HAVERHILL, NH

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

I. RESIDENTIAL AND COMMERCIAL ON-LOT SEWAGE DISPOSAL SYSTEMS

Meeting Date: February 26, 2018 Agenda Item No:

BOROUGH OF BRIDGEPORT FEE SCHEDULE 2018

Fee Schedule for Zoning, Building Permits, and Plan Review Services

TOWNSHIP OF DOYLESTOWN APPLICATION FOR REVIEW OF SUBDIVISION OR LAND DEVELOPMENT PROPOSAL. Please PRINT; all information MUST be filled out completely

THE BOARD OF COUNTY COMMISSIONERS

TOWN OF BLOOMSBURG COLUMBIA COUNTY, PENNSYLVANIA RESOLUTION NO SETTING VARIOUS FEES

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

Caroline County, Maryland Department of Planning & Codes FEE SCHEDULE Tel: Fax:

Planning&Development Fee Standards

City of Maple Plain Ordinance 302 Exhibit A. City of Maple Plain Fee Schedule

CDA Combined Fees FEE / DEPOSIT APPLICATION TYPE / SERVICE. AGENCY FEES (See Resolution )

Fee Resolution

2016 CALN TOWNSHIP FEE SCHEDULE REVISION 1 (Adopted 8/25/16)

Ordinance Page 1

LOCAL LAW NO. 2, 1987 A LOCAL LAW REGULATING EXCAVATION AND TOPSOIL REMOVAL WITHIN THE TOWN OF CAMBRIA

FEE SCHEDULE ADMINISTRATION FEES OF 35% ARE CHARGED TO THE PROPERTY OWNER IN ADDITION TO ALL OTHER APPLICABLE FEES AND COSTS. SEE NO. 13.

RESOLUTION NO AMENDING RESOLUTION NO TOWN OF BEL AIR S FEE SCHEDULE

Meeting Date: December 3, 2018 Agenda Item No:

Community Development Fees (as of March 2015)

Greenbrier County Building Code Administrative Policy Manual

9. Public (Federal, State, or local

Boyertown Borough and Colebrookdale and Pike Townships Joint Zoning Ordinance

ORDINANCE NO

CITY OF PALM COAST SUMMARY OF APPLICATION AND IMPACT FEES

AN ORDINANCE FOR ADOPTION OF FEES IN CONJUNCTION WITH THE FAMILY OF INTERNATIONAL BUILDING CODES FOR PEARL RIVER COUNTY

Office of the Zoning Administrator and Planner. Saugatuck Township Planning and Zoning Applicants. Notice of Information for PC and ZBA Applicants

ZONING BOARD OF ADJUSTMENT MEETINGS ARE TYPICALLY HELD THE 2 nd MONDAY OF THE MONTH AT 7:00 P.M. IN THE COUNCIL ROOM OF THE MUNICIPAL BUILDING

TOWNSHIP OF WANTAGE ORDINANCE #

ORDINANCE NO HOLDING TANK ORDINANCE

Building Division Fee Schedule January 2018

SWIMMING POOL GUIDELINES

RESOLUTION NO NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SATELLITE BEACH, BREVARD COUNTY FLORIDA, as follows:

Chapter 32 Sanitary Code Page 1 of 10

CITY OF MAPLE PLAIN ORDINANCE NO. 297 AN ORDINANCE AMENDING THE COST OF A PERMANENT FENCE PERMIT ON THE FEE SCHEDULE FOR THE CITY OF MAPLE PLAIN

4. Building plans should include top of foundation elevation

Chapter 806 Fees Zoning Certificate Fee Schedule Refund of Permit Fees

City of Brooklyn Park Planning Commission Staff Report

EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

City of Greensburg. Step by Step Guidelines for your Project. Informational Packet for a Compliance Permit

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.

Transcription:

RESOLUTION NO. 2018-08 BUILDING, ZONING, AND SEWAGE ENFORCEMENT FEE SCHEDULE WHEREAS, the Board of Supervisors is authorized and empowered to set reasonable and necessary fees to reimburse the Township for the costs and expenses of processing, issuing and performing inspections related to applications for building permits, zoning permits, and applications, plumbing and administration of the Sewage Facilities Act, and WHEREAS, the Board has considered and reviewed the actual costs associated with the foregoing; NOW THEREFORE, it is resolved that the following fee schedule be and hereby is adopted effective. 1

BUILDING, ZONING, PLUMBING AND SEWAGE ENFORCEMENT FEE SCHEDULE I. *Application Fee (Non Refundable)..$ 50.00 *Application fee is due when a General Permit Application and associated Documents are submitted. This fee will be credited to the permit, plan review, and inspection fees when the application is approved. II. Building Permits A. New Construction: 1 & 2 Family Residential Use Group Classifications (Including Pre-Manufactured Units on Lots)......$.75/sq. ft.* New Commercial, Industrial, Institutional and Multi-Family Residential Uses....$.75/sq. ft.* * Up to 100,000 sq. ft. Gross Floor Area, then $.30/sq. ft. Over 100,000 sq. ft. of gross floor area. New Structures or Facilities (other than buildings) $ 500.00 Minimum Permit Fee: $ 150.00 B. Additions, Alterations and Renovations to Existing Buildings (Including Three Season Rooms and Habitable Space in Basement) Residential Uses... $75.00 First $1000.00 Commercial, Industrial, Institutional and Multi-Family Residential Uses..... $150.00 First $1000.00 Residential Accessory Buildings over 1,000 SF.$75.00 First $1000.00 C. All Electrical Inspections:.As per MDIA Fee Schedule (attached) D. Repairs: New Commercial, Industrial, Institutional and Multi-Family Residential Uses...$150.00 First $1000.00 Residential and all other uses (Decks and Covered Porches) $75.00 First $1,000.00 E. Other Commercial Permits Foundation-Only Permits $ 1,500.00 Allows for the construction of a foundation prior to approval of overall building permit. No construction shall be permitted beyond the foundation construction until a building 2

permit is issued for the entire building. Foundation Only Permit certification form shall accompany all foundation permit application packages. Cost of this permit is in addition to the building permit fees that are applicable for the entire building. Foundation-Only fees are required prior to (Foundation Only) plan review. This permit is limited to commercial construction. Revisions to Approved Plans $ 500.00 F. Plumbing Permit Fees Note: Plumbing permit fees for all Commercial and Residential Construction are included in the building permit fee. G. Miscellaneous Permits: Child Day Care, Accessibility, or other as required by the UCC...$ 50.00 H. Administrative Fee: (Only when 3 rd party reviews permit) New Commercial, Industrial, Institutional and Multi-Family Residential Uses..1% of Building Permit Fee Minimum Fee..$ 50.00 I. All Pre-manufactured Residential Units..... $ 200.00 J Private Swimming Pools: Above Ground......$ 50.00 In-Ground......$ 90.00 Storable (Combination Building and Zoning Permit) $ 50.00 K. Demolition Permits: Residential & Agricultural Uses....$ 50.00 Commercial Interior only.....$ 75.00 Commercial complete building.....$ 150.00 L. Fire Code Permits Operational Permit...$ 50.00 Construction Permit See IIA, IIB, and IID above Fire Safety Inspections $50.00/Hour Minimum of One hour Fireworks Notification Fee..$ Cost of notification M. State Mandated Surcharge... $ As (For all building permits) mandated by State N. Building Code Board of Appeals Applications: *Residential..$ 250.00 *Commercial.$ 350.00 *Public Hearing requested additional......$ 150.00 3

O. Plan Review Fees Residential and Commercial..$85.00/ Hour Minimum 1 hour P. Inspection Fees Miscellaneous (not otherwise stated).$ 50.00/Hour Minimum 1 hour Q. Re-inspection fee after 2 nd failed inspection..$50.00* *Due before next inspection will be performed. R. Construction without a permit: 1 st Offense...$100.00* 2 nd Offense...$250.00* 3 rd and any successive offenses...$500.00* *Plus all permit fees doubled III. Zoning Ordinance A. Zoning Permits: All decks, patios, porches, storage sheds, fences, above/in-ground swimming pools, and replacements thereof..$ 50.00 Any new construction or additions, change in the existing use of an existing structure, or change in use/occupancy of a structure or property, any change or expansion of non-conforming uses, and any construction in the Flood Hazard Zone. $ 100.00 B. Sign Permits: (fee applicable for each sign) Sign Area 1-20 sq. ft... $ 50.00 21-50 sq. ft... $ 100.00 51-100 sq. ft.... $ 150.00 101-200 sq. ft.... $ 200.00 Over 200 sq. ft.... $ 250.00 Temporary Signs... $ 50.00 C. Junkyard License: New Application...... $ 250.00 Yearly Renewal..... $ 50.00 Hearing Required (Additional Fee)..... $ 100.00 D. Water Well Permit: Replacement well at existing residence.. $ 20.00 New well at new residence $ 50.00 plus $25.00 per inspection in excess of two (2) E. Zoning Hearing Board Applications: 1. Variances from the requirements of the Zoning Ordinance, Zoning Hearing Board - Notice of Appeal application required. 4

Residential and Agricultural Uses... $ 350.00 All other Uses...$ 500.00 2. Special Exceptions - Zoning Hearing Board - Notice of Appeal application required. Residential and Agricultural Uses... $ 350.00 All other Uses... $ 500.00 3. Appeals from Orders and Decisions of the Zoning Officer - Zoning Hearing Board - Notice of Appeal application required. Residential and Agricultural Uses... $ 350.00 All other Uses... $ 500.00 F. Modification of a Planned Residential Development..$ 250.00 G. Challenges and Amendments: All amendment requests including Curative Amendments or Substantive Challenges to the Zoning Ordinance and/or Map Planning Commission and Board of Supervisors. In addition to the application fee, a non-refundable deposit of $2,500.00 shall be deposited with the Township to be held in escrow to offset costs incurred. Upon occurring additional costs, such costs will be itemized and charged. All applications... $. 1,000.00 H. Conditional Use Application: Conditional Use Requirements from the Zoning Ordinance - Planning Commission and Board of Supervisors - Conditional Use application required. Agricultural, Residential, and Village Districts... $ 350.00 All other Districts (including Neighborhood District)... $ 500.00 Escrow -- 0-5 disturbed acres..$ 100.00 5 10 disturbed acres. $ 200.00 10 50 disturbed acres. $ 500.00 50 or more disturbed acres. $ 1,000.00 Professional Consultation Fees. Actual Cost I. Conservation Plan for Transfer of Development Rights Review Fee. $ 200.00 J. Zoning Determinations, Verifications or Preliminary Opinions..$ 50.00 IV. Other Permits A. Outdoor Furnaces (Woodfired) Boilers. $ 50.00 5

B. Fireworks Permit...$ 50.00 V. Sewage Enforcement PA. Act #537 A. Application fee for a new or existing building lot..$ 480.00 Application fee covers deep probe evaluations, and perform two (2) percolation tests for conventional type systems. Township requires primary and replacement area testing on all building lots. B. Application fee for a repair / modification permit..$ 225.00 Application fee covers a site investigation, permit, and final inspection Fee does not cover any soil testing. Soils testing fees will be based on Township s current rate. C. Application fee for a new or existing building lot utilizing alternate type systems / no perc test required.$ 200.00 D. Application fee for a holding tank.$ 225.00 Application fee covers a site investigation, permit, and final inspection. Fee does not cover any soil testing. E. Permit fee for all single family residents..$ 125.00 This includes design review, permit, and final inspection. F. Permit fee to transfer or renew expired permit $ 150.00 Application fee covers a site investigation and reissuance of expired permit. *Any additional work performed will be charges based on the Township s current SEO fee schedule. ADDITIONAL INFORMATION Applicant will be responsible to arrange and pay for back hoe. In addition, applicant will be responsible to dig and prepare percolation test holes. All cost and liability associated with the excavation and backfill of all test pits / percolation holes shall be the responsibility of the Applicant. SEO will provide water for percolation testing providing he can drive his truck directly to the actual percolation test site without causing damage to vehicle. SEO will do 24 hour presoak of perc holes. SEO will require applicant to hire a certified professional soil scientist for all fill site evaluations, any alternate type systems, and for any situation where the SEO feels one is needed. Applicant will be 6

responsible for paying for soil scientist SEO will still charge his regular rate. SEO is required to verify all soils testing. Chapter 72.41 states that a sewage enforcement officer has the power and duty to issue, deny and revoke permits, and to take all other actions necessary to administer and enforce section 7 of the act. SEO FEES DEEP PROBE EVALUATIONS FOR CONVENTIONAL TYPE SYSTEMS / LOT $120.00 DEEP PROBE EVALUATIONS FOR ALTERNATE TYPE SYSTEMS / LOT $200.00 SITE INVESTIGATION $100.00 PERCOLATION TEST PER SIX (6) HOLE TEST $180.00 REVIEW DESIGN / ISSUE PERMIT RESIDENTIAL $ 50.00 PERMIT DENIAL $ 50.00 SYSTEM FINAL INSPECTION (PER TRIP) $ 75.00 ANNUAL INSPECTION OF ANY EXISTING SYSTEM $ 75.00 INSPECTION FEE OF EXISTING SYSTEM FOR SUBDIVISION APPROVAL $ 75.00 PRIOR SEO TESTING VERIFICATION / SITE INVESTIGATION $120.00 INVESTIGATE A COMPLAINT $ 75.00 REVIEW MINOR PLANNING MODULE $ 35.00 REVIEW MAJOR PLANNING MODULE $ 40.00 REVIEW NON BUILDING DECLARATION $ 35.00 MISC. HOURLY RATE $ 33.00 MONTHLY ADMINISTRATIVE FEE (2 HOUR) $ 66.00 V. Additional Inspection Fees If the Township determines that any permitted work covered by this resolution is of sufficient magnitude or importance to warrant assignment of one or more persons to inspect the permitted work on a more than spot inspection basis, the permit will so indicate and the permittee shall be charged for additional salary, overhead, and expenses incurred by each assigned inspector and the Township. VI. Fees for Completed Work Where an application is submitted and reviews or inspections are conducted, the Township may charge fees based on the work completed regardless of whether a permit is issued or whether the applicant begins or completes the work proposed. 7

ENACTED this day of, 2018 by and in accordance with law. ATTEST: ` SOUTH MIDDLETON TOWNSHIP BOARD OF SUPERVISORS: BRYAN A. GEMBUSIA, Chairman THOMAS E. FALEY, Vice Chairman SANDRA A. QUICKEL, Secretary WALTER G. REIGHARD RONALD P. HAMILTON R. DUFF MANWEILER 8