Neues Museum. Berlin, Germany

Similar documents
Carmen Würth Forum. Künzelsau, Germany

Rockbund Project & Rockbund Art Museum

External Parameters. Chapter 1 Mapping + Definition of Micro Location. PH3 Museumsinsel. Location:

Düsseldorf Schauspielhaus Theater

BUILDING BERLIN. Reconstruction, Re-Invention and the Rage of Time <

von Gerkan, Marg and Partners Architects

von Gerkan, Marg and Partners Architects

The moving play of reflections of slightly distorted structures, of shadow and light, superposed by the shiny red ceramic surface and its light

Meet the Lighting Firm Illuminating Works by Oscar Niemeyer and Michelangelo

Guiding principles for research and scientific investigation at the Staatliche Museen zu Berlin

Skyline Plaza Frankfurt

Award for new Vietnamese National Assembly building in Hanoi Vietnam relies on German building culture

d o c o _ m o m o _ International working party for

von Gerkan, Marg and Partners Architects

Alvar Aalto. March 1. Principles of furniture and design

Reinforced concrete! the materials

The Industrial Period

von Gerkan, Marg and Partners Architects

AH334 GERMAN ART AND ARCHITECTURE IN THE 20TH CENTURY: FROM 1933 TO THE PRESENT IES Abroad Berlin

Research Within Bounds

my berlin.projects 11

Forschungen zu Südosteuropa Sprache Kultur Literatur

VENECIA 2014.Projects 7

Portfolio. About us. Approximately 120 employees are employed in the planning team of our office in Stuttgart.

von Gerkan, Marg and Partners Architects

Potsdam-Kirchsteigfeld

TOC. Lars Miiller Publishers

In as much as we transform our present, so we are also transforming our past. Tchich Nhat Hanh

Berlin s new cultural heart Cultural stronghold and historical centre

140. Aalto 132. Artist s Studio 130. Oval Office 122. Guggenheim Helsinki 112. Primary & Paravent 101. Cecilia Road Studios Appendix.

VILLA.DAVID CHIPPERFIELD.OVEST

von Gerkan, Marg and Partners Architects

von Gerkan, Marg and Partners Architects

von Gerkan, Marg and Partners Architects

SIMONE MICHELI architect. CASA Micheli in Puntaldia BY SIMOME MICHELI

Architectural Constructions of Memory & the Ruin in Post-1989 Berlin

Feeding Lady Architecture s Fire on Berlin s Museum Island

Leipzig And Nearby Suburban Cities

WHAT SURVEY DO YOU REQUIRE?

PRESS KIT CONTENT. PRESS CONFERENCE , 11 am. Research report on Steffi Brandl Thomas Friedrich Scholarship for Research in Photography

18 th. Century Events

Between Spatial Data Management

LANDMARKBUILDING.DAVID CHIPPERFIELD

Berlin.Projects. Netherlands Embassy Berlin, Germany OMA - Rem Koolhaas embassy, housing. Sony Center. Reichstag

LIBRARIES AT THE BAUHAUS

100 YEARS BAUHAUS What interest do we take in Modern Movement today?

Dusseldorf.Projects 9

British Museum in the 18 th century

von Gerkan, Marg and Partners Architects

High-end agency for cultural management, editing and communications

THE SUPER ART YEAR 2017

The Italian Experience from the 2nd Century to W. Max Lucas University of Kansas

Background information

DIRINGER&SCHEIDEL. family-owned for four generations. People, ideas and the cornerstones of our success

Rethinking Replicas: Temporality and the Reconstructed Pavilion. Dr Ashley Paine

dresden.projects 5 Centrum Galerie Dresden S.L.U.B. Dresden Dresden, Germany Ortner & Ortner library Dresden Station Redevelopment

Berlin Programme of the German-French Research Programme Art Market and Art Collecting from 1900 to the Present in Germany and France

ARCHITECTURE (ARCH) ARCH Courses. Architecture (ARCH) 1

Minimum Documentation Fiche 2003

The Terrace, Lincoln, by Bauman Lyons Architects

Vibes & Scribes, 21 Lavitts Quay, Cork New & Bargain Books (Get a further 20% Off!)

Base camp for a world journey The Humboldt Forum starts now

Description of the RICS HomeBuyer (Survey & Valuation) Service

Kouvola E2 Timber Concept Competition. Team Kaufmann

Who won the competition? Green Talks, CEU, Budapest, 2015

Vaduz.Projects. A-Dome office. Vaduz State Capitol Forum Vaduz, Liechtenstein Hansjörg Göritz government. National Museum Liechtenstein Vaduz

International Study Programme in Architecture. arch.kit.edu KIT-FAKULTÄT FÜR ARCHITEKTUR

Architecture Culture III 1750 thru The International Style Spring 2012

Built Heritage Inventory

DRESDA.Projects 8. Saxony City Archive Dresden. New Synagogue Dresden Dresden, Germany Wandel Hoefer Lorch Architekten community centre, synagogue

WHO I AM. Prof. Ralf Niebergall. Architect in Magdeburg, Germany (2-8 Employees) Professor for architecural design and building theory in Dessau

THE VERY MARK OF REPRESSION

Winton Scott Architects

Stuttgart Main Station. A railway station project of the 21st century. Location Stuttgart, Germany. Built Under construction

MEMORANDUM OF UNDERSTANDING between THE UNITED NATIONS HUMAN SETTLEMENTS PROGRAMME (UN-HABITAT) and THE INTERNATIONAL FEDERATION OF SURVEYORS (FIG)

Berlin s Museum Island, are reflections of a nation s history, culture, and a sense of its Self. 2

Khushrud Village, Herat, Afghanistan

New Marrickville Library

FOLDER OF REFERENCES

FIFA WORLD FOOTBALL MUSEUM

The Symposium: Art. Culture. Sustainability. June 29/30 th, 2018 Academy of Performing Arts (ADK) in Ludwigsburg

Commercial real estate finance

EXPRESSION OF INTEREST (EOI)

Portfolio. Alexander Goessler

Welcome to Workshop Designing Collaborative Interactive Spaces for e Creativity, e Science and e Learning AVI 2012, Capri, Italy, May 25 th.

Company profile. Partner of

A NEW CONCEPT FOR MUSEUM TRAINING IN GERMANY Dr. Angelika Ruge

18. Appendix H Urban Design Panel Presentation

Material monumentality or virtual multiplicity

Structural Design II Philippe Block Joseph Schwartz

THE SMALL HOUSE OF UNIVERSAL DESIGN AWARD

ARCH - ARCHITECTURE. ARCH - Architecture 1. ARCH406 Graduate Architecture Design Studio III (6 Credits)

Your partner for the financing of residential, office and commercial property

Topography of Terror ( )

Galerie Muensterberg, Basel, Switzerland Suzanne Bollag Gallerie, Zurich, Switzerland. Suzanne Bollag Gallerie, Zurich, Switzerland

Restoration Of The Palais Des Gouverneurs Museum / D...

New Amsterdam History Center Framework for a Virtual New Amsterdam Five Dutch Days Presentation

General Instructions For Surveys and Plans Outside the Provincial Survey System

AARON PUPPE. Creative Works & Design Portfolio

Edition Axel Menges GmbH Esslinger Straße 24 D Stuttgart-Fellbach tel fax

Transcription:

Berlin, Germany 1993 2009 The Neues Museum on Berlin s Museum Island was designed by Friedrich August Stüler and built between 1841 and 1859. Extensive bombing during the Second World War left the building in ruins, with entire sections missing completely and others severely damaged. Few attempts at repair were made after the war, and the structure was left exposed to nature. In 1997, David Chipperfield Architects won the international competition for the rebuilding of the Neues Museum in collaboration with Julian Harrap. The key aim of the project was to recomplete the original volume, and encompassed the repair and restoration of the parts that remained after the destruction of the Second World War. The original sequence of rooms was restored with new building sections that create continuity with the existing structure. The archaeological restoration followed the guidelines of the Charter of Venice, respecting the historical structure in its different states of preservation. All the gaps in the existing structure were filled in without competing with the existing structure in terms of brightness and surface. The restoration and repair of the existing is driven by the idea that the original structure should be emphasized in its spatial context and original materiality the new reflects the lost without imitating it. The new exhibition rooms are built of large format pre-fabricated concrete elements consisting of white cement mixed with Saxonian marble chips. Formed from the same concrete elements, the new main staircase repeats the original without replicating it, and sits within a majestic hall that is preserved only as a brick volume, devoid of its original ornamentation. Other new volumes the Northwest wing, with the Egyptian court and the Apollo risalit, the apse in the Greek courtyard, and the South Dome are built of recycled handmade bricks, complementing the preserved sections. With the reinstatement and completion of the mostly preserved colonnade at the Eastern and Southern side of the Neues Museum, the pre-war urban situation is re-established to the East. A new building, the James Simon Galerie, between the Neues Museum and the Kupfergraben canal, echoes the urban situation of the site pre-1938. In 2009, after more than sixty years as a ruin, the Neues Museum reopened to the public as the third restored building on Museum Island, exhibiting the collections of the Egyptian Museum and the Museum of Pre- and Early History. Competition Project start Completion Gross floor area Client User Architect 1993 1994 (Phase 1) 1994 1997 (Phase 2 and 3) 1998 2009 20,500 m 2 Stiftung Preußischer Kulturbesitz represented by the Bundesamt für Bauwesen und Raumordnung Staatliche Museen zu Berlin David Chipperfield Architects London & Berlin in collaboration with Julian Harrap

David Chipperfield Architects Neues Museum Berlin, Germany 1993 2009 Competition Project start Construction start Completion Gross floor area Client Project controlling User Architect Competition team s 1993 1994 (Phase 1) 1994 1997 (Phase 2 and 3) 1998 2003 2009 20,500 m 2 Stiftung Preußischer Kulturbesitz represented by the Bundesamt für Bauwesen und Raumordnung Ernst & Young Real Estate GmbH Staatliche Museen zu Berlin David Chipperfield Architects London & Berlin In collaboration with Julian Harrap Competition, Phase 1 Jamie Fobert Renato Benedetti, Jan Coghlan, Eamon Cushanan, Madeleine Lambert, Genevieve Lilley, Jonathan Sergison, Steven Shorter, Zoka Skorup, Simon Timms Competition, Phase 2 and 3 Mark Randel Philipp Auer, Franz Borho, Nathalie Bredella, An Fonteyne, Robin Foster, Mario Hohmann, Martin Kley, Harvey Langston-Jones, Patrick McInerney, Ian McKnight, Claudia Marx, Guy Morgan-Harris, Rik Nys, Eva Schad, Alexander Schwarz, Haewon Shin, Graham Smith, Henning Stummel, Giuseppe Zampieri, Mark Zogrotzski Outline proposals Harald Müller, Eva Schad Eva Schad Isabel Karig, David Saik, Alexander Schwarz (Design lead), Florian Steinbächer Detailed proposals Harald Müller, Eva Schad Martin Reichert, Eva Schad Janna Bunje, Adrian Dunham, Harald Eggers, Annette Flohrschütz, Michael Freytag, Anke Fritzsch, Isabelle Heide, Christoph Hesse, Christiane Melzer, Franziska Rusch, Alexander Schwarz (Design lead), Christian Stiller

David Chipperfield Architects Neues Museum Berlin, Germany 1993 2009 s Quantity surveyor Executive architect Restoration consultant Structural engineer Services engineer Building physics, Acoustics Lighting consultant Exhibition planning Landscape architect Production information Martin Reichert, Eva Schad, Alexander Schwarz (Design lead) Martin Reichert, Eva Schad Christiane Abel, Arnaud Bauman, Thomas Benk (Historic constructions), Johannes Bennke, Daniela Bruns, Katja Buchholz, Nils Dallmann, Florian Dirschedl, Maryla Duleba, Matthias Fiegl (MEP), Annette Flohrschütz, Michael Freytag (Team leader new construction), Anke Fritzsch (Team leader restoration), Katja Gursch, Anne Hengst, Michael Kaune, Regine Krause, Paul Ludwig, Martina Maire, Marcus Mathias, Werner Mayer-Biela, Virginie Mommens, Harald Müller, Max Ott, Peter Pfeiffer, Martina Pongratz, Robert Ritzmann, Mariska Rohde, Franziska Rusch, Elke Saleina, Sonia Sandberger, Antonia Schlegel, Gunnar Schmidt, Lukas Schwind, Doreen Souradny, Annika Thiel, Barbara Witt, Sebastian Wolf In collaboration with Nanna Fütterer for David Chipperfield Architects Lubic & Woehrlin GmbH, Berlin Pro Denkmal GmbH, Berlin / Bamberg IGB Ingenieurgruppe Bauen, Karlsruhe / Berlin Jaeger, Mornhinweg + Partner Ingenieurgesellschaft, Berlin Kunst und Museumsschutz Beratungs- & Planungs GmbH, Berlin Ingenieurbüro Axel C. Rahn GmbH, Berlin Kardorff Ingenieure Lichtplanung, Berlin architetto Michele de Lucchi S.r.L., Milan Levin Monsigny Landschaftsarchitekten, Berlin