FIFA WORLD FOOTBALL MUSEUM

Similar documents
EUROPAALLEE CONSTRUCTION SITE G

PEAKS PLACE NEW APARTMENT HOTEL WITH A SPA AND RESTAURANT LAAX GR LOCATION / HISTORY

Ambassador House, Opfikon Renovation and reconstruction. Binzstrasse 18, 8045 Zürich Telefon

Residential Design Guide Appendices

Grosvenor House, Drury Lane, London, WC2. October 2003

KAROLINE HERFURTH. 50th PLUS GERMAN ARCHITECTURE DESIGN OF SWITZERLAND AUSTRIAN WINE SPECIAL 2017 CULTURE, TRAVEL & MORE. Issue 50 May 2017 THE

Machine for Living. A live-work complex in Zurich, designed by Müller Sigrist Architekten, is a city in itself.

Potential Building 6-Storey (Allowable) 50' Shoulder ALEXANDER STREET. Evelyne Saller Centre Main Entrance. Rodan Lodge Entry Porch

900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1

Urban Design Brief (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London

Appendix 2: Mt Victoria

STAFF DESIGN REVIEW RESIDENTIAL BUILDING APPLICATION SUPPLEMENT

REINVENTING THE GROUND FLOOR AFTER 50 YEARS

stein am rhein.projects 5

The demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken.

The moving play of reflections of slightly distorted structures, of shadow and light, superposed by the shiny red ceramic surface and its light

Architecture Design Competition 2018/19

BACH HOUSE CORE TOUR. -Interpreters should be familiar with material at each stop, as they will operate on a rotating basis.

Village of Perry Zoning Ordinance Update Draft Diagnostic Report

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

Infill & Other Residential Design Review

From space to scope. Scope for your business.

Design and Access Statement Volume III Part 6 of 9 Plot A1. May 2018 Allies and Morrison

Welcome to Medienpark. The impressive entrance hall elegantly incorporates the spacious look of the exterior.

Detached 5 bedroom villa with pool in Tavira VILLA IN TAVIRA

510 MAIN STREET WINNIPEG CITY HALL Green Blankstein Russell and Associates (Bernard Brown and David Thordarson, principal designers),

STYLE AND ARCHITECTURAL PHILOSOPHY

ARCHITECTS TAILORED ARCHITECTURE & INTERIORS BARCELONA & SITGES ARCHITECTURE + DESIGN + INTERIORS

I.S.T. Austria Institute of Science and Technology Austria

5.1 Site Planning & Building Form

DESIGN, ACCESS & PLANNING STATEMENT

Requirements for accepted development and assessment benchmarks for assessable development

Citation for published version (APA): Kirkegaard, P. H. (2013). Unfolding Utzon: addition and repetition. A&D Skriftserie, 78, 6-9.

Multifaceted shapes. Press release

ST. TERESA S GARDENS REGENERATION PARTNERSHIP

New construction of the bank Sparkasse Mühlacker

New Marrickville Library

Sherwood Forest (Trinity) Housing Corporation. Urban Design Brief

Les Saisons Sai Wan Ho Building Journal, June 2002

Henk Reijenga URBAN DESIGN AND ARCHITECTURAL SUPERVISION. Westpolder Bolwerk project

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017

LANDMARKBUILDING.DAVID CHIPPERFIELD

Arena Boulevard construction scheme

566 Hilson Ave & 148 Clare St., Ottawa Planning Rationale June 20 th, 2014 Prepared by Rosaline J. Hill, B.E.S., B.Arch., O.A.A.

Response to Urban Design Panel Comments

Plan living spaces. Exercise 01_IMIAD Search and analysis of references to the field of elderly housing. Yolanda Castillow Carmen Schultheiss

Jasper 115 Street DC2 Urban Design Brief

OVERVIEW PROJECT SUMMARY. A two storey detached townhouse which is modern and affordable.

Ramp. Bikes Ramp. Landing. Lift. Bikes. Stairs. Bedrm 1 Bedrm 2. Living Rm HWC m 2. Utility. Bthrm. Kitchen.

Kassner Goodspeed Architects Ltd.

County Board Meeting Columbia Pike FBC Redevelopment Proposal

BREDA.Projects 4. Kroeteneiland Breda, Netherlands. 4 Breda, Netherlands OMA - Rem Koolhaas. Carré

VANCOUVER. Laneway Housing Guide: The 10 Biggest Mistakes To Avoid For Homeowners In Vancouver

LOCATION ORIENTATION ARCHITECTURAL UNIQUENESS STATE OF CONSERVATION RETURN ON INVESTMENT

Renovation TRIPLE PLAY 56 CANADIAN HOMES & COTTAGES

WELCOME TIMESCALES. Thank you for attending Anthology s final public exhibition on the emerging plans for Kennington Stage. ANTHOLOGY S COMMITMENTS

Re: TP , Flinders Street MELBOURNE, demolition and construction of 13 storey building.

Residencial Cármenes Balcón de Granada c/ Zahareña (Barranco del Abogado),

When this two-storey Cape Town (South Africa) property, originally designed by SAOTA a decade ago, was bought by its new owners, they called for a

EMBEDDING BUILDINGS. Marlies Rohmer (architect) THE BUILDING IN THE CITY

MONITORED RESULTS FROM AN INNOVATIVE SOLAR RENOVATION OF MULTI STOREY HOUSING - EU SHINE ENGELSBY, FLENSBURG

Ku-ring-gai Local Environmental Plan No 194

[BUILDING STATISTICS PART I]

Daylight availability in courtyards of urban dwellings in Athens

PUBLIC MEETING TABLE DISCUSSION CASE /01/19 MIDTOWN NORTH DEVELOPMENT 1

dresden.projects 5 Centrum Galerie Dresden S.L.U.B. Dresden Dresden, Germany Ortner & Ortner library Dresden Station Redevelopment

PREPARED FOR: ADI DEVELOPMENT GROUP INC.

Sotheron Place, Fulham

Fundamental Study on Thermal Surface Analysis

Build-To-Suit Development

apply sustainability principles to all residential developments in Ardee;

BEAM UP YOUR BUSINESS

Frankfurt.Projects 5. 2 Frankfurt, Germany Richard Meier museum. MyZeil Shopping Mall. Frankfurt Museum of Applied Art. Olivetti Headquarters


Regulation on the Identification and Registration of Immovable Cultural and Natural Property to Be Protected

CONVERTING OFFICE SPACE. using modular prefab architecture to convert vacant office buildings

201 College Avenue. Zoning Compliance. City of Ithaca, New York Date:

Residencial Altos del Sabinal - "Viviendas desde *. Plaza y Trastero Incluido"

A By-law to amend Zoning and Development By-law No regarding Laneway Houses

Traditional Palestinian Architecture. Dr. Hazem Abu-Orf. Palestinian Architecture Lecture 5

SAIIER sir aurobindo institute for intgral education and research

The new Tamedia building

System furniture. Essentiel BENCH

Yonge Street and 3 Gerrard Street East - Zoning Amendment Application - Preliminary Report

P. H. Robinson Consulting Urban Planning, Consulting and Project Management

HISTORIC RESOURCES INVENTORY - BUILDING AND STRUCTURES

Bridgeland-Riverside Area Redevelopment Plan (ARP)

Double Haven. Kau To Shan, Shatin, New Territories, Hong Kong. Building Journal August Project name. Location. Publication

18. Appendix H Urban Design Panel Presentation

Rock Island County Courthouse History & Significance

Article 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT

P. H. Robinson Consulting Urban Planning, Consulting and Project Management

Ken O Brien, MCIP, Manager of Planning and Information Cliff Johnston, MCIP, Director of Planning

Advisory Design Panel Report For the Meeting of February 27, 2019

Sedro woolley, WA 720 MURDOCK ST. FOR sale. 14,500 +/- sf office building with 8,500 +/- sf unfinished basement space on 0.

HOUSE ARCHER, STELLENBOSCH HOUSE WHITFIELD, SOMERSET WEST HOUSE PLOUGHMANN, SOMERSET WEST

Appendix C Built Form Guidelines

OPERABLE ALL-GLASS BALCONY GLAZING SYSTEMS. NanaGlass SL25

Housing for the Region s Future

Design and Access Statement and Planning Statement. Application for Planning Approval. New Shopfront. 58 High Street West Glossop

Transcription:

Online version on the platform www.architectes.ch FIFA WORLD FOOTBALL MUSEUM MUSEUM, GASTRONOMY, OFFICES, APARTMENTS / Zurich ZH Nº 12031E Property owner Swiss Life REIM (Switzerland) AG General-Guisan-Quai 40 P.O. Box 2831 8002 Zurich Principal Fédération Internationale de Football Association (FIFA) FIFA-Strasse 20 8044 Zurich Overall project management Botta Management Group AG Mühlegasse 12a 6342 Baar General contractor HRS Real Estate AG Siewerdtstrasse 8 8050 Zurich Architect SAM Architekten und Partner AG Hardturmstrasse 175 8005 Zurich Museum planning (not commissioned by HRS Real Estate AG) TRIAD Berlin Projektgesellschaft GmbH Marburger Strasse 3 DE-10789 Berlin Civil engineers Gruner & Wepf AG Thurgauerstrasse 56 8050 Zurich Technical consultants Façade planning: Atelier P3 AG Hardturmstrasse 173 8005 Zurich Lighting planning: Reflexion AG Hardturmstrasse 123 8005 Zurich HVAC-E engineer: Amstein + Walthert AG Andreasstrasse 11 8050 Zurich Engineer E: Enerpeak Salzmann AG Stettbachstrasse 7 8600 Dübendorf Construction physics: Kopitsis Bauphysik AG Zentralstrasse 52a 5610 Wohlen Landscape architect Rotzler Krebs Partner GmbH Landschaftsarchitekten BSLA Lagerplatz 21 8400 Winterthur Gastronomy planning hpmisteli Wattenwylweg 28 3006 Berne Building location Seestrasse 25/27 8002 Zurich Planning and implementation phase 2013 2015 LOCATION / HISTORY For the purpose of housing FIFA s World Football Museum, it was necessary to remodel the Haus zur Enge, which is named after the Zurich district in which it stands. Enge is located southwest of Zurich s city centre, bordering both the old part of town and the lake. The property closes off the south side of the Tessinerplatz where the district s magnificent suburban station is located. The building was designed by renowned architect Werner Stücheli and completed in 1978. It is a high-rise building which rises from a two-story base and does not significantly overshadow the surrounding houses. The base part occupies an entire square space, following the course of adjacent streets and the edge of the Tessinerplatz. The upper part is significantly reduced in volume with a narrow outline. Its elongated shape, aligned north to south, is based on a 135-degree grid pattern, which also determines the layout of the individual floors. Published in Switzerland

When the decision was made to accommodate a complex room arrangement for the Federation de Football Association (FIFA) and other uses at this location, it was noticed that the robust substance of the basic building had the required potential. The building s structure is supported by two triangular central utility cores that consistently penetrate all the storeys, holding opportunities for restructuring and consolidation, as well as an increase in volume. Nothing stood in the way of comprehensive renovation. Under these conditions, a strat egy developed for dealing with buildings from the 1970s that is not particularly common. CONCEPT / ARCHITECTURE Since the renovation, the building has housed the World Football Museum, retail space, dining areas, seminar and office space as well as 34 apartments. This mixed

N 50 m Swiss Re use now dominates the square. According to the architects, the new use of the building is an affirmation of the principle of active participation in city life that Werner Stücheli outlined in his first draft, but was unable to achieve at this location. The integration of public usage on several levels, extending to the outdoor terraces of the base structure and, in particular, the museum, seminar and restaurant activities in these areas, bring the building closer to the Tessinerplatz. They emphasize its role as part of the urban space. The architects were able to align their interventions with the existing structure. The predetermined mixed usage, the building law requirements, and the ambition of the architects to create constructive coherence were also determining factors for the draft design. The architects formulated the aim of the reorganization, and the increased height of the high-rise part above the base

from six to eight storeys as follows: to rediscover the lost typological and architectural values of the original project, and in addition to the urban impulses mentioned. This gives it an aesthetic appeal appropriate to its location. The base area will now house the museum, which will extend to the first two basement levels. Access to the museum entrance is orientated towards Enge Station and Tessinerplatz ; the projecting base level will protect it from the weather. The entrances to the office space and apartments have their own addresses ; the architects integrated these into the logic and rhythm of the ground floor façades. The second upper floor is interpreted as a zone between the base and the superstructure. The restaurant and retail spaces arranged here, along with the terraces, are open to the public. Access to these businesses outside museum opening hours is provided by an outdoor staircase; the main entrance. Above this, up to the 7th floor following the X-shaped 135-degree pattern of the building, the residential uses have been arranged to the north and south, and the office areas to the west and east. The distinct, horizontal edging over the last floor of the original building has been preserved as the actual building form. The two new floors above are slightly setback and reproduce the basic shape, in simplified form, without the striking corner formations. They contain additional apartments. SPECIAL FEATURES This conversion is a reinterpretation of the original concept. Materialization played an important role. Base and superstructure have uniform materials and colours. Their new outer cladding is made of dark, ceramic, aubergine-coloured graduated tiles. With these, the architects wanted to give the building an upmarket look. The new window casings stand out from the ceramic cladding, giving the façade a new plasticity with an interesting play of shadows. The new roof Longitudinal section

Ground floor 2nd upper floor 1:300 (m) 1 5 10

structure is discreet, in contrast. The building envelope has a light-coloured appearance consisting of pure aluminium and glass. With horizontal bands and rhythmically modulated window casings, its appearance indicates the underlying residential use. Uniform sun protection, in the form of electrical curtains behind glass, ties in with the colour of the ceramic tiles. HRS as general contractor completed this project on time. The task was challenging, having to be handled in a densely populated inner-city neighbourhood. The existing building made high demands in terms of geometry and workmanship. The project team had to deal with a rolling planning schedule and an extremely short construction time. In terms of logistics, the complex programme was anything but a walk in the park: at all times there were 380 to 460 people working on the construction site. ENERGY CONCEPT In the renovation of the building and the addition of storeys, as well as in the field of building technology, the latest energy concepts were taken into account and implemented for the extensions and the façade. The building is connected to Lake Zurich by underground pipes. Lake water is used as a renewable energy source to heat the building in winter and to cool it in summer. Thanks to this solution, all the roof surfaces could be made available to users.

Project data SIA volume: 81,400 m 3 Total floor space: approx. 24,000 m 2 Office space: approx. 3,500 m 3 Residential space: approx. 3,900 m 3 Exhibition area (gross): approx. 3,000 m 3 Dining areas: approx. 650 m 3 Total height: 37.4 m No. of apartments: 34 Storeys Above ground: 10 Below ground: 4 Architekturbau CRP Sàrl 1020 Renens P. Guillemin November 2016 8077 / MP Printed on FSC-certified paper from sustainable forest management Photos: Adrien Barakat