Final Plat Trails at Redwood Falls, Ph. 1 Hinckley Township Meeting: December 5, 2018 App. No.: 069-2017-PP Owner: Skyland Land Company LLC Engineer: TGC Engineering, T. Crane Parcel Nos.: 016-03A-38-012, 016-03A- 39-001, 016-03A-39-014 Site Area: 96.9011 acres Sublots: 41 Open Space: 25.5151 acres Zoning: 6R1 Single-Family Residential Utilities: Central water and sanitary sewer School Dist.: Highland Local Reviewer: Rob Henwood EXECUTIVE SUMMARY The site is located near the northeast corner of the intersection of Center (S.R. 303) and Stony Hill Roads (see location map below). The proposal includes 41 sublots located on public streets and is served by central water and sewers. Recommendation: APPROVAL WITH MODIFICATIONS Proposal: The applicant proposes the following on the 25.5151 acre site: 1 41 sublots. 25.5151 acres of Open Space (Blocks A through D). Central water and sanitary sewer. Three public streets with 60 foot right-ofways (ROW) and associated general utility and water easements: o Skyland Falls Boulevard stubs to the north. o Lanterman Circle terminates in a permanent cul-de-sac to the east. o Hayden Drive stubs to the west. Two stormwater management easements. Seven storm sewer easements. Map 1: Location Map History: The Medina County Planning Commission (MCPC) approved the Preliminary Plan in January of 2018; two variances from Subdivision Regulation Section 604(B)(9) for exceeding both the maximum length of a cul-de-sac and maximum number of units on a cul-de-sac street were also approved at the same meeting. A Concept Plan was reviewed in October of 2017. Access: Access to the site is via the proposed Skyland Falls Boulevard from Center Road. 1 For the purposes of this staff review the following Final Plat document was utilized: Trails at Redwood Falls Phase 1: Creating Sublot Nos. 1-41, Blocks A D. TGC Engineering, LLC: 7/19/2018. Project No. 1750-P1. Drawing Name: 1750 plat- p1.dwg. Six sheets: dated stamped by DPS staff 9/7/2018.
Trails at Redwood Falls, Ph. 1, Final Plat Zoning: The subject property is zoned 6R1 Single-Family Residential and the applicant is requesting that the site be developed as a Conservation Development; a permitted use in the district. The Hinckley Township Zoning Resolution (HTZ) Section ( ) 6R1.7(A) indicates that Conservation Development standards allow for maximizing the conservation of open space, and retaining the property owner s ability to develop the number of residential units that are permitted under a standard subdivision. Conservation Developments are required to meet the following requirements among others: The minimum area allowable is 100 acres. The maximum permitted density is one unit per two acres. 50 percent of the site must be designated as open space. Common areas may be owned by a Homeowner s Association (HOA) or authorized third party. Per HTZ 6R1.8, the Zoning Commission will review a General and a Final Development Plan for zoning compliance. Comprehensive Plan: The 2015 Hinckley Township Comprehensive Plan (Plan) includes a Future Land Use Map that recommends that this area to be residential and to be developed as density neutral conservation development. Agency Comments: Italicized text indicates quotations from submitting agency comments. Tax Map Department, Beth Mika, 9/17/2018. APPROVED 1. Subject to the Medina County Engineer Land Conveyance Standards available on the website. 2 2. The Tax Map Dept. has previously reviewed this Plat. There are no additional comments. Highway Engineer, Matt Martin, 9/17/2018. CONDITIONAL APPROVAL 1. Sheet 2: Check spelling of Stony Hill Road. 2. Sheet 5: Storm easements between sublots are dimensioned as 5 feet, however, the easements are a total of 20 feet wide, 10 feet on each sublot; revise accordingly. 3. Sheet 5: Show storm easement for storm sewer (CB-2A) located south of Sublot 1. 4. Sheet 6: Show storm easement for storm sewer (HW-9) located north of Sublot 11. 5. Show reservation strips at the north end of Skyland Falls and the west end of Hayden, per MCPC specifications. Sanitary Engineer, Jeremy Sinko, 9/14/2018. APPROVED. The Sanitary Engineer will approve the plat once all requested corrections have been made. The engineer has been notified of the items that need to be corrected. Health Department, Steve Mazak, 9/11/2018. The Trails at Redwood Falls subdivision Phase 1, will be serviced by sanitary sewers and public water. Therefore, our office has no further comments. 2 http://www.highwayengineer.co.medina.oh.us/surveying/landconveystds.pdf Planning Commission Page 2 of 6 December 5, 2018
Trails at Redwood Falls, Ph. 1, Final Plat Ohio Department of Transportation (ODOT), Jared Feller, 9/11/2018. ODOT has no objection to the Final Plat for the Phase 1 of the Trails at Redwood Falls subdivision, we issued an access permit for the proposed street on 9/6/2018. The developer will be responsible for constructing left and right turn lanes on SR 303 with future phases of the proposed subdivision. Highland Local Schools, Catherine Aukerman, 9/10/2018. completely in the Highland Local School District. The proposed subdivision is Hinckley Township, Thomas Wilson, Zoning Inspector, 12/19/2017 The following comply with the above referenced Hinckley Township Zoning Code: Sublots Building setback lines Lot size In my review, I found two oil wells and brought them to the attention of Travis Crane PE of TGC Engineering and Travis sent me an email telling me he was aware of the two wells and Ohio Department of Resources logs indicate the wells have been plugged. Travis will confirm in their due diligence the 25 foot required set back. (Section 4.14.B) TransCanada, Russ Johnson, 12/12/2017. APPROVED Soil and Water Conservation District, Jim Deiter, 10/11/2017. You indicated wetlands on your plan. These areas need to be well marked so it is not disturbed during or after construction. All the wetlands/detention pond areas appear to be in the open space areas. Open space areas behind building lots need to be marked so these areas do not become yard extensions for the home owner. The HOA will need to monitor these areas. Subsurface drain tile may exist on this site. Drainage tile need to be maintained and repaired if damaged during construction. The existing drain tile should not be used as on outlet for the house roof water. Streams on this site will be subject to riparian setbacks per township regulations. 25 feet would be the minimum setback. The primary soil types are Mahoning Silt Loam. This soil has a seasonal high water table and is slow to drain. When the site is cleared, erosion control practices must be in place. Homes with basements will need to plan for seasonal high water table. Footer tile will be required to maintain basement stability. Staff Comments: 1. The following required data/information must be provided on or with a corrected Preliminary Plan as required by the PC s conditional approval granted at the January 3, 2018 meeting: a. Sublots and Blocks: i. The area indicated as the existing clubhouse and parking area located at the entrance to the subdivision on the west side of Center Road is neither designated as sublot nor a block; this parcel must be so designated. Planning Commission Page 3 of 6 December 5, 2018
Trails at Redwood Falls, Ph. 1, Final Plat ii. The open space area adjacent to the existing clubhouse site is not designated by an open space block letter; this block must be assigned a letter. iii. It is not clear why the open space adjacent to the existing clubhouse site is differentiated from the other Open Space blocks; restricted versus regular open space. If the area is intended for future development it must be labelled as such. iv. Block boundaries should be consistent with phase boundaries. Large Open Space Block boundaries such as Blocks D and E should be subdivided so that they follow phase boundaries. v. Indicate uses of sites not intended for single family dwellings. b. Include a watershed boundaries inset map. c. Submit a copy of the Developers Notice of Intent to obtain an Ohio EPA stormwater management permit (NOI). d. Submit evidence that the Zoning Commission has approved the General Development Plan for the subdivision. e. Ensure the submitted corrected Preliminary Plan is consistent with the submitted Phase 1, Final Plat. 2. The following required data/information was not provided on or with the Final Plat (Regulations section references are included): a. An original mylar of the Final Plat. 404(D)(2)d. Submit the original mylar. b. The required building setback lines accurately shown with dimensions. 404(D)(2)f.8. Show building and wetland setbacks. c. Sublot and block identification. 404(D)(2)f.10. All blocks must be labelled as Future Development or Open Space. The two parcels fronting on Center Road in the southwest corner of the site with Parcel I.D. numbers 016-03A-38-012 and 016-03A-39-001 are shown as part of the subdivision and appear to be part of Block A; these parcels must be designated as blocks or sublots or be removed from the subdivision. The remainder parcel, if it is to be platted within this phase of the subdivision must be designated as a Block for Future Development; conversely if it is not to be platted, it may remain as a metes and bounds parcel remainder outside of the subdivision boundary. d. Total site data. 404(D)(2)f.13. Correct the site summary data table. e. Signature and seal of a Registered Surveyor on each sheet. 404(D)(2)f.16. Provide the surveyor s signature and seal on each sheet. f. Notarized certification by the owner or owners of the subdivision. 404(D)(2)f.17. Provide notarized signatures of the owners. g. Variances approved. 404(D)(2)f.18. Indicate approved variances. h. Certification from the Township that the Final Plat as submitted is in compliance with local zoning standards and requirements. Such Certification shall be in the form of an executed signature block on the original mylar and signed by at least two of the Township Trustees. 404(D)(2)g.1. Provide signatures of at least two of the township trustees. i. A subdivision served by a public central sanitary sewer shall be certified by the Medina County Sanitary Engineer stating all required wastewater disposal Planning Commission Page 4 of 6 December 5, 2018
Trails at Redwood Falls, Ph. 1, Final Plat facilities and central water facilities have been satisfactorily installed or adequate financial guarantees have been approved. Such Certification shall be in the form of an executed signature block on the original mylar. 404(D)(2)g.4. Provide the signature of the Sanitary Engineer. j. Certification of County Engineer that all required improvements have been satisfactorily installed or financial guarantees have been provided to cover all construction. 404(D)(2)g.5. Provide the signature of the Highway Engineer. k. Acceptance of offers of dedication by County Commissioners, when all improvements have been constructed, or financial guarantees and construction agreements have been approved. 404(D)(2)g.6. Provide the signatures of the County Commissioners. l. For new subdivisions with planned public improvements written approval by the applicable U.S. Army Corps of Engineers District Office, or other applicable agency, is required before acceptance of public improvements or dedication of public easements.. 404(D)(2)g.6. Provide written approval by the applicable U.S. Army Corps of Engineers District Office (USACE). m. Covenants and Restrictions and/or deed restrictions including establishment of Owners Association, and if applicable, assignment of responsibilities, ownership of common areas, and any other areas of responsibility or concern relative to public or private maintenance of areas or facilities shall be approved by the Medina County Prosecutors Office as to form and correctness. 404(D)(2)h. Submit evidence that the HOA documents have been approved by the Prosecutor s Office and township. n. Protective covenants, conditions and restrictions shall be recorded separately as a separate instrument, provided volume and page reference thereto is indicated on the plat. 404(D)(2)i. Provide reference to the applicable and recorded HOA documents. 3. The proposed Final Plat fulfills the purpose and intent and meets the standards and requirements of the Subdivision Regulations per 404(D)(5)b.1. and 2. 4. The proposed Final Plat IS NOT in substantial conformance with the approved Preliminary Plan per 404(D)(5)b.3. 5. The Final Plat appears to be in conformance with Hinckley Township Zoning per 404(D)(5)b.4. 6. The Medina County Sanitary Engineer has determined that all required central wastewater disposal facilities and central water facilities have been satisfactorily installed or adequate financial guarantees have been approved. 404(D)(5)b.6. 7. Upon receipt of Highway Engineer s certification of approval of the construction drawings, the Director is authorized to execute the Final Plat on behalf of the MCPC upon certification by the Highway Engineer that the construction is complete or that adequate financial guarantees have been provided per 404(D)(5)b.7. Recommendation: Staff recommends the MCPC APPROVE WITH MODIFICATIONS the Trails at Redwood Falls Phase 1 Final Plat subject to the following: 1. Submit all required data/information listed above in Staff Comment 1 on or with a corrected Preliminary Plan as required by the MCPC s conditional approval. Planning Commission Page 5 of 6 December 5, 2018
Trails at Redwood Falls, Ph. 1, Final Plat 2. The applicant shall provide three full size copies of the corrected Preliminary Plan (including a PDF copy of the layout) for transmittal to the appropriate agencies. 3. Satisfy the comments provided by the Highway Engineer. 4. Submit all required data/information and corrections listed in Staff Comment 2 on or with a corrected Final Plat. The following steps must be completed to finalize the Final Plat approval: 1. Three copies of the corrected Final Plat (including a PDF copy of the layout) must be submitted to the Department of Planning Services (DPS) for transmittal to the appropriate agencies. 2. All approval conditions must be satisfied prior to the Director signing the Final Plat. 3. Upon recordation, the applicant shall provide a copy of the recorded Final Plat to the DPS. Attachments: GIS map Final Plat R:\wp\planning\major_subdivisions\2018\Trails_at_Redwood_Falls_Ph_1_FP-fka_Skyland\trails_at_redwood_falls_ph1_final_12052018.docx Planning Commission Page 6 of 6 December 5, 2018