Pond Capacity Purchase Rates

Similar documents
APPLICATION REVIEW CHECKLISTS

ZONING & LAND USE APPLICATION

Hiawatha Drain Informational Open House

Easement Program Guidelines for Water Resources and Stream Work

Appendix A: Submittal Checklists

TOWNSHIP OF BORDENTOWN LAND DEVELOPMENT APPLICATION CHECKLIST. General Requirements for all Applications

CITY OF PETALUMA, CALIFORNIA ANNUAL DEVELOPMENT IMPACT FEE REPORT FISCAL YEAR

DAUPHIN CREEK ESTATES SUBDIVISION

Residential Major Subdivision Review Checklist

Residential Minor Subdivision Review Checklist

Initial Subdivision Applications Shall Include the Following:

City of Owasso Public Work Department STATUS REPORT January 2, 2018

Article III. Erosion and Sedimentation Control

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (PRELIMINARY PLAT)

610 LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS OUTSIDE A UGB

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW

Special Use Permit - Planned Unit Development Checklist. Property Address:

CHECKLIST FOR DEVELOPMENT REVIEW

ARTICLE V PRELIMINARY PLAN SUBMISSION

Appendix J: Stormwater Utility Ordinance Guidance

ORDINANCE CITY OF DUNDAS RICE COUNTY STATE OF MINNESOTA

MAJOR BOUNDARY LINE ADJUSTMENT PROCESS GUIDE

City Of Attleboro Conservation Commission

MINOR BOUNDARY LINE ADJUSTMENT PROCESS GUIDE

Department of Planning & Development Planning Unit

Purpose: Regulations:

STAFF REPORT Administrative Subdivision Hearing West 150 South Street, Parcel # , and

Tentative Map Application Review Procedures

The Ranches Sketch Plan

SUB ; Courthouse Manor, Preliminary Subdivision Plan

LINCOLN COUNTY PLANNING & INSPECTIONS DEPARTMENT

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST

The City Engineering Division has reviewed the subject development and has the following comments.

these areas are compatible with such conditions. [Section (6) (c) C. R. S.]

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) APPLICANT: Name:

MAGNOLIA SPRINGS SUBDIVISION, PHASE ONE

WRIGHT TOWNSHIP Ottawa County 1565 Jackson Street, P.O. Box 255, Marne, Michigan 49435

WRIGHT TOWNSHIP Ottawa County 1565 Jackson Street, P.O. Box 255, Marne, Michigan 49435

Tax Increment Financing Practice and Policy Seminar

PLYMOUTH PLANNING BOARD APPLICATION FOR A MINOR SUBDIVISION OR MAJOR SUBDIVISION

A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT

Drainage Impact Fee AB 1600 Nexus Study Update to the Thermalito Master Drainage Plan

E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals)

APPLICATION PROCESSING

Cobb County Community Development Agency Zoning Division 1150 Powder Springs St. Marietta, Georgia 30064

FINAL SUBDIVISION AND LAND DEVELOPMENT PLAN CHECKLIST. Plan Name. Applicant's Name:

WASTEWATER SERVICE CHARGES EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2003

City of Owasso Public Work Department STATUS REPORT February 6, 2018

CHAPTER 3 PRELIMINARY PLAT

CHAPTER Committee Substitute for Committee Substitute for Senate Bill No. 2188

APPLICATION PROCEDURE

STORM WATER CREDIT MANUAL CITY OF BLOOMINGTON, ILLINOIS ENGINEERING DEPARTMENT

Planned Residential Development ( PRD ) Application

Skyline Estates. A 10-Acre Residential Lot Subdivision - Queen Creek (Phoenix), Arizona DISCLOSURE INVESTMENT DOCUMENT

Drainage Study. Report Description. Prepared for: City of Minnetonka Beach. Prepared by: Phillip Elkin, P.E. Darren Amundsen, P.E.

CONSTRUCTION PLAN REQUIREMENTS

DOUGLAS COUNTY SUBDIVISION RESOLUTION Article 4 Preliminary Plan 10/13/2015

Louisville and Jefferson County Metropolitan Sewer District WASTEWATER SERVICE CHARGES EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2013

CONDOMINIUM REGULATIONS

SPANISH FORT PLANNING COMMISSION PRELIMINARY SUBDIVISION PLAT APPLICATION. Number of Lots (Units) Address. Address.

City of Duluth Development Regulations

AGENDA STATEMENT NO BUSINESS OF THE PLANNING COMMISSION City of Victoria, Minnesota STAFF REPORT. Casco Ventures (Developer)

CITY OF OCOEE LAND DEVELOPMENT CODE SUFFICIENCY TABLE WITH NOTES

ARTICLE 6 PRELIMINARY PLAT

Lilly Creek Improvement Project

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

DESCRIPTION OF THE DISTRICT

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

TOWNSHIP OF DOYLESTOWN APPLICATION FOR REVIEW OF SUBDIVISION OR LAND DEVELOPMENT PROPOSAL. Please PRINT; all information MUST be filled out completely

APPLICATION FOR PRELIMINARY PLAT CERRO GORDO COUNTY, IOWA

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT

JOINT PLANNING BOARD APPLICATION FORM

Date: February Chair and Members Planning & Development Committee. To:

ARTICLE 4 MAJOR SUBDIVISION/LAND DEVELOPMENT PLAN REQUIREMENTS

Chapter 22 PLANNED UNIT DEVELOPMENT.

I. Requirements for All Applications. C D W

REGULAR FINAL PLAT SUBDIVISION APPLICATION

City of Owasso Public Work Department STATUS REPORT November 7, 2017

PRELIMINARY PLAT CHECK LIST

Waseca County Planning and Zoning Office

WASTEWATER SERVICE CHARGES EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2005

Chapter 100 Planned Unit Development in Corvallis Urban Fringe

APPLICATION FOR PERMIT: (Pursuant to Ord & Reso ) 4d Habitat Loss Permit Vegetation Removal Tree Removal. Address:

Final Plats for Major Residential and Commercial Subdivisions Checklist

Town of Middleborough Conservation Commission 2014 Policy

Section SKETCH PLAN REVIEW

Department of Planning & Development Planning Unit

SURFACE WATER ULTILITY FEE CITY OF WASECA

ARTICLE 9 SPECIFICATIONS FOR DOCUMENTS TO BE SUBMITTED

Town of Lincolnville Subdivision Ordinance

CITY OF GROVER BEACH COMMUNITY DEVELOPMENT DEPARTMENT Tentative Map Checklist

Comprehensive Plan 2030

DEPARTMENT OF PLANNING SERVICES 1555 N 17 th Ave Greeley CO Phone (970) Fax (970)

SADC Guidance Document Farmland Preservation: Frequently Asked Questions

SCHEDULE OF RATES, RENTALS & CHARGES

Concho Wastewater Improvement District ( District ) Customer Rules and Regulations

FINAL PLAT SUBMITTAL CHECKLIST

ARTICLE 13 CONDOMINIUM REGULATIONS

SECTION 4: PRELIMINARY PLAT

Condominium Unit Requirements.

Transcription:

Capacity Purchase Rates For UTLTY OWNED REGONAL DETENTON POND FACLTES Prepared For The GARNERS CREE STORM WATER UTLTY CALUMET & OUTAGAME COUNTES, WSCONSN November 14, 2014 PT 1445 MCMAHON DRVE P.O. BOX 1025 - NEENAH, W 54957-1025 PH. 920.751.4200 FX. 920.751.4284 WWW.MCMGRP.COM

Capacity Purchase Rates For UTLTY OWNED REGONAL DETENTON POND FACLTES Prepared For The GARNERS CREE STORM WATER UTLTY CALUMET & OUTAGAME COUNTES, WSCONSN Prepared By McMAHON NEENAH, WSCONSN November 14, 2014 McM. No. G0035-930426.06 TABLE OF CONTENTS A. POND CAPACTY PURCHASE POLCY B. TOTAL PROJECT COSTS C. POND WATERSHED AREA MAP C. POND CAPACTY PURCHASE RATES

POND CAPACTY PURCHASE POLCY

Garners Creek Storm Water Utility Capacity Purchase Policy Background The Garners Creek Storm Water Utility was created to provide a physical system of drainage that protects the landowners by the efficient and effective transportation of water in accordance with and in compliance with local, state and federal regulations. n order to achieve this goal, the Utility constructs regional detention ponds to control the peak flows allowed through the Garners Creek watershed. These ponds also improve water quality along Garners Creek by reducing total suspended solids (TSS) and total phosphorus (TP) pollutants. Since larger, regional detention ponds are generally more costeffective than smaller, site specific ponds, the Utility has decided to offer properties that develop or redevelop the opportunity to purchase capacity from Utility owned and operated regional ponds. Future development or re-development sites within a Utility owned regional pond watershed would have the opportunity to purchase capacity from the Utility, rather than construct and maintain their own facility. Determination of Watershed Area Each regional detention pond receives runoff from a defined watershed area. The watershed area is determined by reviewing USGS or County topographic maps, storm sewer maps, construction plans of individual subdivisions or developments and other available drainage maps. This information is combined and analyzed to determine the watershed area contributing runoff to the detention pond. The watershed area will be shown on a map on file in the Utility office and website. Determination of Project Cost Each detention pond constructed by the Utility is advertised for public bidding in accordance with State of Wisconsin municipal bidding procedures. The total project cost includes, but is not limited to, property or easement acquisition costs, engineering fees, construction cost, permit fees, legal fees, posting and publication expenses, and administrative charges. Any state or federal grant funding received by the Utility is considered and accounted for when determining the total project cost. Determination of Capacity Purchase Rate The detention pond capacity purchase rate will be determined individually for each facility. The rate will be established by dividing the total project cost by the watershed area on an acreage basis. The watershed area will include any existing or future public roadways within the area. At the completion of each regional detention pond project, a capacity purchase rate will be determined and submitted to the Commission for review and approval. Purchase of Regional Retention Capacity Any property owner wishing to purchase capacity in a regional detention pond will make written request to the Commission. The Commission will review the request to determine if capacity is available for purchase and the corresponding fee for the capacity purchase. The Commission will notify the applicant of its decision. The capacity purchase will be considered executed upon the Utility receiving the appropriate fee from the applicant.

TOTAL PROJECT COSTS

UNPS&SW Planning Grant (USP-LF03-44901-13) Dedicated Revenue Sources McM No. G0035-930426.06 November, 2014 TOTAL PROJECT COSTS Vans Road Heartland Land Acquisition $318,523.78 Land Acquisition $547,266.00 Engineering $82,106.17 Engineering n Land Acq. Cost* Construction $634,299.28 Construction $457,912.00 Total $1,034,929.23 Total $1,005,178.00 *Design/Build with developer State Park Court Main Street Land Acquisition $533,978.00 Appraisal/Land Acquisition $282,000.00 Engineering $89,825.86 Engineering $88,592.14 Construction $757,412.80 Construction $498,436.07 Subtotal $1,381,216.66 *Other Misc $5,626.00 Excess Property Sale -$335,500.00 Subtotal $874,654.21 Total $1,045,716.66 WDNR Construction Grant -$150,475.00 ARRA Grant -$241,614.00 Total $482,565.21 *Soil borings, utility relocates, legal, etc Springfield Regal Appraisal/Land Acquisition $472,021.75 Easement Acquisition $2,000.00 Engineering $153,552.75 Engineering $22,652.25 Construction $715,554.05 Construction $74,465.18 *Other Misc $25,048.00 *Other Misc $5,625.00 Wetland Mitigation $26,593.00 Subtotal $104,742.43 Subtotal $1,392,769.55 WDNR Construction Grant -$29,647.00 ARRA Grant -$457,417.50 ARRA Grant -$40,639.00 Total $935,352.05 Total $34,456.43 *Soil borings, utility relocates, legal, etc *Soil borings, utility relocates, legal, etc Emerald Noe Road Appraisal/Land Acquisition $169,200.00 Appraisal/Land Acquisition $267,750.00 Easement Acquisition $4,000.00 Soil Borings $2,984.00 Soil Borings $1,897.00 2014 Ag Rental $15,200.00 Ag Rental $5,337.00 2015 Ag Rental $3,700.00 Engineering $77,411.82 Engineering $168,000.00 Construction $678,074.59 Construction $1,507,275.96 Subtotal $935,920.41 Wetland Mitigation $10,200.00 WDNR Construction Grant -$150,820.00 Subtotal $1,975,109.96 Total $785,100.41 V. Harrison Reimbursement* -$223,806.77 Total $1,751,303.19 *For Midway Road storm sewer interceptor W:\PROJECTS\G0035\930426\06-Dedicated Revenue\ Capacity Purchase Rates Page 1

POND WATERSHED AREA MAP

Ù A City of Appleton Jo h n St re e t  Outagamie County Heartland (84 Acre Regal (19 Acre m an Pl City of aukauna Location Other Mapped Features Study Area Boundary Municipal Boundary Block Road Emerald (83 Acre Right-of-Way Line Town of Buchanan Calumet Street Railroad Centerline Rivers and Streams  Vans Road (437 Acre ad Ì? Noe East (28 Acre Surface Water Source: Calumet County, 2013; Outagamie County, 2009-13. State Park Court (1,031 Acre Ù A Structural BMPs Existing Utility Owned Regional Watershed Existing Utility Owned Regional Watershed (No Capacity Purchase Rate) Garners Creek Watershed Boundary Noe West (25 Acre o kr j Main Street (121 Acre Buchanan Cottages (13 Acre Disclaimer: The property lines, right-of-way lines, and other property information on this drawing were developed or obtained as part of the County Geographic nformation System or through the County property tax mapping function. McMAHON does not guarantee this information to be correct, current, or complete. The property and right-of-way information are only intended for use as a general reference and are not intended or suitable for site-specific uses. Any use to the contrary of the above stated uses is the responsibility of the user and such use is at the user s own risk. L AP L LP Town of Harrison City of Menasha c A Noe Road (342 Acre m Manitowoc Road State Park Road Midway Road Lake Park Road kpk Wallace Street CE Calumet County w:\projects\g0035\930426\06-dedicated Revenue\GS\Figure1_B.mxd January 29, 2015 Ì? L Springfield (682 Acre City of Appleton y Village of Combined Locks Village of imberly ankapot Creek Fox River Ga r Cr ners ee k ñ? Village of Little Chute Town of Grand Chute 0 Village of Harrison i 2,500 5,000 Feet FGURE 1 POND WATERSHEDS POND CAPACTY PURCHASE RATES GARNERS CREE STORM WATER UTLTY OUTAGAME AND CALUMET COUNTES, WSCONSN

POND CAPACTY PURCHASE RATES

UNPS&SW Planning Grant (USP-LF03-44901-13) Dedicated Revenue Sources McM No. G0035-930426.06 November, 2014 GARNERS CREE STORM WATER UTLTY POND CAPCTY PURCHASE RATES 2 Watershed 1 Total Project Area Purchase Rate Regional Cost ($) (Acres) (Per Acre) Van's Road $1,034,929 437 $2,368.26 State Park Court $1,045,717 1,031 $1,014.27 Heartland $1,005,178 84 $11,966.40 Springfield $935,352 682 $1,371.48 Main Street $482,565 121 $3,988.14 Regal $34,456 19 $1,813.50 Emerald $785,100 83 $9,459.04 Noe Road 3 $1,751,303 342 $5,120.77 1 Based on land acquisition, engineering, construction & other project related costs. ncludes any grant funding, if received. 2 Based on 2014 drainage areas and watershed delineations 3 Preliminary total project cost. Construction & Engineering to be finalized in 2015. W:\PROJECTS\G0035\930426\06-Dedicated Revenue\ Capacity Purchase Rates Page 1