ORDINANCE NO

Similar documents
Ordinance No. An Amendment to the City Code of Ordinances

CITY OF GLASGOW ORDINANCE NO. 2809

Appendix J: Stormwater Utility Ordinance Guidance

ORDINANCE NO WHEREAS, the County Council desires to amend the current Code of

CHAPTER 5 RULES, RATES AND CHARGES FOR THE STORMWATER UTILITY SERVICE 1

Change 6, September 1, TITLE 18 WATER AND SEWERS 1

ORDINANCE NO HOLDING TANK ORDINANCE

MODEL STORMWATER UTILITY ORDINANCE

SATELLITE BEACH OFFICIAL CODE OF ORDINANCES PART II. CITY CODE CHAPTER 52. STORMWATER UTILITY

WEBSTER TOWNSHIP LAND DIVISION ORDINANCE. Summary Table of Amendments

STORMWATER BEST MANAGEMENT PRACTICES OPERATIONS AND MAINTENANCE AGREEMENT

SIMPLIFIED APPROACH PERMIT PROCEDURES

STORMWATER MANAGEMENT SYSTEM AND FACILITIES

TOWN OF DYER, LAKE COUNTY, INDIANA ORDINANCE NO.:

ORDINANCE NO

ARTICLE I. IN GENERAL

STORMWATER BEST MANAGEMENT PRACTICES OPERATION, MAINTENANCE, AND INSPECTION PLAN AND AGREEMENT

ORDINANACE NO

Eaton County Stormwater Management Maintenance Covenant for Private Storm Drain Systems

WASTEWATER SERVICE CHARGES EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2003

ORDINANCE CITY OF DUNDAS RICE COUNTY STATE OF MINNESOTA

201 General Provisions

TOWNSHIP OF EDENVILLE COUNTY OF MIDLAND STATE OF MICHIGAN ORDINANCE NO. 178 LAND DIVISION ORDINANCE TOWNSHIP OF EDENVILLE

CITY OF TAMPA Stormwater Utility Funding Frequently Asked Questions 2017

R E C I T A L S. 1. Incorporation of Recitals. The foregoing recitals are incorporated herein as if rewritten.

NC General Statutes - Chapter 153A Article 15 1

WASTEWATER SERVICE CHARGES EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2005

ORDINANCE NO WHEREAS, in Chapter 166 Municipalities, Florida Statutes, the Florida State

Village of Sussex Chapter 14 Page 1 of 67 11/22/2016 Ord. 827

BOROUGH OF CONSHOHOCKEN MONTGOMERY COUNTY, PENNSYLVANIA. ORDINANCE NO 2 of 2013

ORDINANCE # AN ORDINANCE of the City of Asotin relating to Storm Sewer and Surface Water Management Public Utility

ACQUISITION AGREEMENT

ORDINANCE NO. LIMERICK TOWNSHIP MONTGOMERY COUNTY, PENNSYLVANIA

BY BOARD OF COUNTY COMMISSIONERS AN ACT TO BE ENTITLED

PONDS. A. Definitions.

PROPERTY; PROVIDING FOR EXPENDITURE OF REVENUE; PROVIDING FOR REIMBURSEMENT

Maintenance Agreement

Buffer and Soil Loss Statutes, as amended in 2017 by Laws of Minnesota 2017, Chapter 93 (S.F. 844)

PRELIMINARY SCHEDULE OF RATES, RENTALS & CHARGES

Preliminary Analysis

PINELLAS COUNTY, FLORIDA FINAL SURFACE WATER RATE RESOLUTION

Milton Township Antrim County, Michigan Ordinance of SEPTIC INSPECTION AND PROPERTY TRANSFER ORDINANCE

GRANT OF CONSERVATION RESTRICTION (Wetland Mitigation/Riparian Zone Mitigation) WITNESSETH:

SCHEDULE OF RATES, RENTALS & CHARGES

Dedicated program for municipal drainage management

BILL NO. B ORDINANCE NO TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

BY BOARD OF COUNTY COMMISSIONERS

STATE OF NEW JERSEY. SENATE, No th LEGISLATURE. Sponsored by: Senator JEFF VAN DREW District 1 (Atlantic, Cape May and Cumberland)

Charter Township of Bedford 115 S. ULDRIKS DRIVE BATTLE CREEK, MICHIGAN 49037

Louisville and Jefferson County Metropolitan Sewer District WASTEWATER SERVICE CHARGES EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2013

ORDINANCE NO. 14,934

City Of Attleboro Conservation Commission

Fresno Metropolitan Flood Control District Ordinance Code: Ordinance CHAPTER 4 DRAINAGE FEES

CALN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA ORDINANCE NO

CODE OF REGULATIONS OF THE NORTHEAST OHIO REGIONAL SEWER DISTRICT TITLE V STORMWATER MANAGEMENT CODE

OUTLINE OF THE CC&RS. The signers are the Declarants of Green Valley Subdivision and Hidden Grove Subdivision and wish to amend the existing CC&Rs.

***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS

STORMWATER MANAGEMENT AGREEMENT AND DECLARATION OF EASEMENT

Chapter 136. SOIL EROSION

The Honorable Chairman and Members of the Board of County Commissioners

Drainage and Surface Water Management City of St. Petersburg City Code Chapter 16, Land Development Regulations

To: Common Council From: Ari Lavine, City Attorney Subject: Adjustments to Stormwater User Fees Date: October 3, 2018

ASSEMBLY, No STATE OF NEW JERSEY. 218th LEGISLATURE INTRODUCED FEBRUARY 1, 2018

SERVICE AND ASSESSMENT PLAN CITY OF HASLET PUBLIC IMPROVEMENT DISTRICT NO. 2 SERVICE AND ASSESSMENT PLAN August 3, \ v

ORDINANCE NO AN ORDINANCE AMENDING THE CODE OF ORDINANCES OF THE CITY OF PORT ARANSAS, TEXAS, BY ADOPTING A NEW CHAPTER

ORDINANCE AN ORDINANCE TO AMEND SPRING HILL MUNICIPAL CODE, CHAPTER 5, IMPACT FEE-PURPOSES AND ADMINISTRATION

WATER SOFTENING APPLIANCE REGULATION ORDINANCE. (Ord. No ) Brine discharging water softening appliance use regulation ordinance.

ORDINANCE NO Page 1 of7. Ordinance 2866 April 13, 2010 April 27, 2010

SACRAMENTO COUNTY WATER AGENCY ORDINANCE NO. WA0-0089

ORDINANCE NO. 782 AN ORDINANCE REGULATING THE USE AND OCCUPANCY OF THE RIGHT-OF-WAY OF THE CITY OF WASHINGTON, KANSAS.

A PUBLIC RIGHT-OF-WAY MANAGEMENT ORDINANCE BY THE CITY OF SOUTHLAKE, TEXAS; REGULATING THE PHYSICAL USE, OCCUPANCY AND MAINTENANCE

CONSTRUCTION SITE EROSION CONTROL & STORMWATER MANAGEMENT JULY 3, 2014

LOWER OXFORD TOWNSHIP ORDINANCE NO AN ORDINANCE ESTABLISHING REGULATIONS FOR HOLDING/RETAINING TANKS

RANCHO PALOS VERDES CITY COUNCIL MEETING DATE: 04/05/2016 AGENDA HEADING: Regular Business

DEED OF EASEMENT & MAINTENANCE AGREEMENT FOR STORMWATER MANAGEMENT FACILITIES THIS DEED OF EASEMENT AND MAINTENANCE AGREEMENT FOR

RECITALS. Page 1 of 9

1 SB By Senators Hightower, Glover and Albritton. 4 RFD: County and Municipal Government. 5 First Read: 12-MAR-15.

CHAPTER 18 SEWERS AND SEWAGE DISPOSAL

of operation designated by resolution of the Board of County Commissioners as provided

ORDINANCE NO Amending the Stormwater Management Program Rate Structure in Chapter of the Kitsap County Code

ARTICLE 1 GENERAL PROVISIONS

ORDINANCE WHEREAS, this title is intended to implement and be consistent with the county comprehensive plan; and

Appendix 'A' Bill No. By-law No

Village Hall At The Regatta P.O. Box 369 OFFICE OF. Village of Mamaroneck Private Sewer Lateral Law

Water System Master Operating Agreement. for the. Marion, Howell, Oceola and Genoa. Sewer and Water Authority

RULES AND REGULATIONS FOR ADMINISTRATION OF AREA DRAINAGE PLANS

FINAL PLAT SUBMITTAL CHECKLIST

MASTER DECLARATION OF COVENANTS, CONDITIONS, RESTRICTIONS, EASEMENTS, CHARGES AND LIENS FOR STONEBRIDGE PREAMBLE... 1

RATE AND METHOD OF APPORTIONMENT FOR CASITAS MUNICIPAL WATER DISTRICT COMMUNITY FACILITIES DISTRICT NO (OJAI)

SKOKOMISH PUBLIC SEWER CONNECTION ORDINANCE TABLE OF CONTENTS

ORDINANCE NO. 626 (As Codified in Chapter 224)

THE CORPORATION OF THE CITY OF ROSSLAND BYLAW #2503

Exhibit C OFFER TO PURCHASE PROPERTY

CALDWELL COUNTY. Phase II Stormwater Ordinance

Sample. Rider Clauses to Contract of Sale Seller

4. Itemized cost data for cost of construction certified by a Professional Engineer.

ORDINANCE 93-7 "EDUCATIONAL FACILITIES IMPACT FEE ORDINANCE"

OFFICIAL TOWNSHIP OF MOON ORDINANCE NO.

AVENIR COMMUNITY DEVELOPMENT DISTRICT

To achieve the conservation purposes, the following conditions and restrictions are set forth:

Transcription:

26.Sept.2013 ORDINANCE NO. 2013-15 AN ORDINANCE OF THE TOWNSHIP RADNOR, DELAWARE COUNTY, PENNSYLVANIA, ESTABLISHING A USER FEE FOR STORMWATER COLLECTION AND MANAGEMENT WHEREAS, Radnor Township ("Radnor") has constructed and maintains a system of sewers, drains, basins, inlets, outfalls and other infrastructure to collect and manage Stormwater; and WHEREAS, the existing Stormwater Management System requires maintenance, repair, enhancements and replacement to meet existing and future needs, including flooding concerns and water quality protection; and WHEREAS, Radnor finds that excess Stormwater runoff peak rate, volume and poor water quality in a watershed can threaten public health, safety and welfare; and WHEREAS, the requirements of the United States Environmental Protection Agency demand a comprehensive approach to municipal Stormwater management and Radnor wishes to take a proactive approach to these requirements; and WHEREAS, the Pennsylvania Stormwater Best Management Practices Manual serves to provide guidance, options and tools to municipalities and strongly encourages stormwater management practices that both prevent and mitigate runoff; and WHEREAS, a professional engineering and financial analysis of the Stormwater management needs for Radnor has been performed concluding that substantial Stormwater management needs exist; and WHEREAS, under the Radnor Township Home Rule Charter and the Pennsylvania Stormwater Act, Radnor is authorized to enact ordinances to protect the health, safety and welfare of its residents. NOW, THEREFORE, be it ENACTED and ORDAINED by the Radnor Township Board of Commissioners, as follows: Section 1. Title. This Ordinance shall be known and may be cited as the "Radnor Township Stormwater Management Fee Ordinance." Section 2. Statement of findings. Radnor Township makes the following findings:

A. The Stormwater management needs of Radnor have been identified through citizen notifications, field investigations and in studies conducted by AMEC Environment and Infrastructure, Inc., Chagrin Valley Engineering and many other engineering studies and findings, indicating more comprehensive and effective Stormwater management in Radnor would contribute to the protection of the health, safety and welfare of the residents, and that Stormwater facilities, infrastructure and activities associated with Stormwater management provide services and benefits to all properties, property owners, residents and citizens of Radnor. B. Inadequate management of accelerated Stormwater runoff throughout a watershed (i) can increase flood flows and velocities, (ii) contribute to erosion and sedimentation, (iii) overtax the carrying capacity of existing streams and storm sewers, (iv) greatly increase the cost of public facilities to convey and manage Stormwater, (v) undermine floodplain management and flood reduction efforts in upstream and downstream communities, (vi) reduce groundwater recharge, (vii) impact other related water resource needs and (viii) threaten public health and safety. C. Inadequate planning and management of Stormwater runoff throughout a watershed can harm surface water resources by changing the natural hydrologic patterns, accelerating stream flows (which increase scour and erosion of stream beds and stream banks, thereby elevating sedimentation), destroying aquatic habitat, and elevating aquatic pollutant concentrations and loadings such as sediments, nutrients, heavy metals and pathogens. Groundwater resources can also be impacted through loss of recharge. Stormwater is an important water resource which supports groundwater recharge for water supplies and baseflow of streams. D. A comprehensive program of public Stormwater management services which seeks to avoid and minimize flooding, erosion, and water quality degradation is fundamental to the public health, safety, welfare of the residents of Radnor, local property and the environment. E. In order to (i) establish, operate, enhance and maintain the Stormwater infrastructure of Radnor, (ii) insure the continued effective operation of the system through installation and management of best practices, and (iii) to provide other services such as appropriate inspections, asset management, and regulatory oversight associated with Stormwater and watershed management, sufficient and stable funding is required to fund these public services. F. Federal regulations, including those found at 40 CFR Part 122, and Pennsylvania state regulations require Radnor to implement a program of Stormwater controls that regulates the discharge from the Township's regulated Stormwater outfalls to local water bodies. In accordance with those regulations Radnor is required to obtain a permit that allows Stormwater discharges from its municipal separate storm sewer system ("MS4") under the National Pollutant Discharge Elimination System regulations. 2

G. Radnor intends to establish fair and equitable User Fees to assure that each developed property within Radnor will pay its proportionate share of the costs of operation, maintenance, repair, administration, replacement and improvement of all Stormwater services provided or paid for by Radnor based on an impervious surface rate methodology. H. A proposed program for imposing User Fees has received input and comment by the public through the Radnor Township Stormwater Stakeholder Advisory Committee. I. A User Fee schedule based on land area and impervious surface area documented by aerial imagery from the Delaware Valley Regional Planning Commission has been determined to be an appropriate method to raise revenue that will be dedicated to supporting a more effective Stormwater management program, in accordance with the following determinations: (1) A minimum fee per residential unit is reasonable. (2) Subject to such minimum level, basing the fee upon lot area square footage tiers, as described in Section 4 below, was derived from a statistical sampling of impervious surfaces on single family residential properties ("SFR") in Radnor. (3) Under the tiered approach, SFR parcels would be covered by the square footage tiers. (4) All other properties would be classified as "Other Developed Properties". (5) The operation, maintenance, repair, replacement and improvement of the Radnor Stormwater Management System has been and will be of substantial and direct benefit to Users. Section 3. Definitions. A. Words and terms used in this Ordinance, and not given specific definition, shall be defined as set forth in the applicable statutes of the Commonwealth of Pennsylvania or ordinance of Radnor, if any, and shall otherwise be given their ordinary and common meaning. B. For purposes of this Ordinance, the following words and terms shall be defined, as set forth below: BEST MANAGEMENT PRACTICES- methods, procedures and analyses specified in the Pennsylvania Stormwater Best Management Practices Manual to reduce flooding potential and control the volume, flow rate and water quality of Stormwater. IMPERVIOUS SURFACE- a surface that prevents or impedes the infiltration of water into the ground. Impervious surfaces include, but are not limited to, streets, sidewalks, pavements, driveway areas and roofs. Any surface areas designed to be gravel or crushed stone shall be regarded as impervious surfaces. 3

OTHER DEVELOPED PROPERTIES (ODP) - all developed properties other than single family residential properties, including multi-family properties such as apartment or condominium complexes and common areas associated with such uses, and commercial, institutional, governmental and industrial parcels. OWNER - any person, firm, corporation, individual, partnership, company, association, organization, society or group owning real property in Radnor. PROPERTY - each lot, parcel, building or portion thereof, separately established by folio number on the tax rolls of Radnor Township or Delaware County. RADNOR - Radnor Township, Delaware County, Pennsylvania, a home rule municipality. REPLACEMENT - the associated costs of obtaining and installing equipment, accessories or appurtenances which are necessary during the service life of the Radnor Stormwater Management System so as to maintain the capacity and performance for which said system was designed and constructed, and shall include costs associated with improvements, including addition of Best Management Practices to the Stormwater Management System. SINGLE FAMILY RESIDENTIAL (SFR) - single family detached homes, attached homes, townhouses, duplexes and row homes. STORMWATER - includes runoff water from all precipitation events, snowmelts and springs. STORMWATER MANAGEMENT COSTS - the associated public costs of equipment and facilities, energy, manpower, materials, property acquisition, transportation and services required to (i) avoid reduce, manage, treat, collect, convey, detain, infiltrate, pump and transport Stormwater; (ii) provide flood protection; (iii) keep equipment and facilities including best management practices functioning satisfactorily and economically; (iv) administer the Stormwater management program, including regulatory compliance, and (v) to improve Radnor's Stormwater Management System. STORMWATER MANAGEMENT SYSTEM - the system of runoff avoidance, infiltration, collection and conveyance, including storm sewers, pipes, conduits, mains, inlets, culverts' catch basins, gutters, ditches, channels, detention ponds, streets, curbs, drains and all devices^ appliances and Stormwater Best Management Practices and facilities appurtenant thereto used for collecting, conducting, pumping, conveying, detaining, infiltrating, reducing, managing, avoiding the generation of, and treating Stormwater. USER - any person, firm, corporation, individual, partnership, company, association, society or group using, benefiting from or being served by the Radnor Stormwater Management System. USER FEES - sums assessed, imposed and to be collected from each developed property by Delaware County folio number which uses, benefits from, or is serviced by the Radnor 4

Stormwater Management System, or discharges Stormwater, directly or indirectly, into the Radnor Stormwater Management System for the use of such system and the service rendered by, and improvement of, such system. Section 4. Imposition of user fees. It is hereby imposed upon each and every developed property that is connected with, uses, or is benefited by Radnor's Stormwater Management System, either directly or indirectly, a User Fee for the use, benefit, operation, maintenance, repair, replacement and improvement of the Radnor Township Stormwater Management System. Such User Fees are to be imposed on an annual basis. A. Each single family residential parcel shall be charged based upon lot square footage at an annual rate of $29.00 per billing unit in accordance with the following tiers: Billing Acreage Lot Square Footage Units 0 to 7,000 1 0 to 0.16 7001 to 20,000 2 0.16 to 0.46 20,001 to 43,560 3 0.46 to one acre Greater than 43,560 4 Greater than one acre B. All Other Developed Properties shall be billed at the annual rate of $29.00 per billing unit, with one billing unit equaling 1,500 square feet of impervious area. C. Notwithstanding the foregoing, the following property shall be exempt from user fees under this Ordinance: (1) Public Street, as defined in the Radnor Subdivision and Land Development Ordinance. Section 5. Uniform application of user fees. User Fees shall be assessed, liened and collected by folio number as to all property, owners, lots parcels, building units and users, unless exempted. Section 6. "User" and "Owner" distinguished. Reference in this Ordinance to "use", "user", or portion of a property, lot, parcel or building with respect to the calculation and assessment of User Fees shall not be construed to modify or alter the fact that user fees shall be assessed and imposed upon the property pursuant to 53 P.S. 7106 et. seq., as amended, and the owner of each property against which User Fees are imposed and assessed under this Ordinance shall remain liable for payment whether or not such owner occupies the property. Nothing in this Ordinance shall be construed to prohibit or limit an owner's ability to collect by lease or contract sums due by a tenant or other occupier of the owner's property, but such lease or contract shall not bind Radnor or limit in any way Radnor's authority to impose, assess, lien and collect User Fees. 5

Section 7. Billing and collection of user fees. A. The user fees fixed and established by this Ordinance shall be effective as to all properties that use, are served, or are benefited by the Radnor Stormwater Management System existing as ofthe effective date of this Ordinance, and shall be effective to all other properties thereof that use, are served or benefitted by the Stormwater Management System subsequent to the effective date of this Ordinance. User fees imposed by this Ordinance shall be assessed and billed by Radnor on an annual basis. Such assessments shall be payable at their face amount during the 30 days next following the date on which said assessment bill was mailed. The annual billing date shall be on or about January 1. The user fees assessed and collection will not be subject to proration or refund by Radnor in the event a property is sold; provided, however, that this sentence shall not bind a buyer and seller from making their own proration of any user fees assessed hereunder. B. The Board of Commissioners will review and update the user fees fixed and established by this Ordinance by resolution every five years or sooner as deemed necessary. Section 8. Late payment penalty; interest paid on unpaid user fees. The face amount of all user fee charges shall be payable within 30 days of annual bill distribution, with a penalty of 10% assessed on the 31 st day. On the first day of each subsequent month in which the account remains unpaid, an interest charge of.5% per month shall be added to the account. All unpaid user charges shall be a lien against the property and the Township Solicitor shall file such lien on or before December 31 st ofthe year in which the account remains unpaid.. Any collection, legal and filing fees, as set forth in Chapter 162 ofthe Radnor Code of Ordinances shall be borne by the user. Section 9. Stormwater management user fees constitute a lien on property. In accordance with the Municipal Claims Act, 53 P.S. 7101, et. seq., as amended, all user fees, penalties, interest, collection fees, lien filing and satisfaction fees and other charges imposed for failure to pay promptly shall constitute a lien upon and against the subject property and its owner from the date of their imposition and assessment. Section 10. Credits. A. Within six months of the effective date of this ordinance, Radnor shall develop and implement procedures by action of the Board of Commissioners whereby users of the Stormwater Management System may receive credit for onsite activities which reduce and manage Stormwater runoff through detention, retention, infiltration of water and recharge of the aquifer and thereby avoid or minimize public construction, operation, repair and maintenance of facilities and services. 6

B. No credit in user fees shall be granted based on age, race, tax status, gender, sexual preference, economic status or religion of the property owner, or any other conditions unrelated to the demand for and cost of services provided by Radnor. Section 11. Appeal procedures. A. Any owner who believes the provisions of this Ordinance have been applied in error may appeal in the following manner and sequence: (1) An appeal of user fees must be filed in writing with the Public Works Director, or his/her designee, within 30 days of the charge being mailed or delivered to the property owner ("Appeal Date"). The Appeal Date may be extended up to an additional 30 days within the sole discretion of the Township. Any appeal must state the reasons for the appeal. (2) Using information provided by the appellant, the Public Works Director, or his/her designee, shall conduct a technical review of the conditions on the property and respond to the appeal in writing within 30 days of the Appeal Date. In response to an appeal, the Public Works Director may adjust the user fees applicable to the property in accordance with the provisions of this Ordinance. (3) A decision of the Public Works Director that is adverse to an appellant may be further appealed to the Township Manager, or his/her designee, within 30 days of the adverse decision. The appellant, stating the grounds for further appeal, shall deliver notice of the appeal to the Radnor Manager, or his/her designee. The Township Manager, or his/her designee, shall issue a written decision on the appeal within 30 days. All decisions by the Township Manager, or his/her designee, shall be personally delivered to the owner or sent to the billing address ofthe customer by registered or certified mail. (4) If payment is not made within 30 days of receipt of an adverse decision by the Township Manager, appellant's property shall be liened for all past-due amounts in accordance with the Municipal Claims Act, 53 P.S. 7101, et seq., as amended. Section 12. Policies and procedures authorized. A. The Board of Commissioners may by resolution adopt such policies and procedures as it deems appropriate to ensure collection of User Fees assessed and imposed pursuant to this Ordinance. Without limitation, collection procedures may include referral of delinquent accounts to a collection agency, filing of liens, scire facias sur municipal lien proceedings to collect filed liens, and all other measures or combination thereof which the Board may deem appropriate. B. All costs of such collection procedures, including, but not limited to, fees for filing, perpetuation and satisfaction of liens, collection fees, attorneys' fees, court costs, litigation expenses, and charges for service of documents shall, upon being incurred by Radnor, be imposed as a charge for nonpayment and added to the balance due on said owner's account. Chapter 162 of the Radnor Code of Ordinances contains a listing of such charges. 7

C. No lien shall be satisfied nor shall any collection proceeding be discontinued until all amounts due on an account, including user fees, interest, collection fees, attorneys' fees, court costs and other charges are first paid in full to Radnor. D. The Township manager may implement such administrative procedures necessary to implement the policies and requirements set forth in this ordinance. Section 13. Stormwater Management Fund. All User Fees and other Stormwater related funds, such as interest or grant monies, shall be deposited in the Stormwater Management Fund ofthe Township. This fund will be a separate enterprise fund dedicated to the operation, administration, maintenance, repair and improvement ofthe Stormwater Management System, and all related capital costs. Prioritization and selection of capital projects shall be established by separate resolution ofthe Board of Commissioners and the Board shall establish a citizen advisory committee to assist in implementation ofthe program and education of township residents. Section 14. Floods and liability. Floods from Stormwater may occur occasionally that exceed the capacity of the Stormwater system maintained and financed with User Fees. Nothing in this Ordinance shall be deemed to imply that properties subject to charges shall always be free from flooding or flood damage, or that all flood control projects to control Stormwater can provide complete protection from all flood and storm events. Nothing whatsoever in this Ordinance shall deem Radnor liable for any damages incurred from Stormwater or from adverse water quality. Nothing in this Ordinance purports to reduce the need or necessity for flood insurance and Radnor expressly reserves the right to assert all available immunities and defenses in any action seeking to impose monetary damages upon Radnor, its officers, employees and agents arising out of any alleged failure or breach of duty with respect to Radnor's Stormwater Management System. Section 15. Repealer. All ordinances or parts of ordinances which are inconsistent herewith are hereby repealed. Section 16. Severability. If any section, paragraph, subsection, clause or provision of this Ordinance shall be declared invalid or unconstitutional by a court of competent jurisdiction, such decision shall not affect the validity of this Ordinance as a whole or any part thereof other than that portion specifically declared invalid. 8

Section 17. Effective Date. This Ordinance shall become effective in accordance with the Home Rule Charter of Radnor Township. ENACTED and ORDAINED this 14 m day of October 2013. RADNOR TOWNSHIP ATTEST: Robert A. Zienkowski, Secretary Name: Elaine P. Schaefe: Title: President 9