Development assessment and compliance fees 2010/11

Similar documents
SCHEDULE OF FEES AND CHARGES LAND USE PLANNING AND DEVELOPMENT APPROVALS

SCHEDULE OF FEES AND CHARGES LAND USE PLANNING AND DEVELOPMENT APPROVALS

building or renovating your home?

CHECKLIST FOR DEVELOPMENT REVIEW

Fees and charges. Consenting and property information fees and charges. Effective from 1 July 2018

Resource Consent Application Form

9.3.5 Dual occupancy code

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services.

PERMIT AND SUBMITTAL REQUIREMENTS (PR)

Developer Services. Sewerage Technical Team: Fees for April 2018

Automated Land Development Applications

Planning and Environment Regulations 2005 Form 9. Draft for exhibition only - v1. Permit no.: WYP6212/12

IDAS form 1 Application details

Build Over Easement Guidelines

PLANNING PERMIT GRANTED UNDER DIVISION 5 OF PART 4 OF THE PLANNING AND ENVIRONMENT ACT 1987

TYPE OF APPLICATION NOTES. Development Application (DA) and Construction Certificate (CC) Complying Development Certificate

APPLICATION FOR SITE PLAN CONTROL for applying under Section 41 of the Planning Act, R.S.O. 1990, CHAPTER P. 13 (as amended)

South East Queensland Regional Plan State planning regulatory provisions Current as at May 2014

Hinchinbrook Shire Adopted Infrastructure Charges Resolution CR1-2018

Division 4 Large Lot Residential Zone: Assessment Criteria and Assessment Tables

Application details IDAS form 1

FOR PL A N N ERS. Michael Forwood. Tuesday 11 July 2017

Land Information Memorandum (LIM)

9.3.6 Dwelling house code

PART APPLICATION FORMS

GUIDELINES FOR BUILD OVERS

Administration and Calculation of Servicing Agreement Fees and Development Levies

PERMIT APPLICATION FORM

Agenda CCRC Local Government Meeting 08 June Figure 1 - Wongaling Beach Village Area Plan of Development (2002)

Dwelling house guide

SUBDIVISION FEASIBILITY REPORT

SCHEDULE 12 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ12. Kororoit Precinct Structure Plan

FEES FOR BUILDING REGULATION APPLICATIONS The Land Planning and Development (Fees) (Amendment) Regulations, 2017

Volume Three Appendix 7. Scheme Plan and other subdivision requirements

City Of Attleboro Conservation Commission

Community Occupancy Guidelines

Owner Builder permit. Owner builder application. Company application. Lease agreements. Owner builder course. Value of owner builder work

CONCEPT PLAN APPLICATION Meeting with Staff Commercial Projects

BRIDGETON SUBDIVISION APPLICATION CHECKLIST

Aveo Sanctuary Cove. Town Planning Submission Report. Proposed Retirement Village Retirement Facility and Residential Care Facility Uses

TARIFF OF FEES FOR PROCESSING OF PLANNING APPLICATIONS GENERAL TERMS

Residential Subdivision

P L A N N I N G A P P L I C A T I O N F O R M

TOWN OF MARKHAM ONTARIO

Section Three, Part 9 - Subdivision

Application for Outline Plan / Outline Plan Waiver Section 176A, Resource Management Act

SUBDIVISION APPLICATION

DRAFT LOCAL VALIDATION CHECKLIST FOR ALL APPLICATIONS

Division 8 General Urban (T4) Zone: Assessment Criteria and Assessment Tables

HYDRAULIC SERVICES BY - LAW

Staff Report for Council Public Meeting

Schedule "A Fees (Planning Advisory Program)

Division 5 Residential Low Density Zone: Assessment Criteria and Assessment Tables

Application for a sewer requisition and/or the diversion of an existing sewer

TOWNSHIP OF BORDENTOWN LAND DEVELOPMENT APPLICATION CHECKLIST. General Requirements for all Applications

SECTION B - GUIDELINES

Condition. The gross floor area of all buildings must not exceed 250 square metres.

Proposed Encroachment over SA Water Easements

Planning Applications Pre-consultation Package

Modification Application

AIRPORT LESSEE COMPANY CONSENT FORM

SCHEDULE 3 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ3 QUARRY HILLS PRECINCT STRUCTURE PLAN. 1.0 The Plan

Corporate Report. Planning & Development Services, Implementation. Date of Report: January 7, 2013 Date of Meeting: January 21, 2013

1 Adopting the Code. The Consumer Code Requirements and good practice Guidance. 1.1 Adopting the Code. 1.2 Making the Code available

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

MAINTENANCE ISSUES SURVEY PLANS

APPLICATION PROCEDURE

Division 16 Bundamba Racecourse Stables Area Zone: Assessment Criteria and Assessment Tables

SOMERTON ROAD BONDS LANE SECTION ROAD MICKLEHAM ROAD GREENVALE CENTRAL PROVIDENCE ROAD DEVELOPMENT CONTRIBUTIONS PLAN CARROLL LANE

Staff Report for Council Public Meeting

MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS

APPENDIX B TOWN OF LITTLE COMPTON, RHODE ISLAND INSTRUCTIONS AND CHECKLIST FOR MINOR SUBDIVISION

SOUTH TIPPERARY COUNTY COUNCIL

Township of Collier 2418 Hilltop Road Presto, PA 15142

Land Development Policies and Pricing Manual Applicable to applications received subsequent to 1 July 2014

Appendix 5 - Track Changed Ordinance

GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN SOMERTON ROAD BONDS LANE SECTION ROAD MICKLEHAM ROAD OVIDENCE ROAD ROLL LANE

Planning Commission Land Disturbance Permit Application

Property & Development

These can be obtained at the City s Engineering Department or on the City s website (

BYRON TOWNSHIP ZONING APPLICATION

San Antonio Water System Guide to Development 2015

PLANNING BOARD APPLICATION FORM TOWNSHIP OF BETHLEHEM 405 MINE ROAD ASBURY, NEW JERSEY Date of Application: Township Application Number:

PIP practice note 1 planning assumptions. How to use this practice note. Planning assumptions. What are planning assumptions? Type.

The Drainage Control Regulations

SUBDIVISION REGULATIONS

Division 6 Residential Medium Density Zone: Assessment Criteria and Assessment Tables

A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT

Hutt River City Centre Upgrade Project Preliminary Integrated Design

Servicing Dual Occupancy and Other Two-Dwelling Developments

***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS

TENTATIVE MAP INFORMATION SHEET

ARTICLE 24 SITE PLAN REVIEW

HOW TO draft conditions that are lawful, certain and enforceable

FORM 1 Building Act 1993 Building Regulations 2018 APPLICATION FOR BUILDING PERMIT Regulation 26

DEVELOPMENT PLAN ORDINANCE

APPENDIX 2 PROCEDURES AND SUPPLEMENTARY INFORMATION

SECTION 10: FLOOD HAZARD EVALUATION 10-1

APPENDIX B. SUBMISSION REQUIREMENTS

Title: ENCROACHMENT POLICY Number: 0132 Reference: Administrative Committee January 21, Adopted by City Council: February 2, 2009

Transcription:

Development assessment and compliance fees 2010/11 This fact sheet will assist you to determine which Brisbane City Council development assessment and compliance fees are applicable to your development. You are required to pay fees at every assessable development phase. This fact sheet outlines: development phases development types fees applicable at every development phase. Fees listed include GST, where applicable. For staged developments, each development stage is classed as a separate development application. Getting started If you need help preparing your development application or are unsure whether your proposal will meet the requirements of Brisbane City Plan 2000*, you can discuss your application with officers from one of Council s Development Assessment teams. Council offers two pre-lodgement services. Free over-thecounter pre-lodgement advice is available to answer simple questions about your proposal. You can also find out: what information you need to provide with your application what fees you will need to pay how the development process will work. These discussions are limited to 15 minutes and can be done at any of Council s Regional Business Centres or at the Library and Customer Centre, Brisbane Square.** You can arrange a basic pre-lodgement meeting with Council officers. These meetings help identify relevant issues, ensure your application is on the right-track and assist Council to assess your application quickly. Basic pre-lodgement meetings cost $1030 per meeting and are limited to one hour. For more complex enquiries and/or where a meeting is likely to extend beyond 1 hour, you can arrange a complex pre-lodgement meeting. The fee will be advised on application based on officer involvement and preparation work at the rate of $100 per hour. For more information on pre-lodgement meetings please refer to Council s Development Assessment Pre-lodgement Meetings fact sheet. Obtain a copy: online at www.brisbane.qld.gov.au/planningandbuilding by phoning Council on (07) 3403 8888 by visiting any of Council s Regional Business Centres or the Library and Customer Centre, Brisbane Square.** Development phases Phase 1 Development assessment Council first assesses your application. You are required to pay an assessment fee when you lodge your application. These fees are listed on Page 3 of this fact sheet. Phase 2 Operational work and compliance assessment Following assessment of your original application, Council will advise if you are required to submit an operational work application or operational work plans to support your original application. You will need to pay a separate fee for each plan you are required to submit. These fees are listed on Page 5 of this fact sheet. Phase 3 Compliance and inspection fees You will need to pay a compliance fee before you begin construction. This is a one-off fee calculated according to the size and complexity of your project and covers all inspections required during construction. These fees are listed on Page 6 of this fact sheet. Phase 4 Plan sealing If your development involves reconfiguring a lot, Council must endorse the survey plan. You are required to pay a fee to have the plan sealed. Council will seal the plan when the development is finalised and all approval conditions have been met. These fees are listed on Page 7 of this fact sheet.

2 Development types Council's RiskSMART DA Council's RiskSMART DA process can streamline the way certain types of straightforward applications are assessed. Talk to a Council accredited RiskSMART DA consultant about whether this can help your project save time and money. For more information about RiskSMART, including how to find a consultant, visit www.brisbane.qld.gov.au/planningandbuilding or contact Council on (07) 3403 8888. Whether you are doing building work, reconfiguring a lot or making a material change of use, your development should fit into one of the following categories. Refer to examples of work listed under each category to determine the type of work you are doing. Minor development small scale building work requiring development approval under Brisbane City Plan 2000 * (e.g. decks, pergolas, carports, sheds) small scale demolition work requiring development approval under Brisbane City Plan 2000 * rearranging boundaries to resolve encroachments material change of use of an existing or approved multi-unit dwelling to single-unit dwellings any other minor scale development as determined by the Manager of Development Assessment Domestic development Type A building or extending a house building a display home building a satellite dish that requires development approval under Brisbane City Plan 2000 * home business access easement any other domestic scale development as determined by the Manager of Development Assessment Type B demolition, removal or relocation of whole or part of a building reconfiguring a lot into one to four residential lots subdivision under the Body Corporate and Community Management Act for two to four dwelling units Small non-domestic development Type A reconfiguring a lot into five to 10 residential lots or two to 10 non-residential or mixed-use lots Material change of use of an existing or approved multiunit dwelling by the addition of a landing (includes prescribed tidal work component). subdivision under the Body Corporate and Community Management Act for five to 10 dwelling units or two to 10 non-residential units other development with less than 1000m² gross floor area or less than 1000m² site area where no gross floor area is proposed Type B building a multi-unit dwelling made up of two to nine dwelling units building between one and nine single-unit dwellings (excluding subdivision) Large non-domestic development Type A building a multi-unit dwelling made up of more than nine dwelling units building more than nine single-unit dwellings (excluding subdivision) Type B reconfiguring a lot into more than 10 lots subdivision under the Body Corporate and Community Management Act for more than 10 dwelling units Type C other development where new or additional gross floor area or site area is (includes change of use, utilising existing gross floor area or site area): (1) between 1001m² and 2000m² (2) between 2001m² and 4000m² (3) more than 4000m² Hardstand and outdoor areas are taken to be gross floor areas. Where the proposed development includes gross floor area and site area, please use the greater of the two calculated fees. Major project Any proposal required to be decided by full Council.

3 Development assessment fees Application fees for your preliminary approval/development permit Development type Code assessable Impact assessable Minor $450 $670 Domestic Small non-domestic Type A $1260 $1890 Type B $2010 $2980 Type A $3050 $4620 Type B $4620 $6930 Type A $10,800 plus $140 per unit over 9 units $16,100 plus $210 per unit over 9 units Type B $4570 plus $215 per lot over 10 lots $6830 plus $275 per lot over 10 lots Large non-domestic Type C(1) $4620 $6720 Type C(2) $10,700 $16,000 Type C(3) $18,700 $27,200 Change development application prior to decision Change to development approval (includes changing/cancelling conditions) Request to extend relevant period Request for a Negotiated Decision Notice 25% of current 25% of current 25% of current $200 Cancel development approval $315 Request to change compliance permit/ certificate (includes changing conditions) 25% of current Request to change or cancel particular conditions, where conditions were not applied under the Sustainable Planning Act (SPA) Pre-request to change development approval under s368 SPA Scanning of development application documents by Council where a CD or an electronic copy is not provided at lodgement $310 $310 $200 This applies to Material Change of Use, Reconfiguration of Lot, Operational works, compliance assessment and RiskSMART applications. Major projects The following development assessment fees apply to major projects. A minimum fee of $28,000 applies to all major projects. $2.75 per m² of gross floor area for the first 10,000m² and $1.40 per m² for every square metre over 10,000m². If no gross floor area is proposed the minimum fee applies. RiskSMART Applications lodged by a Council RiskSMART DA accredited consultant will attract a discount of 30% off the standard relevant assessment fees providing the application meets all the necessary requirements to be lodged as a Council RiskSMART DA application. Religious and charitable organisations Applications by religious or charitable organisations listed in Appendix A of the Schedule of Fees and Charges are entitled to a 50% discount. If the proposal is primarily for commercial purposes, no discount will be allowed.

4 Additional fees that may apply at the development assessment stage Incomplete...$315 An incomplete will be charged in addition to the base when an applicant is advised that insufficient information was provided at the time of lodgement to enable assessment of the application. All applications are required to be lodged with: all necessary forms (including Fee Assessment and Erosion Hazard Assessment forms) properly completed Appropriate number of copies and format of drawings and reports in hard copy, correctly folded, or in electronic format. An additional fee will be charged where an electronic copy is not provided. assessment reports including relevant technical reports supporting and justifying the proposal. Request for written information...$424 (including calculation of straightforward infrastructure contributions) Discussion and calculation of infrastructure contributions...$1030 Basic pre-lodgement meeting...$1030 Complex pre-lodgement meeting...poa Preliminary approval where Council is the assessment manager for the development permit Preliminary approval to override/ affect Brisbane City Plan 2000 Environmentally relevant activity (ERA) 80% of current development 100% of current development Where an application involves an ERA, additional assessment fees will apply. Refer to the "Environmental Protection Registrations and Development Approvals for ERAs" section under LICENSING AND COMPLIANCE in Council's Schedule of Fees and Charges. Alterations to facade facing Queen Street, Brunswick Street or Chinatown Malls...$1050 Assessment of proposed Master Plan, structure plan or centres concept plan site less than 20 hectares... $8090 site of 20 hectares or more...$13,500 If a structure plan or centres concept plan is required by the planning scheme, this fee is to be paid when the development application is lodged. Superseded planning scheme...$525 Request to extend period when development under a superseded planning scheme must start... $300 Liquor licence investigation...$530 Major hydraulic assessment... $3680 (e.g. impact of fill, effect of structures such as bridges and culverts, development within a waterway corridor or retention basins and open channels) Each re-submission...$1000 Minor hydraulic assessment...$1660 (e.g. hydraulic analysis of overland flow paths and flood depths where not affected by structures) Each re-submission...$525 Major traffic assessment report... $3680 Development involving: access on to a major road access to more than 10 residential units on to a minor road industrial sites greater than 2000m² on to an industrial road more than 10 residential subdivision lots on to a major or minor road all community facilities educational, medical, sporting, child care centre, church, etc all developments in a Centre proposed new intersection, traffic signals or roundabout existing traffic signals or roundabout impacted otherwise, where combined existing and new gross floor area is greater than 1000m² Each re-submission...$1000 Basic traffic assessment report...$1660 Development involving: variation from City Plan standard (parking, servicing, manoeuvring, etc) Each re-submission...$525 Other technical report/plan assessment As determined by the Manager of Development Assessment (e.g. traffic signals, economic impact assessment, etc)...poa Refunds or reductions of fees There will be no refund or reduction of required fees, except at the discretion of the Manager of Development Assessment, where exceptional circumstances have been demonstrated.

5 Operational work and compliance assessment fees Water and sewer minor works/connections plans $150 administration fee per plan Minor plans $665 per plan or per compliance assessment Minor plans include: private landscape management and site works plans for sites up to 2000m² erosion and sediment control plans for sites up to 2000m² traffic functional layout plans (type A, B or C roads) signs and line marking plans (type A, B or C roads). Standard plans $980 per plan or per compliance assessment Standard plans include: public landscape management and site works plans private landscape management and site works plans for sites greater than 2000m² erosion and sediment control plans for sites greater than 2000m² vegetation management and/or rehabilitation plans site-based stormwater management plans roadworks and drainage plans water reticulation plans sewerage reticulation plans filling and excavation/bulk earthworks streetscape concept plans construction management plans traffic functional layout plans (type D roads and signalised intersections). Other plans $1500 per plan or per compliance assessment Other plans include: environmental management plans major infrastructure design plans (e.g. sewer pumping station, trunk mains, vacuum sewer, water booster, water reservoir, bridge, traffic signals). Minor prescribed tidal work $630 per application (e.g. pipeline, embankment, drain, boat ramp) Combined application 60% of current s for both components Minor prescribed tidal work and material change of use for addition of landing to a multi-unit dwelling. Other prescribed tidal work $4520 per application (e.g. revetment wall, marina, bridge, wharf, riverwalk promenade) Incomplete (Operational work only) $315 An incomplete will be charged in addition to the base when an applicant is advised that insufficient information was provided at the time of lodgement to enable assessment of the application. All applications are required to be lodged with: all necessary forms (including Operational Works Fee Assessment form) properly completed appropriate number of copies and format of drawings and reports in hard copy, correctly folded, or in electronic format. An additional fee will be charged where an electronic copy is not provided assessment reports including relevant technical reports supporting and justifying the proposal where for Erosion and Sediment Control Plan, a properly completed Erosion Hazard Assessment form.

6 Compliance and inspection fees The number of compliance components that apply to your development will determine the fees you need to pay at the compliance phase of the development. Below is a list of components that may be relevant to your development. Water reticulation The development requires construction of a water reticulation system. Prior to construction, a water reticulation operational work/compliance assessment plan must be lodged. This excludes minor work involving property connection/s only. Sewer reticulation The development requires construction of a sewer reticulation system. Prior to construction, a sewer reticulation operational work/compliance assessment plan must be lodged. This excludes minor work involving property connection/s only. Roads and drainage The development requires construction of roads and/or stormwater drainage infrastructure. Prior to construction, a road and/or stormwater drainage operational work/ compliance assessment plan must be lodged. Stormwater management A development approval requires a site-based stormwater management plan to be submitted. Landscaping and parkland A development approval requires landscaping or parkland and/or other public access infrastructure. Environmental management A development approval requires work within a waterway corridor and/or where an environmental management plan is required. Erosion and Sediment Control A development approval requires the submission of an Erosion and Sediment Control Plan. Reconfiguration Number of project components 1 2 3 4 or more Boundary realignment $655 Access easement $990 1-3 lots (including boundary rearrangement) $1470 4-7 lots $3680 $4730 $5460 $6620 8-15 lots $7250 $8720 $10,200 16-30 lots $11,800 $13,200 31 or more lots $14,700 $19,300 Material Change of Use and/or Building Work Erosion and Sediment Control and minor impacts on Council assets (eg. footpath, driveway crossover, water supply connection, sewerage connection, stormwater drainage outlets, service extensions to connect to existing services) Erosion and Sediment Control and major impacts on Council assets (eg. footpath or road widening, sewer manhole, sewer main, water main, stormwater manhole, stormwater drain line) Up to 2 project components Fee $1470 per development permit $7250 per development permit 3 project components $8720 per development permit 4 or more project components $10,200 per development permit Additional compliance fees Major infrastructure items... $6200 per item (e.g. sewer pumping station, trunk mains, vacuum sewer, water booster, water reservoir, bridge, traffic signals or other item determined by the Manager of Development Assessment) Additional inspection fee... $315 per site inspection re-inspection of work failing an initial inspection inspection in response to a valid complaint about non-compliance any other non-scheduled inspection Approval for building over or near stormwater infrastructure/overland flow paths...$685 Approval for building over sewer, where inspected and assessed by private building certifier or Registered Professional Engineer Queensland...$70 Approval for building over sewer, where inspected and assessed by Brisbane City Council...$685

7 Plan sealing fees Survey Plan Endorsement Survey plan endorsement/compliance assessment... $140 per lot (includes approval of street names and advice of house numbering where applicable. Minimum fee $400) Re-submission/re-endorsement of survey plan...$315 Request for Council to accept bond for incomplete work...$1580 Re-submission of bond request if application is deemed inadequate or incomplete...$315 Community Title Scheme Endorsement Survey plan endorsement where no previous approval required for reconfiguration. Endorsement of proposed survey plan for up to four units... $1420 Each additional unit...$285 Community Management Statement endorsement...$285 Re-submission/re-endorsement of survey plan...$315 Request for approval of street naming, where not part of survey plan endorsement...$350 per request Request to change the official house number...$320 per request ** Regional Business Centres South Regional Business Centre Sunnybank Hills Shoppingtown 661 Compton Road, Sunnybank Hills East Regional Business Centre 2 Millennium Boulevard, Carindale West Regional Business Centre 70 Station Road, Indooroopilly North Regional Business Centre 960 Gympie Road, Chermside Library and Customer Centre Brisbane Square 266 George Street, Brisbane

8 Example of how to calculate your fees Example scenario You want to demolish a house and build five new townhouses in its place. This will be done in a residential area, within a demolition control precinct. Below is a list of fees for each phase of the development process. Development assessment fees The demolition is code-assessable domestic development. The fee for this part of the application would be $2010. Building five new townhouses is impact-assessable small non-domestic development. The fee for this part of the application would be $6930. The total fee for the development assessment phase of this development would be $8940. Operational work and compliance assessment fees In this example an erosion and sediment control plan, is required and a water reticulation plan and sewerage reticulation plan could be required. Minor plan erosion and sediment control... $665 (this site is less than 2000m²) Standard plan water reticulation plan...$980 Standard plan sewerage reticulation plan...$980 The total fee for the operational works phase of this development would be $2625. Compliance and inspection fees As the proposal is small non-domestic development and involves three compliance components, the fee for this phase of the development would be $8720. This fee covers all necessary inspections required during construction. If any work fails an inspection, a fee of $315 will be charged for each additional site inspection. Plan sealing fees If this development involves reconfiguring a lot, Council will need to endorse the survey plan. The following fees would apply. Endorsement of proposed community title scheme survey plan First four units... $1420 One additional unit...$285 Community Management Statement endorsement...$285 The total fee for the plan sealing phase of this development would be $1990. The total development, compliance and plan sealing fees for this development would be $22,275. Fees listed effective 1 July 2010 30 June 2011. *You can obtain or view a copy of Brisbane City Plan 2000 at any of Council s Regional Business Centres or the Library and Customer Centre, Brisbane Square. You can also view it at any Council library or request a copy by phoning (07) 3403 8888. Brisbane City Council Information GPO Box 1434 Brisbane Qld 4001 Printed on recycled paper For more information visit www.brisbane.qld.gov.au or call (07) 3403 8888?????-????? Brisbane City Council 2010