BLUESTONE DAM AN OVERVIEW NATIONAL INVENTORY OF DAMS ID: WV08902

Similar documents
BLUESTONE DAM DAM SAFETY ASSURANCE MEGA-PROJECT NATIONAL INVENTORY OF DAMS ID: WV08902

LOWER LAKE GIRARD DAM THE BREACHING OF AN AMBURSEN DAM GIRARD, OHIO. by Brian H. Greene

FISHERIES TIMING WINDOW EXTENSION APPLICATION

SC Dams and Reservoirs Safety

Engineering & Operations Committee Item 7-3 July 10, 2017

U.S. Army Corps of Engineers - Charleston District Checklist for 2017 Nationwide Permit Review Nationwide Permit 48

Alberta Flood Hazard Identification Program

SECTION 10: FLOOD HAZARD EVALUATION 10-1

Appendix E: Hydrologic & Hydraulic Report. Proposed Bridge Replacement SR 1008, Section 02B (Henry Road) Over Bushkill Creek

VI. SAFETY ELEMENT I. INTRODUCTION A. PURPOSE B. AUTHORITY. 1. Safety

Federal Mandates and Willing Sellers: Real Estate Acquisition for the Missouri River Recovery Program

PUBLIC NOTICE OF PROPOSED ACTIVITY AND PREPARATION OF ENVIRONMENTAL ASSESSMENT

Fraser River Escarpment Policy

REQUEST FOR PROPOSALS

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Case 1:17-mc SGB Document 16 Filed 11/15/17 Page 1 of 36 IN THE UNITED STATES COURT OF FEDERAL CLAIMS

7-3. Engineering and Operations Committee. Board of Directors. 7/11/2017 Board Meeting. Subject. Executive Summary

State Level Historic Documentation Report. Lilly Bridge Summers County

CHAPTER 24 F FLOOD ZONE OVERLAY DISTRICT

(Chapter Flood Damage Prevention)

SPECIAL PUBLIC NOTICE

PRELIMINARY PLAT Application Packet

Rarity Pointe Commercial Recreation and Residential Development on Tellico Reservoir, Loudon and Monroe Counties, TN

February 29, To: Sarah Absher Senior Planner Tillamook County Department of Community Development

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Floodplain Management and Regulation

JOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF ARKANSAS Application Number: Date: December 9, 2016 Comments Due: January 3, 2017

INFORMATION REQUIRED FOR ALABAMA GENERAL PERMITS - BW&T LAKES

BOUNDARY MANAGEMENT AND ENCROACHMENTS

Implementing the DCR Dam Break Inundation Zone Regulations with Local Government

Abandoned Property: Residential & Commercial Tenancies

Lilly Creek Improvement Project

STORMWATER MANAGEMENT ORDINANCE

APPENDIX H REAL ESTATE REQUIREMENTS

Dam Safety & Public Waters Work Permit

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Douglas County Comprehensive Master Plan. 5.2 Floodplain Management and Regulation

158 FERC 62,225 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Chugach Electric Association, Inc. Project No.

North Beckley Public Service District 122 Clear Water Lane BECKLEY, WEST VIRGINIA Bus: (304) Fax (304)

This is a summary of the Silver Lakes Ranch POA Covenants and is not intended to replace the Declaration of CCRs

Creation of the Lake Holiday Sanitary District;

APPLICATION. Telephone Fax Address. Telephone Fax Address FOR MARTIN COUNTY USE ONLY

BACKGROUND There are 23 flood control structures in the Upper Brushy Creek Water Control and Improvement District (District). See attached map.

Minnesota Department of Natural Resources 500 Lafayette Road Saint Pau I, Minnesota Office of the Commissioner

Surplus and Disposal. Surplus and Disposal

***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS

TOP 10 COMMON LAW DRAINAGE PROBLEMS BETWEEN RURAL NEIGHBOURS H. W. Fraser, P.Eng. and S. Vander Veen, P.Eng.

Michigan Lake & Stream Associations 2016 Annual Convention. Clifford H. Bloom, Esq. Bloom Sluggett Morgan, PC (616)

Coastal Shore Jurisdiction in British Columbia

THE REAL ESTATE GROUP

Chapter 210 CONDITIONAL USES

Appendix A Orleans County Local Law Assessment

MARK TWAIN LAKE MASTER PLAN CLARENCE CANNON DAM AND MARK TWAIN LAKE MONROE CITY, MISSOURI

CHAPTER XVII. REGULATION OF FLOOD PLAIN STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND OBJECTIVES

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 WEST OGLETHORPE AVENUE SAVANNAH, GEORGIA

California Housing Market Update. Monthly Sales and Price Statistics December 2018

ARTICLE 16. FLOODPLAIN MANAGEMENT, EROSION AND SEDIMENT CONTROL, AND STORMWATER MANAGEMENT

THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by ("Covenantor"). RECITALS

APPENDIX D - REAL ESTATE

Town of Middleborough Conservation Commission 2014 Policy

Wetland Mitigation Bank Settlement Agreement Fact Sheet

CONDITIONAL USE PERMIT Application Packet

Monthly Market Watch for Maricopa County An overview of what is happening in the Maricopa County real estate market

Georgia Conservation Tax Credit Program Frequently Asked Questions

CITY OF SACRAMENTO COMMUNITY DEVELOPMENT DEPARTMENT ZONING ADMINISTRATOR 300 Richards Blvd, 3rd Floor, Sacramento, CA 95811

ORDINANCE NO

Initial Project Review

JOINT PUBLIC NOTICE PUBLIC NOTICE

VILLAGE OF ASHVILLE DEPARTMENT OF PUBLIC UTILITIES DIVISION OF STORMWATER MANAGEMENT STORMWATER MANAGEMENT PROGRAM STORMWATER CREDIT MANUAL

Docks, Fun Facts to Know and Tell

DETAILED ANALYSIS. Wyoming Board of Land Commissioners. Consideration for Disposal of State Trust Land. Prepared on July 11, 2014

Floodplain Development Land Use Review

The Drainage Control Regulations

Part 72. Sec. 1. This ordinance shall be known and may be cited as the Clyde Township Wetlands Ordinance.

Public Notice. Notice No Closing Date: August 16, 2018

Construction & Earthwork Request Form (CERF)

ORDER OF THE STATE OF WISCONSIN NATURAL RESOURCES BOARD REPEALING AND RECREATING RULES

FLOOD HAZARD AREA LAND USE MANAGEMENT

Heavily Wooded Acreage Lots at Navarro Mills Lake

Creek Rehabilitation Plan for Apple Valley Questions and Answers from the Pre-Bid Meeting and Site Visit 06/23/2016

The Impact of Market Rate Vacancy Increases Eleven-Year Report

Ensure community interests are protected with respect to the management and disposition of public land;

How Mitigation Banks and ILF Programs Can Help Conservation

Coachella Valley Median Detached Home Price Mar Mar 2018

LAND USE APPLICATION

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY

Maintenance Agreement

City Of Attleboro Conservation Commission

LasVelasVillageSPI.com

CHAPTER XIX FLOOD DAMAGE PROTECTION. Article. 1 Definitions 2 General Provisions 3 Administration 4 Provisions for Flood Hazard Reduction

2015 WETLAND CONSERVATION ACT STATUTE CHANGES

MODEL FLOODPLAIN MANAGEMENT / FLOOD DAMAGE PREVENTION ORDINANCE

Eagle Harbor 2025: Planning for a Sustainable Community

Project File #: SF Project Name: Jackson Ranch Filing No. 4 Parcel Nos.: , and

TITLE 14 ZONING AND LAND USE CONTROL CHAPTER 1 MUNICIPAL PLANNING COMMISSION


LINCOLN COUNTY FLOOD DAMAGE PREVENTION ORDINANCE

7) Contact information of the responsible design professional.

City of Palo Alto (ID # 4882) City Council Staff Report

EXHIBIT B AGREEMENT OF TRANSFER. Between TENNESSEE VALLEY AUTHORITY. And UNITED STATES DEPARTMENT OF THE INTERIOR NATIONAL PARK SERVICE.

NRCS Floodplain Easement Program Sheffield Brook Floodplain Restoration. Lesley R. Sweeney, PE USDA Natural Resources Conservation Service

For public hearing by the Town Council and Planning Commission March 24, 2014

Transcription:

1 BLUESTONE DAM AN OVERVIEW NATIONAL INVENTORY OF DAMS ID: WV08902 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 Updated 10 October 2017 255 255 255 239 65 53 80 119 27 252 174.59 110 135 120 112 92 56 The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation. 62 102 130 102 56 48 130 120 111

WHERE IN THE WORLD IS BLUESTONE? Bluestone Dam Bluestone Dam is on the New River, just upstream of the Greenbrier River. Bluestone Dam controls a watershed nearly the size of Connecticut The New River is renamed the Kanawha River at Gauley Bridge, WV. Bluestone works with Summersville & Sutton Dams to reduce flood risk along the New & Kanawha River valleys all the way to Point Pleasant and down the Ohio River. ½ the water that passes Charleston, WV comes through Bluestone Dam. 4,600 sq. mi. 2

WHAT IS BLUESTONE DAM? Bluestone Dam is a Straight Concrete Gravity Dam Bluestone Dam is approximately 165 feet high Bluestone Dam is nearly ½ mile long Bluestone Dam impounds an 11 mile long lake on the New River 3

WHAT IS BLUESTONE DAM S PURPOSE? BLUESTONE DAM HAS MULTIPLE PURPOSES: 1936: Flood risk management = HELP REDUCE FLOOD RISKS 1938: Hydro-electric Power development = NOT YET INSTALLED 1944: Recreation = FISHING, BOATING, CAMPING 1958: Fish & wildlife enhancement added = GAME MANAGEMENT 1988: Enhanced recreation = WHITE WATER RAFTING 1996: Drift and debris removal = PASS FLOOD DEBRIS 4

WHERE DOES BLUESTONE DAM REDUCE FLOOD RISK? $5.9B Cumulative Damages Prevented Though-out the New & Kanawha River Valleys Hinton Charleston to Montgomery to John Amos And beyond on the Ohio River.. to to Industry Pt. Pleasant 5

HOW DOES BLUESTONE DAM WORK? Bluestone Dam normally sits almost empty. A seasonally fluctuating lake (33-37 feet deep) is maintained for recreation when flood storage is not required. Bluestone Dam can store & slow the release of storm waters up to elevation 1520 feet above sea level or nearly 114 feet above the normal lake level Bluestone Lake designed to fluctuate 114 feet to temporarily store flood waters Crest Gate DEC-MAR EL 1406 The slow release of storm waters significantly reduces flood risks downstream 6

BLUESTONE DAM HYDRO POWER 7 Reallocated Hydro to Flood Storage 6 Penstocks Original Proposed Turbine Location Seasonal lake 6 tunnels called penstocks installed for hydro-electric power. Power generating plant was never installed. Penstock Auxiliary Spillway Today Seasonal lake lowered by 90 feet: reallocation of storage to flood storage. 2010-2016: six tunnels converted into an Penstock auxiliary spillway. Penstock auxiliary spillway can discharge extreme storms waters & reduce the probability of the dam being overtopped & breaching.

BLUESTONE DAM RECREATION FISH & WILDLIFE ENHANCEMENT Aquatic Habitat Terrestrial Habitat Whitewater downstream Bluestone Lake Boat Races 8

9 BLUESTONE DAM DRIFT & DEBRIS Town under construction Acres of drift and debris build up behind the dam Pre-tower drift field Post-tower drift passage 2001-2005 a tower was added to upstream side of dam to flush drift & debris downstream

10 BLUESTONE DAM: DAM SAFETY ASSURANCE PROJECT 2000-PRESENT Significant Investment to Reduce Risks of Breach 216 ANCHORS (PHASE 2B) PURPOSE: Anchor Dam to Foundation & Resist Sliding BLUESTONE LAKE PHASE 4: 278 ANCHORS PURPOSE: Anchor Dam to Foundation & Resist Sliding CONTRACT COMPLETION: Oct 2019 PENSTOCK EXTENTION & THRUST BLOCK (PHASES 1 & 2B) Purpose: Convert Penstocks & Add Weight to Resist Sliding ADDITIONAL MONOLITH (PHASE 2A) Purpose: Stability FISHING PIER (PHASE 2A) Purpose: Mitigation Phase 5 PURPOSE: Address erosion of the primary stilling basin COMPLETE AUXILLARY SPILLWAY (Phase 3) PURPOSE: Release additional extreme storm waters to reduce chance of overtopping C0MPLETED CONSTRUCTION ACTIVE CONSTRUCTION DESIGN UNDERWAY PROJECT COMPLETE: July 2034 NEW RIVER

11