New residential and commercial developments are coming to South San Francisco. Have questions about ongoing or future construction?

Similar documents
City of South San Francisco Page 1 of 5

St Peters Development Frequently Asked Questions

Creative Approaches to Land Acquisition

MARKET UPDATE Q4 2018

Notice of Preparation

On December 15, 2017, the Board of Supervisors approved the legislative amendments associated with the Pier 70 Mixed Use District Project (Project).

Navigating the Garage Entry into Gate 4

ST KILDA ROAD WORKS, DOMAIN PRECINCT

PLANNING APPROVAL STAFF REPORT Date: January 18, 2018

Response to Community Questions Regarding Hunter College-68th Street ADA Project

Long Island City s Fastest Growing Neighborhood BORDEN AVENUE SIX STORY PROMINENT LIC LOFT BUILDING FOR PARTIAL LEASE LONG ISLAND CITY, NY

NOTIFICATION OF ALTERATIONS / IMPROVEMENTS TO YOUR HOME

GOOD NEIGHBOUR AGREEMENT. Between NICHE DEVELOPMENT & FLEMING DEVELOPMENT. and BELGRAVIA COMMUNITY LEAGUE. for

FOR SALE AND/OR SUBLEASE AMNEAL PHARMACEUTICALS IMPAX HAYWARD CAMPUS 7 BUILDINGS ±293,941 SF Available individually or as a combined portfolio

Building Livable Communities with Transit. Introduction to Financing Livable Communities. Portland Lindbergh City Center Case Study

$2,500,000 DOWNTOWN WALNUT CREEK MULTI-TENANT RETAIL PROPERTY SHAWN WILLIS S. MAIN STREET WALNUT CREEK, CA 94596

1102 SOUTH THIRD STREET SAN JOSE, CA.

Parking Challenges and Trade-Offs

FIRE DEPARTMENT INFORMATION BULLETIN #007

Ohlone College Mission Blvd Mixed-Use Project OFFERING MEMORANDUM

95 Merchant Drive Unit B1, D&E Montrose, Colorado 81401

±86 ACRES OF LAND EL CENTRO ROAD & SAN JUAN SACRAMENTO, CA CONTACT US FOR SALE. SITE

When every angle feels like luxury, you ve arrived.

Supplemental Feasibility Study for Ravenswood, Oak Grove, Glenwood and Encinal Avenues Grade Separation. for the. City of Menlo Park

GATEWAY TO LOS ALTOS

Fifty South Sixth PREMIER SPACE AVAILABLE NEW OWNERSHIP: NICOLLET AND 6TH

FOR SALE 12 Apartment Units 316 Alida Way, South San Francisco, California

A 290-UNIT RESIDENTIAL DEVELOPMENT IN DOWNTOWN SAN JOSE

BOUNDARY LINE ADJUSTMENT APPLICATION

DESIGN PUBLIC HEARING JULY 7, 2016 CITY COUNCIL HEARING ROOM, FIRST FLOOR ONE GOVERNMENT CENTER FALL RIVER, MASSACHUSETTS 6:30 PM FOR THE PROPOSED

Grand Pacific Center 400 E Broadway Ave. - 6th Floor - Bismarck, ND 14,700 $16.75 psf

Summary of Presentation and Q&A from January 19, 2016

ONE TEN PLAZA THE CENTER OF IT ALL 110 WEST A STREET // DOWNTOWN SAN DIEGO // 92101

DESIGN PUBLIC HEARING MAY 18, 2017 GROVELAND TOWN HALL GROVELAND, MASSACHUSETTS 7:00PM FOR THE PROPOSED

Memorial Northwest Homeowners Association Master Plan Project Phasing

AGENT VISUAL INSPECTION DISCLOSURE (CALIFORNIA CIVIL CODE 2079 ET SEQ.)

THE DEAN. 480 San Antonio Road, Mountain View, El Camino Real

Transbay Transit Center

DESIGN PUBLIC HEARING NOVEMBER 15, 2017 CARLTON M. VIVEIROS ELEMENTARY SCHOOL COMMUNITY ROOM 525 SLADE STREET FALL RIVER, MA :00 PM

60 South Market, San Jose ±234,439 SF. 15-story Class A office tower centrally located in downtown San Jose, CA. From 2,529 SF 17,977 SF Available

OFFERING MEMORANDUM. Infill Redevelopment Site Los Altos, CA 4896 EL CAMINO REAL LOS ALTOS, CA

DESIGN PUBLIC HEARING

S C O T T OFFERING MEMORANDUM 3265 EL CAMINO REAL PALO ALTO CALIFORNIA

TRANSIT-ORIENTED DEVELOPMENT PLAN PRESENTATION LAWRENCE TO BRYN MAWR MODERNIZATION PROJECT AREA

OTHELLO STATION DEVELOPMENT SITE

105 Merchant Drive Montrose, Colorado 81401

Upper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive

Right to Farm -- ee~iuoo. Alarm systems -- See Ch Animals -- S.~~230.

60 South Market, San Jose ±234,439 SF. 15-story Class A office tower centrally located in downtown San Jose, CA. From 2,529 SF 17,977 SF Available

REQUEST FOR COUNCIL ACTION

Architect: Lucio Trabucco Nunes Trabucco Architects 109 Highland Avenue Needham, MA Tel: Fax:

COMMERCIAL ZONING DISTRICTS (Amended 11/13/14) Part I. C-1 Restricted Commercial District

AGENDA. 1 Background 2 Community Input 3 Short-Term Rental Ordinance Options 4 Next Steps 5 Discussion

COUNTY OF ALBEMARLE. ZONING INFORMATION PACKET (For building permits for a structure on a property with a site plan)

TOWNSHIP OF EWING POLICE DEPARTMENT 2 JAK E GARZIO DRIV E EWING, NJ 08628

ZONING ADMINISTRATOR AGENDA

Z.I. NO INTERIM CONTROL ORDINANCE (ICO) FOR PROPOSED HISTORIC PRESERVATION OVERLAY ZONE (HPOZ) NEIGHBORHOODS

El Rio Mobile Home Park 2120 N. Pacific Ave. Santa Cruz, CA

RECITALS STATEMENT OF AGREEMENT. Draft: November 30, 2018

Request for Expansion of Target Investment Zone Boundaries in Hagerstown December 7, 2006

Treating our tenants with respect A code of conduct for contractors

FOR SALE OR LEASE ±24,000 SF WAREHOUSE on ±1.46 ACRES 1631 CHALLENGE DRIVE, CONCORD, CA

At check-in, you will receive a package of useful information that includes all the activities and entertainment in the area for your enjoyment.

APPROVED LONG-RANGE PROPERTY MANAGEMENT PLAN MAJOR APPROVED DEVELOPMENT PROJECT MISSION BAY

For Sale: 1581 Le Roy Avenue Berkeley, CA

MAIN STREET. 925 Main Street Redwood City, CA

Coto Equestrian Preserve Questions & Answers

Provide a diversity of housing types, responsive to household size, income and age needs.

UV 1806 UV 1804 UV 6. Legend. B u r l e i g h C o u n t y. M o r t o n C o u n t y. Bismarck-Mandan MPO Study Area. M a n d a n.


DESIGN PUBLIC HEARING JANUARY 12, 2017 TOWN HALL SULLIVAN MEETING ROOM 558 SOUTH MAIN STREET RAYNHAM, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

Technical Services Division 1660 Mission Street San Francisco CA Office (415) FAX (415) Website:

Miami Gardens Warehouse for SALE or LEASE NW 49 TH AVE Miami Gardens, FL 33014

STRATA PLAN BCS 2176 THE BENTLEY AT NEWPORT VILLAGE RULES

Executive Summary Conditional Use Authorization and Office Allocation

1265 Montecito Avenue Mountain View, California

CHAPTER 23A: SURPLUS CITY PROPERTY ORDINANCE

Celebrating Campus Community. Housing Sign-Up Information

HOMEOWNER S MANUAL 2004/2005 EDITION

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report

CONSTRUCTION PLANS for HALCYON A RESIDENTIAL SUBDIVISION 6100 MIDNIGHT PASS ROAD, SARASOTA, FL 34242

Coding For Places People Love Main Street Corridor District

PUBLIC NOTICE* Studies Requested: Parking analysis. Other Required Permits: Building Permit, Site Development Permit

Metairie Ridge Tree Preservation District Major Construction Activity Application Jefferson Parish Department of Inspection & Code Enforcement 8/24/11

ORDINANCE NO

San Joaquin County Grand Jury

Downtown & East Town CRA Expansion Plan City of Eustis

APPENDIX A PART 1: GENERAL PLAN AMENDMENTS

Offering Memorandum 12 Units

Rare Downtown Los Angeles Purchase or Lease Opportunity. 741 Maple Avenue, Los Angeles, CA 90014

ORDINANCE NO. PROPOSED ORDINANCE NO. 16-???

LOCATION. INNOVATION. EXCHANGE.

Temporary Sign By-law

ORDINANCE NO. 14,934

14812 EAST 14 TH. Urban Infill Redevelopment Multifamily Commercial SAN LEANDRO CALIFORNIA OFFERING MEMORANDUM. SA-3 Zoning ±0.

Request for Proposals Gabbard Building 106 Judiciary Street Aurora, Indiana. Deadline for response October 19, 2015, 8:30 a.m.

Fifth & Walnut Parking Garage Redevelopment Competitive Proposal Review. Council Work Session Friday, March 24, 2017

DESIGN PUBLIC HEARING FEBRUARY 28, 2018 KENNEDY MIDDLE SCHOOL, AUDITORIUM SPRINGFIELD, MASSACHUSETTS 6:30 PM FOR THE PROPOSED

Attachment A: Bid B24285 Mowing Services for Unified Government Cemeteries

BISCUIT BLOCK FOR LEASE TH AVENUE SE CALGARY, AB. KATIE SAPIEHA Vice President

Transcription:

New residential and commercial developments are coming to South San Francisco. Have questions about ongoing or future construction? You have three ways to get your questions answered about construction in South San Francisco. 1. Phone: Contact our Construction Hotline: (650) 829-4600. You can leave a message and your call will be returned within 48 hours. 2. Email: Email us your question to Construction@ssf.net. 3. Website: The City website is frequently updated with the latest construction information available, along with an interactive map identifying projects going on in the City. Check it out: construction.ssf.net. Follow the Economic and Community Development Facebook page to receive updates on projects in the City. Like us on Facebook! Centennial Village (Spruce & El Camino) Update This is a private development that is currently approved for 284 housing units and 220,000 square feet of retail. However, the project has been stalled since 2014 due to the rising cost of construction. The property owner is now asking the City to amend its development agreement to extend the deadline to begin construction by 12 months, and to allow changes that would reduce project costs.

The Planning Commission will consider the property owner's request on March 2, 2017 and make a recommendation to the City Council on this matter. Sares Regis Project (Airport @ Miller; old Ford Property) This new seven story, two-building residential development with 260 units at the corner of Miller and Airport will soon begin construction. The general contractor recently completed hazardous materials abatement, and will begin installation of fencing to secure the site. Mobilization and demolition of the existing structures will follow (former Ford property). Expected start date for securing the site is next week, February 21, weather permitting. Please note: This project will require sidewalk closures on S. Airport Blvd, adjacent to the site, as well as the removal of the parking lane in the same area. Costco Business Center (Former Levitz Furniture site) Costco plans to open their new "Costco Business Center" in the vacant site at 900 Dubuque Avenue, site of the former Levitz Furniture. The new store, which is the second such store in the Bay Area, will employ approximately 250 people and offer supplies and goods to small companies, restaurants, offices, convenience stores and other similar businesses. Costco Business Centers are open to individuals who are members of the Costco system, but the large stores are not tailored to compete with the wholesale locations which sell food, clothing, appliances, gas, and other home goods to local residents.

Caltrain Station Improvement (Base of Airport & Grand Ave.) This is a City project, that when completed, will realign the Caltrain station to allow easier pedestrian access to downtown, as well as improve station safety and disabled access. An underpass and plaza will be constructed to allow pedestrians access from downtown to the newly renovated station and to the east side of US 101. Demolition of existing structures in preparation for the station improvements is currently underway. There is material removal at the corner of Grand Avenue and Airport Blvd. to clear land for the station plaza. The new station will bid out for construction in early March. Construction currently scheduled to be complete by the end of 2019. DOWNTOWN CONSTRU CTI ON 100 Baden Ave. Update (Pinefino) The contractor at 100 Baden will begin trenching to complete installation of utilities immediately in front of and adjacent to the property. This work will begin the week of March 20, 2017 and be completed approximately one month later, weather permitting. Affected areas include: Sidewalk along south side of Cypress between Baden and Grand Ave.; East sidewalk on Baden Ave. between S. Airport and City parking lot driveway; and 3rd Lane between Cypress and City parking lot driveway entrance. All roadway users should practice caution during construction and follow all traffic control signs and flaggers' instructions. Pedestrians are also encouraged to use alternate routes during construction. Please note: The contractor continues to use Saturdays and possibly Sundays to perform selective work on this project. About this project:

This is the former site of First National Bank, and will be the future home of 69 residential units opening summer 2018. OTHER CONSTRU CTION PROJECTS IN SOU TH SAN FRANCISCO Long Term Parking Garage at SFO FlySFO started a pile driving operation for the new Long Term Parking Garage at SFO this week and will continue until April 25th. The work hours for this project

are from 7:00 a.m. to 5:00 p.m. Please contact the Noise Abatement Office if there are any noise concerns or complaints at (650) 821-5100, or contact them via email. There are several projects in the City led by the South San Francisco Unified School District associated with Measure J. For more information on these projects, please click here, which will take you to the school district website. City of South San Francisco leslie.arroyo@ssf.net http://www.ssf.net