FEASIBILITY REPORT FOR PROPOSED ROAD IMPROVEMENT PROJECT OF OLD VIKING BOULEVARD NOWTHEN, MINNESOTA DECEMBER 6, Prepared by:

CITY OF EAU CLAIRE, WISCONSIN. SPECIAL ASSESSMENT POLICY (Dated: November 8, 2016)

WELCOME Garland Power & Light

Community Development Department

PROJECT: P 0037(129)207 PCN: 039K BROWN COUNTY. S.D. Highway 37 From Aspen Ave to U.S. Highway 12 in Groton

ED-900C EDA Application Supplement for Construction Programs

Introduction to INRMP Implementation Options

OFFICE OF THE CITY ADMINISTRATIVE OFFICER

1. Only items to which the Village has title to and meet the definition of the following will be recorded a tangible capital asset.

CITY OF CIRCLE PINES SPECIAL ASSESSMENT POLICY

Commercial Land Development

PRELMINARY PLAT CHECKLIST

SECTION WATER SYSTEM EXTENSION

Chapter CURBS, SIDEWALKS, AND PAVING

4. No subdivision shall contain a lot that is less than the minimum dimensions set out in the applicable zoning district regulations.

FOCUS ENGINEERING, inc.

PURCHASING and ACQUISITION

Certified Site Program Application Trogdon Industrial Park

Control Code: TANGIBLE CAPITAL ASSETS Classification/Capitalization Threshold/Amortization

RIM 201. BWSR Academy 2013

SECTION 7000 LAND DEVELOPMENT REQUIREMENTS

Town of Cary, North Carolina Rezoning Staff Report 13-REZ-13 An Zou Property Town Council Meeting November 21, 2013

Wind and State Trust Lands

PLAN COMMISSION APPLICATION CITY OF MIDDLETON 7426 HUBBARD AVE. MIDDLETON, WI (608) FAX (608)

LETTER OF TRANSMITTAL

Operating Standards Attachment to Development Application

DESIGN PUBLIC HEARING MAY 18, 2017 GROVELAND TOWN HALL GROVELAND, MASSACHUSETTS 7:00PM FOR THE PROPOSED

DRIVEWAY REQUIREMENTS

SITE PLAN REVIEW ADMINISTRATIVE REVIEW. Please Note: Once submitted to the County, all application materials become a matter of public record.

Master Plan Draft Document

ADMINISTRATIVE REGULATION AR: DATE APPROVED July 14, 2009 ORIGINATING DEPARTMENT:

Planning & Zoning Commission

February 11, The following Councilmembers were present: Brown, Dagg, Kajewski, Hahn and Sollom. Dagg chaired the meeting.

Gates County Planning and Zoning

Pipelines & Eminent Domain THE PROPOSED KINDER MORGAN PERMIAN HIGHWAY PIPELINE OCTOBER 29, 2018 JIM BRADBURY JAMES D.

Post Construction Stakeholder Involvement Charles Brown Town of Cary. TOWN Of CARY

Module 2. Chesapeake Bay Trust Watershed Restoration Project Management Training. Owners & Stakeholders Jim Morris, P.E.

BOSSIER CITY PARISH METROPOLITAN PLANNING COMMISSION 620 Benton Rd. Bossier City, LA Phone: Fax: PRELIMINARY PLAT

Financial Responsibilities. Financial Responsibilities. Financial Responsibilities MUNICIPAL ELECTED OFFICIALS /18/2018

Community Wind Project Development

MINNEHAHA COUNTY HIGHWAY DEPARTMENT HIGHWAY ACCESS APPLICATION & PERMIT

STATE OF OHIO FINANCIAL REPORTING APPROACH GASB 34 IMPLEMENTATION ISSUES TRANSPORTATION INFRASTRUCTURE

BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: September 10, 2018

CHARLES COUNTY GOVERNMENT ITB NO US 301 PARK & RIDE PHASE II

CITY COUNCIL WORK SESSION MEETING AGENDA May 21, :30 6:30pm

PROJECTS: P 0083(74)56; 036E; JONES COUNTY NH 0083(79)45; 04E7; MELLETTE COUNTY NH 0083(80)44; 04E8; MELLETTE COUNTY

How Mitigation Banks and ILF Programs Can Help Conservation

ANNUAL CONTINUING DISCLOSURE REPORT

FLOWCHART #3 - NEW BUILDING CONSTRUCTION AND MAJOR RENOVATION PLANNING MILESTONES

Development Opportunity: Priority Development Site

Proposed Everglades Headwaters National Wildlife Refuge and Conservation Area

Housing 101: Getting Started Development Finance Basics

RESIDENTIAL PROPERTY VALUATION PROCESS

REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington

DESIGN PUBLIC HEARING JULY 7, 2016 CITY COUNCIL HEARING ROOM, FIRST FLOOR ONE GOVERNMENT CENTER FALL RIVER, MASSACHUSETTS 6:30 PM FOR THE PROPOSED

Plan and Zoning Commission Review Process

Title 12 STREETS, SIDEWALKS AND PUBLIC PLACES

Shaping Our Future. Return-on-Investment Study. June 2017

Land Conservation 101. Chris LaPointe, Director of Land Conservation Essex County Greenbelt Association

MAPLETON CITY CORPORATION. Step 7: Upon final approval and prior to plat recording the applicant shall provide the following:

FRESHWATER WETLANDS LETTER OF INTERPRETATION (LOI) APPLICATION CHECKLIST AND FEE TABLE (Updated March 2016)

2011 AICP Review Course

Land Asset Management Policy

City of Grand Forks Staff Report

TOWN OF LEWISTON PLANNING BOARD APPLICATION

FEASIBILITY STUDY FUNDING SCENARIOS

Residential Major Subdivision Review Checklist

REFERRAL. COUNTY OF SAN LUIS OBISPO Department of Public Works. Colt Esenwein, Director

Committed to Service

PROJECT NH 0050(99)381 PCN 6926 YANKTON COUNTY. SD HWY 50 (4 th Street) from Broadway Ave to Archery Road in Yankton, SD

STAFF REPORT Administrative Subdivision Hearing West 150 South Street, Parcel # , and

SECTION 8 - GENERAL RURAL DISTRICT

Golf View Neighborhood Meeting. August 22, 2016

The Florida Affordable Housing Suitability Model. Florida Housing Coalition State Conference Sept. 27, 2011

LEWISTOWN COMMERCE CENTER COMMUNITY DEVELOPMENT AUTHORITY (VIRGINIA) $37,675,000 Revenue Bonds, Series 2007

TOWN OF ROXBURY PLANNING BOARD

CAPITAL IMPROVEMENT PLAN POLICY/PROCEDURE Approved by the Town Council at the Town Council Meeting

Chapter 510 STREETS, SIDEWALKS AND OTHER PUBLIC PLACES

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax 360.

About the Project. The project consists of two new high voltage transmission lines to be built by Sharyland Utilities, L.P. (Sharyland).

Shoreline Use Permits

COMMERCIAL SITE PLAN & CONDITIONAL USE PERMIT REVIEW PROCESS & CHECKLIST

Bryan Tucker. Florida Fish and Wildlife Conservation Commission DATE: FEBRUARY 20, 2017 ADDENDUM NO.: 1 BID NO.: FWC 16/17-106

LAND USE PERMIT INFORMATION PACKET

LAND SALES CASH PURCHASE DISPOSAL TERMS AND CONDITIONS

PERMITS, ENCROACHMENTS AND EASEMENTS

CTAS e-li. Published on e-li ( March 16, 2019 Infrastructure

UPPER MOUNT BETHEL TOWNSHIP, NORTHAMPTON COUNTY, PA MINOR SUBDIVISION FINAL PLAN CHECKLIST* YES** NO

BYRON TOWNSHIP ZONING APPLICATION

Certified Site Program Application Bolivar Business Park

WOODFIELD PARK Parking Study

DESIGN PUBLIC HEARING JANUARY 12, 2017 TOWN HALL SULLIVAN MEETING ROOM 558 SOUTH MAIN STREET RAYNHAM, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

VDOT/Weldon Cooper Center 2017 Highway Finance Survey: line items instructions

YOUNG COUNTY APPRAISAL DISTRICT

Report on the Development. Potential of. Property

DETAILED GRADING PLAN CHECKLIST (TEARDOWN/REDEVELOPMENT)

ARTICLE 900 PLAT AND PLAN REQUIREMENTS

Tangible Capital Assets Implementation of Section 3150 New Brunswick Local Governments. October 2010

CHECKLIST FOR DEVELOPMENT REVIEW

# 1 HOLDOVER Revised SUB CANAL SUBDIVISION

Transcription:

City Projects Concepts, Costing & Construction Dale C. Heglund, PE/PLS - Program Director, NDLTAP Jerod Klabunde, PE Project Manager, Moore Engineering NDLC Annual Conference, Fargo Sept 29, 2017

Info Hand-offs Time Money Risk

300 B.C. Roman Empire

Roadway/Street Sections

Everyone Loves a.6.8.7 4.1.6 2.5 2.9.5 Top ten country roadway networks, shown in million miles 1.0.5

Info Hand-offs Time

Looking Back

Project Timeline Concept Process Approvals Design Maintenance Funding Field Data Construction

State Law Century Code Municipal Government (40) Bidding and Qualification Based Selection (48)

City Projects ND Century Code Develop a long-term plan Inform residents Evaluate whole city / divide into regions Acquiring financing Legal process for project Public involvement Voting vs. protesting

Environmental Review & Permits Dept. of Health NDDOT Game & Fish State Water Commission USDA / NRCS US Fish & Wildlife Historical Preservation Office Railroads Airports ND Parks & Rec US Army Corps of Engineers Tribal Governments County/Township Government Water Resource Districts (Water Board) / Rural Water Districts Other Potential Stakeholders: Wetlands, Utility Companies, Private Landowners, Taxpayers, Gas and Oil Pipelines, Easement Holders, Etc. *Can be dependent on location, project type and funding source

Street Surveys Pavement Management Plans (Large Cities) - Regular evaluations using technology ride quality, roughness,.. - GIS database and mapping - Pavement management software Plan Regular Inspections (Small Cities) - Street surveys, 3-5 year interval - Less technology - Planning

Chad Petersen 701-845-9446 chad.petersen@kljeng.com

Regulations

Time to Start is NOW!!

Info Hand-offs Money

Project Development Planning a key to saving money Project specifications - used to clearly define the material and components

Discovery Phase

Roadway Ailments

Pavement Cross Section

Materials

Costs, Funding and Repayment Engineer s Opinion of Cost Single citywide project Phase project, completion date, milestones Project Funding Low Interest Loans for Streets New for 2017: Infrastructure Revolving Loan from Bank of ND (2% Interest L Repayment Determine Appropriate Length of Time Repayment Options Budget for Work Special assessments Rates / Revenues Sales Tax General Obligation Bonds

Engineer s Opinion of Project Cost Proposed City of Kulm 2016 ($2,000,000) Approximate Assessment per Lineal Footage - $86.96 Projected Repayment Scenarios (100% Financed) Approximate Project Area Front Footage 23,000 Approximate Assessment per Lineal Footage $86.96 City's Annual Payment (15 Years @ 4.5% Interest) $186,227.62 Total Assessment Per Property 25' Lot $2,173.91 50' Lot $4,347.83 75' Lot $6,521.74 100' Lot $8,695.65 Annual Payment per Property (Based on 15-Year @ 4.5% Interest) Assessment Per Foot $8.10 25' Lot $202.42 50' Lot $404.84 75' Lot $607.26 100' Lot $809.69 Notes/Assumptions: 1. This assumes 100% of project is financed. 2. This assumes a straight assessment across all areas. 3. Can consider doing project over multiple phases. 4. We assume interest rate will be better than projected 4.0% interest (conservative).

Cost Estimates (Per Block) Crack Seal $500-1,500 Chip Seal - $2,000 4,000 Edge Mill & Asphalt Overlay - $15,000 25,000 Curb & Gutter - $20,000 30,000 Full Depth Asphalt - $60,000 90,000 Full Depth Concrete - $100,000-150,000 *Costs are highly variable and dependent on factors such as width of street, type of street, size of project, timing of bids/work, location and competition between contractors! See cost estimating handout data provided by Jerod Klabunde, Moore Engineering, and Todd Norton & Mark Lambrecht, Advanced Engineering and Environmental Services, Inc.

Life Cycle Costs Construction Costs Maintenance Costs Salvage Value

Capital Improvements => projects Maintenance => preserve investments

Pavement Deterioration Cost of 'Timely' Maintenance 10 75% Time 8 6 40% Quality Drop Each $1.00 of Renovation Cost 4 2 0 40% Quality Drop 12% Time Will Cost $4.00 to $5.00 if Delayed to Here 0 4 8 12 16 YEARS (Time Varies for Each Road Section) Total Failure

Pavement Preservation Washington State Sample

Alternatives Investment Strategies

Public Expectations

Outreach Efforts

Info Hand-offs Risk

Everyone Loves a.

Construction Loads

Changed Conditions

Frost Damage in Pavement: Causes and Cures (You Tube video) Frost Heaves https://www.youtube.com/watch?v=7gjtfacxvru

Industry Trends

Maintenance Equipment Needs

Types of Pavement Failures

Band-Aids or Stitches?

Info Hand-offs Time Money Risk

Roman Engineer Resource List ND Century Code: Section 40 (Municipal) Section 43 (Engineer) Section 48 (Bid Threshold) ND Local Government Manual NDLC ND Officials Handbook ADA Guide for Small Towns

Handouts Process Checklist ADA Guide Street Assessment Rough Estimating Info Presenter Contact Info

take charge and create the future you want!

City Projects Concepts, Costing & Construction Dale C. Heglund, PE/PLS - Program Director, NDLTAP 701-318-6893 dale.heglund@ndsu.edu Jerod Klabunde, PE Project Manager, Moore Engineering 701-566-4289 Jklabunde@mooreengineeringinc.com NDLC Annual Conference, Fargo Sept 29, 2017