A DJUSTMENTS. C. Parties Involved: Applicant/Owner Church Divinity School of the Pacific, 2451 Ridge Rd., Berkeley, 94709

Similar documents
Z O N I N G A DJUSTMENTS B O A R D

A. Land Use Designations: General Plan: LDR Low Density Residential Zoning: R-1H Single Family Residential - Hillside Overlay

A. Land Use Designations: General Plan: Single-Family Residential Zoning: R-1H, Single-Family Residential, Hillside District

A DJUSTMENTS. C. Parties Involved: Applicant/Owner: Guy Supawit, on the behalf of Wat Mongkolratanaram, 1911 Russell Street, Berkeley CA

A DJUSTMENTS. A. Zoning Permits Required: Use Permit to construct a dwelling unit, as required by BMC Section 23D

Rigoberto Calocarivas, Multicultural Institute, 1920 Seventh St., Berkeley, CA 94710

8 Maybeck Twin Drive Use Permit ZP# to construct a new, three-story, 2,557-square-foot single-family dwelling on a vacant lot.

Use Permit # to establish beer and wine service with meals within an existing quick-service restaurant space.

Z O N I N G A DJUSTMENTS B O A R D

Z O N I N G A D J U S T M E N T S B O A R D S t a f f R e p o r t FOR BOARD ACTION MARCH 31, Berkeley Way UC Press Building

A DJUSTMENTS. B. Permits Requested Pursuant to State Density Bonus Law:

D. Applicant: Muhammad A. Nadhiri, Axis Development Group, 580 California Street, 16 th Floor, San Francisco, CA 94104

The demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken.

2109 Martin Luther King, Jr. Way

Z O N I N G A DJUSTMENTS B O A R D

C. CEQA Determination: Categorically exempt pursuant to Section ( In-Fill Development Projects ) of the CEQA Guidelines.

812 Page Street. Item 10 June 21, Staff Report

P RESERVATION C OMMISSION

1935 ADDISON STREET PRELIMINARY DESIGN REVIEW

- Project Preview - D. CEQA Determination: Categorically exempt pursuant to Section (In-Fill Development Projects) of the CEQA Guidelines.

A. Land Use Designations: General Plan: Downtown Zoning: Downtown Mixed Use (Core)/ Arts District Overlay C-DMU/ADO

Shattuck Avenue

MEETING OF: June 3, Tom Beil, Goring and Straja Architects

2200 FIFTH STREET PRELIMINARY DESIGN REVIEW

L A N D M A R K S P R E S E R V A T I O N C O M M I S S I O N

Honorable Mayor and Members of the City Council

COUNTY OF SAN MATEO PLANNING AND BUILDING DEPARTMENT

ORDINANCE NO

A. CEQA Determination: An Environmental Impact Report (EIR) is being prepared.

Planning Commission Report

Item 12 April 20, 2016

739 Channing Way PRELIMINARY DESIGN REVIEW

Conduct a hearing on the appeal, consider all evidence and testimony, and take one of the following actions:

652 Lockhaven Drive, Pacifica, CA Shattuck Avenue, B100 Berkeley, CA 94704

City of Placerville Planning Commission STAFF REPORT

CITY OF BUENA PARK MINUTES OF ZONING ADMINISTRATOR HEARING March 2, 2016

Review Authority. CMC Section (D) requires that applications for a Site Plan Review be reviewed by the commission at a public hearing.

A G E N D A CITY OF BUENA PARK ZONING ADMINISTRATOR

Item 9 September 7, 2016

COUNTY OF SACRAMENTO CALIFORNIA ZONING ADMINISTRATOR REPORT

PA Conditional Use Permit for Kumon Learning Center at 1027 San Pablo Ave.

PA Parking Adjustment for a change in use at 1300 Solano Ave.

TOWN OF SAN ANSELMO PLANNING COMMISSION STAFF REPORT. For the meeting of January 11, Agenda Item 6C. Zone X (Minimal Flood Hazard Area)

LAND USE PLANNING FEES

A G E N D A CITY OF BUENA PARK ZONING ADMINISTRATOR

SANTA BARBARA COUNTY ZONING ADMINISTRATOR Staff Report for Coleman SFD Addition Coastal Development Permit with Hearing

PLANNING COMMISSION STAFF REPORT

Agenda Report TO: CITY COUNCIL DATE: NOVEMBER 20,2006

Honorable Chairman and Members of the Planning Commission

Durant Apartments Durant Avenue, Berkeley. Applicant OPHCA's Amended Statement for August 21, 2014 DRC Meeting

BEVERLY HILLS. Planning Commission Report

LOT AREA AND FRONTAGE

CITY OF PISMO BEACH PLANNING COMMISSION AGENDA REPORT

Planning Commission Report

Office of the City Manager ACTION CALENDAR March 10, 2009

WALNUT CREEK DESIGN REVIEW COMMISSION STAFF REPORT. AGENDA: July 6, 2016 ITEM 4b.

RESOLUTION PC NOW THEREFORE, the Planning Commission of the City of Duarte resolves as follows:

AGENDA CITY OF EL MONTE MODIFICATION COMMITTEE TUESDAY OCTOBER 23, :00 P.M. CITY HALL WEST CONFERENCE ROOM A VALLEY BOULEVARD

Secondary Dwelling Unit

Durant Ave., Berkeley

4 LAND USE 4.1 OBJECTIVES

That the Planning Commission finds and advises EBMUD that the proposed disposal of property is in conformance with the County General Plan.

Planning Commission Report

Second Reading and Adoption of Zone Text Amendment Ordinance 1/15/19

Proposed Changes to Conservation District Regulations. Quality of Life Committee March 25, 2013

City of San Juan Capistrano Agenda Report

P.C. RESOLUTION NO

1708 Martin Luther King Jr. Way

4.2 LAND USE INTRODUCTION

AGENDA COMMITTEE OPENING OF. use. given the. by staff. CHAIRPERSON DALLAS BAKER CITY PLANNER OFFICIAL TODD MORRIS CHIEF BUILDING

Mary J. Berg House 2517 Regent Street

CHAPTER XV PUD PLANNED UNIT DEVELOPMENT DISTRICT

PART 3 RESIDENTIAL ZONING DISTRICTS. Designation of Residential Zoning Districts and Purpose Statements.


ATTACHMENT 2 PLANNING COMMISSION STAFF REPORT

City of Escondido Zoning Administrator

Cambridge Planning Board Zoning Submission Overview 7/25/2017

CITY PLANNING COMMISSION CITY OF NEW ORLEANS EXECUTIVE DIRECTOR. City Planning Commission Staff Report. Executive Summary

Zoning Administrator Agenda Report Meeting Date 6/12/2018

The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division

Honorable Mayor and Members of the City Council. Submitted by: Dan Marks, Director, Planning and Development

TOWN OF SAN ANSELMO PLANNING COMMISSION STAFF REPORT. For the meeting of December 7, Agenda Item 5A

MONTEREY COUNTY PLANNING COMMISSION

1984 San Antonio Avenue

Plan ning Commission Report

71 RUSSELL AVENUE. PLANNING RATIONALE FOR SITE PLAN CONTROL APPLICATION (Design Brief)

EXHIBIT F RESOLUTION NO.

Planning Commission Report

BUILDING AN ADU GUIDE TO ACCESSORY DWELLING UNITS PLANNING DIVISION

Planning Commission. Hetfield Estates

STAFF REPORT. January 25, North York Community Council. Director, Community Planning, North District

MONTEREY COUNTY ZONING ADMINISTRATOR

CITY COUNCIL OF THE CITY OF NOVATO

VRLYRLY. Planning Commission Report. City of Beverly Hills Planning Division. Meeting Date: July 13, Subject: 462 SOUTH REXFORD DRIVE

5. Housing. Other Relevant Policies & Bylaws. Several City-wide policies guide our priorities for housing diversity at the neighbourhood level: Goals

Planning Commission Report

Honorable Members of the Rent Stabilization Board. IRA/AGA/Habitability Committee. Rent Control Status of Dwelling Units at 3240 Sacramento Street

D1 August 12, 2015 Public Hearing APPLICANT: CCW DEVELOPMENT ASSOCIATES, LLC PROPERTY OWNER: WAYNE DUPREE

DT Downtown. a) Intent. The "downtown (DT) district" is designed for the commercial core of Lake Worth, primarily along Lake and Lucerne Avenues from

PLNPCM : Attached Garage Regulations for Residential Districts ZONING TEXT AMENDMENT

Transcription:

Z O N I N G A DJUSTMENTS B O A R D S t a f f R e p o r t FOR BOARD ACTION APRIL 10, 2008 2451 Ridge Road Use Permit #04-10000066 to demolish rear portion of existing seminary chapel and construct new chapel with same seating capacity, average height of 28 feet, 3 inches, and 2,862 square feet of floor area, on a lot of 109,601 square feet (R-4H, AS) I. Application Basics A. Zoning Permits Required: Use Permit to demolish more than 50 percent of exterior walls and roof of a nonresidential main building, under BMC Section 23C.08.050.A Administrative Use Permit to allow cupola to exceed 35-foot height limit (by approximately 19 feet, 3 inches), under BMC Sections 23D.04.020.C and 23E.96.070.B Modification to existing seminary Use Permit, under BMC Section 23B.56.020 B. CEQA Determination: Categorically exempt pursuant to Sections 15301 and 15332 of the CEQA Guidelines ( Existing Facilities and In-Fill Development Projects ). C. Parties Involved: Applicant/Owner Church Divinity School of the Pacific, 2451 Ridge Rd., Berkeley, 94709 2120 Milvia Street, Berkeley, CA 94704 Tel: 510.981.7410 TDD: 510.981.7474 Fax: 510.981.7420 E-mail: zab@ci.berkeley.ca.us

2451 RIDGE ROAD ZONING ADJUSTMENTS BOARD Page 2 of 9 April 10, 2008 Figure 1: Vicinity Map

ZONING ADJUSTMENTS BOARD 2451 RIDGE ROAD April 10, 2008 Page 3 of 9 Figure 2: Site Plan

2451 RIDGE ROAD ZONING ADJUSTMENTS BOARD Page 4 of 9 April 10, 2008 Table 1: Land Use Information Location Existing Use Zoning District General Plan Designation Subject Property Seminary R-4H High Density Residential Surrounding Properties North University Christian Church, Starr King School of Ministry, GTU student apartments, offices, bookstore R-4H South GTU library, student cooperative R-4H housing (Casa Zimbabwe and Ridge House) East Multi-family housing R-3H (Multiple Family Residential) High Density Residential High Density Residential Medium Density Residential West Pacific School of Religion R-4H High Density Residential Table 2: Special Characteristics Characteristic Applies Explanation to Project? Creeks N No creeks within 30 feet of subject property. Historic Resources N No designated resources on subject property. LPC has reviewed project and did not initiate as City landmark. Oak Trees Y There is a protected coast live oak in the vicinity of the proposed construction. The project has been redesigned to provide an adequate setback from the tree, and tree protection measures will be required during construction. Seismic Hazards N Subject property is not located within any seismic hazard zone. Green Building Score N Project application received prior to initiation of Green Building requirements. Table 3: Project Chronology Date June 7, 2004 July 12, 2007 September 6, 2007 March 27, 2008 April 10, 2008 May 30, 2008 Action Application submitted Application deemed complete LPC hearing Public hearing notices mailed/posted ZAB hearing PSA deadline

ZONING ADJUSTMENTS BOARD 2451 RIDGE ROAD April 10, 2008 Page 5 of 9 Table 4: Development Standards Standard Existing Addition/ Proposed Permitted/ BMC Sections 23D.40.070-080 (Reduction) Total Required Lot Area (sq. ft.) 109,601 -- 109,601 5,000 Gross Floor Area (sq. ft.) 83,179 1,862 85,041 N/A Floor Area Ratio 0.76 0.02 0.78 N/A Building Height Building Setbacks (ft.) (for new construction) Average (ft.) Sacristy: ~18-6 9-9 28-3 (cupola: 54-3 )* Maximum (ft.) ~26 ~7 33 (cupola: 54-3 )* Stories 1 1 1 3 Front (Ridge) -- -- 35 15 Rear (Le Conte) -- -- ~60 15 Left Side (West) -- -- 4 4 Right Side -- -- ~157 6 (Euclid) Lot Coverage (%) 29.9 1.7 31.6 40 Parking 77 -- 77 ** * AUP requested to allow cupola to exceed 35-foot limit. ** Determined by ZAB on case-by-case basis under Section 23D.40.080.B. 35 35 II. Project Setting A. Neighborhood/Area Description: The project site is part of the Graduate Theological Union (GTU), a cluster of religious schools about one block north of the UC campus. Apart from these institutions, the predominant uses in the immediate neighborhood are higher-density residential uses such as student cooperatives and apartments, and commercial uses (primarily restaurants) located on Euclid Avenue to the east. The architectural character of the site and neighborhood is mixed, with both pre-1940 historicist structures such as the chapel on the subject property, and more modern postwar structures such as the GTU library and the Ridge House cooperative directly south of the site. The nearest City landmark is located approximately 300 feet southwest of the site at 1820 Scenic Avenue ( Benjamin Ide Wheeler House and Garden ). B. Site Conditions: The subject property has been developed as an Episcopal seminary, the Church Divinity School of the Pacific (CDSP). The seminary occupies the entire block

2451 RIDGE ROAD ZONING ADJUSTMENTS BOARD Page 6 of 9 April 10, 2008 bounded by Ridge Road, LeConte Avenue, and Euclid Avenue. It contains several buildings in a range of styles reflecting the character of the surrounding neighborhood. The proposed building site is located in the central west portion of the block, which is currently occupied by the rear portion of the existing chapel, and by a landscaped courtyard adjacent to the chapel. According to an architectural historian s report submitted to the LPC, the existing chapel consists of three portions. The front portion of the chapel was built in 1937 from a design by Walter Ratcliff. The rear portion consists of a second Ratcliff building, built in 1940 and originally separate from the 1937 chapel. The middle portion consists of a 1959 addition that joined the two Ratcliff buildings together. Neither the chapel, nor any other building on the site, is a designated historical resource or listed on the State Historic Resources Inventory. According to the historian s report, the 1937 portion appears to be eligible for the California Register of Historical Resources due to its significant contribution to the broad patterns of local religious history, in this case the development of theological education in Berkeley. III. Project Description The proposed project would remove the middle and rear portions of the existing chapel and construct a new chapel to be connected to the front portion via a single-story link structure. The project removes slightly more than fifty percent of the total exterior walls and roof of the existing chapel, and therefore constitutes a demolition under the Zoning Ordinance. The new chapel would seat 146, roughly the same number as the existing chapel, although in a more functional and comfortable space. The new chapel would have a square footprint measuring 53 feet, 6 inches on each side, and a steep-pitched, pyramidal roof rising to a central cupola about 19 feet above the main roof and topped with a cross. The total height including the cupola would be about 54 feet, 3 inches. The roof would be constructed of standing seam metal and the walls primarily of glass, with inner walls providing the main support. The link structure would be constructed of board-formed concrete and would provide a small side chapel, organ equipment room, storage room, and men s restroom. The front portion of the existing chapel would be renovated and utilized as a sacristy 1, small office, storage room, and women s restroom. The project also includes various accessibility upgrades to the site, including an elevator from the adjacent courtyard to the site s north parking lot, and a lot line adjustment (to be approved separately) that will modify the property line between the new chapel and 1 A sacristy is a room used to store garments and other articles used in religious services. The applicants have indicated that this sacristy may also be used for educational purposes, i.e., training seminarians in how to prepare for and conduct religious services.

ZONING ADJUSTMENTS BOARD 2451 RIDGE ROAD April 10, 2008 Page 7 of 9 Easton Hall to the west, in order to meet the required zoning setbacks. The lot line adjustment will not substantially change the area of the subject property. IV. Community Discussion A. Neighbor/Community Concerns: At this writing staff has not received any communications indicating concerns regarding the project. B. Committee Review: On September 6, 2007, the Landmarks Preservation Commission (LPC) reviewed the proposed demolition and chose to pass on initiating the structure as a landmark. V. Issues and Analysis A. Key Issues: 1. Historical Resources: As noted above, the LPC chose to pass on initiating the existing chapel as a landmark, and there are no designated historical resources on the site. According to the architectural historian s report, the portions of the chapel to be removed do not qualify as historical resources for the purposes of the California Environmental Quality Act (CEQA), and the proposed addition has been designed to conform to the Secretary of the Interior s Standards, so as to avoid any significant impact on the historical significance of the front portion of the chapel. The report therefore concludes that the project would not have a significant impact on any historical resources. Staff agrees with this conclusion. 2. Parking: The site has 77 parking spaces, a fairly high number in comparison with most of the other nearby seminaries. The project would not significantly increase the seminary s parking demand, because it would not increase the seating capacity of the chapel. The additional floor area created by the project would be occupied mainly by ancillary spaces that do not contribute significantly to parking demand, such as the sacristy, restrooms, and storage areas. Therefore the project would not have a significant impact due to parking demand. 3. Neighborhood Scale and Character: The proposed chapel would be compatible with the scale and character of the surrounding neighborhood for several reasons. First, the modernist forms and materials of the chapel would be appropriate because the surrounding buildings are eclectic both in style and scale, and they include a significant number of modernist buildings, such as the GTU library and Ridge House cooperative to the south, Shires Hall to the east, and Parsons Hall to the north. Second, the height of the chapel would be appropriate because it would be set back substantially from the public right-of-

2451 RIDGE ROAD ZONING ADJUSTMENTS BOARD Page 8 of 9 April 10, 2008 way, and would be partially screened by landscaping, other buildings, and the uneven topography of the site. Third, the building has a simple but attractive design that will enhance the neighborhood and complement the other notable buildings in the vicinity. 4. Oak Tree: A coast live oak tree is located in the courtyard to the west of the existing chapel, near the west corner of the proposed chapel. As noted in Table 2 above, the project has been redesigned to provide an adequate setback from the tree, and tree protection measures will be required during construction (see Condition 9). B. General and Area Plan Consistency: General Plan Policy Analysis: The 2002 General Plan contains several policies applicable to the project, including the following: 1. Policy LU-3 Infill Development: Encourage infill development that is architecturally and environmentally sensitive, embodies principles of sustainable planning and construction, and is compatible with neighboring land uses and architectural design and scale. 2. Policy LU-7 Neighborhood Quality of Life, Action A: Require that new development be consistent with zoning standards and compatible with the scale, historic character, and surrounding uses in the area. 3. Policy UD-16 Context: The design and scale of new or remodeled buildings should respect the built environment in the area, particularly where the character of the built environment is largely defined by an aggregation of historically and architecturally significant buildings. 4. Policy UD-24 Area Character: Regulate new construction and alterations to ensure that they are truly compatible with and, where feasible, reinforce the desirable design characteristics of the particular area they are in. Staff Analysis: See Neighborhood Scale and Character in Key Issues above. 5. Policy UD-32 Shadows: New buildings should be designed to minimize impacts on solar access and minimize detrimental shadows. Staff Analysis: The roof form and setbacks of the new chapel will minimize additional shadows on adjacent properties.

ZONING ADJUSTMENTS BOARD 2451 RIDGE ROAD April 10, 2008 Page 9 of 9 VI. Recommendation Because of the project s consistency with the Zoning Ordinance and General Plan, and minimal impact on surrounding properties, Staff recommends that the Zoning Adjustments Board APPROVE Use Permit 04-10000066 pursuant to Section 23B.32.040 and subject to the attached Findings and Conditions (see Attachment 1). Attachments: 1. Findings and Conditions 2. Project Plans, dated March 31, 2008 and August 26, 2004 3. Photos 4. Notice of Public Hearing 5. Correspondence Received Staff Planner: Aaron Sage, asage@ci.berkeley.ca.us, (510) 981-7410