COLLIER COUNTY Growth Management Department Engineering Review Services

Similar documents
GROWTH MANAGEMENT DIVISION NAPLES, FLORIDA (239) FAX: (239)

ORANGE BLOSSOM GARDENS PLANNED UNIT DEVELOPMENT PREPARED BY: COASTAL ENGINEERING CONSULTANTS, INC.

CONSTRUCTION PLANS for HALCYON A RESIDENTIAL SUBDIVISION 6100 MIDNIGHT PASS ROAD, SARASOTA, FL 34242

Planning and Zoning Division Department of Community Development. Applicant: Ivory Towns LLC

LOCATION AND EXTENT REVIEW FOR DEVELOPMENT OF PUBLIC FACILITIES (Revised 3/1/2017)

Alvarez Engineers, Inc.

This is a New Findings of Adequacy for a Recorded Plat (Plat Book 179, Page 131) LAND USE Vacant Effective Plan: Pompano Beach

SPECIAL EXCEPTION APPLICATION LEVY COUNTY, FLORIDA. Fee: (see fee schedule) Validation No.

Condominium Unit Requirements.

(a) Commercial uses on Laurel Avenue, abutting the TRO District to the

File Name: Conditional Use Application_2017

Cover Letter with Narrative Statement

Exhibit "A" have applied for a re-zoning and re-classification of that property from OPEN RURAL (OR) to that of a PLANNED UNIT DEVELOPMENT (PUD); and

COLLIER COUNTY Growth Management Department

Proposed 2.53 Acres Park Plan Designation: Regional Activity Center: See attached comments from the Planning Council.

Time Extension Staff Report

ARTICLE 13 CONDOMINIUM REGULATIONS

DRAFT Resolution File No.: CU

THE CITY OF MOBILE, ALABAMA

RESOLUTION R EAST COUNTY MIDDLE SCHOOL SCHOOL SITE PLAN SSP DTS

Residential Minor Subdivision Review Checklist

SUBJECT: Application for Planned Unit Development and Rezoning 1725 Winnetka Road

City of Melissa, Texas Plat Dedication Language

Residential Major Subdivision Review Checklist

FINAL PLAT AMENDMENT APPLICATION Minor / Major / Administrative (Revised 3/1/2017)

CONDOMINIUM APPLICATION GUIDE application for approval under Section 51 of the Planning Act, R.S.O. 1990

FINAL PLAT AMENDMENT APPLICATION Minor / Major / Administrative (Revised 3/1/2017)

Level III Preliminary and Final Site Plans Development Review Application Portland, Maine Planning and Urban Development Department Planning Division

The Following Guidelines are to be used in conjunction with the Deed Restrictions for Rotonda West.

PLANNED DEVELOPMENT DISTRICT STANDARDS. Cadence Site

PETITION APPLICATION PROCEDURE

APPLICATION FOR PLAN EXAMINATION / BUILDING PERMIT or ZONING PERMIT

Explanation of Permanent Stormwater Management Facilities Maintenance Agreement

C O M M U N I T Y D E VELOPMENT S E R VICES PLEASE CHECK ALL THAT APPLY

ARTICLE 1 GENERAL PROVISIONS AUTHORITY AND ADMINISTRATION RESPONSIBILITIES OF DEVELOPER AND PLANNING COMMISSION

PLANNING & ZONING DEPARTMENT 401 South Rogers Street Waxahachie, Texas (469)

RE: File No. LD 1516 Certified Survey Map Tradewinds Parkway (B-R Enterprises of Madison, LLC)

City and County of Broomfield, Colorado

DEVELOPMENT POLICY INFRASTRUCTURE GUIDELINES FOR NEW DEVELOPMENT

Existing Zoning: Commercial (C-1) Proposed Zoning: Commercial (C-1)

LAND USE 1 Single Family Detached Unit Effective Plan: Cooper City

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST

SPRING BROOK TOWNSHIP 966 STATE ROUTE 307 SPRING BROOK TOWNSHIP, PA PHONE (570) FAX (570)

City of Sanibel. Planning Department STAFF REPORT

Marco Island Executive Airport - New Terminal Building & Airside Improvements

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. June 3, 2011

SITE PLAN REVIEW PROCEDURES SECTION DEVELOPMENTS REQUIRING SITE PLAN APPROVAL

STAFF REPORT Strok Plat 058-MP-89

This division may be cited as the Subdivision Map Act.

INSTRUCTIONS FOR LEASE APPLICATIONS LISTED BELOW ARE PROCEDURES AND DOCUMENTS THAT WILL BE REQUIRED FOR APPROVAL OF LEASE:

BY THE CITY COMMISSION ORDINANCE NO.:

Agenda Item 7 Meeting of 06/10/15 RESOLUTION NO.15-

This is a New Finding of Adequacy for a Recorded Plat (Plat Book 179, Page ) Replat: LAND USE Guard House Effective Plan: Davie.

ARTICLE V PRELIMINARY PLAN SUBMISSION

Packet Contents: Page #

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services.

SECTION A-1500 UNIFIED DEVELOPMENT ORDINANCE SECTION A-1600

APPLICATION for MINOR SUBDIVISION REVIEW for CONCEPT and FINAL PLAT within COALVILLE CITY. Project Name: Project Address or Area: Name of Owner:

TOWNSHIP OF INDIANA PLANNING COMMISSION MARCH 22, 2017

LAND USE Vacant Effective Plan: Tamarac. 4,300 Sq. Ft. Office Plan Designation: Commercial. See attached comments from the Planning Council.

Form 11.A.9.17 INSTRUCTIONS FOR APPLICATION FOR PLAT WAIVER (Art. 11.A.8)

STATE OF MICHIGAN COUNTY OF BERRIEN ORONOKO CHARTER TOWNSHIP PRIVATE ROAD ORDINANCE ORDINANCE NO. 65

A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT

4. Building plans should include top of foundation elevation

APPLICATION PROCEDURES FOR A PLAT AMENDMENT OR REVISION

SCOTT TOWNSHIP-LACKAWANNA COUNTY, PA ORDINANCE NO

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2011

PERMITTED USES: Within the MX-1 Mixed Use Neighborhood District the following uses are permitted:

THE CORPORATION OF THE TOWN OF EAST GWILLIMBURY BY-LAW 2016-

SHEDS. You must submit the following items:**

TOWNSHIP OF DOYLESTOWN APPLICATION FOR REVIEW OF SUBDIVISION OR LAND DEVELOPMENT PROPOSAL. Please PRINT; all information MUST be filled out completely

TERMS AND CONDITIONS FOR SUBSCRIPTION TO WESTWOOD EXTENSION ESTATE

SITE CONDOMINIUMS OR CONDOMINIUM SUBDIVISIONS

Planning Department st Avenue East Kalispell, MT Phone: (406) Fax: (406)

THE CITY OF MOBILE, ALABAMA MOBILE Crry PLANNING COMMISSION

Conditional Use Sketch Plan Application Non-Residential Zone

ARTICLE 1 GENERAL PROVISIONS

in Article 5 of the Palm Beach County Unified Land Development Code

DESCRIPTION OF THE DISTRICT

Summary of Changes to TREC Contract Forms Effective February 12, 2018

Northeast Corner of Ocean Boulevard/AIA and Northeast 2 Street Pompano Beach Gross Area: N/A

New Private Way Ordinance Westbrook Planning Board Workshop , Planning Board Public Hearing Definitions

LAND USE APPLICATION

ment a) Construction of Municipal Improvements including landscaping that will be on municipal property or rights-of-way.

Storm Water Management BMP Maintenance Agreement City of St. George, Utah

EXHIBIT A FOR HAMILTON PLACE RPUD

TERMS AND CONDITIONS FOR SUBSCRIPTION TO WESTWOOD PARK ESTATE PHASE II

Wilton Manors. Replat: N/A. LAND USE 3,989 Sq. Ft. Animal Hospital and 6,659 Sq. Ft. Commercial 12,000 Sq. Ft. Office (3,989 Existing, 8,011 Proposed)

WASHINGTON TOWNSHIP MUNICIPAL UTILITIES AUTHORITY Appendix A Rate Schedule

THE CITY OF MOBILE, ALABAMA

PINE RIDGE COMMONS PUD AMEND ORDINANCE NUMBER 99-94

APPLICATION. Telephone Fax Address. Telephone Fax Address FOR MARTIN COUNTY USE ONLY

Chapter IX Site Grading/Construction

LAKE WORTH DRAINAGE DISTRICT OPERATING POLICIES TABLE OF CONTENTS

CONDOMINIUM REGULATIONS

Incorporated Village of Port Jefferson 88 North Country Road, Port Jefferson, NY Telephone: (631) Fax: (631)

CHAPTER 14 PLANNED UNIT DEVELOPMENTS

The construction or installation of a minor structure or service system in an easement shall be by design and shall be easily removed if required.

ARTICLE V GATED DEVELOPMENTS GENERAL REQUIREMENTS & STANDARDS OF DESIGN

VILLAGE OF WILMETTE Grading and Tree Protection Notice Forms

Transcription:

COLLIER COUNTY Growth Management Department Engineering Review Services October 13, 2015 Josh Fruth Davidson Engineering, Inc. 4365 Radio Rd Suite 201 Naples, FL 34104 Re: Final Site Development Plans Approval SDP Midgard Storage (Vanderbilt Commons) - (SDP) Project Number: PL20150000718 Dear Mr. Fruth, Davidson Engineering, Inc.: THIS IS YOUR PERMIT AND MUST BE POSTED ONSITE! Land Development Services Department has reviewed the Final Site Development Plan for the referenced project and has no objection to the construction of water, sewer, paving, and drainage aspects of the project subject to the following stipulations: By receipt and acceptance of this approval, the petitioner acknowledges that a pre-construction meeting is required by code for this project. If the pre-construction meeting is not held prior to the beginning of construction, the project will be cited and shut down until the required meeting is held. Please call the Engineering Inspections Supervisor at 239-252-6820 to schedule a pre-construction meeting at a minimum of 48 hours prior to the start of construction. Even with an Early Work Authorization a pre-construction meeting is required. General Conditions CHANGES IN USE AND/OR DESIGN OF THESE SITE AND ACHITECTURAL PLANS ARE NOT AUTHORIZED WITHOUT WRITTEN APPROVAL BY THE COUNTY. CHANGES SHALL REQUIRE RE REVIEW IN ACCORDANCE WITH ALL CURRENT COUNTY CODES INCLUDING PARKING FACILITIES, UTILITIES, TRANSPORTATION, ENVIRONMENTAL REQUIREMENTS AND THE LIKE. A preliminary inspection and approval of the infrastructure for multi-family residential must be done by Engineer Inspections prior to any Certificate of Occupancy being granted. Permits from other agencies having jurisdiction over this project shall be obtained prior to start of construction.

Please call Mr. David Crane at (239) 252-6820 to schedule a pre construction meeting a minimum of 48 hours prior to start of construction. This Final Site Development Plan is approved due to the issuance of a Certificate of Public Facility Adequacy #15-0044 with respect to Collier County Ordinance 93-82. All construction activities permitted by this letter shall only occur during the following times: 6:30 A.M. to 7:00 P.M., Monday through Saturday; no work is permitted on Sundays and the following holidays: New Year's Day, Memorial Day, 4th of July, Labor Day, Thanksgiving Day, Christmas Day. The review and approval of these improvement plans does not authorize the construction of required improvements, which are inconsistent with easement of record. Upon completion of the infrastructure improvements associated with a site development plan and prior to the issuance of a certificate of occupancy, the engineer shall provide a completion certificate as to the improvements, together with all applicable items referenced in Section 10.02.05 of this code including electronic disk. Upon a satisfactory inspection of the improvements, a certificate of occupancy may then be issued. Zoning Conditions SIGNAGE RESTRICTIONS: Please be advised that any permanent sign (wall, ground, monument, directory, etc.) requires a separate building permit and must meet the provisions of the Collier County Land Development Code, Section 5.06, and/or the applicable provisions of the governing Planned Unit Development (PUD) document, regardless of any sign placement, dimensions or color depicted on the site and/or architectural plans approved by this letter. All PUD related stipulations shall apply to this project. Utility Conditions See attached Exhibit "A" Written confirmation from that the water/sewer facilities have been accepted and placed in service must be provided prior to issuance of a Certificate of Occupancy. APPROVAL OF THESE PLANS DOES NOT CONSTITUTE APPROVAL OF THE METER SIZE. SIZING OF THE METER SHALL BE DONE WITH THE APPROVAL OF PUBLIC UTILITIES ENGINEERING DIRECTOR OR HIS DESIGNEE, BASED ON DOCUMENTATION RECEIVED FROM THE ENGINEERING OF RECORD. THE METER DETAIL SHALL BE SUBMITTED

TO ENGINEERING REVIEW SERVICE FOR APPROVAL PRIOR TO INSTALLATION. No water or sewer utility construction shall commence until proper DEP permits have been obtained. Subdivision Conditions All work shall be in accordance with applicable Collier County ordinances and rules and regulations of other entities having jurisdiction over the project. Environmental Conditions Site clearing is conditioned to the stipulations contained on the approved plans. Required permits for listed species relocation must be provided to staff at the pre-construction meeting. Silt fencing must be installed prior to any mechanical clearing. Exotic vegetation must be removed prior to preliminary acceptance as required on the approved plans. Water Management Conditions All work shall be in accordance with applicable State or Federal rules and regulations. Work area shall be properly barricaded with hay bales and/or silt screens during the entire time of construction, to prevent any siltation during construction. The engineer of record, prior to issuance of a Certificate of Occupancy, shall provide documentation from the stormwater maintenance entity that it has been provided information on how the stormwater system works and their responsibility to maintain the system. This project shall be permitted by SFWMD. Whether or not this project was permitted by SFWMD, dewatering shall not occur without a dewatering permit from the South Florida Water Management District. Addressing Conditions Pursuant to Ordinance No. 07-62, no proposed subdivision, street, building, condominium or development may utilize the same name or a similar sounding name as any existing subdivision, street, building, condominium or development, except that the major street within a subdivision may utilize the name of the subdivision. Any changes to the project name shall be reviewed and approved by Growth Management Division/Planning and Regulation Addressing Section.

Landscaping Conditions At the time of Preliminary Acceptance the Landscape Architect shall certify that he landscaping has been installed in substantial accordance with the approved plans and specifications. The certification shall be in a form approved by the County Manager or his designee. Fire Protection Conditions Please note that prior to the accumulation of combustible building materials on site, proposed fire hydrants must be operable with the minimum required fire flows and improved stabilized emergency apparatus access ways (min. 20' wide) must be available to within 100' of the structures. No fire appliances shall be obstructed, visually or functionally, by vegetation. Additional Stipulations 9/25/15 Stipulation: The full median opening at the intersection of Buckstone Drive and Vanderbilt Beach Road is under study by Collier County, and left-turn traffic from Buckstone Drive to Vanderbilt Beach Road may be restricted in the future. The resulting traffic distribution after such a restriction would be as shown in the TIS for Midgard Storage Addendum dated September 18, 2015. Issuance of a development permit by a county does not in any way create any rights on the part of the applicant to obtain a permit from a state or federal agency and does not create any liability on the part of the county for issuance of the permit if the applicant fails to obtain requisite approvals or fulfill the obligations imposed by a state or federal agency or undertakes actions that result in a violation of state or federal law. This permit is conditioned on all other applicable state or federal permits being obtained before commencement of the development. Eight (8) sets of approved plans, five (5) sets of architectural plans and five (5) sets of landscape plans are being returned herewith for your use. Five copies of approved SDP shall be attached to each set of building plans submitted. PURSUANT TO HB 503, PLEASE COMPLETE THE ATTACHED AFFIDAVIT OF COMPLIANCE AND PROVIDE TO CLIENT SERVICES STAFF (252-2400). INCLUDE THE BALANCE OF ANY OUTSTANDING INSPECTION FEES TOGETHER WITH ANY REQUIRED STATE OR FEDERAL PERMITS. UPON PROCESSING THE AFFIDAVIT OF COMPLIANCE, A PRE-CONSTRUCTION MEETING MAY BE SCHEDULED. Be advised that this approval automatically expires in thirty-six (36) months pursuant to Collier County Land Development Code Section 10.02.03 B.4. The expiration date is October 2, 2018. Please call me if you have any questions or need any additional information. Sincerely,

Matt McLean Matthew McLean, P.E. Principal Project Manager Development Review cc: Property Appraiser (w/attach.) Engineering Inspections Supervisor (w/attach.) Customer Services/Addressing (w/attach.) Operations Analyst, Public Utilities Engineering (w/attach.) Fire Review Records-SDP-PL20150000718, (w/attach.)