LOWER LAKE GIRARD DAM THE BREACHING OF AN AMBURSEN DAM GIRARD, OHIO. by Brian H. Greene

Similar documents
BLUESTONE DAM AN OVERVIEW NATIONAL INVENTORY OF DAMS ID: WV08902

BLUESTONE DAM DAM SAFETY ASSURANCE MEGA-PROJECT NATIONAL INVENTORY OF DAMS ID: WV08902

BACKGROUND There are 23 flood control structures in the Upper Brushy Creek Water Control and Improvement District (District). See attached map.

Post Construction and Operations & Maintenance Guidance

Clarksville, TN APPENDIX C STORM WATER AND BMP MAINTENANCE AGREEMENTS AND INSPECTIONS FORMS

VI. SAFETY ELEMENT I. INTRODUCTION A. PURPOSE B. AUTHORITY. 1. Safety

Article III. Erosion and Sedimentation Control

Minnesota Department of Natural Resources 500 Lafayette Road Saint Pau I, Minnesota Office of the Commissioner

RESPONSIBILITY AND PROCEDURE FOR IMPROVEMENT AND MAINTENANCE OF DRAINS, DITCHES AND WATERCOURSES

STORMWATER MANAGEMENT ORDINANCE

City Of Attleboro Conservation Commission

SC Dams and Reservoirs Safety

Appendix E: Hydrologic & Hydraulic Report. Proposed Bridge Replacement SR 1008, Section 02B (Henry Road) Over Bushkill Creek

REQUEST FOR PROPOSALS

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.

7-3. Engineering and Operations Committee. Board of Directors. 7/11/2017 Board Meeting. Subject. Executive Summary

VILLAGE OF ASHVILLE DEPARTMENT OF PUBLIC UTILITIES DIVISION OF STORMWATER MANAGEMENT STORMWATER MANAGEMENT PROGRAM STORMWATER CREDIT MANUAL

Frequently Asked Questions for: Drainage, Watershed and Water Quality Property Owners Near Creeks Developers and Engineers and Definitions of Terms

DRY POND OPERATION & MAINTENANCE AGREEMENT

Case 1:17-mc SGB Document 16 Filed 11/15/17 Page 1 of 36 IN THE UNITED STATES COURT OF FEDERAL CLAIMS

SUBDIVISION & PLANNING APPROVAL STAFF REPORT Date: December 1, 2016

DEED OF EASEMENT & MAINTENANCE AGREEMENT FOR STORMWATER MANAGEMENT FACILITIES THIS DEED OF EASEMENT AND MAINTENANCE AGREEMENT FOR

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER

Rarity Pointe Commercial Recreation and Residential Development on Tellico Reservoir, Loudon and Monroe Counties, TN

Forecasting the September 2016 Flood in the Cedar River Basin

Maintenance Agreement

Content Copy Of Original

CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW MARCH, 2018

Zoning Permit Application

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Draft Continuing Authorities Program Section 1135 Detailed Project Report and Integrated Environmental Assessment

Frequently Asked Questions: June 26, 2018 Adopted Amendments to the City of Santa Cruz Sanitary Sewer Ordinance

PRELIMINARY PLAT Application Packet

HYDRAULIC SERVICES BY - LAW

CAERNARVON TOWNSHIP CONESTOGA RIVER WATERSHED ACT 167 STORM WATER MANAGEMENT ORDINANCE ORDINANCE NUMBER 89 ADOPTED JUNE 2, 2008

CITY OF SANTA CRUZ TRANSPORTATION AND PUBLIC WORKS COMMISSION AGENDA REPORT

WATER PART 1 WATER REGULATIONS

FLOOD HAZARD AREA LAND USE MANAGEMENT

STORMWATER BEST MANAGEMENT PRACTICES OPERATION, MAINTENANCE, AND INSPECTION PLAN AND AGREEMENT

STAFF REPORT. Modifications to the Mill Valley Municipal Code to Require Inspection and Repair ofprivate Sewer Laterals

BWSR MN Public Drainage Manual Broad Users Outreach Workshop John Kolb, Attorney Lead Writer Chapter 4. MPDM Chapter 4: Viewing and Appraising

Raines, Melton & Carella, Inc. Cost Estimating PRWFPA Staff Working Group Tim Harrison Lidia Gutierrez, Karen Frye September 15,

Volume Three Appendix 7. Scheme Plan and other subdivision requirements

Chapter 149 STORM WATER MANAGEMENT

Town of Middleborough Conservation Commission 2014 Policy

Public Notice. Notice No Closing Date: August 16, 2018

ARTICLE (SM) SURFACE MINING ZONE. 2. To allow the development and use of mineral and aggregate resources;

Implementing the DCR Dam Break Inundation Zone Regulations with Local Government

Fraser River Escarpment Policy

Alberta Flood Hazard Identification Program

ARTICLE 7 UTILITIES AND EASEMENTS

REPORT TO THE SHELBY COUNTY PLANNING COMMISSION From the Department of Development Services Planning Services. February 4, 2019

Construction & Earthwork Request Form (CERF)

STORMWATER MANAGEMENT AGREEMENT AND DECLARATION OF EASEMENT

PLANNING BOARD APPLICATION FORM TOWNSHIP OF BETHLEHEM 405 MINE ROAD ASBURY, NEW JERSEY Date of Application: Township Application Number:

Inventory of the Raymond E. Davis Papers, No online items

FISHERIES TIMING WINDOW EXTENSION APPLICATION

Property condition survey for the Ewa Silo building located in the premises of the Port of Szczecin

ADMINISTRATORS REPORT - MAY 16, 2018.PDF

TOWNSHIP OF SALISBURY LEHIGH COUNTY, PENNSYLVANIA. PLANNING COMMISSION MEETING MINUTES 7:30 PM September 11, 2018

Appendix G. Non-Federal Letters of Support and Draft Real Estate Plan

Engineering & Operations Committee Item 7-3 July 10, 2017

NORTH CORNWALL TOWNSHIP STORM WATER MANAGEMENT ORDINANCE

Stormwater Utility Credit and Adjustment Manual

APPLICATION SUBMITTAL REQUIREMENTS FOR Tentative Parcel or Subdivision Maps

BRISTOL CONSERVATION COMMISSION INLAND WETLANDS AGENCY FORM IW-1 (Application for a Wetlands Permit)

Rules & Regulations. Control and Operation of the Water Distribution System

ORDINANCE NO

Federal Mandates and Willing Sellers: Real Estate Acquisition for the Missouri River Recovery Program

Creek Rehabilitation Plan for Apple Valley Questions and Answers from the Pre-Bid Meeting and Site Visit 06/23/2016

Shoreline Use Permits

CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW

INDIANA DRAINAGE LAW. Title 36 Article 9 Chapter 27

REGIONAL DISTRICT OF NANAIMO BYLAW NO. 1469

Dam Safety & Public Waters Work Permit

SPANISH FORT PLANNING COMMISSION PRELIMINARY SUBDIVISION PLAT APPLICATION. Number of Lots (Units) Address. Address.

Swatara Township Lebanon County, Pennsylvania. Subdivision And Land Development Ordinance

SECTION 10: FLOOD HAZARD EVALUATION 10-1

STORMWATER MANAGEMENT FACILITIES AND PRACTICES COVENANT

tjd&a Terrence J. DeWan & Associates Landscape Architects & Planners Yarmouth, Maine tel fax e.mail.

SURFACE MINING INSPECTION REPORT

ENGINEERING CODE FOR SUBDIVISION DEVELOPMENT OF MEDINA COUNTY, OHIO BOARD OF MEDINA COUNTY COMMISSIONERS

Creation of the Lake Holiday Sanitary District;

West Mead Township STORMWATER MANAGEMENT ORDINANCE

WET POND OPERATION & MAINTENANCE AGREEMENT

CONSTRUCTION SITE EROSION CONTROL & STORMWATER MANAGEMENT JULY 3, 2014

FINAL PLAT SUBMITTAL CHECKLIST

Public Sewer Extension Information Packet

STAFF REPORT Administrative Subdivision Hearing West 150 South Street, Parcel # , and

Drainage Study. Report Description. Prepared for: City of Minnetonka Beach. Prepared by: Phillip Elkin, P.E. Darren Amundsen, P.E.

COUNTY OF SAN MATEO PLANNING AND BUILDING DEPARTMENT

SANILAC COUNTY ROAD COMMISSION ROAD POLICIES. A. Drainage, Base and Grade Construction (NON BITUMINOUS)

THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by ("Covenantor"). RECITALS

OFFERING CIRCULAR. 146 Acre Container Farm Irrigated. Presented by:

APPENDIX H REAL ESTATE REQUIREMENTS

THE CORPORATION OF THE TOWNSHIP OF MUSKOKA LAKES BY-LAW NUMBER

Appendix 4 Agency Approval Letters

RICHLAND TOWNSHIP CAMBRIA COUNTY, PENNSYLVANIA COMPREHENSIVE STORMWATER STUDY JULY 2014

FLOOD HAZARD AREA LAND USE MANAGEMENT GUIDELINES. May Ministry of Water, Land and Air Protection. Province of British Columbia

Final Plat Trails at Redwood Falls, Ph. 1 Hinckley Township EXECUTIVE SUMMARY

Transcription:

LOWER LAKE GIRARD DAM THE BREACHING OF AN AMBURSEN DAM GIRARD, OHIO by Brian H. Greene

PRESENTATION OUTLINE PROJECT FEATURES GEOLOGIC SETTING PROJECT HISTORY PRIOR AMBURSEN DAM FAILURES & SUCCESSES DAM SAFETY & STABILIZATION PROPOSALS 2008 BREACHING OF DAM

PROJECT LOCATION Project Location

Concrete slab buttress section Earthen Embankment on right side Lower Lake Girard Dam (Liberty Lake Dam) Concrete overflow spillway on rock on left side Impoundment of Squaw Creek formed Liberty Lake Squaw Creek

PROJECT FEATURES THE STRUCTURE IS A SLAB BUTTRESS DAM BUILT IN 1917. THE CONCRETE SECTION OF THE DAM HAS A MAXIMUM HEIGHT OF 43 FEET ABOVE ITS FOUNDATION AND A LENGTH OF 436 FEET. AN EARTHEN SECTION CONSTITUTES THE RIGHT SIDE OF THE DAM, AND THERE IS AN OVERFLOW SPILLWAY ON ROCK ON THE LEFT SIDE. TOTAL DAM LENGTH IS ABOUT 1,100 FEET. THE 55 ACRE LAKE FORMED BY THE DAM DRAINED AN AREA OF 17.2 SQUARE MILES. WHEN IN OPERATION, MAXIMUM DISCHARGE WAS 6900 cfs

d

SITE GEOLOGY on bedrock

PROJECT HISTORY DAM WAS BUILT IN 1917 BY THE AMBURSEN HYDRAULIC CONSTRUCTION COMPANY OF BOSTON, MASS TO SUPPORT THE INDUSTRIAL NEEDS OF YOUNGSTOWN, OHIO AND THE MAHONING VALLEY. IT WAS LATER PURCHASED BY THE CITY OF GIRARD IN 1995 FROM THE OHIO WATER SERVICE CO. TO BE USED FOR CITY WATER SUPPLY AND RECREATIONAL FISHING. AS OF 1920, OVER 70 AMBURSEN SLAB BUTTRESS TYPE DAMS HAD BEEN BUILT OVER THE U.S. AND CANADA. THREE, INCLUDING LOWER LAKE GIRARD DAM, REMAIN IN OHIO. GIRARD DAM SURVIVED OVER 90 YEARS, HOWEVER NOT ALL AMBURSON DAMS BUILT AFTER 1900 WERE SUCCESSFUL.

ASHLEY DAM, MA (backward erosion of foundation ) 40 ft high slab and buttress dam. Dam was undermined in 1909 after heavy rains. Reservoir emptied in less than an hour leaving a large gap at its base. Indications that the cut off was not taken to bedrock The crest of the dam sagged a few feet. Dam was repaired and returned to service.

STONY RIVER DAM, WV (piping) 50 ft high slab and buttress dam failed in 1914, only 6 months after the reservoir was impounded. Slow leakage noted under dam. Reservoir emptied slowly followed by a blow out of 5 bays at a location where the upstream slab cut off had not been taken into bedrock.

ROCK RUN DAM, PA 42 ft high slab and buttress dam located in eastern PA. The dam was constructed in 1917 and had very few repairs. Upstream slab was cracked w/ severe concrete deterioration. In 1999, rehabilitation of the dam involved filling the critical east bays with concrete and installing a micropile foundation. From November 2001 issue of CIVIL ENGINEERING magazine. Three co-authors were from, and design done by: the Valley Forge, PA office of Gannett Fleming, Inc.

Lower Lake Girard Dam Foundation The concrete section of the dam successfully impounded a reservoir for over 90 years without incident for 2 key reasons: 1. The upstream cut off was properly embedded in rock forming an effective seepage cut off. 2. Downstream buttresses were also taken to rock, thus there was an effective load transfer from the slab to the buttresses to the downstream footers and into bedrock. f f

DAM SAFETY & STABILIZATION 1/2 There were a number of factors that led to the decision to either repair or breach the dam. Key Dam Safety concerns were: 1. The downstream buttresses of the concrete section had severely weathered and there was exposed rebar. 2. The spillway was deemed inadequate and could not effectively pass the PMF without spilling over the dam either the concrete section or earthen section, resulting in failure. 3. Outlet pipes were inadequate to pass inflow in the event of a peak storm.

DAM SAFETY & STABILIZATION The Corps of Engineers was authorized by Congress to undertake a study of rehabilitation of this non-federal dam (championed by the flamboyant Congressman Traficant of Ohio). The Corps study resulted in a design with plans & specifications to rehabilitate the dam by filling the bays with concrete. Problem was that the repair cost was estimated at $16 million and the congressman was imprisoned on Federal corruption charges in 2002. Thus, no further work leading to repairs progressed. ODNR Dam Safety issued an order to the City of Girard to either repair, breach, or remove the dam. In late 2007, the decision was made to breach the dam as this was the least costly alternative.

PRE BREACH LOWER GIRARD DAM (2005)

PRE BREACH LOWER GIRARD DAM (2005)

PRE BREACH LOWER GIRARD DAM (2005)

DAM SAFETY & STABILIZATION Scassa Aggregate & Asphalt, Inc., a local Ohio company was hired to breach the dam for $139,000. All work was completed in August 2008. Breaching consisted of cutting ten - 10 ft by 15 ft openings into the lower upstream slab of the dam permitting a run of river condition. A diamond saw was used to cut the window openings through the 2 feet thick upstream slab.

2008 BREACHING OF LOWER GIRARD DAM

2008 BREACHING OF LOWER GIRARD DAM

POST BREACH LOWER GIRARD DAM View of downstream buttresses Looking at breach slots from downstream to upstream perspective Note - no flow

LOWER GIRARD DAM Sept 3, 2011

LOWER GIRARD DAM Sept 3, 2011

DEWATERED RESERVOIR

POST BREACH LOWER GIRARD DAM After the 10 windows were cut into the inclined upstream slab, Squaw Creek was in a run of river condition. Fertile bottom sediments promoted rapid growth of vegetation..

REVEGITATED RESERVOIR BED

CONCLUSIONS FULLY REHABILITATING AMBURSEN DAMS CAN BE COST PROHIBITIVE AND LOCAL OWNERS OFTEN CAN NOT AFFORD THE WORK. THOSE REHABILITATIONS THAT HAVE BEEN SUCCESSFUL INVOLVE TRANSFORMING THE SLAB / BUTTRESS DAM INTO A GRAVITY DAM STRUCTURE BY FILLING THE BAYS WITH CONCRETE COUPLED WITH FOUNDATION WORK. IN THE CASE OF LOWER LAKE GIRARD DAM, BREACHING WAS THE ONLY FEASIBLE SOLUTION THAT WOULD INSURE DAM SAFETY AND PROTECT DOWNSTREAM RESIDENTS. KEY TAKAWAYS OF BREACHING AN AMBURSEN DAM: COST EFFECTIVE SHORT CONSTRUCTION DURATION NEED TO INVOLVE ALL STAKEHOLDERS ESPECIALLY ENVIRONMENTAL

Acknowledgements City of Girard, Ohio Ohio Dept of Natural Resources - Dam Safety U.S. Army Corps of Engineers, Pittsburgh

THANK YOU!