PP requested to consider the project on 19/09/2016; Committee accepted

Similar documents
AGENDA FOR 51 st MEETING OF SEAC II, MAHARASHTRA

VIEWS ON CLUSTER DEVELOPMENT URBAN RENEWAL SCHEME/CLUSTER DEVELOPMENT [DCR 33/9]

Proposed Agenda For Meeting Of SEAC II, Maharashtra

Agenda of 84 th Meeting of State Expert Appraisal Committee-2 (SEAC-2) Time: 11:00 A.M. to P.M.

LIMITS TO URBAN GROWTH: THE CASE OF MUMBAI

S L U M R E H A B I L I T A T I O N A U T H O R I T Y M U M B A I M A H A R A S H T R A I N D I A M A R C H 2 1 ST

REVISED DRAFT DCR 2034

SHRI GANESHAY NAMAHA

MAHA RERA Application

Block Number 8th Floor Building Name Piramal Tower. Street Name Ganpatrao Kadam Marg Locality Lower Parel (W)

CTBUH Copyright. The Remaking of Mumbai in the Sustainable Age. Mr. Ratnakar Gaikwad

Integrated Township namely Mohali Hills at Sectors 98, 99, 105, 106, 108, 109 and 110, SAS Nagar, Mohali, Punjab by M/s. Emaar MGF Land Ltd.

Formats of Certificates of Architect, Engineer and Chartered Accountant:

The following recommendations were made by the committee in the first meeting held on

TRANSFER PROCEDURE / CHECKLIST

Impact of Building Byelaws on Housing: A Comparative Study of Development Control Rules of Jaipur and Pune

Welcome Navi Mumbai Airport Influence Notified Area (NAINA)

EXECUTIVE SUMMARY. vii

In December 2000, the Ministry of Civil Aviation advised the Maharashtra government to carry out detailed studies on the Navi Mumbai location.

S A N G H A R S H N A G A R NATIONAL PARK SLUM DWELLERS REHABILITATION AT CHANDIVILI N I V A R A H A K K

MAHA RERA Application

NAGPUR IMPROVEMENT TRUST

Details of vendor / Owner / Builder / Firm

TECHNICAL BID TO BE SUBMITTED IN SEALED ENVELOPE - I

Property Valuation Report For the Property Located at

MASTER PLAN PROVISIONS (1st, 2nd & 3rd MASTER PLANS)

India Infrastructure Finance Company Limited Registered Office: 8 th Floor, HT House, 18 & 20, K. G. Marg, New Delhi

DELHI DEVELOPMENT AUTHORITY OFFICE OF PR.COMMISSIONER(H,LD&CWG)

WELCOME. Calicut Development Authority

Presentation on DCR By Shri Manoj Daisaria

CHAPTER VII MAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY

THE LAND POOLING RULES OF THE KINGDOM OF BHUTAN 2009 ROYAL GOVERNMENT OF BHUTAN MINISTRY OF WORKS AND HUMAN SETTLEMENT

A. B. PATWARDHAN B. Sc. (Hons.) G.D. Arch., F.I.I.A.F.I.V. Architects, Engineers, Govt. Regd. Valuers, interior Consultants

Axis Bank Kalina Ref No : MUM VALUATION REPORT SUMMARY Date : 26/11/2016

Planning Rationale in Support of an Application for Plan of Subdivision and Zoning By-Law Amendment

1970 Victoria Park Avenue and 9 Clintwood Gate Zoning By-law Amendment Application Preliminary Report

SHIVSHAHI PUNARVASAN PRAKALP LTD. (Company of Government of Maharashtra)

KATHPUTLI COLONY AND EWS HOUSING AKANKSHA S.RAO MRINALINI VERMA PRATYUSHA HALDER

Director, Community Planning, North York District NNY 23 OZ Related File Nos NNY 23 OZ and NNY 23 SA

ARTICLE 8C SITE CONDOMINIUM DEVELOPMENT ORDINANCE

Highest and Best Usage (HABU) analysis on vacant land

Government of Uttar Pradesh. Workshop for Housing for All Date - 09/08/2016. State Urban Development Agency

NOTICE FOR PREQUALIFICATION OF CONTRACTOR

HILL Chembur, Mumbai. Reliance Enterprises

PUBLIC HEARING INFORMATION PACKAGE

AGENDA FOR 48 th MEETING OF SEAC II, MAHARASHTRA

Date Received: Application Complete? YES / NO

Appendix C. Zoning Matrix

PLYMOUTH PLANNING BOARD APPLICATION FOR A MINOR SUBDIVISION OR MAJOR SUBDIVISION

AGENDA FOR 50 th (Part A ) MEETING OF SEAC II, MAHARASHTRA

307 Sherbourne Street - Zoning Amendment Application - Preliminary Report

HOUSING DEPARTMENT. Madam Cama Marg, Hutatma Rajguru Chowk, Mantralaya, Mumbai , Dated 20th April NOTIFICATION

Special Use Permit - Planned Unit Development Checklist. Property Address:

PROJECT BROCHURE WEST BENGAL HOUSING BOARD.

Church Street and 117 Dundas Street East - Zoning Amendment Application - Preliminary Report

Chapter Planned Residential Development Overlay

Rapid City Planning Commission Vacation of Right-of-Way Project Report June 9, 2016

City of Sanibel. Planning Department STAFF REPORT

JOINT VENTURE DEVELOPMENT (JVD)

4.2 RESIDENTIAL ZONING DISTRICTS

Land Pooling for Smart Cities. Suresh Babu Additional Chief Planner, CIDCO

COMMON (Under the Bye-law Nos. 17(b) and 19(a) (iv)).

Presented by: K.Vidyadhar AMD MEPMA

pvt. ltd. unit no.- 210, ild trade centre, gurgaon Sartaj Budget homes Neemrana, Japanese Zone, Rajasthan

MODEL DPR FOR INTEGRATED HOUSING AND SLUM DEVELOPMENT PROGRAMMES (IHSDP)

UPPER MOUNT BETHEL TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA

PENSION FUND REGULATORY AND DEVELOPMENT AUTHORITY B-14/A, Chhatrapati Shivaji Bhawan, Qutab Institutional Area Katwaria Sarai, New Delhi

20 Edward Street Zoning Amendment Application - Preliminary Report

PRELIMINARY PLAT CHECK LIST

Real Estate Markets in Mumbai: A Case of Topographical. Policies

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

INSTRUCTIONS TO PRIVATE DEVELOPERS

No.F.1 (10)/2011/ Dir. (Plg.) MPR &TC/ Dt:

CBDT issues Draft ICDS on real estate transactions: public comments invited by 26 May, 2017

Journey of Real estate (Past, present and Future) Speaker CA Sandesh Mundra

BUILDING AN ADU GUIDE TO ACCESSORY DWELLING UNITS PLANNING DIVISION

Task Force on Kai Tak Harbourfront Development. Residential Development at 1-5 Kai Hing Road, Kai Tak South (Kowloon Godown Site)

Plans shall be drawn at a readable scale, signed, and sealed by a Florida Registered Engineer. The application package shall include:

Wilson Bridge Corridor Zoning. Department of Planning & Building

Tentative Map Application Review Procedures

MILESTONE DOMESTIC SCHEME - I

Zoning History of Ashville Park

Subject: Ashville Park Cost Participation Term Sheet and Briefing

The Real Estate (Regulation and Development) Act, 2016 (Maharashtra) MAHA RERA,

HARYANA GOVT. GAZ. (EXTRA.), FEB. 16, 2018 (MAGH. 27, 1939 SAKA) 555. Form REP-I PART-A

Subdivision, Development Plan and PUD Design Standards Porter County Unified Development Ordinance

DELHI DEVELOPMENT AUTHORITY Notification New Delhi,, September, 2014

Tamil Nadu Slum Clearance Board was established in September and has been implementing various Housing, Slum Development and

DEVELOPMENT APPLICATION PRE-CONSULTATION FORM

INFO-PACK. KUBE The Luxury Apartments. Kube Info Pack Page 1

Promoters

HAUXTON MILL BUILDINGS CAMBRIDGE ROAD HAUXTON CAMBRIDGE

Parkland-Spanaway-Midland LUAC - Agenda

National Housing Co-Investment Fund APPLICATION GUIDE FOR FINANCIAL VIABILITY WORKBOOK - NEW CONSTRUCTION

Director, Community Planning, North York District

Community Affairs and Planning Committee Paul Allore, MCIP, RPP Director of Planning and Development Services

GENERAL DESCRIPTION STAFF RECOMMENDATION IMPLEMENTATION REQUIREMENTS

INDIAN INSTITUTE OF TECHNOLOGY BOMBAY OFFICE OF DEAN (INFRASTRUCTURE PLANNING SUPPORT)

SHORELINE MASTER PROGRAM DOES IT REMOVE UNCERTAINTY OR INCREASE IT?

GENERAL CONDITIONS APPLYING TO SUBDIVISIONS APPROVED BY THE PLANNING BOARD OF THE TOWN OF BETHLEHEM ALBANY COUNTY - NEW YORK

Transcription:

Page 6 of 56 Item No.6 Application for EC for proposed Residential Project MARATHON ICON at C.S. No. 2/142, Lower Parel Division, Lower Parel, Mumbai, State. Maharashtra e same. PP requested to consider e project on 19/09/2016; Committee accepted Item No.7 Application for Ec for proposed Residential building at CTS No. E/86/12 & E/99A, Village Bandra, Dr. Ambedkar Road, Khar (W), Andheri, Mumbai Suburban district PP was absent; hence e project is deferred. Item No.8 Application for EC for Proposed New Construction Projects and Industrial Estates Saifee Burhani Upliftment Project at C.S. No. 3571 to 3576, 1/3572, 3577 to 3592, 3601 to 3616, 1/3609, 4394, 4396, 3671 to 3677, 1/3673, 3653 to 3670, 3638 to 3652, 1/3643, 1/3644, 1/3652, 3628 to 3637, 1/3626,3627, 4186 to 4198, 4179 to 4184, 4199 to 4220,4232 to 4250,4251 to 4263,4280 to 4291, 1/4281, 4275 to 4279, 4292 to 4298, 1/4299, 4300, 4303 to 4305, 4308, 1/4308, 4309, 4310, 4312 to 4314, 1/4309, 4315 to 4326, 4264 to 4268, 4270 to 4272, 4273, 4274,4161 to 4178, 4221 to 4231, 1/4227, 4327 to 4341, 4342, 4343, 4358, 4361 Bhuleshwar Division in C-Wa, situated at Maulana Shaukatali road, S.V.P. road, mutton street & Ebrahim Rehmatullah road known as Bhendi bazaar PP informed at ey have received earlier EC vide letter dated 3 May 2013 for total construction area of 7,07,275.67 m 2. PP informed at ey have completed construction admeasuring 7,000 m 2 ((Cluster 1 + Cluster 3) as per EC. Committee noted following comparative changes due to proposed expansion/amendment: As per EC received Proposed Amendment & Expansion in EC Minutes of e 51 st meeting of e SEAC - 2 (MMR) held on 13 & 14 October 2016

Page 7 of 56 Composite Buildings Cluster 1 Basement + Ground + 2 shopping + 2 wings Wing 1A: 3 Wing 1B: 3 Flats: 58 Nos. Shops: 232 Nos. Rooms: 88 Nos. to 15 to 11 upper upper Existing Masjid to be retained: 3 nos. 3 Basements + Lower Ground + Ground + 3 shopping + 2 wings Wing 1A: 4 Wing 1D: 4 to 17 Flats: 101 nos. Shops: 232 nos. Flats: 153 nos. to 19 upper Existing Masjid to be retained: 2 no. Existing Masjid to be redeveloped: 1 nos. Increase in two basement levels Increase in 2 no. of shopping floor Floors increased by 4 nos. in Wing A & 6 nos. in Wing D Reduction in flat/ room nos. by 45 nos. in redevelopment 153 nos. of flats of sale component is proposed - As per EC received Cluster 2 Proposed Amendment & Expansion in EC B + G + 2 [part shopping / part parking (3 levels)] + 3 parking + 4 amenity + 2 wings st Wing 2A: 5 to 31 Wing 2B: 5 Flats: 652 Nos. Shops:185 Nos. to 23 + 3 to 9 parking floor + 10 Wing 2A: 11 Wing 2B: 11 Flats: 578 nos. Shops: 185 nos. Flats: 224 nos. to 40 to 47 Floors increased by 9 nos. in Wing 2A Wing 2A is now proposed for sale component and 224 nos. of flats are proposed Floors increased by 24 nos. in Wing 2B. Reduction in redevelopment flats by 74 nos. -- Imambada Earlier proposed in Cluster 6 As per EC received Cluster 3 B + G + 2 [part shopping /part parking (3 levels)] + 3 & 4 parking + 5 amenity + 2 wings Wing 3A: 6 to 30 Wing 3B: 6 to 37 Flats: 582 Nos. Cluster 4 Proposed Amendment & Expansion in EC Basement + Ground + 2 shopping + 3 7 to 6 parking floor + Wing 3A: 8 to 36 st Wing 3B: 8 to 41 Flats: 633 Nos. Floors increased by 6 nos. in Wing A & 4 nos. in Wing B Increase in flat no by 51 nos. Minutes of e 51 st meeting of e SEAC - 2 (MMR) held on 13 & 14 October 2016

Page 8 of 56 B + G + 2 [part shopping / part parking (3 levels)] + 3 & 4 parking + 5 amenity + 2 wings nd Wing 4 A: 6 to 42 Wing 4 B:6 to 45 Flats: 707 Nos. Shops: 152 Nos. + 3 8 to 7 parking floor + Wing 4A: 9 to 41 Wing 4B: 9 to 44 Flats: 445 Nos. Shops: 152 Nos. st Floors reduced by 1 no. in Wing A & Wing B Decrease in flat no by 262 nos. Existing Masjid to be retained: 1 no Existing Masjid to be retained: 1 no No change As per EC received Proposed Amendment & Expansion in EC Cluster 5 2B + G + 2 [part shopping/ part parking (3 levels)] + 3 & 4 amenity + 2 wings Wing 5A: 6 to 34 Wing 5B: 6 to 40 Flats: 531 Nos. Shops: 123 Nos. parking + 5 Existing Buildings to retained: 1 Building (Shops & School): G + 5 Shops: 18 Nos. 1 residential building: Stilt + 21 Flats: 83 Nos. Shops: 20 Nos. Existing Masjid to be retained: 1 no. + 3 to 7 parking floor + 8 amenity floor + 2 wings Wing 5A: 9 to 40 Wing 5B: 9 to 43 Flats: 443 Nos. Shops: 123 Nos. Existing Buildings to retained: 1 Building (Shops & School): G + 5 Shops: 18 Nos. 1 residential building: Stilt + 21 Flats: 83 Nos. Shops: 20 Nos. Existing Masjid to be retained: 1 no. Floors increased by 6 no. in Wing A & 3 no. Wing B Decrease in flat no by 88 nos. No change As per EC received Proposed Amendment & Expansion in EC Cluster 6 B + G + 2 [part shopping / part parking (3 levels)] + 3 to 5 parking + 6 amenity + 2 wings Wing 6A: 7 to 46 Wing 6B: 7 to 50 Flats: 901 Nos. Shops: 221 Nos. Imambada: 01 no. Cluster 7 + 3 to 7 parking + 8 Wing 6 A: 8 Wing 6 B: 8 Flats: 991 Nos. Shops: 221Nos. to 45 to 48 Floors decreased by 1 no. in Wing A & decreased by 2 nos. in Wing B Increase in flat no by 90 nos. Minutes of e 51 st meeting of e SEAC - 2 (MMR) held on 13 & 14 October 2016

Page 9 of 56 B + G + 2 shopping + 3 to 9 parking + 10 Amenity + 11 to 41 st Shops: 84 Nos. Flats: 228 Nos. Cluster 9 + 3 to 7 parking floor + 8 amenity floor + 9 to 47 Flats: 419 Nos. Shops: 84 Nos. Cluster 7 is now proposed in redevelopment component wi 419 no of flats Floors increased by 6 nos. Existing Masjid to be retained: 2 no Existing Masjid to be retained: 2 nos. No change As per EC received Cluster 8 B + G + 2 [part shopping/ part parking (3 levels)] + 3 to 6 parking + 7 amenity + 2 wings Wing 8A & 8C: 8 to 50 upper Wing 8B: 8 to 58 Flats: 1196 Nos. Reservation Cluster 4 2B (Parking Lot Reservation) + G. floor (Refuge shed) + 1 st & 2 nd [Public toilet] + 3 (Municipal Chowki) & 4 shed) Cluster 9 (Store MHADA/MCGM Public housing: B + Stilt + 2 nd to 32 nd + 33 part floor Flats: 215 nos. Municipal Primary School: 1 no. Proposed Amendment & Expansion in EC + 3 to 10 parking floor + 11 amenity floor wi 3 wings Wing 8A: 12 Wing 8B: 12 to 67 Wing 8C: 12 to 74 Flats: 1436 Nos. to 21 st 2B (Parking Lot Reservation) + Ground floor (Refuge shed) + 1 st & nd 2 [Public toilet] + 3 floor (Municipal Chowki) & 4 (Store shed) MHADA/MCGM Public housing: B + Stilt + 2 nd to 32 nd + 33 part floor Flats: 215 nos. Municipal Primary School: 1 no. No change No change Floors increased by 17 nos. and 16 nos. in Wing A and C respectively and reduced by 29 nos. in Wing B. Increase in flat no by 240 nos. Sr. No Description As per EC received Expansion Amendment Expansion in EC & & 1 Total plot area (Sq. mt.) 66264.74 65429.00 Proposed to be decreased by 835.74 sq. mt. Minutes of e 51 st meeting of e SEAC - 2 (MMR) held on 13 & 14 October 2016

Page 10 of 56 2 Ground Coverage Area (Sq. mt.) 36144.78 36691.00 Proposed to be increased by 546.22 sq. mt. 3 R.G. (Sq. mt.) 7921.25 7826.22 Proposed to be decreased by 95.03 sq. mt 4 5 Permissible Built up area as per FSI (Sq. mt.) Proposed Built up Area as per FSI (Sq.mt.) 330731.42 437939.00 328095.38 434639.00 Proposed to be increased by 1,07,207.58 sq. mt. as per e actual certification carried out by MHADA and addition of fungible area in permissible Built-up area as per FSI in line wi new DCR dated 6.1.2012 Proposed to be increased by 1,06,543.62 sq. mt. due to increase in permissible FSI. 6 Proposed Built-up Area as per Non FSI (Sq.mt.) 379180.29 ju434084.00 Proposed to be increased by 54903.71 sq. mt. 7 Total Construction Built up Area (Sq.mt.) 707275.67 868723.00 Proposed to be increased by 161447.33 sq. mt. The proposal was discussed on e basis of e draft ToR as presented by e PP. All issues related to environment, including air, water, land, soil, ecology and biodiversity and social aspects were discussed for ToR. PP stated at total plot area is 65,429 m 2 & total construction area of e project is 8,68,723 m 2. Committee appraised e project under 8a (B1) category of EIA Notification, 2006. After discussion, ToR presented by PP was approved wi following additional ToR: 1. PP to submit compliance report wi comparative statements of conditions stipulated in earlier EC. 2. PP to submit permissions from concerned auorities for proposed environmental infrastructure. 3. PP to indicate all environmental infrastructure facilities on layout plan and submit. 4. PP to submit HRC permission for proposed height of e buldings. 5. PP to submit contour map of e project superimposed on layout plan, storm water drainage, sewer lines and 1 km area of surroundings. 6. PP to achieve 15% energy savings rough renewable component & submit revised energy calculations indicating e same. 7. PP to ensure at BOD of e treated water should be 5 mg/lit. Minutes of e 51 st meeting of e SEAC - 2 (MMR) held on 13 & 14 October 2016

Page 11 of 56 8. PP to submit detailed light and ventilation analysis, wind analysis, shadow analysis, heat island effect & ermal analysis reports. 9. PP to submit structural stability analysis of e buildings on which vertical expansion is proposed. 10. PP to submit revised socio economic analysis indicating impacts in and around e project. PP to quantify socioeconomic impacts by following specific established meods keeping in view and study similar development in e region around 5 km radius of e project. 11. Proper design of storm water drainage considering all phases of project area should be done to ensure at it should not overload outside storm water drain & submit along wi storm water drainage calculations. Storm water drainage should be designed as per guidelines given in SP:IRC-50. 12. PP to also refer ToR attached as Exhibit-A & standa ToR published by MoEF vide oer dated 10/04/15 in addition to above. Item No.9 Application for EC for Proposed Residential Project wi shopline at Gut.No.50, Plot.No.2, Kambalgaon village, Taluka & District Palghar Representative of PP, Siddhant Vaze & Architect Ajay Wade were present during e meeting along wi environmental consultant M/s Mahabal. PP informed at ey have received Town Planning Approval. The project proposal was discussed on e basis of presentation made and documents submitted by e proponent. All issues related to environment, including air, water, land, soil, ecology and biodiversity and social aspects were discussed. PP stated at total plot area is 68,456.58 m 2 & total construction area proposed in is meeting of e project is 92,584.40 m 2. Committee noted at e project is under 8a (B2) category of EIA Notification, 2006. Consolidated statements, form 1, 1A, presentation & plans submitted are taken on e reco. Brief extract of e project details submitted by PP is as below: Minutes of e 51 st meeting of e SEAC - 2 (MMR) held on 13 & 14 October 2016