TITLE 7, CHAPTER 3 TAZEWELL COUNTY

Similar documents
SHIAWASSEE COUNTY ZONING ORDINANCE Article 4 Specific Use Regulations

EXHIBIT A SHIAWASSEE COUNTY ZONING ORDINANCE ARTICLE 4 SPECIFIC USE REGULATIONS RECOMMENDED AMENDMENTS TO SECTION (REVISED MAY 11, 2018)

1. Assure that any development and production of wind-generated electricity in Boone County is safe and effective.

An Ordinance Governing Wind Energy Conversion Systems In The Unincorporated Areas of Coles County, Illinois

PREAMBLE. That the Gratiot County Zoning Ordinance be amended as follows:

ARTICLE XX THE COUNTY BOARD OF MERCER COUNTY, ILLINOIS RESOLUTION AMENDING THE MERCER COUNTY ZONING ORDINANCE SOLAR ENERGY FACILITIES

Howard County Checksheet for Large Wind to Energy Facilities (WEF)

WIND ENERGY CONVERSION SYSTEM (WECS) APPLICATION

DALLAS TOWNSHIP CLINTON COUNTY, MICHIGAN ORDINANCE NO

Ordinance #68. Highlighted items in bold and underline font to be added. Highlighted items in strikethrough font to be removed.

Chapter 9 Wind Energy

ARTICLE VI. SPECIAL EXCEPTION REGULATIONS

P a g e 1. DRAFT August 31, 2018 Version

Model Wind Energy Facility Local Law for St. Lawrence County Municipalities. Local Law No. of 20

JERSEY COUNTY ORDINACE REGULATING DEVELOPMENT OF COMMERCIAL SOLAR ENERGY SYSTEMS AND WIND ENERGY COVERSION SYSTEMS ADOPTED ORD # 01-19

Local Law No. 1 of Wind Energy Facilities. Be it hereby enacted by the Town Board of the Town of Hartsville as follows:

ORDINANCE NO. BEAVER TOWNSHIP, BAY COUNTY, MICHIGAN, ORDAINS:

Local Law No. 2 of Wind Energy Facilities. Be it hereby enacted by the Town Board of the Town of Jasper as follows:

Wind Energy Conversion System Ordinance No. 467

Appendix Eric Miller Director, Business Development Invenergy LLC. June 27, Altona Town Board 3124 Miner Farm Rd.

KOSSUTH COUNTY ORDINANCE #310

ARTICLE 18 WIND ENERGY CONVERSION SYSTEMS

CHOWAN WIND ENERGY FACILITIES ORDINANCE REVIEW. Chairman Lou Sarratt March 31, 2015 Sub-Committee Members: Patti Kersey Jim Leggett Jim Robison

MONTGOMERY COUNTY BOARD OF COMMISSIONERS

ARTICLE XI CONDITIONAL USE PERMITS

TOWN OF RUTLAND Ordinance No. 12.5

ORDINANCE NO. 20,q/.g

TOWN OF FARMERSVILLE LOCAL LAW NO. OF THE YEAR 2018 A Proposed Local Law Entitled "Wind Energy Facility Law of the Town of Farmersville, New York"

Chapter 137 WIND ENERGY CONVERSION SYSTEMS

This is a conditional use permit request to establish a commercial wind energy conversion system.

ARTICLE 7. SPECIFIC USE STANDARDS

Color Key. Red = BBR Current Comments. Purple/Pink = Amy Cornell s Highlights. Blue/Orange = Opponent Accepted Changes

BEFORE THE HEARINGS EXAMINER FOR THURSTON COUNTY

Wells County Area Plan Commission Requirements for a Wind Energy Conversion System (WECS) Testing Facility or Communication Tower Development Plan

"C" COMMERCIAL DISTRICT SECTION 7

Town of Fort Fairfield Wind Energy Technical Review Committee Council Chambers Monday, March 30, :00 P.M.

KOSSUTH COUNTY ORDINANCE #310 - A

Division 16.Telecommunication Tower Standards

Moore Township Planning Commission 2491 Community Drive, Bath, Pennsylvania Telephone: FAX: Rev:12/23/2013

COMMUNICATION TOWERS ORDINANCE No. 31

ARTICLE 20 SIGNS. SIGN, AREA: The entire area of all sign faces, cumulatively, including sign faces on which no copy is currently displayed.

TITLE 33 REGULATION OF WIRELESS TELECOMMUNICATIONS FACILITIES

Wind Energy System (Residential) Application

DENMARK TOWNSHIP, TUSCOLA COUNTY, MICHIGAN ORDINANCE NO

A LOCAL LAW GOVERNING WIND ENERGY FACILITIES IN THE TOWN OF FREMONT. Be hereby enacted by the Town Board of the Town of Fremont as follows:

HAVERHILL BUSINESS PARK PROTECTIVE COVENANTS (Revised 8/3/09) Purpose

SOLAR ENERGY FACILITIES ORDINANCE #17-07 KOCHVILLE TOWNSHIP

RIGA TOWNSHIP ORDINANCE NO. AMENDMENT TO THE 1974 ZONING ORDINANCE OF RIGA TOWNSHIP

150% of the height of a WECS from the base to a property line.

CHAPTER 12 PLANNING & ZONING ARTICLE 2 - EXCEPTIONS AND ENCROACHMENTS. Section Requirement for conforming structures to height limitations.

LAKE TOWNSHIP HURON COUNTY, MICHIGAN. Ordinance No. ORDINANCE AMENDING TOWNSHIP ZONING ORDINANCE TO ADD SECTION 1613, ALTERNATIVE ENERGY

RESIDENTIAL DISTRICT SECTION 6

Wind Energy Easements

CHAPTER 2 RELATIONSHIP WITH OTHER LAWS.

UPPER MOUNT BETHEL TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA

SITE DEVELOPMENT PLAN FOR WIND FARM LEASE

APPLICATION FOR SITE PLAN REVIEW AND APPROVAL PERMIT FOR THE PALO ALTO WIND ENERGY PROJECT. Submitted By:

Fee $1, Property information and location (All lines applicable to this site must be filled in)

ARTICLE 24 SITE PLAN REVIEW

ARTICLE XXVIII. SPECIAL CONDITIONS AND DEVELOPMENT STANDARDS (Ord. No. 2835, 07/01/0; Ord. No. 2938, 10/19/04; Ord. No. 09/06/16))

Local Law No. 1, of 2012

TABLE OF CONTENTS. Township of Clyde i

ARTICLE III ZONING DISTRICTS AND GENERAL REGULATIONS

PROPOSED ORDINANCE NO TOWNSHIP OF WHITEMARSH MONTGOMERY COUNTY, PENNSYLVANIA ORDINANCE NO.

LAND OWNER OF SITE ADDRESS PHONE NUMBER FAX NUMBER. APPLICANT (if other than owner) ADDRESS PHONE NUMBER FAX NUMBER

NET METERING INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS

RESOLUTION NUMBER 5059

FOR LEASE. +/- 1,090 SF Office Condo West Park Professional Center St. Lucie West, FL. 540 NW University Blvd, #209-A, Port St.

Landowner Guide to Wind Leases and Easements. Pace Energy and Climate Center August, Project Manager: Zywia Wojnar

E. Maintain and preserve the character of the community and residential neighborhoods; and

Pagosa Lakes Telecommunication Facility Development Plan Rezoning in the PUD zone, located at 1311 Lake Forest Cir.

City of Henderson Updated 2/20/2018 TABLE OF CONTENTS. Section 101: Purpose...1 Section 102: Authority...1

PROTECTIVE COVENANTS DEED RESTRICTIONS SPENCER BUSINESS/INDUSTRIAL PARK August 11, 1999 Amended, March 3, 2014

EXHIBIT A TRI-COUNTY ELECTRIC COOPERATIVE, INC INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS

SANDOVAL COUNTY PLANNING AND ZONING COMMISSION DECEMBER 10, 2015 PUBLIC HEARING

New Cingular Wireless Telecommunication Tower at County Road 48, Milner Conditional Use Permit

CHAPTER VII R-2 LOW DENSITY RESIDENTIAL DISTRICT

Alburgh Land Use Regulations

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY

TOWN OF AURORA TOWN BOARD WORK SESSION. June 22, 2010

R-1 SINGLE FAMILY RESIDENCE DISTRICT

CABLE TELEVISION FRANCHISE AND REGULATIONS

ARTICLE 7 R-1 ONE FAMILY RESIDENTIAL DISTRICT

MONTEREY COUNTY PLANNING COMMISSION

Understanding Wind Energy Leases

Bahama Reef Yacht & Country Club Section I

Tuscola Wind II, LLC Wisner Township Special Use Permit Presentation

Community Wind Project Development

I. General. 1 Property managed by Cube includes the land below waters of the reservoirs and the generating facilities.

K. All adjoining lots under common deed, for use as a single residence, are considered to be one lot.

DIVISION I. GENERAL ZONING... 6

EXHIBIT A INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS

Rules & Regulations (Established 7/2016)

Prepared for the Board of Directors of the Green Trails Improvement Association. July, 1981

LAGRANGE TOWNSHIP BOARD OF ZONING APPEALS REQUEST FOR HOME OCCUPATION/CONDITIONAL PERMIT NEW

RESOLUTION DISAPPROVING APPEAL NO

Pocono Springs Civic Association Architectural Rules and Regulations. Adopted by Board of Directors Date: January 20, 2007

ML-4 MULTIFAMILY RESIDENTIAL ZONE. [Added by Ord. No ]

SECTION 5: ACCESSORY USES

APPENDIX J COUNTY CORRESPONDENCE

Transcription:

TITLE 7, CHAPTER 3 TAZEWELL COUNTY WIND FARM ORDINANCE ADOPTED SEPTEMBER 2004 Amendment Dates: February, 2008 March, 2008 February 25, 2009 September 1, 2018

7TCC 3-1. Wind Energy Conversion Systems Purpose. To assure that any development and production of wind-generated electricity in Tazewell County is safe and effective; To facilitate economic opportunities for local municipalities, residents, and Tazewell County as a whole. 7TCC 3-2. Definitions (c) (d) (e) "Wind Energy Conversion System" (WECS) shall mean any device such as a wind charger, windmill, or wind turbine that converts wind energy to a form of usable electrical energy. "Manual and Automatic Controls" give protection to power grids and limit rotation of a WECS' blades to below the designed limits of the conversion system. An "Authorized Factory Representative" shall mean an individual with technical training of a WECS who has received factory installation instructions and is certified in writing by the manufacturer of the WECS. A " Registered Professional Engineer" shall mean any appropriately trained and experienced engineer licensed by the State of Illinois. "Facility Abandonment" shall mean a period of time not less than one year. 7TCC 3-3. Requirements (c) Design Safety Certification- The safety of the design of all WECS towers shall be certified by a Registered Professional Engineer. The standard for certification shall be good engineering practices and shall conform to all the County's officially adopted codes. Controls and Brakes - All WECS projects shall be equipped with Manual and Automatic Controls and mechanical brakes to limit rotation of blades to a speed below the designed limits of a WECS. The Registered Professional Engineer or Authorized Factory Representative must certify that the rotor and overspeed control design and fabrication conform to good engineering practices. No changes or alterations from certified design shall be permitted unless accompanied by a Registered Professional Engineer's or the Authorized Factory Representative's statement of certification. Electrical Components -All electrical compartments, storage facilities, wire conduit and interconnections with utility companies will conform to local utility standards and national and local electrical codes. 2

(d) (e) (f) (g) (h) Color -Towers and blades- Any Non-Reflective, unobtrusive color that will assist in mitigating the visual impact of the structure is allowable. Lighting- Lighting for the towers shall be constructed only in accordance with the minimum requirements and standards allowed through the FAA or other regulatory authority in an effort to minimize the visual impact of the structures. Compliance with FAA-It shall be the responsibility of the person in charge of the WECS project to complete the proper FAA applications and obtain the proper permits for the WECS project. It shall also be the responsibility of the person in charge of the WECS project to obtain a determination of no significant impact to air navigation from the FAA. Warnings-A visible warning sign of "High Voltage" must be placed at the base of all WECS projects. The sign must have at a minimum six-inch letters. Such signs shall be located a maximum of three hundred (300) feet apart and at all points of site ingress and egress. Climb Prevention -All WECS project towers or poles must be unclimbable by design or protected by anti- climbing devices such as: (1) Fences with locking portals at least six feet high; (2) Anti-climbing devices 12 feet from base of pole; or (3) Anchor points for guy wires supporting tower shall be enclosed by a sixfoot high fence or shall be located within the confines of a yard that is completely fenced. (i) (j) Compliance with Zoning Laws - All WECS projects shall be in compliance with all local zoning laws. Setbacks- (1) All WECS Towers shall be set back at least 750 feet from any adjoining property s dwelling unit, and no less than 1.1 times the tower height from the applying property owner s dwelling structure. (2) All WECS Towers shall be set back a distance of at least 1.10 times the WECS Tower Height from public roads, third party transmission lines, and communications towers. (3) All WECS Towers shall be set back a distance of at least 1.10 times the WECS Tower Height from adjacent property lines. Properties lines that are shared with other properties included in the same WECS development may forgo this requirement, provided written acceptance of this waiver is obtained from all affected property owners prior to the public hearing. 3

(4) Any waiver of any setback requirement shall run with the land and be recorded as part of the chain of title in the deed of the subject property. (k) (l) (m) (n) Height - Wind generator machine height must comply with all FAA regulations. (Amendment #25, 2/08) Compliance with additional Regulations- It shall be the responsibility of the person in charge of the WECS project to contact the FCC and FAA regarding additional permits necessary or any other applicable Federal or State regulations for the installation of a WECS project prior to the Tazewell Zoning Board of Appeals granting a Special Use Permit. Installation Certification- The Registered Professional Engineer shall certify that the construction and installation of the WECS project meets or exceeds the manufacturer's construction and installation standards. Roads- Any proposed access roads that will be used for construction purposes shall be identified and approved by the Township Road Commissioner and the County Engineer prior to the granting of the Special Use permit. Any road damage caused by the transport of the facility s equipment, the installation, or the removal, must be completely repaired to the satisfaction of the Township Road Commissioner and the County Engineer. The Township Road Commissioner and County Engineer may choose to require either remediation of road repair upon completion of the project or are authorized to collect fees for oversized load permits. Further, a corporate surety bond in an amount to be fixed by the Township Road Commissioner or the County Engineer may be required by the Township Road Commissioner or the County Engineer to ensure the township or the County that future repairs are completed to their satisfaction. (o) Migratory Birds- An avian study shall be conducted by a qualified third-party professional, such as an ornithologist or wildlife biologist, to determine if there is any potential impact the WECS project may present to migratory birds. The study must provide assurances that the WECS project does not negatively impact the path of migratory birds. The results of the study shall be made available at the official public hearing. 7TCC 3-4. Maintenance and Operation Annual Inspection - Every WECS project must be inspected annually by an Authorized Factory Representative to certify that it is in good working condition and not a hazard to the public. Interference- If the Authorized Factory Representative determines that the WECS project causes severe interference with microwave transmissions, residential television interference or radio reception, the WECS owner must take commercially reasonable steps to correct the problem. 4

(c) (d) Fire Risk- All WECS projects must adhere to all applicable electrical codes and standards and must remove fuel sources, such as vegetation, from the immediate vicinity of electrical gear and connections. Every WECS project must utilize twistable cables on turbines. Waste- All solid wastes, whether generated from supplies, equipment parts, packaging, operation or maintenance of the WECS, including old parts and equipment, shall be removed from the site immediately and disposed of in an appropriate manner. All hazardous waste generated by the operation and maintenance of the WECS, including but not limited to lubricating materials, shall be removed from the site immediately and disposed of in a manner consistent with all local, state, and federal rules and regulations. 7TCC 3-5. Noise Levels Noise levels shall be regulated by the Illinois Pollution Control Agency rules and regulations and the applicant shall certify that applicant s facility is in compliance with the same. 7TCC 3-6. Liability Insurance The WECS project shall maintain a current insurance policy to cover installation and operation of the WECS project. The amount of the policy shall be established as a condition of permit approval. 7TCC 3-7. Decommissioning Plan The WECS project must contain a Decommissioning Plan to ensure it is properly decommissioned upon the end of the project life or facility abandonment. Decommissioning shall include: removal of all structures (including transmission equipment and fencing) and debris to a depth of four (4) feet, restoration of the soil, and restoration of vegetation within six (6) months of the end of project life or facility abandonment. The decommissioning plan shall state how the facility will be decommissioned, the Professional Engineer's estimated cost of decommissioning, the financial resources to be used to accomplish decommissioning, and the escrow agent with which the resources shall be deposited. The decommissioning plan shall also recite an agreement between the applicant and the county that: (1) The financial resources for decommissioning shall be in the form of a Surety Bond, or shall be deposited in an escrow account with an escrow agent acceptable to the Zoning Enforcement Officer. (2) A written escrow agreement will be prepared, establishing upon what conditions the funds will be disbursed. 5

(3) The County shall have access to the escrow account funds for the expressed purpose of completing decommissioning if decommissioning is not completed by the applicant within six (6) months of the end of project life or facility abandonment. (4) The County is granted the right of entry onto the site, pursuant to reasonable notice, to effect or complete decommissioning. (5) The County is granted the right to seek injunctive relief to effect or complete decommissioning, as well as the county's right to seek reimbursement from applicant or applicant successor for decommissioning costs in excess of the amount deposited in escrow and to file a lien against any real estate owned by applicant or applicant's successor, or in which they have an interest, for the amount of the excess, and to take all steps allowed by law to enforce said lien. (6) Financial provisions shall not be so onerous as to make wind power projects unfeasible. 7 TCC 3-8. Fees Charged for Building Permit The fees for processing of the building permit applications for a WECS shall be collected by the Community Development Administrator who shall be accountable to the County for such fees: (1) Each Turbine: $25.00 per foot of total height (including blades) NOTE: WECS are permitted only in the A-1 and A-2 Zoning Districts by Special Use upon approval by the Tazewell County Zoning Board of Appeals 6