A Septic-to-Sanitary Sewer System Conversion Packet

Similar documents
ARTICLE SCHEDULE OF REGULATIONS

CITY OF HUNTINGTON UTILITY RATE ORDINANCE

ARTICLE VII-A - RESIDENTIAL DISTRICT R-2 FH 9. be for one or more of the following uses:

ARTICLE VII - RESIDENTIAL DISTRICT R-2. be for one or more of the following uses:

Lincolnton, NC Code of Ordinances CHAPTER 53: WATER AND SEWER EXTENSIONS AND AVAILABILITY CHARGES

Q: When will the first SID payment become due?

Valley View Sewer District Open House/Public Meeting

b. What cap rate will produce a value of $550,000?

City of Columbia ENgiNEEriNg regulations Part 12: application For NEW WatEr service table of CoNtENts Paragraph Description Page No.

Community Development Fees (as of March 2015)

FINAL SUBDIVISION AND LAND DEVELOPMENT PLAN CHECKLIST. Plan Name. Applicant's Name:

TOWN OF MANSFIELD RULES AND REGULATIONS FOR THE EXTENSION OF PUBLIC SEWERS

CITY OF EAU CLAIRE, WISCONSIN. SPECIAL ASSESSMENT POLICY (Dated: November 8, 2016)

Septic Tank / Drainfield / Holding Tank Permit Application

TABLE OF CONTENTS. Choosing A Home 4. Buying A Home 7. The Manufacturer s Warranty 7. Implied Warranties 8. The Retailer s Warranty 8

Grass Lake Charter Township 373 Lakeside Drive, P.O. Box 216 Grass Lake, Michigan 49240

2013 Profile of Home Buyers and Sellers Metro Indianapolis Report

Settlement Pattern & Form with service costs analysis Preliminary Report

FREQUENTLY ASKED QUESTIONS about on-site wastewater (septic) systems. I want to build a new home served by a septic system. What do I need to do?

Community Development Department 333 Broadalbin Street SW, P.O. Box 490 Albany, OR 97321

APPLICATION FOR FINAL PLAT APPROVAL

CLAYTON COUNTY WATER AUTHORITY. Sewer System Evaluation Surveys

Brandywine Farms Sewer Extension SEP

MAKING AN INFORMED DECISION ABOUT BUYING A MANUFACTURED HOME

Sewer Repair Application for 2019

LAKE WORTH DRAINAGE DISTRICT OPERATING POLICIES TABLE OF CONTENTS

Congress Square I Condominium PO Box Strongsville, Ohio Phone (440) Fax (866)

Hinchinbrook Shire Adopted Infrastructure Charges Resolution CR1-2018

City of Columbia ENgiNEEriNg regulations Part 6: ProCEDurEs For the subdivision of land table of CoNtENts Paragraph Description Page No.

ARTICLE XI MANUFACTURED AND MOBILE HOME PARKS

2.7 R-6: High Density Residential District

H 7724 S T A T E O F R H O D E I S L A N D

LORAIN COUNTY GENERAL HEALTH DISTRICT SEWAGE TREATMENT SYSTEM RULES

Public Sewer Extension Information Packet

TORONTO MUNICIPAL CODE CHAPTER 849, WATER AND SEWAGE SERVICES AND UTILITY BILL. Chapter 849 WATER AND SEWAGE SERVICES AND UTILITY BILL 1

Septic Tank / Drainfield / Holding Tank Permit Application

COMMISSION ON ANNEXATION REPORT RIVERLEA AND WORTHINGTON

FOCUS ENGINEERING, inc.

Property Development Connection Requirements (Sewer)

RESIDENTIAL PROPERTY DISCLOSURES

SUNY 2020 Advanced Manufacturing Institute (AMI) Building

EXHIBIT A to Ordinance No PART 1

ENGLEWOOD WATER DISTRICT MANDATORY WASTEWATER UTILITY CONNECTION POLICY

b. What cap rate will produce a value of $550,000?

LAURENS COUNTY MOBILE HOME PARK ORDINANCE ARTICLE 1 GENERAL

PROPOSED STATE STREET ROAD SANITARY SEWER DISTRICT

A. Location. A MRD District may be permitted throughout the County provided it meets the standards established herein.

City of O Fallon Project Management

Commercial Requirements Packet Sheridan, Indiana Hamilton County

Suite Metering Provisions Under the Residential Tenancies Act, 2006 and the Energy Consumer Protection Act, Consultation Paper

ARTICLE 7 UTILITIES AND EASEMENTS

CHAPTER SECOND UNITS

CHARTER TOWNSHIP OF SPRINGFIELD NOTICE OF HEARING ON CLINTON OAKLAND SEWAGE DISPOSAL SYSTEM SOFTWATER LAKE EXTENSION SPECIAL ASSESSMENT ROLL

RICHFIELD TOWNSHIP LUCAS COUNTY, OHIO BOARD OF RICHFIELD TOWNSHIP TRUSTEES REGULAR MEETING MINUTES. September 16 th, 2010

Springfield Township Zoning Board of Appeals Meeting Minutes of July 15, 2009

HARNETT COUNTY DEPARTMENT OF PUBLIC UTILITIES Equal Opportunity Provider and Employer RESIDENTIAL WATER/SEWER USER AGREEMENT

Environmental Health Technician: (303) ; Environmental Health Manager: (303) ;

Waseca County Planning and Zoning Office

Policy and Standards for Public Local Residential Streets And Private Streets

Be it enacted by the People of the State of Illinois,

COUNTY OF HURON APPLICATION FOR CONSENT Under Section 53 of the Planning Act 8.3.1

Lassen Mobile Home Park

Community Governance Act ANNUAL UTILITY CHARGE REGULATION (2018)

Who Pays? By Reem Abdelrazek MTAS MPA Intern

PEBBLE RIDGE/WOODRIDGE AND VICINITY SEWER PROJECT P R E S E N T AT I O N A N D R E C O M M E N D AT I O N T O T H E BOARD OF SUPERVISORS

Lake County Department of Utilities 2015 Revisions to the Rules and Regulations Summary of proposed changes

Bahama Reef Yacht & Country Club Section I

Application for Preliminary Plat Checklist

610 LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS OUTSIDE A UGB

Annual Report On Our National Real Estate Market

Special Improvement District Assessments UTILITIES

CITY OF OAK HARBOR Development Services Department

West Earl Township 2016 Fee Schedule Item Description Fee

Septic Tank / Drainfield / Holding Tank Permit Application

FLAG LOT PILOT

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

APPLICATION FOR SITE PLAN CONTROL

R3 (MULTIPLE-FAMILY RESIDENCE)

Skamania County Community Development Department

Inclusionary Housing Policy

CURRIE-HALL INVESTMENT CO. BROKERS 77 Milford Road, Suite 274, Hudson, Ohio Akron Cleveland Fax

Community Dev. Coord./Deputy City Recorder

Preliminary Subdivision Application (Major) (Four (4) lots or more)

1. Brief History & Timeline of the Chelmsford Sewer Project

NOTICE OF DECISION CITY OF CASCADE LOCKS PLANNING COMMISSION SUB 04-04

Point of Sale Inspections

Illinois Association of REALTORS RESIDENTIAL REAL PROPERTY DISCLOSURE REPORT

Residential Major Subdivision Review Checklist

LAND DIVISION APPLICATION

AUDIT REPORT SEWER CONNECTION FEES AND THE ESTABLISHMENT OF NEW SEWER ACCOUNTS

LAND USE PERMIT INFORMATION PACKET

ARTICLE XIV - PERMANENT MOBILE HOME/MANUFACTURED HOME PARKS 41. and/or manufactured home park. The permit shall be for a year, and shall be

KINGSLAND MUNICIPAL UTILITY DISTRICT Schedule of Wastewater Rates, Fees and Charges and Service Policies Effective January 1, 2018

West Earl Township 2015 Fee Schedule Item Description Fee

SUBDIVISION BY-LAW MUNICIPALITY OF THE COUNTY OF INVERNESS

West Earl Township 2017 Fee Schedule Item Description Fee

NORTHEAST OHIO REGIONAL SEWER DISTRICT BOARD OF TRUSTEES September 7, 2017 ACTION ITEMS

Ferry County Ordinance #89-04 BINDING SITE PLAN ORDINANCE

SEPTIC PROCESS. NOTE: A Site Analysis Level II (SALII) must be completed before we will accept any permit applications.

LAND USE PERMIT APPLICATION INSTRUCTION SHEET

Transcription:

A Septic-to-Sanitary Sewer System Conversion Packet Information Meeting June 9, 2014 Mayfield Village Civic Center 6622 Wilson Mills Road Mayfield Village, OH 44143 440-461-2210

INTRODUCTION In 1995, the Village created and disseminated its first Sewer System Conversion Packet. Since then, we have refined our data and gained insight with each successive sewer project. This conversion packet is designed for the residents of Eastgate and Meadowood Drive. It has what the Village believes is the most up to date information regarding the sewers we are installing on those two streets starting in 2014. WHAT PROPERTIES ARE AFFECTED? All properties on Eastgate and Meadowood Drive are affected. No property has been charged for more than one unit of benefit. That is to say that even if a house rests on more than one parcel, all assessments have been calculated on one benefiting household so everyone on all two streets will be assessed the same amount. Important to note: The actual assessment levied on all properties is a fraction of the actual cost of the project. The Village has and will continue to subsidize the conversion of septic tanks to sanitary sewers throughout the Village. PROJECT SCOPE AND TIMETABLE: Q. What is the scope of the project? A. The project incorporates the conversion of septic tanks to sanitary sewers along Eastgate and Meadowood Drive. Q. What is the estimated cost of the project? A. $2,700,000.00 (includes replacement of waterline) Q. When will construction start? A. September of 2014. Q. When will construction end? A. Summer of 2015 with any landscaping remaining to be completed. Q. What is the estimated life of the improvement? A. Fifty years. 2

Q. What are the actual assessment costs? A. If a homeowner elects to pay the assessment off in one payment, the assessment will be $7,200.00. However, most homeowners elect to pay the assessment over 20 years. In this case, the assessment will be $480.00 per year or roughly $40.00 per month. Q. When do I need to make the decision to elect? A. Most likely decisions will have to be made by mid-august, 2015, the date by which the Village must report to the County the project assessment costs. Up to this point of certification, all homeowners will be given the opportunity to elect whether to pay off the special assessment all at once or over twenty years when the project is completed. Once you make the decision, your assessment will either be collected in whole or certified for collection over twenty years. Q. How will the assessment be collected? A. The assessment will be collected with your property taxes twice a year. If you pay your property taxes with your mortgage through the bank you will notice an increase in your mortgage payments. Part of that increase will be for the $40 extra a month for the sewer assessment. There will also be an increase in the mortgage payment because the County Sanitary Engineer collects the maintenance fees with the property taxes as well. Those maintenance fees will be discussed further below. INSTALLATION OF SEWER LATERALS: Q. What is a sewer lateral? A. After the new 8" sewer main is installed in front of each property, a smaller pipe (referred to as a lateral) must be laid from each house to the main. This task of connecting the house to the street main is often known as "tying-in" to the sewer. Q. Who is responsible for installing the laterals and how much will they cost? A. Homeowners are individually responsible for the cost of installing sewer laterals from the rightof-way to their house. The Village is prohibited by law from paying for these laterals. Costs vary from home to home, because many factors come into play (such as a home's setback, soil conditions and the locations of existing sewerage delivery systems). Since the Village does not have this cost information, homeowners must obtain estimates from qualified sewer contractors. The cost is typically calculated by the number of lineal feet between the house connection and the main. 3

Q. How much did laterals cost in Worton Park, S.O.M. Center and White Roads and Highland, Metro Park and Zorn? A. Homeowners contracted with individual contractors in these projects. One contractor in particular was charging $20.00 per foot to install laterals in the Worton Park area. The presence of bedrock close to the surface in the Worton Park neighborhood made it difficult and more expensive to install laterals. Other factors which contributed to the cost of a lateral was the setback from the road, whether or not sanitary connections were in the front or the rear of the house and whether or not there were basements with sanitary connections. Some homes on S.O.M. Center Road -- where the homes are set further back and where there are more basements -- were quoted prices of $30 per foot for the installation of sewer laterals. Homes on Highland, Metro Park and Zorn were quoted prices of $40 to $45 per foot. Q. What other costs will sanitary sewers require? A. Village Homeowners with sanitary sewers are required to pay an operation and maintenance fee to the Cuyahoga County Sanitary Engineer's Office of $4.00 per lineal foot of frontage (e.g. $400.00 per year for a home with 100 foot frontage). Questions about this fee can be answered at the Cuyahoga County Sanitary Engineer's Office at (216) 443-8237. Edward Premen is the contact person. Payments for the treatment of sewerage are made to the Northeast Ohio Regional Sewer District (NEORSD) and are based on water consumption. Currently, for Mayfield Village, the rate is $64.55 per 1,000 cubic feet of water consumption. Assuming an annual consumption of 12,000 cubic feet, a homeowner would face four quarterly payments of $193.65 for an annual total of $774.60. The customer service number at NEORSD is (216) 881-8247. Q. When will I have to pay for the various components of sanitary sewers? A. Special Assessments for the sewer project itself will be certified in September, 2015 and will appear on the first property tax bill that you receive in December, 2015 and due for payment around mid-january, 2016. At that time, half of the annual assessment may be paid with the remainder paid with your second bill in June, 2016. If your property taxes are paid with your mortgage to the financial institution holding your mortgage, you will see an increase in your monthly payments either in 2016 or 2017 depending on how your lending institution calculates your escrow. You will need to hire your own contractor for your lateral tie-in and make the arrangements necessary for that cost. Your actual tie in typically must be completed no later than 90 days after the sewer is complete. Therefore, if the Cuyahoga County Sanitary Engineer approves the project in August, 2015, you typically will have until November, 2015 to complete your tie-in. 4

COST COMPONENTS OF CONVERTING TO SANITARY SEWERS NUMBER TOTAL TOTAL BILLING UNIT OF UNIT OF ANNUAL MONTHLY PERIOD APPROPRIATE COMPONENT MEASURE COST UNITS COST COST AND FORM AGENCY SPECIAL ASSESSMENT Cost of Construction $7,200 onetime payment or $480 annual installment One One time cost or annual installments $40 Direct payment or semi-annually on tax bill Mayfield Village (440) 461-2210 SEWER LATERAL TIE-IN Lineal feet from street to service connection at house $50 to $60 per foot One time cost N/A Negotiated with Individual Contractor Individual Contractor OPERATION AND MAINTENANCE Lineal feet of frontage $4.00 per lineal foot Lineal Feet times Unit Cost Semi-Annually on Tax Bill Cuyahoga County Sanitary Engineer s Office (216) 443-8237 FEES SEWERAGE TREATMENT CHARGES Individual water consumption per 1,000 cubic feet $64.55 per 1,000 cubic feet of water consumed Water consumed times rate Quarterly from NEORSD Northeast Ohio Regional Sewer District (NEORSD) (216) 881-8247 5

GLOSSARY OF TERMS Assessments: Assessments are the proportional costs of an improvement, such as a sewer, which are charged to properties which stand to benefit from it. Before a project is started, residents are sent a tentative or estimated assessment. When a project is complete, a resident or business has the option of paying the entire assessment at one time or having the assessment paid over twenty years. If a person elects to pay for the assessment over time, then interest is worked into the payments and the yearly payments are added to a resident's property tax bill. Trunk Line: The North County Line Trunk Sewer is the sewer pipe which will measure anywhere from 12 to 30 inches in diameter and will run along White and S.O.M. Center Roads. Sewer mains for the streets situated north of Wilson Mills Road will eventually tie into the trunk line. Sewer Mains: Every street or road will have an eight (8) inch sewer pipe running the length of the street and into the trunk line. If these mains are not constructed already, they will one day be constructed and tied into the trunk line. Residents served by sewer mains are responsible for the costs of those sewers. These costs are generally paid through the direct assessments levied on the homes and businesses located on the street. Sewer Laterals (Tie-ins): Once a sewer main runs in front of your house, a four (4) to six (6) inch pipe has to be laid from your house to the main. This pipe is called a lateral. Laterals are necessary to tap in to the sewer line. They are the responsibility of individual property owners (from the right-of-way to the house). Individual property owners will have to hire a sewer contractor to do this job and work out financial arrangements for payment with the contractor. 6