To: Nick Made by: Tuyet Date: 06 December 2013 REPORT ON BOYS SHELTER RENOVATION Since 10/2010, the Boys Shelter has suffered from severe leakage problems. This has been due to rainwater intrusion and water dumped after the boys finished hand washing their clothes. This caused water damage on the floor of the outside terrace. Another water leak issue was caused by a water pipe inside the toilet of the 2th floor. Despite previous attempts by plumbers they could not detect the source of the leak. Over the past three years, the roofs and walls of the shelter have become moldy and paint peeled off due to water leakage. Apart from the water leakage issue overtime some of the furniture and electrical appliances have become old and worn out and in need of replacing or fixing. Thanks to the generous support from AKRFC renovation on the Boys Shelter commenced on 9 October 2013. The following works were completed: 1. Painting: All of the outdoor and indoor walls of the Shelter (about 1,900m²), including the terrace, four bedrooms, computer room, study room, living room, dining room, kitchen, atrium and parking area. Front outdoor before and after being painted Boys Shelter Renovation Report - 2013 Page 1
Front door during and after renovation Terrace walls before & after renovation Computer room before & after renovation Boys Shelter Renovation Report - 2013 Page 2
Studying room before & after being painted Bedroom before & after renovation Living room before & after being painted Boys Shelter Renovation Report - 2013 Page 3
Dining room before & after renovation Parking place before & after renovation Outdoor after being painted Boys Shelter Renovation Report - 2013 Page 4
Staircases after being painted Atrium after being painted Front of bedrooms after being painted 2. The terrace: - To fix the leakage, the floor tiles of the terrace (about 100m²) were replaced. - All old water pipes were also replaced. - 56 m² foot walls were made to reduce rainwater leaking through the floor. - To reduce water running off from laundry, an outdoor washbasin was built. Boys Shelter Renovation Report - 2013 Page 5
- The windows on the terrace were originally made of glass and corrugated iron sheets. This prevented proper airflow coming into the house at night time when all windows were closed. To rectify this part of the window areas were replaced with strong nets to allow for both security and airflow. Terrace floor before & after being painted Water pipes before & after being changed Boys Shelter Renovation Report - 2013 Page 6
Upper part of the window being removed Upper part replaced by net A new washbasin 3. The toilets and bathrooms: The water pipes were broken inside the wall which caused serious leakage and peeling of the walls and roofs. Due to leaking water, many repairs were required in all 3 toilets and 3 bathrooms, located on the ground, 1 st floor and 2 nd floor. - To fix the leakage, 24m² floor tiles (1 st & 2 nd floors) were replaced. - The ceilings on the ground and 1 st floor were replaced. The ceiling in the toilet on the 2 nd floor was repainted. - 6 taps of 2 washbasins located on the 1 st & 2 nd floors were replaced - Previously there were no proper doors on 4 toilets only a plastic covering. 4 new doors were made. - 2 doors of 2 restrooms on the 1 st and 2 nd floors were replaced as the old ones were broken. Boys Shelter Renovation Report - 2013 Page 7
- 4 toilet bowls of 4 toilets were in poor condition, and were replaced by new ones, together with an attached hose. - 6 showers of 6 bathrooms were broken, and they were replaced by 6 new ones. - 12 old, broken drain filters were replaced by new ones. - A new set of lavabo, shelf and mirror of the bathroom on the ground was replaced as the old one was broken. Ceiling damaged by water leakage New ceiling New taps Boys Shelter Renovation Report - 2013 Page 8
Toilets with no proper doors New doors Old restroom door New restroom door Boys Shelter Renovation Report - 2013 Page 9
Old toilet bowl One of 6 new toilet bowls Old & broken shower One of 6 new showers Boys Shelter Renovation Report - 2013 Page 10
A new set of basin, mirror, shelf 4. The bedrooms: There are four bedrooms, and 13 bunk-beds in total. Each room has one wardrobe. - All 26 wooden bed bases of the 13 bunk beds were old and broken and were replaced with new ones. - 26 broken bed drawers were also fixed. - 4 wardrobes were replaced with new ones. - 4 bedrooms have a new mirror each. 26 new bed bases Boys Shelter Renovation Report - 2013 Page 11
Old, broken wardrobe New, good quality wardrobe One new mirror in each bedroom 5. The studying room: - A large area of floor tiles were broken, requiring all floor tiles to be replaced with new ones. - 8 studying tables were broken and were replaced. Boys Shelter Renovation Report - 2013 Page 12
Old, broken floor tiles being replaced with new floor tiles Previous studying tables 8 new more sturdy tables 6. The living room: Before the boys sat on the floor to watch TV, to make it more comfortable for them, a new sofa and 6 new cushions were purchased. Boys Shelter Renovation Report - 2013 Page 13
7. The dining room: - The old stainless still tables and chairs were replaced by 2 long wooden tables and 4 wooden benches. Round, stainless still tables replaced with a long wooden table and benches 8. The kitchen: The drainage system of the kitchen was in need of repair. The doors and shelves of the cabinets were also broken. - As a result, a new kitchen (stainless still cabinets, a food cabinet and shelf) were installed. - A drainage system was set up. - 17.5m² floor tiles were changed. - A new refrigerator was purchased. - An upper cabinet was also installed. - All old kitchen/cooking utensils were replaced with new ones. Old kitchen. Boys Shelter Renovation Report - 2013 Page 14
New kitchen 9. Misc: The following additional items were also purchased. - A washing machine: This will be for the staff to use to wash the younger children s clothes. The older boys (10 year olds and up) will continue to do their own washing using the new outside washbasin on the terrace. This is to help them responsibility, and how to manage household chores as well as take care of themselves after they leave the Shelter. - A drinking filter machine: For food safety reasons, this machine was purchased to ensure the boys have clean water to drink. - 2 emergency lights were replaced as the old ones no longer worked. - 5 door locks were replaced. - 11 doors were repaired and repainted. Boys Shelter Renovation Report - 2013 Page 15
- A fire alarm system including 21 alarms were repaired. New washing machine New drinking filter machine 2 new emergency lights 5 new door locks 21 alarms repaired Boys Shelter Renovation Report - 2013 Page 16
Old, broken door New door Boys Shelter Renovation Report - 2013 Page 17