APPLICATION for MINOR SUBDIVISION REVIEW for CONCEPT and FINAL PLAT within COALVILLE CITY. Project Name: Project Address or Area: Name of Owner:

Similar documents
MINOR PLAT AMENDMENT APPLICATION CHECK APPLICABLE PERMIT ATTACHMENT:

Preliminary Subdivision Application (Major) (Four (4) lots or more)

FINAL PLAT APPLICATION

SUBDIVISION APPLICATION

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST

City of Prior Lake APPLICATION FOR REGISTERED LAND SURVEY

Initial Subdivision Applications Shall Include the Following:

City of Prior Lake APPLICATION FOR COMBINED PRELIMINARY AND FINAL PLAT

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT

PLYMOUTH PLANNING BOARD APPLICATION FOR A MINOR SUBDIVISION OR MAJOR SUBDIVISION

E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals)

Conditional Use Sketch Plan Application Non-Residential Zone

MAPLETON CITY CORPORATION. Step 7: Upon final approval and prior to plat recording the applicant shall provide the following:

BRIDGETON SUBDIVISION APPLICATION CHECKLIST

I. Requirements for All Applications. C D W

APPLICATION PROCEDURE

APPLICATION FOR 555 Washington Street Tentative Map Red Bluff, CA Subdivision Map (530) ext Parcel Map.

City of Midland Application for Site Plan Review

CHAPTER 3 PRELIMINARY PLAT

Town of Bargersville, Indiana Subdivision Control Ordinance

PLANNING BOARD CITY OF CONCORD, NH MINOR SUBDIVISION CHECKLIST

CITY OF DECATUR, TEXAS

Residential Minor Subdivision Review Checklist

Sketch Plan 2018 Bargersville Plan Commission Application Kit

PRELMINARY PLAT CHECKLIST

SUBMITTAL REQUIREMENTS

CHAPTER 26 PLANNING AND ZONING ARTICLE VII. MOBILE HOMES AND RECREATIONAL VEHICLE (RV) PARKS. Recreational Vehicle (RV) Park Development Standards

SUBDIVISION AND LAND DEVELOPMENT. 185 Attachment 20

SECTION 4: PRELIMINARY PLAT

New Private Way Ordinance Westbrook Planning Board Workshop , Planning Board Public Hearing Definitions

SUBDIVISION PLAT CHECKLIST. The following information shall be include on the plat:

ARTICLE 4 MAJOR SUBDIVISION/LAND DEVELOPMENT PLAN REQUIREMENTS

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (PRELIMINARY PLAT)

géãç Éy VtÇtÇwt zât 5440 Routes 5 & 20 West Canandaigua, NY Phone: (585) / Fax: (585)

CONCEPT PLAN APPLICATION Meeting with Staff Commercial Projects

City of Prior Lake APPLICATION FOR PRELIMINARY PLAT

géãç Éy VtÇtÇwt zât 5440 Routes 5 & 20 West Canandaigua, NY Phone: (585) / Fax: (585)

Township of Little Egg Harbor Planning Board 665 Radio Road Little Egg Harbor, New Jersey Phone: ext. 221 Fax:

Section Preliminary Plat Checklist and Application Forms

APPENDIX B. SUBMISSION REQUIREMENTS

STONE COUNTY PRELIMINARY PLAT CHECKLIST. Note: Applications need to be in the office by 2 p.m. on the cutoff day.

CHAPTER 32 SUBDIVISIONS SECTION TITLE PAGE NO.

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

APPLICATION SUBMITTAL REQUIREMENTS FOR Tentative Parcel or Subdivision Maps

WRIGHT TOWNSHIP Ottawa County 1565 Jackson Street, P.O. Box 255, Marne, Michigan 49435

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

A GUIDE TO PROCEDURES FOR: SUBDIVISIONS & CONDOMINIUM CONVERSION

Residential Major Subdivision Review Checklist

COMMUNITY DEVELOPMENT DEPARTMENT

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW

RIVERDALE CITY PLANNING COMMISSION APPLICATION FOR RESIDENTIAL SUBDIVISION SITE PLAN APPROVAL

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1

Administrative Application Duplex Subdivisions

New Electronic Planning Commission Submittal Process

ARTICLE 900 PLAT AND PLAN REQUIREMENTS

ARTICLE 6 PRELIMINARY PLAT

TOWN OF ROXBURY PLANNING BOARD

Administrative Plat Application Form

(voice) (fax) (voice) (fax) Site Plan Review

MINOR SUBDIVISION APPLICATION

MINOR SUBDIVISION PLAT CHECKLIST

CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW

Use permitted by: Right Special Exemption

APPLICATION FOR PRELIMINARY PLAT RESIDENTAIL. FILING FEE: $ for the first 20 lots; $10.00 for each additional lot over 20

City of Forest Hill Minor Plat Application

ARTICLE SINGLE FAMILY SITE CONDOMINIUM DEVELOPMENT STANDARDS

TOWNSHIP OF BORDENTOWN LAND DEVELOPMENT APPLICATION CHECKLIST. General Requirements for all Applications

c. Final plat (recommendation by the Planning Commission, approval by City Council)

Appendix A: Submittal Checklists

BOROUGH OF HELLERTOWN 685 Main St., Hellertown PA Phone: Fax:

CHECKLIST FOR DEVELOPMENT REVIEW

Town of Canandaigua 5440 Routes 5 & 20 West Canandaigua, NY Phone: (585) / Fax: (585)

Secondary Plat 2018 Bargersville Plan Commission Application Kit

FINAL SUBDIVISION AND LAND DEVELOPMENT PLAN CHECKLIST. Plan Name. Applicant's Name:

Plan and Zoning Commission Review Process

BOSSIER CITY PARISH METROPOLITAN PLANNING COMMISSION 620 Benton Rd. Bossier City, LA Phone: Fax: PRELIMINARY PLAT

NOT TO BE SUBMITTED WITH SKETCH DESIGN APPROVAL Subdivision Checklist: Major Subdivision Final Plat

ARTICLE V PRELIMINARY PLAN SUBMISSION

Gates County Planning and Zoning

Request for Action form is also defined as an application to be considered by the Planning Commission.

Preliminary Plat/Final Plat Application

CITY OF STRONGSVILLE PLANNING COMMISSION APPLICATION SINGLE FAMILY SUBDIVISION

SECTION 6 - APPROVAL OF PLATS. Whenever any subdivision of land is proposed, and before any permit for the

SECTION SITE SURVEYS

WRIGHT TOWNSHIP Ottawa County 1565 Jackson Street, P.O. Box 255, Marne, Michigan 49435

A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT

APPLICATION REVIEW CHECKLISTS

Site Plan Application

CITY OF FAYETTEVILLE, ARKANSAS FINAL PLAT FOR STAFF USE ONLY FINAL PLAT FEE: $ $ Date Application Submitted: Date Accepted as Complete:

City of Clever Planning & Zoning Department P.O. Box 52 Clever, MO QUALIFICATIONS FOR MINOR SUBDIVISIONS

Township of Collier 2418 Hilltop Road Presto, PA 15142

FINAL SPUD APPLICATION

ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT

TOWN OF LEWISTON PLANNING BOARD APPLICATION

CITY OF HOBBS ORDINANCE NO..

CITY OF GROVER BEACH COMMUNITY DEVELOPMENT DEPARTMENT Tentative Map Checklist

Chapter 115 SUBDIVISION OF LAND

COMMERCIAL SITE PLAN & CONDITIONAL USE PERMIT REVIEW PROCESS & CHECKLIST

SECTION 2. PROCEDURES FOR FILING AND REVIEW

Transcription:

APPLICATION for MINOR SUBDIVISION REVIEW for CONCEPT and FINAL PLAT within COALVILLE CITY For Office Use Only: Application #: Application Date: PC Approval Date: CC Approval Date: Community Development Director Approval Date: Expiration Date: Denial Date: Fee Paid: $ Receipt #: Initial: Project Name: Project Address or Area: Name of Owner: Address of Owner: Phone: Cell: Email: Fax: Name of Applicant: Address of Applicant: Phone: Cell: Email: Fax: Procedure: Under the Minor Subdivision Process, developers will need to follow the steps included in Title 8 of the Coalville Code. The Minor Subdivision Process has been developed in order to streamline the system for the applicant to efficiently develop property within the city while still maintaining the standards of the Coalville City Development Code. The following timeline is given as a guide for developers in order to give them direction during the process. 1

Step 1: Develop Concept Plan. A concept plan shall be prepared showing the concept of the proposed subdivision. The concept plan shall consist of a general site plan with sufficient detail to illustrate on site characteristics of the proposed subdivision and adjacent parcels. Please include the following information for the Concept Review: A plan prepared by a qualified engineer and or Surveyor at an engineers' scale not more than one inch equals one hundred (100) feet. Please submit three (3) standard twenty-four (24) inch by thirty-six (36) inch printed copies and two (2) 11 x 17 printed copies and (1) digital format by e-mail or on a CD. Except when permission is expressly granted by the Staff, no concept plans hand drawn in pen or pencil shall be accepted. Plan shall be submitted to the City three (3) weeks prior to the scheduled meeting of the Planning Commission for review by the Staff and other appropriate agencies. The Plan must be complete and include the following in order to be considered for review. Please use the check-list below to ensure that you have addressed all the requirements that may be applicable. a. b. c. d. e. The date of the plan, true north arrow, standard scale, legend identifying lines and symbols, and title block with the name of the engineer, site or subdivision. The location of the property with respect to surrounding property and streets; along with the location and width of all existing and proposed streets, street names and easements, alleys, trails, fences and other public ways, easements, and proposed street rights-of-way. The location of water bodies, rivers, streams, and other pertinent features such as swamps, drainage or irrigation ditches, bridges, or other nearby features. A preliminary landscape and irrigation plan showing proposed plant species, size and location including means of irrigation. A preliminary lighting and signing plan showing all proposed exterior lighting and signing. f. A preliminary grading and drainage plan with an indication of all slopes from 0-8%, 8-15%, 15-30% and slopes greater than 30%. g. h. i. j. k. l. m. Location of trash receptacle and screening if the site requires a dumpster. Verification and location of fire hydrants. Sewer clean-out locations. Fencing location, type, color and height. Parking stall size, number of stalls, parking lot covering and locations. The location and size of all proposed or existing lots complete with building pads, utility easements, lot numbers, and building setback lines. The location and size of all property proposed to be set aside for park or playground use, or other public or private reservations and open space dedications, with designation of the purpose thereof, types, and conditions, if any, of the dedication, preservation or reservation. 2

n. o. p. q. r. s. t. u. v. The name and address of the owner or owners of land to be developed or subdivided, the name and address of the sub-divider if other than the owner, and the name of the engineer and land surveyor. Indication of the use of all lots or parcels whether single-family, two-family, multi-family, agricultural, commercial, industrial, recreation open space, as well as all uses other than those specified that are proposed by the developer or subdivider. Explanation of reservations and conservation easements, if any. A preliminary utility plan showing all public and private utility, connection, and facilities existing and proposed throughout the site or subdivision. If the plan does not include all contiguous property of the owner of the site or subdivision, an indication of future use of the contiguous property. Proposed Phasing Plan as per Section 8-2-040 of the Subdivision Code if applicable. Five (5) or more lots or units will require an Impact Analysis on public infrastructure as per Section 10-3-090. A right to farm provision agreement or study, with appropriate deed restrictions or restrictive covenants if applicable. All information required by the Land Use Authority or Staff. w. Payment of fee $600.00 Filing fee of $600.00. A one-time fee of $600.00 shall be paid to the city as per the city fee schedule in order to cover the costs of review for the minor subdivision Plus Notification and Publication Costs and is required at the time of application. Note: The fees for reviewing the concept and final plat cover the cost of reviewing one submittal for each stage in the process. Any additional submittals will be assessed a review fee on an hourly basis at the non-negotiable hourly rate of the City Engineer and City Planner. Review costs can be kept to a minimum if the engineer for the developer is detailed in the original plat and plan preparation, is thoroughly familiar with the subdivision ordinance and associated checklists, and is responsive to the review comments. All review costs associated with each subdivision shall be paid in full prior to approval by the governing body. Step 2: Concept Plan Review. The Planning Commission will review the concept plan and recommend the applicant to prepare the Final Plat with any staff of Commission reconditions. Step 4: Final Plat and Construction Drawings Preparation. After gaining approval of the Concept Plan by the City, an applicant shall submit a Final Plat and Construction Drawings. For review by the Planning Commission and for a Public Hearing to be held with the City council. It is the applicant s responsibility to make any necessary changes to the concept plans that were required by the City prior to submitting any Final Plat Plans. 3

Please include the following with the Final Plat: FINAL PLAT [Three (3) Copies]: A plat prepared on reproducible Mylar including all of the requirements of the concept plan, preliminary plan, conditional use permit and master planned development as applicable, and including any other requirements of the Development Code. Applicants may submit a digital copy of the final plat on CD. Plan shall be submitted at least three (3) weeks prior to the next Planning Commission meeting to allow staff adequate time to process and review application. Please include: a. b. c. d. e. f. g. h. i. A final draft of any subdivision restrictive covenants (CC&R s) or agreements All monuments erected, corners, and other points established in the field in their proper places. The material and diameter of which the monuments, corners, or other points are made shall be noted at the representation thereof or by legend. The final subdivision plat shall be prepared by a registered land surveyor licensed by the state of Utah and certified as to the same on the plat. The subdivision plat must be signed by the owner of the property and all persons claiming an interest in the property within the plat, including those holding a security interest in the property, excluding mechanic liens and judgment liens. A condominium plat need not be signed by those holding security interests in the property. All owners' signatures must be legally acknowledged. The plat must have signature blocks for the Mayor, City Engineer, North Summit Fire District, County Recorder, City Attorney, Planning Commission Chair, Rocky Mountain Power, Public Works Director, Questar Gas, Summit County Health Department and any other signatures required by the City. Owner s dedication and consent to record as required by applicable state law. The submission for plat approval must be accompanied by any declarations, easements, dedications of rights-of-way or open space, or similar documents that are in addition to the contents of the plat. A preliminary title report covering all property located within the Subdivision. The report shall be prepared or updated to within thirty (30) days of the date of recording of the Subdivision Plat. Any other information as may be useful or necessary for the meaningful review of the project. Additional information may be requested based on the nature of the project or the site. IF APPLICABLE PLEASE PROVIDE CONSTRUCTION DRAWINGS: (Three [3] copies) a. Plans and profiles showing existing and proposed elevations along centerlines of all roads. Where a proposed road intersects an existing road or roads, the 4

elevation along the centerline of the existing road or roads within one hundred (100) feet of the intersection shall be shown. Approximate radii of all curves, lengths of tangents, and central angles on all streets. The Planning Commission may require, upon recommendation by the City Engineer, where steep slopes exist, that typical cross-sections of all proposed streets be shown. b. c. d. e. f. g. h. i. j. k. Plans showing the location of existing and proposed trails, sidewalks, drainage easements, irrigation ditches, and rights-of-way. Utility plan including plans and profiles showing the location, size and invert elevations of manholes, catch basins, existing and proposed sanitary sewers, storm water drains, culinary and irrigation water lines, fire hydrants, and connections to any existing or proposed utility systems, and exact location and size of all water, gas, or other underground utilities or structures. Location, size, elevation, and other appropriate description of any existing facilities or utilities, including, but not limited to, existing streets, sewers, drains, water mains, and easements, and other pertinent features such as water bodies, streams, wetlands, buildings, and each tree or group of trees and shrubs to be preserved. The water elevations of adjoining lakes or streams at the date of the survey, and the approximate high and low water elevations of such lakes or streams. All elevations shall be referred to the U.S.G.S. datum plane. If the subdivision borders a lake, river, or stream, the distances and bearings of a meander line established not less than fifty (50) feet back from the ordinary highwater mark of such waterways. Topography at the same scale as the Preliminary Plan with contour intervals of five (5) feet over 30% slope and a minimum contour interval of two (2) feet less than 30% slope, referred to sea-level datum. All datum provided shall be the latest applicable U.S. Geodetic Survey datum and should be so noted on the plat. All other specifications, details, and references required by the Coalville City Engineering Standards and Construction Specifications. Signature blocks for the Planning Commission Chair, Mayor, City Engineer, Public Works Director, City Recorder, as well as the applicant s engineer and surveyor. Title, name, address, signature, and seal of the professional engineer preparing the plans, and date, including revision dates. Erosion control plan including limits of disturbance and re-vegetation. Site grading and drainage plans. Landscape, maintenance, and irrigation plans. 5

l. Lighting and signing plans. Notice: Additional information may be required by the project planner to ensure adequate information is provided for staff analysis. All information submitted as part of the application may be copied and made public including professional architectural or engineering drawings which will be made available to decision makers, public and any interested party. If you have any questions regarding the requirements of this application, please contact the Community Development Director prior to submitting the petition. County tax parcel ( Sidwell ) maps and names of property owners are available at: Summit County Recorder s Office 60 North Main Street Coalville, Utah 84017 File the complete application at: Coalville City Hall 10 North Main Street Coalville, Utah 84017 Signature of Property Owner or Representative: Date: 6