VICINITY PLAN SITE PLAN

Similar documents
Mert Meeker 811 NW 19 th Ave., Ste. 102 Portland, OR

BURNSIDE AND COUCH TRANSPORTATION AND URBAN DESIGN PLAN PHASE II CATALYST DEVELOPMENT STUDY. Final Draft June 2005

WORK HERE. For office leasing information, please contact: Nathan Sasaki Executive Director

4001 NE Halsey Street

th Avenue NW Early Design Guidance Meeting - SDCI # EDG Meeting

SCANDINAVIAN DESIGNS - CORTE MADERA

NW 62 ST ASSEMBLAGE FOR SALE

SE TACOMA RETAIL PAD RETAIL & LEASE SELLWOOD SOUTHEAST PORTLAND DRIVE-THRU OPPORTUNITY CLOSE-IN RETAIL + DRIVE THRU-SITE FOR LEASE FOR

FOR LEASE PORTLAND, OR DUANE LINK

FOR LEASE PORTLAND, OR DUANE LINK DOUG CARTER

Draft Strategy Plan Concepts. CAC Meeting #9

Site Context 2.1. Site Context

Surface Building SE 11th. for lease southeast. for lease 2,891 sf creative office/flex space. charlotte larson Tyler Bruss

CITY OF HIAWATHA, IOWA TOWN VILLAGE CENTER URBAN REVITALIZATION PLAN. for the TOWN VILLAGE CENTER URBAN REVITALIZATION AREA

SE 23RD AVENUE 4-PLEX

TRANSIT-ORIENTED DEVELOPMENT PLAN EXISTING CONDITIONS REPORT LAWRENCE TO BRYN MAWR MODERNIZATION

REBRANDED. REIMAGINED.

1737 NE BROADWAY OFFERING MEMORANDUM. Owner/User Office Building or Future Development Opportunity

Draft University of Kentucky College Town Study Update

DISTRICT OF SQUAMISH. A bylaw to amend the District of Squamish Zoning Bylaw No. 1342,1995.

5.1 Site Planning & Building Form

MPN. S broad street corner development site. 701 s broad street, philadelphia, pa 19147

MEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres

Land Development Update

WILLAMETTE PARK APARTMENTS

VILLAGE CENTER ARLINGTON, VIRGINIA ADVISORY WORKING GROUP/ PLANNING COMMISSION FOR ORR PARTNERS 01/

COMMERCIAL DEVELOPMENT OPPORTUNITY

Northwest Quadrant. Aerial Photographs. I th Ave Atlantic Ave 1 st St. SW 10 th /Atlantic SW 8 th /Atlantic

Better Housing by Design - Proposed Draft Summary

Conditional Use Application for the proposed 222 South Bedford Apartment Building Demolition Permit and Rezoning of DR2 portion of site

Project Overview. Washington s Exciting Destination for Office & Retail. For More Information, Visit CapitolCrossingDC.com PROPERTY GROUP PARTNERS

1057 Canton RD Marietta, GA 30066

1237 W. 7 th Street. DLANC: Planning and Land Use Committee Meeting. November 21, 2017 DIR DB-SPP ENV EAF

St. John s Live/Work Opportunity

Calgary Green Line North 64 Ave N Charrette Ideas Session

JEFFERSON STATION S West Temple South Salt Lake, Ut HBC

SELLWOOD MORELAND IMPROVEMENT LEAGUE 8210 SE 13th AVENUE, PORTLAND, OR STATION CHURCH

CREATIVE OFFICE FOR LEASE URBAN ROW BUILDING

Stadium Shopping Center. for lease northwest w burnside street for lease 4,877 sf of retail space. brian greeley dan bozich

Upcoming Apartment Projects with No On-Site Parking Frequently Asked Questions June 2012

CAPITOL VIEWS FOR LESS CAPITAL

2200 FIFTH STREET PRELIMINARY DESIGN REVIEW

WHITMAN 8 Units Vancouver, Washington OFFERING MEMORANDUM

Town of Clinton, Connecticut Action Plan for the Historic Unilever Property and Area. Steering Committee Meeting #5 Implementation Strategies

Downtown Target Area Housing Implementation Strategy

The Benson Blocks: BOMA Real Estate Development Workshop

The Brewery Blocks / Blocks 1, 3, 4, 5

BYLAW NUMBER 64D2010

Presentation Agenda Wilson - Mixed Use Building Presentation Agenda. 16 May 2016 SPRC 1. Pg 2

Section 179 and Bonus Depreciation New Savings for Purchases in 2013

Jasper 115 Street DC2 Urban Design Brief

SUBJECT: Application for Planned Unit Development and Rezoning 1725 Winnetka Road

Historic Resources REPORT 2: DATA AND MAPS

Available Retail - Greater Phoenix

Potential Building 6-Storey (Allowable) 50' Shoulder ALEXANDER STREET. Evelyne Saller Centre Main Entrance. Rodan Lodge Entry Porch

Using Analysis to Improve the Environment for Transit

From Policy to Reality

Call me now for a showing!

14 Strachan Ave and East Liberty St - Rezoning Application - Preliminary Report

KEY CENTER th Avenue NE Bellevue, Washington

BYLAW NUMBER 256D2017

OFFICE MARKET ANALYSIS

4.2.8 Westwood/VA Hospital Station Area

ZONING Matters. Zoning Determines. Citywide Zoning Workshop April 26, 2010 North Oakland West Oakland North Oakland Hills

RETAIL & OFFICE SPACE FOR LEASE

Also present were Bill Mann, Senior Planner and Senior Secretary Amber Lehman.

VINTAGE COURTYARD 10 Units - Portland, Oregon OFFERING MEMORANDUM

STAFF REPORT. January 25, North York Community Council. Director, Community Planning, North District

Billboard Relocation Code Amendments. City Council Transportation and Environment Committee March 23, 2009

CITY OF CHARLOTTESVILLE DEPARTMENT OF NEIGHBORHOOD DEVELOPMENT SERVICES PLANNING COMMISSION

CONCEPTUAL DOWNTOWN REDEVELOPMENT PLAN PROPOSED CONCEPTUAL PLAN

Introduction. General Development Standards

DAUPHIN CREEK ESTATES SUBDIVISION

2018 APPLICATION FOR URBAN DESIGN REVIEW BOARD City of Des Moines, Iowa

REQUEST FOR DEVELOPER PROPOSALS (RFP)

Key to abbreviations:

Proposed Development at Ajax Plaza Windcorp Grand Harwood Place Ltd.

FAMILIES AND INDIVIDUALS

The Mississippi Gold Coast

CENTRAL EASTSIDE. PDe PORTLAND DEVELOPMENT COMMISSIO

20,000 sf Industrail Building 2040 Lee St Hollywood, FL 33020

ANC 1A ZONING REGULATIONS REVIEW SUMMARY. February, 2014

PORTLAND DEVELOPMENT COMMISSION Portland, Oregon. River District Housing Implementation Strategy Annual Report

Office, Industrial & Retail

EIA Model Test 7: R-O to R-O

Trinity Plaza. 450 South Rose Avenue. Tom Davies Canyon Cardiff Oxnard, LLC for New Trinity Community Church

GENERAL PLAN UPDATE. Online Workshop 1 Results. May 26, 2016

HOME TRUST NATION PROPERTY INSPECTION AND MARKET ANALYSIS

3.0 Project Description

FOR SALE TASTE OF EUROPE PROPERTY HIGHLIGHTS. RYAN IMBRIE MANAGING DIRECTOR O: M:

Request For Proposal Acres

MULTIFAMILY MARKET ANALYSIS

Bunker Hill Part II Urban Design. Specific Plan. Case No. CPC SP TABLE OF CONTENTS

307 Sherbourne Street - Zoning Amendment Application - Preliminary Report

DOWNTOWN / WEST END PRIME RESTAURANT & RETAIL OPPORTUNITIES

1800 SW First Avenue, Suite 650 Portland OR

Overview. Foundation: Physical Design Framework 2011 Phase 2 Study

SITE PLAN REVIEW COMMITTEE MEETING AGENDA

ONE TEN PLAZA THE CENTER OF IT ALL 110 WEST A STREET // DOWNTOWN SAN DIEGO // 92101

40-58 Widmer Street - Zoning Amendment Application - Preliminary Report

Transcription:

STUDY SITE The Eastside Mixed-Use Study is comprised of Blocks 67, 68, 69, 74, 75, and 76. Bound to the south by the Burnside Bridge and to the east by NE Jr. Blvd, Block 76 presents the ability to prominently mark the threshold between the City Center and the Central Eastside. Blocks 67 and 68 - a rare superblock in the city grid - contains the possibility of retaining a single, large retailer to anchor the mixed-use development. In an effort to weave a relatively dense development into the Central Eastside and stimulate subsequent redevelopment, several ideas are proposed: retail at the ground floor complimenting the light industrial heritage of the Central Eastside, a mix of affordable, market-rate and live-work studio housing above, a build-to-suit office complex, and parking. In addition, the study proposes to shift the proposed Burnside / Couch Couplet from 3rd Avenue to Jr Blvd.

NW EVERETT ST BANFIELD EXPRESSWAY NW 1ST AVE NW DAVIS ST NW COUCH ST W. BURNSIDE STREET NW FRONT AVE STUDY SITE WILLAMETTE RIVER PM SUN VIEWS TO RIVER AND DOWNTOWN NE 2ND AVE 69 68 67 NE AVE 74 75 76 NE MARTIN LUTHER KING JR BLVD NE EVERETT ST VIEWS TO MT. ST. HELENS AND LLOYD DISTRICT NE DAVIS ST NE COUCH ST NE GRAND AVE AM SUN BURNSIDE BRIDGE E BURNSIDE ST SW ANKENY ST SW ASH ST K SITE MAX LIGHT RAIL I - 5 100 YEAR FLOOD PLAIN ZONED: SE 2ND AVE IG1 - Comp Plan is EXd SE AVE NOON SUN SE MARTIN LUTHER KING JR BLVD SE ANKENY ST 0 100 200 300 400 SE GRAND AVE F.A.R. 9:1; 3:1 Bonus Available OPEN GREEN SPACE EXISTING FREIGHT LINE SETBACK: No MIN, 10ft MAX HEIGHT: 200'; Not eligible for height bonus PROPOSED BURNSIDE / COUCH COUPLET FUTURE STREET CAR ALIGNMENT EXISTING BICYCLE PATH PROPOSED BICYCLE PATH BLDG. EX zone - 100% of site area COVERAGE: R. B. L: Blk 75,76: 75% extend to st. lot line, or 75% within 12ft of st. lot line with space between for active use. : MAXIMUM RATIOS: Located in CE2 Sector Office = 2.5 / 1000 Other = no maximum Expect CCPR

VIEW TO THE SOUTHEAST VIEW TO THE EAST VIEW TO THE NORTHWEST VIEW TO THE WEST

VIEW TO THE SOUTHWEST VIEW TO THE WEST VIEW TO THE NORTH VIEW TO THE NORTHEAST

VIEW TO THE NORTH FROM BURNSIDE BRIDGE VIEW TO THE NORTHWEST FROM BURNSIDE BRIDGE

NE 2ND VIEW EAST NE VIEW SOUTH

FREEWAY OVERPASS (BLOCK 69) EASTBANK ESPLANADE EASTBANK ESPLANADE AND VIEW TO SITE FROM BURNSIDE BRIDGE

VIEW TO THE NORTHWEST FROM UNDER BURNSIDE BRIDGE NE AND NE COUCH

BLOCK 74 VIEW TO THE NORTHEAST BLOCK 74 VIEW TO THE NORTHWEST MARTIN LUTHER KING JR BLVD VIEW TO THE SOUTH

CONVENTION PLAZA - EXTERIOR UNION ARMS - EXTERIOR CONVENTION PLAZA - INTERIOR BURNSIDE SKATE PARK

2ND 2ND LIVE / WORK LIVE / WORK SECTION THROUGH BLOCK 68 AND 75 SECTION THROUGH BLOCK 67 AND 76 200' PHASE I NE 2ND AVE 69 74 68 NE AVE 75 NE MARTIN LUTHER KING JR BLVD NE NE D PHASE III A Scheme A retains existing on-site housing, office, and parking in blocks 68, 69, 74, and 75. Additional housing and parking is proposed on block 67 as well as a live/work and housing development around the existing apartment buildings on block 74 and 75. Fronting 2nd Ave, block 67 contains 30k of leasable space intended for an industrial tenant. As a result of planned Burnside/Couch Couplet on 3rd Ave, block 76's irregularly shaped site presents an architectural opportunity to mark the prominent NW corner of Jr Blvd and E Burnside St with an office complex. BLOCK EX EXISTING INFILL 67 68 69 74 75 76 36,000 GSF 4K 32K - 42 stalls NEW 100K 20K 60K NE 180,000 GSF 100K - 164 stalls 124K 224,000 GSF - 336 stalls 67 BELOW GRADE 76 STREET CAR PHASE II INDUSTRIAL LIVE / WORK TOTAL BUILT (W/O ) 8.5K 9.5K 38.5K 51,500 GSF - 155 stalls 30.5K 30,500 GSF - 45 stalls 10.5K 38K 48,500 GSF - 49 stalls 139K 100K 0K 44K 130K 158K 570,500 GSF - 791 stalls 184.5K 28K 22K 51.5K 286,000 GSF = 635 stalls 0 25 50 75 100 250 SITE SKETCH

NE 2ND 2ND LARGE COVERED LARGE COVERED LARGE LARGE SECTION THROUGH BLOCK 68 AND 75 SECTION THROUGH BLOCK 67 AND 76 200' PHASE I NE 2ND AVE 69 74 EXTERIOR 68 NE AVE 75 NE MARTIN LUTHER KING JR BLVD NE D NE PHASE III PHASE II B1 LG BLK 67-68 Scheme B1 proposes maintaining the existing superblock comprised of blocks 67 and 68. It provides for a single, large retailer occupying two levels of space with housing and parking above. Access to parking from 2nd Ave and access to structured parking from 3rd Ave. Block 69 remains unbuilt, but retains vehicular access from NE Davis to 2nd Ave and contains 30k of exterior, open-to-air retail space. Block 75 to have a new 7 story building with 2 levels of on grade retail and 5 levels of housing above wrapping the existing 4 story apartment building. The Burnside/Couch Couplet is relocated from 3rd Ave to NE Jr Blvd in an effort to alleviate isolation of block 76. An office complex with 2 levels of parking and street level retail is proposed for block 76. EX NEW BLOCK 67 68 69 74 75 76 36,000 GSF 25K 200K 345,000 GSF 138,000 GSF 4K 20K 32K - 42 stalls 100K - 313 stalls 138K - 207 stalls 67 76 STREET CAR EXT 64K 64K 216,000 GSF 30K 30,500 GSF 9.5K 40K 38.5K - 648 stalls - 0 stalls LIVE / WORK 10.5K 10,500 GSF - 10 stalls TOTAL BUILT (W/O ) 89K 264K 30K 44K 172K 177K 776,000 GSF - 1220 stalls 191K 191K 51.5K 433,500 GSF = 963 stalls 0 25 50 75 100 250 SITE SKETCH

NE 2ND 2ND COVERED LARGE COVERED LARGE LARGE SECTION THROUGH BLOCK 68 AND 75 SECTION THROUGH BLOCK 67 AND 76 200' PHASE I NE 2ND AVE EXTERIOR 69 74 68 NE AVE 75 NE MARTIN LUTHER KING JR BLVD NE D NE PHASE III PHASE II B2 LG BLK 67-68 Scheme B2 proposes maintaining the existing superblock comprised of blocks 67 and 68. It provides for a single, large retailer occupying two levels of space with housing and parking above. Access to parking serving the large retailer and housing is from 3rd Ave. Access to large retailer from 2nd and 3rd Ave. Block 69 remains unbuilt, but retains vehicular access from NE Davis to 2nd Ave and contains 30k of exterior, open-to-air retail space. Block 75 to have a new 7 story building with 2 levels of on grade retail and 5 levels of housing above wrapping the existing 4 story apartment building. The Burnside/Couch Couplet is relocated from 3rd Ave to NE Jr Blvd to alleviate isolation of block 76. An office complex with 2 levels of parking and a street level of retail is proposed for block 76. BLOCK EX NEW 67 68 69 74 75 76 36,000 GSF 25K 200K 345,000 GSF 138,000 GSF 4K 20K 32K - 42 stalls 100K - 313 stalls 138K - 207 stalls 67 76 STREET CAR EXT 64K 64K 216,000 GSF 30K 30,500 GSF 9.5K 40K 38.5K - 648 stalls - 0 stalls LIVE / WORK 10.5K 10,500 GSF - 10 stalls TOTAL BUILT (W/O ) 89K 264K 30K 44K 172K 177K 776,000 GSF - 1220 stalls 191K 191K 51.5K 433,500 GSF = 963 stalls 0 25 50 75 100 250 SITE SKETCH

2ND 2ND COVERED COVERED SECTION THROUGH BLOCK 68 AND 75 SECTION THROUGH BLOCK 67 AND 76 200' PHASE I NE 2ND AVE EXTERIOR 69 74 68 NE AVE 75 NE MARTIN LUTHER KING JR BLVD NE NE D NE PHASE III PHASE II B3 LG BLK 67-68 Scheme B3 proposes maintaining the existing superblock comprised of blocks 67 and 68. It provides for a single, large retailer occupying two levels of space with housing above. Access to parking from 3rd Ave. Access to large retailer from 3rd Ave. Block 69 remains unbuilt, but retains vehicular access from NE Davis to 2nd Ave and contains 30k of exterior, open-to-air retail space. Block 75 to have a new 7 story building with 2 levels of on grade retail and 5 levels of housing above wrapping the existing 4 story apartment building. The Burnside/Couch Couplet is relocated from 3rd Ave to NE Jr Blvd to alleviate isolation of block 76. An office complex with 2 levels of parking and a street level of retail is proposed for block 76. BLOCK EX NEW 67 68 69 74 75 76 36,000 GSF 25K 200K 345,000 GSF 138,000 GSF 4K 20K 32K - 42 stalls 100K - 313 stalls 138K - 207 stalls 67 76 STREET CAR EXT 64K 64K 216,000 GSF 30K 30,500 GSF 9.5K 40K 38.5K - 648 stalls - 0 stalls LIVE / WORK 10.5K 10,500 GSF - 10 stalls TOTAL BUILT (W/O ) 89K 264K 30K 44K 172K 177K 776,000 GSF - 1220 stalls 200K 190K 51.5K 441,500 GSF = 981 stalls 0 25 50 75 100 250 SITE SKETCH

2ND 2ND LARGE LARGE LARGE LARGE SECTION THROUGH BLOCK 68 AND 75 MARKET SECTION THROUGH BLOCK 67 AND 76 200' PHASE I NE 2ND AVE 69 74 EXTERIOR 68 NE AVE 75 NE MARTIN LUTHER KING JR BLVD NE NE D NE PHASE III PHASE II C Scheme C approaches the maximum potential development while considering FAR, height, view corridors, and solar shading. The proposal maintains the existing superblock comprised of blocks 67 and 68.It provides for a single, large retailer occupying two levels of space with housing terracing towards the river above. Access to large retailer from 3rd Ave and 2nd Ave. Access to parking is located within large retail space. Block 69 remains unbuilt, but retains vehicular access from NE Davis to 2nd Ave and contains 30k of exterior, open-to-air retail space. Block 75 to have a new 17 story building with on grade retail, 5 levels of parking, and 13 floors of housing. The Burnside/Couch Couplet is relocated from 3rd Ave to NE Jr Blvd in an effort to alleviate isolation of block 76. An office complex with 2 levels of parking and a street level of retail is proposed for block 76. EX NEW BLOCK MAXIMIZE DEVELOP. 67 68 69 74 75 76 36,000 GSF 140K 141K 557,000 GSF 4K 20K - 42 stalls 256K - 506 stalls 138K 67 76 76 STREET CAR EXT 138,000 GSF 85K 85K 258,000 GSF 30K 30,000 GSF - 207 stalls 9.5K 40K 38.5K - 774 stalls - 0 stalls LIVE / WORK 10.5K 10,500 GSF - 10 stalls TOTAL BUILT (W/O ) 225K 226K 30K 44K 296K 177K 1,029,500 GSF - 1539 stalls 170K 170K 180K 51.5K 571,500 GSF =1270 stalls 0 25 50 75 100 250 SITE SKETCH

TYPOLOGY VICINITY PLAN

TYPOLOGY VICINITY PLAN

PORTLAND DEVELOPMENT COMMISION 1900 SW Fourth Ave, Suite 7000 Portland, OR 97201 503.823.3285 GBD ARCHITECTS, INCOPORATED 1120 NW Couch Street, Suite 300 Portland, OR 97209 503.224.9656 PETER FINLEY FRY 2153 SW Main Street, #105 Portland, OR 97205 503.274.2744 TURNER CONSTRUCTION COMPANY 5200 SW Macadam Avenue, Suite 370 Portland, OR 97239 503.552.0422 JOHNSON GARDNER 520 SW Sixth Avenue, Suite 914 Portland, OR 97204 503.295.7832 INTERGRA REALTY RESOURCES 812 SW Washington Street, Suite 850 Portland, OR 97205 503.478.1005 TYPOLOGY