Content. Mission. Objectives. For the People. People First, a District-based and Public Participatory Approach. Redevelopment.

Similar documents
Highlights of the Year

Redevelopment. The vertical green wall featured in URA redevelopment project One Wanchai Redevelopment Eng (5)a.indd 22

Operating Review. Redevelopment. Rehabilitation Revitalisation preservation

Redevelopment: Tackling Urban Decay Effectively

Preservation and Revitalisation

OPERATING REVIEW. URA s 4R work transforms and brings life to urban fabric

Redeveloping/Upgrading old and dilapidate districts as a form of improving the urban quality of Hong Kong

APPROVED URBAN RENEWAL AUTHORITY PRINCE EDWARD ROAD WEST / YUEN NGAI STREET DEVELOPMENT SCHEME PLAN NO. S/K3/URA2/2

BUILDING FOR THE BETTER CHINA. Hong Kong

Unopened Space: Mapping Equitable Availability of Open Space in Hong Kong Press Conference Report by Carine Lai

Kowloon Region. Unit No. District Meeting Venue & Contact Tel. Meeting Time. The Salvation Army Chuk Yuen Children and Youth Centre

Planning & Design Division. Promote Building. Overall Research and Planning for Redevelopment Projects. Rehabilitation. Develop, Implement and Manage

Foreseeable Problems of Redevelopment of. Public Housing Estates a case study of Tsui. Ping (North) Estate

SUN HUNG KAI PROPERTIES LIMITED ANNUAL REPORT 2001/02

Gross Floor Area of HOS Flat by Phase / Estate

For the Hong Kong Housing Society, 1998/1999 has been a year of. facing challenges and finding solutions

Project Summary Major Property Development Projects in Hong Kong. Project Summary Major Property Development Projects in Hong Kong.

S.F. Express Circle K Convenience Store Self-pickup Service Service Coverage: Kowloon

Application Form Common Area Repair Works Subsidy / Interest-free Loan

HKBN Mass Deploys Fiber-To-The-Home Making the Future Today in Hong Kong

HONG KONG HOUSING AUTHORITY HOME OWNERSHIP SCHEME AND PRIVATE SECTOR PARTICIPATION SCHEME AND TENANTS PURCHASE SCHEME INFORMATION FOR APPLICANTS ON

Property Investment. 1. Two IFC, Central 2. International Commerce Centre, Kowloon Station 3. East Point City, Tseung Kwan O 4.

Proposed District Council Constituency Areas

Government Vaccination Programme 2018/19 List of HA GOPCs for GVP Vaccination

Memorandum for the Subsidised Housing Committee of the Hong Kong Housing Authority. Public Rental Housing Allocation Plan for 2010/11

HONG KONG HOUSING AUTHORITY

Delia Memorial School (Hip Wo) Guidance notes on filling Student s Particulars Record

S.F. Service Points Update Notice

FOR VIBRANT LIFESTYLES THE REACH, YUEN LONG, HONG KONG

Property Development. 1. YOHO Town, Yuen Long 2. Park Island, Ma Wan 3. Severn 8, The Peak 4. The Arch, Kowloon Station. Park Island, Ma Wan

HK Island Central. Central / Admiralty / Sheung Wan Admiralty Centre ifc (International Finance Centre) (One & Two) Shanghai Commercial Bank Building

Collection Point Address

Property Development 26 SUN HUNG KAI PROPERTIES LIMITED. Manhattan Hill, West Kowloon

S.F. Service Points Update Notice

香港物業管理公司協會有限公司 The Hong Kong Association of Property Management Companies Limited

Contribution of Manufacturing to GDP and Stock of Industrial Premises

CLP Power Extends Electric Vehicle Charging Network as Popularity of Green Motoring Accelerates

Selection Method for Shaw College Student Hostel Places 2014/2015 (Second draft)

Appendix: List of CLP Power s EV charging stations (14 December 2018)

Assets, Regeneration & Growth Committee 17 March Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes )

Selection Method for Shaw College Student Hostel Places 2017/2018 (First Draft)

MiC Display Centre Officially Established The First Building Constructed with the Use of MiC

A New Page of the NEC Expedition - DSD s Initial Experience on 5 More NEC Pilot Contracts

Selection Method for Shaw College Student Hostel Places 2016/2017 (Final Version)

Selection Method for Shaw College Student Hostel Places 2017/2018 (Second Draft)

Recommended District Council Constituency Areas

The Past, Present and Future Land-forming in Hong Kong

Self Service Terminal Service Hour Hong Kong District Branch

Shaw College Selection Method for Student Hostel Places 2018/2019 (1st Draft)

S.F. Service Points Update Notice

Gross Rental Income* Gross Rental Income* by Sector

1

MTR to work closely and align with the Government on announcement mechanism in relation to Railway Protection Area

Day 1 Session 1 'Rajiv Awas Yojana - Slum Free India Mission' by P.K.Mohanty (Joint Secretary and Mission Director JNNURM, MoHUPA)

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Commercial Properties Committee. Shopping Centres Scheduled for Completion in 2000/2001

Job Expo for Elderly and Rehabilitation Services

Proposed Residential Development at 1-5 Kai Hing Road, Kai Tak South

Assets, Regeneration & Growth Committee 11 July Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes )

Facilitating Services Scheme

Monthly update of MTR facilities for passengers with disabilities December 2017

Parallel Lines : Railway Infrastructure Development and its interaction with Urban Growth in Hong Kong

FY2013 Annual Results. 26 September New World One Step Forward We Create New Living Experience

SHKP seafront development # Wings at Sea Offers diverse premium unit layouts for different buyers needs

Operation Building Bright

Uphold the Rule of Law Seize the Opportunities Make the Right Choices

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Housing Authority. Secretary s Report Committee Work (September November 1998)

S.F. Service Points Update Notice

The highly distinctive Manulife Financial Centre sets a precedent for the regeneration of the older districts of Hong Kong, providing over one

Progress Update on Shatin to Central Link (SCL) 2 May 2013

Shaw College Selection Method for Student Hostel Places 2019/2020

MTR Transformation of CBDs in Hong Kong

Appendix. Office and Unit Lists. HKFYG Website: hkfyg.org.hk M21 Multimedia Web: M21.hk

Survey on the Current Status of Industrial Buildings for Arts Activities and Future Demand Report Summary

City of Winnipeg Housing Policy Implementation Plan

CURRICULUM VITAE (Updated )

Centre and the Hong Kong Sectio

Task Force on Kai Tak Harbourfront Development. Residential Development at 1-5 Kai Hing Road, Kai Tak South (Kowloon Godown Site)

Major SmarTone Authorised Resellers

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Housing Authority and Home Ownership Committee. Motion Debate on the Tenants Purchase Scheme

MEGA CUBE. Kowloon Bay, Hong Kong

Property Investment. International Commerce Centre, Kowloon Station 38 SUN HUNG KAI PROPERTIES LIMITED

Task Force on Kai Tak Harbourfront Development

18 D Shop D & Portion of Shop B, G/F, B. 16 B Shop B, G/F and Shop A2 & A3, Upper G/F, A2

High Park Grand Mong Kok, Hong Kong

Booth no: 1E-F12. Booth no: 1E-F15. Booth no: 1E-F19 ALFALFA ATELIER AMEBA DESIGN LIMITED AP CREATIVE LIMITED

Qualification Snapshot CIH Level 3 Certificate in Housing Services (QCF)

Booth no: 1E-F12. Booth no: 1E-F15. Booth no: 1E-F19 ALFALFA ATELIER AMEBA DESIGN LIMITED AP CREATIVE LIMITED

A Dissertation On Hang Hau Town And Ap Chai Wan By Kwok-shing Pun READ ONLINE

BANK OF CHINA LIMITED (A joint stock company incorporated in the People s Republic of China with limited liability) Stock Code: 3988

HSIN CHONG CONSTRUCTION GROUP LTD.

Hong Kong Property Transaction Analysis Report

Summary of Decision Made by the Home Ownership Committee

Hamburg Partner Meeting June Pilot Reporting

Customer Engagement Strategy

Develop a GIS-based Electronic Mark Plant Circulation System in a collaborative and end-user computing approach

Occupational Safety and Health Council Construction Safety Promotional Campaign 2017 Competition Winners List

Quality Building Award 2018 Results Released New Category Introduced and Number of Jurors Increased to Enhance Industry Representation

DATE: June 25, 2014 TO:

/ 2736 BOULEVARD, NATHAN ROAD, TSIM SHA TSUI

Link Housing s Tenant Engagement and Community Development Strategy FormingLinks

Transcription:

Content 2 4 6 8 10 14 18 20 21 Mission Objectives For the People People First, a District-based and Public Participatory Approach Redevelopment Rehabilitation Heritage Preservation and Revitalisation Working with the Community Commitments

2

Mission The Urban Renewal Authority (URA) is tasked to adopt Redevelopment and Rehabilitation as its core businesses. Through urban renewal initiatives, we aim at creating high quality and vibrant urban living in Hong Kong. 3

Mr Tsui (Kwun Tong Town Centre project) enjoys his new cosy home at Tseung Kwan O. Wong s family (Ma Tau Wai Road/Chun Tin Street project) settles in a public housing estate in Tai Kok Tsui. Mrs Hung and her family (Lai Chi Kok Road / Kweilin Street and Yee Kuk Street project) reside in the URA s re-housing block at Bedford Tower. 4

Objectives Many residents of dilapidated buildings in rundown districts long for the opportunity to improve their living environment and to escape from their substandard housing in which they feel trapped. The priority objective of the URA is to help them make their dream come true. The frontline staff of URA provides residents and shop operators affected by URA projects with caring services and practical assistance when they are in need of help. URA staff members, Connie Cheung, Stella Cheng and Dora Lam receive The Ombudsman s Awards (public officer) for their distinguished and caring services for residents in 2006, 2008 and 2010 respectively. 5

Unbearable plight: Today, there are approximately 110,000 households living in poor and squalid environment. Many live in tiny cocklofts in kitchens while a typical flat of less than 47 square metres could be home to a dozen households living in small cubicles and partitioned rooms sharing only one kitchen and one bathroom. Without windows for air ventilation and air conditioning, the daytime temperature in their accommodations in summer time could reach as high as 37 degrees centigrade or more. And you could imagine the kind of plight they have to endure. Improving the quality of living for the less fortunate people makes a dire need of urban renewal. Mr Cheung lives in a bed-sized caged home at Fuk Tsun Street. 6 The tiny bed space in Wan Chai is home for Madam Leung and her son.

For the People There are some 4,000 buildings of over 50 years old in Hong Kong and around half of them are in poor or deteriorating condition. Many of these buildings are lack of proper maintenance. And even basic facilities. Obsolete building design together with the lack of elevators in some buildings can no longer keep up with the modern and quality living standard nowadays. 7

In May 2001, the URA was established under the Urban Renewal Authority Ordinance (URAO) to replace the Land Development Corporation as the statutory body to undertake, encourage, promote and facilitate the urban renewal of Hong Kong. In June 2002, the Legislative Council s Finance Committee approved that the Government injected HK$10 billion to URA in five tranches over a five-year period from 2002/2003. As one of the initiatives, the URA is supported by the Government through waiver of land premia for redevelopment sites. According to the URAO, the URA shall exercise due care and diligence in handling its finances and to be self-financing in long run. 8

People First, a Districtbased and Public Participatory Approach Following an extensive two-year public engagement process, the Government announced the new Urban Renewal Strategy (URS) in February 2011, which spelt out a people first, district-based and public participatory approach for urban renewal. The URA is tasked to adopt Redevelopment and Rehabilitation as its core businesses. The URA also preserves, restores and revitalises buildings, sites and structures of historical, cultural or architectural interest, if such preservation forms part of its urban renewal projects. A new advisory platform, District Urban Renewal Forum (DURF), is set up by the Government to identify the vision and needs of urban renewal at the district level. DURF advises the Government on districtbased urban renewal initiatives, including regeneration and redevelopment areas, preservation targets and implementation models. The URA will make reference to the recommendations of DURF and taking into account other factors as well. The Urban Renewal Trust Fund with HK$500 million endowment from the URA is set up to fund activities and studies to be conducted by DURF and the operation of social services teams. Applications from non-government organisations and other stakeholders for urban renewal related activities will also be considered. 9

10 Kwun Tong Town Centre Project, the URA s largest redevelopment project, features the most extensive greening with some 30% of the site area incorporated with greening facilities. The new town centre will also create a new focus for community life.

Cherry Street project (Florient Rise) in Tai Kok Tsui is awarded the Hong Kong Building Environmental Assessment Method (HK-Beam) Platinum Rating. Redevelopment Through redevelopment, the URA aims to improve residents living condition and to replace clusters of dilapidated buildings with modern living standard. The URA seeks to incorporate environmental features to fostering a quality and sustainable living for the people of Hong Kong. We try to include the following environmental provisions in the design and construction of our projects: Energy efficiency Water conservation Environmentally friendly building materials Facilities for collection of recyclable wastes Reduction of construction waste and environmental nuisance Extensive and well-planned greening A number of URA projects have achieved the Hong Kong Building Environmental Assessment Method (HK-Beam) Platinum Rating. The Lee Tung Street project is the first URA project incorporating environmental provisions in a comprehensive way. Application of the green features on the project can reduce its carbon dioxide emissions by about 23%. This reduction in the project s carbon footprint is equivalent to about 170,000 trees. 11

Social Mission: The URA has implemented over 50 redevelopment projects, providing some 38,000 square metres of public open space and about 74,000 square metres of Government, Institution and Community facilities. Commercial space is reserved in some projects for social enterprises. URA also licenses out vacated shops in some project sites to charitable and non-government organisations at nominal fees for social and educational purposes. Improving the quality of living for the less fortunate people makes a dire need of urban renewal.

URA-initiated redevelopment projects Pluralistic approach to urban renewal Demand-led redevelopment projects Diverse Forms for Redevelopment Facilitating Services To tackle the problem of urban decay more effectively, redevelopment takes more diverse forms with the demand-led model and URA as a facilitator, in addition to URA-initiated projects. The demand-led model is intended to let building owners decide collectively if they want URA to redevelop their properties. The URA may respond to requests from owners to initiate redevelopment of their lots/buildings. The URA considers the applications based on a number of criteria such as the building conditions, living environment, benefits to the community and feasibility. If the URA accepts the application, it will commence the redevelopment process in accordance with the URAO. As a facilitator, the URA provides facilitating services to owners in amalgamating their property interests for joint sale in the market. Flat-for-Flat Pilot Scheme: The Flat-for-Flat (FFF) option is offered as an alternative to cash compensation under the new URS promulgated by the Government on 24 February 2011. It is only applicable to domestic owner-occupiers who are affected by URA projects commenced after 24 February 2011. Under the FFF pilot scheme, domestic owner-occupiers could have a choice of in-situ flats in the new development site or flats in Kai Tak development site. Domestic owner-occupiers who opt for FFF must first accept the cash compensation calculated on a seven-year-old flat formula in the first round of acquisition offered by the URA. FFF is not intended to enhance the level of compensation. 13

14

Rehabilitation Building rehabilitation is an important segment of urban renewal, slowing down the pace of urban decay. It offers speedy improvement to the living conditions of people in-situ and retains the community network. The URA s motto is We help owners to help themselves. Since 2004, the URA has provided assistance to owners so as to encourage them undertake proper maintenance of buildings, making their homes safer and better places to live in. The URA s materials incentive and loan schemes have assisted owners of about 40,000 units in over 520 buildings, to undertake building rehabilitation work. 15

16

One-stop Service A comprehensive Integrated Building Maintenance Assistance Scheme (IBMAS) was launched on 1 April 2011 to encompass four major areas of assistance: subsidy for formation of Owners Incorporation, subsidy and interest-free loan for works in common area and home renovation interest-free loan. The URA provides one-stop and user-friendly service for owners in need of assistance. These include setting up a hotline service and resource centres, and providing advice on colour scheme designs and technical assistance. The URA also supports the Government in enhancing building safety by implementing the Operation Building Bright. The URA will provide assistance to owners on the Mandatory Building Inspection and Mandatory Window Inspection Schemes when the relevant legislation comes into effect. 17

Central Oasis revitalisation project Revitalisation Projects: Revitalisation synergises all urban renewal efforts in the old districts. The URA is revitalising the former Central Market building to turn it into a new Central Oasis for public enjoyment. Other projects include the Pak Tsz Lane revitalisation project which highlights its connection with the 1911 Chinese Revolution, and the Mallory Street Art Community for the art and creative industries. Pak Tsz Lane revitalisation project Mallory Street Art Community revitalisation project The URA also carries out street beautification works in the vicinity of its redevelopment and rehabilitation projects to enhance the district s environment. 18

Sports Retail City in the Sai Yee Street project Promotional activities for Graham Street Lee Tung Street project s Wedding City Heritage Preservation and Revitalisation Preservation of shophouses on Johnston Road The URA preserves heritage buildings if such preservation forms part of its urban renewal projects. Its objective is to restore heritage buildings for public enjoyment. After years of planning and renovation work, a cluster of four shophouses and a pre-war building that form part of the Johnston Road redevelopment project in Wan Chai have been converted into specialty restaurants. Shanghai Street preservation project Prince Edward Road West preservation project The URA has preserved a number of historical buildings in its many redevelopment projects and also has plans to preserve two clusters each of 10 pre-war verandah type shophouses on Shanghai Street and Prince Edward Road West. In the Wan Chai Road / Tai Yuen Street project, the core elements of the market building are preserved in-situ. Enhance local characteristics: The URA makes its best effort to preserve the local characteristics within or in the vicinity of its redevelopment projects. Examples are the century-old street market outside the Peel Street / Graham Street project, Wedding City in the Lee Tung Street project and Sports Retail City in the Sai Yee Street project. Core element preservation for Wan Chai Market building 19

Working with the Community Community participation and support are essential to urban renewal. As such, the URA has embraced public aspirations through extensive community engagement. The URA organises activities such as briefings, resident meetings, workshops, focus groups, opinion surveys, public forums, roadshows, and set up neighbourhood centres, resource centres, hotlines and Urban Renewal Exploration Centre to enhance communication with the public and gauge their views. Through these efforts, urban renewal projects are planned and designed in the best interest and aspirations of the community. 20

Commitments Under the new URS, the URA will continue to embrace new challenges in tackling urban decay. These include: Improving the living condition of those people residing in dilapidated buildings; Improving cityscape of old districts and engineering economic growth; Providing no-frills flats to the mass market; Preserving heritage buildings within its project sites; Pursuing environmentally sustainable development; and Achieving greater community involvement, ensuring value for money from the resources which the Government entrusts to the URA. Urban renewal is a driving force for the sustainable development of Hong Kong. The URA will continue to work closely with all stakeholders to tap the full potential of urban renewal with a view to creating a quality urban living environment in Hong Kong and making it a better home to live in. 21