DESIGN BUILD PROJECTS

Similar documents
Appraisal / Appraisal Review Challenges with Design-Build Program

Troy D. Byers Assistant State ROW Administrator Georgia Department of Transportation

Putting it all together. Presented by: RIGHT OF WAY SERVICES

Locally Administered Projects Overview

By: John R. Navratil, ASA, SR/WA, R/W-AC, R/W-NAC

TABLE OF CONTENTS General Legal Authority for Certification of Right of Way Control 24-2

Precondemnation Procedures: Acquiring Right of Way in a New World October 9, Presented by David Graeler and Brad Kuhn

OFFICE OF REAL ESTATE

Boot Camp Breakout Session #3. September 19, 2018 Carolyn France Moderator Transportation Alternatives Program Manager, Central Office

Task Central Office Real Estate Responsibilities District Responsibilities

Franklin County REQUEST FOR QUALIFICATIONS. Engineering and Real Estate Acquisition Services for

JAMES R. HALL, SR. REALTY OFFICER FEDERAL HIGHWAY ADMINISTRATION OFFICE PHONE:

RIGHT-of-WAY in INDIAN COUNTRY

OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF REAL ESTATE. Kevin O Grady, Manager Appraisal Unit. Changes and Updates to the Real Estate Manual

State of Florida Department of Transportation EXHIBIT A, SCOPE OF SERVICES

Tel: (617) Fax: (617) OWNER S PROJECT MANAGER GUIDELINES M.G.L. c. 149, 44A1/2

Frequently Asked Questions From the Certification of R/W Training Sessions

Changing the Paradigm

The Continuing Success Story

PENNSYLVANIA TURNPIKE COMMISSION HIGHSPIRE, PENNSYLVANIA FORMAL MEETING OCTOBER 17, :00 A.M. AGENDA

RIGHT OF WAY LIFE CYCLE

Belcher 1 USING THE EASEMENT ASSIGNMENT PROCESS FOR EFFICIENT UTILITY RELOCATION OF A LOCALLY ADMINISTERED PROJECT

Ohio Department of Transportation. Division of Engineering. Office of Real Estate. Synergy. Real Estate Business Analysis

Allegheny County Sanitary Authority REQUEST FOR QUALIFICATIONS. for

RIGHT OF WAY PRIMARY ROLES & RESPONSIBILITIES

What/Who Determines that an Appraiser is Qualified in our Program?

DESIGN PUBLIC HEARING JANUARY 12, 2017 TOWN HALL SULLIVAN MEETING ROOM 558 SOUTH MAIN STREET RAYNHAM, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

LWDB PROCUREMENT / PROPERTY MANAGEMENT POLICY

SCOPE OF SERVICES Appraisal Consultant Services For SR 710/Beeline Highway FM

2018 Louisiana Transportation Conference Property Management: The Ins and Outs of the Property Disposal Process

RECORDKEEPING PROCESS. All ACEDP grantees are required to develop a recordkeeping system that is comprehensive, well-organized and easy to review.

TEXAS GENERAL LAND OFFICE PROCUREMENT GUIDANCE FOR RECIPIENTS AND SUBRECIPIENTS UNDER 2 CFR PART 200 (UNIFORM RULES)

PENNSYLVANIA TURNPIKE COMMISSION HIGHSPIRE, PENNSYLVANIA FORMAL TELEPHONE MEETING JULY 5, :00 A.M. AGENDA

Right of Way Acquisition

Government Furnished Property What Is It???

EMERGING ALTERNATE DELIVERY LEASE LEASEBACK FOR COMMUNITY COLLEGES CCFC 21 ST ANNUAL CONFERENCE SEPT 9 TH, TUESDAY 10:25 AM 11:40 AM WORKSHOP #1 (CC

RCI, PAL and Army Housing Training. Real Estate Process / Actions

7. IMPLEMENTATION STRATEGIES

OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF REAL ESTATE

INDEX. of subrecipients, VIII -2 records, VI-1, 4, 13. OMB Circular A-122, VIII- 3 certification: I-28

OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF REAL ESTATE. Adam Sheets, Manager, Administrative Section. Changes and Updates to the Real Estate Manual

What is the Omni-Circular Final Guidance on the Uniform Administrative Requirements, Cost Principals and Audit Requirements for Federal Awards

Right-of-Way Acquisition and

PUBLIC HEARING. Loop 88 Segment 3 Thursday, October 12, 2017 Lubbock-Cooper Performing Arts Center at 6:00p.m. Date. Footer Text

RIGHT OF WAY AND UTILITIES DIVISION RIGHT OF WAY ACQUISITION AND ASSOCIATED SERVICES. (Internet Posting)

NSP Rental Basics: A Primer on Using Rental Projects to Meet NSP Obligation and 25% Set-Aside Requirement. About this Tool

QUESTIONS AND ANSWERS FOR: RFP# 13-34, RFP for Engineering Services for Gas Distribution System Improvements

OPERATIONS MANUAL CHAPTER 3 ACQUISITION AND PROPERTY MANAGEMENT

Common Audit Findings Related to Purchasing and How to Avoid Them

Georgia Department of Transportation Surplus Property Disposal Harold F. Kelman Manager, Surplus Properties Inventory and Disposal

Responsibilities of the Grant Recipient LAND AND WATER CONSERVATION FUND PROGRAM

Streamlining the Entitlement Process for Transit-Oriented Development

MAP. METHODS AND ASSISTANCE PROGRAM 2015 REPORT El Paso Central Appraisal District. Glenn Hegar Texas Comptroller of Public Accounts

PART ONE - GENERAL INFORMATION

POSITION DESCRIPTION

1.1 Purpose. The purpose of this chapter is to summarize guidance on those requirements generally applicable to grant programs.

Air Rights Development Project Briefing August 6, Speakers: Tony Kinn, Director Sam Beydoun, Program Manager Jonathan Walk, Jones Lang LaSalle

COMMUNITY COLLEGE SYSTEM OF NEW HAMPSHIRE

Sound Transit. Performance Audit Report Real Property Acquisition

THE WAIVER OF APPRAISAL

METHODS AND ASSISTANCE PROGRAM 2014 REPORT Kerr Central Appraisal District. Glenn Hegar Texas Comptroller of Public Accounts

content chapter Section 6(f) Land and Water Conservation Fund Areas 23.1 Summary of Key Legislation, Regulations, and Guidance 23.

Figures List for New LPA Manual

Future Canadian Embassy, Current state 130 rue du Faubourg Saint-Honoré, Paris

Federal Aid Acquisition Guide. For Property Owners

PROJECT: P 0037(129)207 PCN: 039K BROWN COUNTY. S.D. Highway 37 From Aspen Ave to U.S. Highway 12 in Groton

Right of Way Procedures for Highway Occupancy Permits (HOP) The following policies and revised deed forms are attached:

LEGAL PITFALLS OF RIGHT OF WAY : DELAYS IN ACQUISITION. Darby F. Venza, ROW Attorney

JOB DESCRIPTION MANAGEMENT EXCLUSION

SERVICE CONTRACTS (except for A/E professional services) AND PURCHASE CONTRACTS (purchasing apparatus, supplies, materials, or equipment)

SOLUTION 4 BUYOUT AND RESILIENT HOUSING INCENTIVE PROGRAM HOMEOWNER GUIDANCE DOCUMENT BUYOUT RESILIENT HOUSING INCENTIVE

The following addendum to this Request for Proposal is hereby incorporated into the bid process.

Alternative Project Delivery Strategies for Expansion and Renovation

METHODS AND ASSISTANCE PROGRAM 2014 REPORT Van Zandt County Appraisal District. Glenn Hegar Texas Comptroller of Public Accounts

MOTION NO. M Property Exchange Agreement with the University of Washington for the Northgate Link Extension

Ohio Department of Transportation. Division of Engineering. Office of Real Estate. Synergy. Real Estate Business Analysis

Internal Audit Report

A REPORT FROM THE OFFICE OF INTERNAL AUDIT

Accelerated Right-of-Way Process for Sidewalks

IC Chapter 7. Real Property Transactions

EASEMENT BASICS. Definition of Easement Types. Easements are part of our assets. Easement Research. Access, maintenance and operations.

Potential Property Impacts Lawrence to Bryn Mawr Modernization

PROJECTS: P 0083(74)56; 036E; JONES COUNTY NH 0083(79)45; 04E7; MELLETTE COUNTY NH 0083(80)44; 04E8; MELLETTE COUNTY

REQUEST FOR PROPOSALS Solicitation Number: RE AM

PENNSYLVANIA TURNPIKE COMMISSION HIGHSPIRE, PENNSYLVANIA FORMAL TELEPHONE MEETING MARCH 7, :00 A.M. AGENDA

Neighborhood Line Extension Program

PENNSYLVANIA TURNPIKE COMMISSION HIGHSPIRE, PENNSYLVANIA FORMAL MEETING OCTOBER 20, :00 A.M. AGENDA

LOCAL PUBLIC AGENCY MANUAL

R/W PREQUALIFICATION ODOT, 3/14/2018

RIGHT OF WAY DATA SHEET (Form #)

ISC: UNRESTRICTED AC Attachment. Attainable Homes Acquisition and Development Cycle Audit

DESIGN PUBLIC HEARING

M.G.L. c. 30B Bidding Basics

Draft: January 19, 2016

PUBLIC PROCUREMENT BASICS

RFQ INDEFINITE DELIVERIES CONTRACT - LAND SURVEYING SERVICES MAY

Brad Faiman, NDDOT Right of Way Raymond Barchenger, NDDOT Right of Way

Sarpy Transmission Project & La Vista Transmission Project Project Updates. Tim Nissen, PE Director T&D Engineering & Substation August 17, 2017

Atypical Owner- Occupant Situations. Robert N Merryman O R Colan Associates

ED-900C EDA Application Supplement for Construction Programs

Transcription:

DESIGN BUILD PROJECTS Michele Palicka FHWA Real Estate Specialist Troy Byers GDOT Asst. State R/W Administrator

Agenda Federal Oversight on Design Build Projects State of Georgia Oversight on Design Build Projects Georgia Design Build Projects: Goals & Benefits/ROW Scopes of Services/Procurement ROW Plans Environmental Compliance Construction & ROW Authorizations ROW Certifications Conventional Projects V/S Design Build Projects (Pros & Cons) Lessons Learned in Georgia

Federal Oversight on Design Build Projects Michele Palicka FHWA Real Estate Specialist

Federal Regulations 23 CFR 710.313 Must comply with the Uniform Act GDOT Right of Way Design/ Build Procedures in Manual Right of Way Services in Design/Build Contract

ROW in Design Build Contract o Design Builder prepares a Right of Way Acquisition and Relocation Plan o Design builder establishes a project tracking system/quality control system o Agency may establish hold off zones o Design Builder to allow adequate access to properties

ROW in Design Build Contract o Utility service must be provided to all occupied properties at all times o Open burning should not occur within 1,000 feet of occupied dwelling o Agency will provide a Right of Way Project Manager

Right of Way Authorization Right of Way Authorization Cost Estimate Listed In TIP/STIP NEPA Completed Two Step Process Right of Way Plans Federal / State Oversight Agreement

Right of Way Certification 23 CFR 635. 309(p) STIP/TIP NEPA Completed Partial Certifications Right of Way Plan / Partial Approvals

State Oversight on Design Build Projects Troy Byers Asst. State R/W Administrator

State of Georgia Design-Build Projects are Governed by: 23 Code of Federal Regulations (CFR) Part 636 (Design Build Contracting) (when using federal $) Georgia Code Section 32 2 81 (Enacted 2004) (when using State OR Federal $) Board Rules, Chapter 672 18 (Adopted 2006) GDOT R/W Manual on Policies and Procedures

Design Build Project Goals in Georgia Accelerate overall Program Delivery (thereby reducing public transportation congestion ASAP) Directly support and be considerate of Economic Development Establish up front contractor & engineer interaction to stimulate value engineering analysis in order to attempt to reduce overall project costs and project delays Better address complex constructability issues; or projects that require specialty or innovative design or construction methods and techniques Utilize for Emergency Projects (i.e. Bridge/Intersection (safety upgrades), etc. Planned Projects Schedule Recovery

Design Build Project Benefits in Georgia (to date) Accelerating our overall Program Delivery Early pricing so we know our total costs in advance of completion of construction More schedule certainty (hold one contractor liable from beg. to completion of project) Have efficiency (i.e. upfront designer/contractor collaboration; upfront contractor coordination with utility providers) Enable Design Build Contractor Team to be more innovative by making recommended design and construction changes that can save the Contractor and save GDOT $ Ability to add additional resources (i.e. Env./Design/ROW/Const. Inspection, etc.) without further depleting our in house resources (from beginning of project concept until completion of construction of project)

Georgia s ROW Scopes of Services (Summary for Design Build Projects)

Right of Way: The Contractor shall be responsible for the acquisition of the Right of Way and Easements required for the construction of the Project and comply with all State and Federal (when using federal $) laws, guidelines, polices, and procedures. Any land or easement required to construct the project shall be in the name of Georgia Department of Transportation. Land or easements acquired outside those areas needed for actual construction of the project (i.e. construction office space, material storage, etc ) will be the responsibility of the Contractor. GDOT will not pay for land or easements outside the construction footprint of the project. Land or easements as needed for the relocation of Utilities with prior rights are considered within the construction footprint of the project. (See Handout for more specific details of ROW Scopes of Services)

Georgia s ROW Scopes of Services: (18 sections) 1. General Requirements 2. Administrative requirements 3. ROW Acquisition Plan 4. Schedule and Review Procedures 5. Contractor s ROW Scope of Services 6. Acquisition Process Summary 7. ROW Personnel Qualifications 8. Contractor Conflict of Interest 9. Meetings

ROW Scopes of Services Cont. 10. Documentation & Reporting 11. Responsibilities of Contractor 12. Responsibilities of GDOT 13. GDOT Project Monitor/Reviewer 14. Responsibilities of the Office of Attorney General 15. Pre acquisition Activities 16. Appraisals 17. Acquisition Activities 18. Early ROW Acquisition

Design Build Procurement in Georgia Request for Qualifications (RFQ) o Includes area class, as well as ROW acquisition personnel requirements o Letter of Interest/Statement of Qualifications (LOI/SOQ) o Agency evaluates o Design Build teams are prequalified by the Agency Request for Proposal (RFP) o Includes the Right of Way Acquisition Scope of Services Award/N.T.P. o Award is based on lowest qualified bid

ROW Plans (Georgia) State or Federal $ Project ROW Plans may be submitted for review and approval in segments or phases: can t be parcel 1 then parcel 100. (i.e. must be 1 20, or 30 50, or 80 100 sequences that make sense) must be complete enough for appraiser to properly value the property must be complete enough to show property owner necessary impacts must have sufficient details such as cuts/fill slopes, required ROW boundaries, required easement boundaries, existing ROW boundaries, existing property line boundaries, site improvements (enough to reveal possible impacts) properly spotted on plans, data tables with required areas and remainders defined, etc.

Environmental Compliance May began ROW Acquisition at risk prior to Environmental Approvals With State $ only in project, will not have to get NEPA doc. approval and can speed up the environmental approval processes with State environmental doc. only (GEPA)

P.E./Construction / ROW Authorization (Georgia State $ only) may authorize early may set up one account (Construction) in the very beginning may set up two accounts (Construction and ROW) may set up three accounts (P.E.; ROW; and Construction) In Georgia we have set up Construction, and Construction and ROW, and omitted P.E.

ROW Certification In Georgia, we do a Certification III ( Dirty Certification ) Certify ROW when project is awarded Submit a Clean certification when all ROW is acquired and prior to construction

Awarded Design Build Projects in Georgia: (11) projects have been awarded from 2007 to current just under $ 364 M. Types Include: Interchange Lighting Interstate Auxiliary Lane State Route Bridge Replacement State Route / Interstate Connector Ramps State Route / County Road Interchange Interstate Diamond Interchange Interstate / State Route / County Road Connector Interstate Collector Distributor Interstate / County Road Connector and Interchange

I 85 KIA Interchange Expedited delivery to support economic development April 20, 2007 letting date $ 80,857,486.98 - Federal Funds with full oversight December 31, 2008 completion date Completed 30 days early, included incentive 18 months to complete Design-Build contract Highways for Life grant In-house coordinated ROW services (Used Advanced Acq. Protective Buy)

SR 400 at I 85 Connector Ramps Expedited delivery May 20, 2011 letting date $ 21,423,500.00 December 31, 2013 scheduled completion date 100% State Funded In house coordinated ROW

Jimmy Deloach Connector Expedited delivery November 18, 2011 letting date, and December 31, 2015 completion date 100 % State Funded $ 72,772,000 DB contract includes Design, Construction, Mitigation credit purchase, Preparation of Individual Permit (IP), and R/W acquisition services

Approved Design Build Projects in Georgia (to be Awarded): (8) projects are currently approved and scheduled to be awarded by the end of 2012 alone for a total of about $ 345 M. Types include: Variable Speed Limit Signage Signing and Paving Marking SR Lane Extension SR Interchange Ramp Extension SR / County Road Interchange Improvement Upgrade Interstate Managed Lanes Extension Interstate Managed Lanes Addition

Conventional V/S Design Build Conventional ROW is acquired prior to Letting Final completed plans are advertised Design Build ROW acquired prior to or concurrently with or after Letting (depending on project needs) 30% plans typically advertised; allows some flexibility for innovative solutions Unit price construction contract ROW is authorized after complete ROW plan approval and after environmental approval Lump sum Design Build contract If ROW is in the contract, Design Build team will provide ROW Acquisition services and likely will acquire ROW in segments as plans are sufficient for the specific segments or leg

ROW in Design Build (pros and cons) Pros Allows for accelerated delivery/reducing acquisition timeline Encourages use of effective scheduling methods and software Allows for greater risk transfer to Design Build team; with some risk retained by Agency Encourages design modifications to mitigate damage impacts and save $ Affords more available ROW Acquisition resources / lessen burdens on in house available staff resources Cons Concerns of possible rushed or coersive negotiations and increases in condemnation rates Concerns of Design Build contractor implementing plan changes to mitigate damage impacts without proper input, guidance, and feasibility studies being prepared from ROW staff and prior to an appraisal to determine impacts due to time With greater responsibilities being transferred to Design Build contractor, lose some hands on and oversight at lower levels Potential for Design Build Contractor to hire the lesser qualified or lower end quality of ROW Acquisition sub personnel based on price only Potential for precedent setting bad ROW practices

Lessons Learned The RFP is a controlling document. Scopes, reviews, oversight, and timelines must be clearly defined. Spend enough time reviewing the scopes to ensure all expectations are clear A commitment to oversight is required and necessary by the Agency Never underestimate amount of time and resources the Agency will still need to provide for oversight on Design Build projects Hold the Design Build Contractor accountable (rest assured they will hold Agency accountable) Assess and manage Risk wisely Make the Design Build Contractor retain responsibility of clearing ROW after the NTP date, as stipulated in the RFP, and prior to construction to avoid many problems, concerns, and issues. Important to monitor and audit the Design Build contractor s QC/QA processes for adequacy and effectiveness

Contacts Michele Palicka Federal Highway Administration Michele.Palicka@dot.gov 404 562 3634 Troy Byers Georgia Department of Transportation tbyers@dot.ga.gov 404 347 0179

Questions?

The End