APPENDIX B. Approved and Pending Development Projects

Similar documents
1910 N BROADWAY LONG TERM GROUND LEASE OR FOR SALE

PROJECT PIPELINE LIST - QUARTERLY REPORT PROJECT STATUS AS OF DECEMBER

4.0 CUMULATIVE SCENARIO

APPENDIX A PART 1: GENERAL PLAN AMENDMENTS

Current Development Projects

Current Development Projects

ADMINISTRATIVE STAFF REPORT 5.1

$2,500,000 DOWNTOWN WALNUT CREEK MULTI-TENANT RETAIL PROPERTY SHAWN WILLIS S. MAIN STREET WALNUT CREEK, CA 94596

City Team. City Staff. PlaceWorks, Inc.

1820 Bonanza Street AVAILABLE FOR SALE > WALNUT CREEK, CA > RARE OWNER-USER OPPORTUNITY > WALKING DISTANCE TO DOWNTOWN CORE RETAIL

Claremont Club, Spa & Residences Project Description November 22,2016

City of Malibu M E M O R A N D U M

Inclusionary Housing In Lieu Fee Analysis

4.0 Basis of Cumulative Analysis

Holding Steady NORTH I-680 CORRIDOR OFFICE Q % Research & Forecast Report. Market Indicators

1950 CONCORD AVENUE CONCORD, CA PREPARED BY SHAWN WILLIS

4 LAND USE 4.1 OBJECTIVES

The Impact of The Ellis Act. January 1, 2005 December 31, 2005

Weighing Options NORTH I-680 CORRIDOR OFFICE Q % Research & Forecast Report. Market Indicators

III. Environmental Setting

Development Program Report for the Alamo Area of Benefit

M E M O. September 14, 2017 Agenda Item #4. Planning Commission. David Goodison, Planning Director

WALNUT CREEK CENTER 100 / 200 WALNUT CREEK BART

220 ALICE JACK LONDON DISTRICT OAKLAND CALIFORNIA. Multifamily Urban Infill Transit-Oriented Development OFFERING MEMORANDUM

Changing of the Guard

3.0 Project Description

BAY AREA RESIDENTIAL. CONTACT Oakland California th Street 3rd Floor Oakland CA

Switching Gears NORTH I-680 CORRIDOR OFFICE Q % Research & Forecast Report. Market Indicators

Table of Contents. 3.0 Land Use... 2

QUARTERLY REPORT. North I-680 Office Flex First Quarter WALNUT CREEK OFFICE

City of Lafayette Study Session Project Data

NOTICE OF PREPARATION of a Draft Program Environmental Impact Report for the Fresno County General Plan Review and Zoning Ordinance Update

Planning Commission June 25, Lincoln Boulevard

Town of Holly Springs Town Council Meeting Agenda Cover Sheet

Land Development Update

III. PROJECT DESCRIPTION

JACK WESSON ARCHITECTS INC. PROJECT LIST

South Park Residential Urban Village Site

Notice of Preparation

CORBIN AND NORDHOFF III. ENVIRONMENTAL SETTING ENV EIR B. RELATED PROJECTS

Exclusive Property Summary

421 7 th Street, oakland, ca. Christopher Silverman (510) License #

EXPERIENCE MODERN ROWHOMES PHASE 6

SQUAW VALLEY PUBLIC SERVICE DISTRICT

RESOLUTION NO. WHEREAS, per the 2010 U.S. Census the population of the City of Placerville was 10,389; and

Date: May 1,2014 Committee of the Council of The Corporation of the City of Brampton

SHAWN WILLIS INCOME PROPERTY SERVICES

Development Activity Report Last updated: January Commercial Activity. Dr. Bui Medical/Retail Building. One Broadway Plaza

COMMUNITY DEVELOPMENT DEPARTMENT DEVELOPMENT REVIEW DIVISION PROJECT STATUS REPORT December 31, 2012

LAKE MERRITT STATION AREA PLAN

Brunswick Street Apartment Project Introduction

P. H. Robinson Consulting Urban Planning, Consulting and Project Management

SHAWN WILLIS DOWNTOWN MARTINEZ COTTAGES OFFERED AT $945,000. INCOME PROPERTY SERVICES A.G.

BUREAU OF PLANNING/ZONING DIVISION 250 Frank H. Ogawa Plaza, 2nd Floor Oakland, California 94612

III. Environmental Setting

City of Lafayette Staff Report Design Review Commission

CITY OF BRANTFORD COMMUNITY DEVELOPMENT BUILDING DEPARTMENT REPORT ON CONSTRUCTION ACTIVITY FOR THE MONTH OF JUNE 2018 SUMMARY

NEARLY FINISHED 60 UNIT TOWNHOME SITE

PLANNING AND IMPLEMENTING TOD: KEY FACTORS FOR SUCCESS. Sujata Srivastava Knowledge Corridor TOD Workshop June 5, 2013

Gulf Boulevard, Indian Rocks Beach

RESOLUTION NO. (ANNEXATION AREA NO. 2)

T ECHNICAL M EMORANDUM

Regional Development Impact Fee Joint Powers Agency

CITY OF OAKLAND IMPACT FEE ANNUAL REPORT FOR: Fiscal Year Ended June 30, 2018

18 Rosebank Dr - Part Lot Control Application Final Report

Acres Fresno County, California MATURE VINEYARD PROPERTY

$2,500,000 7 APARTMENT UNITS SHAWN WILLIS EL DORADO AVENUE, DANVILLE, CA INCOME PROPERTY SERVICES A.G.

1069 regarding Accessory Dwelling Units (ADUs) were signed into law; and

Sutter and Yuba Counties Subsidized/Low-income Multi Family Housing Sutter County

January 7, Sarah Smith Community Development Director City of Mound 5341 Maywood Road Mound, MN Dear Ms. Smith,

COMMUNITY BENEFIT REQUIREMENTS & IMPACT FEES FOR DEVELOPMENTS IN VARIOUS CITIES

Ideas + Action for a Better City learn more at SPUR.org. tweet about this #BroadwayValdez

B. BACKGROUND The Town does not currently regulate minimum levels of density for new projects. In the past, projects have generally been at the higher

ARTICLE 3: Zone Districts

Scenic Pacifica Incorporated Nov. 22, 1957

Vermont Corridor Project State Clearing House No

PLANNING COMMISSION. Study Session: Beach Boulevard Specific Plan Workshop

City of Orange Development Fees

STAFF REPORT ACTION REQUIRED

ATHERTON PLACE CITY COUNCIL HEARING DECEMBER 5, 2017

Second Reading and Adoption of Zone Text Amendment Ordinance 1/15/19

November 27, AGENCY/Zoning Division 250 Frank H. Ogawa Plaza, 2 nd Floor Oakland, California

APPENDIX B RESIDENTIAL DENSITY

November 22, AGENCY/Zoning Division 250 Frank H. Ogawa Plaza, 2 nd Floor Oakland, California

Community Development

609 East Fourth Street Condominium 609 East Fourth Street South Boston, MA

City of Orange Development Fees

Village of Port Jefferson Urban Renewal Plan

Town of North Topsail Beach

THE REDEVELOPMENT PLAN

Vista Pacific Residences Approved 16 Single Family Detached Homes Site Rancho del Oro Drive, Oceanside, CA 92056

FOR SALE BRYANT MOTORS 1300 BRONSON WAY N., RENTON, WA PROPERTY FEATURES: PRIME DEVELOPMENT OR OWNER/USER OPPORTUNITY IN RENTON

An Update on Development in Long Beach

April 1, Mammoth Lakes Market Trends Report First Quarter

Prior Planning Board Worksessions

per unit Live/Work 1 per unit None mentioned. MF 1 2 bdrms. MF 2+ bdrms* (Transit Oriented MU District) Single Unit, Two Unit, Multi Unit &

MEMORANDUM. Bunge Elevator Complex Bunge Midway grain elevator th Ave SE. Grain Elevators (1935) and Headhouse (1936)

DEVELOPMENT STANDARDS FOR RESIDENTIAL PROJECTS RESIDENTIAL BUILDING TYPES: APPROPRIATE ZONES AND DENSITIES 2-1

Table of Contents 1.0 How to Read the Lakeview Local Area Plan 2.0 Urban Design Policies 3.0 Land Use 3.1 Residential 3.

GATEWAY DISTRICTS DRAFT ZONING & DEVELOPMENT STANDARDS City of Portsmouth, NH

Transcription:

APPENDIX B Approved and Pending Development Projects Broadway Plaza Long Range Master Plan EIR B-1 ESA / 211723 Draft EIR March 2012

This page intentionally left blank B-2

Approved and Pending Development Projects 1 The following projects were determined by the City of Walnut Creek staff to be of sufficient size and proximity to Broadway Plaza that they should be included in the cumulative analysis. Project details are provided in the table following this page. 1. E lan (formerly Riviera Homes) 2. Villagewalk Condos 3. Bonanza Heritage Condominiums 4. 235 Ygnacio 5. Walker-Sierra Townhomes 6. Overlook Homes 7. Cole Terrace Subdivision/Condominiums 8. Parkview Condos 9. Homestead Terrace Homes 10. Holcomb Court Condos 11. Overlook Town Homes 12. Lincoln Triplex 13. Almond Lofts 14. Howard Oaks Subdivision 15. The Village (Mixed Use) 16. 24-Hour Fitness/Chick-Fil-A 17. Walnut Creek BART Transit Village (Mixed Use) 18. Pleasant Creek Homes 19. Paragon Apartments 20. North Main Apartments (former WC Motor Lodge) 21. The Arroyo Apartments 22. Co-op Site Retail Development 23. Shadelands Gateway 24. Safeway Remodel 25. Locust St / Mt Diablo Blvd Specific Plan 26. Block C 1 Source: Kimley-Horn and Associates, Inc. B-3

# Project Name Location Land Use COMMERCIAL & RETAIL DEVELOPMENTS 1 E lan (formerly Riviera Homes) 2 Villagewalk Condos 3 Bonanza Heritage Condominiums 4 235 Ignacio 5 Walker-Sierra Townhomes 6 Overlook Homes 7 Cole Terrace Subdivision/Condominiums 8 Parkview Condos 9 Homestead Terrace Homes 10 Holcomb Court Condos 11 Overlook Town Homes 12 Lincoln Triplex 13 Almond Lofts 14 Howard Oaks Subdivision 15 The Village (Mixed Use) 1605 Riviera 1725-1727 Lacassie 1874 & 1882 Bonanza St, 1826 Sharpe Ave 235 Ignacio Valley Road 1241 Walker 2245 Overlook Drive 1756 Cole Ave 1665 Camel Drive 1279 Homestead Ave 15 Holcomb Court 2725 Overlook Drive 1229 Lincoln 1960 and 1872 Almond, 1600 Oakland 2361 and 2373 Walnut 1500 Newell Size of Developments Anticipated to be Constructed by the end of 2012 1 AM Ksf 2 Single DU 3 Multi DU PM Distance from Broadway Plaza (miles) 38 17 20 1.0-2 13 4 5 0.6-2 15 5 6 0.4 10 5 6 0.7 MFT 4 2 2 0.3 SFR 8 6 8 0.9 11 5 6 0.5 7 3 4 0.4 8 3 4 0.9 2 1 1 0.1 6 3 3 1.5 2 1 1 0.2 SFR/MFR 7 2 6 8 0.6 SFR 3 2 3 0.9 Retail & 38.08 49 46 128 0.1 Notes 48-unit, five-story condo development (38 net new 13 condos on two lots replacing 2 single-family residences on two parcels (11 net new 15 condominium units in a three-story building over parking (partial basement) garage, replacing two SFR (13 net new 4-story multi-family structure over at grade parking area with 11 condominium units across from Walnut Creek BART Station (10 net new 2 new duplex units with a total of 4 new dwellings on existing hillside lot (3 net new 9 Single Homes (8 net new 12 multi-family condominium units, with underground/podium parking (11 net new 5-story, 8-unit condominium project with 12 parking stalls (7 net new New 12-unit condominium development replacing 2 existing duplexes (8 net new One-lot subdivision for 5 new airspace Condos (2 net new 7 Multi-family condo units (6 net new New 3 unit condo development (2 net new Mixture of 7 single family and 1 duplex units on vacant lot (9 net new Minor subdivision Create 4 lots with 1 remainder parcel (3 net new lots) Demolish existing 1- story retail building to construct new 4- story structure with 38,079 square feet 1 Excludes developments that are currently occupied; trips are already accounted for in traffic counts. 2 Ksf = thousand square feet 3 DU = dwelling unit B-4

# Project Name Location Land Use 16 17 24-Hour Fitness/Chick-Fil- A Walnut Creek BART Transit Village (Mixed Use) 18 Pleasant Creek Homes 19 Paragon Apartments 20 North Main Apartments (former WC Motor Lodge) 21 The Arroyo Apartments 22 Co-op Site Retail Development 23 Shadelands Gateway 24 Safeway Remodel 25 Locust St / Mt Diablo Specific Plan 26 Block C 2800 N. Main Street 200 Ygnacio Valley Road 1935 Barkley 141 North Civic Drive 1960 North Main Street 1250 Arroyo Way 1510 Geary Road Ygnacio Valley Road and Oak Grove 600 South Broadway Northeast Corner of N California and Mt Diablo Southeast Corner of Locust Street and Mt Diablo Health/Fitness Club & Fast Food Restaurant w/d.t. Size of Developments Anticipated to be Constructed by the end of 2012 1 AM Ksf 2 43.00 & 4.343 Single DU 3 Multi DU PM Distance from Broadway Plaza (miles) 27 207 2.0 MFT & Retail 30.00 596 0.7 10 4 5 0.9 MFR 300 153 186 0.8 MFR 126 64 78 0.7 MFR 107 55 66 0.6 Retail 35.00 83 315 2.1 Retail 246.00 246 918 3.2 Notes of retail and 49 condominium units, including two level underground parking garage with 250 parking spaces Taken from Traffic Study 596 MF residential units, 30,000 sq. ft. commercial, parking for 1,500 vehicles (596 net new 10-unit multifamily affordable residential development consisting of town style units on individual fee simple lots. Infrastructure improvement including a public access pathway to WC BART Station (10 net new 300 units comprised of 1BR, and 2BR units (300 net new New 4-story multifamily building with 126 apartment units, including 3 live-work units (126 net new New 6-story multifamily building with 107 apartment units and two levels of above ground parking (107 net new Demolition of the existing vacant building and construction of a 35,000 sq. ft. Sprouts Farmers Market and two ~5,000 sq. ft. pad retail buildings with a 146-stall parking lot 11.3 acres at 0.5 FAR Supermarket 25.00 90 263 0.1 Net New Office, Retail, Office, Retail, Restaurant 30 32 0.1 Use Traffic studies 89 145 0.1 TOTAL 417.08 11 1,309 950 2,420 From Traffix Network B-5

TABLE B-1 PROJECTS INCLUDED IN THE CUMULATIVE DISCUSSION FOR EACH ENVIRONMENTAL TOPIC Resource Area Pending Development Projects Aesthetic Resources Air Quality Biological Resources Cultural Resources Geology, Soils, Seismicity Green Gases/ Climate Change Hazards/Hazardous Materials Hydrology/ Water Quality Land Use/ Planning Construction Noise Traffic Noise Population/Housing/ Employment Public Services/ Recreation Transportation/ Circulation Utilities/ Service Systems E'Ian X X X X X X X X X X X X Villagewalk Condos X X X X X X X X X X X X Bonanza Heritage Condos X X X X X X X X X X X X 235 Ygnacio X X X X X X X X X X X X Walker-Sierra Townhomes X X X X X X X X X X X X X Overlook Homes X X X X X X X X X X X X Cole Terrace Condos X X X X X X X X X X X X Parkview Condos X X X X X X X X X X X X Homestead Terrace Homes X X X X X X X X X X X X Holcomb Court Condos X X X X X X X X X X X X X Overlook Townhomes X X X X X X X X X X X X Lincoln Triplex X X X X X X X X X X X X Almond Lofts X X X X X X X X X X X X Howard Oaks Subdivision X X X X X X X X X X X X The Village X X X X X X X X X X X X X X 24-Hour Fitness X X X X X X X X X X X X Walnut Creek BART Transit Village X X X X X X X X X X X X X Pleasant Creek Homes X X X X X X X X X X X X Paragon Apartments X X X X X X X X X X X X North Main Apartments X X X X X X X X X X X X Arroyo Apartments X X X X X X X X X X X X Co-Op Site Commercial X X X X X X X X X X X X Shadelands Gateway X X X X X X X X X X X X Safeway Remodel X X X X X X X X X X X X X X Locust St/ Mt Diablo Specific Plan X X X X X X X X X X X X X X Block C X X X X X X X X X X X X X X B-6