GROWTH MANAGEMENT DIVISION NAPLES, FLORIDA 310 www.colliergov.net (239) 252-200 FAX: (239) 252-6358 Subdivision Construction Plans and Plat (PPL) Application LDC Section 10.02.0, and other provisions of the LDC Chapter 5 D.1. of the Administrative Code PROJECT NO PROJECT NAME DATE PROCESSED For Staff Use Only APPLICANT CONTACT INFORMATION Name of Applicant: Firm: Address: City: State: ZIP: Telephone: Cell: Fax: E-Mail Address: Name of Owner: Address: City: State: ZIP: Telephone: Cell: Fax: E-Mail Address: PROPERTY INFORMATION Provide a detailed legal description of the property covered by the application, if space is inadequate, attach on a separate page: Project Name: Property ID Number: Address of subject site and general location: Zoning District: Section/Township/Range: / / Subdivision: Unit: Lot: Block: 7/30/201 Page 1 of 5
GROWTH MANAGEMENT DIVISION NAPLES, FLORIDA 310 www.colliergov.net (239) 252-200 FAX: (239) 252-6358 Pre-Application Meeting and Final Submittal Requirement Checklist for: Subdivision Construction Plans and Plat Chapter 5 D.1. of the Administrative Code The following Submittal Requirement checklist is to be utilized during the Pre-Application Meeting and at time of application submittal. At final submittal, the checklist is to be completed and submitted with the application packet. Please provide the submittal items in the exact order listed below, with cover sheets attached to each section. Incomplete submittals will not be accepted. # OF REQUIREMENTS FOR REVIEW COPIES REQUIRED NOT REQUIRED STANDARD REQUIREMENTS: Completed Application (download current form from the County website) 1 Cover Letter explaining the project 1 Completed Addressing Checklist 1 Fee Calculation Worksheet & Review fees, signed 1 Digital file of conditional use or PUD application, if applicable 1 PUD Monitoring Schedule 2 PUD Ordinance and Development Commitment Information, as applicable 12 Affidavit of Authorization & Evidence of Authority 2 Opinion of Title 1 Letter of Intent as to the timeline for construction and platting 2 Home Owner Association documents, if applicable 2 Aerial Photograph with all information legible at the scale provided 3 Certificate of Public Facility Adequacy application with fee 2 Fire Flow tests 2 Zoning Data Sheet Historical/Archeological Survey or waiver, if applicable Environmental Data Requirements 3 Transportation Impact Study 7 School Impact Analysis Application for residential projects only (download the School Impact Analysis Application from website) 2 Information and data relating to previous zoning actions affecting the project site Utility Letters of availability and plat easement approval letter for utility easements, if applicable 1 Engineer s Report, including assumptions and explanations, with the following included: Completed calculations used to design the facilities, including but not limited to all water, sewer, road, water management systems, and all accessory facilities, public or private; Detailed hydraulic design calculations utilized to design the stormwater management facilities for the subdivision or development; Detailed hydraulic design calculations utilized to design the water and sewer facilities regulated by the County. Geo-technical report with soil boring results; Engineering Review Checklist, signed and sealed by the applicant s professional Engineer; Engineer s Opinion of probable cost; and Status of all other required permits including copies of information and data submitted to the appropriate permitting agencies. 7/30/201 Page 2 of 5
GROWTH MANAGEMENT DIVISION NAPLES, FLORIDA 310 www.colliergov.net (239) 252-200 FAX: (239) 252-6358 Permits: All Federal, State and local permits, including but not limited to the following, shall be submitted prior to construction and before the pre-construction meeting. If approved by the County Manager or designee, an applicant may submit Federal, State and local agency permits at the pre-construction meeting. SFWMD Permit, Permit Modification, or waiver, including staff report 2 exhibits; DEP utility installation permits, water/sewer; Right-of-Way Permit; and US Army Core of Engineers permit and exhibit, if applicable. Vegetation Removal and Site Filling permit, if requested Provide separate acreage calculations for each phase of clearing requested; If clearing or filling lots and building sites, with or without stockpiling, a 1 separate VRSFP application shall be submitted, pursuant to LDC subsection.06.0 A.2.; and A site clearing plan, see Requirements for Construction Plans in Chapter 5 D.1. of the Administrative Code for more information. Streetlight Plans, signed and sealed by a professional Engineer licensed to practice 7 in the State of Florida or the utility provider Landscape Plans, signed and sealed by a landscape architect registered in the 5 State of Florida Irrigation Plans, signed and sealed by a landscape architect or irrigation designer 5 Electronic copies of all documents and plans 1 Construction Plans, see Requirements for Construction Plans in Chapter 5 D.1. of 1 the Administrative Code Water Management for Construction Plans, see Requirements for Water 1 Management for Construction Plans in Chapter 5 D.1. of the Administrative Code Final Subdivision Plat, see Requirements for Final Subdivision Plats in Chapter 5 1 D.1. of the Administrative Code For a Townhouse Fee Simple Development, see Chapter 5 D.2. of the 1 Administrative Code for additional submittal requirements *If located in the FRMUD or RLSAO areas, include an additional set of each submittal requirement If located in RFMU (Rural Fringe Mixed Use) Receiving Land Areas Pursuant to LDC subsection 2.03.08.A.2.a.2.(b.)i.c., the applicant must contact the Florida Forest Service at 239-690-3500 for information regarding Wildfire Mitigation & Prevention Plan. School Concurrency - If the proposed project includes a residential component, you are required to contact the School District of Collier County at 239-377-0267 to discuss school concurrency requirements. Applicant/Agent Signature Date 7/30/201 Page 3 of 5
COLLIER COUNTY GOVERNMENT GROWTH MANAGEMENT DIVISION www.colliergov.net NAPLES, FLORIDA 310 (239) 252-200 FAX: (239) 252-6358 Subdivision Construction Plans and Plat Fee Calculation Worksheet x () x () Subdivision Review Fees (PPL): Paving Grading, and Drainage Review and Inspection Fee 271,205 Construction Cost Estimate: o Construction Documents Review Fee: 0.75% of probable Paving, Grading, Drainage, Lighting, Code Minimum Landscaping and any other appurtenant cost of construction 2,03.0 $ o Subdivision Inspection fee: 2.25% of probable Paving, Grading, Drainage, Lighting, Code Minimum Landscaping, and any other appurtenant cost of construction ($271,205 x 2.25%=$6,102.11 / 2 = $3,051.06) 3,051.06 Plat Review Fees: o Residential: $1000.00 Base Fee plus $5.00 per acre (round up to the next acreage) o Non-Residential: $1000.00 Base Fee plus $10.00 per acre (round up to the next acreage) Certificate of Public Facility Adequacy, if required: $200.00 plus $25.00 per residential dwelling unit ($5,000.00 maximum) Environmental Impact Statement, if required: $2,5000.00 for 1st submittal and 2nd submittal, additional fees apply for 3rd and subsequent submittals Listed or Protected Species review fee, if required: $1,000.00 Site Clearing Permit, if required: $250.00 for first acre or fraction of an acre, $50.00 per additional acre or fraction of an acre ($3,000.00 maximum) Utility Plan Review and Inspection fees: Utility Cost Estimate: o Construction Document Review: 0.75% of probable water and/or sewer construction costs o Construction Inspection: 2.25% of probable water and/or sewer construction costs Excavation Permit (Development): $00.00 (Commercial: $2,000) 2,000 Transportation Methodology Review fee, if required: $500.00 to be paid at Methodology Meeting, additional fees to be determined at that time o Right-of-way Permit: To be determined by Transportation School Concurrency fee, if required: [reserved] (mitigation Fees, if applicable, to be determined by the School District in coordination with the County) Utility Modeling and Analysis fee, applicable to projects zoned PUD or DRI: $1,000.00 7,085.10 500.00 Pre-Application Meeting fee credit: 6,585.10 Total: 7/30/201 Page of 5
GROWTH MANAGEMENT DIVISION NAPLES, FLORIDA 310 www.colliergov.net (239) 252-200 FAX: (239) 252-6358 Allowed Dwelling Units and Square Footage within PUD s The attached form must be submitted with all reviews that involve the addition and/or deletion of dwelling units or square footage. (Some examples: SDP, SDPA, SDPI, PPL, PPLA, ICP) The form allows the individual owners, developer, agents, and County staff to track remaining units and square footage in order to avoid going over the maximum allowed by the PUD Ordinance. Instructions to complete: Project Name: Name of the project PUD Name: Name of the PUD Review #: To be completed by County staff This submittal: The addition and/or deletion of single family units, multi-family units, commercial square footage for office, retail or other, industrial square footage, medical, special, or other square footage. When choosing Other or Special square footage please indicate when the other or special type is. Approved to Date: Total approved units and/or square footage within the entire PUD. Please complete for all categories. Maximum Allowable per PUD Ordinance: Maximum limits provided for each category per the PUD Ordinance. Please include the Ordinance number. Acreage Constructed to Date: Some of the PUD s allow construction based upon acreage rather than square footage limits. These are usually the older PUD s. Maximum Allowed: Maximum acres allowed to be constructed based upon the PUD Ordinance. Signature of Owner or Agent: Please sign Date: Please date with submittal All lines must be completed. If a line is not applicable, please write. 7/30/201 Page 5 of 5