CITY OF LAKE MARY, FLORIDA NON-RESIDENTIAL DEVELOPMENT FEE ESTIMATE PACKET

Similar documents
CITY OF ALTAMONTE SPRINGS

HOLLEY NAVARRE WATER SYSTEM, INC. IMPACT FEE POLICIES, PROCEDURES & CALCULATIONS

COMMERCIAL BUILDINGS

ORDINANCE NUMBER

FEES AND CHARGES WORKSHEET

FEE SCHEDULE. Updated December 18, 2018

Van Buren Township Water & Sewer Department Schedule of Rates - Effective January 1, 2019 Resolution

Permit Application Procedures

City: State: City: State: Phone: ( ) Fax: ( ) Phone: ( ) Fax: ( ) Project Information

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

THE EVESHAM MUNICIPAL UTILITIES AUTHORITY RATE SCHEDULE

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

CITY OF TARPON SPRINGS, FLORIDA

SEWER CONNECTION APPLICATION

Community Development Fees (as of March 2015)

TABLE 1. Water & Sewer Fees and Charges

JEFFERSON COUNTY ENVIRONMENTAL SERVICES DEPARTMENT (ESD) IMPACT DIVISION COMMERCIAL PROJECT CHECKLIST (WEB: JEFFCOES.ORG)

NOTE: FEES ARE PAYABLE BY CASH OR CHECK ONLY TO THE CITY OF FREDERICK

NOTE: FEES ARE PAYABLE BY CASH OR CHECK ONLY TO THE CITY OF FREDERICK

Fees--Commercial Development (includes Residential 3 units or more) Effective August 1, 2017

Meridian Service Metropolitan District Residential Rates Monthly Fee Schedule Per Single Family Residence Actual 2018 Rate Water

Form WFR-001 Revision 03/11

Fees--Commercial Development (includes Residential 3 units or more) Effective January 1, 2019

APPENDIX A BUILDING PERMIT AND RELATED FEES

Fees--Commercial Development (includes Residential 3 units or more) Effective January 1, 2019

South Park County Sanitation District

STANDARD DEVELOPMENT REVIEW PROCESS

CITY OF CHARLES TOWN, a municipal utility SEWERAGE AND SEWAGE DISPOSAL SERVICE

Concurrency Reservation Certificate (CRC) APPLICATION FORM

"The City ofvaytona Beach UtiCity BiCCing Division

RESOLUTION NO

Equivalent User Table

LAND USE COMPATIBILITY STATEMENT (LUCS) PROCEDURES AND FORMS

CITY OF PALM COAST SUMMARY OF APPLICATION AND IMPACT FEES

ORDINANCE 495 CONCURRENCY MANAGEMENT AND PROPORTIONATE FAIR-SHARE MITIGATION TABLE OF CONTENTS

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

City of Casselberry Public Works Department

GROWTH MANAGEMENT DIVISION NAPLES, FLORIDA (239) FAX: (239)

2018 FEE SCHEDULE. Chapter 8 Animals, Article ll Dog License Dog at Large $75.00

WASHINGTON TOWNSHIP MUNICIPAL UTILITIES AUTHORITY Appendix A Rate Schedule

Village of Baxter Estates Fee Schedule

COUNTY OF TAZEWELL DEPARTMENT OF COMMUNITY DEVELOPMENT

KAMAS CITY FEE & RATE RESOLUTION NO

COMMERCIAL PLAN REVIEW PACKET

Chapter 3.08 FEE SCHEDULE OF VILLAGE PERMITS AND SERVICES*

2018 FEE SCHEDULE. Assessment Searches...$30.00 per tax parcel. Building Permits... see 1997 Uniform Building Code

TABLE OF CONTENTS SUPPLEMENT TO RATES & RULES (Updated July 1, 2017)

CHARTER TOWNSHIP OF OSHTEMO KALAMAZOO COUNTY, MICHIGAN AMENDED AND RESTATED WATER CONNECTION FEES EFFECTIVE: JANUARY 1, 2019 CONNECTION FEES

CHARTER TOWNSHIP OF NORTHVILLE WATER AND SEWER DIVISION FEE SCHEDULE

Administrative Regulations

Zoning Permit Application

NEW SINGLE FAMILY RESIDENTIAL

CONSOLIDATED PLANNING AND DEVELOPMENT APPLICATION FEES REGULATION

TOWN OF HASTINGS, FLORIDA TOWN CODE. Chapter 18. Water and Sewer. Article I. Connections, Application for Service, Rates.

THE TOWN OF Angier N O R T H C A R O L I N A

Table B-1 Service Connection Charge (1,2) Table B-2 General Facilities Charge (GFC) (1)

GENERAL OFFICE & MISC. REQUESTS

Chapter Fees (d) OFFICIAL ZONING MAP UPDATE (EXCLUDING FINAL PLATS) $10.00, PER LOT (e) HOME OFFICE PERMIT

MASTER FEE SCHEDULE ATTACHMENT TO CITY ORDINANCE 102. Alcoholic Beverages:

Development Impact Fee Study

INFORMATION HANDOUT FOR CONDITIONAL USE PERMIT APPLICANT S

Town of Angier Rate and Fee Schedule Fiscal Year Effective July 1, 2011

SCHEDULE A. Classes of Permits and Fees (Reference By-law No ) 1.) Calculation of Permit Fees (All fees are exempted from HST)

CHARTER TOWNSHIP OF GAINES COUNTY OF KENT, MICHIGAN RESOLUTION TO ESTABLISH WATER SUPPLY AND SEWER RATES AND CHARGES

SEWER AUTHORITY OF THE CITY OF NORWICH NOTICE OF ADOPTION OF SEWER CAPITAL CONNECTION FEE

TRANSPORTATION FACILITY FEES. AUTHORITY: Chapter 3.85 Chico Municipal Code; Resolution No ;

9. Public (Federal, State, or local

COMMERCIAL/ INDUSTRIAL PERMIT APPLICATION

ORDINANCE NO AN ORDINANCE OF THE CITY OF FERNDALE ESTABLISHING SEWER CONNECTION AND USAGE FEES AND REPEALING RESOLUTION

BUI L DIN G A ND E L E V A T O R F E ES

CONSTRUCTION PERMIT FEE SUMMARY

CITY FEE SCHEDULE effective 9/23/13

D R A F T. Impact Fees

CHARTER TOWNSHIP OF OSHTEMO KALAMAZOO COUNTY, MICHIGAN AMENDED AND RESTATED WATER CONNECTION FEES EFFECTIVE: JANUARY 1, 2016 CONNECTION FEES

Chapter 74 WATER/SEWER UTILITY. ARTICLE I Sewer Use Rules and Regulations

2017 Amount (Dollars) Category Amount (Dollars) PUBLIC WORKS

QUESTION 11 - REVENUE GENERATION SUMMARY

Lake County Planning, Building and Development Department

CHICKASAW TRAIL INDUSTRIAL PARK SITE DEVELOPMENT PACKAGE

CITY OF MASCOTTE SERVICE FEES. One or Two Sided Copy not more than 8 ½ x 11 per page.15. One Sided Copy or Two sided 8 ½ x 14 per page.

CHARTER TOWNSHIP OF OSHTEMO KALAMAZOO COUNTY, MICHIGAN AMENDED AND RESTATED SEWER MAIN CONNECTION CHARGES EFFECTIVE: JANUARY 1, 2016

Water and Wastewater Submetering Addendum SAMPLE

and ORDINANCE NO. ----

2018 APPLICATION AND PROCESS FOR OBTAINING WATER AND SEWER SERVICES

ENGLEWOOD WATER DISTRICT MANDATORY WASTEWATER UTILITY CONNECTION POLICY

SEWER SERVICE INFORMATION

City of Altamonte Springs Developer s Guide

Developer Extension Agreement Application

City of Tonka Bay 2018 Fee Schedule Type of Charge Fee Defined per City Ordinance

City of East Orange. Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST

2018 FEE SCHEDULE. Storm Water Utility Uniform Base Fee. Street Light/Tornado Siren Utility Fee

CITY OF HUNTINGTON UTILITY RATE ORDINANCE

PLYMOUTH PLANNING BOARD APPLICATION FOR A MINOR SUBDIVISION OR MAJOR SUBDIVISION

FY 18/19 DEVELOPMENT IMPACT FEES

Project Address. Name of Project/business name. Owner of Property Phone . Emergency contact phone number. Parcel Number

DEVELOPMENT IMPACT FEE SCHEDULE (Revised 7/12)

BUILDING PERMIT APPLICATION. Commercial Building Permit Application Checklist

ORDINANCE WHEREAS, this title is intended to implement and be consistent with the county comprehensive plan; and

Environmental Health Technician: (303) ; Environmental Health Manager: (303) ;

Transcription:

CITY OF LAKE MARY, FLORIDA NON-RESIDENTIAL DEVELOPMENT FEE ESTIMATE PACKET I. Building Permit Fees Estimate II. Impact Fee Estimate THIS INFORMATION IS PROVIDED AS A WORKSHEET AND IS NOT A QUOTE. Charges provided are based upon Ordinances in place as of March 4, 2011. All rates / charges are subject to change without prior individual notice. Anyone using this worksheet is advised that a fee estimate will be prepared by the City at no charge with the submittal of a Request for Fee Estimate to the City s Community Development Department (a Request for Fee Estimate Form is attached). 04/22/13 Page 1 of 9

I. BUILDING PERMIT FEES Building permit fees are based on the cost of construction rounded up to the next higher thousand dollars. For example, if the cost of construction is $1,300,001, the building permit fee would be calculated on $1,301,000. A portion of the building permit fee is due at the time the permit application is submitted. This fee calculation is provided under section A. The remainder of the permit fee is due at the time the permit is issued. This fee calculation is provided under section B. State Surcharge fees, as well as Utility Connection fees are also due at the time of permit issuance. These fee calculations are provided under section C and D, respectively. Note: Building permit fees do not include ancillary permits such as plumbing permits, electrical permits, fire sprinkler permits, irrigation permits, site construction permits and the like. These are separate permits assessed individually at the time of application. For an estimate of fees associated with these types of ancillary permits please request a complete fee schedule as codified in section 150.05 of the Lake Mary Code of Ordinances. A. SUBMITTAL FEES: The Submittals Fees consist of the Application Fee and Plan Review Fee and are due at the time of application submittal (Note: Fire Plan Review Fees may be applicable). The Application Fee is calculated based on the cost of construction multiplied by $ 0.75 per $1,000 of cost. The minimum fee is $5.00. This fee is non-refundable. Example: (Based on example above.) $ $1,301,000 / $1,000 X $ 0.75 = $ 975.75 (Cost of construction rounded up (Minimum Fee = $5.00) Calculate your fee due at submission: $ / $1,000 X $ 0.75 = $ (A) (Cost of construction rounded up (Minimum Fee = $5.00) The Plan Review Fee is calculated based on the cost of construction multiplied by $ 0.45 per $1,000 of cost. The minimum fee is $5.00. This fee is non-refundable. Example: (Based on example above.) $ $1,301,000 / $1,000 X $ 0.45 = $ 585.45 (Cost of construction rounded up (Minimum Fee = $5.00) Calculate your fee due at submission: $ / $1,000 X $ 0.45 = $ (B) (Cost of construction rounded up (Minimum Fee = $5.00) ESTIMATED TOTAL FEE DUE IS (A) + (B) 04/22/13 Page 2 of 9

B. PERMIT ISSUANCE FEES: The Permit Issuance Fees consist of the Building Permit Fee and Inspection Fee (Note: Fire Inspection Fees may be applicable). The Building Permit Fee is calculated based on the cost of construction multiplied by $ 0.75 per $1,000 of cost. The minimum fee due at permit issuance is $35.00. Example: (Based on example above.) $ $1,301,000 / $1,000 X $ 0.75 = $ $ 975.75 (Cost of construction rounded up (Minimum Fee = $35.00) Calculate your fee due at submission : $ / $1,000 X $ 0.75 = $ (A) (Cost of construction rounded up (Minimum Fee = $35.00) The Inspection Fee is calculated based on the cost of construction multiplied by $ 0.45 per $1,000 of cost. Example: (Based on example above.) $ $1,301,000 / $1,000 X $ 0.45 = $ $ 585.45 (Cost of construction rounded up Calculate your fee due at submission : $ / $1,000 X $ 0.45 = $ (B) (Cost of construction rounded up ESTIMATED TOTAL FEE DUE IS (A) + (B) 04/22/13 Page 3 of 9

C. STATE SURCHARGE FEE DUE AT PERMIT ISSUANCE: Both these fees are mandated by the State of Florida for all new construction. Each fee is based on the combined total of the Application Fee and Permit Fee of the structure multiplied by ½ cent. State Surcharge Fee: ( X $ 0.015) X (2) = $ (DBPR) (App Fee + Permit Fee) TOTAL FEE (Min. $4.00) D. UTILITY CONNECTION FEES DUE AT PERMIT ISSUANCE: The utility connection fee for non-residential development is based on meter size. The City provides meters up to 2 inches in size. The table below provides the associated installation fees, tap fees and service deposit. If a larger meter is required the developer is responsible for providing the meter. For information on meter requirements and determination of the tap fees and service deposits please contact the Finance Department at (407) 585-1448. Meter Size Meter Cost and Installation Tap Fees Service Deposit TOTAL ¾ 245.00 140.00 40.00 $ 425.00 1 290.00 140.00 100.00 $ 530.00 1 ½ 380.00 335.00 200.00 $ 915.00 2 490.00 475.00 320.00 $ 1,285.00 Total Fee $ 04/22/13 Page 4 of 9

II. IMPACT FEE ESTIMATE Both the City of Lake Mary and Seminole County assess impact fees associated with the construction of nonresidential development. Water and sewer impact fees are due at the time of site construction permit issuance or building permit issuance, whichever is first. City Services Impact Fees and Transportation Impact Fees are due at the time of building permit issuance. The City shall make every effort to provide the most recent Seminole County Impact Fee assessments. The below referenced fees are current as of March, 2011. Should these fees change due to a Seminole County Impact Fee assessment update, the permittee shall be responsible to pay the fees in place at the time of permit issuance. To inquire about Seminole County fees directly contact the Seminole County Concurrency Division at (407) 665-7474. A. CITY SERVICES IMPACT FEE - DUE AT BUILDING PERMIT ISSUANCE: For non-residential uses, City Services impact fees are calculated by multiplying the gross square foot (GSF) of the structure times the rate per square foot as shown below: CITY SERVICES IMPACT FEE RATE PER GROSS SQUARE FOOT Police Protection $ 0.082 Fire Protection 0.129 Recreation 0.031 Public Works 0.017 Calculation: TOTAL $ 0.259 (GSF of building) X $ 0.259 = $ City Services Impact Fee Example: 10,000 GSF building X $0.259 = $2,590.00 City Services Impact Fee B. TRANSPORTATION IMPACT FEE DUE AT BUILDING PERMIT ISSUANCE: Transportation Impact Fees are assessed by Seminole County. Contact Concurrency Division (407)665-7474 for fee estimate. You will need to provide the location, type of use and square footage of the building. TOTAL.$ 04/22/13 Page 5 of 9

C. WATER SERVICE IMPACT FEE: (DUE AT SITE CONSTRUCTION PERMIT OR BUILDING PERMIT, WHICHEVER IS FIRST) The Water Service Impact Fee is $1,010.00 per each Equivalent Residential Unit (ERU). An ERU is established to be equal to a flow of 350 gallons per day (GPD), average daily flow. The GPD factor is determined per type of use. The table below lists some of the type of uses most commonly developed, and the associated GPD factors. For all other uses please call the Community Development Department at 407-585-1493. Restaurant 24 hour Use Fast Food Bar/Cocktail Lounge Type of Use Unit Measurement GPD per Unit 35 60 30 50 Hotel/Motel (without food service) Per bed 120 Laundry (self serve) Per machine 470 Office Buildings (without food service) Per 1000 square feet 120 Shopping Centers (without food service) Per 1000 square feet 120 Service Station Dentist Per Bay Per wash bay Per toilet Per dentist Per wet chair Based on a determination of GPD, the following calculation will provide the associated water impact fee: Calculation: 350 1120 350 Type of use = (GPD per Unit) X (unit measurement) = GPD GPD / 350 = ERU* ERU X $1010.00 = Water Impact Fee. 300 115 Example: A 10,000 square foot office building would be calculated as follows: Office = 120 GPD per 1000 square feet X 10 = 1200 GPD 1200 GPD/ 350 = 3.42 ERU 3.42 ERU X $1010.00 = $3454.20 Water Impact Fee * The total ERU value used to calculate a water service impact fee for any separate establishment shall not be less than 1 ERU. 04/22/13 Page 6 of 9

D. SEWER SERVICE IMPACT FEE: (DUE AT SITE CONSTRUCTION PERMIT OR BUILDING PERMIT, WHICHEVER IS FIRST) The Sewer Service Impact Fee is $2,664.00 per each Equivalent Residential Unit (ERU). An ERU is established to be equal to a flow of 300 gallons per day (GPD), average daily flow. The GPD factor is determined by the type of use. The table below lists some of the types of uses most commonly developed, and the associated GPD factors. For all other uses please call the Community Development Department at 407-585- 1493. Restaurant 24 hour Use Fast Food Bar/Cocktail Lounge Type of Use Unit Measurement GPD per Unit 30 50 25 30 Hotel/Motel (without food service) Per bed 100 Laundry (self serve) Per machine 400 Office Buildings (without food service) Per 1000 square feet 100 Shopping Centers (without food service) Per 1000 square feet 100 Service Station Dental Office Per Bay Per wash bay Per toilet Per dentist Per wet chair Based on a determination of GPD, the following calculation will provide the associated sewer impact fee: Calculation: Type of use = (GPD per Unit) X (unit measurement) = GPD GPD / 300 = ERU ** ERU X $2,664.00 = Sewer Impact Fee. 300 960 300 250 100 Example: A 10,000 square foot office building would be calculated as follows: Office = 100 GPD per 1000 square feet X 10 = 1000 GPD 1000 GPD/ 300 = 3.33 ERU 3.33 ERU X $2,664.00 = $8,871.12 Sewer Impact Fee *The sewer impact fee is a combination of City and Seminole County impact assessments. Certain areas are as within the City s jurisdiction may only be charged the Seminole County Impact fee rate. These areas are generally south of Lake Mary Boulevard and west of Lake Emma Road. ** The total ERU value used to calculate a sewer service impact fee for any separate establishment shall not be less than 1 ERU. 04/22/13 Page 7 of 9

Tally Sheet I. Building Permit Fees A. Submittal Fees Due. $ B. Permit Issuance Fees Due... $ C. State Surcharge Fees...... $ D. Utility Connection Fees...$ II. Impact Fees A. City Services Impact Fee... $ B. Transportation Impact Fee. $ C. Water Service Impact Fee..$ D. Sewer Service Impact Fee....$ TOTAL ESTIMATED FEE.$ 04/22/13 Page 8 of 9

Request for Fee Estimate Form THIS FEE ESTIMATE IS NOT A QUOTE. This fee estimate is provided as a courtesy by the City at no charge to the applicant. The fees provided are based upon Ordinances in place as of March, 2011. All fees are subject to change without prior individual notice. The applicant is responsible to pay fees in place at the time of permit issuance. Please provide the information requested below as it relates to your non-residential development construction plans. The accuracy of this estimate is dependent on the information you provide. Please allow 5 working days to process fee estimate request. NOTE: This fee estimate will not include Transportation Impact Fees. Transportation Impact Fees are assessed by Seminole County. Contact Seminole County Concurrency Division (407) 665-7474 for fee estimate. Contact Information: Name Phone Address Fax Project Information: Address of project site Subdivision Phase Lot Type of project New construction: Square footage Type of Use Renovation/Addition: Replacement: Square footage of renovation area Type of Use Square footage of addition area Type of Use Square Footage of old development Type of Use Square Footage of new development Type of Use Cost of construction: Water Utility Service: This property will utilize: Sewer Utility Service: This property will utilize: City of Lake Mary Water Service City of Lake Mary Sewer Service Other Central Water Utility Provider Other Central Sewer Utility Provider Individual Well System Individual Septic System I believe the information provided above is true and correct to the best of my ability. I understand that any building permit or impact fee estimate provided by the City based on this information is not a quote and that I will be responsible to pay the charges, rates or fees in effect at the time of permitting. Signature Date 04/22/13 Page 9 of 9