BUILDING PERMIT FEE SCHEDULE

Similar documents
WELD COUNTY BUILDING PERMIT & INSPECTION FEE SCHEDULE JANUARY 2018

BUILDING PERMITS Table Total Valuation. $1.00 to $ $26.00

City of Georgetown. Inspection Services

BUILDING PERMIT APPLICATION. Commercial Building Permit Application Checklist

AN ORDINANCE FOR ADOPTION OF FEES IN CONJUNCTION WITH THE FAMILY OF INTERNATIONAL BUILDING CODES FOR PEARL RIVER COUNTY

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

Commercial Fee estimate The Building department will provide the actual fees at the time the permit is issued.

City of Georgetown. Inspection Services

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

PLANNING AND DEVELOPMENT DIVISION OF BUILDING AND INFRASTRUCTURE HAMILTON COUNTY, OHIO SCHEDULE OF FEES JANUARY, 2014, EDITION

Commissioners to enact, amend, and enforce technical construction and building codes; and,

City of Wausau Building, Housing and Zoning Fee Schedule

County of Kane CHAPTER 6, BUILDINGS AND BUILDING REGULATIONS, OF THE KANE COUNTY CODE

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

THE BOARD OF COUNTY COMMISSIONERS

3. COMMUNITY DEVELOPMENT Approved FY 18 19

2018 Municipal Fee Schedule Main Street Southlake, Texas

Resolution Fee Schedule

BUILDINGS AND BUILDING REGULATIONS: (1) Building permit fees ( 6-3(108.2 of the Florida Building Code, 2004 ed.)): See subsection (6) for all new

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

Chapter 806 Fees Zoning Certificate Fee Schedule Refund of Permit Fees

NOTICE. Valuations for determining the building permit fee shall be set by the Building Official per International Building Code Section

City of Wausau Building, Housing and Zoning Fee Schedule 2019

Planning&Development Fee Standards

Worcester Township Fee Schedule

RESOLUTION PERMIT FEE SCHEDULE

MILLCREEK. Planning & Development Services APPROVED FEE SCHEDULE. for Submitted for review and approval in 2016

City of High Point Development Fee Schedule

Certificate of: Compliance/Completion/Occupancy Flat Fee $100

Rules and Regulations. for. Building Control Fees. Revised January 2, 2018

Building Permit & Plan Check Fees

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

Appendix B PENALTY, SALARY, BONDS and FEES

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

PLANS MUST BE APPROVED BY THE FIRE DEPARTMENT BEFORE SUBMITTING TO OUR OFFICE FOR REVIEW.

Department of Public Works Permit Fee Schedule

RESOLUTION NO

FEES. Facility Rental/Damage Deposit $ Inspection, review, examine, search for, etc. of a public document

Schedule of City Fees & Charges

CHAPTER 6: ALCOHOLIC BEVERAGES

TOWN OF CASTLE ROCK. Fee Schedules. Development Services MAY 2018

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

Permitting Fee Schedule

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

BUILDING PERMIT APPLICATION

Meeting Date: December 3, 2018 Agenda Item No:

APPENDIX A FEE SCHEDULE

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Zoning Fee Schedule. Per Chapter Part VIII Administrative Code

SCHEDULE OF PERMIT FEES. (Effective November 3, 2015)

Meeting Date: February 26, 2018 Agenda Item No:

DESCRIPTION FEE UNIT MINIMUM BLDG FEE¹ New Building or Addition All occupancy classifications except

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

CITY OF PALM COAST SUMMARY OF APPLICATION AND IMPACT FEES

RESOLUTION NO NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SATELLITE BEACH, BREVARD COUNTY FLORIDA, as follows:

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

EXHIBIT A to Ordinance No PART 1

Greenbrier County Building Code Administrative Policy Manual

New Hanover Township

Community Development Fees (as of March 2015)

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

MUDDY CREEK TOWNSHIP 2018 FEE SCHEDULE RESOUTION #

Amendment to the City s Master Schedule of Fees, Charges & Application Fees

1. Permit Fees for new single family dwellings, duplexes, and multifamily dwellings with eight units or less are as follows:

Planning, Zoning and Building Fee Schedule

TOWN OF WOODWAY FEE SCHEDULE EFFECTIVE JANUARY 8, 2019

REPORT TO COUNCIL City of Sacramento

FEE SCHEDULE Construction Services and Permitting

APPENDIX A BUILDING PERMIT AND RELATED FEES

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

LINCOLN COUNTY, NORTH CAROLINA PLANNING & INSPECTIONS DEPARTMENT FEE SCHEDULE ADOPTED AUGUST 15, 2016 EFFECTIVE SEPTEMBER 6, 2016

FEE SCHEDULE ADMINISTRATION FEES OF 35% ARE CHARGED TO THE PROPERTY OWNER IN ADDITION TO ALL OTHER APPLICABLE FEES AND COSTS. SEE NO. 13.

Chapter CONSTRUCTION CODES

Building Permit Miscellaneous Fees At time of submittal, a 15% non-refundable deposit is required.

City of Lake Dallas Master Fee Schedule Fiscal Year 2017

CITY OF CORTEZ COUNCIL RESOLUTION NO. 45, SERIES 2016

Appendix G Fee Schedule

Chapter Fees (d) OFFICIAL ZONING MAP UPDATE (EXCLUDING FINAL PLATS) $10.00, PER LOT (e) HOME OFFICE PERMIT

FY 2018 FEE SCHEDULE (Effective )

9. Public (Federal, State, or local

CHAPTER 16 ELECTRICAL CODE PAGE NO.

This permit application includes the land use/zoning and building inspection reviews.

BUILDING DIVISION FEE SCHEDULE Fiscal Year

BUILDING PERMIT FEE SCHEDULE

TOWN OF ROME 1156 ALPINE DR. NEKOOSA, WI (715)

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION

6 TH EDITION (2017) OF THE FLORIDA BUILDING CODE IS IN EFFECT

This fee structure applies to applications submitted on or after January 1, 2018.

Land Use Application Fees

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

BUILDING PERMIT FEE SCHEDULE AMENDED April 9, 2002

City of Lake Dallas Master Fee Schedule Fiscal Year 2019 Fee Fee Amount Code Reference

The City of Daytona Beach Fee Schedule

Building Division Fee Schedule January 2018

Total Cost of the Building Permit. Total Valuation*

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

Transcription:

BUILDING PERMIT FEE SCHEDULE Section 109 of the International Building Code as adopted by Ordinance 987 reads as follows: FEES 109.1 Payment of fees. A permit shall not be valid until the fees prescribed by law have been paid. Nor shall an amendment to a permit be released until the additional fee, if any, has been paid. 109.2 Schedule of permit fees. On buildings, structures, electrical, gas, mechanical and plumbing systems or alterations requiring a permit, a fee for each permit shall be paid as required, in accordance with the schedule as established by the applicable governing authority. 109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. 109.4 Work commencing before permit issuance. Any person who commences any work on a building, structure, electrical, gas, mechanical or plumbing system before obtaining the necessary permits shall be subject to an additional fee established by the building official that shall be in addition to the required permit fees. 109.5 Related fees. The payment of the fee for the construction, alteration, removal or demolition for work done in connection with or concurrently with the work authorized by a building permit shall not relieve the applicant or holder of the permit from the payment of other fees that are prescribed by law. 109.6 Refunds. The building official is authorized to establish a refund policy. 109.7 Re-inspection Fee. A fee as established by city council resolution may be charged when: The inspection called for is not ready when the inspector arrives; The temporary electrical pole does not have a building permit clearly posted; No building address or permit card is clearly posted; City approved plans are not on the job site available to the inspector; The building is locked or work otherwise not available for inspection when called; The job site is red-tagged twice for the same item; The original red tag has been removed from the job site. Violations exist on the property including failure to maintain erosion control, trash control or tree protection. Any re-inspection fees assessed shall be paid before any more inspections are made on that job site. 109.8 Investigation Fee. Work without a permit. 109.8.1 Investigation. Whenever work for which a permit is required by this code has been commenced without first obtaining a permit, a special investigation shall be made before a permit may be issued for such work. 109.8.2 Fee. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is subsequently issued. The investigation fee shall be equal to the amount of the permit fee required by this code or the city fee schedule as applicable. The payment of such investigation fee shall not exempt the applicant from compliance with all other provisions of either this code or the technical codes nor from penalty prescribed by law. 109.9 Unauthorized cover up fee. 109.9.1 Any work concealed without first obtaining the required inspection in violation of section 109 shall be assessed a fee as established by the city fee schedule. The attached Fee Schedule was adopted by resolution of the City Council on 10-21-14. The Building Official has created the attached SOUTHLAKE BUILDING VALUATION TABLE based on the ICC Building Valuation Data table published by ICC periodically in Building Safety Journal. A copy of the Southlake table is attached in the fee schedule below. The ICC table is available on the ICC web site at www.iccsafe.org.

2018 Fee Building Permit (1) New Residential: For one and two family dwellings: new, additions or conditioned areas within accessory buildings, a new residential permit including Building Permit, Electrical Permit, Plumbing Permit, Mechanical Permit, Drainage Inspection Fee and Plan Review Fees, the permit fee shall be $50.00 plus $0.80/sf of living area not including garages, carports, porches and similar spaces. The new residential permit does not include impact fees, as assessed by ordinance. (2) Residential Remodel & Accessory Building: For other accessory buildings or remodeling space inside previously permitted space inside a dwelling unit, the permit fee shall be $50.00 plus $0.25/sf, with a minimum of $100.00. For purposes of this schedule, manufactured homes shall be figured at the accessory building rate. Where there is no specific area associated with the remodel, the fee shall be $100.00 (3) Commercial: For each commercial or non-residential building the permit fee shall be based on the valuation as specified in the table below. The permit includes Building Permit, Electrical Permit, Plumbing Permit, Mechanical Permit, Drainage Inspection Fee and Plan Review Fees. The permit does not include Impact Fees, as assessed by ordinance. Minimum fee shall be $100.00. Commercial Permit Total Valuation Fee $1.00 to $500.00 $100.00 minimum fee $501.00 to $2,000.00 $50.00 for the first $500.00 plus $6.60 for each additional $100.00 or fraction thereof $2,001.00 to $25,000.00 $150.00 for the first $2,000.00 plus $30.00 for each $25,001.00 to $50,000.00 $840.00 for the first $25,000.00 plus $21.60 for each $50,001.00 to $100,000.00 $1,380.00 for the first $50,000.00 plus $15.00 for each $100,001.00 to $500,000.00 $2,130.00 for the first $100,000 plus $12.00 for each $500,001.00 to $1,000,000.00 $6,930.00 for the first $500,000.00 plus $10.20 for each $1,000,001.00 and up $12,030.00 for the first $1,000,000 plus $6.60 for each 3

Additional Plan Review (required by revisions) per hour, one hour minimum 50.00 Certificate of Occupancy Temporary per 30 days 250.00 Construction or Sales Office Temporary includes plumbing & electrical permits per trailer 100.00 Contractor Registration 105.00 Culvert and/or Approach Permit if no active building permit on the site 50.00 Demolition Permit 100.00 Electrical Permit 75.00 Fence or Retaining Wall Permit 50.00 Food Program Tarrant County For the most current information on Tarrant County fees, please contact Tarrant County, visit their website or search for Tarrant County Department of Public Health. Fees are paid to Tarrant County. Game Court includes the court, nets, fencing & lighting per site, per application 100.00 4

Gas Drilling Specific Use Permit per pad site 19,500.00 Grading or Earth Disturbance Permit 200.00 Inspections Outside Normal Business Hours per hour, two hour minimum 50.00 Mechanical Permit 75.00 Noise Exemptions Permit Temporary 25.00 Oil & Gas Insurance Requirement Review 1,000.00 Oil & Gas Permit per well 8,500.00 Oil & Gas Permit Amended 5,000.00 Outside Consultants for Plan Review or inspections not otherwise included actual cost Pipeline Permit Regulated Pipeline 2,500.00 5

Pipeline Permit Unregulated Permit 1,500.00 Plumbing Permit 75.00 Portable on Demand (POD) Storage Unit per Zoning Ordinance, Section 34.1, ff 25.00 per Zoning Ordinance, Section 34.1, gg 50.00 Reinspection first inspection 100.00 each additional 200.00 Assessed under provisions of International Building Code (IBC) section 109.7, as amended, and charged as a result of re-inspection for stop-work orders. Reroofing 50.00 Revolving Account Per Gas Drilling Pad Site minimum balance 50,000.00 Revolving Account Per Regulated Pipeline Permit minimum balance 15,000.00 Road Damage per lane mile 2 course surface treatment 6 7 flex base 166,000.00 7 flexible pavement structure (total ACP + flex base) 173,000.00 7.5 flexible pavement structure (total ACP + flex base) 188,000.00 8 flexible pavement structure (total ACP + flex base) 115,000.00 8.5 flexible pavement structure (total ACP + flex base) 100,000.00 9 flexible pavement structure (total ACP + flex base) 85,000.00 9.5 flexible pavement structure (total ACP + flex base) 70,000.00 concrete pavement 73,000.00 6

Seismic Survey Permit 500.00 Sign Permit permanent type, 1 50 sf, minimum 100.00 permanent type, > 50 sf, per additional sf 1.00 temporary/banner 30.00 existing commercial building for sale/lease 100.00 multiple temporary/existing commercial building for sale/lease 200.00 illuminated sign/electrical permit is included with sign permit no charge Sign Recovery 1 50 sf 30.00 > 50 sf 55.00 plus any outside services required, at actual cost, plus 10% processing fee Spa, Hot Tub or Fountain Permit 200.00 Swimming Pool Permit 300.00 Swimming Pool, Spa and Interactive Water Feature Tarrant County For the most current information on Tarrant County fees, please contact Tarrant County, visit their website or search for Tarrant County Department of Public Health. Fees are paid to Tarrant County. Tent or Temporary Membrane Structure Permit 55.00 Tree Removal Permit 50.00 7

Variance Request Lighting Ordinance 300.00 Variance Request Masonry Ordinance 100.00 Variance Request Noise Ordinance 100.00 Variance Request Sign Ordinance per application set 300.00 per Master Sign plan 500.00 Work Covered Prior to Required Inspection 350.00 8

City of Southlake Building Fee Schedule SOUTHLAKE BUILDING VALUATION TABLE EFFECTIVE October 1, 2009. Actual construction costs may vary. This table is only for determining Building Valuation for use in Commercial Permit Fee Table. Use Construction Type and Occupancy group as defined in the 2009 International Building Code. All values are in dollars per square foot. For shell construction only use 60% of table value; For Interior finish use 40% of table value; For remodels* use actual bid cost. Group (2006 International Building Code) 1A 1B 2A 2B 3A 3B 4 5A 5B A-1 Assembly, theaters, 202.05 195.53 190.98 2182.97 172.26 167.18 177.12 157.17 151.38 with stage A-1 Assembly, theaters, 182.99 176.47 171.92 163.91 153.24 148.16 158.07 138.15 132.36 without stage A-2 Assembly, 155.74 151.36 147.50 141.90 133.46 129.73 136.94 121.02 116.96 nightclubs A-2 Assembly, 154.74 150.36 145.50 140.90 131.46 128.73 135.94 119.02 115.96 restaurants, bars, banquet halls A-3 Assembly, churches 186.22 179.70 175.15 167.15 156.44 151.36 161.30 141.35 135.56 A-3 Assembly, general, 157.46 150.93 145.39 138.38 126.08 122.58 132.53 111.57 106.79 community halls, libraries, museums A-4 Assembly, arenas 181.99 175.47 169.92 162.91 151.24 147.16 157.07 136.15 131.36 B Business 154.89 149.31 144.53 137.72 125.27 120.56 132.32 109.78 105.26 E Educational 171.53 165.59 160.55 153.20 141.88 134.72 147.92 123.99 119.32 F-1 Factory and 94.86 90.51 85.32 82.51 73.88 70.62 79.19 60.84 57.54 industrial, moderate hazard F-2 Factory and 93.86 89.51 85.32 81.51 73.88 69.62 78.19 60.84 56.54 industrial, low hazard H-1 High Hazard, 88.89 84.54 80.35 76.54 69.09 64.83 73.22 56.05 explosives N.P. H234 High Hazard 88.89 84.54 80.35 76.54 69.09 64.83 73.22 56.05 51.75 H-5 HPM 154.89 149.31 144.53 137.72 125.27 120.56 132.32 105.26 105.26 I-1 Institutional, 159.09 153.50 148.95 142.51 130.74 127.30 138.80 117.44 112.84 supervised environment I-2 Institutional, 260.68 255.10 250.32 243.51 230.40 N.P. 238.12 214.91 N.P. hospitals I-2 Institutional, nursing 182.27. 176.70 171.91 165.10 153.06 N.P. 159.71 137.57 N.P. homes I-3 Institutional, 178.01 172.44 167.66 160.85 149.66 143.95 155.45 134.16 127.64 restrained I-4 Institutional, day care 159.09 153.50 148.95 142.51 130.74 127.30 138.80 117.44 112.84 facilities M Mercantile 115.80 111.42 106.56 101.96 93.15 90.42 97.00 80.71 77.65 R-1 Residential, hotels 160.44 154.84 150.29 143.85 132.24 128.80 140.31 118.95 114.35 R-2 Residential, multiple 134.26 128.66 124.11 117.67 106.72 103.28 114.78 93.42 88.82 family R-3 Residential, one- 126.16 122.65 119.64 116.48 112.21 109.30 114.55 105.15 98.95 and two-family R-4 Residential, 159.09 153.50 148.95 142.51 130.74 127.30 138.80 117.44 112.84 care/assisted living facilities S-1 Storage, moderate 87.89 83.54 78.35 75.54 67.09 63.83 72.22 54.05 50.75 hazard S-2 Storage, low hazard 86.89 82.54 78.35 74.54 67.09 62.83 71.22 54.05 49.75 U Utility, miscellaneous 68.86 64.97 60.79 57.48 51.24 47.92 54.61 39.75 37.87 NOTES: *Remodel: means previously finished space not totally gutted. Additions: Figure as new construction for area added. Based on August 2009 Table published by ICC.

City of Southlake Building Fee Schedule FOOD PROGRAM FEE SCHEDULE Tarrant County Health Attachment C Food Store < 5000 sq. ft. $200 > 5000 sq. ft. $300 Food Service < 500 sq. ft. $100 > 500<1500 sq. ft. $150 > 1500< 3000 sq. ft. $200 > 3000<6000 sq. ft. $250 > 6000 sq. ft. $300 Child Care Food Service $150 Catering Operation $250 Food Court $200 per establishment Adjunct Operation Food Service Food Store <5000 sq. ft. Food Store >5000 sq. ft. $150 per independent operation $150 per independent operation $200 per independent operation Commissary No food prep $100 With food prep $200 Mobile Units Prepackaged food only $100 Open and/or food prep $200 Push Carts $200

City of Southlake Building Fee Schedule Plan Review < 500 sq. ft. $0 > 500<3000 sq. ft. $50 > 3000 sq. ft. $100 Late Fee From 1-30 days 10% of fee owed From 31-60 days 20% of fee owed The late fee increases 10% for each 30 day block until permit fee and late fee is paid. Permits that are more than 90 days overdue will be void and required to reapply. Re-inspection Fee Required re-inspection $75 SWIMMING POOL SPA & INTERACTIVE WATER FEATURE FEE SCHEDULE Plan Review and opening inspection $150 Annual Permit $250 Required re-inspection $75