Fulton Center, New York Uday Durg PE, Program Executive and Chief Engineer MTACC, New York Gillian Blake PE, Arup, New Delhi
2
Presentation Overview Project Introduction Goals Passenger focus Historic Preservation Execution Revenue Generation 3
4
Existing Condition Limited connectivity because of competitive history. World Trade Center Site Band-aid solution: Construction of A/C Mezzanine in 1933
Existing Conditions Narrow entrances inhibit quick access No accessibility for disabled 6
7 Deficiencies/Existing Conditions
8 Project Overview
Specific Goals Prominent and effective downtown transit hub Seamless connectivity System flexibility in the event of service disruptions Access to, transfers within, and way-finding Improving east-west pedestrian movements across lower Manhattan Supporting current use as well as future development Promoting safety and congestion reduction at heavily trafficked street crossings 9
10
Design Vision Light Natural & Artificial Horizontal movement from river to river Vertical movement from street level to concourse Movement reinforced by light and finish Grand Central Station 11
12
13
14
15
16
18 MTACC/NYCT Arup
Design Vision Old and New Historic Fabric Finish Treatment Axonometric Diagram 19
Material Palette Floor treatment Granite Glass Wall treatment Glass tiles LED Glass Tiles Stainless steel High strength concrete Ceiling treatment High strength concrete GFRC ceiling panels Components Glass balustrades Stainless Steel balustrades Artwork Recycling/Relocation/Reinstallation Marine Grill Murals & Gate Trade, Treasure, Travel 20
Over 30% potable water use reduction through water efficient fixtures Increased daylighting and views Reduced urban heat island effect through reflective roof surfaces Over 15% energy demand reduction compared to a baseline building of similar type Over 80% of construction waste diverted from landfills A reduction in the embodied environmental impact of materials greater than 10% of materials are sourced locally and are made of recycled content Reduction of transport related carbon emissions - over 400 transit trips per day 21
Dey Street Head house
23 135 William Street Head House Interior Looking West
MTACC/NYCT Arup 24 135 William Street Head House Basement Looking South
MTACC/NYCT Arup 25 Openings in Historic A/C walls
National Registry Property Aesthetic & Technical contributions to the history of American Architecture A proto-skyscraper Experimental and pre-patented use of Guastavino structural floor tile arches Fire-resistive construction Pioneering use of terracotta decoration by the New York Architectural Terra Cotta Company Early Otis elevator construction and use 26
27 Corbin Building Pre Renovation
28 Corbin Building - Details
Corbin Building - Restored
MTACC/NYCT Arup 30 Corbin Building
Fulton Center
Thank you 2015 International Construction Project of the Year British Construction Industry Awards 2015 AIA New York State Design Awards Citation' Design Award 2015 Public Art Network (PAN) Year in Review Sky Reflector Net IESNYC (Illuminating Engineering Society of New York City) 2015 Lumen Awards Citation for an Architectural Feature as a Light Source IESNA (Illuminating Engineering Society of North America) 2015 Illumination Awards Award of Merit Award of Distinction The Municipal Engineers of the City of New York 2014 Project of the Year Fulton Center ACEC American Council of Engineering Companies 2014 - Engineering Excellence, National Recognition Award Presented to MTA Capital Construction Fulton Center Corbin Building NYSSPE NY Chapter 2014 NY Chapter Awards Project of the Year Fulton Street Transit Center The New York Landmarks Conservancy 2013 Lucy G. Moses Stewardship Award Presented to the MTA AIA New York State 2013 AIANYS Design Award Award of Merit in Adaptive Reuse Corbin Building Restoration, Fulton Street Transit Center ACEC of New York 2012 - Silver Award for Engineering Excellence Presented to MTA Capital Construction Structural Rehab and Finishes for Cortlandt Street Railroad Station, New York, NY 2015 UITP Design Award Sky Reflector-Net at Fulton Centre Presented to MTA New York City Transit 34
Thank You.
Fulton Center Project Team Client MTA-Capital Construction / NYCT Funding FTA Prime Design Consultant Ove Arup & Partners Consulting Engineers PC (Arup) Design Team Arup Grimshaw Architects HDR Daniel Frankfurt Page Ayres Cowley Architects Systra Engineering AG Consulting Engineering B-A Engineering Barbara Thayer Associates Louis Nelson Associates Macon Pace Mueser Rutledge Consulting Engineers Naik Prasad VJ Associates Yu & Associates AB Consulting Additional Design Consultants during Concept and Preliminary Engineering Lee Harris Pomeroy Architects GZA Geoenvironmental Vollmer Associates Cooley Monato Studio Fisher Marantz Stone MCSS Van Deusen Associates Jamie Carpenter Design Associates Zetlin Strategic Communications Environmental Impact Consultant (Prime) Louis Berger Consultant Cultural Resources Management Team CRM (Prime) AKRF FTA Project Management Oversight Consultant PMOC (Prime) David Evans & Associates Physical Models Radii Inc Copyright of the images, 3d Visualizations and model MTA-CC/NYCT Arup 36
Fulton Center Project Team Consultant Construction Management CCM (Prime) PB/Bovis Lend Lease LLB, JV Package 1: 2/3 Station and 4/5 Southern Stairs Citnalta Construction - $34m Package 2: Dey Street Structural Box Design-Build Skanska - $133m Package 3: Deconstruction of Buildings Gramercy Group - $7m Package 4A: Transit Center Foundations (and underpinning of Corbin Building) Skanska - $70m Package 4B: A/C Station and J/M/Z Vertical Circulation Skanska - $120m Package 4C/D: 4/5 Station Rehab and Dey Street Headhouse WDF Inc. - $58m Package 4E: Dey Street Concourse Finishes and R/W Station Skanska - $17m Package 4F: Transit Center Enclosure Plaza/Schiavone JV - $176m Package 4G: Corbin Building Judlau - $60m 37
Dey Street Head House MTACC/NYCT Arup
Dey Street Head House MTACC/NYCT Arup
Dey Street Concourse MTACC/NYCT Arup
New R Underpass MTACC/NYCT Arup