APPLICATION PACKET FOR RESIDENTIAL ALTERATION COVER SHEET

Similar documents
APPLICATION PACKET FOR RESIDENTIAL ADDITION COVER SHEET

APPLICATION PACKET FOR WHEELCHAIR RAMP PERMIT COVER PAGE

APPLICATION PACKET FOR ALTERATION PERMIT COVER PAGE. 2. Business Occupancy permit application

CHICKEN COOP BUILDING REQUIREMENTS

TOWN OF ROME 1156 ALPINE DR. NEKOOSA, WI (715)

WISE COUNTY DEPARTMENT OF BUILDING & ZONING PO BOX 570 / 206 EAST MAIN ST WISE, VA Applicant: Phone #:

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

HOME ADDITION PERMIT PROCESS

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

NASSAU COUNTY ELECTRICAL PERMIT APPLICATION FOR CONTRACTORS

NEW HOME CONSTRUCTION PERMIT PROCESS

NEBRASKA REAL ESTATE COMMISSION SELLER PROPERTY CONDITION DISCLOSURE STATEMENT Residential Real Property

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

APPENDIX A BUILDING PERMIT AND RELATED FEES

SCHEDULE OF PERMIT FEES. (Effective November 3, 2015)

Home Basis Record Book

-PLUMBING- BUILDING PERMIT APPLICATION PACKET

SWIMMING POOL PERMIT APPLICATION PACKET

TOWN OF HERNDON, VIRGINIA ORDINANCE MAY 26, 2015

New Business Information Packet

City of Wausau Building, Housing and Zoning Fee Schedule 2019

Irrigation Permit Requirements FOR OWNER/BUILDER

BUILDING PERMIT APPLICATION

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION

WASHINGTON SELLER S RESIDENTIAL PROPERTY DISCLOSURE STATEMENT

City of Beacon Building Department

CHAPTER 1321 Permit and Inspection Fees

Residential Re-Roof Permit Requirements FOR CONTRACTORS

Permit Fees for The City of Monroe **Effective July 2, 2018** Table of Contents

BUILDING PERMIT APPLICATION

AN ORDINANCE FOR ADOPTION OF FEES IN CONJUNCTION WITH THE FAMILY OF INTERNATIONAL BUILDING CODES FOR PEARL RIVER COUNTY

Be it enacted by the People of the State of Illinois,

CITY OF NAPERVILLE Transportation, Engineering, & Development (T.E.D.) Business Group

BUILDING SERVICES ~ FEE SCHEDULE

Connor Rose Realty Inc

OREGON SELLER S PROPERTY DISCLOSURE STATEMENT

Before I can issue a permit, I need the following items:

WISCONSIN REAL ESTATE CONDITION REPORT 1

NOVA SCOTIA POWER INC. SCHEDULE OF FEES FOR INSPECTION OF ELECTRICAL INSTALLATIONS AS APPROVED BY THE NOVA SCOTIA UTILITY AND REVIEW BOARD

WEST VINCENT TOWNSHIP COMMERCIAL BUILDING PERMIT

CHAPTER 16 ELECTRICAL CODE PAGE NO.

TOWN OF BROOKFIELD CHAPTER 15 PLUMBING CODE

NASSAU COUNTY MECHANICAL PERMIT APPLICATION

SELLER S PROPERTY DISCLOSURE STATEMENT

City of Greensburg. Step by Step Guidelines for your Project. Informational Packet for a Compliance Permit

INTERGOVERNMENTAL AGREEMENT FOR BUILDING INSPECTION SERVICES Between the Village of Saukville and Village of Grafton

MEDINA COUNTY BUILDING REGULATIONS

PROCEDURE FOR OBTAINING A DECK/PORCH PERMIT

CITY OF LITTLE FALLS BUILDING PERMIT APPLICATION ALL BUILDING PERMITS ARE GOOD FOR ONE YEAR

Abandoned Wells

Please complete the enclosed application and PRINT clearly.

UNIVERSITY OF KENTUCKY COLLEGE OF AGRICULTURE FACILITIES MANAGEMENT 2275 TURNER PLACE LEXINGTON, KY

LEASE AGREEMENT Premises Rent

BUILDING PERMIT / ZONING USE PERMIT APPLICATION

Pavers, Concrete Driveways, Sidewalks, Patio and Pads Permit Requirements FOR OWNER/BUILDER

Project Address. Name of Project/business name. Owner of Property Phone . Emergency contact phone number. Parcel Number

SELLER DISCLOSURE STATEMENT IMPROVED PROPERTY

SELLER S PROPERTY CONDITION DISCLOSURE STATEMENT

Huntington Building Inspection

FORM 1.3b. Permit #: Total Fee. Lawn Sprinkler (Irrigation) Application. Property Address. Owner Address Phone Fax

TECHNICAL BULLETIN FX-1

BUILDING PERMIT FEE ESTIMATE

NEW SINGLE FAMILY RESIDENTIAL

DEPARTMENT OF BUILDING AND SAFETY

INFORMATION REQUIRED FOR OBTAINING A BUILDING PERMIT

SWIMMING POOL GUIDELINES

OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS

FY 2018 FEE SCHEDULE (Effective )

Chapter 3 Holding Tanks

Application for a Building/Zoning Permit

-MECHANICAL- BUILDING PERMIT APPLICATION PACKET

PROPERTY INSPECTION REPORT

North Carolina General Statutes

REAL ESTATE PURCHASE AGREEMENT

Violet Township requires Zoning and Plans Examination and Building Permits for all new construction.

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

APPLICATION FOR CONDITIONAL USE PERMIT

Make checks payable to Columbia County Treasurer. We do not issue refunds. Credit Cards accepted.

Community & Economic Development Department 2200 Civic Center Place Miramar, Florida Tel: Fax:

BUILDING PERMIT APPLICATION

VILLE DE / TOWN OF BEAUMONT

PROPERTY MANAGEMENT AGREEMENT

203k U N D E R S T A N D I N G A G U I D E T O H O M E O W N E R S H I P

C. For all areas of unincorporated Multnomah County:

House Bill 2140 Sponsored by Representative BOONE (Presession filed.)

Being a By-law to require owners of Lodging Houses and Rental Dwelling Units to obtain a business licence

MARION COUNTY SPORTSMEN CLUB ---CLUBHOUSE RENTAL POLICIES---

6 TH EDITION (2017) OF THE FLORIDA BUILDING CODE IS IN EFFECT

BUILDING CODE SERVICES PERMIT SUBMITTAL REQUIREMENTS (2017 Florida Building Code in Effect)

ORDINANCE NO ORDINANCE TO AMEND AN ORDINANCE CODIFIED IN THE CODE OF THE TOWNSHIP OF NUTLEY, CHAPTER 272, ENTITLED CONSTRUCTION CODES, UNIFORM

PROPERTY INSPECTION REPORT

Remember, PA One-Call before excavating. Simply dial 811 or

COUNTY OF TAZEWELL DEPARTMENT OF COMMUNITY DEVELOPMENT

County of San Bernardino Department of Public Health Environmental Health Services

IBI Online Permits Center

COMMUNITY AND DEVELOPMENT SERVICES APPLICATION FOR RESIDENTIAL BUILDING PERMIT HOPKINSVILLE KY

75th OREGON LEGISLATIVE ASSEMBLY Regular Session. Enrolled. House Bill 3450

Transcription:

APPLICATION PACKET FOR RESIDENTIAL ALTERATION COVER SHEET Project Address The following items must be completed and submitted as a packet: 1. Residential Alteration permit application 2. Residential Plumbing permit application (signed by a Wisconsin-licensed Master Plumber) 3. Residential Electrical permit application (signed by a Wisconsin-licensed Master Electrician) 4. Residential HVAC permit application (signed by an individual that possesses a City of Kenosha HVAC license OR a State of Wisconsin HVAC Qualifier license) 5. One (1) set of floor plans (size 8 1/2 x 11 or 11 x 17, drawn at 1/4 scale), showing door and window sizes, and hallway and room dimensions of the altered area 6. One (1) set of cross-section drawings (size 8 1/2 x 11 or 11 x 17, drawn at 1/4 scale), showing structural members, insulation, exterior siding, and interior wall finish 7. If you are not submitting floor plans or cross section drawings (items 6 and 7 above), please explain why below: 8. Cautionary Statement (required if the property owner is listed as the contractor); OR State Licensing (required if a contractor is listed) If you do not intend to proceed with this project, please contact our office at 262.653.4263 to avoid paying the entire cost of the permit. Administrative and/or plan review fees will be charged. Any/all unpaid permit fees, along with an additional $100.00 Administrative Fee, will be processed as a special charge against the real estate upon which the service was performed.

FOR OFFICE USE ONLY Date Permit # Needs Approval IP Fee'd APPLICATION FOR RESIDENTIAL ALTERATION Form #CDI124 (rev. 01/18) You will be notified when your permit is ready; please do not submit payment with permit application. Project Address Property Owner Contractor Mailing Address Mailing Address City State Zip City State Zip Phone ( ) Phone ( ) Contractor e-mail Estimated cost (excluding plumbing, electric, and HVAC) Type of alteration Property Type: Single-family Two-family Will the work include the addition of a kitchen? Yes No For Office Use Only: Zoning: Zoning Review/Approval: Any general contractor* that performs work on a one- or two-family dwelling must possess the following two licenses: 1) Dwelling Contractor Certification number: 2) Dwelling Contractor Qualifier Certification number: PLAN REVIEW - RESIDENTIAL $ 60.00 Ea. ALTERATIONS $ 60.00 Ea. ZONING PLAN REVIEW $ 60.00 Ea. NOTE: If work is started without first obtaining a permit, a penalty fee will be charged in accordance with Chapter 9.07C of the Code of General Ordinances. Dwelling Contractor Qualifier Licensee Signature Date: Please Print Name *Note to Property Owners: If the owner of the property is listed as the general contractor, a license is not required; however, the attached Cautionary Statement must be signed by the property owner.

CAUTIONARY STATEMENT TO OWNERS OBTAINING BUILDING PERMITS 101.65(lr) of the Wisconsin Statutes requires municipalities that enforce the Uniform Dwelling Code to provide an owner who applies for a building permit with a statement advising the owner that: If the owner hires a contractor to perform work under the building permit, and the contractor is not bonded or insured as required under S.101.654(2)(a), the following consequences might occur: a) The owner may be held liable for any bodily injury to or death of others or for any damage to the property of others that arises out of the work performed under the building permit or that is caused by any negligence by the contractor that occurs in connection with the work performed under the building permit. b) The owner may not be able to collect from the contractor damages for any loss sustained by the owner because of a violation by the contractor of the one- and two-family dwelling code or an ordinance enacted under Sub.(1) (a) because of any bodily injury to or death of others or damage to the property of others that arises out of the work performed under the building permit or because of any bodily injury to or death of others or damage to the property of others that is caused by any negligence by the contractor that occurs in connection with the work performed under the building permit. CAUTIONARY STATEMENT TO CONTRACTORS FOR PROJECTS INVOLVING BUILDINGS BUILT BEFORE 1978 If this project is in a dwelling or child-occupied facility, built before 1978, then the requirements of Ch. DHS 163 requiring Lead-Safe Renovation Training and Certification apply. For details of how to be in compliance, go to http://dhs.wisconsin.gov/lead/renovationrules.htm. I agree to comply with all applicable codes, statutes, and ordinances, and with the conditions of this permit; understand that the issuance of the permit creates no legal liability, express or implied, on the state or municipality; and, certify that all of the permit information herein is accurate. If I am the property owner applying for an erosion control or construction permit, I have read and signed the above cautionary statement. I expressly grant the building inspector, or the inspector s authorized agent, permission to enter the premises for which this permit is sought at all reasonable hours and for any proper purpose to inspect the work which is being done. I vouch that I am or will be an owner-occupant of this dwelling for which I am applying for an erosion control or construction permit (of a single-family or two-family dwelling) without a Dwelling Contractor Certification and have read this Cautionary Statement regarding contractor responsibility. (Note: This form is not required for general contractors of multi-family or commercial buildings). Project Address Property Owner's Signature Date Please Print Name

APPLICATION FOR RESIDENTIAL PLUMBING PERMIT Form #CDI127 (rev. 01/18) Project Address Owner Name Mailing Address City State Zip Phone ( ) Estimated Cost: Lot # (for new buildings) Contractor Mailing Address City State Zip Phone ( ) Contractor e-mail Description of Work / Comments CHECK ONE: One-family Two-family CHECK ONE: New Building Existing If you do not intend to proceed with this project, please contact our office at 262.653.4263 to avoid paying the entire cost of the permit. Administrative and/or plan review fees will be charged. Any/all unpaid permit fees, along with an additional $100.00 Administrative Fee, will be processed as a special charge against the real estate upon which the service was performed. IT IS THE PLUMBING CONTRACOR'S RESPONSIBILITY TO CALL FOR ALL INSPECTIONS. NEW 1&2 FAMILY PLUMBING $ 180.00 Per Dwelling PER FIXTURE $ 11.00 Ea. ROOF DRAIN $ 11.00 Ea. CATCH BASIN/MANHOLES $ 24.00 Ea. BACKFLOW PREVENTER $ 11.00 Ea. SANITARY EJECTOR $ 11.00 Ea. SUMP PUMP $ 11.00 Ea. GAS OPENING $ 11.00 Ea. INTERIOR SEWER $ 30.00 Ea. WATER HEATER $ 18.00 Ea. CIRCULATION PUMP $ 11.00 Ea. MINI VENT $ 36.00 Ea. MISCELLANEOUS $ 12.00 Ea. MINIMUM RESIDENTIAL PLUMBING $ 60.00 Ea. If work is started without first obtaining a permit, a penalty fee will be charged in accordance with Chapter 9.07C of the Code of General Ordinances Any contractor that performs plumbing work must possess the following license: 1) Wisconsin Master Plumber's License number: Licenses are available through the Department of Safety & Professional Services (DSPS) at: dsps.wi.gov I agree to comply with all applicable codes, statutes, and ordinances, and with the conditions of this permit; understand that the issuance of the permit creates no legal liability, express or implied, on the state or municipality; and, certify that all of the above permit information herein is accurate. I expressly grant the building inspector, or the inspector s authorized agent, permission to enter the premises for which this permit is sought at all reasonable hours and for any proper purpose to inspect the work which is being done. Master Plumber's Signature: Date Please Print Name: FOR OFFICE USE ONLY Date Permit # Needs Approval IP Fee'd Community Development & Inspections 625 52 St. Rm 100, Kenosha WI 53140 T: 262.653.4263 F: 262.653.4254 Email: bldgpermits@kenosha.org kenosha.org

APPLICATION FOR RESIDENTIAL ELECTRIC PERMIT Form #CDI125 (rev. 01/18) Project Address Property Owner Mailing Address City State Zip Phone ( ) Lot # (for new buildings) Contractor Mailing Address City State Zip Phone ( ) Estimated Cost: Contractor e-mail Description of Work: If new service, indicate size CHECK ONE: Overhead Underground City needs to notify WE Energies: Yes No CHECK ONE: New Building Existing CHECK ONE: One-family Two-family Note: Service upgrades for two-family units require a Zoning approval. You will be notified after approval; please do not submit payment with permit application. Zoning Zoning Review/Approval If you do not intend to proceed with this project, please contact our office at 262.653.4263 to avoid paying the entire cost of the permit. Administrative and/or plan review fees will be charged. Any/all unpaid permit fees, along with an additional $100.00 Administrative Fee, will be processed as a special charge against the real estate upon which the service was performed. ALL ELECTRICAL INSPECTIONS MUST BE CALLED IN BY THE ELECTRICAL CONTRACTOR. NEW 1&2 FAMILY - 100 Amp Service $ 180.00 Per Dwelling NEW 1&2 FAMILY - 200 Amp Service $ 210.00 Per Dwelling REHAB/REMODEL ENTIRE HOME $ 180.00 WIRING EXTENSION - (Additions, Basements, Garages) $ 60.00 Ea. SERVICE UPGRADE or PANEL CHANGE $ 90.00 Ea. Unit SERVICE RE-CONNECT $ 60.00 MISCELLANEOUS - (Furnaces, A/C, Garbage Disposals, Appliances, etc.) $ 6.00 Ea. MINIMUM RESIDENTIAL FEE $ 60.00 ZONING PLAN REVIEW (for two-family upgrades) $ 60.00 If work is started without first obtaining a permit, a penalty fee will be charged in accordance with Chapter 9.07C of the Code of General Ordinances Any contractor that performs electrical work must possess the following two licenses: 1) Wisconsin Master Electrician's License number 2) Wisconsin Electrical Contractor License number Licenses are available through the Department of Safety & Professional Services (DSPS) at: dsps.wi.gov I agree to comply with all applicable codes, statutes, and ordinances, and with the conditions of this permit; understand that the issuance of the permit creates no legal liability, express or implied, on the state or municipality; and, certify that all of the permit information herein is accurate. I expressly grant the building inspector, or the inspector s authorized agent, permission to enter the premises for which this permit is sought at all reasonable hours and for any proper purpose to inspect the work which is being done. Master Electrician's Signature Date Please Print Name FOR OFFICE USE ONLY Date Permit # Needs Approval IP Fee'd Community Development & Inspections ǀ 625 52 nd St. Rm 100 Kenosha, WI 53140 ǀ T: 262.653.4263 ǀ F: 262.653.4254 Email: bldgpermits@kenosha.org kenosha.org

FOR OFFICE USE ONLY APPLICATION FOR RESIDENTIAL HVAC PERMIT* Form #CDI126 (rev 01/18) *For One- and Two-family Project Address Property Owner Mailing Address City State Zip Phone ( ) Date Permit # Needs Approval IP Fee'd Lot # (for new construction) Contractor Mailing Address City State Zip Phone ( ) Estimated Cost Contractor e-mail: Description of Work CHECK ONE: One-family Two-family CHECK ONE: New Building Existing Note: No air conditioning units shall be installed in front of the building. If you do not intend to proceed with this project, please contact our office at 262.653.4263 to avoid paying the entire cost of the permit. Administrative and/or plan review fees will be charged. Any/all unpaid permit fees, along with an additional $100.00 Administrative Fee, will be processed as a special charge against the real estate upon which the service was performed. IT IS THE HVAC CONTRACTOR'S RESPONSIBILITY TO CALL FOR ALL INSPECTIONS NEW 1&2 FAMILY HVAC $ 180.00 Per Dwelling FURNACE UP TO 200,000 BTU $ 30.00 Ea. FURNACE WITH A/C $ 42.00 Per Unit VENTILATION FAN $ 14.00 Ea. AIR COND./UP TO 5 TONS $ 4.80 Per Ton FIREPLACE $ 36.00 Ea. MISCELLANEOUS $ 14.00 Ea. MINIMUM RESIDENTIAL $ 60.00 Ea. If work is started without first obtaining a permit, a penalty fee will be charged in accordance with Chapter 9.07C of the Code of General Ordinances Contractors of HVAC Projects must posess the following two licenses: 1) Wisconsin HVAC Qualifier Certification number OR City of Kenosha HVAC License number* 2) Wisconsin HVAC Contractor Registration number: Licenses are available through the Department of Safety & Professional Services (DSPS) at dsps.wi.gov *New City of Kenosha Licenses are no longer issued if you do not currently possess a City License, you will need a State Qualifier Certification. I agree to comply with all applicable codes, statutes, and ordinances, and with the conditions of this permit; understand that the issuance of the permit creates no legal liability, express or implied, on the state or municipality; and, certify that all of the permit information herein is accurate. I expressly grant the building inspector, or the inspector s authorized agent, permission to enter the premises for which this permit is sought at all reasonable hours and for any proper purpose to inspect the work which is being done. Licensee's Signature Date Please Print Name