PROPOSED HOUSING FOR Jal Vayu Towers, Boitawala, Jaipur
BACKGROUND Air Force Naval Housing Board (AFNHB) was formed on 16 Nov 1979. The objective of the Board is to promote housing schemes all over India for Air Force and Naval Personnel and their widows on no profit no loss basis. All the schemes launched by the board are self financed schemes. The Board was registered under the Societies Registration Act 1860 in May 1980. The Board s primary function is to facilitate providing the affordable housing to serving as well as pensioners from the two services. Widows of the personnel of the Air Force and Navy who die in harness /action are accorded top priority in allotment of dwelling units. From the humble beginning in Nov 1979, AFNHB schemes are now spread all over the country with a clientele of 18602 allottees. AFNHB has completed handing over of almost 16822 dwelling units.
BACKGROUND
BACKGROUND
PINK CITY JAIPUR KEEPING TRADITIONS ALIVE, BLENDING ASPIRATIONS OF FUTURE
LOCATION SITE INDIA JAIPUR JN RAILWAY STATION 13 KM JAIPUR RAJASTHAN 30 KM JAIPUR INTERNATIONAL AIRPORT
EXISTING SITE SCENARIO Site is approx. 10 acres and is in the midst of agricultural land In Boytawala Village. Towards Benad Railway Station 2 kms. astride Benad Road and a village road goes right upto the site. SITE 3 kms. from Benad Railway Station. 14 kms. from Jaipur Railway Station. Sri Balaji College of Engg. & Technology is located near to site. Towards Jaipur Railway Station The site is adjacent to South Western Command of Army.
SITE IMAGES 2 1 2 1 Actual site photographs
SITE IMAGES 2 4 3 1 1 1 4 3 Construction as per latest technology 2 Actual site photographs
USP S SALIENT FEATURES It is JDA compliant. The Building plans and layouts are sanctioned by all the necessary authorities. The Project is registered as RAJ/P/2017/553 under the RERA registration. Environment friendly Design. Time bound construction- Project to be delivered by 2019. Supervision by qualified engineers, service consultants and architects. Well secured gated complex with strict security control measures. The cost is all inclusive- No PLC charges, No development charges, No club Membership charges unlike other prevailing market projects. PROJECT COMFORTS Ample Parking Space Basement, Stilt & Open Shops 24*7 Electricity Supply & Water Supply Power Back-up Supply Rain Water Harvesting System Society Office Installation of Fire Fighting System as per norms.
LAYOUT PLAN TOTAL TOWERS- 11 No. s TOTAL DU S = 444 No. s TOTAL BUILTUP AREA = 10 Lac Sq.Ft. SUPERSTRUCTURE BASEMENT AREA = 3 Lac Sq.Ft. CLUB MAIN ENTRY-EXIT FOUR BED SERVANT ENTRY-EXIT THREE BED ROOM TWO BED ROOM STUDY N
PHASING FOUR BED SERVANT THREE BED ROOM PHASE 2 K TWO BED ROOM STUDY PHASE 2 L J H G C B A D E F PHASE 1 TOWER C,D,E,F,L,J and H CLUB and Common Facilities PHASE 2 TOWER A,B,G and K TOWERS IN PH-2 = 4 No. s TOWERS IN PH-1 = 7 No. s DU S IN PH-1 = 282 No. s DU S IN PH-2 = 162 No. s N
AMENITIES 9 20 10 14 12 15 21 16 5 22 3 17 19 7 6 5 2 4 4 18 4 1 18 1 13 8 11 1. Entry Exit points 2. Parking in PCC Pavers 3. Water Feature 4. Drop-off in Delhi Quartzite 5. Pathway 6. Trellis with Pergola 7. Basketball Court 8. Tennis Court 9. Badminton Court 10. Kids Play Area 11.Gazebo 22. Club & 12.Mounds swimming 13.Jogging Track Pool 14. Tot-Lot 15.Lawn 16.Pergola 17.Party Lawn 18.Driveway in Delhi Quartzite 19.Rock Garden 20.Fragrance Planting 21.Edge Green N
AERIAL VIEW Air Force Naval Housing Board caters to the aspirations of serving and retired Defense personnel and their widows by constructing and providing them their dream houses through self financing housing schemes at no profit no loss. The Project is registered a s RAJ/P/2017/553 under the RERA registration BASIC FACILITIES Stilt Parking Basement Parking Surface Parking Solar Water Heating Fire Suppression Systems Solar Water Heating Systems Rain Water Harvesting Controlled Entry-Exit points
LANDSCAPE IDEAS Trellis Fragrance Planting Shaded Jogging tracks Party Lawn Green Pavers
LANDSCAPE: Reference Visuals 1. Water Feature 2. Gazebo 2 1 3 KEY PLAN 3. Rock Garden Note: All images indicated may differ from those actually to be executed on site.
RECREATIONAL FACILITIES: Reference Visuals 1. Tot Lot & Kids Play 2. Basket Ball Court 3 1 2 KEY PLAN 3. Badminton Court Note: All images indicated may differ from those actually to be executed on site.
TOWER DROP OFF: Reference Visuals KEY PLAN Note: All images indicated may differ from those actually to be executed on site.
CLUSTER PLAN: 4 BHK + 4 TOILET 4 Units to a core. Two Lifts and Two staircases, One will be emergency in case of fire. Fully Ventilated and well lit lift lobby. Circulation area within unit and the core is kept minimal to ensure efficient planning. F E D C KEY PLAN B A TYPICAL FLOOR PLAN TOWERS A, B, C and D,E,F
3D VIEW: 4BHK
UNIT PLAN: 4 BHK + 4 TOILET Three bed rooms and living room have attached balcony with large windows. All bedrooms have wardrobes and attached toilet. Separate store for kitchen. Separate entry for servant connected with kitchen via utility balcony. TOTAL NO. OF 4BHK UNITS = 228 PHASE 1 = 156 PHASE 2 = 72 SUPER AREA : 2211 SQ.FT. CARPET AREA :1660 SQ.FT.
AXONOMETRIC VIEW: 4 BHK + 4 TOILET Three bed rooms and living room have attached balcony with large windows. All bedrooms have wardrobes and attached toilet. Separate store for kitchen. All toilets naturally ventilated. Well ventilated but hidden utility balconies.
CLUSTER PLAN: 3 BHK + 3 TOILET 4 Units to a core. Two Lifts and Two staircases, One will be emergency in case of fire. Fully Ventilated and well lit lift lobby. Circulation area within unit and the core is kept minimal to ensure efficient planning. J H G TYPICAL FLOOR PLAN TOWERS G,H,J KEY PLAN
3D VIEW: 3BHK
UNIT PLAN: 3 BHK + 3 TOILET Two bed rooms and living room have attached balcony with large windows. Cross ventilation in living-dining. Entrance lobby All bedrooms have wardrobes and attached toilet. All toilets naturally ventilated. Well ventilated but hidden utility balconies attached to kitchen. TOTAL NO. OF 3BHK UNITS = 108 PHASE 1 = 72 PHASE 2 = 36 SUPER AREA CARPET AREA : 1623 SQ.FT. : 1160 SQ.FT.
AXONOMETRIC VIEW: 3 BHK + 3 TOILET Two bed rooms and living room have attached balcony with large windows. Cross ventilation in livingdining. Entrance lobby All bedrooms have wardrobes and attached toilet. All toilets naturally ventilated. Well ventilated but hidden utility balconies attached to kitchen.
CLUSTER PLAN: 2 BHK + 2 TOILET 6 Units to a core. Two Lifts and Two staircases, One will be emergency in case of fire. Fully Ventilated and well lit lift lobby. Circulation area within unit and the core is kept minimal to ensure efficient planning. K L KEY PLAN TYPICAL FLOOR PLAN TOWERS K and L
3D VIEW: 2BHK
UNIT PLAN: 2 BHK + 2 TOILET All bed rooms and living room have attached balcony with large windows. Cross ventilation in livingdining. All bedrooms have wardrobes and attached toilet. All toilets naturally ventilated. Well ventilated but hidden utility balconies attached to kitchen. TOTAL NO. OF 2BHK UNITS = 108 PHASE 1 = 54 PHASE 2 = 54 SUPER AREA CARPET AREA : 1230 SQ.FT. : 860 SQ.FT.
AXONOMETRIC VIEW: 2 BHK + 2 TOILET All bed rooms and living room have attached balcony with large windows. Cross ventilation in livingdining. All bedrooms have wardrobes and attached toilet. All toilets naturally ventilated. Well ventilated but hidden utility balconies attached to kitchen.
COMMUNITY CENTRE AREA = 16000 Sq.ft. approx AMENITIES Reception cum Waiting Area Multipurpose Hall Swimming Pool with Separate Kids Pool Gymnasium Ample Space for Indoor Games Children Play Area with Equipment's KEY PLAN GROUND FLOOR PLAN N
COMMUNITY CENTRE Double height multipurpose hall with a capacity of gathering 150 people. Guest rooms available attached to an open terrace. KEY PLAN FIRST FLOOR PLAN N
COMMUNITY CENTRE Swimming pool of 40 x 20 feet Area with a separate kid s pool. Pool facing indoor games and gymnasium. KEY PLAN BASEMENT PLAN N
COMMUNITY CENTRE: Reference Visuals 1. Double Height Reception Lobby 2. Indoor Kids Play Area 2 1 3 3. Double Height Multipurpose Hall Note: All images indicated may differ from those actually to be executed on site.
COMMUNITY CENTRE: Reference Visuals 1. Gymnasium 2. Indoor Games 2 3 1 3. Pool and Deck Note: All images indicated may differ from those actually to be executed on site.
VIEWS
VIEWS
VIEWS
VIEWS
VIEWS
VIEWS
VIEWS
VIEWS
BASEMENT PLAN NO. OF CARS IN BASEMENT 600 NO. OF CARS IN STILT 100 NO. OF CARS IN OPEN 200 TOTAL NO. OF CARS 900 N
AREA STATEMENT UNIT AREA(FAR) SQ.FT TOTAL SUPER AREA DU'S / FLR NO OF BLOCKS NO OF FLRS TOTAL DU'S TOTAL BUILT UP TYPE 1 4 BED + 4 TOI+ SERVANT 1635 2156 4 3 10 120 258720 51.4% (STORE FREE FROM FAR) 4 BED + 4 TOI+ SERVANT 1635 2156 4 3 9 108 232848 (STORE FREE FROM FAR) TYPE 2 3 BED + 3 TOILET 1146 1559 4 3 9 108 168372 24.3% TYPE 3 2 BED + 2 TOILET +STUDY 794 1166 6 2 9 108 125928 24.3% TOTAL 11 444 785868 GROUND COVERAGE-19% PARKING REQUIRED @ 1ECS PER 75 Sq Mts 721.29 25 % FOR VISITORS 180.32 TOTAL REQUIRED ECS 901.6 75%OF CARS AND 25% ECS FOR SCOOTERS 676 CARS NO. OF CARS IN BASEMENT 600 NO. OF CARS IN STILT 100 NO. OF CARS IN OPEN 200 TOTAL NO. OF CARS 900 % OF UNITS
AREA STATEMENT SITE AREA 40480 SQ.MT 4.048 HAC 10.0 ACRE F.A.R. 1.33 53838.40 SQ.MT 579516.54 SQ.FT BUILT UP OF COMMUNITY+ CONVINIENT SHOPPING 29390.52 SQ.FT GATE HOUSE METRE ROOM GAS BANK, MUMTY,MACHINE ROOM SUB STATION ETC @7% FREE FROM FAR (COMMON SERVICES) 40566.16 SQ.FT BULT UP AREA OF ABOVE 42594.47 SQ.FT BASEMENT AREA 177417.738 SQ.FT. STILT AREA 84444 SQ.FT OPEN AREA(FOR PARKING) 60547.5 SQ.FT COSTING TYPE AREA VACANCY STATUS COST (In Lakh) AI (4BHK) 2211 98 54.63 BI (3BHK) 1623 43 41.15 BII (2BHK) 1230 53 32.14
T E A M S T R E N G TH OUR STRENGTH
Area: 26,00,000 sq.ft. Client: Manglam Builders MANGLAM ANANDA SANGANER, JAIPUR
MANGLAM ANANDA SANGANER, JAIPUR Area: 26,00,000 sq.ft. Client: Manglam Builders
CONTRACTORS - MITRA GUHA BUILDERS (INDIA) CO. A professionally managed Company engaged in Civil Construction for 36 years with their Head Office at Noida (U.P.), and branch office at Kolkata & Bengaluru. the company has successfully completed more than 43 Projects The Company have successfully handed over more than 10000 flats Out of 43 Projects, the company has successfully completed 8 Residential Projects at Bangaluru, 14 Residential Projects in the NCR 15 projects at Kolkata & 6 projects in Punjab, Haryana & Jaipur. The company is managed by a well experienced & highly qualified Engineers & Other Professionals with adequate Tools, Plants, Vehicles & Shuttering material etc.
Company has already completed 5 nos. of AFNHB Projects since 1991 to the entire satisfaction of Allotters' and AFNHB. The Company has executed Project for various Clients. Some of the Esteemed Organizations for which the Company have executed the Project are as under: AIR FORCE NAVAL HOUSING BOARD ARMY WELFARE HOUSING ORGANISATION CENTRAL GOVERNMENT EMPLOYEES WELFARE ORGANISATION TISCO EMPLOYEES HOUSING & WELFARE SOCIETY EMAAR GROUP. ELDECO GROUP INDIAN RAILWAY WELFARE ORGANISATION GHAZIABAD DEVELOPMENT AUTHORITY DELHI DEVELOPMENT AUTHORITY KOLKATA METROPOLITON DEVELOPMENT AUTHORITY LIFE INSURANCE CORP. OF INDIA GAS AUTHORITY OF INDIA JAYPRAKASH ASSOCIATES FIRE LUXUR DEVELOPERS PVT. LTD GMR GROUP WAVE INFRATECH PVT. LTD. OIL & NATURAL GAS CORPORATION BENGAL SHELTER HOUSING LTD. KOLKATA
POINT OF CONTACT Headquarters AIR FORCE NAVAL HOUSING BOARD AIR FORCE STATION RACE COURSE, NEW DELHI 110 003 TEL: 011-23793462 / 63 FAX: 011-23014942 EMAIL directorgeneral@afnhb.org / WEBSITE afnhb.org Site Office GP CAPT BR DESSA - PROJECT DIRECTOR TEL - 09990195959 Architect M/s Gian P Mathur & Associates Pvt Ltd C-55, East of Kailash New Delhi 110065 Contractor M/s Mitra Guha Builders (India) Co C-21, 1st Floor, Sector 2 Noida 201 301 (UP)
SCHEME IS NOW OPEN FOR ARMY PERSONNEL ON FIRST COME FIRST SERVE BASIS THANK YOU