Schedule "A Fees (Planning Advisory Program)

Similar documents
Hamilton Conservation Authority Watershed Planning and Engineering

PERMIT APPLICATION FORM

OWNERSHIP DETAILS. Mailing Address: City / Town: Postal Code. Phone Business: ( ) Residence: ( ) FAX: ( )

OWNERSHIP DETAILS. Mailing Address: City / Town: Postal Code. Phone Business: ( ) Residence: ( ) FAX: ( )

OWNERSHIP DETAILS. Mailing Address: City / Town: Postal Code. Phone Business: ( ) Residence: ( ) FAX: ( )

TRCA Administrative Fee Schedule for ENVIRONMENTAL ASSESSMENT and INFRASTRUCTURE PERMITTING SERVICES IMPLEMENTATION GUIDELINES May 2014

5.0 Permit Applications

Grey Sauble Conservation 2019 Fee Schedule for All Departments

Date Received: Application Complete? YES / NO

LAND DIVISION COMMITTEE. The meeting was called to order at 9:00 a.m. A quorum was present.

APPLICATION FOR APPROVAL OF A PLAN OF SUBDIVISION or CONDOMINIUM DESCRIPTION Under Section 51 of the Planning Act

City of Prior Lake APPLICATION FOR PRELIMINARY PLAT

REPORT CENTRAL LAKE ONTARIO CONSERVATION AUTHORITY

COUNTY OF BRANT DEVELOPMENT SERVICES DEPARTMENT COMMITTEE OF ADJUSTMENT. Chair and Members of the Committee of Adjustment

Municipality of Brockton Planning Report. Application: Minor Variance Application. Members of the Committee of Adjustment, Municipality of Brockton

City of Prior Lake APPLICATION FOR COMBINED PRELIMINARY AND FINAL PLAT

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services.

City of Prior Lake APPLICATION FOR REGISTERED LAND SURVEY

CITY OF CORNING TENTATIVE MAPS

RESIDENTIAL / DEVELOPMENT PROJECTS

EXCERPTS FROM HALIFAX REGIONAL MUNICIPALITY CHARTER

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Floodplain Management and Regulation

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Douglas County Comprehensive Master Plan. 5.2 Floodplain Management and Regulation

PLANNING RATIONALE ONTARIO LTD. APLLICATION FOR PLAN OF SUBDIVISION APPROVAL

Committee of Adjustment Hearing Thursday, September 1, 2016 at 7 p.m. 225 East Beaver Creek Road, Richmond Hill, ON 1 st Floor (Council Chambers)

APPLICATION PROCEDURE

Private Landowner Contribution for Erosion Control Works

A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT

The Corporation of the Town of Orangeville

APPLICATION FOR AN OFFICIAL PLAN AMENDMENT

City of Kingston Report to Planning Committee Report Number PC

County of Peterborough

Committee of Adjustment Agenda

DEVELOPMENT APPLICATION PRE-CONSULTATION FORM

APPLICATION FOR PLAN OF SUBDIVISION/CONDOMINIUM

REGIONAL DISTRICT OF NANAIMO BYLAW NO. 1469

IMPORTANT NOTICE MINOR VARIANCE APPLICATION

The Corporation of The Town of Richmond Hill. Schedule of Conditions. Draft Plan of Subdivision. File 19T(R)-16002

Fee Type Make Cheque Payable to Fee. (Minor - easement, lot addition, lease, etc.) City of Burlington $3, City of Burlington

Complete applications are due by 2:00 p.m. on the submission cut-off date.

Citizens Advisory Committee 5/16/2013 6:00 p.m.

Committee of Adjustment Information for Applications for Consent (Severance)

The Corporation of The Town of Richmond Hill. Schedule of Conditions. Draft Plan of Subdivision. File 19T(R) Town of Richmond Hill

50 Humberwood Boulevard - Zoning By-law Amendment Application - Preliminary Report

TOWN OF HANOVER APPLICATION FOR OFFICIAL PLAN AND/OR ZONING BY-LAW AMENDMENT Under Sec. 22 (4) of the Ontario Planning Act, R.S.O.

Regulatory Fee Schedule

Site Alteration By-law

COMPLETENESS OF APPLICATION:

Development Application Type

Please read the entire application form prior to completing

CONSENT APPLICATION FORM

TENTATIVE PARCEL MAP APPLICATION GUIDE TENTATIVE PARCEL MAP APPLICATION REQUIREMENTS

Grand River Conservation Authority

YCCD EROSION & SEDIMENT POLLUTION CONTROL (E&SPC) PROGRAM SERVICES FEE SCHEDULE, RULES, & GUIDELINES

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

Application for Consent Under Section 53 of the Planning Act Committee of Adjustment of the Municipality of Shuniah

Implementation Tools for Local Government

APPLICATION FOR SUBDIVISION APPROVAL OF A SKETCH PLAN with checklist

Residential Minor Subdivision Review Checklist

Subdivision/Condominium Approval Procedures

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST

PLANNING PROCEDURES AND FEES BYLAW

TOWNSHIP OF GEORGIAN BLUFFS APPLICATION FOR AMENDMENT TO THE ZONING BY-LAW

LAND DIVISION COMMITTEE. In the absence of Chairman, R. Strachan, it was moved by C. Tyson that D. Murphy Chair today s meeting.

ENVIRONMENTAL ASSESSMENT / INFRASTRUCTURE PROJECTS

FLOOD HAZARD AREA LAND USE MANAGEMENT

Greenfield Development Requirements

Zoning Permit Application Cover Page

Committee of Adjustment Agenda

Date: February 15 th, Based on the analysis contained below, Development Services staff recommends:

CHAPTER 3 PRELIMINARY PLAT

Easement Program Guidelines for Water Resources and Stream Work

Proponent s Guide to the NCC s Federal Land Use, Design and Transaction Approvals Process

MUNICIPALITY OF THE TOWNSHIP OF McNAB/BRAESIDE GUIDELINES

Application for Plan of Subdivision (Section 51 of the Planning Act) or Condominium Description (Section 50 of the Condominium Act)

TARIFF OF FEES FOR PROCESSING OF PLANNING APPLICATIONS GENERAL TERMS

LAND DIVISION COMMITTEE. MOTION #LD MOVED BY: C. Tyson SECONDED BY: D. Murphy

Instructions for APPLICATION FOR CONSENT

BRISTOL CONSERVATION COMMISSION INLAND WETLANDS AGENCY FORM IW-1 (Application for a Wetlands Permit)

ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW

LAND DIVISION COMMITTEE. MOTION #LD MOVED BY: C. Tyson SECONDED BY: D. Murphy

Planning and Development Department Form One Property and Applicant Information

Committee of Adjustment CONSENT INFORMATION/GUIDELINE The following is preliminary information only

Prepared for: Ontario Limited

THE CORPORATION OF THE MUNICIPALITY OF MISSISSIPPI MILLS SITE PLAN CONTROL APPLICATION FORM Procedure Guide June 12, 2017

CONDOMINIUM APPLICATION GUIDE application for approval under Section 51 of the Planning Act, R.S.O. 1990

Preliminary Subdivision Application (Major) (Four (4) lots or more)

Staff Report for Committee of the Whole Meeting

TOWNSHIP OF EGG HARBOR ZONING BOARD ADJUSTMENT CHECK LIST

GOVERNMENT CODE SECTION GOVERNMENT CODE SECTION 65302

Consolidated as of May 14, 2012

The Corporation of the Township of Oro-Medonte

Application for Sketch Plan Review

Schedule A to Bylaw No. 477, 2013 APPLICATION FEES 1. Official Community Plan Bylaw Amendment $ Zoning Bylaw Amendment $ Simultaneous Of

BACKGROUND There are 23 flood control structures in the Upper Brushy Creek Water Control and Improvement District (District). See attached map.

Fees and charges. Consenting and property information fees and charges. Effective from 1 July 2018

FOR TOWN USE ONLY. Fifteen (15) reduced copies of the proposed draft plan of subdivision or condominium (either 8 ½ x 11 or 8 ½ x 14 format).

TOWN OF MARKHAM ONTARIO

Transcription:

Approvals Fee Schedule (Effective January 1, 2018) Schedule "A Fees (Planning Advisory Program) - 2018 Planning Application Type Fee is for provision of comments to municipal approval authority on site specific development applications pursuant to the Ontario Planning Act. Technical report review fees (Schedule C ) shall additionally apply. CA Act regulatory approvals (Schedule B ) normally follow planning approvals where required. Natural hazards", "natural heritage", water quality and quantity", & private on-site services review Official Plan Amendments Standard Major Zoning By-law Amendments Minor Standard Major Minor Variance Applications Standard (additions and other minor works) Major and / or new construction Site Plan Control! Single Residential $720 $3,610 $360 $550 $835 $360 $500 $360! Multiple Residential, Commercial, Industrial Standard Major $975 $2,445 Lifting 30 Centimetre Reserve $210 Consent to Sever (per application) Standard $450 Administrative Clearance of Conditions (No site visit required; for site visit add surcharge of $150) $210 Plan of Subdivision / Part lot Control / Condominium (with no previous site plan circulation) Charges are for the review to provision of Conditions of Draft Approval only on a new application; any involvement subsequent to draft approval is subject to additional charges. $3,610! Clearance of Conditions for Subdivision Registration (per phase) $1,810! Draft Plan Approval Revisions (alterations to site/plan layout) $1,810! Draft Plan Extension (original conditions about to lapse) $3,610 All application types after two years of dormancy REVISION from initial submission (all application types) 50% of fee in effect at time of reactivation or change.

City of Ottawa Schedule A Screening Fee - collected at Ottawa Client Service counters Circulation varies with Ward as per agreement with City Where full review required CA prepares & transmits invoice for additional review fees over and above screening fee as applicable; technical report review fees may additionally apply. CA receipt of all required fees in full is required prior to release of comments to the City. 2018 Committee of Adjustment * $105 Zoning Amendments * $105 * The Screening Fee applies inside the Urban Boundary only as defined on Schedule B to the City of Ottawa Official Plan approved SCHEDULE at the time of application. B (Section 28 of the Conservation Authorities Act) Notes for Schedule A: Reviews are undertaken in accordance with the Conservation Authority s mandate and are directly related to circulation requirements under the Planning Act and the 2001 Provincial Memorandum of Understanding on Procedures to Address Conservation Authority Delegated Responsibility. Some reviews are completed under Municipal Memorandums of Understanding to provide planning advice and agreements with the Provincial and Federal governments. Section 21(1) (m) of the Conservation Authorities Act enables Conservation Authorities to charge fees for such services. Fees are exclusive of technical report review fees (refer to Schedule C). All fees must be paid prior to the release of written comments to an approval authority. For concurrent applications, one fee (the highest) applies. Application Category: Minor no technical studies Standard one technical study Major more than one technical study The CA reserves the right to charge additional fees in the event that the review requires a substantially greater level of effort than the norm, additional site visits etc., OR where additional processing past the initial submission period is required. A reactivation fee shall be charged for applications which have been left dormant by the proponent for a year; this fee shall be calculated at 50% of the applicable fee in effect at the time of reactivation. Fees are exclusive of Technical Report Review Fees (see Schedule C ); technical report review fees shall be charged additionally on a per issue basis. Such fees would typically apply to the review of stormwater management reports, hydraulic or hydrology reports, geotechnical analysis, EIS reports, site specific natural heritage studies etc.

Approvals Fee Schedule (Effective January 1, 2018) Schedule B Fees (Section 28 of the Conservation Authorities Act) - 2018 Development, Interference with Wetlands and Alterations to Shorelines and Watercourses Regulation Pursuant to the provisions of Ontario Regulation 174/06 and the RVCA s regulation policies, permission is required prior to undertaking development in or on hazardous areas, in or adjacent to wetlands and before straightening, changing, diverting or interfering in any way with the existing channel of a lake, river, creek, stream or watercourse or prior to changing or interfering in any way with a wetland. Application or Project / Proposal Type Project descriptions are meant only to be typical examples; some projects may have the fee established on a case by case basis dependent on the perceived complexity of the project. 2 Fees in this schedule are exclusive of Technical Report Review Fees (see Schedule C ) which may be additionally charged. Project type & associated fee 1, 2 Development 3 Interference Wetland Alteration to Watercourse 4 Minor Works $245 Minor Fill placement i.e., replacement septic system <50 3 (65 yards 3 ) Auxiliary or Farm buildings outside floodplain but within regulated area Additions without foundations outside floodplain but within regulated area Minor Fill placement and/or grading within adjacent lands i.e., replacement septic system, minor site grading for existing development. Shoreline Erosion Protection less than 15 linear (50 feet) Single span bridge deck replacement <30 across Culvert Replacement (like for like) < 25 and <1.0 metre diameter Vegetation debris removal from existing watercourse (clean out) Directional Drill for utility crossing with channel width <1.5 Small residential dock shore interference Small Project $590 Single family residential addition less than 20% or 20 2 (215 feet 2 ) to existing residence Auxiliary building and/or structure at existing grade less than 538 feet 2 Foundation replacement or reconstruction Farm auxiliary building <than 92.9 2 (1000 feet 2 ) Swimming pool in flood or slope hazard area Fill placement 50-100 3 Fill placement grading within adjacent lands for new development such as new residential construction and new septic systems Municipal recreational pathways <500 linear Private road repair and municipal road reconstruction <500 linear Shoreline Erosion Protection 15-50 linear Replacement culvert >25 (like for like) to 30 in length (<1 metre diameter) Bridge deck replacement >30 New culvert or culvert with change in size <1m diameter Watercourse alteration <100 linear Water crossing - Directional drill for channel width 1.5-3

Typical Project $940 Large Project $1,850 Major Project $2,420 Single family addition >20 2 Single family dwelling reconstruction with no addition. Fill project 100-500 3 Single family residential additions >50 2 Single family dwelling reconstruction with addition proposal New Single-family dwelling with site grading and servicing in flood or slope hazard Cut and fill project 500-1000 3 Large single residential proposal or major addition Multiple residential units/block or institutional, commercial buildings <464 2 Major cut & fill project 1000-2500 3 Municipal recreational pathways >500 linear Private road repair and municipal road reconstruction >500 linear Shoreline erosion protection >50 Culvert new or replacement >1metre diameter (0.8 square in area) up to 2 diameter (<3.25 square in area) Watercourse alteration 100-500 linear Water Crossing - Directional drill channel width >3 Water Crossing - open cut with channel width <3 New roadway/access construction Shoreline erosion protection and / or marine facilities (dock, boat port, boat slip) Culvert new or replacement >2 (3.25 square in area) Watercourse alteration 500-1000. Water Crossing - open cut with channel width >3 or < 10 Commercial shoreline project Infrastructure new bridge construction, stormwater management pond /cell, major utility crossing Watercourse channelization >1000 Water crossing open cut with channel > 10 wide

Fill Deposit Level 1, 2 or 3 application Level 4 or 5 application Planting Deposit Both deposits are refundable (less 10% administration fee) at project completion subject to approval conditions having been satisfied. The CA does not pay interest on monies held against projects. For fill, submission of satisfactory as built grades indicating conformity with CA approval are required prior to reimbursement. Planting deposit may be waived for approved RVCA stewardship projects $1,560 $3,120 $500 (commercial/ industrial / institutional assessed separately @ $500 / 30 of water frontage) Revisions Relates to applications which, prior to expiry, are modified or amended following the application being deemed complete and / or approved (overall scale of project remains the same). Also includes review or modification to previously reviewed sediment and erosion control plans. 50% 2 surcharge on current fee Review of Applications Retroactive to Project Commencement 100% 2 surcharge on current fee S. 28 Development Review Hearing (see also www.rvca.ca for hearing procedures) $195 Property Inquiries and Clearance Letters For written responses to legal, real estate and related financial (including CMHC) inquiries by landowners or others on their behalf; includes flood plain map (where applicable) and photocopy costs File search only - File Search - expedited service = <5 business days provided for response! Site inspection - additional $160 surcharge $245 $490 Review/Stamp Plan Confirmation that development proposed is outside regulation limits to Ontario Regulation 174/06 (provides clearance to municipal building official as required) $75 THIS SCHEDULE MUST BE READ IN CONJUNCTION WITH NOTES AND INTERPRETATIONS APPENDED

SCHEDULE "B" FEES (SECTION 28 OF THE CONSERVATION AUTHORITIES ACT) - 2018 NOTES 1 Fees are approved by the CA Board of Directors and apply to application review only; acceptance of an application as complete is not to imply permission may be granted; permission will be forthcoming only if submissions address statutory requirements and are in conformity with approved CA policies (available at www.rvca.ca or from RVCA directly) in effect at the time an application is made or where allowances are granted by the Authority s Executive Committee. All fees are payable at the time the application is submitted failing which the application cannot be deemed complete or processed. 2 The CA reserves the right to charge additional fees in the event that the review requires a substantially greater level of effort than the norm, additional site visits etc., OR where additional processing past the initial submission period is required. A reactivation fee shall be charged for applications which have been left dormant by the proponent for a year; this fee shall be calculated at 50% of the applicable fee in effect at the time of reactivation. Fees are exclusive of Technical Report Review Fees (see Schedule C ); technical report review fees shall be charged additionally on a per issue basis. Such fees would typically apply to the review of hydraulic or hydrology reports, geotechnical analysis, EIS reports, site specific natural heritage studies etc. 3 Development: for definition see Section 28 (25) of the Conservation Authorities Act of Ontario (R.S.O. 1990, Chpt. 27) 4 Watercourse: for definition see Section 28 (25) of the Conservation Authorities Act of Ontario (R.S.O. 1990, Chpt. 27)

Approvals Fee Schedule (Effective January 1, 2018) Schedule C Fees: Technical Report Review - 2018 Reviews are prepared by qualified professionals in the fields of water resources engineering, groundwater science, site servicing, geotechnical engineering, environmental assessments, ecology, and planning to support appropriate development. Our reviews involve evaluation of whether the applicable guidelines and legislation have been appropriately addressed. Report Review Development Type Fee Normal Review (20 business days) - Flood plain hydrology analysis - Geotechnical reports (unstable soils and slopes) - Wetland hydrologic impact analysis - Environment impact studies - Stormwater management - Grading and drainage plan - Aquatic habitat assessment/fish habitat impact - Hydrological assessment - Groundwater and terrain analysis Major Projects Development area 0.5 hectares Development area 0.5 hectares - 2hectares Development Area >2hectares - < 3hectares Development area > 3 hectares - 5 hectares Development area > than 5 hectares $410 $800 $1,100 $1,700 $2,655 Hourly (Schedule D) Aggregate Resources Act Application Reviews (plus Schedule C fees as applicable) $3,610 Notes for Schedule C Technical report review services are tracked per file on an hourly basis. Where reviews exceed the standard allocated review time, or require multiple submissions and re-reviews, RVCA reserves the right to charge an hourly professional rate (refer to Schedule D) in addition to the initial fee. Major projects are those with a high level of concern about the local environment, complex ecological, ground water and surface water interactions and which may require RVCA staff attendance at multiple meetings with proponents, consultants or public meetings to satisfy regulatory requirements.

Approvals Fee Schedule (Effective January 1, 2018) Schedule D Fees: Information & Professional Services - 2018 Product / Service Fee Staff Time Administrative Rate Technical Rate Professional Rate Digital Data Ontario Stream Assessment Protocol monitoring data, GIS files aerial photography 1 First Item: Additional Item: $55 / hour $75 / hour $85 / hour $145 $55 / item plus staff time Paper & Digital Maps Customized Maps Floodplain: Other: $70 / item $50 / item plus staff time Technical Services Rate Reports Base Cost (digital and paper) Small: 1-30 pg: Med: 31-100 pg: Large: > 100 pg: $125 $245 $370 Models: Photocopying: Black and White Colour $0.50 / page $1.00 / page plus staff time Hydraulic Model (Digital Copy) HEC II, HEC RAS model files 1 Hydraulic Model (Digital Copy) HEC HMS, SWMHYMO model files 1 Watershed Model (Digital Copy) Regional Mike11 model files $1,000 plus staff time $1,000 plus staff time $10,000 plus staff time Note: A copy of the updated input and output files and revised floodplain maps must be provided to RVCA. 1 a signed digital data license agreement with the RVCA is required.