The Miramar Santa Monica

Similar documents
ii. Project description

Bidders Conference 4 th /5 th & Arizona

MEMORANDUM. C3A District Shoreland Overlay District 32,055 square feet / 0.74 acres. West Calhoun, adjacent to Cedar-Isles-Dean

MEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres

Planning Commission Report

MACK URBAN SITE 1 & 1a (VTT-72702) PROJECT DESCRIPTION (REVISED )

PROJECT DESCRIPTION STATION 1300

Ann Arbor Downtown Zoning Evaluation

Table of Contents. Concept Plan Overview. Statement of Compliance with Design Guidelines. Statement of Compliance with Comprehensive Plan

III. PROJECT DESCRIPTION

EVENT SPACE BANQUET HALL RETAIL DTLA LEASE OPPORTUNITY Adjacent to Fashion District & Arts District

DTLA RETAIL OR RESTAURANT FOR LEASE Adjacent to Fashion District & Arts District E WASHINGTON BLVD, LOS ANGELES, CA Offering Memorandum

M-43 CORRIDOR OVERLAY ZONE

THE COHEN GROUP OFFERING MEMORANDUM PALMWOOD DRIVE LOS ANGELES, CA JOSH COHEN CA:

The 12.1-net acre property is the premier development site in the western United States, sitting at the gateway of San Diego s Broadway office

3.0 Project Description

FLEX/CREATIVE OFFICE SPACE FOR LEASE Adjacent to Fashion District & Arts District

Planning Commission June 25, Lincoln Boulevard

Parking Challenges and Trade-Offs

10 St Mary Street - Zoning Amendment Application - Preliminary Report

Cambridge Planning Board Zoning Submission Overview 7/25/2017

Waterfront Development

1237 W. 7 th Street. DLANC: Planning and Land Use Committee Meeting. November 21, 2017 DIR DB-SPP ENV EAF

TRANSIT-ORIENTED DEVELOPMENT PLAN EXISTING CONDITIONS REPORT LAWRENCE TO BRYN MAWR MODERNIZATION

5 to 25 Wellesley Street West and 14 to 26 Breadalbane Street - Zoning Amendment Application - Preliminary Report

April 12, 2019 ENVIRONMENTAL CASE NO.: ENV EIR PROJECT NAME: PROJECT APPLICANT:

ATTACHMENT A REQUEST/BACKGROUND INFORMATION VENTURA/TYRONE REDEVELOPMENT PROJECT PROJECT OVERVIEW/REQUEST BACKGROUND Ventura Boulevard

FOR LEASE RETAIL SPACE

Submission 1 - April 21, 2015

Proposed Development at Ajax Plaza Windcorp Grand Harwood Place Ltd.

DTLA PRIME CREATIVE OFFICE SPACE LEASE OPPORTUNITY Adjacent to Fashion District & Arts District

FACTS & HIGHLIGHTS. The community will attract young professionals and provide a housing option for empty nesters.

RETAIL SPACE IN BOULDER S NEWEST TRANSIT-ORIENTED DEVELOPMENT Bluff Street and 3390 Valmont Road Boulder, Colorado

20 Edward Street Zoning Amendment Application - Preliminary Report

LITTLE MOUNTAIN ADJACENT AREA REZONING POLICY

Cambridge Ordinance Committee Zoning Submission Overview 8/2/2017

Composition of traditional residential corridors.

Announcing an unparalleled mixed-use development at the most desirable location in Greater Cincinnati.

A 290-UNIT RESIDENTIAL DEVELOPMENT IN DOWNTOWN SAN JOSE

PLANNING COMMISSION MAY 3, 2018 PUBLIC HEARING

Puyallup Downtown Planned Action & Code Changes. January 10, 2017

III. PROJECT DESCRIPTION

STAFF REPORT. March 14, Toronto and East York Community Council. Director, Community Planning, South District

Urban Design Brief 6233, 6237, 6241 and 6245 Main Street, Stouffville Pace Savings and Credit Union June 15, 2012

Community Advisory Committee (CAC) Meeting #7 West Anaheim Youth Center May 26, 2016

CREATIVE OFFICE/SHOWROOM SPACE DTLA LEASE OPPORTUNITY Adjacent to Fashion District & Arts District

WALNUT CREEK PLANNING COMMISSION STAFF REPORT

BEVRLYRLY. Planning Commission Report

NOTICE OF PREPARATION/NOTICE OF PUBLIC SCOPING MEETING

4 LAND USE 4.1 OBJECTIVES

The demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken.

SUBJECT: AMENDMENTS TO TITLE 13 DATE: June 5, 2017 OF THE SAN JOSE MUNICIPAL CODE

A APPENDIX A: FORM-BASED BUILDING PROTOTYPES

174 North King Street Workforce Housing Development Downtown Jackson, Wyoming

Jasper 115 Street DC2 Urban Design Brief

Memo to the Planning Commission HEARING DATE: JULY 6, 2017

Downtown Development Focus Area: I. Existing Conditions

Montreal Road District Secondary Plan [Amendment #127, October 9, 2013]

College Avenue. Sowers Street. Calder Way. Beaver Avenue

EAST WEST PARTNERS SCOTT MURRAY LAND PLANNING, INC.

Chapter 7 Riverfront District

Community Workshop #1 October 15, Redwood City. Regulatory Approaches to Implementing a Community Benefits Program

FOR SALE > MULTIFAMILY/COMMERCIAL REDEVELOPMENT OPPORTUNITY

Plan Dutch Village Road

TEN LIGHT MIXED USE 10 Light Street Baltimore, MD

From Policy to Reality

40-58 Widmer Street - Zoning Amendment Application - Preliminary Report

NAPERVILLE PLANNING AND ZONING COMMISSION AGENDA ITEM

Text Amendment July 29, Charlotte - Mecklenburg Planning Department

County Lot C Redevelopment

COMMUNITY BENEFIT REQUIREMENTS & IMPACT FEES FOR DEVELOPMENTS IN VARIOUS CITIES

Requested Information for 6701 W Sunset 2 messages

30 Widmer Street and Adelaide Street West - Zoning Amendment Application - Preliminary Report

Chapter 10: Implementation

WESTPORT CUPERTINO GENERAL PLAN AMENDMENT AUTHORIZATION

Wheaton Sector Plan. Preliminary. Recommendations. Montgomery County Planning Board

MEMORANDUM. DATE: August 31, Honorable Mayor and City Councilmembers Patrick Klaers, City Administrator. Matthew Bachler, Associate Planner

Kassner Goodspeed Architects Ltd.

Yonge Street and 3 Gerrard Street East - Zoning Amendment Application - Preliminary Report

Accessory Coach House

SUMMARY. Trinity Partners / LISTING BROKER. AVAILABLE: 4th Quarter Finished. 733 spaces in on-site garage. Designed to be Energy Star Rated

Church Street and 117 Dundas Street East - Zoning Amendment Application - Preliminary Report

4.2.8 Westwood/VA Hospital Station Area

Upper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive

APARTMENT HOMES 7501 MONTGOMERY BLVD NE ALBUQUERQUE, NM A 210-UNIT MULTIFAMILY OPPORTUNITY

Part 9 Specific Land Uses - Multi Dwelling Housing

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

8350 Broad Street, Tysons

{ ( ' INCENTIVES & BONUSES

1417, , 1427 & 1429 Yonge Street - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

M E M O R A N D U M PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA PLANNING DIVISION

3.1 PZ / 20 W. Northwest Highway / Nicholas & Associates / Plat of subdivision and conditional use for a final planned unit development

Bylaw No , being "Official Community Plan Bylaw, 2016" Schedule "A" DRAFT

Director, Community Planning, Etobicoke York District

ENTANA medical plaza TARZANA S NEW CLASS A MEDICAL / OFFICE DEVELOPMENT FOR LEASE. John La Spada Lic

Planning Commission Report

Waikïkï Special District Amendments 2010 Initiative

serving retail on the ground floor street frontage with offices and housing above and behind. Purpose and Intent: To create a vibrant pedestrian

S ANTA B OULEVARD M ONICA FOR SALE PRICE REDUCTION PRIME MIXED-USE ALONG SANTA MONICA BOULEVARD SANTA MONICA, CA 90404

CITY COUNCIL PUBLIC HEARING MARCH 20, 2017 SUBJECT:

Transcription:

The Miramar Santa Monica Project Description The Santa Monica Miramar Hotel (the Miramar or the Hotel ) has been an institution in the City of Santa Monica since originally opening on the site in 1920. As the Hotel approaches 100 years of age, it is in need of a comprehensive redevelopment in order to remain competitive and regain its stature as one of the premier hotel destinations in Southern California. The proposed Miramar Santa Monica (the Redevelopment Project ) is a mixed-use hotel, retail and residential project, providing the finest in new hotel room and function space product, food and beverage offerings and public amenities and contributing in a meaningful way to the pedestrian experience in Downtown Santa Monica. When complete, the Redevelopment Project will create a new landmark and a spectacular addition to Downtown Santa Monica. It features the preservation of two local landmarks and the addition of significant new open spaces encouraging pedestrian activity to and through the site. It celebrates the site s incredible history, while incorporating bold, contemporary architecture, stunning landscape design and aiming for the highest levels of sustainability. The Redevelopment Project is not only consistent with but implements and realizes the City s bold vision for Downtown Santa Monica set forth in the 2010 Land Use and Circulation Element ( LUCE ) and the recently-adopted Downtown Community Plan ( DCP ) and offers significant community benefits including the addition of a 100% affordable housing building at 1127/1129 Second Street. Consistency with Local Plans The LUCE sets forth a series of guidelines for the development of the Downtown and specifically recognizes the importance of the Miramar site, identifying it for focused new investment, exceptional planning and design and substantial community benefits. The DCP built upon the foundation of the LUCE and provided specific direction on height, density, community benefits and six overarching principles implemented through goals, policies, standards and guidelines. The goals and objectives of the LUCE and the DCP have served as the guiding vision for our distinguished design team. Existing Conditions The Miramar site is a full city block, bounded by Wilshire Boulevard on the South, Ocean Avenue on the West, California Avenue on the North and Second Street on the East. Much of the site is enclosed and walled off from the adjacent streets by buildings or tall walls. The existing 301-room hotel has approximately 262,284 sf of floor area, comprised of the following: - The six-story Palisades Building, originally constructed in 1924, located at the southwest corner of Second Street and California Avenue - The ten-story Ocean Building, with an elevator tower that goes up to twelve stories - A two-story meeting and back of house building - Several one and two-story structures along Ocean Avenue and California Avenue The site has two local landmarks the Palisades Building, landmarked in 2013, and the Moreton Bay Fig Tree, planted in 1879 and landmarked in 1976. 1

The site s primary vehicular access is from Wilshire Boulevard and wraps around the Moreton Bay Fig Tree. A secondary vehicular access, used frequently when the primary access is closed for special events, is located along Ocean Avenue. The site s Wilshire Boulevard frontage is not friendly to pedestrians. It is occupied by two surface parking lots sitting behind tall brick walls, and two driveways leading to/from the Hotel s main entrance cause frequent conflicts with pedestrian activity. Additional surface parking for the Miramar Hotel is located at 1127/1129 Second Street. With only [103] on-site parking spaces and a total of 167 parking spaces, the Hotel is currently significantly underparked. Valets often must leave the site to park offsite, and most Hotel employees currently park on neighboring residential streets. Proposed Project The proposed Miramar Santa Monica is a thoughtful blend of extraordinary architecture and landscape design integrated with the preservation and celebration of the historic aspects of the site. The Redevelopment Project will create a new mixed-use luxury hotel with stunning new open spaces that encourage pedestrian activity to and through the site. These new open spaces (more than 50% at ground level) will be activated with new food and beverage offerings open and available to the public, offering stunning outdoor dining and event venues with views of the Santa Monica Bay. 2

Aerial View from Ocean Avenue View from Wilshire Boulevard and Second Street 3

Site Planning and Design As shown in the site plan below, the Redevelopment Project opens the site in all directions to provide significant new pedestrian access to and through the site. Approximately 52% of the site (nearly 100,000 sf) is proposed as ground floor open space. The new design incorporates sweeping curves that celebrate and embrace the historic Moreton Bay Fig Tree in a contemporary building called the Ocean Building. The tree is newly protected and featured at the center of an incredible new open space of approximately 36,000 sf. With the removal of the tall walls along Ocean Avenue, the site visually reconnects to Palisades Park (as it did historically) with a new publicly-accessible garden area (approximately 14,000 sf) at the corner of Ocean Avenue and Wilshire Boulevard. Site Plan The new design invites community and public use of the site through the publicly-accessible open spaces with exceptional views of the Moreton Bay Fig Tree, a prominent piece of public art at the corner of Wilshire Boulevard and Ocean Avenue, new food and beverage offerings, retail spaces and improved ballroom and function spaces. A key input from our community outreach was the need for a larger main ballroom to accommodate larger special events. As a result, in place of the existing 7,500 sf Main Ballroom and 2,500 sf Junior Ballroom, the new plan includes a divisible main ballroom with nearly 10,000 square feet, 20 + tall ceilings, state-of-the-art audiovisual technology and both indoor and outdoor pre-function space adjacent to the Moreton Bay Fig Tree. To help address traffic concerns, the Redevelopment Project provides for a reduction in total meeting space from the existing hotel. In order to prioritize the pedestrian experience on Wilshire Boulevard, the main hotel entry will be relocated to Second Street from Wilshire Boulevard. A grand opening (approximately 150 wide and 30 tall) through the building is provided on Second Street to provide visual and pedestrian permeability 4

through the site and connect the Moreton Bay Fig Tree, Palisades Park, and the ocean back to Second Street (see rendering below). Second Street Entrance To take maximum advantage of Santa Monica s wonderful year-round climate, the design includes significant outdoor spaces for all areas of the building. The proposed plan has a range of building heights, with almost 70% of the site below 84 and an average height of 48-8. Consistent with the DCP, the maximum height of the new, 10-story Ocean Building is 130. As the Ocean Building wraps around the Moreton Bay Fig Tree, it steps down in height to seven stories (91 ) along Second Street and further down to three stories (40 ) and two stories (28 ) along Wilshire Boulevard. As shown on the site plan, the proposed buildings cover only 48% of the site, allowing for grand open spaces. 5

View from Ocean Avenue View of Café from Public Garden Terraces 6

Preservation of City Landmarks: The centerpiece of the project is the historic Moreton Bay Fig Tree. Rather than being surrounded by a driveway, as it is today, the tree has been thoughtfully integrated into a magnificent new open space with a wood deck to protect the roots and enhance the long-term health of the tree. The new design will allow pedestrian access to and public enjoyment of the tree and the adjacent new food and beverage offerings with stunning views of the ocean. The Fig Tree Deck The Palisades Building will be adaptively re-used and rehabilitated with design inspiration taken from historic images of the building from the 1940 s-1950 s. The Palisades Building visually connects to the historic Moreton Bay Fig Tree through a new, 2-story glass hotel lobby at the base of the Ocean Building. The newly rehabilitated Palisades Building will be celebrated with an outdoor terrace directly off the lobby (see rendering of the Palisades Terrace on the following page). 7

The Palisades Terrace Parking and Circulation: As guided by the LUCE, the Hotel s main vehicular entrance will be relocated to Second Street to prioritize the pedestrian experience, avoid pedestrian/vehicular conflicts and avoid mid-block conflicts on Wilshire Boulevard. A new, 428-space subterranean parking garage will be directly accessed from this entry. Providing adequate on-site parking for employees will free up substantial amounts of parking on neighborhood streets adjoining the Hotel, thereby addressing a longstanding issue in the local neighborhood. Two additional entrances to the subterranean parking are provided: a private entry on Ocean Avenue for residents only and an entry on California Avenue for employees only. By providing adequate on-site parking, well over a hundred daily valet trips made to off-site locations will be eliminated. Convenient bicycle parking (short term and long term) will be dispersed throughout the site to encourage bicycle access. This, combined with the improved pedestrian access, an improved vehicular site access plan, enhanced TDM plan and targeted programmatic revisions, will facilitate the traffic flow and circulation on the streets and intersections around the Hotel. According to a preliminary traffic study by Linscott Law and Greenspan (LLG), the proposed project is forecast to be essentially traffic neutral on an overall basis during the peak traffic periods when compared to the existing Hotel, with an estimated reduction in trips in the key weekday PM peak period. 8

Project Summary: Following is a summary of the proposed program for the project. Hotel: 312 guestrooms 13,000 sf of meeting space, including an enlarged ballroom at 10,000 sf 11,500 sf of food and beverage spaces, with new outdoor dining spaces open to the public 12,500 sf of spa and fitness 6,600 sf of retail space, including 5,500 sf of ground floor retail along Wilshire Boulevard Open Space: Significant new ground floor open space (52% of the site / approximately 100,000 sf) activated by adjacent food and beverage offerings open to the public - Approximately 14,000 sf of publicly-accessible open space at the corner of Wilshire and Ocean, including a prominent work of public art Residential: Up to 60 market rate condominiums 100% affordable housing project on Second Street - Number of affordable apartments will be not less than 50% of the number of market rate condominiums Historic Preservation: Preservation and featuring of the two City landmarks - Rehabilitation of the historic Palisades Building - Increased visibility and protection of, as well as increased access to and around, the historic Moreton Bay Fig Tree Parking: Up to 428 on-site underground parking spaces (plus 49 aisle spaces) to meet demand for all guests, residents, employees and visitors Consistency with the Downtown Community Plan: - 130 maximum height vs. DCP maximum of 130 for the site, (48-8 average height), - 2.6 FAR vs. DCP maximum 3.0 FAR for the site (1.2 net new FAR) o 502,157 total sf (net new 239,873 sf) - 52% ground floor open space (approximately 100,000 sf) consistent with the DCP, plus additional upper level decks - Retail frontage and elimination of driveway curb-cuts on Wilshire Boulevard to enhance the pedestrian experience per the DCP - Expanded sidewalks on Wilshire Boulevard, Ocean Avenue and Second Street consistent with the DCP Sustainability - Approximately 33% water use reduction estimate from existing Hotel - Approximately 29% energy use reduction estimate from existing Hotel - Pursuit of LEED Platinum 9

Project and Community Benefits: As originally identified in the LUCE and the further specified in the DCP, the Miramar has the ability to provide significant community benefits for the City. Per the LUCE and the key priorities identified in the DCP (Section 2.3A, Table 2A.4 and Table 2A.3), the Redevelopment Project includes the following project and community benefits: 1. Significant new affordable housing the project includes an 100% affordable housing building on the Hotel s Second Street lot. Preliminary discussions have begun with Community Corporation of Santa Monica on the optimal mix, affordability and size. In all cases, the affordable apartment count will be at least 50% of the number of market rate condominiums, well above the City s new 30% requirement in the DCP and consistent with the DCP s principle of promoting new housing opportunities 2. Preservation, accessibility and featuring of the two local landmarks on the site, consistent with the DCP s principle to honor history through preservation and context sensitive urban design 3. Providing significant new open spaces for public access and enjoyment. Over 50% of the site dedicated for ground level open space, including an approximately 14,000-sf publicly-accessible garden and several new elevated outdoor dining areas available to the public, consistent with the DCP s principle to focus investment to serve residents, visitors, and employees 4. World-class architectural and landscape design, consistent with the DCP s principle of enhancing the character of Downtown Santa Monica 5. Redeveloping the nearly 100-year old Hotel to restore its prominence as a world-class, fullservice luxury resort offering new and improved banquet and meeting facilities for guests and community organizations, thereby ensuring that the Miramar remains a treasured community asset for another 100+ years 6. Providing world-class public art at one of the most prominent intersections in the City, consistent with the DCP s principle of cultural vitality 7. Enhanced pedestrian and bicycle access to the Hotel, along with improvements in parking and circulation, to facilitate traffic flow and circulation on the streets and intersections around the site, consistent with the DCP s principle of creating a new model of mobility 8. Aggressive sustainability targets on water savings, energy savings and LEED rating, consistent with the City s sustainability goals 9. Providing adequate on-site parking for Hotel guests, residents and visitors, which will free up substantial amounts of street parking and help address the acute parking shortage on neighborhood streets surrounding the site 10. Significant new short-term and long-term bicycle parking for all users of the property 11. Estimated Reduction of weekday PM peak period trips as compared to the existing Hotel, as well as minimal incremental trip generation in the weekday AM and weekend peak periods 12. Generating new jobs (approximately 150) and remaining a union hotel 13. Significantly increasing City tax revenues. A preliminary study by CBRE suggests that at stabilization the Redevelopment Project will provide over $16 million per year in direct City tax revenue ($7.5M net new) and approximately $408 million in direct City tax revenue over the first 20 years of operations ($187M net new), consistent with the DCP s principle of economic vitality 14. Local hiring objectives Comparison with 2013 Proposed Project The Applicant has made numerous changes to its previous project submittal in response to feedback from City staff and its public outreach efforts: 10

- Reduction in maximum building height to 130 (previous submittal was 262 ) - Reduction in total floor area to 2.6 FAR (previous submittal was 2.8 FAR) - Minimum 50% reduction in the number of market rate condominiums to not more than 60 (previous submittal was not more than 120) - Reduction in market rate condominium square footage to 170,000 sf (previous submittal was 249,000 sf) - Increase in the ratio of affordable apartments to market rate condominiums to a minimum of 50% - Increase in number of hotel rooms from 280 to 312 - Increase in project s sustainability goals Aerial View from Wilshire Boulevard and Second Street 11