Zoning Permit Application Cover Page

Similar documents
RESIDENTIAL PLAN APPROVAL AND INSPECTION FEES. 2. Inspection fee $.25 per sq. ft. Minimum Inspection Fee of $25.00

BOROUGH OF BANGOR ZONING PERMIT APPLICATION PACKET. Submission Checklist

PROCEDURE GUIDE AND APPLICATION FOR A DEVELOPMENT PERMIT TO CLEAR AND GRADE A PARCEL OF LAND

City of Midland Application for Site Plan Review

APPLICATION PROCEDURE

Remember, PA One-Call before excavating. Simply dial 811 or

FINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina

Residential Minor Subdivision Review Checklist

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

Septic Tank / Drainfield / Holding Tank Permit Application

Septic Tank / Drainfield / Holding Tank Permit Application

Residential Major Subdivision Review Checklist

Athens Township Zoning Permit

MASTER SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

MCPC MONONGALIA COUNTY PLANNING COMMISSION 243 High Street, Rm 110, Morgantown, WV Phone Fax

COMMUNITY AND DEVELOPMENT SERVICES APPLICATION FOR RESIDENTIAL BUILDING PERMIT HOPKINSVILLE KY

DEVELOPMENT PLAN REVIEW CHECKLIST. To initiate the application, the applicant shall submit to the Administrative Officer:

9. Public (Federal, State, or local

PRE CONSTRUCTION CHECK LIST FOR BUILDING PERMITS

Zoning/Building Permit Application

LAND USE PERMIT INFORMATION PACKET

BAY COUNTY BUILDERS SERVICES DIVISION RESIDENTIAL. MANUFACTURER/MOBILE HOME PLAN REVIEW SUBMITTAL FORM (For HUD approved structures only)

COMMERCIAL SITE DEVELOPMENT GUIDE FOR UNINCORPORATED ST. CHARLES COUNTY

BUILDING PERMIT / ZONING USE PERMIT APPLICATION

E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals)

ZONING PERMIT APPLICATION and INSTRUCTIONS

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

Waterford Owners Association Construction Guidelines

City of Prior Lake APPLICATION FOR REGISTERED LAND SURVEY

APPLICATION PROCEDURE

Cibola County Floodplain Development Permit Application

Charter Township of Garfield Grand Traverse County

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

City of Prior Lake APPLICATION FOR COMBINED PRELIMINARY AND FINAL PLAT

FINAL PLAT CHECKLIST

EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

THE BUILDING PERMIT PROCESS FOR SINGLE-FAMILY DWELLINGS REVISED MAY 2006

City of Prior Lake APPLICATION FOR PRELIMINARY PLAT

BYRON TOWNSHIP ZONING APPLICATION

CITY OF ELSMERE 318 Garvey Avenue, Elsmere KY 41018

Final Plats for Major Residential and Commercial Subdivisions Checklist

ARTICLE 9 SPECIFICATIONS FOR DOCUMENTS TO BE SUBMITTED

R e z o n i n g A p p l i c a t i o n S u b m i s s i o n R e q u i r e m e n t s

PRELIMINARY PLAN CHECKLIST Major Land Development Projects. To initiate the application, the applicant shall submit to the Administrative Officer:

CONOY TOWNSHIP 211 Falmouth Road Bainbridge, Pennsylvania Lancaster County Phone: Fax:

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

LAND USE APPLICATION

Individual Well Individual Septic. Community Well 19. What is the proposed method of sewage disposal? Public. None

PRELIMINARY PLAT Checklist

ZONING COMPLIANCE PERMIT APPLICATION

NEW SINGLE FAMILY RESIDENTIAL

Subdivision (Plat) Checklist

TOWNSHIP OF EGG HARBOR ZONING BOARD ADJUSTMENT CHECK LIST

(voice) (fax) (voice) (fax) Site Plan Review

Secondary Dwelling Unit

Administrative Review Application Blair Township, Grand Traverse County. Blair Township

BUILDING PERMIT APPLICATION

APPLICATION PACKET FOR RESIDENTIAL ADDITION COVER SHEET

FINAL PLAT APPLICATION

CITY OF PANAMA CITY BEACH Building and Planning Department

BOSSIER CITY PARISH METROPOLITAN PLANNING COMMISSION 620 Benton Rd. Bossier City, LA Phone: Fax: PRELIMINARY PLAT

Violet Township requires Zoning and Plans Examination and Building Permits for all new construction.

PLANNING BOARD CITY OF CONCORD, NH MINOR SUBDIVISION CHECKLIST

Residential Low Density Park Zone (RLP) Major Site Development Plan/Plan Amendment Application Packet

APPLICATION FOR PLAN EXAMINATION / BUILDING PERMIT or ZONING PERMIT

Zoning Permit Application

GALLATIN COUNTY Land Use Permit Information & Application

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2016

Zoning Permit Application Information Sheet

SUBDIVISION APPLICATION

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax 360.

SUBDIVISION, PLANNED UNIT DEVELOPMENT, & REZONING STAFF REPORT Date: September 17, 2015

Use permitted by: Right Special Exemption

WASCO COUNTY PRELIMINARY SUBDIVISION APPLICATION

VARIANCE APPLICATION PACKET

Gates County Planning and Zoning

CITY OF EMILY VARIANCE APPLICATION

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT

PROTOCOL FOR ZONING PERMIT SUBMITTAL

SWIMMING POOL PERMIT APPLICATION PACKET

REGULAR FINAL PLAT SUBDIVISION APPLICATION

STREAM BUFFER VARIANCE APPLICATION PACKET

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) APPLICANT: Name:

PERMIT AND SUBMITTAL REQUIREMENTS (PR)

COMMERCIAL/ INDUSTRIAL PERMIT APPLICATION

ALEXANDRIA TOWNSHIP Land Use/Building Permit Application

MINOR SUBDIVISION APPLICATION

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (PRELIMINARY PLAT)

SPECIAL USE PERMIT APPLICATION CHECKLIST BUCKINGHAM COUNTY OFFICE OF ZONING AND PLANNING MINUMUM SUBMISSION REQUIREMENTS

Detached Residential Accessory Structures and Garages

Currituck County Phone: Planning and Community Development Fax: Courthouse Road, Suite 110 Currituck, NC 27929

Directions For Filling Out A CAMA MINOR Permit

REZONING APPLICATION CHECKLIST BUCKINGHAM COUNTY OFFICE OF ZONING AND PLANNING MINUMUM SUBMISSION REQUIREMENTS

ADMINISTRATIVE SITE PLAN REVIEW

APPLICATION FOR A ZONING CERTIFICATE PLEASE PRINT OR TYPE

JEFFERSON COUNTY, ALABAMA

Manor Township Zoning Permit Application (Section 702) Application Number Application Date / /

Level III Preliminary and Final Site Plans Development Review Application Portland, Maine Planning and Urban Development Department Planning Division

I. Requirements for All Applications. C D W

Transcription:

Zoning Permit Application Cover Page The City of Belmont performs an initial site inspection prior to issuance of a zoning permit for new construction. Upon receipt of a full and complete application submittal via mail, in person, or online at www.cityofbelmont.org, the site inspection should occur within 48 hours. Ensure submittal of: Complete Zoning permit application Scaled site plan showing all property corners and dimensions, footprint of house, building setbacks, location of driveway and sidewalks, location of utility connections, tree save areas, and easements. For properties with any portion in the 100 year flood plain: A sealed survey from a registered surveyor must be provided and must show the contour line of the base flood elevation (100-year flood plain), proposed building footprint, finished floor elevation (FFE) of lowest inhabitable floor, elevation of bottom of floor joist for lowest FFE, and any other information the city may need to comply with adopted FEMA floodplain regulations. Plan for each floor of the house All appropriate fees Fee total for zoning permit, inspections, and water meter installation will be provided to the builder and must be paid prior to issuing the zoning permit. Water meter work order When the site is properly prepared for the water meter installation, the builder must submit an online water meter work order request using the link below. Repeat trips for unprepared sites will result in additional fees starting at $75 per trip. Please allow up to 10 working days from the requested date for installation. http://www.cityofbelmont.org/formcenter/planning-zoning-7/water-meter-request-95. Requirements for lot inspection: Property corners and house corners clearly identified and staked Lot number clearly identified and displayed until final site inspection Driveway location clearly identified and staked Water meter location and sewer clean-out exposed, staked blue for water, green for sewer Within the lot boundaries At least two feet from driveway I hereby acknowledge that I have read and understand these requirements. I agree to pay reinspection fees starting at $50 per trip for locations not originally prepared for inspection. Signature

City of Belmont Zoning Permit Application 37 N. Main St. P. O. Box 431 Belmont, NC 2801 2 704 901 2610 Fax: 704 825 0514 Property owner(s): Lot Number Property address: Parcel ID no. (Six-digit): Owner mailing address: City, state, ZIP: Phone: Work/cell: E-mail: Subdivision or development name: Applicant (if different from property owner): Mailing address: City, state, ZIP: Phone: Contractor: Mailing address: City, state, ZIP: Phone: Application for: New construction* Change in use Interior renovation Accessory building* Swimming pool* Addition/expansion* Demolition/grading Sign* Other: *A scaled site plan or plot plan must be submitted for these items. Description of project: Project cost: $ Number of bedrooms (New SFD) Lot Coverage (maximum impervious) % Lot size (sq. ft.): Lot frontage: Front setback: Left side setback: Right side setback: Rear setback: Htd. sq. ft. of house: Accessory structure information (detached garage, utility building, pool, carport, etc.): Size of bldg.: by Htd. sq. ft. of house: Left side setback: Right side setback: Rear setback: Dist. from house: Note: Dimensions in feet unless noted. Dimensions are critical for accurate measurements and must be provided.

Floodplain compliance Is there a stream on the property? Yes No Does project include a stream crossing? Yes No Culvert Bridge Other: Is property in a special flood hazard area? Yes No Panel: Is property in a floodway zone? Yes No Will project involve stream channel relocation? Yes No Are there any wetlands on project site? Yes No A survey from a registered surveyor must be provided and must show the contour line of the base flood elevation (100-year flood plain), proposed building footprint, finished floor elevation (FFE) of lowest inhabitable floor, elevation of bottom of floor joist for lowest FFE, and any other information the city may need to comply with adopted FEMA floodplain regulations. Grading compliance (if applicable) Company/person responsible for land disturbing activity: Address: Phone: Cell: Size of disturbed area (specify square feet or acres): A grading plan must be attached. Checklist of basic plan elements (other items may be required): Survey with contours (existing and proposed); proposed clearing limits, drainage structures, culverts, etc. Narrative explaining construction timeline Approved Gaston County sedimentation and erosion control permit Please note: If the project is located in a water supply watershed protection district, or if the area of disturbed land exceeds one acre, we may require additional material to be submitted. Contact the planning department for more information. By signing below, I agree to conform to all applicable city ordinances and zoning regulations. I also agree to obtain a building permit from Gaston County (if required), and to construct to the specifications of plans submitted and to building code standards regulating such work. I hereby affirm that the above information is accurate and correct to the best of my knowledge. Signature of applicant: Printed name: Date: Application revised 10/3/17 Page 2

Final Zoning Compliance Inspection Checklist As you complete building and development projects and prepare for the final county inspection, we ask you to submit a city zoning compliance inspection request online 2-5 days in advance of your desired inspection date. (For last minute changes to scheduled inspection, please reschedule before 9:00 a.m. by calling (704) 901-2084 to avoid additional reinspection fees.) Once all required work is performed and confirmed, we will transmit the completed inspection form to Gaston County. The city will be confirming proper installation of city utility connections, ensuring sidewalk areas are installed and have not been damaged by new construction, verifying tree planting and landscaping requirements have been satisfied, and verifying any other work performed to meet city infrastructure and zoning requirements specific to the property. Final Zoning Compliance Inspection Checklist: Compare actual construction to approved site plan Address displayed properly Driveway apron in good condition Streets in good condition Sidewalks in good condition Water meter box at grade, not damaged Sewer clean out at grade, not damaged Required on site and street trees planted Site lighting in compliance if applicable Required buffer installed where applicable Trash and debris removed from site Submit backflow prevention report if applicable Submit inspection requests here 2-5 days in advance of desired inspection date: http://www.cityofbelmont.org/formcenter/planning--zoning-7/certificate-of-zoning-complianceapplica-83 Direct questions and concerns to: Jamie Mendoza jmendoza@cityofbelmont.org Phone: (704) 901-2084