Time Extension Staff Report

Size: px
Start display at page:

Download "Time Extension Staff Report"

Transcription

1 Time Extension Staff Report Subdivision Name Lunara Subdivision File Number SUB Approval Time Extension for Lead Agency Boise City Certification Signature of Boise City Engineer Annexation Date December 30, 1988 Comp. Plan Complies Public Hearing Date May 5, 2009 Heard by Boise City Council Final Plat Approval July 24, 2007 Staff David Abo, AICP Request: The applicant is requesting a one-year time extension to July 24, 2010 for obtaining the Certification Signature of the Boise City Engineer on the Final Plat for the Lunara Subdivision. The Final Plat was approved by the Boise City Council on July 24, This is a single family residential subdivision with eight buildable lots and two common lots on 1.38 acres. Location: The subject property is located on the southwest corner of W. Ustick Road and N. Kimball Street, approximately ¼ mile west of Maple Grove Road. Contents: Basis for Recommendation Applicant s Letter, April 7, 2009 Vicinity Map Final Plat Aerial Map Conditions of Approval

2 Page 2 of 12 Basis for Recommendation The one-year time extension has been requested to allow the applicant to have additional time to secure the Certification Signature of the Boise City Engineer on the Final Plat. Please see the applicant s letter which cites the need for the time extension. The Boise City Subdivision Ordinance provides for time extensions not to exceed one year. Boise City Subdivision Ordinance: PROCEDURES D. PROCEDURE: BOISE CITY FINAL PLAT The following procedures shall apply to the filing for final approval of any subdivision located within Boise City. 1. FILING BY APPLICANT: a. After the approval or conditional approval of the Preliminary Plat, the applicant may cause the subdivision, or any part thereof, to be surveyed and a Final Plat prepared in accordance with the Preliminary Plat as approved. Any portion of a Preliminary Plat in conformance with Zoning Ordinance Standards that is left unplatted shall be deemed a single parcel by the City until a subdivision plat is recorded. b. The Final Plat, prepared in accordance with Title 50, Chapter 13 of the Idaho Code and the provisions set forth herein, shall be filed with the Review Analyst. c. Such Final Plat, when submitted, shall be accompanied by prints, thereof, as required by the Review Analyst. d. The Boise City Engineer shall sign all Final Plats within Boise City as evidence for a conformance with the Subdivision Ordinance and the City Council's conditions of approval. 2. LIMITATION ON TIME OF FILING: a. Filing of the Final Plat shall be made within two (2) years after action by the Council on said Preliminary Plat. b. Failure to file a Final Plat within two (2) years after the action by the Council approving said Preliminary Plat shall cause all approvals of said Preliminary Plat to have been voided; provided, however, that upon

3 Page 3 of 12 Recommendation: application of the applicant, the Council may grant an extension for a period not to exceed one (1) year, provided an application for extension is filed, in writing, at least twenty (20) working days prior to the expiration of the first two (2) year period and each additional period as may have been granted by the Council. In granting of the time extension, the Council reserves the right to modify and/or add conditions to the Final Plat to conform with adopted policies and/or ordinance changes which have occurred following initial approval. Upon approval/denial of a time extension, the Review Analyst shall notify applicant and all agencies having jurisdiction of the action taken by the Council. c. Filing of Final Plat on phased developments may require modifications to the conditions as approved by Council. Council reserves the right to modify and/or add conditions to the Final Plat to conform with adopted policies and/or ordinance changes for each phase submitted after two (2) years following Preliminary Plat approval in accordance with D.2.b. d. Certification Signature of Boise City Plats by the Boise City Engineer shall be made within two (2) years from date of approval of the Final Plat by the Council, however, that upon application of the applicant, the Council may grant time extensions, and each time extension shall be for a period not to exceed one (1) year, provided an application for extension is filed, in writing, at least twenty (20) working days prior to the expiration of the first two (2) year period, or expiration date established thereafter. In granting of the time extension, the Council reserves the right to modify and/or add condition(s) to the original Final Plat to conform with adopted policies and/or ordinance changes. Staff recommends approval of a one-year time extension to July 24, 2010 for obtaining the Certification Signature of the Boise City Engineer on the Final Plat of the Lunara Subdivision subject to Conditions of Approval.

4 RECEIVED INVESTMENT GROUP, LLC PLANNING DEPT. SUBONISIONS,677 S. Caleb pl. Meridian, Idaho CZOS) Dear Boise City Subdivision Dept, I would like to request a 12 month extension for the Lunara subdivision. Due to the extreme downturn in the building market, we have not yet started to development this subdivision. We are requesting the additional time so that we can see if the market is going to show some signs of stability prior to putting more money into this project. I have enclosed a check for $ so that you can put this issue before the city council. Troy Q ck

5

6

7

8 Page 4 of 12 Conditions of Approval Special Conditions 1. Developer shall comply with B.C.C D.2 which specifies the limitation on time for filing and obtaining certification. Certification by the Boise City Engineer shall by July 24, A. The developer may submit a request for a time extension, including the appropriate fee, to the Boise City Planning and Development Services Department for processing. Boise City Council may grant time extensions for a period not to exceed one year provided the request is filed, in writing by June 25, 2010 or twenty working days prior to the expiration of the one year time extension. B. If a time extension is granted, the Boise City Council reserves the right to modify and/or add condition(s) to the original Final Plat to conform with adopted policies and/or ordinance changes. C. The Final Plat shall be recorded with the Ada County Recorder within one year from the date of the Boise City Engineer s signature. If the Final Plat is not recorded within the one-year time frame the subdivision shall be deemed null and void. 2. Prior to approval by the City Council, the Preliminary Plat shall be revised to show Lots 6-9 to meet the minimum frontage requirements. 3. Vehicular access for Lots 5-10 shall be from a common driveway. 4. All parking shall be set back a minimum of 20 feet from the edge of the paved common driveway. 5. Duplexes shall be prohibited on Lots 5-10, regardless of the zoning. 6. The common driveway and utilities for Lots 5-10 shall be constructed concurrently with all other public improvements. 7. Comply with all requirements of Section I of the Boise City Zoning Ordinance. 8. The plat shall include delineations that describe the boundaries of the perpetual ingress/egress common driveway easement as indicated on the plat for Lots 5-10.

9 Page 5 of 12 A. Design: Where practical the boundary of said easements shall align with the property line. The developer and/or owner shall also submit a site plan showing: 1) The location of the common driveways, 2) The location(s) of private driveways, 3) The location of typical building foundation layout and orientation for each lot, 4) The location and type of no-parking signs, and 5) Typical building setbacks. This information is necessary in order that the applicant become fully aware of the subsequent design and marketability of lots that are accessed by a common driveway, and to provide evidence to Boise City that the design of the subdivision will benefit from the use of common driveways. B. Construction: Paving of the common driveway and related utilities shall be constructed concurrently with all other required public improvements of this subdivision. Otherwise, the applicant shall bond for 110% of the value and enter into a non-build agreement for the affected lots until such time as the improvements are made. 1) Common driveways shall be installed within 90 days of the issuance of the first Building Permit in the development, if building permits are obtained prior to completion of common driveway improvements. C. Addressing: Street address numbering shall be in accordance with B.C.C D. The developer and/or owner shall submit evidence that the address numbers posted on the structures on Lots 5-10 will be visible from the street. Otherwise, a signage plan shall be submitted to and approved by the Boise City Fire Department and the Boise City Planning and Development Services Department ensuring compliance with the Boise City Street Name and Addressing Ordinance. Additional signage may be required. 1) Plat Note Requirements: Notes on the face of the Final Plat are required: i. Which state, "Vehicular access to Lots 5-10, shall be provided from a common driveway and not from N. Kimball Street. Setbacks for required parking shall be a minimum of 20-feet from the edge of the built common driveway, or property line whichever is more restrictive, and parking on the common driveway is prohibited." and ii. Which state, Duplex structures may not be constructed on lots that utilize a common driveway, regardless of zoning district," and iii. Which set forth the legal description of the driveway(s) and conveys to those lot owners taking access from the driveway(s) and easement(s), the perpetual right of ingress and egress over the described driveway(s), and provides that such perpetual easement(s) shall run with the land.

10 Page 6 of 12 D. Covenant Requirements: A restrictive covenant or other similar deed restriction(s) acceptable to the Boise City Attorney shall be recorded at the time of recording the plat which provides: 1) For the perpetual requirement for the maintenance of the driveway(s) and cross easement, and 2) That said restrictions shall run with the land, and that said easement(s) and restrictions shall be reviewed and approved by the Boise City Attorney. 9. Prior to the Boise City Engineer signing the Final Plat by, the plat shall include a landscaping buffer along W. Ustick Road as specified in section K. of the Boise City Subdivision Ordinance or a waiver shall be obtained. A. Design: A detailed landscaping plan that is drawn by a licensed landscape architect and drawn in conformance with Section I (Landscaping) of the subdivision ordinance, shall be submitted to, reviewed and approved by the Planning Department and Forestry Division, prior to signature of the Final Plat by the Boise City Engineer. It shall be drawn in compliance with all "Development Standards" listed in the document, "A Guide to Creating Water-Efficient Landscapes," and shall provide all information needed to determine compliance with said ordinance and document. B. Construction: Developer/owner may either construct the landscape area prior to final platting or post bond/agreement in the amount of 110% of the estimated costs with the Planning and Development Services Department prior to signing of the Final Plat by the Boise City Engineer. Construction of the landscape shall be in conformance with approved design plans. C. Maintenance: A note on the face of the Final Plat is required stating, Lots 1 and 2 contain a landscaping buffer easement which shall be maintained by the Lunara Homeowners Association. Said buffer may not be vacated without the express consent of Boise City." 10. A Waiver of Subdivision Ordinance is hereby granted to allow the required landscaping buffer along W. Ustick Road to be reduced from the required width of 30 feet to 7 feet. 11. A Waiver of Subdivision Ordinance is hereby granted to allow the required landscaping buffer area along W. Ustick Road to be located in an easement on buildable lots (Lots 1 and 2) that do not meet the minimum dimensional standards to incorporate a landscaping buffer on buildable lots. 12. Lots 3 and 10 are common lots to be used for open space. A note on the face of the Final Plat shall state: Lots 3 and 10 are common lots to be used for open space, which shall be

11 Page 7 of 12 owned and maintained by the Lunara Homeowner s Association. This lot cannot be developed for residential purposes in the future 13. For streets having a width less than 36 feet back of curb to back of curb parking shall be restricted on (1) one side; for streets having a width less than 29 feet back of curb to back of curb parking shall be restricted on both sides; and for standard ACHD cul-de-sacs parking shall be restricted on both sides. A note on the face of the Final Plat is required noting the parking restriction prior to signing of the Final Plat by the Boise City Engineer. Covenant Requirements 14. Covenants, homeowners association by-laws or other similar deed restrictions acceptable to the Boise City Attorney, which provide for the use, control and maintenance of all common areas, common party walls, storage facilities, recreational facilities or open spaces shall be reviewed and approved by the Boise City Attorney. Erosion Control Requirements 15. Prior to the City Engineer's Certification of the Final Plat and prior to earth disturbing activities, an erosion and sediment control (ESC) permit must be obtained. An ESC plan conforming to the requirements B.C.C. Title 8 Chapter 17, is to be submitted to the Director of Planning and Development Services for review and approval. No grading or earth disturbing activities may start until an approved ESC permit has been issued. 16. An individual who has attended the Boise City Responsible Person (RP) certification class, or has obtained Interim Certification for Responsible Person is not identified for this project. A permit will not issue until such time as the name and certification number of the RP has been provided to Boise City. This information can be faxed to or ed to swebb@cityofboise.org. Drainage Conditions 17. Subdivision drainage shall be in accordance to B.C.C E. The developer shall submit a letter from appropriate drainage entity approving the drainage system or accepting the drainage there from; or submit a letter from a registered professional engineer certifying that all drainage shall be retained on-site. A copy of the construction drawing(s) depicting all site drainage improvements shall be submitted with the letter. A. Developer may either construct improvement prior to final platting or post bond in the amount of 110% of the estimated construction costs. Estimated construction costs shall be provided by the developer s engineer.

12 Page 8 of 12 B. For drainage facilities located outside of the public right-of-way, the developer shall dedicate a storm drainage easement. Said easement shall be labeled as either an Ada County Highway District storm drainage easement or a homeowners association storm drainage easement, depending on what entity will assume responsibility for the operation and maintenance of the storm drainage system. Irrigation Conditions Should the homeowners association be responsible for the operation and maintenance of the storm drainage facilities, covenants, homeowners association by-laws or other similar deed restrictions acceptable tot eh Boise City Attorney shall be reviewed and approved by the Boise City Attorney. 18. Comply with Boise City Code Section J and Idaho State Code, Section concerning pressure irrigation requirements prior to signing of the Final Plat by the Boise City Engineer. A. The owner or person, firm or corporation filing the subdivision plat shall provide a pressurized irrigation system. The system must conform to the minimum design standards and specifications of Boise City or of the entity that will operate and maintain the system, if that entity has published standards. Fees: Developer and/or owner shall pay the current inspection and plan review fees on the proposed subdivision prior to signing of the Final Plat by the Boise City Engineer (B.C.C ). B. Developer may construct prior to Final Platting or bond in the amount of 110% of the estimated construction costs. C. Prior to either commencing construction or signing of the Final Plat by the Boise City Engineer, developer shall: i. Submit construction plans and specifications for the pressurized system, stamped by a registered engineer, to the Department of Public Works and acquire approval there from. ii. Provide written assurance that provisions have been made for ownership, operation, and maintenance of the system. iii. Delineate all necessary irrigation easements on the Final Plat (B.C.C F). D. Developer shall provide for an independent inspection of the installation of irrigation facilities and written certification by the design or project engineer that the system was installed according to the approved plans. In addition, the

13 Page 9 of 12 Department of Public Works must be present for the system pressure test and participate in a final inspection. 19. No ditch, pipe or structure for irrigation water or irrigation waste water shall be obstructed, rerouted, covered or changed in any way unless such obstruction, rerouting, covering or changing has first been approved in writing by the ditch company officer in charge. A copy of such written approval by the ditch company officer shall be filed with the construction drawing and submitted to the Department of Planning and Development Services prior to signing of the Final Plat by the Boise City Engineer (B.C.C F.2). 20. Fence, cover or tile all irrigation ditches, laterals or canals and drains, exclusive of natural waterways, intersecting, crossing or lying adjacent to the subdivision prior to Final Platting or post bond in the amount of 110% of the estimated improvement cost with the Boise City Planning and Development Services Department. "Adjacent" is defined by the Boise City Code as "located within less than sixty feet (60') of any lot included in the development." A. Any covering or fencing program involving the distribution of any irrigation district shall have the prior approval of the affected district. B. If the developer requests a water amenity, such request shall comply with B.C.C F.5. C. Fencing shall be installed prior to issuance of the first building permit in the development. Sewer Condition 21. Wet line sewers are required (B.C.C D.). A. Developer and/or owner shall contact the Department of Public Works regarding the financing and details of extending the sewers to the subject property. Developer shall enter into a sewer reimbursement contact with the City of Boise. B. Plans shall be submitted to and approved by the Boise City Department of Public Works prior to commencing with construction. Developer and/or owner may either construct improvements prior to final platting or execute a performance agreement and provide surety in the amount of 110% of the estimated costs. The developer shall coordinate with the Department of Public Works for construction inspection prior to and during construction. Unless otherwise approved by the Public Works Department, all sewer construction shall be completed and accepted within 90 days of plat recordation or within 30 days of issuance of the first

14 Page 10 of 12 Building Permit with the subdivision, whichever comes first. NOTE: All bonding shall conform to Boise City Code, Title 8, Chapter 20. C. Developer and/or owner shall pay the current sewer inspection fees for the proposed subdivision prior to signing of the Final Plat by the Boise City Engineer. 22. The developer and/or owner shall delineate all necessary Boise City sanitary sewer easements on the Final Plat prior to signing of the Final Plat by the Boise City Engineer (B.C.C F.). 23. Developer and/or owner unless previously paid shall pay a sewer assessment along W. Ustick Road and/or as may be approved by the Boise City Public Works commission prior to signing of the Final Plat by the Boise City Engineer. Contact the Department of Public Works for specific costs. 24. Developer and/or owner unless previously paid shall pay a connection fee and physically connect to sewer all existing homes remaining within the subdivision boundary prior to signing of the Final Plat by the Boise City Engineer or post bond/agreement for 10% of the cost to connect. NOTE: All bonding shall conform to Boise City Code, Title 9, Chapter 20, Section 8.B.3. which specifies that the improvements to be made shall be done in a time period not to exceed one year from the date of approval of the Final Plat. Street Light Conditions 25. Developer shall delineate on the face of the Final Plat a Boise City street light easement, acceptable to the Boise City Department of Public Works, for the purpose of installing and maintaining city-owned street light fixtures, conduit and wiring lying outside the dedicated public right-of-way (B.C.C F). 26. The developer shall be required to install, at their expense, street lights in accordance with Boise City Public Works specifications and standards at locations designated by the Public Works Department (B.C.C H). Plans shall be reviewed and approved by the Boise City Public Works Department prior to commencement of construction, bonding, or payment into trust fund. A. Fees: Developer shall pay the current street light inspection and plan review fees on the proposed subdivision (B.C.C ). B. The street lights shall be installed and accepted by the Boise City Public Works Department at the following locations. Unless otherwise noted, street lights shall be installed at a 25-foot minimum mounting height, 100 W.H.P.S.

15 Page 11 of 12 i. N.E. Corner of Lot 1, Block 1 ii. S.E. Corner of Lot 10, Block 1 at a 30 feet minimum mounting height, 250/400 W.H.P.S. C. If bonding approval is granted by the Boise City Public Works Department, developer may bond in the amount of 110% of the estimated street light costs. Street lights shall be installed within 90 days of the issuance of the first building permit in the development, if building permits are obtained prior to completion of street light improvements. General Conditions 27. The developer shall make arrangements to comply with all requirements of the Boise City Fire Department and verify in one of the following ways: A. A letter from the Boise City Fire Department stating that all conditions for water, access, and/or other requirements have been satisfied, OR B. A non-build agreement has been executed and recorded with a note on the face of the Final Plat identifying the instrument number. NOTE: No Parking" signs and curb painting shall be required on streets having a width less than 36-feet, back of curb to back of curb. Contact the Boise City Fire Department for sign placement and spacing. Developer may either construct prior to Final Platting or post bond in the amount of 110% of the estimated costs with the Boise City Planning and Development Services Department. 28. The name, Lunara Subdivision, is reserved and shall not be changed unless there is a change in ownership, at which time, the new owner(s) shall submit their new name to the Ada County Surveyor for review and reservation. Should a change in name occur, applicant shall submit, in writing, from the Ada County Surveyor, the new name to the Department of Planning and Development Services and re-approval by the Boise City Council of the "revised" Final Plat shall be required. Developer and/or owner shall submit all items including fees, as required by the Boise City Planning and Development Services Department, prior to scheduling the "revised" Final Plat for hearing. 29. Correct street names as approved by the Ada County Street Name Committee shall be placed on the plat (I.C. Title 50, Chapter 13).

16 Page 12 of A letter of acceptance for water service from the utility providing same is required (B.C.C C). 31. Developer shall provide utility easements as required by the public utility providing service (B.C.C F). 32. Developer shall provide a letter from the United States Postal Service stating, "The Developer and/or Owner have received approval for location of mailboxes by the United States Postal Service." Contact: Dan Frasier, Postmaster 770 S. 13th St. Boise, ID Phone No. (208) FAX No. (208) Approval of sewer and water facilities by the Central District Health Department is required (I.C. Title 50, Chapter 13). 34. A letter from the appropriate school district is required stating, "The Developer has made arrangements to comply with all requirements of the School District." 35. Developer shall comply with all construction standards of Ada County Highway District including approval of the drainage plan, requirements for installing curb, gutter, sidewalks and paving throughout the subdivision as specified by the Boise City Council. Signature by the Ada County Highway District on the Final Plat is required (I.C. Title 50, Chapter 13). 36. Prior to submitting the Final Plat for recording, the following endorsements or certifications must be executed: Signatures of owners or dedicators, Certificate of the Surveyor, Certificate of the Ada County Surveyor, Certificate of the Central District Health Department, Certificate of the Boise City Engineer, Certificate of the Boise City Clerk, signatures of the Commissioners of the Ada County Highway District and the Ada County Treasurer (I.C. Title 50, Chapter 13). 37. No application for a building permit for the construction of any new structure upon property within this proposed subdivision plat shall be accepted until the Final Plat has been recorded pursuant to the requirements of the Boise City Subdivision Ordinance. 38. The Lunara Subdivision is approved for eight buildable lots and two common lots.

Time Extension Staff Report

Time Extension Staff Report Time Extension Staff Report Subdivision Name Therrin Subdivision File Number SUB06-00020 Approval Time Extension for Lead Agency Boise City Certification Signature of Boise City Engineer Annexation Date

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Subdivision Name Madera Creek File Number SUB06-00068 Subdivision Approval Final Plat Lead Agency Boise City Annexation Date December 9, 1974 Comp. Plan Complies Public Hearing

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Subdivision Name Cayenne Corner File Number SUB06-00060 Subdivision Approval Final Plat Lead Agency Boise City Annexation Date January 1, 1987 Comp. Plan Complies Public Hearing

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Subdivision Name Coldstream File Number SUB06-00040 Subdivision Approval Preliminary Plat Lead Agency Boise City Annexation Date December 9, 1974 Comp. Plan Complies Public Hearing

More information

Let me know if I need to bring you any other documentation for this withdrawl. Thanks!

Let me know if I need to bring you any other documentation for this withdrawl. Thanks! >>> david benoit 11/27/2007 10:00 AM >>> Dave, I am set to be heard on the Cranston Corner Subdivision on December 4th in front of City council. I have sold this property and am requesting

More information

Location: The subject property is located at the northeast corner of S. Holden Lane and E. Boise Avenue.

Location: The subject property is located at the northeast corner of S. Holden Lane and E. Boise Avenue. Subdivision Staff Report Subdivision Name Tianna Park File Number SUB11-00008 Approval Preliminary Plat Lead Agency Boise City Annexation Date December 19, 1977 Comp. Plan Complies Public Meeting Date

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Subdivision Name Birmingham Place File Number SUB06-00051 Subdivision Approval Preliminary/Final Plat Lead Agency Boise City Annexation Date December 3, 1962 Comp. Plan Complies

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Subdivision Name Toli Park Subdivision File Number SUB07-00035 Approval Preliminary Plat Lead Agency Boise City Annexation Date December 30, 1987 Comp. Plan Complies Public Hearing

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Subdivision Name Honeymoon Cove Subdivision File Number SUB08-00005 Approval Preliminary/ Final Plat Lead Agency Boise City Annexation Date December 30, 2004 Comp. Plan Complies

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Subdivision Name Athletic Subdivision File Number SUB08-00023 Approval Preliminary/ Final Plat Lead Agency Boise City Annexation Date July 30, 1984 Comp. Plan Complies Public Hearing

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Subdivision Name Greenfield Park File Number SUB06-00110 Subdivision Approval Preliminary/Final Plat Lead Agency Boise City Annexation Date December 9, 1974 Comp. Plan Complies

More information

SOS / Waiver of Subdivision Standards / John Cashin

SOS / Waiver of Subdivision Standards / John Cashin SOS15-00012 / Waiver of Subdivision Standards / John Cashin Summary John Cashin requests a Waiver of Subdivision Standards in the Boise Development Code that requires construction of new sidewalk for approval

More information

ARTICLE 4 PERMITS REQUIRED FOR DEVELOPMENT OR CONSTRUCTION 4.1 AUTHORIZATION REQUIRED FOR LAND DISTURBANCE OR DEVELOPMENT ACTIVITIES

ARTICLE 4 PERMITS REQUIRED FOR DEVELOPMENT OR CONSTRUCTION 4.1 AUTHORIZATION REQUIRED FOR LAND DISTURBANCE OR DEVELOPMENT ACTIVITIES ARTICLE 4 PERMITS REQUIRED FOR DEVELOPMENT OR CONSTRUCTION 4.1 AUTHORIZATION REQUIRED FOR LAND DISTURBANCE OR DEVELOPMENT ACTIVITIES 4.1.1 Permit Required - Exemptions: No disturbance of the land, including

More information

ALBA BEACH SUBDIVISION, RESUBDIVISION OF LOT 17

ALBA BEACH SUBDIVISION, RESUBDIVISION OF LOT 17 ALBA BEACH SUBDIVISION, RESUBDIVISION OF LOT 17 Engineering Comments: FINAL PLAT COMMENTS (should be addressed prior to submitting the FINAL PLAT for acceptance and signature by the City Engineer): A.

More information

DAUPHIN CREEK ESTATES SUBDIVISION

DAUPHIN CREEK ESTATES SUBDIVISION # 12 SUB-000076-2017 DAUPHIN CREEK ESTATES SUBDIVISION Engineering Comments: FINAL PLAT COMMENTS (should be addressed prior to submitting the FINAL PLAT for review and/or signature by the City Engineer):

More information

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: August 8, 2013

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: August 8, 2013 ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: August 8, 2013 NAME SUBDIVISION NAME PV-Magnolia, LLC Twelve Trees Subdivision LOCATION 2860, 2862 and 2866 Pleasant Valley Road

More information

The following application has been scheduled for hearing by the Boise City Council on February 15, 2011:

The following application has been scheduled for hearing by the Boise City Council on February 15, 2011: MEMORANDUM TO: FROM: Mayor and City Council David Abo, AICP Chief Subdivision Review Analyst Boise City Planning and Development Services DATE: February 8, 2011 The following application has been scheduled

More information

BYRON TOWNSHIP ZONING APPLICATION

BYRON TOWNSHIP ZONING APPLICATION BYRON TOWNSHIP ZONING APPLICATION Phone: (616) 878-9104 * Fax: (616) 878-3980 * Website: www.byrontownship.org This application will not be accepted if incomplete. APPLICATION FOR & REQUIRED COPIES Private

More information

MOBILE TOWERS SUBDIVISION

MOBILE TOWERS SUBDIVISION # 3 SUB2014-00100 MOBILE TOWERS SUBDIVISION Engineering Comments: The following comments should be addressed prior to submitting the FINAL PLAT for acceptance and signature by the City Engineer: 1) Provide

More information

CONCEPT PLAN APPLICATION Meeting with Staff Commercial Projects

CONCEPT PLAN APPLICATION Meeting with Staff Commercial Projects COMMUNITY DEVELOPMENT City of South Salt Lake Community Development Department 220 E. Morris Avenue South Salt Lake City, Utah 84115 Phone (801) 483-6011 Fax (801) 483-6060 CONCEPT PLAN APPLICATION Meeting

More information

TURTLE CREEK SUBDIVISION, PHASE THREE

TURTLE CREEK SUBDIVISION, PHASE THREE TURTLE CREEK SUBDIVISION, PHASE THREE Engineering Comments: Must comply with the Mobile County Flood Damage Prevention Ordinance. Development shall be designed to comply with the storm water detention

More information

MTC ALABAMA SUBDIVISION

MTC ALABAMA SUBDIVISION # 2 SUB-000370-2017 MTC ALABAMA SUBDIVISION Engineering Comments: FINAL PLAT COMMENTS (should be addressed prior to submitting the FINAL PLAT for review and/or signature by the City Engineer): A. Provide

More information

ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: July 9, 2015

ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: July 9, 2015 ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: July 9, 2015 APPLICANT NAME 2513 Dauphin Street, Inc. SUBDIVISION NAME Audubon Place Extension No. 3, Resubdivision of Lots 1-5 LOCATION 2513 Dauphin Street

More information

MINOR SUBDIVISION INFORMATION

MINOR SUBDIVISION INFORMATION A. POINTS OF CONTACT: MINOR SUBDIVISION INFORMATION Surveyor: Address: Phone #: Fax # E-Mail Address: Representative (If different from applicant): Address: Phone #: Fax # E-Mail Address: B. GENERAL INFORMATION:

More information

SOS ; State of Idaho, Consent to Partially Vacate Public Alley Rightof-Way at 611 North 6 th Street

SOS ; State of Idaho, Consent to Partially Vacate Public Alley Rightof-Way at 611 North 6 th Street MEMORANDUM TO: FROM: Mayor and City Council David Abo, AICP Subdivision Review Analyst Boise City Planning and Development Services DATE: November 6, 2012 RE: SOS12-00013; State of Idaho, Consent to Partially

More information

WRITTEN DECISION OF THE HAYDEN CITY COUNCIL REGARDING MAPLE GROVE PRELIMINARY SUBDIVISION APPLICATION (SUB-0013) HAYDEN SIGNATURE, LLC

WRITTEN DECISION OF THE HAYDEN CITY COUNCIL REGARDING MAPLE GROVE PRELIMINARY SUBDIVISION APPLICATION (SUB-0013) HAYDEN SIGNATURE, LLC WRITTEN DECISION OF THE HAYDEN CITY COUNCIL REGARDING MAPLE GROVE PRELIMINARY SUBDIVISION APPLICATION (SUB-0013) HAYDEN SIGNATURE, LLC Application of Hayden Signature, LLC, an Idaho limited liability company,

More information

DINKINS ESTATE FAMILY SUBDIVISION

DINKINS ESTATE FAMILY SUBDIVISION # 9 SUB2015-00122 DINKINS ESTATE FAMILY SUBDIVISION Engineering Comments: The following comments should be addressed prior to submitting the FINAL PLAT for acceptance and signature by the City Engineer:

More information

APPLICATION PROCEDURE

APPLICATION PROCEDURE ANTRIM PLANNING BOARD P. O. Box 517 Antrim, New Hampshire 03440 Phone: 603-588-6785 FAX: 603-588-2969 APPLICATION FORM AND CHECKLIST FOR MINOR OR MAJOR SITE PLAN REVIEW File Date Received By APPLICATION

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 20, 2017

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 20, 2017 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 20, 2017 DEVELOPMENT NAME SUBDIVISION NAME LOCATION Rangeline Crossing III Subdivision Rangeline Crossing III Subdivision 5289 Halls Mill

More information

Major Subdivision Application Packet. Revised June 2018

Major Subdivision Application Packet. Revised June 2018 Major Subdivision Application Packet Revised June 2018 Caroline County Department of Planning and Community Development 233 West Broaddus Avenue Bowling Green, VA 22427 www.co.caroline.va.us Phone: 804-633-4303

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Name: Brownstone Subdivision Date: May 12, 2004 File: SUB04-00041 Meeting: May 18, 2004 Approval: Preliminary To: City Council Lead Agency: Ada County (04-10-S) From: Richard Beck

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: November 17, 2016

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: November 17, 2016 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: November 17, 2016 DEVELOPMENT NAME SUBDIVISION NAME LOCATION Autonation Ford of Mobile Autonation Ford of Mobile Subdivision 901, 909, and 925

More information

Residential Major Subdivision Review Checklist

Residential Major Subdivision Review Checklist Residential Major Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

KRONER S MOBILE WEST COMMERCIAL BUSINESS PARK SUBDIVISION

KRONER S MOBILE WEST COMMERCIAL BUSINESS PARK SUBDIVISION KRONER S MOBILE WEST COMMERCIAL BUSINESS PARK SUBDIVISION Engineering Comments: Must comply with the Mobile County Flood Damage Prevention Ordinance. Development shall be designed to comply with the storm

More information

(voice) (fax) (voice) (fax) Site Plan Review

(voice) (fax) (voice) (fax) Site Plan Review Town of South Boston PO Box 417 455 Ferry Street South Boston Virginia 24592 Planning Department Public Works Department (Engineering) 434.575.4241 (voice) 434.575.4275 (fax) 434.575.4260 (voice) 434.575.4275

More information

THE CI FY OF MOBILE, ALABAMA

THE CI FY OF MOBILE, ALABAMA THE CI FY OF MOBILE, ALABAMA LETTER OF DECISION DewberryiPreble-Rish 9949 Bellaton Avenue Daphne, AL 36526 Re: Area bounded by Foxtail Drive, Lace Bark Drive and Whitebark Drive Council District 6 SUB-000323-2017

More information

ARTICLE IV: DEVELOPMENT STANDARDS

ARTICLE IV: DEVELOPMENT STANDARDS ARTICLE IV: DEVELOPMENT STANDARDS IV-53 409 PRIVATE STREETS A private street means any way that provides ingress to, or egress from, property by means of vehicles or other means, or that provides travel

More information

JOHNNY S RV PARK SUBDIVISION

JOHNNY S RV PARK SUBDIVISION # 11 SUB2016-00001 JOHNNY S RV PARK SUBDIVISION Engineering Comments: The following comments should be addressed prior to submitting the FINAL PLAT for acceptance and signature by the City Engineer: A.

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Subdivision Name Watertower Place File Number SUB08-00008 Subdivision Approval Preliminary/Final Plat Lead Agency Boise City Annexation Date December 31, 1965 Comp. Plan Complies

More information

Committed to Service

Committed to Service Committed to Service Paul Woods, President Rebecca W. Arnold, Vice President Sara M. Baker, Commissioner Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner August 25, 2017 Development Services TO:

More information

Date: March 16, Jake Centers ERD, LLC P.O. Box 1610 Eagle, ID Elevation Ridge Subdivision (SUB & PUD ) Street Address

Date: March 16, Jake Centers ERD, LLC P.O. Box 1610 Eagle, ID Elevation Ridge Subdivision (SUB & PUD ) Street Address Rebecca W. Arnold, President Sara M. Baker, Vice President John S. Franden, Commissioner Carol A. McKee, Commissioner David L. Case, Commissioner Date: March 16, 2012 To: Jake Centers ERD, LLC P.O. Box

More information

ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: March 1, 2018

ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: March 1, 2018 #13 SUB-000406-2018 & ZON-000407-2018 ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: March 1, 2018 NAME SUBDIVISION NAME LOCATION Creekside @ Kooiman Dairy Creekside @ Kooiman Dairy Subdivision (South

More information

SUBDIVISION, PLANNING APPROVAL, & REZONING STAFF REPORT Date: June 4, 2015

SUBDIVISION, PLANNING APPROVAL, & REZONING STAFF REPORT Date: June 4, 2015 SUBDIVISION, PLANNING APPROVAL, & REZONING STAFF REPORT Date: June 4, 2015 APPLICANT NAME SUBDIVISION NAME DEVELOPMENT NAME LOCATION Board of Water & Sewer Commissioners of the City of Mobile MAWSS MLK

More information

CITY OF FERNDALE HEARING EXAMINER

CITY OF FERNDALE HEARING EXAMINER CITY OF FERNDALE HEARING EXAMINER RE: Planned Unit Development ) 16001-PUD Preliminary Plat ) 16018-SE Plat Variance ) 16002-VAR Application by ) ) MD General, L.L.C. ) FINDINGS OF FACT, Malloy Heights

More information

May 21, ACHD Board of Commissioners Stacey Yarrington, Planner II DRH /DRH

May 21, ACHD Board of Commissioners Stacey Yarrington, Planner II DRH /DRH Development Services Department May 21, 2013 TO: FROM: SUBJECT: ACHD Board of Commissioners Stacey Yarrington, Planner II DRH13-00106/DRH13-00108 Executive Summary: This is a design review application

More information

SECTION 7000 LAND DEVELOPMENT REQUIREMENTS

SECTION 7000 LAND DEVELOPMENT REQUIREMENTS SECTION 7000 LAND DEVELOPMENT REQUIREMENTS 7000 LAND DEVELOPMENT REQUIREMENTS... 1 7001 LEGISLATIVE AUTHORITY... 1 7001.1 LAND DEVELOPMENT... 1 7001.1.1 Title 40, Idaho Code... 1 7001.1.2 Idaho Code 40-1415

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT August 18, 2016

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT August 18, 2016 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT August 18, 2016 DEVELOPMENT NAME SUBDIVISION NAME Mullinax Ford Subdivision Mullinax Ford Subdivision LOCATION CITY COUNCIL DISTRICT District 6 Southeast

More information

HERON LANDING SUBDIVISION

HERON LANDING SUBDIVISION HERON LANDING SUBDIVISION Engineering Comments: Per FEMA guidelines, any development greater than 5 acres in size or subdivision 50 lots in size, requires a flood study. Width of drainage easement to be

More information

Committed to Service. License Agreement Application Form

Committed to Service. License Agreement Application Form Committed to Service License Agreement Application Form PLEASE NOTE: Effective February 16, 2010 - License Agreements within the downtown Boise area for public structures, objects and uses on ACHD sidewalks

More information

COMMERCIAL SITE PLAN & CONDITIONAL USE PERMIT REVIEW PROCESS & CHECKLIST

COMMERCIAL SITE PLAN & CONDITIONAL USE PERMIT REVIEW PROCESS & CHECKLIST Community Development 110 South Main Street Springville, UT 84663 COMMERCIAL SITE PLAN & CONDITIONAL USE PERMIT REVIEW PROCESS & CHECKLIST 801.491.7861 www.springville.org Prior to the issuance of a building

More information

McGowin Park, LLC. B-3, Community Business District

McGowin Park, LLC. B-3, Community Business District # 10, 11, 12 SUB2014-00024 ZON2014-00500 ZON2014-00501 SUBDIVISION, PLANNED UNIT DEVELOPMENT (East), PLANNED UNIT DEVELOPMENT (West) STAFF REPORT Date: April 3, 2014 DEVELOPMENT NAME LOCATION McGowin Park,

More information

ELMORE COUNTY LAND USE & BUILDING DEPARTMENT 520 E 2 nd South Mountain Home, ID (208) Preliminary Plat Application

ELMORE COUNTY LAND USE & BUILDING DEPARTMENT 520 E 2 nd South Mountain Home, ID (208) Preliminary Plat Application ELMORE COUNTY LAND USE & BUILDING DEPARTMENT 520 E 2 nd South Mountain Home, ID 83647 (208) 587-2142 www.elmorecounty.org Preliminary Plat Application We are unable to accept facsimile copies. (Subdivisions

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Subdivision Name Sunnyridge Subdivision File Number SUB07-00007 Approval Preliminary Plat Lead Agency Ada County Annexation Date NA Comp. Plan Complies (With Conditions of Approval)

More information

PORT CITY COMMERCE PARK SUBDIVISION

PORT CITY COMMERCE PARK SUBDIVISION # 4 SUB2015-00019 PORT CITY COMMERCE PARK SUBDIVISION Engineering Comments: Must comply with the Mobile County Flood Damage Prevention Ordinance. Development shall be designed to comply with the storm

More information

City of Melissa, Texas Plat Dedication Language

City of Melissa, Texas Plat Dedication Language City of Melissa, Texas Plat Dedication Language [INCLUDE THE FOLLOWING DEDICATION LANGUAGE FOR INDIVIDUALS (MODIFY APPROPRIATELY TO REFLECT EXACTLY AS SHOWN ON PROPERTY DEED)]: NOW THEREFORE, KNOW ALL

More information

DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS 2.1 Required Plan Sheets 2.2 Drawing Requirements 2.3 Graphic Standards 2.4 Easements 2.5 Utility Locations 2.6 Private Facility Locations

More information

Memorandum: October 13, 2008 REVISED To: Trowbridge Township Planning Commission From: P. Hudson, AICP Re: Suggested New Ordinance

Memorandum: October 13, 2008 REVISED To: Trowbridge Township Planning Commission From: P. Hudson, AICP Re: Suggested New Ordinance 1 Memorandum: October 13, 2008 REVISED 2-11-09 To: Trowbridge Township Planning Commission From: P. Hudson, AICP Re: Suggested New Ordinance Because of changes in both the Michigan Planning Enabling Act

More information

Section Preliminary Plat Checklist and Application Forms

Section Preliminary Plat Checklist and Application Forms Section 201 - Preliminary Plat Checklist and Application Forms PRELIMINARY SUBDIVISION PLAT REVIEW PROCESS CHART PRELIMINARY SUBDIVISION PLAT APPLICATION PRELIMINARY PLAT REVIEW CHECKLIST CITY OF NAMPA

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2016

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2016 # 10 SUB2016-00089 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2016 NAME SUBDIVISION NAME LOCATION Lot 12 Laughlin Industrial Park Subdivision Lot 12 Laughlin Industrial Park

More information

MCGOWIN PARK EAST OF SATCHEL PAIGE SUBDIVISION, RESUBDIVISION OF

MCGOWIN PARK EAST OF SATCHEL PAIGE SUBDIVISION, RESUBDIVISION OF # 14 SUB2015-00058 MCGOWIN PARK EAST OF SATCHEL PAIGE SUBDIVISION, RESUBDIVISION OF Engineering Comments: The following comments should be addressed prior to submitting the FINAL PLAT for acceptance and

More information

The purpose of this Chapter is to establish rules, regulations, standards and procedures for approval of subdivisions of land to promote and ensure:

The purpose of this Chapter is to establish rules, regulations, standards and procedures for approval of subdivisions of land to promote and ensure: CHAPTER 7 SUBDIVISION SECTION 7.1 PURPOSE The purpose of this Chapter is to establish rules, regulations, standards and procedures for approval of subdivisions of land to promote and ensure: A. Conformity

More information

MUDDY CREEK TOWNSHIP PO BOX 239 PORTERSVILLE, PA SUBDIVISION AND LAND DEVELOPMENT APPLICATION

MUDDY CREEK TOWNSHIP PO BOX 239 PORTERSVILLE, PA SUBDIVISION AND LAND DEVELOPMENT APPLICATION MUDDY CREEK TOWNSHIP PO BOX 239 PORTERSVILLE, PA 16051 724-368-3438 SUBDIVISION AND LAND DEVELOPMENT APPLICATION NOTE TO ALL APPLICANTS: This checklist must be completed in its entirety If an item is not

More information

BEAR CREEK TOWNSHIP EMMET COUNTY, MICHIGAN. PRIVATE ROAD ORDINANCE Ordinance No. 11A-99. (to replace prior Private Road Ordinance No.

BEAR CREEK TOWNSHIP EMMET COUNTY, MICHIGAN. PRIVATE ROAD ORDINANCE Ordinance No. 11A-99. (to replace prior Private Road Ordinance No. BEAR CREEK TOWNSHIP EMMET COUNTY, MICHIGAN PRIVATE ROAD ORDINANCE Ordinance No. 11A-99 (to replace prior Private Road Ordinance No. 11-99) An Ordinance to protect the health, safety, and general welfare

More information

THE CITY OF MOBILE, ALABAMA

THE CITY OF MOBILE, ALABAMA THE CITY OF MOBILE, ALABAMA LE 'I IER OF DECISION Kimberly Clark Mobile Operations 200 Africatown Blvd. Prichard, AL 36610 Re: 100 & 200 Africatown Boulevard (Northeast corner of Bay Bridge Road and Paper

More information

TOWN OF LEWISTON PLANNING BOARD APPLICATION

TOWN OF LEWISTON PLANNING BOARD APPLICATION TOWN OF LEWISTON PLANNING BOARD APPLICATION DESCRIPTION OF PROPOSED REQUEST: Name of Property Owner: Phone #: Name of Applicant:Phone #: Address or Location of Proposal:_SBL# Size of Parcel or Structure:Existing

More information

THE CITY OF MOBILE, ALABAMA MOBILE Crry PLANNING COMMISSION

THE CITY OF MOBILE, ALABAMA MOBILE Crry PLANNING COMMISSION THE CITY OF MOBILE, ALABAMA MOBILE Crry PLANNING COMMISSION LETTER OF DECISION MLK Avenue Redevelopment Corp. Attn: Michael Pierce P.O. Box 2204 Mobile, AL 36652 Re: Case #SUB2014-00040 (Subdivision) MLK

More information

Amended Subdivision Staff Report

Amended Subdivision Staff Report Amended Subdivision Staff Report Subdivision Name Silverpine Subdivision File Number SUB06-00052 No.2 Approval Preliminary Plat Lead Agency Ada County Annexation Date NA Comp. Plan Complies (With Conditions

More information

SOUTHERN INDUSTRIAL PARK SUBDIVISION, LOT A, RESUBDIVISION OF LOTS 7 & 8

SOUTHERN INDUSTRIAL PARK SUBDIVISION, LOT A, RESUBDIVISION OF LOTS 7 & 8 SOUTHERN INDUSTRIAL PARK SUBDIVISION, LOT A, RESUBDIVISION OF LOTS 7 & 8 Engineering Comments: Need to increase width of existing easement to include an area at least 20 from the top of the existing ditch,

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Request Consent to vacate public alley Right-of-Way File Number SOS09-00006 Applicant Gran-Del Petroleum Products, Inc Lead Agency Boise City Alley Public Alley Right-Of-Way Comp.

More information

CITY OF INVER GROVE HEIGHTS 8150 Barbara Avenue Inver Grove Heights, MN (651)

CITY OF INVER GROVE HEIGHTS 8150 Barbara Avenue Inver Grove Heights, MN (651) 8150 Barbara Avenue Inver Grove Heights, MN 55077 (651) 450-2545 www.invergroveheights.org FINAL PLANNED UNIT DEVELOPMENT (City Code Section 10-13A) The following must be submitted prior to review and

More information

FINAL PLAT APPLICATION

FINAL PLAT APPLICATION City of Star P.O. Box 130 Star, Idaho 83669 P: 208-286-7247 F: 208-286-7569 FINAL PLAT APPLICATION ***All information must be filled out to be processed. FILE NO.: Date Application Received: Fee Paid:

More information

Residential Minor Subdivision Review Checklist

Residential Minor Subdivision Review Checklist Residential Minor Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

Lake County Planning, Building and Development Department

Lake County Planning, Building and Development Department SUBMISSION CHECKLIST FOR SUBDIVISION FINAL PLAT Lake County Planning, Building and Development Department 500 W. Winchester Rd. Unit 101 Libertyville, Illinois 60048-1331 Telephone (847) 377-2600 E-mail:

More information

THE CITY OF MOBILE, ALABAMA

THE CITY OF MOBILE, ALABAMA THE CITY OF MOBILE, ALABAMA LETTER OF DECISION March 9, 2018 Byrd Surveying, Inc. 2609 Halls Mill Road Mobile, AL 36606 Re: 4439 Rangeline Road (Northwest corner of Rangeline Road and Halls Mill Road).

More information

WESTMINSTER PARK PLACE SUBDIVISION

WESTMINSTER PARK PLACE SUBDIVISION WESTMINSTER PARK PLACE SUBDIVISION Engineering Comments: FINAL PLAT COMMENTS (should be addressed prior to submitting the FINAL PLAT for review and/or signature by the City Engineer): A. Provide all of

More information

Condominium Unit Requirements.

Condominium Unit Requirements. ARTICLE 19 CONDOMINIUM REGULATIONS Section 19.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

CONDOMINIUM REGULATIONS

CONDOMINIUM REGULATIONS ARTICLE 37 CONDOMINIUM REGULATIONS SECTION 37.01. Purpose The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

FINAL PLAT APPLICATION

FINAL PLAT APPLICATION FINAL PLAT APPLICATION (Page 1 of 3) LEGAL OWNER(s): NAME: STREET ADDRESS OWNER(s): CITY, STATE, ZIP CODE: PHONE NUMBER: BILLING ADDRESS: NAME OF ENGINEER/SURVEYOR: Engineer/Surveyor Address, Phone: PROPERTY

More information

Planning Department st Avenue East Kalispell, MT Phone: (406) Fax: (406)

Planning Department st Avenue East Kalispell, MT Phone: (406) Fax: (406) Planning Department 201 1 st Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 www.kalispell.com/planning April 1, 2015 Doug Russell, City Manager City of Kalispell 201 1 st Ave

More information

MAPLETON CITY CORPORATION. Step 7: Upon final approval and prior to plat recording the applicant shall provide the following:

MAPLETON CITY CORPORATION. Step 7: Upon final approval and prior to plat recording the applicant shall provide the following: MAPLETON CITY CORPORATION Subdivision Process The City s subdivision requirements are designed to facilitate orderly, safe and efficient development and to implement the adopted General Plan. Below is

More information

THE WHEELER BUILDING SUBDIVISION

THE WHEELER BUILDING SUBDIVISION THE WHEELER BUILDING SUBDIVISION Engineering Comments: FINAL PLAT COMMENTS (should be addressed prior to submitting the FINAL PLAT for review and/or signature by the City Engineer): A. Provide all of the

More information

BROADWAY THREE NOTCH ROAD SUBDIVISION

BROADWAY THREE NOTCH ROAD SUBDIVISION # 3 SUB-000803-2018 BROADWAY THREE NOTCH ROAD SUBDIVISION Engineering Comments: FINAL PLAT COMMENTS (should be addressed prior to submitting the FINAL PLAT for review and/or signature by the City Engineer):

More information

Subdivision Staff Report

Subdivision Staff Report Subdivision Staff Report Name: Madronawood Subdivision Date: January 26, 2005 File: SUB05-00005 Meeting: February 1, 2005 Approval: Preliminary To: City Council Lead Agency: Ada County (04-31-S) From:

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019 DEVELOPMENT NAME SUBDIVISION NAME Springhill Village Subdivision Springhill Village Subdivision LOCATION 4350, 4354, 4356, 4358,

More information

APPENDIX 7 SPECIAL NOTES FOR PLATS AND CONSTRUCTION PLANS

APPENDIX 7 SPECIAL NOTES FOR PLATS AND CONSTRUCTION PLANS APPENDIX 7 SPECIAL NOTES FOR PLATS AND CONSTRUCTION PLANS EASEMENT AND DRAINAGE STATEMENT TO BE PLACED ON PLANS AND ALL SUBDIVISION PLATS REQUIRING SOIL DRAINAGE MANAGEMENT PLANS The easements designated

More information

13-2 SUBDIVISION PLANS AND PLATS REQUIRED EXCEPTIONS Subdivision Plats Required To be Recorded

13-2 SUBDIVISION PLANS AND PLATS REQUIRED EXCEPTIONS Subdivision Plats Required To be Recorded ARTICLE XIII SUBDIVISIONS 13-1 INTENT AND PURPOSE 13-1-1 Intent: It is the intent of the County Commission through the adoption of this Article to more fully avail itself of the power granted under 17-27-601

More information

ARTICLE SINGLE FAMILY SITE CONDOMINIUM DEVELOPMENT STANDARDS

ARTICLE SINGLE FAMILY SITE CONDOMINIUM DEVELOPMENT STANDARDS ARTICLE 28.00 SINGLE FAMILY SITE CONDOMINIUM DEVELOPMENT STANDARDS Section 28.01 PURPOSE The purpose of this Article is to recognize that conventional single family developments, traditionally developed

More information

I. Requirements for All Applications. C D W

I. Requirements for All Applications. C D W 108-16.1. Application checklists. Checklist for Required Submissions to the Planning Board or Zoning Board of Adjustment of Monroe Township All required submissions are to be made to the Administrative

More information

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513)

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513) CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT 11700 SPRINGFIELD PIKE SPRINGDALE, OHIO 45246 TELEPHONE: (513) 346-5730 SUBMISSION REQUIREMENTS AND INSTRUCTIONS FOR FINAL PUD/TRANSITION DISTRICT

More information

BETTA STOR-IT SUBDIVISION

BETTA STOR-IT SUBDIVISION BETTA STOR-IT SUBDIVISION Engineering Comments: Must comply with all storm water and flood control ordinances. Any increase in impervious area in excess of 4,000 square feet will require detention. Any

More information

RIVERDALE CITY PLANNING COMMISSION APPLICATION FOR RESIDENTIAL SUBDIVISION SITE PLAN APPROVAL

RIVERDALE CITY PLANNING COMMISSION APPLICATION FOR RESIDENTIAL SUBDIVISION SITE PLAN APPROVAL Community Development 4600 So. Weber River Drive Riverdale, Utah 84405 RIVERDALE CITY PLANNING COMMISSION APPLICATION FOR RESIDENTIAL SUBDIVISION SITE PLAN APPROVAL CASE NO: DATE SUBMITTED: APPLICANT S

More information

#1 (CAR /SUB )

#1 (CAR /SUB ) Development Services Department Project/File: Lead Agency: Site address: Fork South #1 (CAR14-00009/SUB14-00024) The applicant is requesting annexation, rezone and preliminary plat approvals for a 52-lot

More information

Right-of-Way & Development Services Planning Review Division Committed to Service This application is approved at the staff level on February 1, 2006.

Right-of-Way & Development Services Planning Review Division Committed to Service This application is approved at the staff level on February 1, 2006. Right-of-Way & Development Services Planning Review Division Committed to Service This application is approved at the staff level on February 1, 2006. Tech Review for this item was held with the applicant

More information

ARTICLE 3 DEFINITIONS

ARTICLE 3 DEFINITIONS Sections: 3-1 Rules of Construction 3-2 Definitions ARTICLE 3 DEFINITIONS SECTION 3-1 RULES OF CONSTRUCTION 3-101. a. The language set forth in these regulations shall be interpreted in accordance with

More information

ARTICLE 900 PLAT AND PLAN REQUIREMENTS

ARTICLE 900 PLAT AND PLAN REQUIREMENTS ARTICLE 900 PLAT AND PLAN REQUIREMENTS SEC. 900.1 ITEMS TO BE SHOWN ON PLAT OR PLAN General (1) Property lines of all property owners adjacent to the exterior boundaries of the project shall be located

More information

DRIVEWAY REQUIREMENTS

DRIVEWAY REQUIREMENTS APPLICATION FOR: RESIDENTIAL DRIVEWAY / ACCESS Zoning Review Mail: - 101 White Ave. S.E. - Live Oak, FL 32064 Office: City Hall Annex - 416 Howard Street E - Live Oak, FL 32064 Phone: 386.362.2276 ofc.

More information

FINAL PLAT CHECKLIST

FINAL PLAT CHECKLIST FINAL PLAT CHECKLIST Project Name: Tax ID #: Project Number: Date: _ Reviewed By: Telephone: Please address all items marked with an "X" Please return redline comments with corrected plan, original mylar,

More information

WESTMINSTER PARK SUBDIVISION

WESTMINSTER PARK SUBDIVISION WESTMINSTER PARK SUBDIVISION Engineering Comments: FINAL PLAT COMMENTS (should be addressed prior to submitting the FINAL PLAT for review and/or signature by the City Engineer): A. Provide all of the required

More information

NOT TO BE SUBMITTED WITH SKETCH DESIGN APPROVAL Subdivision Checklist: Major Subdivision Final Plat

NOT TO BE SUBMITTED WITH SKETCH DESIGN APPROVAL Subdivision Checklist: Major Subdivision Final Plat Must be received with review fee (equal to $200.00, plus $25.00 per lot) no later than 15 days prior to Planning Board meeting, which is normally the first Monday of the month (certain holidays may modify

More information

SUBDIVISION, PLANNED UNIT DEVELOPMENT, & REZONING STAFF REPORT Date: September 17, 2015

SUBDIVISION, PLANNED UNIT DEVELOPMENT, & REZONING STAFF REPORT Date: September 17, 2015 SUBDIVISION, PLANNED UNIT DEVELOPMENT, & REZONING STAFF REPORT Date: September 17, 2015 APPLICANT NAME SUBDIVISION NAME DEVELOPMENT NAME LOCATION Daniel Clark Mack Manufacturing Subdivision, Resubdivision

More information