Prepared by and to be returned to Linn County Planning & Development nd Street S.W., Cedar Rapids, Iowa (319)
|
|
- Helena Lawrence
- 5 years ago
- Views:
Transcription
1 Prepared by and to be returned to Linn County Planning & Development nd Street S.W., Cedar Rapids, Iowa (319) LINN COUNTY, IOWA ZONING BOARD OF ADJUSTMENT In the matter of the application of Scott B De Camp & Mary J Zalesky, Owners, and, Petitioner, requesting a Conditional Use Floodplain Permit for an accessory structure in accordance with Article 7, Section 13, (5) of the Linn County Unified Development Code. The property is located at 1074 Springville Rd, and generally described as being in the NESE DECISION AND ORDER CASE NUMBER FINDINGS OF FACT The Board of Adjustment makes the following Findings of Fact: 1. Scott De Camp & Mary Zalesky are the owners of record of the subject property. 2. The subject parcel is zoned AG (Agricultural). 3. The location of the proposed accessory structure is designated as an unstudied 100-year floodplain on the current Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM). 4. A Floodplain Permit is a conditional use in an unstudied General Floodplain Overlay District. 5. An application for a Conditional Use Floodplain Permit was received on July 13, A site specific floodplain elevation determination was received on August 2 nd, 2017 from Bill Cappuccio, Floodplain Management Engineer for the Iowa Department of Natural Resources (IDNR), stating:
2 Page 2 of 7 (1) The site is not in a Floodway, and (2) The 100-year flood elevation as determined by the IDNR is lower than the existing natural ground elevations at the project site. The 100-year flood elevation for this location is determined to be ft. Ground elevations at the project site are above that elevation (between ft). 7. The Linn County Planning & Zoning Commission recommended approval of the application at their August 21, 2017 meeting by a vote of 7 to 0. CONCLUSIONS OF LAW: CONFORMANCE TO THE UNIFIED DEVELOPMENT CODE ARTICLE 7, SECTION 13 FLOODPLAIN OVERLAY DISTRICT (b)(iii)(3) Factors. In reviewing applications for conditional uses or requests for variances, the Board of Adjustment shall consider all relevant factors specified in other sections of the UDC and: (A): The danger to life and property due to increased flood heights or velocities caused by encroachments. The proposed accessory structure will not cause increased flood heights or velocities based on IDNR determination of the 100-year floodplain. (B): The danger that materials may be swept on to other lands or downstream to the injury of others. The proposed accessory structure and its contents will pose little to no danger to people and property downstream based on IDNR determination of the 100-year floodplain. (C): The proposed water supply and sanitation systems and the ability of these systems to prevent disease, contamination and unsanitary conditions. n/a (D): The susceptibility of the proposed facility and its contents to flood damage and the effect of such flood damage on the individual owner. The proposed accessory structure and its contents will have little to no susceptibility to flood damage based on IDNR determination of the 100-year floodplain. (E): The importance of the services provided by the proposed facility to the County Board. n/a (F): The requirements of the facility for a floodplain location.
3 Page 3 of 7 The accessory structure is not being placed in a floodplain location based on IDNR determination of the 100-year floodplain. (G): The availability of alternate locations not subject to flooding for the proposed uses. The availability of alternate locations not subject to flooding is not relevant to the case based on IDNR determination of the 100-year floodplain. (H): The compatibility of the proposed use with existing development and development anticipated in the foreseeable future. The proposed development will be compatible with surrounding development as long as it adheres to the Linn County UDC maximum size requirement for an accessory structure, in front of a principal structure, on a parcel of 3 acres or less. (I): The relationship of the proposed use to the comprehensive plan and flood plain management program for the area. The proposed use is consistent with the floodplain management practices of Linn County. (J): The safety of access to the property in times of flood for ordinary and emergency vehicles. Ordinary and emergency vehicles will have safe access to the property in times of flood. (K): The expected height, velocity, duration, rate of rise and sediment transport of the floodwater expected at the site. It is not anticipated that the proposed use will affect existing conditions for any of these elements based on IDNR determination of the 100-year floodplain. (L): Such other factors which are relevant to the purpose of this ordinance. There are no other factors which are relevant.
4 Page 4 of 7 ORDER WHEREFORE, it has been demonstrated that all Legal Principles have been met; it is ordered that the appellant is granted a Conditional Use Floodplain Permit,, for an Accessory Structure to be sited in the following location: 1074 SPRINGVILLE RD Mount Vernon, IA (This permit is subject to the conditions as shown on Attachment A.) Voting aye: Voting nay: Not voting: Absent: Any person who desires to appeal this decision to a court of record may do so within 30 days after the filing of this decision with the Board s office. Done this 6 th day of September, Veronica Cerka, Chairperson Linn County Board of Adjustment Space below reserved for Planning and Development office use only. FILING DATE:
5 Page 5 of 7 Attachment A LINN COUNTY ENGINEERING DEPARTMENT STEVE GANNON, COUNTY ENGINEER, Steve.Gannon@linncounty.org Brad.Ketels@linncounty.org 1. Entrance permit required for new entrances and existing unpermitted entrances, Sec.11 and the Unified Development Code, Article 4, Sec. 8B 9(e). One entrance per parcel is allowed. An additional access may be allowed with justification and permit. An easement must be shown and recorded for drive access through adjacent property to shared drive. Comments: 1. No construction within the County right-of-way without a permit from the Linn County Engineer. 2. Entrance permit required for new entrances and existing entrances that do not conform to County Standard Specifications. Only a breakaway mailbox is allowed. Decorative walls, or other items that may identify the owner or address of the property, are not allowed within the road right-of-way. 3. Proposed private and public roads shall be constructed to comply with County Standard Specifications. 4. All drainage easements follow the natural flow of surface water as per Article 4, Section 8B, 9(f)(ii) of the Unified Development Code. 5. No vertical headwalls within the right-of-way. A breakaway mailbox is allowed. No other type of mailbox is allowed within the road right-of-way. Decorative walls, or other items that may identify the owner or address of the property, are not allowed within the road right-of-way. IOWA DEPARTMENT OF TRANSPORTATION JOEL KEIM, ENGINEERING OPERATIONS TECHNICIAN, Joel.Keim@dot.iowa.gov LINN COUNTY PUBLIC HEALTH DEPARTMENT SUE ELLEN HOSCH, ENVIRONMENTAL SPECIALIST, SueEllen.Hosch@linncounty.org NATURAL RESOURCES CONSERVATION SERVICE JON GALLAGHER, LINN COUNTY SOIL CONSERVATIONIST
6 Page 6 of 7 JOHN BRUENE, DISTRICT CONSERVATIONIST, x3 Jon.Gallagher@ia.nacdnet.net Comments: 1. Before grading and building on lots, a plan for erosion control is needed. Plan shall be implemented before, during, and after construction. Utilize Erosion Control for Small Site Development brochure during construction of homes and outbuildings. The brochure can be obtained from the NRCS office or Planning and Development. LINN COUNTY CONSERVATION DEPARTMENT DENNIS GOEMAAT, Dennis.Goemaat@linncounty.org LINN COUNTY EMERGENCY MANAGEMENT MIKE GOLDBERG, Mike.Goldberg@linncounty-ema.org LINN COUNTY 911 COORDINATOR SHARENE OTTAWAY, Sharene.Ottaway@linncounty.org LINN COUNTY PLANNING AND DEVELOPMENT - ZONING DIVISION MIKE TERTINGER, PLANNER, Mike.Tertinger@linncounty.org 1. The Conditional Use application shall be reviewed within one year to ensure that all conditions have been met. 2. The Conditional Use permit authorizes the permit holder the use of land or structures in a particular way and subject to certain conditions. As such, it is transferable; however, no person (including successors or assigns of the original permit holder) may make use of the land or structures covered under such permit except in accordance with all terms and requirements of the permit, so long as the permit remains in effect.
7 Page 7 of 7 3. The Conditional Use permit shall expire automatically (a) if, within 5 years after issuance, substantial action has not been taken to accomplish the purpose of the permit, or; (b) if, after substantial action has been taken and subsequently such work is discontinued for a period of one year, the permit shall immediately expire, or; (c) if the conditional use has been established and subsequently is discontinued for a period of one year, or; (d) if the official FEMA Flood Insurance Rate Map has been updated to show the conditional use permit project location is no longer considered within the 100-year flood elevation, the permit shall expire. 4. Site plan shall meet the standards of Article 4, Section 7, Subsection 1, of the Unified Development Code. 5. The petitioner shall sign an Acceptance of Conditions form which provides assurance that all conditions will be met on a continuous basis and specifically agrees to hold Linn County harmless from any and all damages or claims for damages that might arise or accrue by reason of approval of the conditional use case by the Linn County Board of Adjustment. Further, by signing the Acceptance of Conditions form, the petitioner shall agree to allow employees of the County reasonable access to the property for inspection and for submission of documents to verify employment level of off-site employees. 6. All zoning requirements shall be met. LINN COUNTY PLANNING AND DEVELOPMENT - BUILDING DIVISION ANDREW OIEN, BUILDING OFFICIAL, Andrew.Oien@linncounty.org 1. A building permit is required before work to construct, enlarge, alter, repair, move, or demolish a building or structure, or to change the occupancy (use) of a building or structure. 2. Separate permits are required for any electrical, plumbing, and/or mechanical (HVAC) work. Permits shall be obtained and work performed by contractors licensed in the respective trade. 3. A certificate of occupancy issued by the building official is required before the building or structure, or portion thereof, is used or occupied. 4. Conditional Use applicants should contact the building official for specific code provisions and/or submittal documents required for the proposed business or conditional use. Based on cursory review of preliminary plans, the operatory room with medical gas use may require special building code considerations. Public restrooms will need to be accessible per Chapter 11 of the 2009 International Building Code (and ANSI A by reference).
Prepared by and to be returned to Linn County Planning & Development nd Street S.W., Cedar Rapids, Iowa (319)
Prepared by and to be returned to Linn County Planning & Development 935 2 nd Street S.W., Cedar Rapids, Iowa 52404-2161 (319) 892-5130 LINN COUNTY, IOWA ZONING BOARD OF ADJUSTMENT IN THE MATTER OF THE
More informationPrepared by and to be returned to Linn County Planning & Development nd Street S.W., Cedar Rapids, Iowa (319)
Prepared by and to be returned to Linn County Planning & Development 935 2 nd Street S.W., Cedar Rapids, Iowa 52404-2161 (319) 892-5130 LINN COUNTY, IOWA ZONING BOARD OF ADJUSTMENT IN THE MATTER OF THE
More informationCASE # JPS EXECUTIVE SUMMARY RESIDENTIAL PARCEL SPLIT STAFF CONTACT: MIKE TERTINGER
CASE # JPS17-0019 EXECUTIVE SUMMARY RESIDENTIAL PARCEL SPLIT STAFF CONTACT: MIKE TERTINGER OWNER/APPLICANT INFORMATION OWNER/APPLICANT: MAILING ADDRESS: PROPERTY ADDRESS: Tom & Kim Sindelar 4292 Boy Scouts
More informationCASE # PS EXECUTIVE SUMMARY RESIDENTIAL PARCEL SPLIT STAFF CONTACT: STEPHANIE LIENTZ
CASE # PS15-0009 EXECUTIVE SUMMARY RESIDENTIAL PARCEL SPLIT STAFF CONTACT: STEPHANIE LIENTZ OWNER/APPLICANT INFORMATION OWNER/APPLICANT: James L & Esther M Benesh Darek Benesh MAILING ADDRESS: PROPERTY
More informationCASE # JR EXECUTIVE SUMMARY REZONING STAFF CONTACT: STEPHANIE LIENTZ
CASE # JR16-0002 EXECUTIVE SUMMARY REZONING STAFF CONTACT: STEPHANIE LIENTZ OWNER/APPLICANT INFORMATION OWNER/APPLICANT: Donald & Martha Berner Michael & Sandra Wolrab MAILING ADDRESS: PO BOX 93 Mt Vernon,
More informationPresentation and discussion on the proposed Maquoketa River Watershed Management Authority.
James Houser District 1 Stacey Walker District 2 Ben Rogers District 3 Brent Oleson District 4 John Harris District 5 MEETING AGENDA MONDAY, DECEMBER 5, 2016 9:00 A.M. INFORMAL BOARD ROOM JEAN OLEY PUBLIC
More informationLINN COUNTY BOARD OF ADJUSTMENT. Jean Oxley Public Service Center nd Street SW, Cedar Rapids, Iowa. MINUTES Wednesday, March 28, 2018
LINN COUNTY BOARD OF ADJUSTMENT Jean Oxley Public Service Center 935 2 nd Street SW, Cedar Rapids, Iowa MINUTES Wednesday, I. QUORUM DETERMINE D: The Linn County Board of Adjustment meeting was called
More informationFloodplain Development Land Use Review
PUBLIC WORKS - COMMUNITY DEVELOPMENT 333 Broadalbin Street SW, PO Box 490, Albany, Oregon 97321-0144 BUILDING 541-917-7553 PLANNING 541-917-7550 Floodplain Development Land Use Review Application Information
More informationBYRON TOWNSHIP 8085 BYRON CENTER AVENUE, SW BYRON CENTER, MI PHONE: FAX: STORMWATER APPLICATION AND PERMIT
BYRON TOWNSHIP 8085 BYRON CENTER AVENUE, SW BYRON CENTER, MI 49315 PHONE: 616-878-9066 616-878-3980 STORMWATER APPLICATION AND PERMIT This application is not a valid Permit until reviewed / approved /
More informationDIVISION 1. - GENERAL PROVISIONS
Sec. 90-708. - Statutory authorization and purpose. Sec. 90-709. - Applicability. Sec. 90-710. - Compliance and liability. Sec. 90-711. - Records. Sec. 90-712. - Abrogation and greater restrictions. Sec.
More informationFlood Plain Management
Ordinance No. 40 AN ORDINANCE establishing Flood Plain Management regulations in the un-incorporated area of Monroe County. The Legislature of the State of Iowa has in Chapter 335 Code of Iowa, as amended,
More informationORDINANCE NO
ORDINANCE NO. 14 126 Introduced by: Joseph M. Reda Date of introduction: TO AMEND CHAPTER 40 OF THE NEW CASTLE COUNTY CODE (ALSO KNOWN AS THE UNIFIED DEVELOPMENT CODE OR UDC ), ARTICLE 4 ( DISTRICT INTENSITY
More informationLegal Description Part of the Western Half of the Eastern Half of the Northwest Quarter of Section 30, Le Ray Township
Owner and Applicant s 20448 State Highway 83 Mankato, MN 56001 Request and Location Request for review and approval of a Conditional Use Permit to allow an Elder Care Residential Unit to be constructed
More informationSIOUX COUNTY IOWA FLOODPLAIN MANAGEMENT ORDINANCE
SIOUX COUNTY IOWA FLOODPLAIN MANAGEMENT ORDINANCE SIOUX COUNTY FLOODPLAIN MANAGEMENT ORDINANCE SECTION I Statutory Authority, Findings of Fact and Purpose A. The Legislature of the State of Iowa has in
More informationFLOOD-RESISTANT CONSTRUCTION
FLOOD-RESISTANT CONSTRUCTION The provisions contained in this appendix are not mandatory unless specifically referenced in the adopting ordinance. SECTION G101 ADMINISTRATION G101.1 Purpose. The purpose
More informationEffective Date: July 21, 2017 Page 1 of 8. Reference: DBC Admin 132.9, IEBC 407.1, Ordinance No , Series of 2017
Effective Date: July 21, 2017 Page 1 of 8 Reference: DBC Admin 132.9, IEBC 407.1, Ordinance No. 20170726, Series of 2017 DEFINITIONS Applicant In this policy means the owner of the building or the tenant
More informationORDINANCE NO
ORDINANCE NO. 2017-01 AN ORDINANCE TO ADOPT THE GUTHRIE COUNTY, IOWA FLOODPLAIN MANAGEMENT ORDINANCE SETTING FORTH THE REGULATIONS GOVERNING THE ORDERLY LAND DEVELOPMENT FOR ALL THE UNINCORPORATED AREA
More information(Chapter Flood Damage Prevention)
Chapter 13.10 Flood Damage Prevention Section: 13.10.010 Purpose and Policy 13.10.020 Definitions 13.10.030 Applicability and Areas of Special Flood Hazard 13.10.040 Administration 13.10.050 Provisions
More informationCHAPTER XVII. REGULATION OF FLOOD PLAIN STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND OBJECTIVES
CHAPTER XVII. REGULATION OF FLOOD PLAIN ARTICLE 1.0 STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND OBJECTIVES 17.0101 STATUTORY AUTHORIZATION The Legislature of the State of North Dakota has in
More informationARTICLE I. IN GENERAL
Adopted by City Council on December 7, 2009 AN ORDINANCE TO AMEND AND REORDAIN CHAPTER 10 (WATER PROTECTION) OF THE CODE OF THE CITY OF CHARLOTTESVILLE, 1990, AS AMENDED, BY DELETING SECTIONS 10-51 AND
More informationLINN COUNTY BOARD OF SUPERVISORS CEDAR RAPIDS, LINN COUNTY, IOWA WEDNESDAY, APRIL 29, :00 A.M.
LINN COUNTY BOARD OF SUPERVISORS CEDAR RAPIDS, LINN COUNTY, IOWA WEDNESDAY, APRIL 29, 2015 10:00 A.M. The Board met in session at the Linn County Jean Oxley Public Service Center. Present: Vice Chairperson
More informationSection Floodplain Development Ordinance This ordinance, adopted pursuant to the authority of RSA 674:16, shall be known as the Town of Newport
Section 212 - Floodplain Development Ordinance This ordinance, adopted pursuant to the authority of RSA 674:16, shall be known as the Town of Newport Floodplain Development Ordinance. The regulations and
More informationTown of Scarborough, Maine
Town of Scarborough, Maine Miscellaneous Appeal INFORMATION REQUIRED FOR ALL APPEALS Before any appeal can be processed, the following material must be submitted to the Code Enforcement Office: 1. A fee
More informationResidential Subdivision Preliminary Plat Application
WATER MODELING FEES Major : $650 or Minor : $550 # of lots x $35 per lot Residential Preliminary Plat Application Lots: 1-9 10-19 20-49 50-99 100-199 $300 $400 $475 $625 $825 200-349 350-499 500-499 700-999
More informationCOMMERCIAL SITE DEVELOPMENT GUIDE FOR UNINCORPORATED ST. CHARLES COUNTY
COMMERCIAL SITE DEVELOPMENT GUIDE FOR UNINCORPORATED ST. CHARLES COUNTY GENERAL INFORMATION: This brochure is to be used as a guide and is not intended to amend or supersede the corresponding County ordinances
More informationTown of Alexandria. Floodplain Management Ordinance
1 of 7 8/8/2009 4:56 PM Town of Alexandria Floodplain Management Ordinance SECTION 1 PURPOSE Certain areas of the Town of Alexandria, New Hampshire are subject to periodic flooding, causing serious damages
More informationDU PAGE COUNTY ZONING BOARD OF APPEALS JACK T. KNUEPFER ADMINISTRATION BUILDING 421 NORTH COUNTY FARM ROAD, WHEATON, ILLINOIS 60187/
DU PAGE COUNTY ZONING BOARD OF APPEALS JACK T. KNUEPFER ADMINISTRATION BUILDING 421 NORTH COUNTY FARM ROAD, WHEATON, ILLINOIS 60187/ 630-407-6700 M E M O R A N D U M TO: FROM: DuPage County Board DuPage
More informationNEW SINGLE FAMILY RESIDENTIAL
Community Development Building & Permitting Development 38 Hill Street, Suite G-30 Roswell, GA 30075 770-641-3780 www.roswellgov.com NEW SINGLE FAMILY RESIDENTIAL BUILDING PERMIT APPLICATION This packet
More informationTOWN OF ERWIN Zoning Board of Appeals
TOWN OF ERWIN Zoning Board of Appeals MINUTES 10/27/15 MEETING PRESENT: Chairman Frank Thiel, Bridget Ackerman, Ruth Fisher McCarthy, Jay McKendrick, Angela Narasimhan, Kris West ABSENT: GUESTS: Kevin
More informationLINN COUNTY BOARD OF ADJUSTMENT. Jean Oxley Public Service Center nd Street SW, Cedar Rapids, Iowa. MINUTES Monday, November 23, 2015
LINN COUNTY BOARD OF ADJUSTMENT Jean Oxley Public Service Center 935 2 nd Street SW, Cedar Rapids, Iowa MINUTES Monday, I. QUORUM DETERMINED: The meeting was called to order at 6:30 p.m. by Chairperson
More informationSECTION 10: FLOOD HAZARD EVALUATION 10-1
10) SECTION 10: FLOOD HAZARD EVALUATION A. General. Land subject to being flooded by a Flood of 100-Year Frequency as defined by Title 76, Chapter 5, MCA, or land subject to flooding pursuant to these
More informationDEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County
REQUIRED MATERIALS FOR RESIDENTIAL BUILDING PERMITS The following materals shall be submitted and reviewed by the Johnson County Planning & Zoning Department PRIOR to the approval of a residential building
More informationPREAMBLE. That the Gratiot County Zoning Ordinance be amended as follows:
Amendment of Gratiot County Zoning Ordinance AN ORDINANCE TO AMEND THE GRATIOT COUNTY ZONING ORDINANCE REQUIREMENTS FOR SOLAR ENERGY SYSTEMS AND SOLAR FARMS FOR THE COUNTY-ZONED TOWNSHIPS OF ELBA, HAMILTON,
More informationCOMMUNITY DEVELOPMENT DEPARTMENT 333 Broadalbin Street SW, P.O. Box 490 Albany, OR 97321
COMMUNITY DEVELOPMENT DEPARTMENT 333 Broadalbin Street SW, P.O. Box 490 Albany, OR 97321 Ph: 541-917-7550 Fax: 541-917-7598 www.cityofalbany.net STAFF REPORT Application for Site Plan Review SP-07-18 and
More informationFLOODPLAIN MANAGEMENT ORDINANCE
FLOODPLAIN MANAGEMENT ORDINANCE SECTION I - Statutory Authority, Findings of Fact and Purpose A. The Legislature of the State of Iowa has in Chapter 364, Code of Iowa, as amended, delegated the power to
More informationFlood Damage Prevention
Flood Damage Prevention Town of Berkshire Local Law No. 1 of the year 1989 A local law for flood damage prevention as authorized by the New York State Constitution, Article IX, Section 2, and Environmental
More informationFENCE PERMIT APPLICATION
Village of Glen Ellyn Planning & Development Department 535 Duane Street Glen Ellyn, IL 60137 Phone: 630-547-5250; Fax: 630-547-5370 www.glenellyn.org FENCE PERMIT APPLICATION Permit Number Date Issued
More informationBASICS OF FLOODPLAIN MANAGEMENT & PLANNING IN NEW JERSEY
BASICS OF FLOODPLAIN MANAGEMENT & PLANNING IN NEW JERSEY STATE OF NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION VINCENT J. MAZZEI, JR., PE November 12, 2008 Flood Hazard Areas What is a 100-year flood?
More informationLINN COUNTY PLANNING & ZONING COMMISSION. MINUTES Monday, September 17, 2018
LINN COUNTY PLANNING & ZONING COMMISSION MINUTES Monday, The Linn County Planning and Zoning Commission meeting was called to order at 6:30 p.m. by Chair, Christine. The meeting was held in the Jean Oxley
More informationCHAPTER County of Alameda Onsite Wastewater Treatment Systems Ordinance
The Alameda County Board of Supervisors hereby finds and declares: A. Modifications to Chapter 15.18 of the Alameda County General Ordinance Code are necessary to comply with new standards and regulations
More informationZoning Permit Application Cover Page
Zoning Permit Application Cover Page The City of Belmont performs an initial site inspection prior to issuance of a zoning permit for new construction. Upon receipt of a full and complete application submittal
More informationGoodhue County Zoning Ordinance Excerpts
Goodhue County Zoning Ordinance Excerpts Full Document available at, http://www.co.goodhue.mn.us/departments/landuse/zoning/ordinance.pdf (last visited March 11, 2014). TABLE OF CONTENTS Article 1: General
More informationDevelopment Guidebook 2016 TEXAS
TEXAS Development Guidebook 2016 DISCLAIMER: This Development Guidebook is not law. For the full and complete requirements necessary for submitting development applications, please see the City of Magnolia
More informationTown of Jamestown Single/Two-family Residential. Building Permit Application Packet
Town of Jamestown Single/Two-family Residential Building Permit Application Packet Contact: Administrator (317) 258-8046, dluzier@grwinc.com This application packet is for residential building permits,
More informationREGIONAL DISTRICT OF NANAIMO BYLAW NO. 1469
REGIONAL DISTRICT OF NANAIMO BYLAW NO. 1469 A BYLAW TO ESTABLISH FLOODPLAINS, CONSTRUCTION LEVELS IN FLOODPLAINS, AND SETBACKS FOR LANDFILL AND STRUCTURES IN FLOODPLAINS WHEREAS Section 910 of the Local
More informationText of law should be given as amended; Do not include matter being eliminated and do not use italics or underlining to indicate new matter.
Local Law Filing NEW YORK STATE DEPARTMENT OF STATE 41 ST ATE STREET ALBANY, NY 12231 Text of law should be given as amended; Do not include matter being eliminated and do not use italics or underlining
More informationDetached Residential Accessory Structures and Garages
How to Obtain a Building Permit Step 1- Is the location appropriate? The first step in the process for building a detached accessory structure or garage on you lot is to make sure that your residence is
More informationProject File #: SF Project Name: Jackson Ranch Filing No. 4 Parcel Nos.: , and
COMMISSIONERS: DARRYL GLENN (PRESIDENT) MARK WALLER (PRESIDENT PRO TEMPORE) STAN VANDERWERF LONGINOS GONZALEZ PEGGY LITTLETON PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CRAIG DOSSEY, EXECUTIVE DIRECTOR
More informationORDINANCE NO. _4.06 AN ORDINANCE TO ESTABLISH BUILDING SITE REGULATIONS SECTION A PURPOSE AND INTENT
ORDINANCE NO. _4.06 AN ORDINANCE TO ESTABLISH BUILDING SITE REGULATIONS SECTION A PURPOSE AND INTENT This Ordinance provides minimum regulations, provisions and requirements for safe, aesthetically pleasing
More informationFENCE BUILDING PERMIT APPLICATION
Village of Glen Ellyn Planning & Development Department 535 Duane Street Glen Ellyn, IL 60137 Phone: 630-547-5250; Fax: 630-547-5370 www.glenellyn.org FENCE BUILDING PERMIT APPLICATION Permit Number Date
More informationPlanning and Zoning Commission
Village of Lemont Planning and Zoning Commission 418 Main Street Lemont, Illinois 60439 phone 630-257-1595 fax 630-257-1598 PLANNING & ZONING COMMISSION Regular Meeting Wednesday, January 18, 2012 6:30
More informationCOUNTY OF TAZEWELL DEPARTMENT OF COMMUNITY DEVELOPMENT
The following checklist is aid in a thorough submittal process and shall be submitted with a building permit application: Completed commercial building permit application to include a Site Plan of the
More informationEXTRA-TERRITORIAL ZONING AUTHORITY
EXTRA-TERRITORIAL ZONING AUTHORITY DOÑA ANA COUNTY COMMUNITY DEVELOPMENT DEPARTMENT Doña Ana County Government Complex 845 North Motel Boulevard Las Cruces, New Mexico 88007 Office: (575) 647-7237 MEETING
More informationBUILDING PERMIT / ZONING USE PERMIT APPLICATION
Date Received Zoning District: UPPER MILFORD TOWNSHIP ~ LEHIGH COUNTY, PA Permit No. Pin No. BUILDING PERMIT / ZONING USE PERMIT APPLICATION CONTACT INFORMATION: Check who is responsible for permit. Site
More information***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS
105.11. Permit requirements. 105.12. Waiver of permit requirements. Title 25 Environmental Protection Part I. Department of Environmental Protection Subpart C. Protection of Natural Resources Article I.
More informationCHAPTER 3 PERMITS, PLANS AND ANNEXATION
CHAPTER 3 PERMITS, PLANS AND ANNEXATION SECTION: 10-3-1: General Regulations 10-3-2: Building Permit 10-3-3: Plans 10-3-4: Certificate of Compliance and Occupancy 10-3-5: Conditional Use Permits 10-3-6:
More informationZONING COMPLIANCE PERMIT APPLICATION
Description of Work Property Contractor Owner Applicant Corporation of Harpers Ferry Listed on the National Registry of Historic Places 1000 Washington Street P.O. Box 217 Harpers Ferry, West Virginia
More informationTABLE OF CONTENTS ARTICLE I
TABLE OF CONTENTS Section Page ARTICLE I General Provisions 1-1 Title 1 1-2 Authority 1 1-3 Jurisdiction 1 1-4 Purpose and Intent 1 1-5 Interpretation, Conflict, and Severability 3 1-5.1 Interpretation
More informationChapter 5. Floodplain Management. 5.0 Introduction. 5.1 Floodplain Management and Regulation
5.0 Introduction This chapter summarizes the Town s rules and regulations regarding floodplain management and development. The requirements presented in this chapter should be used by the design engineer
More informationSUBDIVISION APPLICATION
SUBDIVISION APPLICATION Community Planning and Economic Development Development Services Division 250 South 4 th Street, Room 300 Minneapolis MN 55415-1316 612-673-3000 This application packet is used
More informationLINCOLN COUNTY FLOOD DAMAGE PREVENTION ORDINANCE
LINCOLN COUNTY FLOOD DAMAGE PREVENTION ORDINANCE SECTION 1.0 STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND OBJECTIVES SECTION 2 DEFINITIONS SECTION 3.0 GENERAL PROVISIONS SECTION 4.0 ADMINISTRATION
More informationRESIDENTIAL PLAN APPROVAL AND INSPECTION FEES. 2. Inspection fee $.25 per sq. ft. Minimum Inspection Fee of $25.00
RESIDENTIAL PLAN APPROVAL AND INSPECTION FEES A fee for each building permit shall be paid as set forth in the following table: (a) New Residential Construction - one and two family: 2. Inspection fee
More informationCity of Xenia, Ohio Official Land Development Code
City of Xenia, Ohio Official Land Development Code Effective July 9, 2016 Ordinance #16-26 Amendments Effective Date Ordinance # 9/23/2017 17-40 Table of Contents Chapter 1218: General Provisions... 1
More informationSUBDIVISION REGULATIONS
SUBDIVISION REGULATIONS CITY OF DICKSON TENNESSEE SUBDIVISION REGULATIONS CITY OF DICKSON, TENNESSEE ADOPTED: June 17, 2008 LAST AMENDED: January 18, 2011 PREPARED FOR THE DICKSON MUNICIPAL PLANNING COMMISSION
More informationFLOOD DAMAGE PREVENTION
ARTICLE 30 FLOOD DAMAGE PREVENTION 30.01 General Provisions... 30-1 30.02 Administration... 30-2 30.03 Provisions for Flood Hazard Reduction... 30-7 30.01 General Provisions 30.01.01 Lands to Which This
More informationTOWN OF SPAFFORD LOCAL LAW 3 OF THE YEAR 2016
TOWN OF SPAFFORD LOCAL LAW 3 OF THE YEAR 2016 A Local Law Amending Local Law No. 2 of the Year 1990 to repeal the existing language and replace it with the following language relating to Flood Damage Prevention
More informationThe Onekama Township Flood Damage Prevention Ordinance of Onekama Township, Manistee County, Michigan was adopted by the Onekama ORDINANCE #4
AN ORDINANCE The Onekama Township Flood Damage Prevention Ordinance of Onekama Township, Manistee County, Michigan was adopted by the Onekama Township Board at a regular meeting of its Township Board held
More informationChapter 5. Floodplain Management. 5.0 Introduction. 5.1 Douglas County Comprehensive Master Plan. 5.2 Floodplain Management and Regulation
5.0 Introduction This chapter summarizes the County s rules and regulations regarding floodplain management and development. The requirements presented in this chapter should be used by the design engineer
More informationMINOR PLAT FILING APPLICATION
FILING APPLICATION Date of PC Meeting: Date of BCC Meeting: Fee Paid: 1. APPLICANT: DAYTIME PHONE: MAILING ADDRESS: LANDOWNER: DAYTIME PHONE: MAILING ADDRESS: AUTHORIZED AGENT: MAILING ADDRESS: RELATIONSHIP
More informationGuide to Combined Preliminary and Final Plats
Guide to Combined Preliminary and Final Plats Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested
More informationMCPC MONONGALIA COUNTY PLANNING COMMISSION 243 High Street, Rm 110, Morgantown, WV Phone Fax
GENERAL APPLICATION FOR DEVELOPMENT OF SIGNIFICANT IMPACT This application shall be used for all Level III reviews of developments of significant impact (DSI) that have a broader impact. Such impacts would
More informationMINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina
MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina This document is a public record under the North Carolina Public Records Act and may be published on the Town s website or disclosed
More informationPlanning Department Frequently Asked Questions
Planning Department Frequently Asked Questions Contents How do I find out what my property is zoned and what that means?... 1 What is the ETJ?... 2 Why do I need a zoning permit?... 2 What do I need to
More informationRESOLUTION NO. R
RESOLUTION NO. R-2008-1394 RESOLUTION APPROVING ZONING APPLICATION Z2008-00294 (CONTROL NO. 1995-00044) OFFICIAL ZONING MAP AMENDMENT (REZONING) APPLICATION OF FLORIDA SEVASHRAM SANGHA INC. BY JON E. SCHMIDT
More informationCHAPTER XVIII SITE PLAN REVIEW
CHAPTER XVIII SITE PLAN REVIEW Section 18.1 Section 18.2 Description and Purpose. The purpose of this chapter is to provide standards and procedures under which applicants would submit, and the Township
More informationARTICLE XI CONDITIONAL USE PERMITS
ARTICLE XI CONDITIONAL USE PERMITS 11.1 Purpose. The City of Hailey recognizes that certain uses possess unique and special characteristics with respect to their location, design, size, method of operation,
More informationAPPLICATION FOR A CERTIFICATE OF ZONING COMPLIANCE
TOWN OF MILO, NEW YORK Department of Code Enforcement and Administration 137 Main Street Penn Yan, New York 14527 Telephone No.: (315) 531-8042 Fax No.: (315) 536-9760 TDD No.: (202) 720-6382 Email: codeofficer@townofmilo.com
More informationARTICLE FIVE FINAL DRAFT
ARTICLE FIVE 021218 FINAL DRAFT Sec. 503.6 Open Space Preservation Option Open Space Preservation Option Open Space Preservation developments may be approved in the AR, R-1, R-2 and R-3 zoning districts,
More informationSUBDIVISION REGULATIONS
CHAPTER 14 SUBDIVISION REGULATIONS 14-100 Provisions 14-200 Preliminary Plat 14-300 Final Plat 14-400 Replat 14-500 Minor Subdivision 14-600 Administrative Replat 14-700 Vacation of Roadways, Public Easements,
More informationMeeting Minutes Lodi Township Planning Commission November 27, 2012 Lodi Township Hall 3755 Pleasant Lake Road Ann Arbor, MI 48103
Meeting Minutes Lodi Township Planning Commission November 27, 2012 Lodi Township Hall 3755 Pleasant Lake Road Ann Arbor, MI 48103 1) Call to Order The meeting was called to order by Chair Jack Steeb at
More informationSalem Township Zoning Ordinance Page 50-1 ARTICLE 50.0: PUD PLANNED UNIT DEVELOPMENT
Salem Township Zoning Ordinance Page 50-1 ARTICLE 50.0 PLANNED UNIT DEVELOPMENT Section 50.01 Purpose The provisions of this Article provide enabling authority and standards for the submission, review,
More informationTOWN OF ROME 1156 ALPINE DR. NEKOOSA, WI (715)
TOWN OF ROME 1156 ALPINE DR. NEKOOSA, WI 54457 (715) 325-8012 For obtaining a Permit for SHEDS AND DECKS the following must be done before the Inspector can issue the permit: 1. County Zoning Permit -
More informationBEFORE THE HEARING EXAMINER FOR THURSTON COUNTY
COUNTY COMMISSIONERS Cathy Wolfe District One Diane Oberquell District Two Robert N. Macleod District Three HEARING EXAMINER BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY In the Matter of the Application
More informationTown of Bristol Rhode Island
Town of Bristol Rhode Island Subdivision & Development Review Regulations Adopted by the Planning Board September 27, 1995 (March 2017) Formatted: Highlight Formatted: Font: 12 pt Table of Contents TABLE
More informationBuildings for Lease or Rent
Buildings for Lease or Rent Table of Contents Page 1. Purpose 3 2. Authority & Administration 3 3. Applicability 3 4. Definitions 3 5. Requirements for Buildings for Rent or Lease 4 6. Application & Review
More informationCONDITIONAL USE PERMIT Application Packet
CONDITIONAL USE PERMIT Application Packet Community Development Department 1020 East Pioneer Road, Draper, UT 84020 (801) 576-6539 Fax (801) 576-6526 Dear Applicant, This application packet has been developed
More informationI hereby declare, by my initials below, and certify to each of the 8 following declarations:
v 6-13-12 6p2s Express Permitting Application CA Health and Safety Code Section 19825 For the following limited residential improvements (check all that apply): (11) County Standard Retaining Wall (60-64)
More informationCHARLOTTE CODE CHAPTER 1: PURPOSE AND APPLICABILITY
CHAPTER 1: PURPOSE AND APPLICABILITY Section 1.101. Title. These regulations shall be known and may be cited as the Zoning Ordinance of the City of Charlotte, North Carolina. Section 1.102. Authority and
More informationCARTER COUNTY, OKLAHOMA FLOODPLAIN BOARD REGULATIONS ARTICLE I STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND METHODS
CARTER COUNTY, OKLAHOMA FLOODPLAIN BOARD REGULATIONS ARTICLE I STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND METHODS SECTION A. STATUTORY AUTHORIZATION The Legislature of the State of Oklahoma
More informationFINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina
FINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina This document is a public record under the North Carolina Public Records Act and may be published on the Town s website or disclosed to third
More informationCHAPTER 30 BUILDING CODE
CHAPTER 30 BUILDING CODE 30.01 SOUTHEASTERN WISCONSIN CODE ADOPTED Pursuant to the authority of Section 66.035 of the Wisconsin Statutes, the Southeastern Wisconsin Uniform Building Code in the form prepared
More informationChapter 4 BUILDINGS; CONSTRUCTION AND RELATED ACTIVITIES*
Chapter 4 BUILDINGS; CONSTRUCTION AND RELATED ACTIVITIES* * Cross References: Creation of noise in construction operation, 9-3(2); manufactured home park construction permit, 11-9; historic properties
More informationAPPLICATION PROCEDURE
ANTRIM PLANNING BOARD P. O. Box 517 Antrim, New Hampshire 03440 Phone: 603-588-6785 FAX: 603-588-2969 APPLICATION FORM AND CHECKLIST FOR EARTH EXCAVATION AND RECLAMATION File # Date Received By APPLICATION
More informationPLANNED UNIT DEVELOPMENTS (Ordinance No.: 3036, 12/3/07; Repealed & Replaced by Ordinance No.: 4166, 10/15/12)
159.62 PLANNED UNIT DEVELOPMENTS (Ordinance No.: 3036, 12/3/07; Repealed & Replaced by Ordinance No.: 4166, 10/15/12) A. PURPOSE 1. General. The Planned Unit Development (PUD) approach provides the flexibility
More informationSubchapter 16 Subdivisions.
Subchapter 16 Subdivisions. Sections: 35.16.1 Authority. 35.16.2 Purpose. 35.16.3 Jurisdiction. 35.16.4 Application. 35.16.5 Compliance and Enforcement. 35.16.6 Approval of Plat Required. 35.16.7 Lots,
More informationSeptic Tank / Drainfield / Holding Tank Permit Application
Septic Tank / Drainfield / Holding Tank Permit Application : Permit # : PID #: Septic Fee $: Soil Verification Fee $: Investigative/Other Fee $: PLEASE PRINT CLEARLY Total Permit Fee $: The Applicant Is:
More informationLINN COUNTY BOARD OF SUPERVISORS CEDAR RAPIDS, LINN COUNTY, IOWA WEDNESDAY, JANUARY 21, :30 A.M.
LINN COUNTY BOARD OF SUPERVISORS CEDAR RAPIDS, LINN COUNTY, IOWA WEDNESDAY, JANUARY 21, 2015 8:30 A.M. The Board met in session at the Linn County Jean Oxley Public Service Center. Present: Chairperson
More information201 General Provisions
201 General Provisions 201.01 Title 201.09 Amendments 201.02 Purpose and Intent 201.10 Public Purpose 201.03 Authority 201.11 Variances and Appeals 201.04 Jurisdiction 201.12 Nonconformances 201.05 Enactment
More informationChapter 8 FLOOD PREVENTION AND PROTECTION
Chapter 8 FLOOD PREVENTION AND PROTECTION ARTICLE I - GENERAL 8.1 Title. 8.2 Scope. 8.3 Intent. 8.4 Coordination with the Florida Building Code. 8.5 Warning. 8.6 Disclaimer of Liability. 8.7 through 8.10
More informationTOWN OF JEWETT LOCAL LAW # OF 2008 FLOOD PREVENTION LOCAL LAW STATUTORY AUTHORIZATION AND PURPOSE
TOWN OF JEWETT LOCAL LAW # OF 2008 FLOOD PREVENTION LOCAL LAW SECTION 1. STATUTORY AUTHORIZATION AND PURPOSE 1.1 FINDINGS The Town Board of the Town Jewett finds that the potential and/or actual damages
More information