1 for a Boundary Survey of the DeHart Reservoir Property Capital Region Water Administrative Offices 212 Locust Street, Suite 302 Harrisburg, PA

2 Boundary Survey of the DeHart Reservoir Property Invitation Capital Region Water (CRW) is requesting Proposals for the professional services and expertise of a licensed land surveyor to establish and verify the boundaries of the approximately 8,000 acres of CRW property surrounding the DeHart Reservoir in Clarks Valley, Pennsylvania. Proposal Process Schedule Task Date RFP Issued April 24, 2015 Proposal Due Date June 5, 2015 by 4:00 PM EST Interview Period (if deemed necessary) June 15-19, 2015 Selection of Consultant June 24, 2015 General Information and Background CRW owns approximately 8,000 acres in Rush Township, Dauphin County, Pennsylvania. The land (largely forested) surrounds the DeHart Reservoir the primary drinking water source for the City of Harrisburg and nearby communities. The DeHart Reservoir is made possible due to an impoundment of Clark Creek, a high quality, cold water fishery. CRW is interested in a boundary survey to confirm the location of property lines for management and planning purposes, including conservation protection. CRW s Board and staff desires a comprehensive management approach to the acreage owned in Clarks Valley, including an option for the land to be conserved in long-term perpetuity. The property boundary survey is a single component of a plan that may include a legal analysis of permanent conservation protection (i.e., restriction or easement), forest management services, and source water protection planning. Requests for Proposals (RFPs) for a forest stewardship plan and legal assistance are also attached hereto. Proposers are welcome and encouraged to submit additional Proposals if the professional or firm can demonstrate expertise in multiple facets of ecosystem management, surveying, and legal analysis. Proposal Requirements Scope of Work CRW has outlined the scope of work below. Please reference and provide a response to CRW s scope and specific tasks. A:\Sustainability\DeHart Comprehensive Management\RFP_Boundary Survey_final draft.docx Page 1 of 5

3 Boundary Survey of the DeHart Reservoir Property Task: Perform a boundary retracement survey in accordance with the Manual of Practice for Professional Land Surveyors in the Commonwealth of Pennsylvania to establish the real property title or rights of the referenced CRW properties. a) Consultant will commission the performance of a Title Report for the applicable subject tracts comprising the above mentioned 8,000 acres. b) Consultant will review the resultant Title Report to identify elements therein requiring location on the face of the earth and depiction on the record plat of final survey. c) Consultant will perform a field run boundary retracement survey for the subject property including the location of adjoining property boundary evidence as necessary for the proper determination of the record boundary of the CRW property. d) Consultant shall determine the title boundaries and rights encumbering the subject tracts, including updated legal descriptions and the monumentation of external/perimeter property corners based upon this determination. e) Consultant shall provide a record plat of survey, deliverables in both hardcopy and portable document format (PDF), based on the above, of the perimeter of the property owned by CRW and all easements, rights-of-way or other matters affecting property within CRW boundaries. Internal tract lines shall be depicted. f) Consultant shall provide written legal descriptions of all property easements, improvements, encumbrances, elements, etc. impacting title or rights of the property. g) Consultant shall provide a certified survey report detailing the performance of this survey. h) Consultant shall provide all data layers and associated annotation developed for the various boundaries, easements, right-of-ways, etc. in ESRI-based geodatabase format for incorporation into CRW s enterprise GIS. Optional task: Identifying and marking of the property boundary lines in addition to the property corners using informational signage provided by CRW, marking paint, and/or a combination. If requested, this task will be completed in close coordination with CRW field operations staff. Deliverable Schedule CRW anticipates the development of the Property Boundary Survey and associated tasks to take approximately three (3) months to complete. Please provide a review of CRW s preliminary schedule in the Proposal, including an estimate of time required to complete initial planning and research. Please also submit a schedule for completion of the land survey and associated report. A:\Sustainability\DeHart Comprehensive Management\RFP_Boundary Survey_final draft.docx Page 2 of 5

4 Boundary Survey of the DeHart Reservoir Property Proposal Qualifications Qualifications Must be a Pennsylvania licensed Professional Land Surveyor (PLS) with no less than five (5) years of experience providing land surveys (include licenses and memberships in professional organizations) No less than five (5) years of experience evaluating and reporting upon legal title to, and encumbrances upon, real estate property parcels in Pennsylvania, including legal expertise necessary to identify, assess and resolve conflicts, discrepancies, irregularities, and claims regarding property boundaries or title Proposal (limit to 3 pages) Provide a work plan summarizing your understanding and approach for the scope of work outlined above. The Proposal should also include the following: Technical description outlining research and surveying methodology, including but not limited to, information assembly process, sequencing of tasks, and a schedule/timeline of deliverables Approach to title search and analysis, including how you might identify and manage potential conflicts of interest Time availability to devote to this project Any additional information which may distinguish the surveyor from others, including background or special expertise Any additional ways in which scope of work/associated tasks could be improved or enhanced to CRW s benefit Credentials/proof of training and insurance (may include as additional attachment if referenced) Provide a not-to-exceed fee, including all expenses under the scope of work. In addition to the fee, please include the estimated fee schedule that outlines major tasks and the hourly rate for field work, hourly rate for any additional administrative work, including research and writing, and an hourly rate for travel time. Please also include a separate, not-to-exceed fee for marking property boundary lines. Reference Letters Provide up to three (3) relevant references from entities with whom similar work was performed in scope to the requirements of this RFP. Please include a description of the land surveying services and description of title search and analysis performed. A:\Sustainability\DeHart Comprehensive Management\RFP_Boundary Survey_final draft.docx Page 3 of 5

5 Boundary Survey of the DeHart Reservoir Property Submission of Proposals Interested individuals or firms should submit their Proposal, clearly labeled Proposal Enclosed Boundary Survey of the DeHart Reservoir Property, by 4:00 PM on Friday, June 5, Please submit electronically in PDF format via to and mail one (1) hard copy to: Attn: Tanya Dierolf Sustainability Manager Capital Region Water 212 Locust Street, Suite 302 Harrisburg, PA Selection Criteria Evaluation and selection of Proposals will be based on content and responsiveness to all Proposal requirements. It is the intent of CRW to review Proposals within two weeks of receipt and, if necessary, select no more than three (3) consultants to conduct phone interviews. Following review, CRW will select a surveyor who offers the highest quality services and with a price structure that is within the best interest to CRW. It is CRW s goal to select a consultant at the June 24, 2015 Board Meeting and issue a Notice to Proceed by July 1, CRW reserves the right to require any firm to submit additional information deemed necessary in evaluating the Proposals and reserves the right to negotiate final contract, scope of services and cost with the selected surveyor. General Terms CRW reserves the right to reject any or all Proposals and to select the Proposal that it determines to be in the best interest of CRW. The contract is subject to the approval of CRW s Board of Directors and is effective only upon their approval. Proposals will remain effective for CRW review and approval for 60 days from the deadline for submitting Proposals. The proposer is encouraged to add, modify, or clarify any scope of work items it deems appropriate to develop a high quality plan at the lowest possible cost. All changes shall be explicitly listed and explained. However, the scope of work proposed must accomplish the goals and work stated in the RFP. A:\Sustainability\DeHart Comprehensive Management\RFP_Boundary Survey_final draft.docx Page 4 of 5

6 Boundary Survey of the DeHart Reservoir Property If proposer incorporates CRW branding into the Proposal, brand standards should be met. Please see for additional information. Attachments Project Site Map Forest Stewardship RFP Legal Services RFP If there are any questions regarding this Request for Proposals, please contact Tanya Dierolf at Capital Region Water, 212 Locust St. Suite 302, Harrisburg, PA 17101, by at or by phone at A:\Sustainability\DeHart Comprehensive Management\RFP_Boundary Survey_final draft.docx Page 5 of 5

7 Attachments

8 FOREST C NORTH WOLFE OAK ARCH MILL SCHAFFER BECHTEL SIMON RAKERS MILL ENGLE PINE WISE STATE DEITRICH DAIRY KOCHER LOCUST HENNINGER SNAPPER MATTER ROMBERGER DEEP HOLLOW MANORS FIELD FISHER CROSSROADS SPECKTOWN MOUNTAIN WOLF POND LONG CABIN INDIAN TRAIL GUN CLUB SUNSHINE CHESTNUT SPRING 209 POTTSVILLE SCHREFFLER UNST691 HILL PARK LAWLEY FIRSTNORTH THIRD MEDCO MAIN FIR GLEN PARK LYKENS D B E C A RACE PINE MACHAMER BEAR VALLEY DAYTON 209 FAIRVIEW SLANT JULIAN FIFTH BROAD GRUBB COLLIERY MARKET BOYER Privately Owned Parcels within Watershed CARL SOUTH BERRY MOUNTAIN CHESTNUT PEARL RED HILL GREENLAND RED HILL STONE HOUSE HOUTZ REINERS SCHOOL DRY RUN BOHRS Schuylkill County (not owned by Capital Region Water, Assumed Private) GOLD MINE CAMP EARTH HARMAN TWO MILE Route 325 AZALEA SUNRISE STAHLS POWELLS VALLEY EARTH MOUNTAIN HOUSE UNST337 UNST338 Capital Region Water's Transmission Water Main to Water Services Center HOLTZMAN HEMLOCK WEST CROSS CARSONVILLE MIDDLE WHITE OAK BACK TURKEY RIDGE UNST334 UNST336 CLARKS VALLEY Capital Region Water's Parcels surrounding the DeHart Reservoir SHOOP RUMMEL UNST333 CARSONVILLE RATTLING RUN United States owned Parcel (Appalachian Trail) WEIS Fort Indiantown Gap (Military Installation) Lebanon County DeHart Reservoir and Surrounding Properties CRW Water Transmission Line CRW Owned Parcels Streams Privately Owned Parcels Dauphin County MUMMA FISHING CREEK VALLEY MOUNTAIN MCLEAN FOGARTY ANTENNA MOUNTAIN AMMO FARMALL MORRISSEY FIREHOUSE LOG CABIN DeHart Reservoir PA State Game Land 1 inch = 7,000 feet O April 24, 2015

9 for a Forest Stewardship Plan of the DeHart Reservoir Property Capital Region Water Administrative Offices 212 Locust Street, Suite 302 Harrisburg, PA

10 Forest Stewardship Plan for the DeHart Reservoir Property Invitation Capital Region Water (CRW) is requesting Proposals for a Consulting Forester (CF) to assist in the management of the approximately 8,000 acres CRW owns surrounding the DeHart Reservoir in Clarks Valley, Pennsylvania. CRW is seeking the services of a CF to prepare a forest management plan that will guide forest and water management efforts for the next 10 years. A Request for Proposals (RFP) for surveying services for a property/boundary assessment is also attached hereto. Proposers are welcome and encouraged to submit additional Proposals if the professional or firm can demonstrate expertise in multiple facets of ecosystem management and surveying. Proposal Process Schedule Task Date RFPs Issued April 24, 2015 Proposal Due Date June 5, 2015 by 4:00 PM EST Interview Period June 15-19, 2015 Selection of Consultants/Teams June 24, 2015 General Information and Background CRW owns approximately 8,000 acres in Rush Township, Dauphin County, Pennsylvania. The land (largely forested) surrounds the DeHart Reservoir the primary drinking water source for the City of Harrisburg and nearby communities. The DeHart Reservoir is made possible due to an impoundment of Clark Creek, a high quality, cold water fishery. Protection of this raw water source is of utmost importance to the staff and Board of CRW. In addition to water quality concerns, CRW is also responsible for a downstream conservation release benefitting Clarks Creek. CRW oversees the management of the watershed and forest related activities. CRW is interested in retaining full ownership of the property and actively managing it to ensure long-term watershed and ecosystem health. Specifically, CRW is interested in sustainable management in order to preserve the natural filtration that ultimately minimizes water treatment costs. CRW also recognizes potential to generate revenue and seeks an assessment of the viability of economic opportunities in timber and non-timber products. To date, the land has not been actively managed. Forest management contracts have existed in the past and portions of the property have been timbered for hardwood and pulpwood sales. This management has been piecemeal with varying levels of success. CRW s Board and staff desire to see a comprehensive management approach to the acreage owned in Clarks Valley, including an option for the land to be conserved in long-term perpetuity. The Consulting Forester contracted under this Proposal should A:\Sustainability\DeHart Comprehensive Management\RFP_Forest Stewardship Plan_final draft.docx Page 1 of 5

11 Forest Stewardship Plan for the DeHart Reservoir Property be prepared to coordinate closely with personnel and consultants preparing, developing and implementing a comprehensive watershed stewardship plan. The Forest Stewardship Plan is a single component of a plan likely to include a legal analysis of permanent conservation protection (i.e., restriction or easement), surveying services, and source water protection planning. Although, CRW is not interested in expanding recreation access to the property due to safety and security concerns, CRW is interested in continuing its partnership with the Pennsylvania Game Commission. A portion of CRW s land is enrolled in the Public Access Program Cooperative Forest Game Use Project Agreement granting hunting and hiking access to the property in unrestricted zones. More specifically, CRW desires to see a plan that satisfies the stewardship goals below: 1) Water: Preserve and/or enhance the high quality drinking water by improving the capacity of the system to produce the resource. Watershed security must also be maintained to insure the safety of the supply. Critical riparian buffer zones must be maintained and established as necessary. All water resources on the property must be recognized, including any springs, tributaries, and wetlands. In addition, the plan must complement existing operations and source water protection efforts that provide drinking water to nearly 67,000 people. 2) Revenue: Improve the capacity of the watershed and downstream properties to produce carbon-friendly revenue options. Revenue streams will allow CRW to enhance and protect the asset. This includes sustainable timber harvesting and monetizing of ecosystem services. 3) Ecosystem health: Maintain and enhance long-term ecosystem health and viability. Identify and conserve high priority conservation areas, contribute to the conservation of biological diversity and habitat, and actively manage the property for resiliency to withstand threats (invasive species, particularly Hemlock woolly adelgid and gypsy moth, storms, insect invasions, changing climate). 4) Compliance and recordkeeping: Ensure any active management of the property exceeds any federal, state and local requirements and best practices. Implementation of the plan must be monitored and documented with incremental benchmarks. Proposal Requirements Scope of Work CRW has outlined the scope of work below. Please reference and provide a response to CRW s scope and specific tasks. Task 1: Prepare a 10-year Forest Stewardship Council (FSC) compliant forest management plan consistent with CRW s overarching stewardship goals for the property A:\Sustainability\DeHart Comprehensive Management\RFP_Forest Stewardship Plan_final draft.docx Page 2 of 5

12 Forest Stewardship Plan for the DeHart Reservoir Property a) Assess current forest conditions and produce an inventory of resources on the property, including general tree communities/composition, health, and regeneration potential b) Identify any invasive species of concern and propose appropriate management techniques c) Divide the property by specific management zones to allow for optimal forest health and water protection. A water resources/riparian inventory should be considered d) Provide a harvest schedule and recommendations for long-term management of the property describing how planned activities will achieve stewardship goals e) Provide projected revenue estimates based on production capacity Task 2: Provide an examination of potential revenue from non-timber resources a) Evaluate current and future markets for ecosystem services b) Citing specific examples, discuss the policies and implementation process necessary to enter markets c) Based on the above evaluation, produce a recommendation Optional task: Perform a boundary retracement survey in accordance with the Manual of Practice for Professional Land Surveyors in the Commonwealth of Pennsylvania to establish the real property title or rights of the referenced CRW properties. See the attached Boundary Survey RFP for the scope of work. Deliverable Schedule CRW anticipates the development of the Forest Stewardship Plan and associated tasks to take approximately three (3) months to complete with a separate contract for ongoing consulting services outside the initial scope of work. Please provide a review of CRW s preliminary schedule and any suggested variations in the Proposal. Proposal Qualifications CF Qualifications Must be a graduate of a Society of American Foresters accredited School of Forestry Demonstration of experience in forest management, related to and not necessarily limited to: - Forest management planning - Marketing of forest products - Certified timber and timberland appraising - Erosion and sedimentation plans - Sustainable forest stewardship - Forest economics/ecosystem valuation A:\Sustainability\DeHart Comprehensive Management\RFP_Forest Stewardship Plan_final draft.docx Page 3 of 5

13 Forest Stewardship Plan for the DeHart Reservoir Property - Carbon sequestration - Game and forest related activity - Hydrology, water quality and watershed management - Mapping and geographic information systems - Surveying/spatial analysis Proposal (limit to 3 pages) Provide a work plan summarizing your understanding and approach for the scope of work outlined above. The Proposal should also include the following: Qualifications and experience of provided services similar to those required by this RFP Time availability to devote to this project Any additional information which may distinguish the CF from others, including background or special expertise Any additional ways in which scope of work/associated tasks could be improved or enhanced to CRW s benefit Credentials/proof of training and insurance (may include as additional attachment if referenced) Provide a not-to-exceed fee including all expenses under the scope of work. In addition to the fee, please include the estimated fee schedule that outlines major tasks and the hourly rate for field work, hourly rate for any additional administrative work, including research and sale prep, and an hourly rate for travel time. Reference Letters Provide up to three (3) relevant references from entities with whom similar work was performed in scope to the requirements of this RFP. Submission of Proposals Interested individuals or firms should submit their Proposal, clearly labeled Proposal Enclosed Forest Stewardship Plan for the DeHart Reservoir Property, by 4:00 PM on Friday, June 5, Please submit electronically in PDF format via to tanya.dierolf@capitalregionwater.com and mail one (1) hard copy to: Attn: Tanya Dierolf Sustainability Manager Capital Region Water 212 Locust Street, Suite 302 Harrisburg, PA A:\Sustainability\DeHart Comprehensive Management\RFP_Forest Stewardship Plan_final draft.docx Page 4 of 5

14 Forest Stewardship Plan for the DeHart Reservoir Property Selection Criteria Evaluation and selection of Proposals will be based on content and responsiveness to all Proposal requirements. It is the intent of CRW to review CF Proposals within two weeks of receipt, and select no more than three (3) CF s to conduct phone interviews. Following discussions, CRW will select a CF who offers the highest quality services and with a price structure that is within the best interest to CRW. It is CRW s goal to select the CF at the June 24, 2015 Board Meeting and issue a Notice to Proceed by July 1, CRW reserves the right to require any firm to submit additional information deemed necessary in evaluating the Proposals and reserves the right to negotiate final contract, scope of services and cost with the selected CF. General Terms CRW reserves the right to reject any or all Proposals and to select the Proposal that it determines to be in the best interest of CRW. The contract is subject to the approval of CRW s Board of Directors and is effective only upon their approval. Proposals will remain effective for CRW review and approval for 60 days from the deadline for submitting Proposals. The proposer is encouraged to add to, modify, or clarify any scope of work items it deems appropriate to develop a high quality plan at the lowest possible cost. All changes shall be explicitly listed and explained. However, the scope of work proposed must accomplish the goals and work stated in the RFP. If proposer incorporates CRW branding into the Proposal, brand standards should be met. Please see for additional information. Attachments Project Site Map Property Boundary RFP If there are any questions regarding this Request for Proposals, please contact Tanya Dierolf at Capital Region Water, 212 Locust St. Suite 302, Harrisburg, PA 17101, by at tanya.dierolf@capitalregionwater.com, or by phone at A:\Sustainability\DeHart Comprehensive Management\RFP_Forest Stewardship Plan_final draft.docx Page 5 of 5

15 for Legal Services Conservation Transactions of the DeHart Reservoir Property Capital Region Water Administrative Offices 212 Locust Street, Suite 302 Harrisburg, PA

16 Legal Services Conservation Transactions for the DeHart Reservoir Property Invitation Capital Region Water (CRW) is requesting proposals to contract for legal services for the remainder of As permanent land conservation options are considered to protect the property surrounding the DeHart Reservoir just north of Harrisburg, legal assistance is needed to advise and negotiate on behalf of CRW. Proposal Process Schedule Task Date RFPs Issued April 24, 2015 Proposal Due Date June 5, 2015 by 4:00 PM EST Interview Period (if deemed necessary) June 15-19, 2015 Selection of Attorney/Firm June 24, 2015 General Information and Background CRW owns approximately 8,000 acres in Rush Township, Dauphin County, Pennsylvania. The land (largely forested) surrounds the DeHart Reservoir the primary drinking water source for the City of Harrisburg and nearby communities. The DeHart Reservoir is made possible due to an impoundment of Clark Creek, a high quality, cold water fishery. Protection of this raw water source is of utmost importance to the staff and Board of CRW. CRW s Board and staff desires a comprehensive management approach to the acreage owned in Clarks Valley, including an option for the land to be conserved in long-term perpetuity. In addition to a legal analysis of permanent conservation protection (i.e., restriction or easement), CRW is interested in forest management services and source water protection planning as elements of a comprehensive stewardship plan for the property. CRW is interested in retaining full ownership of the property and actively managing it to ensure long-term watershed and ecosystem health, in order to preserve the natural filtration that ultimately minimizes water treatment costs. To date, the land has not been actively managed. Legal counsel contracted under this Proposal should be prepared to coordinate closely with personnel and consultants preparing, developing and implementing additional elements of a comprehensive watershed stewardship plan. More specifically, CRW desires a plan that satisfies the stewardship goals below: A:\Sustainability\DeHart Comprehensive Management\RFP_Legal Services_final draft.docx Page 1 of 5

17 Legal Services Conservation Transactions for the DeHart Reservoir Property 1) Water: Preserve and/or enhance the high quality drinking water by improving the capacity of the system to produce the resource. Watershed security must also be maintained to insure the safety of the supply. Critical riparian buffer zones must be maintained and established as necessary. All water resources on the property must be recognized, including any springs, tributaries, and wetlands. In addition, the plan must complement existing operations and source water protection efforts that provide drinking water to nearly 67,000 people. 2) Revenue: Improve the capacity of the watershed and downstream properties to produce carbon-friendly revenue options. Revenue streams will allow CRW to enhance and protect the asset. This includes sustainable timber harvesting and monetizing of ecosystem services. 3) Ecosystem health: Maintain and enhance long-term ecosystem health and viability. Identify and conserve high priority conservation areas, contribute to the conservation of biological diversity and habitat, and actively manage the property for resiliency to withstand threats (invasive species, particularly Hemlock woolly adelgid and gypsy moth, storms, insect invasions, changing climate). 4) Compliance and recordkeeping: Ensure any active management of the property exceeds any federal, state and local requirements and best practices. Implementation of the plan must be monitored and documented with incremental benchmarks. Proposal Requirements Scope of Work CRW has outlined the scope of work below. Please reference and provide a response to CRW s scope and specific tasks. Task 1: Provide an evaluation of permanent land conservation options for CRW, including and not limited to a deed restriction or conservation easement, consistent with CRW s desire to retain ownership and oil/gas/mineral/timber rights and partial enforcement authority of any agreement Task 2: Provide ongoing legal services to CRW as a conservation restriction/easement is proposed, negotiated and finalized a) Advise on property, real estate, and conservation-related matters and transactions b) Review, draft and negotiate real estate and conservation agreements c) Advise on legal issues relate to a municipal authority d) Make written or oral reports to the Board of Directors and attend meetings as necessary e) Prepare legal documents as necessary f) Assist and cooperate with CRW staff, consultants, and general counsel A:\Sustainability\DeHart Comprehensive Management\RFP_Legal Services_final draft.docx Page 2 of 5

18 Legal Services Conservation Transactions for the DeHart Reservoir Property g) Other legal services as needed Deliverable Schedule CRW has been approached to enter into a conservation easement and is expecting to continue negotiations through The complete scope of services needed is evolving as is a more specific timetable. Proposal Qualifications Qualifications Currently licensed to practice law in Pennsylvania Demonstration of experience in conservation-related legal transactions, related to and not necessarily limited to: - Real estate - Restrictions and easements - Land use - Municipal and/or nonprofit law - Conservation finance - Planning - Title work Proposal (limit to 3 pages) Please provide a summary in response to the scope of work outlined above. The Proposal should also include the following: Description of legal experience advising clients similar to CRW in similar matters Specific qualifications of the attorney assigned to the representation (education, position in firm, years and types of experience, etc.) Time availability to devote to this project Any additional information which may distinguish the attorney from others, including background or special expertise Any additional ways in which scope of work/associated tasks could be improved or enhanced to CRW s benefit Provide a proposed price, including information on the hourly billing rates of each attorney or other legal staff expected to work on this representation and charges for any expenses (research, copies, etc.). Proposer should be prepared to submit detailed billing statements for all services billed at an hourly rate and, if necessary, broken down into time increments of a quarter hour, and summaries of work performed. Alternatively, CRW would also consider billing Proposals such as flat rates or a A:\Sustainability\DeHart Comprehensive Management\RFP_Legal Services_final draft.docx Page 3 of 5

19 Legal Services Conservation Transactions for the DeHart Reservoir Property monthly charge for fees. The cost Proposal should provide some assurance of expected costs relative to an estimated time commitment. Reference Letters Provide up to three (3) relevant references from entities with whom similar work was performed in scope to the requirements of this RFP. Please include a description of the legal services and representation on behalf of the client. Submission of Proposals Interested individuals or firms should submit their Proposal, clearly labeled Proposal Enclosed Legal Services - Conservation Transactions for the DeHart Reservoir Property, by 4:00 PM on Friday, June 5, Please submit electronically in PDF format via to tanya.dierolf@capitalregionwater.com and mail one (1) hard copy to: Attn: Tanya Dierolf Sustainability Manager Capital Region Water 212 Locust Street, Suite 302 Harrisburg, PA Selection Criteria Evaluation and selection of Proposals will be based on content and responsiveness to all Proposal requirements. It is the intent of CRW to review Proposals within two weeks of receipt. CRW reserves the right to conduct interviews as appropriate. Following discussions, CRW will select legal services by the individual/firm offering the highest quality services and with a price structure that is within the best interest to CRW. It is CRW s goal to select the individual/firm at the June 24, 2015 Board Meeting and issue a Notice to Proceed by July 1, CRW reserves the right to require any firm to submit additional information deemed necessary in evaluating the Proposals and reserves the right to negotiate final contract, scope of services and cost. General Terms CRW reserves the right to reject any or all Proposals and to select the Proposal that it determines to be in the best interest of CRW. A:\Sustainability\DeHart Comprehensive Management\RFP_Legal Services_final draft.docx Page 4 of 5

20 Legal Services Conservation Transactions for the DeHart Reservoir Property The contract is subject to the approval of CRW s Board of Directors and is effective only upon their approval. Proposals will remain effective for CRW review and approval for 60 days from the deadline for submitting Proposals. The proposer is encouraged to add to, modify, or clarify any scope of work items it deems appropriate to develop a high quality plan at the lowest possible cost. All changes shall be explicitly listed and explained. However, the scope of work proposed must accomplish the goals and work stated in the RFP. If proposer incorporates CRW branding into the Proposal, brand standards should be met. Please see for additional information. Attachment Project Site Map If there are any questions regarding this Request for Proposals, please contact Tanya Dierolf at Capital Region Water, 212 Locust St. Suite 302, Harrisburg, PA 17101, by at tanya.dierolf@capitalregionwater.com, or by phone at A:\Sustainability\DeHart Comprehensive Management\RFP_Legal Services_final draft.docx Page 5 of 5

Request for Proposals for Legal Services Conservation Transactions of the DeHart Reservoir Property

Request for Proposals for Legal Services Conservation Transactions of the DeHart Reservoir Property for Legal Services Conservation Transactions of the DeHart Reservoir Property Capital Region Water Administrative Offices 212 Locust Street, Suite 302 Harrisburg, PA 17101 717-525-7677 www.capitalregionwater.com

More information

March 25, Wet Weather Community Engagement Board of Directors Workshop. What are our requirements? 8/28/2015

March 25, Wet Weather Community Engagement Board of Directors Workshop. What are our requirements? 8/28/2015 Wet Weather Community Engagement Board of Directors Workshop March 25, 2015 Nine Minimum Controls NMC 7 Pollution Prevention NMC 8 Public Notification Partial Consent Decree CSO Signage CSO Notification

More information

January 28, Parcel sale. Proposed Clarks Creek Property Sale. Potential sale of acres 8/27/2015

January 28, Parcel sale. Proposed Clarks Creek Property Sale. Potential sale of acres 8/27/2015 Proposed Clarks Creek Property Sale January 28, 2015 Potential sale of 383.8 acres CRW The Conservation Fund PA Game Commission The Conservation Fund is Fort Indiantown Gap selected partner Using Fort

More information

Radnor Township Township Solicitor

Radnor Township Township Solicitor GENERAL CONDITIONS AND SPECIFICATIONS BACKGROUND: The Township of Radnor, located in suburban Philadelphia, is a Home Rule Township operating in accordance with the codes and laws of the Commonwealth of

More information

URBAN REDEVELOMENT AUTHORITY OF PITTSBURGH REQUEST FOR PROPOSALS (RFP) Appraisal Services

URBAN REDEVELOMENT AUTHORITY OF PITTSBURGH REQUEST FOR PROPOSALS (RFP) Appraisal Services SUMMARY INFORMATION URBAN REDEVELOMENT AUTHORITY OF PITTSBURGH REQUEST FOR PROPOSALS (RFP) Appraisal Services RFP Issue Date: Wednesday, November 15, 2017 Proposal Due Date: Thursday, November 30, 2017

More information

Central Pennsylvania Conservancy Project Selection Criteria Form

Central Pennsylvania Conservancy Project Selection Criteria Form Central Pennsylvania Conservancy Project Selection Criteria Form The following criteria guide the actions of the Central Pennsylvania Conservancy s Land Protection Committee and Board of Directors in selecting

More information

APRIL 30, ILL. ADM. CODE 2580 CH. I, SEC. 2580

APRIL 30, ILL. ADM. CODE 2580 CH. I, SEC. 2580 TITLE 17: CONSERVATION CHAPTER I: DEPARTMENT OF NATURAL RESOURCES SUBCHAPTER f: ADMINISTRATIVE SERVICES PART 2580 CONSERVATION STEWARDSHIP PROGRAM Section 2580.10 Definitions 2580.20 Eligibility 2580.30

More information

REQUEST FOR PROPOSAL (RFP) RFP AS. Appraisal Services Valuation of DBHA Properties

REQUEST FOR PROPOSAL (RFP) RFP AS. Appraisal Services Valuation of DBHA Properties REQUEST FOR PROPOSAL (RFP) RFP 2019-01AS Appraisal Services Valuation of DBHA Properties Daytona Beach Housing Authority (DBHA) 211 N Ridgewood Ave Suite 300 Daytona Beach, FL 32114 (386) 253-5653 Terril

More information

Request for Proposals

Request for Proposals Request for Proposals On Call Right-of-Way and Easement Acquisition and Related Services Requested by: Charter Township of Shelby Department of Public Works 6333 23 Mile Road Shelby Township, MI 48316

More information

Conservation Easement Assistance Program

Conservation Easement Assistance Program PENNSYLVANIA LAND TRUST ASSOCIATION Conservation Easement Assistance Program GUIDELINES last updated 3/12/2013 Introduction... 2 Qualify an Organization... 2 The Basics... 2 Open Application Period...

More information

REQUEST FOR PROPOSAL RFP # TOC17-001

REQUEST FOR PROPOSAL RFP # TOC17-001 REQUEST FOR PROPOSAL RFP # TOC17-001 April 25, 2017 157 NW Columbia Avenue P. O. Box 183 Chapin, SC 29036 Tel.: (803) 345-2444 Fax: (803) 345-0427 April 25, 2017 REQUEST FOR PROPOSAL RFP # TOC17-001 The

More information

REQUEST FOR PROPOSALS APPRAISAL SERVICES

REQUEST FOR PROPOSALS APPRAISAL SERVICES REQUEST FOR PROPOSALS APPRAISAL SERVICES Issued By: Philadelphia Land Bank Proposals Must Be Received No Later Than: Friday, February 5, 2016, 4:00 PM, Local Time at the Offices of the Philadelphia Land

More information

Tejon Ranch Conservation and Land Use Agreement Executive Summary

Tejon Ranch Conservation and Land Use Agreement Executive Summary Tejon Ranch Conservation and Land Use Agreement Executive Summary The Tejon Ranch Company (TRC) and Audubon California, the Endangered Habitats League, Natural Resources Defense Council, Planning and Conservation

More information

Request for Proposals To prepare a Zoning Ordinance and Map Comprehensive Update

Request for Proposals To prepare a Zoning Ordinance and Map Comprehensive Update Request for Proposals To prepare a Zoning Ordinance and Map Comprehensive Update City of Riverbank, California Prepared by: Donna M. Kenney, Planning and Building Manager 6707 Third Street Riverbank, CA

More information

REQUEST FOR PROPOSALS Development of an Asset Management Plan

REQUEST FOR PROPOSALS Development of an Asset Management Plan REQUEST FOR PROPOSALS Development of an Asset Management Plan The Township of North Glengarry 90 Main Street South Alexandria, Ontario K0C 1A0 TABLE OF CONTENTS OVERVIEW... 2 Introduction... 2 Background...

More information

PERRY CITY UTAH REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES

PERRY CITY UTAH REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES PERRY CITY UTAH REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES Overview The City of Perry, Utah is hereby requesting proposals from qualified, real estate brokers to assist with the sale of approximately

More information

DRAFT FOR PUBLIC HEARING (rev. March, 2016)

DRAFT FOR PUBLIC HEARING (rev. March, 2016) Chapter 200. ZONING Article VI. Conservation/Cluster Subdivisions 200-45. Intent and Purpose These provisions are intended to: A. Guide the future growth and development of the community consistent with

More information

PROJECT SCORING GUIDANCE. Introduction: National Proiect Selection:

PROJECT SCORING GUIDANCE. Introduction: National Proiect Selection: FOREST LEGACY PROGRAM PROJECT SCORING GUIDANCE Introduction: This document provides guidance to the National Review Panel on how to score individual Forest Legacy Program (FLP) projects, including additional

More information

Town of North Castle New York REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES

Town of North Castle New York REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES Town of North Castle New York REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES 1. Overview The Town of North Castle, New York is hereby requesting proposals from qualified, real estate brokers to assist

More information

Allegheny County Sanitary Authority REQUEST FOR QUALIFICATIONS. for

Allegheny County Sanitary Authority REQUEST FOR QUALIFICATIONS. for Allegheny County Sanitary Authority REQUEST FOR QUALIFICATIONS for PROPERTY AND RIGHT OF WAY ACQUISITION SERVICES CLEAN WATER PLAN CAPITAL PROJECT S-451 November 2017 1.0 INTRODUCTION ALCOSAN has agreed

More information

Request for Proposals For Village Assessment Services

Request for Proposals For Village Assessment Services Request for Proposals For Village Assessment Services INQUIRIES AND PROPOSALS SHOULD BE DIRECTED TO: Jesse Thyes Village Administrator 860 Badger Circle Grafton, WI 53024 Introduction The Village of Grafton

More information

Right-of-Way Acquisition and

Right-of-Way Acquisition and Request for Proposals On Call Right-of-Way Acquisition and Appraisal Services Requested by: CityofElCentro Department of Public Works 307 W. Brighton Avenue El Centra, Ca. 92243 Phone: (760) 337-4505 Fax:(760)337-3172

More information

Claudia Stuart, Williamson Act Program Manager and Nick Hernandez, Planning Intern

Claudia Stuart, Williamson Act Program Manager and Nick Hernandez, Planning Intern Land Conservation (Williamson) Act Advisory Committee STAFF REPORT September 15, 2014 Prepared by: Claudia Stuart, Williamson Act Program Manager and Nick Hernandez, Planning Intern Subject: Discussion:

More information

DESCRIPTION OF A LAND TRUST

DESCRIPTION OF A LAND TRUST DESCRIPTION OF A LAND TRUST What is a land trust? Land trusts are non-profit organizations that work hand-in-hand with landowners to protect our valuable natural resources. Land trusts have become increasingly

More information

Establishing a Wetland Bank in Minnesota

Establishing a Wetland Bank in Minnesota Establishing a Wetland Bank in Minnesota Updated February 1, 2018 This document provides a general summary of the key steps in establishing an individual wetland bank site within the state wetland banking

More information

REQUEST FOR QUALIFICATION (RFQ) SUMMARY

REQUEST FOR QUALIFICATION (RFQ) SUMMARY REQUEST FOR QUALIFICATION (RFQ) TO: FROM: PROJECT: INTERESTED CONSULTANTS TOWNSHIP OF MOON MOON TOWNSHIP MARKET ANALYSIS DATE: March 29, 2016 SUMMARY The Board of Supervisors of Moon Township, Allegheny

More information

Residential Major Subdivision Review Checklist

Residential Major Subdivision Review Checklist Residential Major Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

RESIDENTIAL REAL ESTATE AGENT SERVICES FOR NEIGHBORHOOD STABILIZATION PROGRAM

RESIDENTIAL REAL ESTATE AGENT SERVICES FOR NEIGHBORHOOD STABILIZATION PROGRAM Mark A. Cowart Chief Information Officer DEPARTMENT OF ADMINISTRATIVE SERVICES PURCHASING 2222 M Street Merced, CA 95340 (209) 385-7331 (209) 725-3535 Fax www.co.merced.ca.us Equal Opportunity Employer

More information

1. Canyon Pointe 2. Glen Willow 3. Madison. ISSUED: November 15, 2017

1. Canyon Pointe 2. Glen Willow 3. Madison. ISSUED: November 15, 2017 4800 N. Broadway, Boulder, CO 80304 Phone: 720-564-4610 Fax: 303-939-9569 www.boulderhousing.org Hearing Assistance: 1-800-659-3656 Boulder Housing Partners Request for Proposals: RFP #32-2017 Physical

More information

APPRAISAL MANAGEMENT COMPANY

APPRAISAL MANAGEMENT COMPANY APPRAISAL MANAGEMENT COMPANY STANDARDS OF GOOD PRACTICE IN APPRAISAL MANAGEMENT JANUARY 6, 2010 POST OFFICE BOX 1196 WEXFORD, PA 15090 (P) 724-934-1420 (F) 724-934-0057 (W) WWW.TAVMA.ORG APPRAISAL MANAGEMENT

More information

REQUEST FOR PROPOSAL/QUALIFICATIONS ENGINEERING SERVICES TOWNSHIP ENGINEER

REQUEST FOR PROPOSAL/QUALIFICATIONS ENGINEERING SERVICES TOWNSHIP ENGINEER REQUEST FOR PROPOSAL/QUALIFICATIONS ENGINEERING SERVICES TOWNSHIP ENGINEER Issued by the Township of Exeter Date Issued: November 19, 2015 Responses Due by: December 4, 2015 REQUEST FOR PROPOSAL & QUALIFICATIONS

More information

REQUEST FOR PROPOSALS FOR SUBSTATION ENGINEERING SERVICES REBUILD OF TYGH VALLEY AND NEW CONSTRUCTION OF EASTSIDE SUBSTATIONS

REQUEST FOR PROPOSALS FOR SUBSTATION ENGINEERING SERVICES REBUILD OF TYGH VALLEY AND NEW CONSTRUCTION OF EASTSIDE SUBSTATIONS REQUEST FOR PROPOSALS FOR SUBSTATION ENGINEERING SERVICES REBUILD OF TYGH VALLEY AND NEW CONSTRUCTION OF EASTSIDE SUBSTATIONS October 1, 2018 Northern Wasco County People s Utility District ( NWCPUD )

More information

Chapter 11. Competitive Negotiation: Procedure

Chapter 11. Competitive Negotiation: Procedure Chapter 11. Competitive Negotiation: Procedure Summary This chapter provides an overview of the procedure for procuring goods and services using the competitive negotiation procedure. The competitive negotiation

More information

OPEN-SPACE CONVERSION REQUEST

OPEN-SPACE CONVERSION REQUEST OPEN-SPACE CONVERSION REQUEST Applicant: Board Meeting: February 9, 2017 Landowner: Normandy Capital, LLC VOF Easement: BAT-03678 Table of Contents: Cover Page 1 Table of Contents 2 Application Overview

More information

PRELIMINARY PLAT CHECK LIST

PRELIMINARY PLAT CHECK LIST PRELIMINARY PLAT CHECK LIST Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application

More information

TOWN OF GROTON, MASSACHUSETTS

TOWN OF GROTON, MASSACHUSETTS TOWN OF GROTON, MASSACHUSETTS REQUEST FOR PROPOSAL TOWN COUNSEL SERVICE JULY 23, 2015 1 Town of Groton Massachusetts Request for Proposal Town Counsel Services July 23, 2015 STATEMENT OF INTENT The Town

More information

REQUEST FOR PROPOSAL FOR. Appraisal Services. Office of the Special Deputy Receiver

REQUEST FOR PROPOSAL FOR. Appraisal Services. Office of the Special Deputy Receiver REQUEST FOR PROPOSAL FOR Appraisal Services Office of the Special Deputy Receiver October 1, 2008 REQUEST FOR PROPOSAL ( RFP ) Appraisal Services BACKGROUND The Office of the Special Deputy Receiver (OSD),

More information

REQUEST FOR PROPOSALS (RFP) SECTION 8 CONTRACT ADMINISTRATION SERVICES

REQUEST FOR PROPOSALS (RFP) SECTION 8 CONTRACT ADMINISTRATION SERVICES REQUEST FOR PROPOSALS (RFP) 09-331 SECTION 8 CONTRACT ADMINISTRATION SERVICES FOR THE HOUSING AUTHORITY OF THE CITY OF WINSTON-SALEM WINSTON-SALEM, NORTH CAROLINA 1 TABLE OF CONTENTS 1. Introduction 2.

More information

Chapter 100 Planned Unit Development in Corvallis Urban Fringe

Chapter 100 Planned Unit Development in Corvallis Urban Fringe 100.100 Scope and Purpose. Chapter 100 Planned Unit Development in Corvallis Urban Fringe (1) All applications for land divisions in the Urban Residential (UR) and Flood Plain Agriculture (FPA) zones within

More information

LIVING LANDS BIODIVERSITY GRANTS: INFORMATION AND APPLICATION. Due: January 16, 2009

LIVING LANDS BIODIVERSITY GRANTS: INFORMATION AND APPLICATION. Due: January 16, 2009 LIVING LANDS BIODIVERSITY GRANTS: INFORMATION AND APPLICATION Due: January 16, 2009 PURPOSE OF LIVING LANDS PROJECT Defenders of Wildlife s Living Lands project provides financial, technical and educational

More information

REQUEST FOR PROPOSAL FIRE DEPARTMENT STUDY/REVIEW

REQUEST FOR PROPOSAL FIRE DEPARTMENT STUDY/REVIEW REQUEST FOR PROPOSAL FIRE DEPARTMENT STUDY/REVIEW PURPOSE: The Upper Macungie Township, PA (hereinafter Township ) is seeking a fire service consultant experienced in the management and operations of volunteer

More information

TOWNSHIP OF NEPTUNE COUNTY OF MONMOUTH STATE OF NEW JERSEY REQUESTS FOR QUALIFICATIONS FOR COASTAL ENGINEER BID/PROPOSAL # PS

TOWNSHIP OF NEPTUNE COUNTY OF MONMOUTH STATE OF NEW JERSEY REQUESTS FOR QUALIFICATIONS FOR COASTAL ENGINEER BID/PROPOSAL # PS TOWNSHIP OF NEPTUNE COUNTY OF MONMOUTH STATE OF NEW JERSEY REQUESTS FOR QUALIFICATIONS FOR COASTAL ENGINEER BID/PROPOSAL # PS-2019-28 Sealed proposals will be received by the Township Clerk of the Township

More information

Charter Township of Redford

Charter Township of Redford Charter Township of Redford REQUEST FOR PROPOSAL: LEGAL SERVICES ISSUE DATE: 09/20/2018 RESPONSE DEADLINE: 10/18/2018, 3 P.M. EST Submit proposals to: Garth J. Christie, MMC Township Clerk 15145 Beech

More information

REQUEST FOR PROPOSAL (RFP) for SALE OR LEASE OF HOMEVALE PROPERTY (PARCELS 1 AND 2)

REQUEST FOR PROPOSAL (RFP) for SALE OR LEASE OF HOMEVALE PROPERTY (PARCELS 1 AND 2) REQUEST FOR PROPOSAL (RFP) for SALE OR LEASE OF HOMEVALE PROPERTY (PARCELS 1 AND 2) DEADLINE TO SUBMIT PROPOSALS: November 9, 3:00 P.M. MDT PROPOSALS MUST BE DELIVERED TO: MISSOULA COUNTY PUBLIC SCHOOLS

More information

Town of Falmouth s Four Step Design Process for Subdivisions in the Resource Conservation Zoning Overlay District

Town of Falmouth s Four Step Design Process for Subdivisions in the Resource Conservation Zoning Overlay District Town of Falmouth s Four Step Design Process for Subdivisions in the Resource Conservation Zoning Overlay District All subdivisions shall be designed in accordance with the following four-step process.

More information

Requests for Qualifications

Requests for Qualifications Franklin Redevelopment and Housing Authority I. GENERAL SPECIFICATIONS Requests for Qualifications RFQ #20140224 DEV Franklin Redevelopment and Housing Authority ( FRHA ) hereby requests proposals from

More information

Colorado Parks and Wildlife. Acquisition Selection for the Colorado Wildlife Habitat Protection Program

Colorado Parks and Wildlife. Acquisition Selection for the Colorado Wildlife Habitat Protection Program Colorado Parks and Wildlife Acquisition Selection for the Colorado Wildlife Habitat Protection Program State Wildlife Action Plan and CPW s Strategic Plan: *Conserve wildlife and habitat to ensure healthy

More information

Forest Service Role CHAPTER 2

Forest Service Role CHAPTER 2 CHAPTER 2 Forest Service Role Implementation of the Management Plan charters a federal presence with an expanded focus beyond traditional Forest Service roles. In addition to administration of the National

More information

PERMITTED ACTS and RURAL ENTERPRISES

PERMITTED ACTS and RURAL ENTERPRISES PERMITTED ACTS and RURAL ENTERPRISES Pennsylvania s Agricultural Area Security Law, known as Act 43, 3 P.S. 901. et seq., and the Regulations promulgated thereunder by the Pennsylvania Department of Agriculture

More information

REVISED REQUEST FOR REDEVELOPMENT PROPOSALS (RFP) 62 nd STREET INDUSTRIAL PARK IN THE UPPER LAWRENCEVILLE NEIGHBORHOOD OF THE CITY OF PITTSBURGH

REVISED REQUEST FOR REDEVELOPMENT PROPOSALS (RFP) 62 nd STREET INDUSTRIAL PARK IN THE UPPER LAWRENCEVILLE NEIGHBORHOOD OF THE CITY OF PITTSBURGH REVISED REQUEST FOR REDEVELOPMENT PROPOSALS (RFP) 62 nd STREET INDUSTRIAL PARK IN THE UPPER LAWRENCEVILLE NEIGHBORHOOD OF THE CITY OF PITTSBURGH Proposal Due Date: Accepting Proposals on a Rolling Basis

More information

REQUEST FOR PROPOSAL/QUALIFICATIONS FOR MUNICIPAL PROFESSIONALS

REQUEST FOR PROPOSAL/QUALIFICATIONS FOR MUNICIPAL PROFESSIONALS REQUEST FOR PROPOSAL/QUALIFICATIONS FOR MUNICIPAL PROFESSIONALS Issued by the Township of Middletown Date Issued: January 3, 2018 Responses Due by: January 12, 2018 11:00 a.m. Opening of Proposals January

More information

Residential Minor Subdivision Review Checklist

Residential Minor Subdivision Review Checklist Residential Minor Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

Township of Salisbury Lehigh County, Pennsylvania REQUEST FOR PROPOSALS PROFESSIONAL FINANCIAL AND ADMINISTRATIVE AUDITING SERVICES

Township of Salisbury Lehigh County, Pennsylvania REQUEST FOR PROPOSALS PROFESSIONAL FINANCIAL AND ADMINISTRATIVE AUDITING SERVICES Township of Salisbury Lehigh County, Pennsylvania REQUEST FOR PROPOSALS PROFESSIONAL FINANCIAL AND ADMINISTRATIVE AUDITING SERVICES Township of Salisbury 2900 South Pike Avenue Allentown, PA 18103 (610)

More information

Land Trust of Santa Cruz County. Strategic Plan. July 2012 to June This is a public version of a more detailed internal plan.

Land Trust of Santa Cruz County. Strategic Plan. July 2012 to June This is a public version of a more detailed internal plan. Land Trust of Santa Cruz County Strategic Plan July 2012 to June 2015 This is a public version of a more detailed internal plan. Over the next three years the Land Trust will pursue four critical strategies.

More information

Sample Baseline Documentation Report (BDR) Annotated Template for Environmentally Important Land

Sample Baseline Documentation Report (BDR) Annotated Template for Environmentally Important Land Sample Baseline Documentation Report (BDR) Annotated Template for Environmentally Important Land The baseline documentation report (BDR) provides a snap shot of the biophysical condition of a property

More information

PENN MANOR SCHOOL DISTRICT

PENN MANOR SCHOOL DISTRICT PENN MANOR SCHOOL DISTRICT REQUEST FOR PROPOSAL Real Estate Broker Services 2011-2012 School Year DUE: FRIDAY, September, 30 2011 2:00 p.m. CHRISTOPHER L. JOHNSTON BUSINESS MANAGER 2950 CHARLESTOWN ROAD

More information

Chapter HABITAT CONSERVATION PLAN / NATURAL COMMUNITY CONSERVATION PLAN IMPLEMENTATION ORDINANCE

Chapter HABITAT CONSERVATION PLAN / NATURAL COMMUNITY CONSERVATION PLAN IMPLEMENTATION ORDINANCE Chapter 15.108 HABITAT CONSERVATION PLAN / NATURAL COMMUNITY CONSERVATION PLAN IMPLEMENTATION ORDINANCE Sections: 15.108.010 Purpose. 15.108.020 Definitions. 15.108.030 Applicability 15.108.040 Responsibility

More information

Request for Proposals. Milton Reservoir Lease or License. Weld County, Colorado

Request for Proposals. Milton Reservoir Lease or License. Weld County, Colorado Request for Proposals Milton Reservoir Lease or License Weld County, Colorado Page 1 of 11 1.0 INTRODUCTION 1.1 Objectives The Farmers Reservoir and Irrigation Company ( FRICO ) is soliciting proposals

More information

BROCHURE # 37 OPEN SPACE

BROCHURE # 37 OPEN SPACE BROCHURE # 37 OPEN SPACE The information and instructions in this publication are to be used when applying for assessment on the basis of current use under the open space laws, chapter 84.34 RCW and chapter

More information

78th OREGON LEGISLATIVE ASSEMBLY Regular Session. House Bill 2510 SUMMARY

78th OREGON LEGISLATIVE ASSEMBLY Regular Session. House Bill 2510 SUMMARY th OREGON LEGISLATIVE ASSEMBLY--0 Regular Session Sponsored by Representative CLEM (Presession filed.) House Bill 0 SUMMARY The following summary is not prepared by the sponsors of the measure and is not

More information

TOWN OF TROY REQUEST FOR PROPOSALS AND QUALIFICATIONS TOWN ATTORNEY SERVICES

TOWN OF TROY REQUEST FOR PROPOSALS AND QUALIFICATIONS TOWN ATTORNEY SERVICES The Town of Troy, St. Croix County, WI is requesting proposals from legal firms or private practice attorneys to provide contract legal services, prosecutorial services and labor relation services to the

More information

ZONING BY-LAW REVIEW TERMS OF REFERENCE

ZONING BY-LAW REVIEW TERMS OF REFERENCE ZONING BY-LAW REVIEW TERMS OF REFERENCE March 2011 ZONING BY-LAW REVIEW TERMS OF REFERENCE 1. INTRODUCTION The Town of East Gwillimbury s comprehensive Zoning By-law was updated and consolidated with the

More information

Conservation Easement Stewardship

Conservation Easement Stewardship Conservation Easements are effective tools to preserve significant natural, historical or cultural resources. Conservation Easement Stewardship Level of Service Standards March 2013 The mission of the

More information

IRS FORM 8283 SUPPLEMENTAL STATEMENT DONATION OF CONSERVATION EASEMENT

IRS FORM 8283 SUPPLEMENTAL STATEMENT DONATION OF CONSERVATION EASEMENT Name(s) shown on income tax return Identifying Number Robert T. Landowner 021-34-1234 Susan B. Landowner 083-23-5555 IRS FORM 8283 SUPPLEMENTAL STATEMENT DONATION OF CONSERVATION EASEMENT On November 12,

More information

February 22, RFQ No. 1 California WaterFix Real Estate Services ADDENDUM NO. 2

February 22, RFQ No. 1 California WaterFix Real Estate Services ADDENDUM NO. 2 February 22, 2018 RFQ No. 1 California WaterFix Real Estate Services ADDENDUM NO. 2 This Addendum is meant to address Questions and Answers to the Real Estate Services Request for Qualifications (RFQ)

More information

THE TOWN OF BANCROFT REQUEST FOR PROPOSAL (RFP) COMMERCIAL REAL ESTATE BROKERAGE SERVICES

THE TOWN OF BANCROFT REQUEST FOR PROPOSAL (RFP) COMMERCIAL REAL ESTATE BROKERAGE SERVICES THE TOWN OF BANCROFT REQUEST FOR PROPOSAL (RFP) 2016-02 COMMERCIAL REAL ESTATE BROKERAGE SERVICES Proposals will be received at the Town of Bancroft Municipal Office, 24 Flint Ave., Bancroft, Ontario,

More information

Request for Proposals for Commercial Real Estate Brokerage Services Port Angeles, Washington. Issued June 6, 2016

Request for Proposals for Commercial Real Estate Brokerage Services Port Angeles, Washington. Issued June 6, 2016 Request for Proposals for Commercial Real Estate Brokerage Services Port Angeles, Washington Issued June 6, 2016 Proposal Due Date: June 13, 2016 RFP FOR PROPOSALS ( RFP ) COMMERCIAL REAL ESTATE BROKERAGE

More information

Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012

Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012 Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012 IMPORTANT NOTE: This document was created to accompany the City of Fort Collins

More information

2018 Highlands Region Land Preservation Status Report

2018 Highlands Region Land Preservation Status Report 2018 Highlands Region Land Preservation Status Report Highlands Development Credit (HDC) properties (l to r): Tewksbury Township, Hunterdon County; Mount Olive, Morris County; Independence Township, Warren

More information

Transfer of Development Rights

Transfer of Development Rights Ordinance Transfer of Development Rights King County s (WA) 2008 ordinance establishes a transfer of development rights program. The ordinance: Sets eligibility criteria for sending and receiving sites

More information

CHAPTER 3 PRELIMINARY PLAT

CHAPTER 3 PRELIMINARY PLAT 10-3-1 10-3-3 SECTION: CHAPTER 3 PRELIMINARY PLAT 10-3-1: Consultation 10-3-2: Filing 10-3-3: Requirements 10-3-4: Approval 10-3-5: Time Limitation 10-3-6: Grading Limitation 10-3-1: CONSULTATION: Each

More information

OPEN SPACE TIMBER PROGRAM OKANOGAN COUNTY CODE, CHAPTER 14.09

OPEN SPACE TIMBER PROGRAM OKANOGAN COUNTY CODE, CHAPTER 14.09 OPEN SPACE TIMBER PROGRAM OKANOGAN COUNTY CODE, CHAPTER 14.09 14.09.010 - Short Title 14.09.020 - Purpose 14.09.030 - Administration 14.09.040 - Compliance with Regulations 14.09.050 - Scope 14.09.060

More information

Request for Proposals WASTE AND ORGANICS COLLECTION SERVICES RFP# ANM

Request for Proposals WASTE AND ORGANICS COLLECTION SERVICES RFP# ANM Village of Anmore Request for Proposals WASTE AND ORGANICS COLLECTION SERVICES RFP# ANM2014-02 Date Issued: March 10, 2014 Closing Date: April 2, 2014 Submission Location: Village of Anmore 2697 Sunnyside

More information

The Lawrenceville Community Land Trust: A Scattered Site, Single- Family, For- Sale Housing Development Lawrenceville Corporation

The Lawrenceville Community Land Trust: A Scattered Site, Single- Family, For- Sale Housing Development Lawrenceville Corporation REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL OR DESIGN BUILD SERVICES The Lawrenceville Community Land Trust: A Scattered Site, Single- Family, For- Sale Housing Development Lawrenceville Corporation

More information

REQUEST FOR PROPOSALS RFP # September 16, 2011 Proposals Due on October 5, 4:00 pm

REQUEST FOR PROPOSALS RFP # September 16, 2011 Proposals Due on October 5, 4:00 pm Development Division 4800 N Broadway, Boulder, CO 80304 Phone: 720-564-4610 Fax: 303-544-9553 TDD/TTY: 1-800-659-3656 www.boulderhousing.org REQUEST FOR PROPOSALS RFP #13-2011 September 16, 2011 Proposals

More information

ARTICLE I. IN GENERAL

ARTICLE I. IN GENERAL Adopted by City Council on December 7, 2009 AN ORDINANCE TO AMEND AND REORDAIN CHAPTER 10 (WATER PROTECTION) OF THE CODE OF THE CITY OF CHARLOTTESVILLE, 1990, AS AMENDED, BY DELETING SECTIONS 10-51 AND

More information

Missouri Housing Development Commission

Missouri Housing Development Commission REQUEST FOR QUALIFICATIONS and PROPOSALS Real Estate Broker Missouri Housing Development Commission Response Deadline: Three copies and one electronic copy on a CD-ROM to MHDC No later than 4:00 p.m. on

More information

Township of Salisbury Lehigh County, Pennsylvania REQUEST FOR PROPOSALS EMERGENCY SERVICES COMPREHENSIVE REVIEW

Township of Salisbury Lehigh County, Pennsylvania REQUEST FOR PROPOSALS EMERGENCY SERVICES COMPREHENSIVE REVIEW Township of Salisbury Lehigh County, Pennsylvania REQUEST FOR PROPOSALS EMERGENCY SERVICES COMPREHENSIVE REVIEW Township of Salisbury 2900 South Pike Avenue Allentown, PA 18103 (610) 797-4000 Cathy Bonaskiewich

More information

Forestry and Forested Land Protection Grant Program for Anne Arundel County

Forestry and Forested Land Protection Grant Program for Anne Arundel County Forestry and Forested Land Protection Grant Program for Anne Arundel County www.chesapeakebaytrust.org / 410-974-2941 Introduction This program is designed to increase acres of forest and protected forested

More information

American Tree Farm System Eligibility Requirements and Guidance for Certification

American Tree Farm System Eligibility Requirements and Guidance for Certification American Tree Farm System Eligibility Requirements and Guidance for Certification American Tree Farm System (ATFS) eligibility requirements were developed to ensure that ATFS certification remains consistent

More information

SUBDIVISION GUIDELINES (As Approved by the State Agricultural Land Preservation Board on July 10, 1996)

SUBDIVISION GUIDELINES (As Approved by the State Agricultural Land Preservation Board on July 10, 1996) SUBDIVISION GUIDELINES (As Approved by the State Agricultural Land Preservation Board on July 10, 1996) Section XI: CONSTRUCTION OF AN ADDITIONAL STRUCTURE AND SUBDIVISION A. Authority Authority for the

More information

***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS

***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS 105.11. Permit requirements. 105.12. Waiver of permit requirements. Title 25 Environmental Protection Part I. Department of Environmental Protection Subpart C. Protection of Natural Resources Article I.

More information

Guide to Minor Developments

Guide to Minor Developments Guide to Minor Developments Introduction The Douglas County (DCD) is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested in

More information

Township of Ligonier Westmoreland County, Pennsylvania REQUEST FOR PROPOSALS PROFESSIONAL FINANCIAL AND ADMINISTRATIVE AUDITING SERVICES

Township of Ligonier Westmoreland County, Pennsylvania REQUEST FOR PROPOSALS PROFESSIONAL FINANCIAL AND ADMINISTRATIVE AUDITING SERVICES Township of Ligonier Westmoreland County, Pennsylvania REQUEST FOR PROPOSALS PROFESSIONAL FINANCIAL AND ADMINISTRATIVE AUDITING SERVICES Township of Ligonier 1 Municipal Park Drive Ligonier, PA 15658 (724)

More information

Request for Proposal(RFP) for Planning Services

Request for Proposal(RFP) for Planning Services Request for Proposal(RFP) for Planning Services Issued December 18, 2017 Population (2010 census) 2,454 Area.55 square miles No. of Households 731 SUMMARY The Charter Township of Royal Oak requests proposals

More information

A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT

A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT 700. 701.A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT SECTION 700 PURPOSE The purpose of this Article is to set forth a streamlined set of Plan Requirements for minor

More information

Lawrenceville Housing Corporation

Lawrenceville Housing Corporation Lawrenceville Housing Corporation Request for Proposal: Licensed Real Estate Professionals Request for Proposals Licensed Real Estate Professionals Page 2 TABLE OF CONTENTS TABLE OF CONTENTS... 2 REQUEST

More information

RECITALS. B. WHEREAS, Ranch, its successors and assigns, are referred to in the Easement as the Grantor ; and

RECITALS. B. WHEREAS, Ranch, its successors and assigns, are referred to in the Easement as the Grantor ; and Basic Components of Management Plans Associated with Conservation Easement Acquisitions Where A Land Trust Or other third party Is the Grantee April 17, 2012 Key: Text in normal font, without highlight,

More information

Lessard Sams Outdoor Heritage Council

Lessard Sams Outdoor Heritage Council Lessard Sams Outdoor Heritage Council MEMO: Agenda Item # 10 DATE: December 11, 2014 SUBJECT: PRESENTER: 2015 Legislative Appropriation Recommendation Bill Heather Koop, LSOHC staff Background: On October

More information

TOWN OF PORT DEPOSIT. Request for Proposal RFP Cultural Resources Inventory and Risk Assessment for Cecil County Towns

TOWN OF PORT DEPOSIT. Request for Proposal RFP Cultural Resources Inventory and Risk Assessment for Cecil County Towns TOWN OF PORT DEPOSIT Request for Proposal RFP-02.2016 Cultural Resources Inventory and Risk Assessment for Cecil County Towns Town of Port Deposit Town of Elkton Due Date September 29, 2016 4:00 p.m. Return

More information

Thurston County Planning Department BOARD OF COUNTY COMMISSIONERS PUBLIC HEARING DRAFT AMENDMENTS TO THE CRITICAL AREAS REGULATIONS. Chapter 24.

Thurston County Planning Department BOARD OF COUNTY COMMISSIONERS PUBLIC HEARING DRAFT AMENDMENTS TO THE CRITICAL AREAS REGULATIONS. Chapter 24. Thurston County Planning Department BOARD OF COUNTY COMMISSIONERS PUBLIC HEARING DRAFT AMENDMENTS TO THE CRITICAL AREAS REGULATIONS Chapter 24.01 GENERAL PROVISIONS Chapter 24.01 6/4/2012 GENERAL PROVISIONS

More information

SPANISH FORT PLANNING COMMISSION PRELIMINARY SUBDIVISION PLAT APPLICATION. Number of Lots (Units) Address. Address.

SPANISH FORT PLANNING COMMISSION PRELIMINARY SUBDIVISION PLAT APPLICATION. Number of Lots (Units)  Address.  Address. Case No. SPANISH FORT PLANNING COMMISSION PRELIMINARY SUBDIVISION PLAT APPLICATION Name of Subdivision Tax Parcel Number(s) Subdivision Location Total Acreage Number of Lots (Units) Average Lot Size Current

More information

Exploring the 2016 ALTA/ACSM NSPS Land Title Survey Standards

Exploring the 2016 ALTA/ACSM NSPS Land Title Survey Standards Exploring the 2016 ALTA/ACSM NSPS Land Title Survey Standards Ian Wilson, PLS Central Valley Chapter 2016 Ian Wilson 2/25/2016 Purpose of the LTS History of the Standards What a Land Title Survey is and

More information

2018 Requirements Manual An In-Depth Look at Changes to the Requirements

2018 Requirements Manual An In-Depth Look at Changes to the Requirements 2018 Requirements Manual An In-Depth Look at Changes to the Requirements Executive Summary The Requirements Manual helps land trusts understand how the Land Trust Accreditation Commission verifies that

More information

Request for Qualifications (RFQ) # On-Call Land Surveying Services November 21, 2018

Request for Qualifications (RFQ) # On-Call Land Surveying Services November 21, 2018 Request for Qualifications (RFQ) #2018-54 On-Call Land Surveying Services November 21, 2018 Electronic Submittals are due by 3:00 PM on December 10 th, 2018 The EVERETT HOUSING AUTHORITY is soliciting

More information

CITY OF VERONA. Request for Proposals (RFP) Assessment Services For the Assessment Years

CITY OF VERONA. Request for Proposals (RFP) Assessment Services For the Assessment Years CITY OF VERONA Request for Proposals (RFP) Assessment Services For the Assessment Years 2019-2022 Due Date: December 28, 2018 by 4:30 p.m. Table of Contents DOCUMENT PAGE Background Information... 2 Specific

More information

Franklin County REQUEST FOR QUALIFICATIONS. Engineering and Real Estate Acquisition Services for

Franklin County REQUEST FOR QUALIFICATIONS. Engineering and Real Estate Acquisition Services for Franklin County REQUEST FOR QUALIFICATIONS Engineering and Real Estate Acquisition Services for CRP 602 JUNIPER DUNES RECREATION AREA ACCESS L11AP2000001-002 and CRP 605 PASCO-KAHLOTUS ROAD RECONSTRUCTION/OVERLAY

More information

Preserving Forested Lands

Preserving Forested Lands Preserving Forested Lands Maryland Woodland Stewards October 3, 2014 Megan Benjamin, Western & Central Region Planner Forestlands in Maryland Forests cover 41% of the State 2.6 million acres Ownership

More information

REQUEST FOR PROPOSALS NEW HAMPSHIRE HOUSING FINANCE AUTHORITY FOR ACCESSORY DWELLING UNITS IN NEW HAMPSHIRE: A GUIDE FOR HOMEOWNERS

REQUEST FOR PROPOSALS NEW HAMPSHIRE HOUSING FINANCE AUTHORITY FOR ACCESSORY DWELLING UNITS IN NEW HAMPSHIRE: A GUIDE FOR HOMEOWNERS REQUEST FOR PROPOSALS NEW HAMPSHIRE HOUSING FINANCE AUTHORITY FOR ACCESSORY DWELLING UNITS IN NEW HAMPSHIRE: A GUIDE FOR HOMEOWNERS About New Hampshire Housing Finance Authority (NHHFA): As a self-supporting

More information

Georgia Conservation Tax Credit Program Frequently Asked Questions

Georgia Conservation Tax Credit Program Frequently Asked Questions Georgia Conservation Tax Credit Program Frequently Asked Questions What are the minimum requirements for eligibility under the Georgia Conservation Tax Credit Program (GCTCP)? Individual and corporate

More information