1 Site Plan Approval Guidelines Page 1 Schedule "A" to By-law No. SITE PLAN CONTROL GUIDELINES TOWNSHIP OF BLANDFORD-BLENHEIM Prepared by the County of Oxford Community and Strategic Planning Office April 13, 2011

2 Site Plan Approval Guidelines Page 2 TABLE OF CONTENTS SECTION 1 - INTRODUCTION DESCRIPTION DEFINITION OF DEVELOPMENT GOALS OF SITE PLAN CONTROL 5 SECTION 2 SITE PLAN CONTROL PROCESS REVIEW PROCESS 6 SECTION 3 - APPLICATION REQUIREMENTS REQUIREMENTS FOR MAKING AN APPLICATION PUBLIC MEETING(S) SECURITY DEPOSIT GENERAL REQUIREMENTS FOR DRAWINGS: SITE PLAN DRAWING REQUIREMENTS LANDSCAPE PLAN REQUIREMENTS SITE SERVICING PLAN REQUIREMENTS Sanitary Sewer Systems Storm Drainage Systems Water System Electricity System Natural Gas System BUILDING ELEVATION AND CROSS-SECTION DRAWINGS REQUIREMENTS 15 SECTION 4 SITE PLAN CONTROL OBJECTIVES AND GUIDELINES GENERAL OBJECTIVES AND GUIDELINES - ALL DEVELOPMENTS Location of Buildings and Facilities Building Orientation Building Form ACCESSIBILITY FOR PERSONS WITH DISABILITIES RESIDENTIAL GUIDELINES General Building Orientation Multi-family Residential Setbacks and Separation Spaces Private Outdoor Amenity Areas Children's Play Areas 19

3 Site Plan Approval Guidelines Page Parking and Loading Facilities and Internal Driveways Proximity to Railway Lines and Other Sources of Noise COMMERCIAL GUIDELINES General Guidelines Commercial Development in the Village Core Areas PARKING, DRIVEWAY AND LOADING FACILITIES GUIDELINES Parking Areas Parking Space Requirements Internal Driveways Off-Street Loading Facilities ACCESS AND ROAD WIDENINGS GUIDELINES Access Fire Department Access Road Widenings and Sight Triangles PEDESTRIAN FACILITIES GUIDELINES SITE LIGHTING GUIDELINES LANDSCAPING AND BUFFERING FEATURES GUIDELINES Definitions Screening Ornamental Planting Preservation of Existing Landscape Elements Plant Selection WASTE STORAGE FACILITIES GUIDELINES Design Features of Waste Storage Facilities and Enclosures GRADING AND DISPOSAL OF STORM, SURFACE AND WASTE WATER Storm Water Retention Systems Waste Water Systems TREE PROTECTION STANDARDS COMMUNITY MAILBOXES EASEMENTS 28 APPENDIX A TOWNSHIP SITE PLAN APPLICATION FORM 29 APPENDIX "B" - CHECKLIST FOR SITE PLAN DRAWING REQUIREMENTS 36 APPENDIX C - APPLICATION FEE 37 APPENDIX D EXAMPLE SITE PLAN DEVELOPMENT AGREEMENT 38

4 Site Plan Approval Guidelines Page 4 SECTION 1 - INTRODUCTION 1.1 DESCRIPTION In the Province of Ontario, the Planning Act authorises municipalities to employ Site Plan Control as a land use tool to ensure the appropriate location of a development on a site and to ensure the safety, attractiveness and compatibility with the surrounding land. This Guideline document has been prepared to inform potential developers and the general public about the use of Site Plan Control, the requirements for Site Plan Control in the Township of Blandford- Blenheim and, to provide guidelines for site plan preparation and review. Section 2 of this Guide provides an overview of the Township s Site Plan Control process. Section 3 identifies the information requirements for submitting development applications seeking Site Plan approval. The more specific objectives for each matter which is subject to Site Plan Control, as well as the guidelines, criteria and standards to be used in order to achieve these goals, are set out in Section 4 of this guide. 1.2 DEFINITION OF DEVELOPMENT For the purposes of Site Plan Control, development is defined in the Planning Act as: the construction, erection, or placing of one or more buildings or structures on land or the making of an addition or alteration to a building or structure that has the effect of substantially increasing the size or usability thereof, or the laying out and establishment of a commercial parking lot or of sites for the location of three or more trailers as defined in subsection 164(4) of the Municipal Act, 2001, or subsection 3(1) of the City of Toronto Act, 2006, as the case may be, or of sites for the location of three or more mobile homes as defined in subsection 46(1) of this Act, or of sites for the construction, erection or location of three or more land lease community homes as defined in subsection 46(1) of this Act. [S. 41(1) Planning Act, R.S.O. 1990] In addition to the provisions in the Act, within Oxford County and its local area municipalities, the general policies for use of Site Plan Control are contained in Section of the County of Oxford Official Plan. The Official Plan defines the entire Township as a proposed Site Plan Control Area. Development in the Township is further regulated through the Township of Blandford-Blenheim Zoning By-law, the Township Site Plan Control By-law and other applicable By-laws. Pursuant to Section 41 of the Planning Act, the Council of the Township of Blandford-Blenheim has enacted a comprehensive Site Plan Control (SPC) By-law. The Township s SPC By-law identifies the development situations and land use classes subject to Site Plan Control. The Bylaw also exempts certain classes of land use from these controls. The By-law requires the submission of plans, drawings and, where necessary, appropriate studies, prior to permitting development on the land that is subject to Site Plan Control.

5 Site Plan Approval Guidelines Page 5 Site Plan approval is required for all new commercial, industrial, institutional or medium density residential uses. In particular, recreational uses and agricultural-commercial and agriculturalindustrial uses in the Agricultural Reserve designation of the Official Plan are subject to Site Plan Control. Site Plan approval is also required for existing development where an addition is proposed to increase the size of a building or structure by more than 25% of the gross floor area in any of the categories noted above. More detailed information is set out in Section GOALS OF SITE PLAN CONTROL The principal goals of Site Plan Control are to: ensure the safety and convenience of vehicular and pedestrian traffic to, from, and on the site of a new development or redevelopment; reduce the cost to the municipality where development requires the widening of existing roads or the granting of easements for municipal purposes; ensure that off-street parking and loading facilities are properly located, constructed and maintained during all seasons; improve the quality and aesthetic appearance of developments for greater enjoyment by the users and tenants; improve the image of the Township through well-designed individual developments.

6 Site Plan Approval Guidelines Page 6 SECTION 2 SITE PLAN CONTROL PROCESS 2.1 REVIEW PROCESS The Township s Site Plan Control review process is described below. It is Council s expectation this process will take approximately 30 days from submission of a complete application to final approval by the Township. 1. Pre-Submission Consultation The Township requires that the owner/applicant and their agents meet with the Site Plan Administrator, or his/her designate, to discuss the development proposal before submitting an application for Site Plan Control. The applicant will be advised that various Official Plan policies and Zoning By-law provisions will apply to the development. Review of these policies and provisions will assist the applicant to design the placement of the proposed buildings, structures and other built features on the site before submitting the site plan drawings and the lot grading and servicing drawings. It is expected that any required or additional studies will be identified during the pre-submission consultation review. The applicant will be expected to provide such studies in conjunction with the complete application. 2. Submit Application The site plan review process is initiated by submitting a completed application for Site Plan approval to the Township. Application forms are available at the Township Municipal office, the Oxford County Community and Strategic Planning Office or on-line via: (the application is also included as Appendix A to this guideline document). The prescribed application fee and any required deposit as established by the Township must accompany the completed application. The complete application submission requirements are listed in Section 3 of this Guideline. Appendix B to this Guideline contains a checklist of information required to be included on the Site Plan drawings. 3. Initial Review The Site Plan application will be received by the Site Plan Administrator who will review the application for completeness, compliance with the Zoning By-law, the policies of the Oxford County Official Plan, review previous planning applications on the same site, and determine if a Public Meeting (with notice to the public) is required. If necessary, the Site Plan Administrator will seek the advice of the County Development Planner to determine compliance with the relevant Official Plan policies. (The types of developments that may be subject to a public meeting are listed in Section of the County Official Plan). 4. Agency Review The Site Plan Administrator will send an acknowledgement letter to the applicant and circulate a copy of the Site Plan application to the following public agencies: i. Township Chief Building Official ii. Township Fire Chief iii. Township Road Superintendent

7 Site Plan Approval Guidelines Page 7 iv. Township Drainage Superintendent v. Township Police Department vi. Oxford County Community and Strategic Planning Office vii. Oxford County Department of Public Works viii. Oxford County Department of Public Health and Emergency Services, (only required for applications using private sanitary services). ix. County or Township Accessibility Advisory Committee, if required x. Conservation Authority agency with jurisdiction, if required. xi. Any other agency as required (eg. Bell Canada, Union Gas, etc). The Site Plan Administrator will arrange all meetings between staff, circulated agencies and the applicant/developer and their representative(s). Other agencies, including Provincial ministries, may be circulated depending on the location and scope of the application. For example, the Ministry of Environment will be circulated applications involving private communal sanitary and water systems. One or more meetings with staff may be necessary before the application can be presented at a to the Township Council. Prior to any public review or public meeting of the Township Council, the Site Plan Administrator will inform the applicant in writing if the circulated agencies require revisions of the site plan drawings or if additional information is required. 5. Site Plan Report After receiving agency comments, the Site Plan Administrator will prepare a Site Plan Report to Council. The report will outline the nature of the proposal and provide a summary of the comments received. A draft Site Plan Development Agreement will be prepared by staff and appended to the report to Council for Council s consideration. The staff report and draft Agreement will be conveyed to the applicant in advance of the Council meeting for their review. 6. Council Review At a regular Council meeting, the Township Council will review the proposal, consider the Site Plan Report and the draft Site Plan Development Agreement. Section 41 of the Planning Act authorises the Council to approve, refuse or modify the application and accompanying plans. Council may also modify the draft Site Plan Agreement, if necessary. Where conditional approval is granted, the developer will modify the drawings and plans in accordance with the direction of Council. Approval of the application will require the Owner to enter into a Site Plan Development Agreement with the Township. The Site Plan Development Agreement will include standard development requirements and any necessary special provisions to address all requirements of the review agencies and Council. (See Appendix D for an example Site Plan Development Agreement.) 7. Appeals Under Section 41(12) of the Planning Act, if the Township does not approve the completed application within 30 days after it has been received or the applicant is not satisfied with any of the requirements or conditions imposed by the Township, including any terms of the required Site Plan Development Agreement, the applicant may file an appeal to the Ontario Municipal Board (OMB). Written notice of appeal, including the reasons for appeal and the prescribed fees, shall be lodged with both the OMB and the Township Clerk, in accordance with the Planning Act.

8 Site Plan Approval Guidelines Page 8 After receipt of an appeal, the OMB will schedule a hearing and make final determination of the matters and issues under dispute. The Planning Act provides for the OMB to make any decision that Township Council could have made (approve, modify or refuse) in regard to the issues before the OMB. Once the OMB has issued it s decision and/or order, the applicant shall be required to enter into a Site Plan Development Agreement with the Township to implement the OMB decision. The decision of the OMB is final and binding on all parties. 8. Final Approval Upon receipt of the revised plans, the Site Plan Administrator will prepare the final Site Plan Development Agreement. The approved plans will be attached as a Schedule "A" to the Site Plan Development Agreement. Any recommendations of related studies will be incorporated into the Agreement, as required. The Township Site Plan Administrator will forward three (3) copies of the Agreement to the applicant for signature/execution. 9. Agreement Execution The applicant will execute and return the signed Agreements to the Township along with any necessary performance securities or deposits. The Mayor and CAO/Clerk will sign the Agreement on behalf of the Township. The Site Plan Administrator will arrange to register the Agreement on title (in the Oxford County Land Registry Office) and return one copy to the applicant. 10. Building Permit Construction of buildings or structures cannot commence until the Agreement is registered and building permits are issued. The Site Plan Administrator will notify the Township Chief Building Official when both the applicant and Township officials have executed the Agreement, and the required performance security or deposit have been received. The applicant may then apply for a building permit. 11. Post-construction The Township will return the applicant s security deposit when the Township s Engineer or the Developer s Engineer, as the case may be, has indicated to the Site Plan Administrator, in writing, that all inspections of the property have been completed to ensure compliance with the terms of the Site Plan Development Agreement. The applicant will be required to provide to the Township and/or County any professional reports or as-built drawings to confirm the completion of works (i.e., final grading, curbs/gutters, sidewalk, storm water management facilities, etc.) on the subject property and on adjacent municipal lands, prior to the return of any applicable security. The as-built drawings shall be provided in print copy and digital format, as specified by the Township and/or County.

9

10 Site Plan Approval Guidelines Page 10 SECTION 3 - APPLICATION REQUIREMENTS 3.1 REQUIREMENTS FOR MAKING AN APPLICATION Site Plan approval is required for commercial, industrial, institutional, private recreational or multi-family (medium density) residential types of land uses in the following situations: a) The construction, erection or placement of one or more buildings/structures on the land; or, b) An interior or exterior alteration to a building or structure on a property that has the effect of increasing the usability (as defined in the Township Site Plan Control By-law) of the property; or, c) An addition or alteration to a building or structure on a property that has the effect of increasing the size of the building or structure by more than 25% of the gross floor area; or d) The making or construction of, or addition to, a commercial or industrial parking lot resulting in five (5) or more parking spaces; or, e) An amendment to an existing Site Plan (or related building elevations plan, landscape plan, and/or servicing plan) or an amendment to an existing Site Plan Development Agreement with the Township on property which has been designated as a Site Plan Control Area as set out under Section 41 of the Planning Act by the Site Plan Control By-law which has been adopted by the Township. The following classes of development are exempted from site plan approval: Single detached dwelling; or, Semi-detached dwelling; or, Duplex dwelling; or, Converted dwelling containing a maximum of two (2) dwelling units; or, Uses, buildings or structures accessory to the uses listed above, provided that they do not generate a requirement for two (2) or more additional parking spaces; or, Buildings or structures used for an agricultural use, but not including agricultural-commercial or agricultural-industrial operations such as farm equipment sales and service establishments, farm supply outlets and other uses set out in the Agri-Business (AB) zone or Special AB zone; or, Minor additions and alterations, as defined above. NOTE: All submissions must meet the requirements of the Township of Blandford- Blenheim s Zoning By-law No and the County of Oxford Official Plan.

11 Site Plan Approval Guidelines Page 11 The application form must be filed in duplicate and submitted at one of the following locations. Although applications cannot be accepted electronically, submission of digital copies of the related studies and the drawings, in standard AutoCAD format (DWG) or as PDF files, is encouraged. Township of Blandford-Blenheim Municipal Office 47 Wilmot Street South P.O. Box 100 Drumbo, Ontario N0J 1G0 Telephone: (519) Fax: (519) Website: County of Oxford Community and Strategic Planning Office 21 Reeve Street P.O. Box 1614 Woodstock, Ontario N4S 7Y3 Telephone: (519) Fax: (519) Website: The application must be accompanied by a fee, payable in cash or cheque made to the "Treasurer of the Township of Blandford-Blenheim", together with the required refundable Deposit, (as prescribed in Appendix "C"). The property owner or his authorized agent must complete the application. Where an agent is making the application, the written authorization of the owner must accompany the application. If the application is being made under an agreement of purchase and sale, a copy of the agreement must be attached and will remain confidential. 3.2 PUBLIC MEETING(S) To assist in encouraging the integration of new development with adjacent land uses, where a site-specific Zone Change application is approved prior to the submission of a Site Plan application, the Township Council may, by duly adopted resolution of Council, require a formal public meeting at the site plan approval stage. Public meetings are encouraged in situations where the location, massing and conceptual design of new development may significantly affect the character of the surrounding area. The applicant will be notified of any requirement for a public meeting as close to the beginning of the application process as possible. Where Council has resolved to seek further public input in regard to site-specific development issues, a Public Notice letter shall be prepared by the Site Plan Administrator. Said Public Notice shall contain a reduced copy of the proposed Site Plan drawing(s) and a brief description of the proposal, and it shall be sent to the neighbouring property owners who were previously advised of the related Zone Change application. The Public Notice shall also be sent to any person who did not receive the related notice for the Zone Change application but did make a written request to the Township for notice of the Township s decisions in regard to the proposed development. 3.3 SECURITY DEPOSIT In accordance with the Township Site Plan Control By-law, an applicant may be required to provide the Township with a performance security deposit of cash, certified cheque or irrevocable letter of credit, or any combination thereof, to ensure satisfactory provision and maintenance of the facilities, works or matters listed in Section 41(7)(a) of the Planning Act, as approved under the site plan approval process. The performance security shall be administered

12 Site Plan Approval Guidelines Page 12 in accordance with the following provisions: a) The applicant shall provide the performance security before the Township Chief Building Official issues a building permit. b) The amount of the performance security shall be based on 50% of the estimated cost of the facilities or site works (exclusive of any buildings or structures) of the proposed development or $ 1,000.00, whichever is greater. The amount of the performance security shall be listed in the agreement with the applicant. c) The release of the performance security may be done in phases as each phase is completed. The method by which the release is phased shall be outlined in the agreement with the applicant. d) The final release of the performance security shall be upon completion of facilities, works or other matters, as noted in the Agreement, to the satisfaction of the Township Engineer, the Township Chief Building Official or the Site Plan Administrator. The applicant s request for final release of the performance security shall be accompanied by any necessary certificates, as required by the Township. 3.4 GENERAL REQUIREMENTS FOR DRAWINGS: The completed application form shall be accompanied by site plan drawings. At a minimum, the drawings used to describe the proposed development will show the site details, landscaping, services and grading. If necessary, additional separate drawings showing the landscape plan, the site servicing plan and the building elevation and building cross section plan(s) shall be submitted. Eleven (11) full-size folded copies of the site plan drawing(s) are required. These drawings shall be prepared by a qualified professional (Registered Professional Planner, Professional Engineer or Architect) and shall be prepared in such a manner as to permit registration at the Oxford County Land Registry Office. An Ontario Land Surveyor shall certify any property boundary dimensions and measurements. Two (2) additional copies of the plans reduced to 8.5" X 11' or 8.5" X 14" shall be included for circulation purposes. Once granted final approval, five (5) sets of full-size large drawings and three (3) sets of small drawings shall be submitted to be included in the Site Plan Development Agreement to be registered on title. All final approved drawings shall be certified by the appropriate professional(s) who prepared such drawing(s). The drawings and plans shall meet the requirements set out in Section SITE PLAN DRAWING REQUIREMENTS The site plan requirements listed below are further summarized in checklist format in Appendix B : a) All site plans and floor plans must be drawn to scale at a maximum of 1:200 and minimum of 1:300. b) Property dimensions and lot area must be certified by an Ontario Land Surveyor. c) Top right corner - Location (key) map at a scale of 1:2000 showing an outline of the development site with sufficient amount of surrounding area to indicate its general

13 Site Plan Approval Guidelines Page 13 location, with major adjacent features indicated, such as parks and roads; d) development title and developer s name, e) site location (legal description and municipal address), f) Property Identification Number ("PIN") g) drawing date (including schedule of revisions); h) north arrow and drawing scale; i) centre line and curb line of adjacent streets, sidewalks and existing street line; j) any portions of the subject lands that are required to be dedicated for road allowance and street widening purposes in accordance with adopted Township Council and/or County Council policies; k) if the site is adjacent to a river or large watercourse, show the location of the surface water at normal flows and the regulatory floodplain boundary, and any regulatory fill line limits, if established by the Conservation Authority; l) clear indication of subject property (dimensions & area calculations) and property details (i.e. gross floor area of buildings, percent of landscaped open space, number of dwelling units, etc.); m) approximate location and height of buildings on adjacent sites; n) adjacent property owned or controlled by the applicant; o) locations, heights and dimensions of all buildings and other structures proposed on the site, and the dimensions of all required yards. Include location of existing and proposed septic tank and tile beds, and private wells, if applicable. p) location and height of external lighting fixtures; q) location of all garbage and recyclable storage facilities (including type of structure and fencing); r) loading areas; s) access driveways and parking aisles showing on-site vehicular circulation and the aisle widths and proposed direction of traffic flows as well as any proposed ramps; t) parking areas, or structures, number of spaces, including spaces for persons with disabilities, u) dimensions of parking spaces, location of pedestrian and vehicular building entrances; v) the site or building area to be devoted for each proposed use, if multiple uses are proposed; w) proposed drive-through location showing dimensions, required number of queue spaces, order boards and drive-through window(s) and any associated traffic control features (pavement arrows and signs); x) proposed snow storage areas; y) landscaped open space areas; z) existing and proposed grades; aa) on-site storm water management facilities, if required; bb) location and height of free-standing signs; and, cc) location and width of walkways. 3.6 LANDSCAPE PLAN REQUIREMENTS The base mapping for the landscape plan(s) is the area of the site plan. The landscape plan is to be drawn in black line only, and must include: a) the location of all existing (to be preserved or removed) and proposed trees and shrubs (the symbols used must reflect the branch spread or canopy of existing trees and shrubs, and the proposed trees and shrubs at maturity);

14 Site Plan Approval Guidelines Page 14 b) a Landscaping Table listing all species, including common name, botanical name, quantity, size and condition at planting; c) planting specifications and any required instructional drawings; d) inset drawings can be used to show detailed tree and potted shrub planting methods; e) all areas to be seeded or covered in grass sod and the calculated area thereof, in addition to the percent coverage for the site. 3.7 SITE SERVICING PLAN REQUIREMENTS The site servicing plan must include details of all sanitary sewer, storm drainage, potable water natural gas and electricity systems as detailed below: Sanitary Sewer Systems The sanitary sewer features are to be designed in accordance with Provincial and County of Oxford standards and specifications. The following features must be illustrated on the servicing drawing: a) sanitary drainage piping existing location size and grade in municipal road allowance and from all buildings to street line showing location of any private drain connections, size and grade; b) private drain connections - existing and new, location, size and grade; c) control access (man)holes to be located at the street line on private property; d) all control access holes must show invert and finish grade elevations; e) Ministry of Environment requirements - "private sewers" are to be designed generally in accordance with "Guidelines for the Design of Sanitary Sewage Works, Systems, Storm Sewers (interior), Water Distribution Systems and Water Storage Facilities"; and, f) location and capacity of existing and proposed septic tank(s) and tile bed(s) on the property, if municipal sanitary sewers are not available Storm Drainage Systems The storm drainage features are to be designed in accordance with Township and Conservation Authority standards and specifications. For lands abutting County road allowances, County standards will be followed. The following features must be illustrated on the servicing drawing. a) catch basins - locations, proposed elevations for grates and inverts; b) drainage piping location and all access hole inverts and final grade elevations from building to private drain connections; c) private drain connections - existing and new, location, size and grade; drainage swales (landscaped areas) - elevations along swale, cross sections % grade (slope); d) overland flow - show flow arrows to permit ready identification of overland flow direction, show existing and proposed elevations along property lines, and key points on site and abutting properties; e) flows from adjacent properties - in the event that adjacent private properties drain onto the site being developed, the storm drainage system is to be designed to prevent storm water from backing up and creating a flooding or ponding condition on the adjacent property; f) weeping tiles - identify how flows will be handled should weeping tiles be installed;

15 Site Plan Approval Guidelines Page 15 g) dry well systems and retention systems - display such relevant detail contained in the consulting Engineer's design as will be necessary to ensure that these features are implemented by the contractor; and, h) sediment and erosion control measures to be implemented before and during construction and post-construction Water System The water system features are to be designed in accordance with Provincial and County of Oxford standards and specifications. The following features must be illustrated on the servicing drawing. a) location and size of all existing or proposed water pipes and mains, valves, shutoffs and blow-offs; b) location of existing and proposed fire hydrants in the vicinity which will service the development; and c) location of existing and proposed private water wells on the subject property, if applicable Electricity System The electrical system features are to be designed in accordance with the electrical distribution authority s standards and specifications. The following features must be illustrated on the servicing drawing. a) transformer and vault location; b) primary, secondary and service wire and/or cable location; and, c) service entrance and meter location on any buildings or structures Natural Gas System The natural gas system features are to be designed in accordance with the technical specifications of the applicable authority s standards and specifications. The following features must be illustrated on the servicing drawing. a) location of natural gas service in the road allowance; b) location of the private connection to the service in the road allowance; and, c) gas meter locations on any buildings or structures. 3.8 BUILDING ELEVATION AND CROSS-SECTION DRAWINGS REQUIREMENTS For residential buildings containing more three (3) or more dwelling units, ALL commercial, industrial and institutional buildings, the building elevation/profile and cross section drawings must be submitted in black line format only and shall include the following details: a) drawing scale; b) elevation and details of all facades of the building including type of surface material and paint colour schemes; c) all windows, doors, other openings, and any mechanical equipment on the roof,

16 Site Plan Approval Guidelines Page 16 including the dimensions of these features; d) a longitudinal cross-section view, for each floor, through the building to the street line; and, e) elevation and dimensions of any sign structure on the building. If a freestanding sign is proposed, show details of the sign in an insert drawing. SECTION 4 SITE PLAN CONTROL OBJECTIVES AND GUIDELINES 4.1 GENERAL OBJECTIVES AND GUIDELINES - ALL DEVELOPMENTS The following objectives and design guidelines are to be applied as the need arises, on a project by project basis, in order to achieve and effect good, orderly development Location of Buildings and Facilities The objectives of site plan control for building and facility location are to demonstrate the extent to which the massing and conceptual design of new developments are developed: a) to minimize conflicts with adjacent land uses; b) to provide a comfortable and pleasing environment for the intended uses in terms of building orientation, form and siting; c) to be consistent with or complimentary to existing buildings that are to be retained; and, d) to be consistent with or complimentary to existing streetscapes Building Orientation Objectives for proper orientation of buildings on a development site, include the following: a) Where possible, buildings should reinforce the prevailing street pattern by aligning with the established building line or street edge. Buildings may be set back from or placed at an angle to the existing street edge if they are of community importance. b) Where possible, public views into, through and out of a development site should maintained and improved. Community identity can be achieved by ensuring views are maintained to community features such as churches, heritage buildings, bodies of water, valleys, open space and bridges. c) New development next to parks, open space and streets should be designed to blend with the open area. d) Buildings should be oriented to maximize energy conservation Building Form The scale and character of new development should reflect the existing neighbourhood pattern and/or adjacent heritage buildings. The following features on neighbouring development should be reflected in the new development: building height, ground level treatments, ground level views,

17 Site Plan Approval Guidelines Page 17 roof treatments, frontage widths, continuity of street face, facades, scale of doors, windows and other openings, canopies, lighting, landscaping. The form created by the building should produce a sense of physical security by controlling ingress and egress as well as providing visual surveillance of all public or common areas. The applicant is encouraged to consider the following aesthetic characteristics of adjacent development and incorporate similar features into the design of new buildings and structures: compatibility of materials, textures and colours; unique architectural details, cornices, railings, lintels, arches, ironworks, chimneys, etc. 4.2 ACCESSIBILITY FOR PERSONS WITH DISABILITIES In accordance with the Accessibility for Ontarians with Disabilities Act, 2005, the Township aims to make all buildings accessible to persons with disabilities. Site plans shall incorporate design features that will make all facilities accessible. Indoor and outdoor design of facilities shall be made safe and convenient by minimizing grade changes and providing such things as accessible parking spaces, suitable curb cuts, ramps and hand-rails. Specific details are set out in this guideline and the County of Oxford s Facility Accessibility Design Standards, which are available on the County of Oxford website, or at the County offices. The Design Standards are not mandatory, but are encouraged for all new or redeveloped buildings and facilities. The Design Standards go beyond the minimum requirements set out in the Ontario Building Code. Under the Ontario Building Code, some types of buildings and structures are required to incorporate design features that will make them accessible to persons with disabilities. Reference should be made to the Ontario Building Code for the details. 4.3 RESIDENTIAL GUIDELINES General Building Orientation a) Consideration should be given to locating residential buildings close to the north lot line to increase solar access to open spaces on the site. b) The proposed building(s) should not excessively shade adjacent private or public property. c) The long axis of apartment buildings should be oriented north and south or northeast and southwest where feasible, to ensure that most of the dwelling units will receive sunlight during some part of the day. d) The long axis of residential buildings with openings on opposite sides should be oriented east and west to the greatest possible extent. e) Residential buildings exceeding 4 storeys should be sited with one of the longest walls parallel to and not more than 6 m (20 feet) from a driveway that can accommodate fire

18 Site Plan Approval Guidelines Page 18 equipment. f) Common areas and, in particular, children's play areas should be located centrally so as to provide for visual surveillance Multi-family Residential Setbacks and Separation Spaces A separation space generally refers to the space between buildings on the same site. Setback generally refers to the space between a building and the street line or property line. Separation is also required for fire protection under the Ontario Building Code. Separation between buildings and setbacks from property lines will address: a) Daylight/Sunlight - Space should be provided around dwellings to ensure the provision of daylight. It is also desirable to provide for direct sunlight to habitable areas of each dwelling unit, if possible, throughout the year. New housing should be located so as not to unduly deprive existing dwellings and private outdoor spaces in the surrounding areas of adequate sunlight or daylight. b) Ventilation - The space around the unit should be sufficient to permit natural ventilation of the dwelling. c) Noise - Physical separation and/or screening should be provided between the dwelling unit and adjacent users and activities to permit the occupant to enjoy rest and privacy without undue interference from external noise. d) Visual Privacy - Windows and entrances of a dwelling unit should be separated and/or screened from adjacent buildings and activities so as to permit residents to make full use of their interior living spaces. The frequency, duration, and proximity of potential intrusions outside the unit affect visual privacy within a dwelling unit. These will determine the type of separation of screening required. e) Application of Setback and Separation Space - The minimum setback or separation space in front of any window or opening should be applied along the full length and height of the exterior wall. Separation spaces should be free of buildings, roadways, communal parking areas and any communal amenity areas intended for active use Private Outdoor Amenity Areas Private Outdoor Amenity Areas are intended to provide private outdoor areas directly related to the dwelling unit that can effectively extend the living area of the unit. These areas are to be used for recreation or aesthetic purposes within the boundaries of a lot and may include landscaped open areas, patios, balconies, communal lounges, swimming pools, recreation facilities and any other areas which may be used for recreational or aesthetic purposes. Outdoor amenity areas shall not include any driveway or parking area. Private outdoor amenity areas should address: a) Type of Occupancy - The amenity space should reflect the anticipated type of households that will occupy the dwelling units. b) Accessibility - For ease of maintenance, an on-grade private outdoor space should be accessible from the front of the unit without requiring access through a living or dining room. A private outdoor space above grade should be easily accessible from a principle habitable room such as a living room. c) Separation and Screening - Separation between a private outdoor space and adjacent use should be sufficient. This can be accomplished by distance separation or screening. Where screening is used to provide separation between abutting on grade privacy areas, this screening should be at least 1.5 m (5 feet) high.

19 Site Plan Approval Guidelines Page 19 d) Parking Separation - Common parking lots should not be closer than 3 m (9.8 feet) to a private outdoor space and should be oriented so that headlights and fumes are not directed towards the private outdoor space by using a parallel parking arrangement or by screening with planting or fencing Children's Play Areas All Multi-family residential development shall have an area set aside within the site for the exclusive use by children as a play area. This play area shall reflect: a) Size - A children's outdoor play area shall be sized as follows: i. One or Two Bedroom Unit 1 sq. m. per unit ii. Three Bedroom Unit 1.5 sq. m. per unit In no case shall the play area be less than 50 sq. metres b) Location - The area shall be located away from parking areas and driveways and garbage bins and shall not be located closer than 5 m (16.4 feet) to any door or window of a dwelling unit. If located adjacent to a property line, the area shall be fenced with a six-foot privacy fence. c) Surface - The areas shall be level and be landscaped with grass and perimeter trees Parking and Loading Facilities and Internal Driveways To ensure appropriate design for vehicle access and loading, the following are to be considered: Also see Sections 5.14 & 5.17 of the Township of Blandford-Blenheim Zoning By-law ). a) All surfaces used for required parking and loading facilities and vehicular circulation shall be paved with asphalt or other hard surface treated to prevent the raising of dust or other loose particles as set out in the Zoning By-law. b) Consideration may be given to alternative surface materials such as cobblestone, etc., which allow precipitation to percolate into the soil, for any parking spaces provided over the minimum number required. c) All parking stalls are to be painted with lines to delineate the size of stalls Proximity to Railway Lines and Other Sources of Noise Applicants may be required to provide, in conjunction with site plans, an acoustical engineering study outlining on-site noise measurements, methods of evaluation, noise sources and abatement measures that are recommended to meet provincial standards. New residential development which is proposed to locate in proximity to railway lines or other major sources of noise will be required to meet Provincial Noise Guidelines for residential (sensitive use) development to ensure an acceptable acoustical environment is provided for future occupants. The applicant will be responsible for any costs associated with having the study peer-reviewed by an independent acoustical engineer on behalf of the Township of Blandford-Blenheim. Where noise abatement measures are required, site plans and/or landscaping plans shall incorporate the necessary remedial and mitigation measures.

20 Site Plan Approval Guidelines Page COMMERCIAL GUIDELINES General Guidelines In general, commercial uses can have impacts on other more sensitive land uses (such a residential). New commercial uses, and expansions to existing commercial uses, must seek to have minimal impacts on nearby sensitive land uses. As such, the design should meet the following objectives: a) Ensure new developments are sited such that adjacent properties have visual privacy and sunlight as well as protection from the new development's lighting, noise, odour and vibration. b) Screen unsightly elements from public view, such as loading areas, snow storage areas, transformers, meters, garbage enclosures and roof-top mechanical equipment. c) Avoid building designs with large flat surfaces and incorporate angles, differing setbacks, peaked rooflines, canopies, and coloured trim to provide interesting, attractive façade(s). d) Provide safe, convenient access for persons with disabilities to all major building entrances by means of minimal grade changes, curb cuts, ramps and railings. e) Provide screening and buffering between existing residential uses and new developments Commercial Development in the Village Core Areas Within the Village Core Areas, locate buildings at the minimum setback line from the street and to a width equal to the maximum frontage of the property so as to: a) Provide frequent and convenient pedestrian connections between buildings and the public sidewalk. b) Provide an interesting and attractive edge to the public sidewalk. c) Provide weather protection for the pedestrian. Avoid conditions that increase wind and snow piling in pedestrian areas. Provide protection for pedestrians from inclement weather with shelters, canopies and windbreaks at building entrances and along storefront facades. d) Minimize the public view of off-street parking areas and servicing facilities. e) Define a public street space that is comfortable to the pedestrian in its proportions and scale. 4.5 PARKING, DRIVEWAY AND LOADING FACILITIES GUIDELINES Parking Areas To ensure adequate parking areas are provided that have orderly circulation and an attractive community appearance: a) Delineate parking rows with poured concrete curbs or planters at each end to prevent uncontrolled internal traffic movements and generally to confine traffic to designated parking aisles or driveways. b) Mark all parking areas to clearly designate all parking spaces. c) Design all parking areas so as not to require vehicles to reverse from the property onto a

21 Site Plan Approval Guidelines Page 21 public street. d) Minimize access to and from parking aisles along main internal driveways. e) No more than 15 parking spaces should be permitted in a row without an interrupting minimum 3 metre (9.8 ft.) wide planting area. f) Provide adequate and convenient parking for all types of motorists such as employees, visitors and the public and clearly identify the types of parking areas. g) Public parking should not conflict with shipping, loading, garbage removal or utility areas. h) Avoid excessive grades for parking areas. i) The surface of required parking areas shall be paved with asphalt or other hard surface treated to prevent the raising of dust or other loose particles as set out in the Zoning Bylaw. Consideration may be given to alternative surface materials that allow precipitation to percolate into the soil for any parking spaces provided over the minimum number required. j) To ensure that parking is not the dominant visual element in the streetscape, screen larger parking areas with buildings, landscaping or low walls, while still maintaining some visibility to provide public safety by means of public surveillance. k) Provide properly identified accessible parking spaces in close proximity to building entrances. The spaces should be designed to minimize the need for persons with disabilities to cross internal driveways. Accessible parking spaces should accommodate cars or vans which have lifts or ramps installed on either the side or rear of the vehicle. Parking spaces should be designed to provide space for the lift or ramp and manoeuvring space for the person with a disability. Appropriate signage is required at the designated parking space(s). Specific details are set out in the County of Oxford Facility Accessibility Design Standards, which are available on the County of Oxford website, or at the County offices. The Design Standards are not mandatory, but are encouraged for all new or redeveloped buildings and facilities Parking Space Requirements Requirements for the number of parking spaces for specific types of uses and the size of spaces are set out in the Township Zoning By-law, Section The number of parking spaces designated to accommodate persons with disabilities shall be in accordance with the Zoning By-law. Where more than 10 parking spaces are required, 1 space out of the first 10 spaces and 1 space out of each additional 100 spaces, or portion thereof, shall be for accessible parking and shall have a minimum width of 3.9 m. (12.8 ft.) and a minimum length of 5.5 m. (18 ft.) (Section of the Zoning By-law). The County of Oxford Facility Accessibility Design Standards (Section ) sets out recommendations for the size and number of designated parking spaces that go beyond the minimum required in the Zoning By-law. Requirements for accessible parking signage are included in the Design Standards Internal Driveways To ensure adequate internal driveways: a) delineate main internal driveways, which are heavily travelled, with raised curbs to avoid interference to moving traffic created by parking manoeuvring. b) the horizontal alignment of all driveways should be geometrically sound, but lengthy

22 Site Plan Approval Guidelines Page 22 straight sections should be minimized to discourage high speeds. c) speed bumps may be used to discourage high speeds. d) ensure adequate visibility of intersecting traffic movements in the design of driveways and parking aisle intersections. e) in large commercial or industrial developments, main internal driveways should not be located abutting building entrances in order to minimize pedestrian and vehicle conflicts. f) driving lanes that allow two-way circulation are encouraged and should be easily identifiable. g) driving lanes should widen at drop-off areas near buildings. h) one-way lanes shall have clearly marked directional signs. i) turning areas shall be provided at the end of dead-end driveways Off-Street Loading Facilities To ensure facilities for loading goods, equipment and other materials are properly located and designed consideration is to be given to the following: a) Access - Sufficient space should be provided on a property to permit delivery vehicles to make all manoeuvres "off-street". Vehicles reversing from the property on to a street should be avoided. Roads providing access to building fronts and fire routes are to be designed to support emergency vehicles. b) Location - Access to loading facilities may be by separate access or by an internal driveway serving a parking area. Loading spaces shall abut the building to be served. c) Paving - All loading spaces, manoeuvring areas and driveways should be hard surfaced with suitable materials in accordance with Section of the Zoning By-law d) Joint Loading Facilities - In commercial developments or other similar integrated development, the use of joint loading facilities to serve all or several individual businesses will be encouraged. 4.6 ACCESS AND ROAD WIDENINGS GUIDELINES Access To ensure the orderly and safe movement of traffic in and out of private properties with minimum interference between vehicular and pedestrian traffic using the public road system, a) the number of access driveways shall be minimized; b) each development will be analyzed in terms of site characteristics, including street frontage, land area, traffic generation and parking capacity to determine the desirable number and location of access driveways. c) individual residential driveways on to arterial streets should be avoided. d) access for development on a corner lot should be as far from the intersection of the two streets as possible. e) where required, the site plan shall make provisions for the joint use of common driveways between abutting properties. The development will make provision for these types of driveways.

Financial Impact Statement There are no immediate financial impacts associated with the adoption of this report.

Financial Impact Statement There are no immediate financial impacts associated with the adoption of this report. STAFF REPORT Planning and Development Department Subject: Application by RYC Property to rezone a portion of lands on John Murray Dr. and Megan Lynn Dr. from R2 to R3 and to enter into a Development Agreement

More information

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017 Appendix1,Page1 Urban Design Guidelines DRAFT September 2017 Back to Back and Stacked Townhouses Appendix1,Page2 Table of Contents 1 Introduction 1 1.1 Purpose 1 1.2 Urban Design Objectives 1 1.3 Building

More information

THE CITY OF ORILLIA DEVELOPMENT SERVICES AND ENGINEERING DEPARTMENT APPLICATION FOR SITE PLAN CONTROL

THE CITY OF ORILLIA DEVELOPMENT SERVICES AND ENGINEERING DEPARTMENT APPLICATION FOR SITE PLAN CONTROL THE CITY OF ORILLIA DEVELOPMENT SERVICES AND ENGINEERING DEPARTMENT APPLICATION FOR SITE PLAN CONTROL COMPLETENESS OF THE APPLICATION: A Site Plan Control application cannot be accepted prior to the mandatory

More information

3.1. OBJECTIVES FOR RESIDENTIAL LAND USE DESIGNATIONS GENERAL OBJECTIVES FOR ALL RESIDENTIAL DESIGNATIONS

3.1. OBJECTIVES FOR RESIDENTIAL LAND USE DESIGNATIONS GENERAL OBJECTIVES FOR ALL RESIDENTIAL DESIGNATIONS 3. RESIDENTIAL LAND USE DESIGNATIONS INTRODUCTION The Residential land use designations provide for housing and other land uses that are integral to, and supportive of, a residential environment. Housing

More information

THE CITY OF ORILLIA DEVELOPMENT SERVICES AND ENGINEERING DEPARTMENT APPLICATION FOR SITE PLAN CONTROL

THE CITY OF ORILLIA DEVELOPMENT SERVICES AND ENGINEERING DEPARTMENT APPLICATION FOR SITE PLAN CONTROL THE CITY OF ORILLIA DEVELOPMENT SERVICES AND ENGINEERING DEPARTMENT APPLICATION FOR SITE PLAN CONTROL COMPLETENESS OF THE APPLICATION: A Site Plan Control application cannot be accepted prior to the mandatory

More information

Combined Zoning/Minor Variance and Boulevard Parking Agreement Exception

Combined Zoning/Minor Variance and Boulevard Parking Agreement Exception Residential Front Yard and Boulevard Parking Policy Name: Residential Front Yard and Boulevard Parking Legislative History: Enacted September 19, 2017 (By-law No. CPOL.-223-475); Amended June 26, 2018

More information

PLANNING RATIONALE REPORT

PLANNING RATIONALE REPORT PLANNING RATIONALE REPORT Zoning By-law Amendment Application 2920 Danbury Way Prepared for: Bravar Custom Builders Inc. and Village View Estates Ltd. by: 6393 Roslyn Street Ottawa (Orleans), Ontario K1C

More information

Accessory Coach House

Accessory Coach House Updated July 2018 Accessory Coach House Development Permit Guidelines 1 Accessory Coach House Development Permit Guidelines Zoning Bylaw, 1995 DIVISION VII C. Contents Part I General Reglations 1 Introduction

More information

Town of Whitby By-law #

Town of Whitby By-law # Town of Whitby By-law # 7015-15 Site Plan Control By-law Being a By-law to designate the Town of Whitby as a Site Plan Control Area and to delegate to the Commissioner of Planning the approval of plans

More information

UPPER MOUNT BETHEL TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA

UPPER MOUNT BETHEL TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA UPPER MOUNT BETHEL TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA JOINDER DEED / LOT CONSOLIDATION TOWNSHIP REVIEW PROCESS When accepting proposed Joinder Deeds / Lot Consolidations, review the Joinder Deed

More information

THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE

THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE SITE PLAN APPLICATION GUIDELINES January, 2018 1 THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE Site Plan Application Guidelines (January 2018) Applicants

More information

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services.

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services. Conditions Relating to Draft Plan of Subdivision Approval East Fonthill 26T 01014 (Draft Plan dated December 1, 2013, and revised August 28, 2014), the Town of Pelham 1. This approval applies to the Draft

More information

8.5.1 R1, Single Detached Residential District

8.5.1 R1, Single Detached Residential District 8.5.1 R1, Single Detached Residential District The purpose of this district is to provide for residential development in the form of single detached dwellings. Dwelling, Single Detached Home Business,

More information

the conditions contained in their respective Orders until January 1, 2025, at the discretion of the Director of Planning, Property and Development.

the conditions contained in their respective Orders until January 1, 2025, at the discretion of the Director of Planning, Property and Development. Part 4: Use Regulations Temporary Uses and Structures Purpose the conditions contained in their respective Orders until January 1, 2025, at the discretion of the Director of Planning, Property and Development.

More information

Application for Site Plan Agreement

Application for Site Plan Agreement Township of Asphodel-Norwood Building and Planning Department 2357 County Road 45 Norwood, ON K0L 2V0 Application for Site Plan Agreement The undersigned hereby applies to the Council of the Township of

More information

RURAL SETTLEMENT ZONE - RULES

RURAL SETTLEMENT ZONE - RULES Chapter 38 RURAL SETTLEMENT ZONE - RULES INTRODUCTION This Chapter contains rules managing land uses in the. The boundaries of this zone are shown on the planning maps. There is limited opportunity for

More information

II. What Type of Development Requires Site Plan Review? There are five situations where a site plan review is required:

II. What Type of Development Requires Site Plan Review? There are five situations where a site plan review is required: I. What is a Site Plan Review? Site Plan Review is a process where the construction of new buildings, new additions, and certain types of canopies and/or tax-exempt institutions are reviewed by the City

More information

Urban Design Brief Dundas Street. London Affordable Housing Foundation. November Zelinka Priamo Ltd.

Urban Design Brief Dundas Street. London Affordable Housing Foundation. November Zelinka Priamo Ltd. Urban Design Brief 1039-1047 Dundas Street London Affordable Housing Foundation November 2017 Zelinka Priamo Ltd. TABLE OF CONTENTS Page No. INTRODUCTION... 3 SECTION 1 LAND USE PLANNING CONTEXT... 3 1.1

More information

ARTICLE 15. RULES, REGULATIONS AND DEFINITIONS

ARTICLE 15. RULES, REGULATIONS AND DEFINITIONS ARTICLE 15. RULES, REGULATIONS AND DEFINITIONS Section 1. Interpretation and Construction: The following rules and regulations regarding interpretation and construction of the Ulysses-Grant County, Kansas,

More information

CHAPTER 26 PLANNING AND ZONING ARTICLE VII. MOBILE HOMES AND RECREATIONAL VEHICLE (RV) PARKS. Recreational Vehicle (RV) Park Development Standards

CHAPTER 26 PLANNING AND ZONING ARTICLE VII. MOBILE HOMES AND RECREATIONAL VEHICLE (RV) PARKS. Recreational Vehicle (RV) Park Development Standards CHAPTER 26 PLANNING AND ZONING ARTICLE VII. MOBILE HOMES AND RECREATIONAL VEHICLE (RV) PARKS. Section 26-VII-1. Section 26-VII-2. Section 26-VII-3. Section 26-VII-4. Section 26-VII-5. Purpose Permitted

More information

Staff Report for Council Public Meeting

Staff Report for Council Public Meeting Agenda Item 3.3 Staff Report for Council Public Meeting Date of Meeting: September 27, 2017 Report Number: SRPRS.17.134 Department: Division: Subject: Planning and Regulatory Services Development Planning

More information

and Members of Municipal Council

and Members of Municipal Council REPORT TO: SUBMITTED BY: SUBJECT: Mayor James M. Diodati and Members of Municipal Council Planning, Building & Development 26T-11-2017-002 Winzen Niagara Draft Plan of Subdivision 4825 Pettit Avenue Applicant:

More information

P. H. Robinson Consulting Urban Planning, Consulting and Project Management

P. H. Robinson Consulting Urban Planning, Consulting and Project Management PLANNING RATIONALE REPORT FOR SITE PLAN AND DRAFT PLAN OF CONDOMINIUM APPLICATIONS 73-75 HARVEY STREET CITY OF OTTAWA PREPARED BY: P H ROBINSON CONSULTING AUGUST 2012 1 This report has been prepared on

More information

SECTION 10.7 R-PUD (RESIDENTIAL PLANNED UNIT DEVELOPMENT) ZONE

SECTION 10.7 R-PUD (RESIDENTIAL PLANNED UNIT DEVELOPMENT) ZONE Article X Zones 10-20 SECTION 10.7 R-PUD (RESIDENTIAL PLANNED UNIT DEVELOPMENT) ZONE A. PURPOSE AND INTENT: The R-PUD Residential PUD Zone is intended to provide alternative, voluntary zoning procedures

More information

Guidelines for the Approval of New Homes Sales Offices (Building Permits, Agreements, Securities)

Guidelines for the Approval of New Homes Sales Offices (Building Permits, Agreements, Securities) Guidelines for the Approval of New Homes Sales Offices (Building Permits, Agreements, Securities) ENCLOSURES: Site Plan Application Building Permit Application Grading and Drainage Approval Requirements

More information

TOTTENHAM SECONDARY PLAN

TOTTENHAM SECONDARY PLAN TOTTENHAM SECONDARY PLAN AMENDMENT NO. 11 TO THE OFFICIAL PLAN OF THE TOWN OF NEW TECUMSETH The following text and schedules to the Official Plan of the Town of New Tecumseth constitute Amendment No. 11

More information

CHAPTER XVIII SITE PLAN REVIEW

CHAPTER XVIII SITE PLAN REVIEW CHAPTER XVIII SITE PLAN REVIEW Section 18.1 Section 18.2 Description and Purpose. The purpose of this chapter is to provide standards and procedures under which applicants would submit, and the Township

More information

APPLICATION FOR PLAN OF SUBDIVISION/CONDOMINIUM

APPLICATION FOR PLAN OF SUBDIVISION/CONDOMINIUM The Corporation of the County of Wellington APPLICATION FOR PLAN OF SUBDIVISION/CONDOMINIUM Please review the following application guidelines PRE-CONSULTATION: The County of Wellington strongly encourages

More information

APPLICATION FOR SITE PLAN DEVELOPMENT FOR MULTIPLE RESIDENTIAL AND NON-RESIDENTIAL

APPLICATION FOR SITE PLAN DEVELOPMENT FOR MULTIPLE RESIDENTIAL AND NON-RESIDENTIAL APPLICATION FOR SITE PLAN DEVELOPMENT FOR MULTIPLE RESIDENTIAL AND NON-RESIDENTIAL TOWNSHIP OF KING PLANNING DEPARTMENT 2075 KING ROAD KING CITY, ONTARIO L7B 1A1 (905) 833-5321 APPLICATION FOR SITE PLAN

More information

Urban Design Brief. Italian Seniors Project 1090, 1092, 1096 Hamilton Road City of London

Urban Design Brief. Italian Seniors Project 1090, 1092, 1096 Hamilton Road City of London Urban Design Brief Italian Seniors Project City of London October 1, 2017 TABLE OF CONTENTS Page No. INTRODUCTION... 2 1.0 LAND USE PLANNING CONCEPT... 2 1.1 Subject Lands... 2 1.2 Official Plan and Zoning

More information

Requirements for accepted development and assessment benchmarks for assessable development

Requirements for accepted development and assessment benchmarks for assessable development 9.3.10 Small Lot Housing Design Code 9.3.10.1 Application (1) This code applies to development identified as requiring assessment against the Small Lot Housing Design Code by the categories of development

More information

Part 9 Specific Land Uses - Multi Dwelling Housing

Part 9 Specific Land Uses - Multi Dwelling Housing 11 MULTI DWELLING HOUSING This section of the DCP only provides Council s specific requirements for Multi Dwelling Housing developments. Other requirements that must be addressed are contained in the relevant

More information

STAFF REPORT. Financial Impact Statement There are no immediate financial impacts associated with the adoption of this report.

STAFF REPORT. Financial Impact Statement There are no immediate financial impacts associated with the adoption of this report. STAFF REPORT Planning and Development Department Subject: Cottage Country Unsubstantial Amendment to Development Agreement To: CAO for Planning Advisory Committee, December 13, 2016 Date Prepared: December

More information

ARTICLE 15 - PLANNED UNIT DEVELOPMENT

ARTICLE 15 - PLANNED UNIT DEVELOPMENT Section 15.1 - Intent. ARTICLE 15 - PLANNED UNIT DEVELOPMENT A PUD, or Planned Unit Development, is not a District per se, but rather a set of standards that may be applied to a development type. The Planned

More information

Planning & Development. Background. Subject Properties

Planning & Development. Background. Subject Properties Planning & Development APPLICATION BRIEFING Prepared For: Planning Advisory Committee Submitted by: Jason Fox, Director of Planning & Development Date: Subject: Application by Meech Holdings Limited to

More information

Title: ENCROACHMENT POLICY Number: 0132 Reference: Administrative Committee January 21, Adopted by City Council: February 2, 2009

Title: ENCROACHMENT POLICY Number: 0132 Reference: Administrative Committee January 21, Adopted by City Council: February 2, 2009 POLICY Title: ENCROACHMENT POLICY Number: 0132 Reference: Administrative Committee January 21, 2009 February 2, 2009 Supersedes: May 2, 2005 Prepared by: PLANNING, BUILDING AND DEVELOPMENT SERVICES STATEMENT

More information

Draft Model Access Management Overlay Ordinance

Draft Model Access Management Overlay Ordinance Draft Model Access Management Overlay Ordinance This model was developed using the City of Hutchinson and the Trunk Highway 7 corridor. The basic provisions of this model may be adopted by any jurisdiction

More information

Medical Marijuana Special Exception Use Information

Medical Marijuana Special Exception Use Information Medical Marijuana Special Exception Use Information The Special Exception Use information below is a modified version of the Unified Development Code. It clarifies the current section 5:104 Special Exceptions

More information

Town of Penetanguishene APPLICATION FOR SITE PLAN APPROVAL

Town of Penetanguishene APPLICATION FOR SITE PLAN APPROVAL APPLICATION CHECKLIST (It is recommended that you consult with the Town s Planning and Development Department prior to submitting your application.) Please ensure you have completed the following prior

More information

APPLICATION PROCEDURE

APPLICATION PROCEDURE ANTRIM PLANNING BOARD P. O. Box 517 Antrim, New Hampshire 03440 Phone: 603-588-6785 FAX: 603-588-2969 APPLICATION FORM AND CHECKLIST FOR MINOR OR MAJOR SITE PLAN REVIEW File Date Received By APPLICATION

More information

CITY OF TORONTO. BY-LAW No

CITY OF TORONTO. BY-LAW No Authority: Toronto and East York Community Council Item 13.10, as adopted by City of Toronto Council on March 5, 6 and 7, 2012 and MM26.23, moved by Councillor McConnell, seconded by Councillor Milczyn,

More information

9.3.5 Dual occupancy code

9.3.5 Dual occupancy code 9.3.5 Dual occupancy code 9.3.5.1 Application (1) This code applies to accepted development and assessable development identified as requiring assessment against the Dual occupancy 1 code by the tables

More information

Authority: North York Community Council Item 34.85, as adopted by City of Toronto Council on August 25, 26, 27 and 28, 2014 CITY OF TORONTO

Authority: North York Community Council Item 34.85, as adopted by City of Toronto Council on August 25, 26, 27 and 28, 2014 CITY OF TORONTO Authority: North York Community Council Item 34.85, as adopted by City of Toronto Council on August 25, 26, 27 and 28, 2014 CITY OF TORONTO BY-LAW No. 1038-2014 To amend former City of Toronto Zoning By-law

More information

Section 1: US 19 Overlay District

Section 1: US 19 Overlay District Section 1: US 19 Overlay District Section 1.1 Intent and Purpose The purpose of the US Highway 19 Overlay District is to manage access to land development along US Highway 19 in a manner that preserves

More information

ACCESSORY DWELLING UNITS

ACCESSORY DWELLING UNITS ACCESSORY DWELLING UNITS LAND USE BYLAW C-4841-97 ACCESSORY DWELLING UNIT (ADU): means a subordinate dwelling unit attached to, created within or detached from the principal dwelling, single detached,

More information

CONDOMINIUM REGULATIONS

CONDOMINIUM REGULATIONS ARTICLE 37 CONDOMINIUM REGULATIONS SECTION 37.01. Purpose The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

MIDWAY CITY Planning Office 75 North 100 West Phone: x105 Midway, Utah Fax:

MIDWAY CITY Planning Office 75 North 100 West Phone: x105 Midway, Utah Fax: MIDWAY CITY Planning Office 75 North 100 West Phone: 435-654-3223 x105 Midway, Utah 84049 Fax: 435-654-2830 mhenke@midwaycityut.org Preliminary/ Final Application for Small Scale Subdivision Application

More information

900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1

900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1 50 City of Vancouver Land Use and Development Policies and Guidelines Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7344 fax 873.7060 planning@city.vancouver.bc.ca 900 BURRARD STREET

More information

ARTICLE 24 SITE PLAN REVIEW

ARTICLE 24 SITE PLAN REVIEW ARTICLE 24 SITE PLAN REVIEW 24.1 PURPOSE: The intent of these Ordinance provisions is to provide for consultation and cooperation between the land developer and the Township Planning Commission in order

More information

Staff Report for Council Public Meeting

Staff Report for Council Public Meeting Agenda Item 3.3 a Staff Report for Council Public Meeting Date of Meeting: February 7, 2018 Report Number: SRPRS.18.022 Department: Division: Subject: Planning and Regulatory Services Development Planning

More information

ARTICLE 5.0 SCHEDULE OF REGULATIONS

ARTICLE 5.0 SCHEDULE OF REGULATIONS ARTICLE 5.0 SCHEDULE OF REGULATIONS Section 5.101 Table of Dimensional Standards by District. Dimensional Standards AG AG with sewer Districts Rural Residential Business Other SF SF with sewer R-1 R-1

More information

THE CORPORATION OF THE MUNICIPALITY OF MISSISSIPPI MILLS SITE PLAN CONTROL APPLICATION FORM Procedure Guide June 12, 2017

THE CORPORATION OF THE MUNICIPALITY OF MISSISSIPPI MILLS SITE PLAN CONTROL APPLICATION FORM Procedure Guide June 12, 2017 THE CORPORATION OF THE MUNICIPALITY OF MISSISSIPPI MILLS SITE PLAN CONTROL APPLICATION FORM Procedure Guide June 12, 2017 1. Application forms are available from the Municipal Office. The Site Plan Control

More information

SECTION 15 - R3 - RESIDENTIAL THIRD DENSITY ZONE

SECTION 15 - R3 - RESIDENTIAL THIRD DENSITY ZONE SECTION 15 - R3 - RESIDENTIAL THIRD DENSITY ZONE Within the Residential Third Density (R3) Zone, no person shall use any land, erect, alter, enlarge, use or maintain any building or structure for any use

More information

Multi-unit residential uses code

Multi-unit residential uses code 9.3.11 Multi-unit residential uses code 9.3.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Multi-unit residential uses code by the tables

More information

Authority: Ontario Municipal Board Decisions/Orders issued June 26, 2014, August 24, 2015 and July 13, 2016 in Board File PL CITY OF TORONTO

Authority: Ontario Municipal Board Decisions/Orders issued June 26, 2014, August 24, 2015 and July 13, 2016 in Board File PL CITY OF TORONTO Authority: Ontario Municipal Board Decisions/Orders issued June 26, 2014, August 24, 2015 and July 13, 2016 in Board File PL130285 CITY OF TORONTO BY-LAW 591-2018(OMB) To amend former City of Toronto Zoning

More information

LAND USE BYLAW NO. 747

LAND USE BYLAW NO. 747 TOWN OF PICTURE BUTTE LAND USE BYLAW NO. 747 Prepared by the OLDMAN RIVER INTERMUNICIPAL SERVICE AGENCY June 1998 Amended to Bylaw No. 792-06 TABLE OF CONTENTS TITLE... 1 DATE OF COMMENCEMENT... 1 REPEAL

More information

Greenfield Development Requirements

Greenfield Development Requirements Greenfield Development Requirements Planning & Engineering Department City of Yorkton Saskatchewan 2014 Summary Greenfield Development refers to the development of raw land to a finished state as residential,

More information

Section 7.22: Multifamily Assisted Housing in AA-30 Residential Zone (MAHZ) [Note: an additional line will be added to the Table in Article 3, 3.1.

Section 7.22: Multifamily Assisted Housing in AA-30 Residential Zone (MAHZ) [Note: an additional line will be added to the Table in Article 3, 3.1. Section 7.22: Multifamily Assisted Housing in AA-30 Residential Zone (MAHZ) [Note: an additional line will be added to the Table in Article 3, 3.1.1A] 7.22.1 Purpose The purpose of this Special Regulation

More information

Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department

Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department Public Report To: From: Report Number: Development Services Committee Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department DS-16-50 Date of Report: April 14, 2016 Date of Meeting:

More information

ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW

ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW Section 7.0 - Purpose The purpose of this article is to specify the documents and/or drawings required for a Site Plan Review or a Plot Plan

More information

Special Use Permit - Planned Unit Development Checklist. Property Address:

Special Use Permit - Planned Unit Development Checklist. Property Address: Special Use Permit - Planned Unit Development Checklist Special Use Permit Number. Parcel Code/s #28-11- - - Property Address: Applicant: ARTICLE VIII Ordinance Reference - Section 8.1.2 Permit Procedures:

More information

ARTICLE XI MANUFACTURED AND MOBILE HOME PARKS

ARTICLE XI MANUFACTURED AND MOBILE HOME PARKS ARTICLE XI MANUFACTURED AND MOBILE HOME PARKS 11.01 General Description Manufactured/Mobile Homes are becoming an increasingly popular form of housing. However, because of their limited size, relative

More information

CONDOMINIUM APPLICATION GUIDE application for approval under Section 51 of the Planning Act, R.S.O. 1990

CONDOMINIUM APPLICATION GUIDE application for approval under Section 51 of the Planning Act, R.S.O. 1990 CONDOMINIUM APPLICATION GUIDE application for approval under Section 51 of the Planning Act, R.S.O. 1990 City of Mississauga Development Services Planning and Building Department 300 City Centre Drive,

More information

(b) The location of principal and accessory buildings on the lot and the relationship of each structure to the other.

(b) The location of principal and accessory buildings on the lot and the relationship of each structure to the other. ARTICLE XIX SITE PLAN Sec. 20-1900 Site Plan Review Procedure - Intent The site plan review procedures are instituted to provide an opportunity for the Township Planning Commission to review the proposed

More information

ARTICLE 9 SPECIFICATIONS FOR DOCUMENTS TO BE SUBMITTED

ARTICLE 9 SPECIFICATIONS FOR DOCUMENTS TO BE SUBMITTED ARTICLE 9 SPECIFICATIONS FOR DOCUMENTS TO BE SUBMITTED SECTION 950 GENERALLY All applications shall be properly signed and filed by the owner or, with the owner s specific written consent, a contract purchaser

More information

H4. Residential Mixed Housing Suburban Zone

H4. Residential Mixed Housing Suburban Zone H4. Residential Mixed Housing Suburban Zone H4.1. Zone description The Residential Mixed Housing Suburban Zone is the most widespread residential zone covering many established suburbs and some greenfields

More information

PART 6 GENERAL REGULATIONS

PART 6 GENERAL REGULATIONS PART 6 GENERAL REGULATIONS 6.1 GENERAL PROVISIONS (1) The general development regulations of this Section prevail in all districts. Where there appears to be a conflict with the regulations in other Sections,

More information

Policy and Standards for Public Local Residential Streets And Private Streets

Policy and Standards for Public Local Residential Streets And Private Streets Appendix A City of Toronto Development Infrastructure Policy & Standards Policy and Standards for Public Local Residential Streets And Private Streets November 2005 Policy and Standards For Public Local

More information

PLANNING BOARD CITY OF CONCORD, NH MINOR SUBDIVISION CHECKLIST

PLANNING BOARD CITY OF CONCORD, NH MINOR SUBDIVISION CHECKLIST PLANNING BOARD CITY OF CONCORD, NH MINOR SUBDIVISION CHECKLIST Summary This checklist is intended to assist applicants and design professionals in the preparation of minor subdivision applications for

More information

Understanding the Conditional Use Process

Understanding the Conditional Use Process Understanding the Conditional Use Process The purpose of this document is to explain the process of applying for and obtaining a conditional use permit in the rural unincorporated towns of Dane County.

More information

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST Completed DRC Application for Review Required for Application Process DRC Processing Fee 1 Commercial $2,500.00 Fire Department Review Fee 150.00 Total $2,650.00

More information

RESIDENTIAL CLUSTER DEVELOPMENT DISTRICT SPECIAL PERMIT RULES AND REGULATIONS OF THE PLANNING BOARD OF THE TOWN OF COHASSET, MASSACHUSETTS

RESIDENTIAL CLUSTER DEVELOPMENT DISTRICT SPECIAL PERMIT RULES AND REGULATIONS OF THE PLANNING BOARD OF THE TOWN OF COHASSET, MASSACHUSETTS RESIDENTIAL CLUSTER DEVELOPMENT DISTRICT SPECIAL PERMIT RULES AND REGULATIONS OF THE PLANNING BOARD OF THE TOWN OF COHASSET, MASSACHUSETTS Attached: Residential Cluster Development District Special Permit

More information

4.2 RESIDENTIAL ZONING DISTRICTS

4.2 RESIDENTIAL ZONING DISTRICTS 4.2 RESIDENTIAL ZONING DISTRICTS A. Purpose: To define regulations and standards for each residential zoning district in the City. The following sections identify uses, regulations, and performance standards

More information

Urban Design Brief. Proposed Medical / Dental Office 1444 Adelaide Street North. Vireo Health Facility Ltd.

Urban Design Brief. Proposed Medical / Dental Office 1444 Adelaide Street North. Vireo Health Facility Ltd. Urban Design Brief Proposed Medical / Dental Office Vireo Health Facility Ltd. November 27, 2013 TABLE OF CONTENTS Page No. INTRODUCTION... 1 SECTION 1 LAND USE PLANNING CONTEXT... 1 1.1 The Subject Lands...

More information

DEVELOPMENT APPLICATION PRE-CONSULTATION FORM

DEVELOPMENT APPLICATION PRE-CONSULTATION FORM DEVELOPMENT APPLICATION PRE-CONSULTATION FORM Meeting Date: Property Owner: Site Address: Applicant & Address Site Area: APPLICATION TYPE (check applicable applications): Local Official Plan Amendment

More information

SECTION 10.0 GENERAL PROVISIONS FOR RESIDENTIAL ZONES

SECTION 10.0 GENERAL PROVISIONS FOR RESIDENTIAL ZONES SECTION 10.0 GENERAL PROVISIONS FOR RESIDENTIAL ZONES 10.1 The following provisions shall apply to all residential zones, and where specified to Agricultural Zones, as shown on Schedule A to this by-law

More information

CHAPTER34 PRUD - PLANNED RESIDENTIAL UNIT DEVELOPMENT

CHAPTER34 PRUD - PLANNED RESIDENTIAL UNIT DEVELOPMENT CHAPTER34 PRUD - PLANNED RESIDENTIAL UNIT DEVELOPMENT 17-34-1 17-34-2 17-34-3 17-34-4 17-34-5 17-34-6 17-34-7 17-34-8 17-34-9 Purpose Planned Residential Unit Development Defined Planned Residential Unit

More information

The Corporation of The Town of Richmond Hill. Schedule of Conditions. Draft Plan of Subdivision. File 19T(R) Town of Richmond Hill

The Corporation of The Town of Richmond Hill. Schedule of Conditions. Draft Plan of Subdivision. File 19T(R) Town of Richmond Hill The Corporation of The Town of Richmond Hill Development Planning Division Schedule of Conditions Draft Plan of Subdivision File 19T(R)-14009 Country Wide Homes (Jefferson) Inc. Lot 3, Plan 65M-2071 Town

More information

ORDINANCE NO The Town Council of the Town of Yucca Valley does ordain as follows:

ORDINANCE NO The Town Council of the Town of Yucca Valley does ordain as follows: ORDINANCE NO. 141 AN ORDINANCE OF THE TOWN COUNCIL OF THE TOWN OF YUCCA VALLEY, CALIFORNIA, AMENDING TITLE 8, DIVISION 12, CHAPTER 1 RELATING TO DEFINITIONS AND TITLE 8, DIVISION 8, CHAPTER 3, RELATING

More information

The Corporation of The Town of Richmond Hill. Schedule of Conditions. Draft Plan of Subdivision. File 19T(R)-16002

The Corporation of The Town of Richmond Hill. Schedule of Conditions. Draft Plan of Subdivision. File 19T(R)-16002 Town of Richmond Hill The Corporation of The Town of Richmond Hill Development Planning Division Schedule of Conditions Draft Plan of Subdivision File 19T(R)-16002 Country Wide Homes (Jefferson) Inc. Lots

More information

TOWN OF SIDNEY BYLAW 1390

TOWN OF SIDNEY BYLAW 1390 The contents of this Bylaw are produced and consolidated for convenience only. Every effort has been made to ensure the accuracy and completeness of the material, however, the Town cannot guarantee its

More information

Condominium Unit Requirements.

Condominium Unit Requirements. ARTICLE 19 CONDOMINIUM REGULATIONS Section 19.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

Amend. BL 3480, 1982 Amend. BL 4691, 1990 RMH ZONE: MOBILE HOME PARK RESIDENTIAL. 640A.1 Permitted Uses: Dwelling, Mobile Home

Amend. BL 3480, 1982 Amend. BL 4691, 1990 RMH ZONE: MOBILE HOME PARK RESIDENTIAL. 640A.1 Permitted Uses: Dwelling, Mobile Home BL 3480, 1982 BL 6074, 2002 BL 6890, 2011 640A.1 Permitted Uses: Dwelling, Mobile Home RMH ZONE: MOBILE HOME PARK RESIDENTIAL One Dwelling Unit for the accommodation of the owner/manager Common storage

More information

Residential and Commercial Tolerance (DAV A ) Application

Residential and Commercial Tolerance (DAV A ) Application Planning, Property and Development Department Service de l urbanisme, des biens et de l aménagement Unit 3-30 Fort Street / Rue Fort, Unité 3, Winnipeg, Manitoba, R3C 47 Residential and Commercial Tolerance

More information

ORDINANCE NO. Be it ordained by the City Council of the City of Abilene, Texas:

ORDINANCE NO. Be it ordained by the City Council of the City of Abilene, Texas: ORDINANCE NO. An ordinance repealing Chapter 23, Subpart B of the Code of the City of Abilene, Texas, entitled Mobile Homes and Vacation Travel Trailers; stating the authority; setting forth the scope

More information

Planning and Building Department

Planning and Building Department Page 1 of Report PB-83-13 TO: Development and Infrastructure Committee Planning and Building Department SUBJECT: OP & Rezoning 5001 Corporate Drive Appleby Gardens LJM Developers Report Number: PB-83-13

More information

PROPOSED AMENDMENTS TO THE DERBY ZONING REGULATIONS AUGUST 12, 2008

PROPOSED AMENDMENTS TO THE DERBY ZONING REGULATIONS AUGUST 12, 2008 ARTICLE II Definitions and word usage 195-7. Definitions and word usage. Modify the following: HOUSING FOR THE ELDERLY OLDER PERSONS Housing in accordance with and as defined in the United States Fair

More information

MUNICIPAL DISTRICT OF ROCKY VIEW NO. 44 ELBOW VALLEY WEST DIRECT CONTROL DISTRICT BYLAW C

MUNICIPAL DISTRICT OF ROCKY VIEW NO. 44 ELBOW VALLEY WEST DIRECT CONTROL DISTRICT BYLAW C This document has been consolidated for convenience only. A current listing of any and all amendments can be obtained from the Municpal District Office Bylaw No. Date of Approval Amendment Type Bylaw C-6042-2005

More information

ARTICLE 13 CONDOMINIUM REGULATIONS

ARTICLE 13 CONDOMINIUM REGULATIONS ARTICLE 13 CONDOMINIUM REGULATIONS Section 13.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

111 Plunkett Road (formerly part of 135 Plunkett Road) - Zoning By-law Amendment Application and Plan of Subdivision Application - Preliminary Report

111 Plunkett Road (formerly part of 135 Plunkett Road) - Zoning By-law Amendment Application and Plan of Subdivision Application - Preliminary Report STAFF REPORT ACTION REQUIRED 111 Plunkett Road (formerly part of 135 Plunkett Road) - Zoning By-law Amendment Application and Plan of Subdivision Application - Preliminary Report Date: May 27, 2013 To:

More information

LOT AREA AND FRONTAGE

LOT AREA AND FRONTAGE LOT AREA AND FRONTAGE Lot Area & Frontage for the R2.1 Zone Lot Area & Frontage for the R2.4 Zone Minimum Lot Minimum Lot Zone Area Width R2.1 700 sq m 18 m R2.4 600 sq m 16 m Lot Area means the total

More information

Site Plan Application

Site Plan Application Site Plan Application City of St. Pete Beach Community Development Department 155 Corey Avenue St. Pete Beach, Florida 33706 (727) 367-2735 www.stpetebeach.org Case Number: PROPERTY OWNER: Name: Address:

More information

COUNTY OF WELLINGTON AND MUNICIPALITY OF Application for Part Lot Control Exemption By-law GUIDELINES AND EXPLANATORY NOTES

COUNTY OF WELLINGTON AND MUNICIPALITY OF Application for Part Lot Control Exemption By-law GUIDELINES AND EXPLANATORY NOTES COUNTY OF WELLINGTON AND MUNICIPALITY OF Application for Part Lot Control Exemption By-law GUIDELINES AND EXPLANATORY NOTES Introduction: The submission of an application to the municipality to seek approval

More information

TOWN OF WATERVILLE VALLEY NEW HAMPSHIRE SITE PLAN REVIEW REGULATIONS

TOWN OF WATERVILLE VALLEY NEW HAMPSHIRE SITE PLAN REVIEW REGULATIONS TOWN OF WATERVILLE VALLEY NEW HAMPSHIRE Effective date March 17, 1981 Revised March 16, 1982 Revised March 13, 1986 Revised March 10, 1987 Revised March 14, 2013 Revised March 8, 2016 TOWN OF WATERVILLE

More information

1202 & 1204 Avenue Road Zoning By-law Amendment Application - Preliminary Report

1202 & 1204 Avenue Road Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 1202 & 1204 Avenue Road Zoning By-law Amendment Application - Preliminary Report Date: March 17, 2017 To: From: Wards: Reference Number: North York Community Council Director,

More information

GENERAL PLAN, DEVELOPMENT CODE AND ZONING MAP AMENDMENT APPLICATION INFORMATION SHEET

GENERAL PLAN, DEVELOPMENT CODE AND ZONING MAP AMENDMENT APPLICATION INFORMATION SHEET GENERAL PLAN, DEVELOPMENT CODE AND ZONING MAP AMENDMENT APPLICATION INFORMATION SHEET GENERAL INFORMATION This information sheet explains how an application requesting an amendment to the Truckee General

More information

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit. To Whom It May Concern: Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit. The fee for the permit application is $75.00, which shall be made payable to

More information

EXCERPTS FROM HALIFAX REGIONAL MUNICIPALITY CHARTER

EXCERPTS FROM HALIFAX REGIONAL MUNICIPALITY CHARTER EXCERPTS FROM HALIFAX REGIONAL MUNICIPALITY CHARTER Municipal planning strategy 227 The Council may adopt a municipal planning strategy for all, or part, of the Municipality and there may be separate strategies

More information

Authority: Etobicoke York Community Council Item 25.2, as adopted by City of Toronto Council on April 6, 2009 Enacted by Council: April 30, 2009

Authority: Etobicoke York Community Council Item 25.2, as adopted by City of Toronto Council on April 6, 2009 Enacted by Council: April 30, 2009 Authority: Etobicoke York Community Council Item 25.2, as adopted by City of Toronto Council on April 6, 2009 Enacted by Council: April 30, 2009 CITY OF TORONTO BY-LAW No. 501-2009 To amend Chapters 320

More information

Washington County, Minnesota Ordinances

Washington County, Minnesota Ordinances Washington County, Minnesota Ordinances Ordinance No. 153 Text Amendment to the Washington County Development Code - Chapter One, Section 2 and Chapter Two, Part 1, Part 2, Part 3, of the Development Code

More information