Howard County Checksheet for Large Wind to Energy Facilities (WEF)

Size: px
Start display at page:

Download "Howard County Checksheet for Large Wind to Energy Facilities (WEF)"

Transcription

1 Wind to Energy Facility, Large permitted in AG IA I1 I2 IU Howard County Checksheet for Large Wind to Energy Facilities (WEF) Zoning of Property: Address of Property: Number of Components: General Information: Narrative describing wind to energy facility Overview of the project The approximate generating capacity of the facility The approximate number, types and height (or ranges of heights) of the wind turbines including their generating capacity, dimensions and respective manufacturers and a description of ancillary facilities. Map: Howard County map showing all existing facilities The proposed facility The boundaries of the Large WEF Project area. Copies: Licenses Permits or approvals or applications for the same required by federal, state or local agencies. Kokomo Board of Aviation Commissioners notice of intent to build a Large WEF in Howard County Notices sent to utilities with facilities, wires or cables within 1.1 times the turbine height of the tower(s) or within the Wind Energy Facility Project boundary of the applicant s intent to build the large wind energy facility near the utility s facilities, wires or cables. Photographic presentation depicting current conditions with a superimposed image of the proposed wind turbine to demonstrate anticipated views from all directions (N/S/E/W), at distances no less than ½ mile and no greater than 1 mile. (Applicants with multiple wind turbines may provide one photographic presentation for a typical wind turbine. The drainage plan as approved by the Howard County Drainage Board (See 7.M. Pre- Construction Requirements) The Road Use and Maintenance Agreement approved by the Howard County Board of Commissioners (See 7.M. Pre-Construction Requirements) Documents related to decommissioning, including a schedule for the decommissioning and financing security. Other relevant studies, reports, certifications, and approvals as may be reasonably requested by the Plan Commission to ensure compliance with this Ordinance. Page 1 of 7

2 Site specific Information: (applies to the individual LEF component which the applicant is seeking an improvement location permit) Affidavit or similar evidence of agreement between property owner and facility owner or operator authorizing the facility owner or operator to secure construction and operation permits for the WEF. Complete legal description of the facility component parcel or lease area. Location map identifying properties on which the proposed WEF component will be located, and the properties adjacent to where the WEF will be located. A site plan showing: Location of the WEF component for which a permit is sought Property lines Setback lines Access road and turnout locations Substations Electrical cabling from the facility component to other components including substations Ancillary equipment Buildings Structures including permanent meteorological towers, associated transmission lines and layout of all existing structures within the geographical boundaries of any applicable setback. Design and Installation: To the extent applicable, the WEF shall comply with the Indiana Uniform Building Code, as amended, and the regulations adopted by the State of Indiana. The design of the Wind Energy Facility shall conform to applicable industry standards, including those of the American National Standards Institute. The applicant shall submit certificates of design compliance obtained by the equipment manufacturers from Underwriters Laboratories, or other similar certifying organizations. All WEF shall be equipped with a redundant braking system. This includes both aerodynamic over speed controls (including variable pitch, tip, and other similar systems) and mechanical brakes. Mechanical brakes shall be operated in a fail-safe mode. Stall regulation shall not be considered a sufficient braking system for over speed protection. All electrical components of the WEF shall conform to relevant and applicable local, state and national codes and relevant and applicable international codes. Visual Appearance: WEF shall be a non-obtrusive color such as white, off-white, gray earth tones or similar nonreflective colors. WEF shall not be artificially lighted, except to the extent required by Federal Aviation Administration or other applicable authority that regulates air safety. WEF shall not display advertising, except for reasonable identification of the turbine manufacturer, facility owner and operator. Power Lines: Collection lines between turbines shall be placed underground to the maximum extent practical. Page 2 of 7

3 Warning: A clearly visible warning sign of voltage must be placed at the base of all pad-mounted transformers and substations. Visible, reflective, colored objects, such as flags, reflectors, or tape shall be placed on the anchor points of guy wires and along the guy wires up to a height of 10 ft. from the ground. Climb Prevention/Locks: Wind turbines shall not be climbable up to 15 feet above ground surface, with the exception of stairs leading to the access doors All access doors to wind turbines and electrical equipment shall be locked or fenced, as appropriate, to prevent entry by non-authorized persons. Setbacks: Occupied Buildings or Recorded, Platted Subdivision Lot: WEF shall be set back from the nearest occupied building a distance not less than 500 feet plus 1.1 times the height of the turbine. The setback distance shall be measured from the center of the wind turbine base to the nearest point on the foundation of the occupied building or recorded, platted subdivision lot property line other than a residence on the same lot as the wind turbines. A WEF may be placed up to 1.1 times the turbine height from the occupied building, if a nonencroachment easement or recorded written agreement is secured from the occupied building or lot owner(s) providing the grantor shall hold the grantee harmless to the extent agreed to or allowed by law. Electric Transmission Lines: All WEF shall be set back from electric transmission line a distance of not less than 1.1 times the turbine height. The setback distance shall be measured to the center of the wind turbine base. A WEF may be placed up to the easement line, if a nonencroachment easement or recorded written agreement is secured from the easement holder providing the grantor shall hold the grantee harmless to the extent agreed to or allowed by law. _ Property Lines: All WEF shall be set back from any property line a distance of not less than 1.1 times the turbine height. The setback distance shall be measured to the center of the wind turbine base. a. Aggregate Wind Energy Facility Projects (WEFP): In determining setback requirements for an AWEFP, internal property lines shall be excluded when contiguous properties are planned and developed as part of an Aggregate Wind Energy Facility Project. Any properties not located within the approved mapped boundary of an AWEFP or not a part of an AWEFP shall be subject to setbacks as herein provided. b. Non-Participating Landowners: A wind energy facility may be placed up to the property line, if a non-encroachment easement or recorded written agreement is secured from the adjacent non-participating landowners prohibiting building inhabitable structures within 1.1 times the turbine height and the grantor shall hold the grantee harmless to the extent of the agreed to or allowed by law. Public Roads: All WEF shall be set back from the nearest public road a distance of not less than 1.1 times the turbine height, as measured from the larger of the existing or proposed right-of-way line of the nearest public road to the center of the WEF base. Page 3 of 7

4 Wetlands, Conservation, Riparian Areas: All WEF shall be set back a minimum of 100 feet plus the length of a rotor on the wind turbine or the setback required under applicable State or Federal law, whichever is greater from any: a. Wetlands as set forth on the National Wetland Inventory Map of the U.S. Fish and Wildlife Service; b. Existing conservation easements, and c. Riparian corridors: i. Any perennial stream depicted on the U.S. Geological Survey 7.5 minute series topographical maps, or ii Any regulated county drains; Riparian corridor setbacks shall be from the greater of the top of the bank or from the edge of the Special Flood Hazard Area identified by the Federal Emergency Management Agency Flood Insurance Rate Maps for the area, whichever is determined applicable by the Plan Commission. Municipalities: Large wind turbines shall be at least 1 mile from the boundary of any municipality. Tower Types: Safety: _ Large WEF must utilize tubular type towers with rotors. Lattice type towers are not permitted except for temporary meteorological towers. The rotors (blades) shall have a minimum of 30 feet ground clearance. Installation: The towers shall be installed as per the manufacturer s engineered specifications. The feeder lines between the large WEF and substations shall be buried where possible. Maximum Number of Structures: No maximum number only restricted by minimum setbacks. Illumination: Large WEF shall not be illuminated in any way unless required by FCC or FAA regulations. FCC or FAA regulations shall be demonstrated to the Planning Director prior to installation. Pre-Construction Requirements: A drainage plan prescribing or referencing provisions for addressing crop and field tile damages approved by the Howard County Drainage Board. A road use and maintenance agreement approved by the County Commissioners: Identification of roads and services: The applicant shall identify all state and local public roads to be used within Howard County to transport equipment and parts for construction, operation, or maintenance of the WEF. All routes shall be reviewed by committee consisting of representatives of the Howard County Sheriff s Department, other emergency services serving the affected area, the public school corporations serving the affected area, the United States Postal Service, and any highway department having jurisdiction over any road used. Any route using a public road shall be approved by the highway department having jurisdiction. Page 4 of 7

5 The county engineer or a qualified third party engineer hired by the Howard County Board of Commissioners and paid for by the applicant, shall document road conditions prior to construction. The engineer shall document road conditions again 30 days after construction is complete or as weather permits. The Board of Commissioners may require an applicant to post a reasonable bond for damages which may be caused to county roads and rights-of-way during the construction phase of a wind turbine or WEF. Any road damage caused by the applicant or its contractors shall be promptly repaired at the expense of the applicant. The applicant shall demonstrate that it has appropriate financial assurance to ensure the prompt repair of damaged roads. Waiver of Setbacks: The Board of Zoning Appeals may grant variances to setback requirements hereunder where it has determined that literal enforcement will exact undue hardship because of peculiar conditions pertaining to the land in questions and provided that such waiver will not be contrary to the public interest. The Board of Zoning Appeals may take into consideration the support or opposition of adjacent property owners in granting variances to setback requirements hereunder. Local Emergency Services: The applicant shall provide a copy of the project summary and site plan to local emergency services, including paid and volunteer fire department(s). Upon request, the applicant shall cooperate with emergency services to develop and coordinate implementation of an emergency response plan for the Wind Energy Facility. Noise and Shadow Flicker: Audible sound from a WEF shall not exceed 55 dba, as measured at the exterior of any occupied building on a non-participating landowner s property. Methods for measuring and reporting acoustic emissions from wind turbines and the WEF shall be equal to or exceed the minimum standards for precision described in AWEA Standard 2.1 titled Procedures for Measurement and Reporting for Acoustic Emissions from Wind Turbine Generation Systems, Volume I: First Tier. The Board of Zoning Appeals may grant a variance to such standards where it has determined that literal enforcement will exact undue hardship because of peculiar conditions pertaining to the land in question and provided that such waiver will not be contrary to the public interest. The facility owner and operator shall take shadow flicker into consideration during location and construction of the wind system and shall work to minimize any potential shadow flicker on a nonparticipating owner s dwelling. Signal Interference: The applicant shall make reasonable efforts to avoid any disruption of loss of radio, telephone, television or similar signals, and shall mitigate any harm caused by the WEF. Liability Insurance: There shall be maintained a current general liability policy covering bodily injury and property damage with limits of at least one million per occurrence and one million in the aggregate. Certificates shall be made available to the Plan Commission upon request. Page 5 of 7

6 Decommissioning: The facility owner and operator shall, at its expense, complete decommissioning of the WEF, or individual wind turbines, within twelve (12) months after the end of the useful life of the facility or individual wind turbines. The WEF or individual wind turbines will presume to be at the end of its useful life if no electricity is generated for a continuous period of twelve (12) months. Decommissioning shall include removal of wind turbines, buildings, overhead cabling, electrical components other than below ground feeder lines, roads, foundations to a depth of 36 inches and any other associated facilities. Disturbed earth shall be graded and re-seeded, unless the landowner requests in writing that the access roads or other land surface areas not to be restored. An independent and certified professional engineer shall be retained to estimate the total cost of decommissioning ( Decommissioning Costs ) without regard to salvage value of the equipment, and the cost of decommissioning net salvage value of the equipment ( Net Decommissioning Costs ). Said estimates shall be submitted to the Board of Commissioners after the first year of operation and every fifth year thereafter. the facility owner or operator shall post and maintain Decommissioning Funds in an amount equal to Net Decommissioning Costs; provided that at no point shall Decommissioning Funds be less than 25% of Decommissioning Costs. The Decommissioning Funds shall be posted and maintained with a bonding company or Federal chartered lending institution chosen by the facility owner or operator posting the financial security, provided that the bonding company or lending institution is authorized to conduct such business within the State of Indiana and is approved by the Board of Commissioners. Decommissioning Funds may be in the form of a performance bond, surety bond, letter of credit, corporate guarantee, or other form of financial assurance as may be acceptable to the Board of Commissioners. If the facility owner or operator fails to complete decommissioning within the period prescribed by paragraph 16(A), then the landowner shall have six (6) months to complete decommissioning. If neither the facility owner or operator, nor the landowner, complete decommissioning within the periods prescribed in Paragraphs 16(A), then the Howard County Board of Commissioners may take such measures as necessary to complete decommissioning. The escrow agent shall release the Decommissioning Funds when the facility owner or operator has demonstrated and the Howard County Board of Commissioners concurs that decommissioning has been satisfactorily completed, or upon the written approval of said Commissioners in order to implement the decommissioning plan. Public Inquiries and Complaints: The facility owner and operator shall maintain a phone number and identify a responsible person for the public to contact with inquiries and complaints throughout the life of the project. The facility owner and operator shall make reasonable efforts to respond to the public s inquiries and complaints. Remedies: It shall be unlawful for any person, firm, or corporation to violate or fail to comply with or take any action which is contrary to the terms of the ordinance, or any permit issued under the ordinance, or cause another to violate or fail to comply, or to take any action which is contrary to the terms of the ordinance or any permit issued under the ordinance. Page 6 of 7

7 _ If the Plan Commission determines that a violation of the Ordinance or the permit has occurred, the Plan Commission shall provide written notice to any person, firm, or corporation alleged to be in violation of this Ordinance or permit. If the alleged violation does not pose an immediate threat to public health or safety, the Plan Commission and the parties shall engage in good faith negotiations to resolve the alleged violation. Such negotiations shall be conducted within 30 days of the notice of violation. If, after 30 days from the date of the notice of violation, the Plan Commission determines, in its discretion, that the parties have not resolved the alleged violation, the Plan Commission may institute civil enforcement proceedings or any other remedy at law or in equity to ensure compliance. Page 7 of 7

Chapter 9 Wind Energy

Chapter 9 Wind Energy SECTION 9.01 PURPOSE AND INTENT This ordinance balances the need for clean renewable energy resources with the necessity to protect the public health, safety, and welfare of the community. Tuscola Township

More information

1. Assure that any development and production of wind-generated electricity in Boone County is safe and effective.

1. Assure that any development and production of wind-generated electricity in Boone County is safe and effective. 4.8. WIND ENERGY CONVERSION SYSTEMS SITING 4.8.1. Purpose. It is the purpose of this Section to: 1. Assure that any development and production of wind-generated electricity in Boone County is safe and

More information

Ordinance #68. Highlighted items in bold and underline font to be added. Highlighted items in strikethrough font to be removed.

Ordinance #68. Highlighted items in bold and underline font to be added. Highlighted items in strikethrough font to be removed. Ordinance #68 AN ORDINANCE ENTITLED, AN ORDINANCE AMENDING ARTICLE II DEFINITIONS AND CHAPTER 5.22 (WIND ENERGY SYSTEMS) OF ARTICLE V GENERAL REQUIREMENTS OF ORDINANCE 65 AN ORDINANCE AMENDING ORDINANCE

More information

TITLE 7, CHAPTER 3 TAZEWELL COUNTY

TITLE 7, CHAPTER 3 TAZEWELL COUNTY TITLE 7, CHAPTER 3 TAZEWELL COUNTY WIND FARM ORDINANCE ADOPTED SEPTEMBER 2004 Amendment Dates: February, 2008 March, 2008 February 25, 2009 September 1, 2018 7TCC 3-1. Wind Energy Conversion Systems Purpose.

More information

EXHIBIT A SHIAWASSEE COUNTY ZONING ORDINANCE ARTICLE 4 SPECIFIC USE REGULATIONS RECOMMENDED AMENDMENTS TO SECTION (REVISED MAY 11, 2018)

EXHIBIT A SHIAWASSEE COUNTY ZONING ORDINANCE ARTICLE 4 SPECIFIC USE REGULATIONS RECOMMENDED AMENDMENTS TO SECTION (REVISED MAY 11, 2018) EXHIBIT A SHIAWASSEE COUNTY ZONING ORDINANCE ARTICLE 4 SPECIFIC USE REGULATIONS RECOMMENDED AMENDMENTS TO SECTION 4.3.76 (REVISED MAY 11, 2018) Section 4.3.76 Wind Energy Conversion Systems ( WECS ) 1.

More information

SHIAWASSEE COUNTY ZONING ORDINANCE Article 4 Specific Use Regulations

SHIAWASSEE COUNTY ZONING ORDINANCE Article 4 Specific Use Regulations SHIAWASSEE COUNTY ZONING ORDINANCE Article 4 Specific Use Regulations Section 4.3.76 Wind Energy Conversion Systems 1. Purpose A. Through this section it is hereby set forth that Shiawassee County promotes

More information

ARTICLE 18 WIND ENERGY CONVERSION SYSTEMS

ARTICLE 18 WIND ENERGY CONVERSION SYSTEMS ARTICLE 18 WIND ENERGY CONVERSION SYSTEMS Section 1800 Purpose & Intent The purpose of this Article is to regulate the placement, construction, and modification of Mini WECS, SWECS, and Wind Energy Conversion

More information

MONTGOMERY COUNTY BOARD OF COMMISSIONERS

MONTGOMERY COUNTY BOARD OF COMMISSIONERS MONTGOMERY COUNTY BOARD OF COMMISSIONERS Ordinance 2018-4 An Ordinance Amending Noise Regulation of Wind Energy Conservation Systems Whereas, pursuant to Indiana Code 36-8-2-4, the Board of Commissioners

More information

DALLAS TOWNSHIP CLINTON COUNTY, MICHIGAN ORDINANCE NO

DALLAS TOWNSHIP CLINTON COUNTY, MICHIGAN ORDINANCE NO DALLAS TOWNSHIP CLINTON COUNTY, MICHIGAN ORDINANCE NO. 2012-03 At a duly scheduled and noticed meeting of the Township Board of the Township of Dallas, Clinton County, Michigan, held at the Dallas Township

More information

An Ordinance Governing Wind Energy Conversion Systems In The Unincorporated Areas of Coles County, Illinois

An Ordinance Governing Wind Energy Conversion Systems In The Unincorporated Areas of Coles County, Illinois An Ordinance Governing Wind Energy Conversion Systems In The Unincorporated Areas of Coles County, Illinois The County of Coles, Illinois hereby establishes this Wind Energy Conversion Systems Ordinance

More information

ORDINANCE NO. 20,q/.g

ORDINANCE NO. 20,q/.g ORDINANCE NO. 20,q/.g AN ORDINANCE TO REGULATE WIND ENERGY CONVERSION SYSTEMS WHEREAS, large-scale wind energy conversion systems ("wind farms") may be constructed in Montgomery County, Indiana ("County");

More information

Town of Fort Fairfield Wind Energy Technical Review Committee Council Chambers Monday, March 30, :00 P.M.

Town of Fort Fairfield Wind Energy Technical Review Committee Council Chambers Monday, March 30, :00 P.M. Town of Fort Fairfield Council Chambers Monday, 6:00 P.M. Members: Dick Langley, Todd Maynard, Tim Goff, David McCrea, Phil Christensen, Jim Everett, John Herold, Brent Churchill, Michael Bosse and Carl

More information

CHOWAN WIND ENERGY FACILITIES ORDINANCE REVIEW. Chairman Lou Sarratt March 31, 2015 Sub-Committee Members: Patti Kersey Jim Leggett Jim Robison

CHOWAN WIND ENERGY FACILITIES ORDINANCE REVIEW. Chairman Lou Sarratt March 31, 2015 Sub-Committee Members: Patti Kersey Jim Leggett Jim Robison CHOWAN WIND ENERGY FACILITIES ORDINANCE REVIEW Chairman Lou Sarratt March 31, 2015 Sub-Committee Members: Patti Kersey Jim Leggett Jim Robison 1 Project Overview Review of County 2013 Wind Ordinance The

More information

Wind Energy Conversion System Ordinance No. 467

Wind Energy Conversion System Ordinance No. 467 Wind Energy Conversion System Ordinance No. 467 AN ORDINANCE ESTABLISHING A PERMITTING PROCESS FOR WIND ENERGY CONVERSION SYSTEMS ADOPTED BY THE Big Timber City Council on this day of, 2006. ADOPTED BY

More information

ARTICLE XX THE COUNTY BOARD OF MERCER COUNTY, ILLINOIS RESOLUTION AMENDING THE MERCER COUNTY ZONING ORDINANCE SOLAR ENERGY FACILITIES

ARTICLE XX THE COUNTY BOARD OF MERCER COUNTY, ILLINOIS RESOLUTION AMENDING THE MERCER COUNTY ZONING ORDINANCE SOLAR ENERGY FACILITIES ARTICLE XX THE COUNTY BOARD OF MERCER COUNTY, ILLINOIS RESOLUTION AMENDING THE MERCER COUNTY ZONING ORDINANCE SOLAR ENERGY FACILITIES 20.1 TITLE. This ordinance shall be known as the Solar Energy Ordinance.

More information

P a g e 1. DRAFT August 31, 2018 Version

P a g e 1. DRAFT August 31, 2018 Version A. Wind Energy Conversion Systems 1. Purpose a. It is the purpose of this section to: 1) Assure the protection of health, safety, welfare, and property values for all DeKalb County residents and landowners.

More information

This is a conditional use permit request to establish a commercial wind energy conversion system.

This is a conditional use permit request to establish a commercial wind energy conversion system. Public Works 600 Scott Boulevard South Hutchinson, Kansas 67505 620-694-2976 Road & Bridge Planning & Zoning Noxious Weed Utilities Date: March 28, 2019 To: From: Reno County Planning Commission Russ Ewy,

More information

KOSSUTH COUNTY ORDINANCE #310

KOSSUTH COUNTY ORDINANCE #310 KOSSUTH COUNTY ORDINANCE #310 AN ORDINANCE REGULATING THE CONSTRUCTION AND OPERATION OF COMMERCIAL WIND ENERGY CONVERSION SYSTEMS IN KOSSUTH COUNTY, IOWA Introduction The purpose and intent of this Ordinance

More information

KOSSUTH COUNTY ORDINANCE #310 - A

KOSSUTH COUNTY ORDINANCE #310 - A KOSSUTH COUNTY ORDINANCE #310 - A AN ORDINANCE REGULATING THE CONSTRUCTION AND OPERATION OF COMMERCIAL WIND ENERGY CONVERSION SYSTEMS IN KOSSUTH COUNTY, IOWA Introduction The purpose and intent of this

More information

Local Law No. 2 of Wind Energy Facilities. Be it hereby enacted by the Town Board of the Town of Jasper as follows:

Local Law No. 2 of Wind Energy Facilities. Be it hereby enacted by the Town Board of the Town of Jasper as follows: Local Law No. 2 of 2006 Wind Energy Facilities Be it hereby enacted by the Town Board of the Town of Jasper as follows: SECTION 1: Local Law No. 2 of 2006, entitled WIND ENERGY FACILITIES, is hereby adopted

More information

Model Wind Energy Facility Local Law for St. Lawrence County Municipalities. Local Law No. of 20

Model Wind Energy Facility Local Law for St. Lawrence County Municipalities. Local Law No. of 20 Local Law No. of 20 Be it hereby enacted by the Town Board of the Town of as follows: Section 1: Local Law No. of 20, entitled 'WIND ENERGY FACILITIES;" is hereby adopted to read in its entirety as follows:

More information

NEWPORT CODE DRAFT latest revision 11/11/13 APPENDIX A. SPECIAL USE and CONDITIONAL USE PERMITS

NEWPORT CODE DRAFT latest revision 11/11/13 APPENDIX A. SPECIAL USE and CONDITIONAL USE PERMITS PROVISIONS FOR SPECIAL and CONDITIONAL USES 9-6 Tall Structures, General Tall Structures are defined as but not limited to: Steeples, Towers, Smoke Chimneys, Wind activated Devices, Wind Energy Facilities

More information

CABLE TELEVISION FRANCHISE AND REGULATIONS

CABLE TELEVISION FRANCHISE AND REGULATIONS 113.01 Definitions 113.09 Service Rules 113.02 Grant of Authority 113.10 Franchise Fee 113.03 Franchise Term 113.11 Use of Streets and Property 113.04 Franchise Territory 113.12 Indemnification and Insurance

More information

Local Law No. 1 of Wind Energy Facilities. Be it hereby enacted by the Town Board of the Town of Hartsville as follows:

Local Law No. 1 of Wind Energy Facilities. Be it hereby enacted by the Town Board of the Town of Hartsville as follows: Local Law No. 1 of 2006 Wind Energy Facilities Be it hereby enacted by the Town Board of the Town of Hartsville as follows: SECTION 1: Local Law No. 1 of 2006, entitled WIND ENERGY FACILITIES, is hereby

More information

WIND ENERGY CONVERSION SYSTEM (WECS) APPLICATION

WIND ENERGY CONVERSION SYSTEM (WECS) APPLICATION PLANNING & DEVELOPMENT SERVICES PO Box 4169, 911 North 7 Avenue Pocatello, Idaho 83205 WIND ENERGY CONVERSION SYSTEM (WECS) APPLICATION Submittal Date: Contact Person: Permit #: Receipt Date: Plan Review

More information

ORDINANCE NO. BEAVER TOWNSHIP, BAY COUNTY, MICHIGAN, ORDAINS:

ORDINANCE NO. BEAVER TOWNSHIP, BAY COUNTY, MICHIGAN, ORDAINS: ORDINANCE NO. An ordinance amending Beaver Township Ordinance No. 15, as amended, the Township Zoning Ordinance, in the following particulars: by changing Chapter II by adding Section 2.60 to provide a

More information

Appendix Eric Miller Director, Business Development Invenergy LLC. June 27, Altona Town Board 3124 Miner Farm Rd.

Appendix Eric Miller Director, Business Development Invenergy LLC. June 27, Altona Town Board 3124 Miner Farm Rd. Appendix 31-3 June 27, 2016 Altona Town Board 3124 Miner Farm Rd. Altona, NY 12910 RE: Bull Run Wind Energy Center, Applicable Local Laws Dear Altona Town Board, We hope this letter finds you well. We

More information

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY Adopted January 3, 2012 PURPOSE: The purpose of the policy statement is to clarify the policies and procedures of the City of Fort

More information

Color Key. Red = BBR Current Comments. Purple/Pink = Amy Cornell s Highlights. Blue/Orange = Opponent Accepted Changes

Color Key. Red = BBR Current Comments. Purple/Pink = Amy Cornell s Highlights. Blue/Orange = Opponent Accepted Changes Color Key Red = BBR Current Comments Purple/Pink = Amy Cornell s Highlights Blue/Orange = Opponent Accepted Changes Black Strikeouts = Opponent Proposed Changes TITLE 5 UTILITIES SECTION 1.0 UTILITIES:

More information

PREAMBLE. That the Gratiot County Zoning Ordinance be amended as follows:

PREAMBLE. That the Gratiot County Zoning Ordinance be amended as follows: Amendment of Gratiot County Zoning Ordinance AN ORDINANCE TO AMEND THE GRATIOT COUNTY ZONING ORDINANCE REQUIREMENTS FOR SOLAR ENERGY SYSTEMS AND SOLAR FARMS FOR THE COUNTY-ZONED TOWNSHIPS OF ELBA, HAMILTON,

More information

Tuscola Wind II, LLC Wisner Township Special Use Permit Presentation

Tuscola Wind II, LLC Wisner Township Special Use Permit Presentation Tuscola Wind II, LLC Wisner Township Special Use Permit Presentation Questions or concerns may be addressed by calling NextEra at (800) 951-9211. This number is answered 24 hours a day, 7 days a week.

More information

Right-of-Way and Easements for Electric Facility Construction

Right-of-Way and Easements for Electric Facility Construction Right-of-Way and Easements for Electric Facility Construction The Public Service Commission of Wisconsin (PSC) offers this overview to landowners who must negotiate easement contracts with utilities for

More information

RIGA TOWNSHIP ORDINANCE NO. AMENDMENT TO THE 1974 ZONING ORDINANCE OF RIGA TOWNSHIP

RIGA TOWNSHIP ORDINANCE NO. AMENDMENT TO THE 1974 ZONING ORDINANCE OF RIGA TOWNSHIP RIGA TOWNSHIP ORDINANCE NO. AMENDMENT TO THE 1974 ZONING ORDINANCE OF RIGA TOWNSHIP RIGA TOWNSHIP ORDAINS: Section 1. Purpose and Findings. A. Purpose. The most common and prevalent land use within Riga

More information

LAND OWNER OF SITE ADDRESS PHONE NUMBER FAX NUMBER. APPLICANT (if other than owner) ADDRESS PHONE NUMBER FAX NUMBER

LAND OWNER OF SITE ADDRESS PHONE NUMBER FAX NUMBER. APPLICANT (if other than owner) ADDRESS PHONE NUMBER FAX NUMBER TELECOMMUNICATION TOWER CONDITIONAL USE PERMIT APPLICATION FOR WALWORTH COUNTY - $1025 The undersigned hereby applies to the Walworth County Zoning Agency (Walworth County Land Use and Resource Management

More information

TOWN OF FARMERSVILLE LOCAL LAW NO. OF THE YEAR 2018 A Proposed Local Law Entitled "Wind Energy Facility Law of the Town of Farmersville, New York"

TOWN OF FARMERSVILLE LOCAL LAW NO. OF THE YEAR 2018 A Proposed Local Law Entitled Wind Energy Facility Law of the Town of Farmersville, New York TOWN OF FARMERSVILLE LOCAL LAW NO. OF THE YEAR 2018 A Proposed Local Law Entitled "Wind Energy Facility Law of the Town of Farmersville, New York" Be it hereby enacted by the Town Board of the Town of

More information

ARTICLE VI. SPECIAL EXCEPTION REGULATIONS

ARTICLE VI. SPECIAL EXCEPTION REGULATIONS ARTICLE VI. SPECIAL EXCEPTION REGULATIONS SECTION 601. GENERAL DESCRIPTION Special exceptions are deemed to be permitted uses in their respective districts, subject to the satisfaction of the requirements

More information

TYPE II LAND USE APPLICATION Telecommunications Tower: Collocation

TYPE II LAND USE APPLICATION Telecommunications Tower: Collocation LAND MANAGEMENT DIVISION Date Received: TYPE II LAND USE APPLICATION Telecommunications Tower: Collocation PUBLIC WORKS DEPARTMENT 3050 N. DELTA HWY, EUGENE OR 97408 Planning: 682-3577 For Office Use Only

More information

JERSEY COUNTY ORDINACE REGULATING DEVELOPMENT OF COMMERCIAL SOLAR ENERGY SYSTEMS AND WIND ENERGY COVERSION SYSTEMS ADOPTED ORD # 01-19

JERSEY COUNTY ORDINACE REGULATING DEVELOPMENT OF COMMERCIAL SOLAR ENERGY SYSTEMS AND WIND ENERGY COVERSION SYSTEMS ADOPTED ORD # 01-19 JERSEY COUNTY ORDINACE REGULATING DEVELOPMENT OF COMMERCIAL SOLAR ENERGY SYSTEMS AND WIND ENERGY COVERSION SYSTEMS ADOPTED ORD # 01-19 AN ORDINANCE REGULATING RENEWABLE ENERGY SYSTEMS DEVELOPMENT IN JERSEY

More information

TOWN OF RUTLAND Ordinance No. 12.5

TOWN OF RUTLAND Ordinance No. 12.5 TOWN OF RUTLAND Ordinance No. 12.5 AN ORDINANCE RELATING TO CHANGES TO ZONING DISTRICT BOUNDARIES AND CONDITIONAL USE PERMITS REQUESTED TO ALLOW THE CONSTRUCTION AND OPERATION OF COMMUNICATION TOWERS The

More information

Wind Energy Easements

Wind Energy Easements Wind Energy Easements Prepared by Robert R. Nardi Willeke & Daniels 210 Ridgewood Avenue Minneapolis, MN 55403 (612) 870-4000 Presented by John H. Daniels, Jr. Willeke & Daniels 210 Ridgewood Avenue Minneapolis,

More information

Community Wind Project Development

Community Wind Project Development Community Wind Project Development Melissa Peterson, Melissa Peterson Windustry Program Analyst Feb 10 th, 2009 Pre-Conference Workshop-CERTS Community Based Energy Development Windustry Program Analyst

More information

LAKE TOWNSHIP HURON COUNTY, MICHIGAN. Ordinance No. ORDINANCE AMENDING TOWNSHIP ZONING ORDINANCE TO ADD SECTION 1613, ALTERNATIVE ENERGY

LAKE TOWNSHIP HURON COUNTY, MICHIGAN. Ordinance No. ORDINANCE AMENDING TOWNSHIP ZONING ORDINANCE TO ADD SECTION 1613, ALTERNATIVE ENERGY LAKE TOWNSHIP HURON COUNTY, MICHIGAN Ordinance No. ORDINANCE AMENDING TOWNSHIP ZONING ORDINANCE TO ADD SECTION 1613, ALTERNATIVE ENERGY LAKE TOWNSHIP ORDAINS: Section 1. Amendment of Zoning Ordinance Lake

More information

A LOCAL LAW GOVERNING WIND ENERGY FACILITIES IN THE TOWN OF FREMONT. Be hereby enacted by the Town Board of the Town of Fremont as follows:

A LOCAL LAW GOVERNING WIND ENERGY FACILITIES IN THE TOWN OF FREMONT. Be hereby enacted by the Town Board of the Town of Fremont as follows: Local Law No. 2 of 2018 A LOCAL LAW GOVERNING WIND ENERGY FACILITIES IN THE TOWN OF FREMONT Be hereby enacted by the Town Board of the Town of Fremont as follows: Section 1: Title This Local Law shall

More information

TITLE 33 REGULATION OF WIRELESS TELECOMMUNICATIONS FACILITIES

TITLE 33 REGULATION OF WIRELESS TELECOMMUNICATIONS FACILITIES CITY OF STURGIS ORDINANCES TITLE 33-1 TITLE 33 REGULATION OF WIRELESS TELECOMMUNICATIONS FACILITIES (Title 33 established effective 8/4/07, Ordinance 2007-17) Chapters: 33.01: General Provisions 33.02:

More information

BYRON TOWNSHIP ZONING APPLICATION

BYRON TOWNSHIP ZONING APPLICATION BYRON TOWNSHIP ZONING APPLICATION Phone: (616) 878-9104 * Fax: (616) 878-3980 * Website: www.byrontownship.org This application will not be accepted if incomplete. APPLICATION FOR & REQUIRED COPIES Private

More information

Chapter 137 WIND ENERGY CONVERSION SYSTEMS

Chapter 137 WIND ENERGY CONVERSION SYSTEMS Chapter 137 WIND ENERGY CONVERSION SYSTEMS [HISTORY: Adopted by the Town Board of the Town of Conklin 9-13-2005 by L.L. No. 1-2005. Amendments noted where applicable.] Flood damage prevention See Ch. 76.

More information

REPRESENTATIVE: Centerline Solutions Table Mountain Parkway Golden, CO 80403

REPRESENTATIVE: Centerline Solutions Table Mountain Parkway Golden, CO 80403 COMMISSIONERS: DARRYL GLENN (PRESIDENT) MARK WALLER (PRESIDENT PRO TEMPORE) STAN VANDERWERF LONGINOS GONZALEZ PEGGY LITTLETON PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CRAIG DOSSEY, EXECUTIVE DIRECTOR

More information

***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS

***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS 105.11. Permit requirements. 105.12. Waiver of permit requirements. Title 25 Environmental Protection Part I. Department of Environmental Protection Subpart C. Protection of Natural Resources Article I.

More information

-MENDOCINO COUNTY PLANNING AND BUILDING SERVICES- DIVISION OF LAND REGULATIONS TITLE 17

-MENDOCINO COUNTY PLANNING AND BUILDING SERVICES- DIVISION OF LAND REGULATIONS TITLE 17 ARTICLE VI -- GENERAL REGULATIONS AND PROVISIONS Sec. 17-50. Sec. 17-51 General Plan. Sec. 17-52 Lot and Block Design and Configuration. Sec. 17-53 Lot Access. Sec. 17-54 Private Roads. Sec. 17-55 Water

More information

150% of the height of a WECS from the base to a property line.

150% of the height of a WECS from the base to a property line. the WECS from the 150% of the height of Akron Township a Utility Grid turbine from the base of the to a property line. Where property is leased on both sides of a public right of way, a wind energy system

More information

MODEL WIRELESS TELECOMMUNICATIONS ORDINANCE for Siting of "Small Cell" Telecommunication Infrastructure in Public Rights-Of-Way

MODEL WIRELESS TELECOMMUNICATIONS ORDINANCE for Siting of Small Cell Telecommunication Infrastructure in Public Rights-Of-Way MODEL WIRELESS TELECOMMUNICATIONS ORDINANCE for Siting of "Small Cell" Telecommunication Infrastructure in Public Rights-Of-Way This document is intended for use by towns and villages that have existing

More information

Landowner Guide to Wind Leases and Easements. Pace Energy and Climate Center August, Project Manager: Zywia Wojnar

Landowner Guide to Wind Leases and Easements. Pace Energy and Climate Center August, Project Manager: Zywia Wojnar Landowner Guide to Wind Leases and Easements Pace Energy and Climate Center August, 2011 Project Manager: Zywia Wojnar Contributors: Anne Marie Hirschberger Todd Olinsky-Paul Leasing Your Land If you own

More information

SIGNS MASTER SIGN PROGRAM

SIGNS MASTER SIGN PROGRAM SIGNS MASTER SIGN PROGRAM How to apply for a Master Sign Program What is the purpose of a Master Sign Program? A Master Sign Program (MSP) is used to create standard sign design guidelines for projects

More information

COMMUNICATION TOWERS ORDINANCE No. 31

COMMUNICATION TOWERS ORDINANCE No. 31 COMMUNICATION TOWERS ORDINANCE No. 31 ARTICLE 1: AUTHORITY AND JURISDICTION Authority Pursuant to the authority granted by 1967 SDCL 11-2 as amended; the following regulations are hereby adopted by the

More information

Town of Scarborough, Maine

Town of Scarborough, Maine Town of Scarborough, Maine Miscellaneous Appeal INFORMATION REQUIRED FOR ALL APPEALS Before any appeal can be processed, the following material must be submitted to the Code Enforcement Office: 1. A fee

More information

ARTICLE SINGLE FAMILY SITE CONDOMINIUM DEVELOPMENT STANDARDS

ARTICLE SINGLE FAMILY SITE CONDOMINIUM DEVELOPMENT STANDARDS ARTICLE 28.00 SINGLE FAMILY SITE CONDOMINIUM DEVELOPMENT STANDARDS Section 28.01 PURPOSE The purpose of this Article is to recognize that conventional single family developments, traditionally developed

More information

ISSUING AGENCY: Commissioner of Public Lands - New Mexico State Land Office. [ NMAC - Rp,

ISSUING AGENCY: Commissioner of Public Lands - New Mexico State Land Office. [ NMAC - Rp, TITLE 19 CHAPTER 2 PART 10 NATURAL RESOURCES AND WILDLIFE STATE TRUST LANDS EASEMENTS AND RIGHTS OF WAY 19.2.10.1 ISSUING AGENCY: Commissioner of Public Lands - New Mexico State Land Office. [19.2.10.1

More information

BEFORE THE HEARINGS EXAMINER FOR THURSTON COUNTY

BEFORE THE HEARINGS EXAMINER FOR THURSTON COUNTY BEFORE THE HEARINGS EXAMINER FOR THURSTON COUNTY In the Matter of the Application of ) NO. SUPT 020642 ) T-Mobile ) FINDINGS, CONCLUSIONS ) AND DECISION For Approval of a Special Use Permit ) ) SUMMARY

More information

CHAPTER 12 PLANNING & ZONING ARTICLE 2 - EXCEPTIONS AND ENCROACHMENTS. Section Requirement for conforming structures to height limitations.

CHAPTER 12 PLANNING & ZONING ARTICLE 2 - EXCEPTIONS AND ENCROACHMENTS. Section Requirement for conforming structures to height limitations. CHAPTER 12 PLANNING & ZONING ARTICLE 2 - EXCEPTIONS AND ENCROACHMENTS SECTIONS: Sections 12-2-101 to 199, inclusive. General provisions. Section 12-2-101. Requirement for conforming structures to height

More information

ARTICLE XI CONDITIONAL USE PERMITS

ARTICLE XI CONDITIONAL USE PERMITS ARTICLE XI CONDITIONAL USE PERMITS 11.1 Purpose. The City of Hailey recognizes that certain uses possess unique and special characteristics with respect to their location, design, size, method of operation,

More information

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS - Larimer County Planning Dept. Procedural Guide for 1041 PERMITS PLEASE NOTE: A PRE-APPLICATION CONFERENCE IS REQUIRED PRIOR TO SUBMITTING THIS APPLICATION. PURPOSE: State Statutes allow local governments

More information

TOWNSHIP OF WHITE PLANNING BOARD COUNTY OF WARREN, STATE OF NEW JERSEY

TOWNSHIP OF WHITE PLANNING BOARD COUNTY OF WARREN, STATE OF NEW JERSEY Application # 757 Resolution Approved: 4/12/11 TOWNSHIP OF WHITE PLANNING BOARD COUNTY OF WARREN, STATE OF NEW JERSEY RESOLUTION GRANTING PRELIMINARY AND FINAL MAJOR SITE PLAN APPROVAL TO PPL RENEWABLE

More information

Electric Transmission Right-of-Way Usage Policy

Electric Transmission Right-of-Way Usage Policy Electric Transmission Right-of-Way Usage Policy For over 50 years, VELCO has managed the safe, reliable and economical delivery of electric energy through Vermont s high voltage transmission system. Maintaining

More information

Packet Contents: Page #

Packet Contents: Page # CLEAR CREEK COUNTY PLANNING DEPARTMENT REQUIREMENTS FOR COMMERCIAL AND MULTI-FAMILY DEVELOPMENTS Prior to submitting a building permit application, the Planning staff will review the site plan and construction

More information

Division 16.Telecommunication Tower Standards

Division 16.Telecommunication Tower Standards Division 16.Telecommunication Tower Standards Section 17-311. Telecommunication towers and antennas: general provision. The Director shall have the authority to regulate the construction and operation

More information

Wells County Area Plan Commission Requirements for a Wind Energy Conversion System (WECS) Testing Facility or Communication Tower Development Plan

Wells County Area Plan Commission Requirements for a Wind Energy Conversion System (WECS) Testing Facility or Communication Tower Development Plan Wells County Area Plan Commission Requirements for a Wind Energy Conversion System (WECS) Testing Facility or Communication Tower Development Plan Filing and Meeting dates are available at the Area Plan

More information

A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT

A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT 700. 701.A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT SECTION 700 PURPOSE The purpose of this Article is to set forth a streamlined set of Plan Requirements for minor

More information

DRAFT Smithfield Planning Board Minutes Thursday, May 7, :00 P.M., Town Hall, Council Room

DRAFT Smithfield Planning Board Minutes Thursday, May 7, :00 P.M., Town Hall, Council Room DRAFT Smithfield Planning Board Minutes Thursday, May 7, 2015 6:00 P.M., Town Hall, Council Room Members Present: Chairman Eddie Foy Vice-Chairman Stephen Upton Daniel Sanders Gerald Joyner Mark Lane Jack

More information

RENTS, ROYALTIES, EASEMENTS AND LAND VALUES

RENTS, ROYALTIES, EASEMENTS AND LAND VALUES RENTS, ROYALTIES, EASEMENTS AND LAND VALUES M. Ragheb 3/26/2011 INTRODUCTION Developers and landowners have invested in long term leases for wind farms potential sites in the American Midwest in states

More information

SOLAR ENERGY FACILITIES ORDINANCE #17-07 KOCHVILLE TOWNSHIP

SOLAR ENERGY FACILITIES ORDINANCE #17-07 KOCHVILLE TOWNSHIP SOLAR ENERGY FACILITIES ORDINANCE #17-07 KOCHVILLE TOWNSHIP WHEREAS, the Kochville Township Board desires to enact an ordinance providing for the regulating of solar energy facilities in Kochville Township,

More information

CHAPTER 154 RIGHTS OF WAY

CHAPTER 154 RIGHTS OF WAY CHAPTER 154 RIGHTS OF WAY 154.01 Purpose and Rule of Interpretation 154.09 City Construction and Paving 154.02 Franchise, License or Lease Required 154.10 Design Notice to City 154.03 Fees Required 154.11

More information

SOLAR POWER INSTALLATION AND MAINTENANCE AGREEMENT

SOLAR POWER INSTALLATION AND MAINTENANCE AGREEMENT SOLAR POWER INSTALLATION AND MAINTENANCE AGREEMENT This Solar Power Installation and Maintenance Agreement is made this day of, 20, by (name) of (address), Windsor Locks, Connecticut ( Grantor ) and the

More information

TOWNSHIP OF EGG HARBOR ZONING BOARD ADJUSTMENT CHECK LIST

TOWNSHIP OF EGG HARBOR ZONING BOARD ADJUSTMENT CHECK LIST TOWNSHIP OF EGG HARBOR ZONING BOARD ADJUSTMENT CHECK LIST Schedule A - General Requirements 1. Where the application involves only a variance one (1) original and nineteen (19) copies of the appropriate

More information

STAFF REPORT. To: Planning Commission Meeting date: January 11, 2017 Item: UN Prepared by: Marc Jordan. Schoolhouse Development, LLC

STAFF REPORT. To: Planning Commission Meeting date: January 11, 2017 Item: UN Prepared by: Marc Jordan. Schoolhouse Development, LLC STAFF REPORT # 9 ) UN-05-17 AMERICAN LEADERSHIP ACADEMY SPECIAL USE PERMIT CHARTER SCHOOL PUBLIC HEARING To: Planning Commission Meeting date: January 11, 2017 Item: UN-05-17 Prepared by: Marc Jordan GENERAL

More information

Zoning Regulations. Blount County, Tennessee

Zoning Regulations. Blount County, Tennessee Zoning Regulations Blount County, Tennessee June 15, 2000 Zoning Regulations Blount County, Tennessee June 15, 2000 Containing the text of resolutions from Resolution 00-06-010, a resolution adopting zoning

More information

CHAPTER 154: SIGNS. Section

CHAPTER 154: SIGNS. Section CHAPTER 154: SIGNS Section 154.01 Permit required 154.02 Where prohibited 154.03 Street decorations 154.04 Approval by state 154.05 Purpose 154.06 Definitions 154.07 General sign and street graphics regulations

More information

FRESHWATER WETLANDS LETTER OF INTERPRETATION (LOI) APPLICATION CHECKLIST AND FEE TABLE (Updated March 2016)

FRESHWATER WETLANDS LETTER OF INTERPRETATION (LOI) APPLICATION CHECKLIST AND FEE TABLE (Updated March 2016) State of New Jersey Department of Environmental Protection Land Use Regulation Program Mail Code 501-02A PO Box 420 Trenton, NJ 08625-0420 Fax# (609)-777-3656 www.nj.gov/dep/landuse/ FRESHWATER WETLANDS

More information

ARCHITECTURAL REGULATIONS WOODSIDE PARK Units 2, 3 and 4 I. PREAMBLE Woodside is a community where dwellings of various styles and designs come

ARCHITECTURAL REGULATIONS WOODSIDE PARK Units 2, 3 and 4 I. PREAMBLE Woodside is a community where dwellings of various styles and designs come ARCHITECTURAL REGULATIONS WOODSIDE PARK Units 2, 3 and 4 I. PREAMBLE Woodside is a community where dwellings of various styles and designs come together in harmony complementing the surrounding landscape.

More information

Conservation Design Subdivisions

Conservation Design Subdivisions Conservation Design Subdivisions An excerpt from the Rules and Regulations Governing Division of Land in Sheridan County, Wyoming, November 5, 2010 Sheridan County Public Works Department 224 S. Main Street

More information

A. Maintenance. All legally established, nonconforming structures can be maintained (e.g., painting and repairs);

A. Maintenance. All legally established, nonconforming structures can be maintained (e.g., painting and repairs); Chapter 24.50 NONCONFORMING USES, STRUCTURES AND LOTS Sections: 24.50.010 Nonconforming uses, structures, and lots Purpose. 24.50.020 Nonconforming uses, structures, and lots Alteration or expansion of

More information

People, Property and Power Lines. Frequently asked questions about power lines on or near your property

People, Property and Power Lines. Frequently asked questions about power lines on or near your property People, Property and Power Lines Frequently asked questions about power lines on or near your property Great River Energy is a not-for-profit wholesale electric power cooperative which provides electricity

More information

ORDINANCE NO. Be it ordained by the City Council of the City of Abilene, Texas:

ORDINANCE NO. Be it ordained by the City Council of the City of Abilene, Texas: ORDINANCE NO. An ordinance repealing Chapter 23, Subpart B of the Code of the City of Abilene, Texas, entitled Mobile Homes and Vacation Travel Trailers; stating the authority; setting forth the scope

More information

DOUGLAS COUNTY ZONING RESOLUTION Section 4 LRR - Large Rural Residential District 3/10/99. -Section Contents-

DOUGLAS COUNTY ZONING RESOLUTION Section 4 LRR - Large Rural Residential District 3/10/99. -Section Contents- SECTION 4 LRR LARGE RURAL RESIDENTIAL DISTRICT -Section Contents- 401 Intent... 4-2 402 Principal Uses... 4-2 403 Accessory Uses... 4-3 404 Uses Permitted by Special Review... 4-4 405 Land Dedication...

More information

a. RIGHTS OF WAY: Utility will own, operate and maintain extension facilities only: ISSUED BY Date Filed: July 2, 1996

a. RIGHTS OF WAY: Utility will own, operate and maintain extension facilities only: ISSUED BY Date Filed: July 2, 1996 SOUTHERN CALIFORNIA WATER COMPANY ORIGINAL Cal. P.U.C. Sheet No. 1005-E Page 1 APPLICABILITY: This rule is applicable to extension of electric Distribution Lines 1 of Utility s standard voltages (less

More information

WIND ENERGY FACILITY ORDINANCE FOR THE TOWN OF DIXFIELD

WIND ENERGY FACILITY ORDINANCE FOR THE TOWN OF DIXFIELD WIND ENERGY FACILITY ORDINANCE FOR THE TOWN OF DIXFIELD November 2, 2010 TABLE OF CONTENTS 1.0 Title 3 2.0 Authority 3 3.0 Purpose 3 4.0 Definitions 3 5.0 Jurisdiction 9 6.0 Conflict and Severability 10

More information

DRAFT PARK COUNTY US HIGHWAY 89 SOUTH EAST RIVER ROAD OLD YELLOWSTONE TRAIL ZONING DISTRICT REGULATIONS

DRAFT PARK COUNTY US HIGHWAY 89 SOUTH EAST RIVER ROAD OLD YELLOWSTONE TRAIL ZONING DISTRICT REGULATIONS Formatting: Changes recommended by the Board and accepted by the County Commission are formatted in RED: Changes made by the Park County Commission are formatted in YELLOW highlight: and changes made by

More information

CHAPTER 14: DRIVEWAYS, TOWN HIGHWAYS, AND PRIVATE ROADS

CHAPTER 14: DRIVEWAYS, TOWN HIGHWAYS, AND PRIVATE ROADS CHAPTER 14: DRIVEWAYS, TOWN HIGHWAYS, AND PRIVATE ROADS TABLE OF CONTENTS CHAPTER 14: PRIVATE DRIVEWAYS, TOWN HIGHWAYS AND PRIVATE ROADS 14-1 14.0100 AUTHORITY... 14-1 14.0200 TITLE... 14-1 14.0300 REGULATION

More information

Prepared for the Board of Directors of the Green Trails Improvement Association. July, 1981

Prepared for the Board of Directors of the Green Trails Improvement Association. July, 1981 DEED RESTRICTIONS - GREEN TRAILS Prepared for the Board of Directors of the Green Trails Improvement Association. July, 1981 1. Residential Use No lot or portion thereof within the property shall be used

More information

FINAL SUBDIVISION AND LAND DEVELOPMENT PLAN CHECKLIST. Plan Name. Applicant's Name:

FINAL SUBDIVISION AND LAND DEVELOPMENT PLAN CHECKLIST. Plan Name. Applicant's Name: TOWNSHIP OF UPPER ST. CLAIR FINAL SUBDIVISION AND LAND DEVELOPMENT PLAN CHECKLIST Date Filed Plan Name PLC Applicant's Name: Phone Filing Date for Final Application Final Plat 114.22. FINAL APPLICATION

More information

Signs along highways shall meet all of the requirements of the zoning districts in which they are located.

Signs along highways shall meet all of the requirements of the zoning districts in which they are located. SECTION 39 SIGNS 39.1 INTENT 39.1.1 The intent of this section is to regulate signs as defined hereinafter, to protect the safety of users of the streets and highways, to assure compatibility with uses

More information

EXHIBIT "A" THE PRESERVE AT WILDERNESS LAKE COMMUNITY DEVELOPMENT DISTRICT 5844 Old Pasco Road, Suite 100, Wesley Chapel, Florida 33544

EXHIBIT A THE PRESERVE AT WILDERNESS LAKE COMMUNITY DEVELOPMENT DISTRICT 5844 Old Pasco Road, Suite 100, Wesley Chapel, Florida 33544 EXHIBIT "A" THE PRESERVE AT WILDERNESS LAKE COMMUNITY DEVELOPMENT DISTRICT 5844 Old Pasco Road, Suite 100, Wesley Chapel, Florida 33544 NATURAL AREAS POLICY STATEMENT The following is the policy statement

More information

STATE OF OKLAHOMA TEXAS COUNTY PUBLIC SERVICE/PIPELINE OWNER. LINE INSTALLATION (Revised May 14, 2015)

STATE OF OKLAHOMA TEXAS COUNTY PUBLIC SERVICE/PIPELINE OWNER. LINE INSTALLATION (Revised May 14, 2015) STATE OF OKLAHOMA TEXAS COUNTY PUBLIC SERVICE/PIPELINE CROSSING LINE INSTALLATION (Revised May 14, 2015) We, the undersigned, hereby petition the Texas County Board of County Commissioners to grant a permit

More information

OTERO COUNTY ELECTRIC COOPERATIVE, INC FOURTH REVISED RULE NO. 15 CANCELING THIRD REVISED RULE NO. 15 EXTENSION POLICY.

OTERO COUNTY ELECTRIC COOPERATIVE, INC FOURTH REVISED RULE NO. 15 CANCELING THIRD REVISED RULE NO. 15 EXTENSION POLICY. Page 1 of 12 1. STATEMENT OF POLICY: CONSUMER ADVANCES REQUIRED This extension policy is intended to enable Otero County Electric Cooperative, INC. (OCEC) to extend its lines and facilities as needed to

More information

MONTEREY COUNTY PLANNING COMMISSION

MONTEREY COUNTY PLANNING COMMISSION MONTEREY COUNTY PLANNING COMMISSION Meeting: June 11, 2003 @ 9:30 AM Agenda Item: D2 Project Description: Use Permit (Associated Tagline/Sprint #PLN000669) for the construction of a 50 Ft. monopole with

More information

TITLE XV: LAND USAGE 150.BUILDING REGULATIONS 151.FLOOD DAMAGE PREVENTION 153.[RESERVED] 154.COMPREHENSIVE PLAN 155.SUBDIVISION AND ZONING CODE

TITLE XV: LAND USAGE 150.BUILDING REGULATIONS 151.FLOOD DAMAGE PREVENTION 153.[RESERVED] 154.COMPREHENSIVE PLAN 155.SUBDIVISION AND ZONING CODE 1 TITLE XV: LAND USAGE Chapter 150.BUILDING REGULATIONS 151.FLOOD DAMAGE PREVENTION 152.SIGN AND BILLBOARD REGULATIONS 153.[RESERVED] 154.COMPREHENSIVE PLAN 155.SUBDIVISION AND ZONING CODE 2006 S-2 1 2

More information

ZONING RESOLUTION OF BLOUNT COUNTY, TENNESSEE

ZONING RESOLUTION OF BLOUNT COUNTY, TENNESSEE ZONING RESOLUTION OF BLOUNT COUNTY, TENNESSEE Article 1. ENACTMENT. Section 1.1. Title. This Resolution shall be titled Zoning Resolution of Blount County, Tennessee, hereinafter referred to as Resolution.

More information

APPLICATION FOR A CERTIFICATE OF ZONING COMPLIANCE SIGNAGE

APPLICATION FOR A CERTIFICATE OF ZONING COMPLIANCE SIGNAGE TOWN OF MILO, NEW YORK Department of Code Enforcement and Administration 137 Main Street Penn Yan, New York 14527 Telephone No.: (315) 531-8042 Fax No.: (315) 536-9760 TDD No.: (202) 720-6382 Email: codeofficer@townofmilo.com

More information

TOWN OF MELBOURNE BEACH 2016 DEVELOPMENT APPLICATION

TOWN OF MELBOURNE BEACH 2016 DEVELOPMENT APPLICATION TOWN OF MELBOURNE BEACH 2016 DEVELOPMENT APPLICATION I. SUBMITTAL REQUIREMENTS: 1. Fees per current schedule. 2. Deed to property. 3. Pre-Application meeting is mandatory. Contact the Building Official

More information

Article 18. Sign Regulations

Article 18. Sign Regulations Article 18. Sign Regulations Section 18.01 Purpose and Intent Section 18.02 Use Regulations Section 18.03 Classification of Signs Section 18.04 Structural Types Section 18.05 General Standards Section

More information

FPL Energy Illinois Wind, LLC Response to Staff Report of DeKalb County Planning/Zoning/Building Department. March 20, 2009

FPL Energy Illinois Wind, LLC Response to Staff Report of DeKalb County Planning/Zoning/Building Department. March 20, 2009 FPL Energy Illinois Wind, LLC Response to Staff Report of DeKalb County Planning/Zoning/Building Department March 20, 2009 Planning/Zoning/Building Department STAFF REPORT TO: FROM: Dave Dockus DeKalb

More information