1 Ohio Department of Transportation Division of Engineering Office of Real Estate Synergy Real Estate Business Analysis Appraisal System Specification Version 1.02 Revision History Date Version Modified By 2/26/ Initial Draft Cheryl Jacino 3/15/ Define Real Estate Acquisition Process Cheryl Jacino 4/23/ Define Real Estate Appraisal Process Cheryl Jacino 5/22/ Finalize Appraisal SRS Cheryl Jacino 5/24/ Add Appraisal to page headings. Cheryl Jacino 5/28/ Added Corrections from District 5 Cheryl Jacino Page 1 of 28 Wednesday, June 12, 2013

2 Table of Contents 0 Synergy Appraisal System Specification Purpose Author(s) Audience Business System Specifications Table: Process Flow Chart: Appraisal Process Pre-Valuation Process Assign Staff Prelim Reviewer Engage Consultant Prelim Reviewer Determine Available Consultants Identify Valuation Problem Process Scope Staff Appraisal Scope Consultant Appraisal Determine Appraisal Type Determine Available Consultants Appraisal Process Appraisal Review Process Establish FMVE Revisit FMVE...28 Page 2 of 28 Wednesday, June 12, 2013

3 0 Synergy Appraisal System Specification 0.1 Purpose The System Specification (SRS) is to capture the business requirements for the Real Estate Right of Way System. The purpose of these requirements is three fold: 1) used to select a system to purchase 2) used to identify feature requirements during the system design phase 3) assist the business with identifying change management needs The SRS document should also capture the non-functional requirements as well as system conversion requirements. 0.2 Author(s) The Business Analyst is the owner of this document, with assistance from the Business Sponsors, Business Stakeholders, Business Subject Matter Experts, District Subject Matter Experts, and Project Management Office Manager. 0.3 Audience The SRS is a useful tool for Business Users requesting the system to communicate the functions of the system with DoIT and vendors involved in creating the software or system. This document will also serve as a reference for any future development. Page 3 of 28 Wednesday, June 12, 2013

4 0.4 Business A business requirement is a specific, actionable, testable directive that is under the control of the business and supports a business policy. Included in the document of SRS are the high-level lists of requirements that will be broken into features during the Systems Design Phase that follows Business Analysis. There may be more than one feature for each business requirement. 0.5 System Specifications Table: Each section of system requirements specification is included in a table with the following parts: This is a numeric that will be used to track the requirement through all phases of the system development to ensure the requirement is designed, developed, tested, approved, and implemented. includes the title of the process and a definition of what is included in the process. Used to identify the source of the requirement. In this case the requirement is being tracked back to the requirements gathering session. RE-Acquisition-BA stands for Real Estate Acquisition Gathered during Business Analysis. stands for Real Estate Appraisal Gathered during Business Analysis. RE-Acquisition-Type-BA stands for Real Estate Acquisition Type Gathering during Business Analysis. RE-Utility-BA stands for Real Estate Utility Coordination Gathering during Business Analysis. RE-Relocation-BA stands for Real Estate Relocation Gathering during Business Analysis. RE-Property-Mgmt-BA stands for Real Estate Property Management Gathering during Business Analysis. RE-Fiscal-BA stands for Real Estate Fiscal Gathering during Business Analysis. RE-General-BA stands for Real Estate Reporting, Records Retention, & Document Handling Gathering during Business Analysis. RE-Technical-BA stands for Real Estate Technical, System Interfaces, and Non-Functional Gathering during Business Analysis. RE-Synergy-BA stands for Real Estate Synergy Presentation of Business Analysis. Page 4 of 28 Wednesday, June 12, 2013

5 Priority Define the priority within the replacement New System for each requirement. - Current Paradox System Process that is required in the New System. Obsolete - Current Paradox System Process that is Obsolete and will not be present in the New System. New - Process that is not in the Current Paradox System Process but is required in the New System. Extra - Process that is not in the Current Paradox System Process and is an Unnecessary but desirable Extra Feature in the New System. Future - Process that is not in the Current Paradox System Process and is a desirable Feature in a future version of the New System. Any necessary preliminary setup to easily provide this feature in the future is advised. Process that is manual and does not lend itself to a system solution. See Detail Priority is captured in a sub-process related to this process. Change? Does this need Change Management for implementation? Feature Used during Systems Design Phase to trace Functional Requirement related to the Business System Requirement. Page 5 of 28 Wednesday, June 12, 2013

6 0.6 Process Flow Chart: Each Process is accompanied by a process flow chart. The legend below shows all of the shapes used in the flow charts and the meaning of the shapes. Although the process flow represents the general flow of the acquisition work, there is complete flexibility in the order each process is completed. Below is a legend describing the shapes used within the system requirement flow charts. LEGEND Process Process A specific, actionable, testable activity that is under the control of the business and supports a business policy. Group Process Group Process A group of related processes that will be broken down into specific, actionable, testable activities. To see the breakdown of this group, an embedded link to the tab with the breakdown of processes is included Search Public Records for Owner Enter Encumbrance Into Ellis Process A specific, actionable, manual activity that cannot be replaced by system activity. External Process An activity that is a necessary part of the business process flow but takes place in a system external to this Real Estate System. Multi-Process Multi-Process Multiple distinct yet related activities are directly accessed from this entry point in the business process flow. Decision? Decision This is a point where the process splits into different processes based on the question shown in the diamond. Each directional arrow leaving the diamond is labeled with the answer to the question and points to the process that follows. Continue? Continue This is a point where the process repeats until the answer allows the process to continue to the next step. Start or End Start or end A start or end point for the process flow that originates or ends at this point. Document Document Document A paper copy of the named document. Documents can be input to a process or output from a process but it does not represent any activity related to the document. Mail C Certified Mail Mail A paper copy of the named document is mailed. Mail can be input to a process or output from a process but it does not represent any internal system activity, only the external activity of mailing a document. Deliver/Receive Document in person. This can be input to a process or output from a process but it does not represent any activity, only the external delivery or receipt a document. Note: Title Process Note This contains notes that are important to the business process flow. Page 6 of 28 Wednesday, June 12, 2013

7 2 Appraisal Process This section contains the requirements for the process to appraise real estate right of way parcels for the purpose of determining Fair Market Value Estimate (FMVE) used to acquire parcels for Department of Transportation projects. It is important to note that multiple appraisers, appraisals, and reviewers may be required for parcels and parcel types. There are ROW Appraisal Activities and Non-ROW Appraisal Activities that are not directly part of the Acquisition Appraisal to establish FMVE. All of these Non-acquisition appraisal activities are complete at the end of 2.5 Appraisal Review Process and are conducted with any flexibility deemed necessary. Below is a list of the ROW Activities that are not directly Acquisition Appraisals: 1. Litigation Support that occurs in 1.11 Track Post Certification Activities 2. Relocation Support that occurs as needed in 3.0 Relocation Below is a list of the Non-ROW Activities: 1. Appraisals in support of Property Management; Excess Land Disposals, Non-Eminent Domain Valuations, Access Modification Appraisals and Rent Studies 2. Environmental Mitigation 3. Appraisal Activities for other Government Entities 4. Non-Highway Corridor Valuation Activities 5. Billboard Valuation Activities on Government Owned Property 6. Cell Tower Valuation Activities on Government Owned Property Additional Steps for Non-ROW Activities include the assignment of false P s and identifying the funding source for appraisal activities. 2.0 APPRAISAL 2.1 Pre-Valuation Process 2.2 Identify Valuation Problem 2.3 Scope Appraisal Process 2.4 Appraisal Report Process 2.5 Appraisal Review Process 2.6 Is this an Acquisition Appraisal? 2.7 Establish FMVE Process Nothing Priority Change? Feature RE 2.1 Pre-Valuation Process - Preliminary steps required to understand the ROW valuation problem and select a preliminary reviewer. See Detail RE 2.2 Identify Valuation Problem Agency works with Reviewer to determine the valuation problem and draft Parcel Impact Notes (PIN s). See Detail RE 2.3 Scope Appraisal Process Select Appraiser(s) and Reviewer(s) to conduct a field review and finalize scope and PIN s. See Detail Page 7 of 28 Wednesday, June 12, 2013

8 Priority Change? Feature RE 2.4 Appraisal Report Process Appraiser is provided all pertinent documents in order to appraise the parcel, prepare and complete the appraisal report. See Detail RE 2.5 Appraisal Review Process Reviewer(s) are provided the appraisal report created by the Appraiser. Reviewer(s) will either Accept, Not- Accept, or Recommend the Appraisal. Final outcome of the Appraisal Review Process is a recommended FMVE. See Detail RE 2.6 Is this an Acquisition Appraisal? There are other ROW Appraisal Activities and Non-ROW Appraisal Activities that are complete at the end of 2.5 Appraisal Review Process. RE-Synergy-BA RE 2.7 Establish FMVE Process Either the District or Central Office (CO) establishes the FMVE. See Detail Page 8 of 28 Wednesday, June 12, 2013

9 2.1 Pre-Valuation Process Preliminary steps required to understand the ROW valuation problem and select a preliminary reviewer. 2.1 Pre-Valuation Process Is there an improvement in the take? Is Prelim FMVE >= $500k? Is Prelim FMVE >= $1mil? Assign Staff or Engage Consultant Prelim Reviewer Continue with 2.2 Identify Valuation Problem Create RE Note that 2 Reviewers are Engage CO with Scoping Reviewer and Appraiser RE95 RE Is there an improvement in the take? - Evaluate the parcel for improvements that need documented on the RE95. RE RE RE RE Is Preliminary FMVE >= $500k? - A preliminary FMVE is compared to the threshold set for requiring 2 reviewers for the appraisal. Is Preliminary FMVE >= $1mil? - A preliminary FMVE is compared to the threshold set for requiring CO to participate in identifying valuation problem and scoping Appraiser(s) and Reviewers. Assign Staff or Engage Consultant Prelim Reviewer Determine if Staff or Consultants will be used for the Valuation Problem Analysis and drafting of PIN s. Contract consultants as needed. Continue with 2.2 Identify Valuation Problem Pre-Valuation Activities are complete; continue with identifying the valuation problem. See Detail Page 9 of 28 Wednesday, June 12, 2013

10 RE Create RE95 When the parcel includes improvements, complete the RE95. RE Note that 2 Reviewers are When the Preliminary FMVE is over a certain threshold, the appraisal will need to be reviewed by two different Reviewers. New RE Engage CO with Scoping Reviewer and Appraiser When the Preliminary FMVE is over a certain threshold, CO will participate in identifying valuation problem and scoping the Appraiser(s) and Reviewers. New Page 10 of 28 Wednesday, June 12, 2013

11 2.1.4 Assign Staff Prelim Reviewer Determine if Staff Preliminary Reviewer will be used for the Valuation Problem Analysis Process. Assign staff if available or look for an available consultant ASSIGN STAFF PRELIM REVIEWER Is Reviewer Pre-Qualified? Determine Available Staff Meet Staff to Scope Proceed with Staff Service TE: Staff Assignments are made throughout the process whenever the need arises. RE RE RE RE Is Reviewer Pre-Qualified? - Is the Reviewer currently on the staff prequalified list? Determine Available Staff Available Staff must meet the necessary expertise the parcel presents and have time available to complete the work. Meet Staff to Scope Meet with the assigned staff to establish scope of the Valuation Assignment and other variables. Proceed with Staff Service Staff Reviewer proceeds with assigned service. New Yes New Yes Page 11 of 28 Wednesday, June 12, 2013

12 2.1.4 Engage Consultant Prelim Reviewer Determine if Consultant Preliminary Reviewer will be used for the Valuation Problem Analysis Process. Engage consultant by issuing Authorization Letter ENGAGE CONSULTANT PRELIM REVIEWER Determine Available Consultants Meet Reviewer to Scope Work Receive Fee Proposal Is Fee Reasonable? Agree on Consultant Fee Did Negotiations Fail? Continue to Negotiate Fee Make Consultant Funds Available Finalize and Print Consultant Authorization Authorize Consultant Proceed with Reviewer Service Note: There are two points in the process where a reviewer may be engaged; first to identify the valuation problem, second to perform the appraisal review. A second reviewer is engaged when Preliminary FMVE >= $500k RE Determine Available Consultants Determine which consultants may be available. See Detail RE Meet Reviewer to Scope Work - Meet reviewer to discuss the scope of the work related to draft PIN s. Also discuss the APA form as necessary. New RE Receive Fee Proposal Reviewer submits a fee proposal for scope of work. RE Is Fee Reasonable? District Real Estate Administrator (REA) evaluates Reviewer s fee proposal to make sure it is reasonable. Historical fees may be used for comparison. RE Agree on Consultant Fee If fee is reasonable there is agreement on the consultant fee. Page 12 of 28 Wednesday, June 12, 2013

13 RE Did Negotiations Fail? When agreement on fee or timing cannot be satisfied, the negotiations end. The process of determining available consultants starts over. RE Continue to Negotiate Fee Negotiations continue by phone, in person, or by in an effort to agree on the consultant fee and timing. RE Make Consultant Funds Available To be defined during Fiscal Process Gathering Session. See Detail RE Finalize and Print Consultant Authorization All agreed scope and fee requirements are entered into Authorization Letter, Scope of Services, and Task Division Sheet then printed. RE Authorize Consultant Sign and issue Authorization Letter with attachments. RE Proceed with Reviewer Service - Now that Reviewer is engaged, continue with scope of service as authorized. Page 13 of 28 Wednesday, June 12, 2013

14 Determine Available Consultants Consultant is available when Reviewer is on Consultant Pre-Qualified List and Reviewer s company is on Task Order List with funds available, and Reviewer s schedule is a match for project schedule. In some instances a Project Specific Task Order or Personal Service Contract may be necessary DETERMINE AVAILABLE CONSULTANTS Is Consultant Pre-Qualified? Is Consultant Covered on Task Order with Available Funds? Reserve Funds Call Consultants to Confirm Availability Proceed to Meet Reviewer to Scope Work Is Project Specific Task Order Necessary? Work with Consultant Services to Obtain Task Order Is PSC Necessary? Select Another Available Consultant Is Fee < $50k? Call Consultants to Confirm Availability Note to Issue Personal Service Contract Project Specific Task Orders may need to be initiated early in the project planning process in order to have consultants available. RE Is Consultant Pre-Qualified? - Is the Consultant currently on the consultant pre-qualified list? RE-Acquisition-BA RE Is Consultant Covered on Task Order with Available Funds? - If consultant s company is on Task Order List with funds available, the consultant is potentially available. RE-Acquisition-BA RE Reserve Funds Enter reservation of funds against the task order. RE-Acquisition-BA Page 14 of 28 Wednesday, June 12, 2013

15 RE RE RE RE RE Call Consultant to Confirm Availability Call consultant and confirm they are available during the timeframe forecast based on the given the scope. Proceed to Meet Reviewer to Scope. Is Project Specific Task Order Necessary? Make a decision about whether a Project Specific Task Order is Needed. Work with Consultant Services to Obtain Task Order Follow the procedures to obtain a task order through Consultant Services. Is PSC Necessary? Is Personal Service Contract (PSC) necessary? RE Select Another Available Consultant Start over with determining the next available consultant. RE RE Is Fee < $50k? Is consultant fee less than the threshold amount allowed for PSC s? Note to Issue Personal Service Contract Make a note to issue a personal service contract with the available consultant. RE-Acquisition-BA RE-Acquisition-BA RE-Acquisition-BA RE-Acquisition-BA RE-Acquisition-BA RE-Acquisition-BA RE-Acquisition-BA RE-Acquisition-BA Page 15 of 28 Wednesday, June 12, 2013

16 2.2 Identify Valuation Problem Process Agency works with Reviewer to determine the valuation problem and draft PIN s. 2.2 Identify Valuation Problem Create Draft PIN s Complete Field Review with Reviewer and Agency Update PIN s Continue with 2.3 Scope Appraisal Value Problem Analysis is legally required to be performed on all appraisal assignments. APA APA is a form used for complex appraisal assignments. PIN s Parcel Impact Notes are required for all assignments. RE RE RE Create Draft PIN s - During valuation problem analysis, create draft PIN s. Create Appraisal Problem Analysis (APA) form when necessary. Complete Field Review with Reviewer and Agency Meet at project location with selected Reviewer and Agency representative to compare the ROW and construction plans to what physically exists and determine what will influence the value of the property. Update PIN s Update Parcel Impact Notes with value influences identified during the Field Review. Also update APA form when necessary. RE Continue with 2.3 Scope Appraisal New Page 16 of 28 Wednesday, June 12, 2013

17 2.3 Scope Staff Appraisal Select Appraiser(s) and Reviewer(s) to conduct a field review and finalize scope and PIN s. In order to avoid conflict of interest, the Reviewer and Appraiser cannot be the same person on the same parcel. 2.3 Scope Staff Appraisal Are Reviewer and/ or Appraiser Pre- Qualified? Determine Available Staff Complete Field Review with Reviewer, Appraiser, and Agency Determine Appraisal Type Negotiate Scope Finalize PIN s Proceed with Staff Service TE: Staff Assignments are made throughout the process whenever the need arises. RE RE RE RE RE Are Reviewer and/or Appraiser Pre- Qualified? Are staff reviewer and/or staff appraiser on the staff pre-qualified list? Determine Available Staff - Available staff must meet the necessary expertise the parcel presents and have time available to complete the work. Complete Field Review with Reviewer, Appraiser, and Agency - Meet at project location with selected Reviewer, Appraiser, and Agency representative to compare the ROW and construction plans to what physically exists and determine what will influence the value of the property. Determine Appraisal Type Based on complexity of the value problem and FMVE determine the appraisal type. Negotiate Scope - Reviewer, Agency, and Appraiser must fully discuss the scope of work and come to agreement. New Yes Page 17 of 28 Wednesday, June 12, 2013

18 RE Finalize PIN s - After scope meeting, the preliminary PIN s are updated into the final PIN s. Also update APA form when necessary. RE Proceed with Staff Service Assignment of Appraiser/Reviewer is complete. Continue with scope of service. Page 18 of 28 Wednesday, June 12, 2013

19 2.3 Scope Consultant Appraisal Select consultant Appraiser(s) and Reviewer(s) to conduct a field review and finalize scope and PIN s. In order to avoid conflict of interest, the Reviewer and Appraiser cannot be the same person on the same parcel. 2.3 Scope Consultant Appraisal Determine Available Consultants Complete Field Review with Reviewer, Appraiser, and Agency Determine Appraisal Type Negotiate Scope Finalize PIN s Receive Fee Proposal Is Fee Reasonable? Agree on Consultant Fee Make Consultant Funds Available Finalize and Print Consultant Authorization Did Negotiations Fail? Continue to Negotiate Fee Sign and Authorize Consultant Proceed with Consultant Service Negotiate Scope covers the following items; ROW plans, Construction Plans, Draft APA or PIN s, Pre-Acq survey, Parcel Due Dates, RE95 as needed, Contacts, Title Report, Prior Work History, Media, Environmental, Difficult Property Owners from Public Meetings, Contact Info if available, and Appraiser Feedback. RE Determine Available Consultants Determine which consultants may be available. See Detail RE Receive Fee Proposal Appraiser/Reviewer submits a fee proposal for scope of work. RE Is Fee Reasonable? - District REA evaluates fee proposal to make sure it is reasonable. Historical fees may be used for comparison. RE Agree on Consultant Fee If fee is reasonable there is agreement on the consultant fee. RE Make Consultant Funds Available To be defined during Fiscal Process Gathering Session. See Detail Page 19 of 28 Wednesday, June 12, 2013

20 RE Finalize and Print Consultant Authorization All agreed scope and fee requirements are entered into Authorization Letter, Scope of Services, and Task Division Sheet then printed. RE Did Negotiations Fail? - When agreement on fee or timing cannot be satisfied, negotiations end. The process of determining available consultants starts over. RE Continue to Negotiate Fee Negotiations continue by phone, in person, or by in an effort to agree on the consultant fee and timing. RE Authorize Consultant - Sign and issue Authorization Letter with attachments. RE Proceed with Consultant Service Now that consultant is engaged, continue with scope of service as authorized. Page 20 of 28 Wednesday, June 12, 2013

21 2.3.4 Determine Appraisal Type Based on complexity of the value problem and FMVE determine the appraisal type Determine Appraisal Type Is Valuation Problem Simple? Note Summary Appraisal FMVE <= $10k? FMVE <= $65k? Note Value Analysis Note Value Finding RE Is Valuation Problem Simple? Determine if the valuation problem is a simple one. RE Note Summary Appraisal Make a note for the appraisal process that this will be a summary appraisal. RE FMVE <= $10k? - FMVE is compared to the threshold set for requiring a value analysis report. RE FMVE <= $65k? - FMVE is compared to the threshold set for requiring a value finding report. RE Note Value Analysis Make a note for the appraisal process that this will be a value analysis. RE Note Value Finding - Make a note for the appraisal process that this will be a value finding. Page 21 of 28 Wednesday, June 12, 2013

22 2.3.8 Determine Available Consultants Based on complexity of the value problem and FMVE determine the appraisal type. In order to avoid conflict of interest, the Reviewer and Appraiser cannot be the same person on the same parcel Determine Available Consultants Is Consultant Pre-Qualified? Is Consultant Covered on Task Order with Available Funds? Reserve Funds Call Consultants to Confirm Availability Proceed to Complete Field Review with Reviewer, Appraiser, and Agency Is Project Specific Task Order Necessary? Work with Consultant Services to Obtain Task Order Is PSC Necessary? Select Another Available Consultant Is Fee < $50k? Call Consultants to Confirm Availability Note to Issue Personal Service Contract Project Specific Task Orders may need to be initiated early in the project planning process in order to have consultants available. RE Is Consultant Pre-Qualified? - Is the Consultant currently on the consultant pre-qualified list? RE RE RE Is Consultant Covered on Task Order with Available Funds? - If consultant s company is on Task Order List with funds available, the consultant is potentially available. Reserve Funds Enter reservation of funds against the task order. Call Consultants to Confirm Availability Call consultant and confirm they are available during the timeframe forecast based on the given the scope. RE-Acquisition-BA Extra Page 22 of 28 Wednesday, June 12, 2013

23 RE RE RE RE Proceed to Complete Field Review with Reviewer, Appraiser, and Agency Is Project Specific Task Order Necessary? Make a decision about whether a Project Specific Task Order is Needed. Work with Consultant Services to Obtain Task Order Follow the procedures to obtain a task order through Consultant Services. Is PSC Necessary? Is PSC necessary? RE Select Another Available Consultant Start over with determining the next available consultants. RE RE Is Fee < $50k? - Is consultant fee less than the threshold amount allowed for PSC s? Note to Issue Personal Service Contract Make a note to issue a personal service contract with the available consultant. Page 23 of 28 Wednesday, June 12, 2013

24 2.4 Appraisal Process Appraiser is provided all pertinent documents in order to appraise the parcel and prepare the appraisal report. 2.4 Appraisal Report Process Is Summary Appraisal Noted? Begin Appraisal Create Summary Appraisal Summary ROW Appraisal Is Value Finding Noted? Begin Appraisal Create Value Finding Value Finding Begin Waiver Valuation Create Value Analysis Value Analysis RE RE Is Summary Appraisal Noted? Is Appraisal Type noted as a Summary Appraisal? Begin Appraisal With PIN s and scope established, begin work of determining estimate of fair compensation. RE Create Summary Appraisal RE Is Value Finding Noted? Is Appraisal Type noted as a Value Finding? RE Create Value Finding RE Begin Waiver Valuation With PIN s and scope established, begin work of determining estimate of fair compensation. RE Create Value Analysis Page 24 of 28 Wednesday, June 12, 2013

25 2.5 Appraisal Review Process Reviewer(s) are provided the appraisal report created by the Appraiser. Reviewer(s) will either Accept, Not-Accept, or Recommend the Appraisal. Final outcome of the Appraisal Review Process is a recommended FMVE. 2.5 Appraisal Review Process Receive Appraisal Review Appraisal Is Appraised Value >= $500k Second Review of Appraisal Review Checklist 25-13, 25-14, Complete Review Checklist Nothing Complete Second Review Checklist Review Checklist 25-13, 25-14, Return to 2.3 Scope Appraiser Accept Accept, Recommend, Not Accept? Recommend Complete FMVE Recommendation Not Accept Appraisal Report Correct Appraisal and Re-Submit Issue Review Letter to Seek Corrections RE22 or VA RE22-1 (If Applicable) RE22-2 Reviewer 1 RE22-2 Reviewer 2 (If Applicable) Review Letter RE RE Receive Appraisal District REA receives Appraisal from Staff or Consultant. Review Appraisal Reviewer determines if the appraisal is compliant to Scope, Law, Professional Appraisal Standards, and if estimation of compensation is reasonable. RE Is Appraised Value >= $500k? Appraised Value is compared to the threshold set for requiring a second Reviewer to review the Appraisal and establish FMVE. New Yes Page 25 of 28 Wednesday, June 12, 2013

26 RE RE Second Review of Appraisal Second Reviewer determines if the appraisal is compliant to Scope, Law, Professional Appraisal Standards, and if estimation of compensation is reasonable. Complete Review Checklist Reviewer completes Review Checklist for Appraisal. RE Complete Second Review Checklist - Second Reviewer completes Review Checklist for Appraisal. Yes RE Return to 2.3 Scope Appraiser RE Accept, Recommend, Not Accept? Reviewer will make a final recommendation. When a second reviewer is needed, the Reviewer and Second Reviewer must agree on the final recommendation. If no agreement, then CO acts as tie breaker. Accepted, if the Appraisal meets the compliance considerations but cannot be recommended. Recommended, if the Appraisal meets the compliance considerations and is a fair and reasonable estimation of compensation. Not Accept, if the Appraisal does not meet the compliance consideration or the estimation of compensation is not fair or reasonable. RE Complete FMVE Recommendation Complete RE22 or VA and any other required report; RE22-1 or RE22-2. Deliver signed Appraisal Report and Signed RE22 or VA to recommend FMVE RE Correct Appraisal and Re-Submit Appraiser makes corrections and completes Appraisal Report to Resubmit. RE Issue Review Letter to Seek Corrections - Issue Review Letter to seek corrections from appraiser. Page 26 of 28 Wednesday, June 12, 2013

27 2.7 Establish FMVE Either the District or CO establishes the FMVE. 2.7 ESTABLISH FMVE RE22 or VA Is FMVE < $1.5 mil? Establish FMVE at District RE22-1 (if applicable) RE22-2 Reviewer 1 (if applicable) Establish FMVE at CO Approved RE22 or Value Analysis RE22-2 Reviewer 2 (if applicable) Approved RE22 RE RE RE Is FMVE < $1.5 mil? FMVE is compared to the threshold set for requiring CO to establish FMVE. Establish FMVE at District Establish FMVE at District if FMVE is less than threshold set for requiring CO to establish FMVE. Establish FMVE at CO - Establish FMVE at CO if FMVE is greater than or equal to the threshold set for requiring CO to establish FMVE. New Yes Page 27 of 28 Wednesday, June 12, 2013

28 2.7 Revisit FMVE When there is a change in the plans or other change that impacts the established valuation problem, this process is followed to make sure the FMVE is accurate based on the new valuation problem. 2.7 REVISIT FMVE Does Change Impact Valuation Problem? 2.2 Identify Valuation Problem 2.3 Scope Appraisal Process 2.4 Appraisal Report Process 2.5 Appraisal Review Process 2.7 Establish FMVE Process RE Does Change Impact Valuation Problem? - Does the new information impact the established valuation problem? If it does, follow the complete appraisal process. If it does not impact the valuation problem, begin at 2.5 Appraisal Review Process. RE-Synergy-BA Page 28 of 28 Wednesday, June 12, 2013

Ohio Department of Transportation. Division of Engineering. Office of Real Estate. Synergy. Real Estate Business Analysis

Ohio Department of Transportation. Division of Engineering. Office of Real Estate. Synergy. Real Estate Business Analysis Ohio Department of Transportation Division of Engineering Office of Real Estate Synergy Real Estate Business Analysis Fiscal System Specification Version 1.02 Revision History Date Version Modified By

More information

Ohio Department of Transportation. Division of Engineering. Office of Real Estate. Synergy. Real Estate Business Analysis

Ohio Department of Transportation. Division of Engineering. Office of Real Estate. Synergy. Real Estate Business Analysis Ohio Department of Transportation Division of Engineering Office of Real Estate Synergy Real Estate Business Analysis Relocation System Specification Version 1.00 Revision History Date Version Modified

More information

OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF REAL ESTATE

OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF REAL ESTATE OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF REAL ESTATE DATE: April 3, 2017 TO: FROM: RE: Users of the Real Estate Manual Jared Miller, Manager Appraisal Unit Changes and Updates to the Real Estate Manual

More information

Task Central Office Real Estate Responsibilities District Responsibilities

Task Central Office Real Estate Responsibilities District Responsibilities PAGE 1 Appraisal 1. Procedures relative to the entire appraisal process. 1. Prepare preliminary fee schedules, setting monetary guidelines. 2. Prepare and issue contractual agreements with fee appraisers

More information

OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF REAL ESTATE. Kevin O Grady, Manager Appraisal Unit. Changes and Updates to the Real Estate Manual

OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF REAL ESTATE. Kevin O Grady, Manager Appraisal Unit. Changes and Updates to the Real Estate Manual OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF REAL ESTATE DATE: May 01, 2014 TO: FROM: RE: Users of the Real Estate Manual Kevin O Grady, Manager Appraisal Unit Changes and Updates to the Real Estate Manual

More information

THE WAIVER OF APPRAISAL

THE WAIVER OF APPRAISAL THE WAIVER OF APPRAISAL Succinct Explanation of the RW Process When rights of way are needed for a highway project, the owner of the property needed for the project is offered compensation (FMVE). Then

More information

OFFICE OF REAL ESTATE

OFFICE OF REAL ESTATE OFFICE OF REAL ESTATE DATE: October 25, 2017 TO: FROM: RE: Users of the Real Estate Manual Wayne Pace, Manager Acquisition Unit Changes and Updates to the Real Estate Manual The only current and accurate

More information

Putting it all together. Presented by: RIGHT OF WAY SERVICES

Putting it all together. Presented by: RIGHT OF WAY SERVICES Putting it all together Presented by: RIGHT OF WAY SERVICES OUTLINE Introduction Purpose Federal & State Laws Project Process and Timeline NEPA Requirements Right of Way Plans Title OUTLINE CONTINUED Survey

More information

TABLE OF CONTENTS General Legal Authority for Certification of Right of Way Control 24-2

TABLE OF CONTENTS General Legal Authority for Certification of Right of Way Control 24-2 TABLE OF CONTENTS 2400 CERTIFICATION OF RIGHT OF WAY CONTROL PAGE 2401 General 24-1 2402 Legal Authority for Certification of Right of Way Control 24-2 2403 Right of Way Certification and Advertising for

More information

EASEMENT BASICS. Definition of Easement Types. Easements are part of our assets. Easement Research. Access, maintenance and operations.

EASEMENT BASICS. Definition of Easement Types. Easements are part of our assets. Easement Research. Access, maintenance and operations. EASEMENT BASICS Definition of Easement Types. Easements are part of our assets. Easement Research. Access, maintenance and operations. Right-of-Way Regardless of how sophisticated we become, this is still

More information

Arlington County, Virginia. Internal Audit of the Real Estate Assessment Appeals Process Calendar Year Ended December 31, 2014

Arlington County, Virginia. Internal Audit of the Real Estate Assessment Appeals Process Calendar Year Ended December 31, 2014 Arlington County, Virginia Internal Audit of the Real Estate Assessment Appeals Process Calendar Year Ended December 31, 2014 Table of Contents Transmittal Letter... 1 Executive Summary... 2-9 Background...

More information

Sound Transit. Performance Audit Report Real Property Acquisition

Sound Transit. Performance Audit Report Real Property Acquisition Performance Audit Report Real Property Acquisition November 28,2017 Miller & Miller, P.S. 4240 West Cramer Street Seattle, WA 98199-1005 Telephone (206) 281-0281 Fax (206) 281-0276 E-mail mandmps@comcast.net

More information

Federal Aid Acquisition Guide. For Property Owners

Federal Aid Acquisition Guide. For Property Owners Federal Aid Acquisition Guide For Property Owners Federal Aid Acquisition Guide for Property Owners INTRODUCTION The purpose of this Guide is to summarize the land acquisition process, including eminent

More information

User Manual. Section 2: Implementation and Industry Translations. Created: October Copyright PropertyBoss Solutions, LLC. All Rights Reserved.

User Manual. Section 2: Implementation and Industry Translations. Created: October Copyright PropertyBoss Solutions, LLC. All Rights Reserved. User Manual Section 2: Implementation and Industry Translations Created: October 2010 Copyright PropertyBoss Solutions, LLC. All Rights Reserved. PropertyBoss Manual Section 2 - Implementation and Industry

More information

HOW TO CREATE AN APPRAISAL

HOW TO CREATE AN APPRAISAL Page 1 7/19/2005 IMAGEsoft s Appraise Link Instruction Manual HOW TO CREATE AN APPRAISAL Start at the MAIN MENU. Click on APPRAISALS. The WORK WITH APPRAISALS screen appears. This screen stores your appraisals,

More information

RIGHT OF WAY PRIMARY ROLES & RESPONSIBILITIES

RIGHT OF WAY PRIMARY ROLES & RESPONSIBILITIES RIGHT OF WAY PRIMARY ROLES & RESPONSIBILITIES PRIMARY TASK ODOT (REA unless otherwise noted) LPA EECUTE LPA PROJECT AGREEMENT LPA Manager; REA may require Real Estate Checklist to be signed off at this

More information

SCOPE OF SERVICES Appraisal Consultant Services For SR 710/Beeline Highway FM

SCOPE OF SERVICES Appraisal Consultant Services For SR 710/Beeline Highway FM SCOPE OF SERVICES Appraisal Consultant Services For SR 710/Beeline Highway FM 2298961 This project will be divided into two separate groups of parcels, identified as Group A and Group B. The specific parcel

More information

Accelerated ROW Process for Sidewalks FAQ s

Accelerated ROW Process for Sidewalks FAQ s Accelerated ROW Process for Sidewalks FAQ s General FAQs... 3 1. What is the Accelerated ROW Process for Sidewalks?... 3 2. When is the Process Available?... 3 3. Can the accelerated right-of-way process

More information

PROJECT INITIATION DOCUMENT

PROJECT INITIATION DOCUMENT Project Name: Housing Futures Phase Two Project Sponsor: Steve Hampson Project Manager: Denise Lewis Date Issued: 15 February 2008 Version No: 1 Background: At Full Council on 31 January 2008 the following

More information

Beginning Fixed Assets

Beginning Fixed Assets Beginning Fixed Assets GASB Statement 34 GASB 34 Overall Objective A governmental unit will have a set of government-wide financial statements that will present the government as a single unified entity

More information

RIGHT OF WAY LIFE CYCLE

RIGHT OF WAY LIFE CYCLE EXPEDITING THE RIGHT OF WAY PROCESS RIGHT OF WAY LIFE CYCLE Right of Way planning begins during the Feasibility Phase of a project. Determining the magnitude of the Right of Way Phase allows the LDOTD

More information

The Uniform Act. Acquisition, Relocation & Demolition. Disaster Recovery CDBG Administration Training. February 14, 2012

The Uniform Act. Acquisition, Relocation & Demolition. Disaster Recovery CDBG Administration Training. February 14, 2012 The Uniform Act Acquisition, Relocation & Demolition Disaster Recovery CDBG Administration Training February 14, 2012 Uniform Act Overview 49 CFR 24 Protections and assistance to establish minimum standards

More information

2009 QBS Request for Statement of Interest (SOI) On Call Appraisal Services

2009 QBS Request for Statement of Interest (SOI) On Call Appraisal Services 2009 QBS Request for Statement of Interest (SOI) On Call Appraisal Services The Kane County Division of Transportation is in need of professional services from an appraisal firm to provide appraisals for

More information

Service Plan for Real Estate Services

Service Plan for Real Estate Services Service Plan for Real Estate Services 2018-2019 (2018) Capital Regional District Date submitted: September 30, 2017 Table of Contents 1 Overview... 1 1.1 Division & Service Summary... 1 1.2 Organization

More information

I N T R O D U C T I O N

I N T R O D U C T I O N I N T R O D U C T I O N Introduction I N T R O D U C T I O N PROJECT BACKGROUND The original Jackson Hole land surveys in the late 1800s ended at meander lines established at the outer banks of the Snake

More information

Locally Administered Projects Overview

Locally Administered Projects Overview Locally Administered Projects Overview Locally Administered Projects Overview What you will learn from this Presentation: Major Steps of administering a federal-aid project by a local government agency

More information

VIRGINIA CENTRAL REGION ITS ARCHITECTURE MAINTENANCE PLAN

VIRGINIA CENTRAL REGION ITS ARCHITECTURE MAINTENANCE PLAN VIRGINIA CENTRAL REGION ITS ARCHITECTURE MAINTENANCE PLAN Prepared for: Prepared by: June 30, 2009 Table of Contents 1 INTRODUCTION... 1 2 ARCHITECTURE MAINTENANCE DECISIONS... 1 2.1 Architecture Maintainer...

More information

2019 9% Competitive Housing Credit Application

2019 9% Competitive Housing Credit Application 2019 9% Competitive Housing Credit Application Application Checklist This checklist includes all the items from the CFA application and the LIHTC Addendum that are required for the 2019 9% Application

More information

Establishing a Wetland Bank in Minnesota

Establishing a Wetland Bank in Minnesota Establishing a Wetland Bank in Minnesota Updated February 1, 2018 This document provides a general summary of the key steps in establishing an individual wetland bank site within the state wetland banking

More information

Understand Exhibit A foundational info. Definition Update triggers Value to an airport Sponsor Where we ve been & where we re at today

Understand Exhibit A foundational info. Definition Update triggers Value to an airport Sponsor Where we ve been & where we re at today Pulling Together the Exhibit A Presented to: By: Date: 2017 Airports Fall Seminar Gina Mitchell, AICP November 30, 2016 Agenda Understand Exhibit A foundational info Definition Update triggers Value to

More information

The What, Why and How of Project Work Breakdown Structures (WBS)

The What, Why and How of Project Work Breakdown Structures (WBS) PM TUTORIAL The What, Why and How of Project Work Breakdown Structures (WBS) Purpose This document is a guide for understanding, preparing and using a Work Breakdown Structure (WBS) as a part of planning

More information

Anatomy Of An Appraisal

Anatomy Of An Appraisal Anatomy Of An Appraisal Leslie A. Fields The most important thing to know about an appraisal report is how to review and critique it. Leslie A. Fields a partner with the Law Firm of Faegre & Benson LLP,

More information

APPRAISAL MANAGEMENT COMPANY

APPRAISAL MANAGEMENT COMPANY APPRAISAL MANAGEMENT COMPANY STANDARDS OF GOOD PRACTICE IN APPRAISAL MANAGEMENT JANUARY 6, 2010 POST OFFICE BOX 1196 WEXFORD, PA 15090 (P) 724-934-1420 (F) 724-934-0057 (W) WWW.TAVMA.ORG APPRAISAL MANAGEMENT

More information

Re: FASB Exposure Draft, Proposed Statement of Financial Accounting Standards, "Business Combinations, a replacement of FASB Statement No.

Re: FASB Exposure Draft, Proposed Statement of Financial Accounting Standards, Business Combinations, a replacement of FASB Statement No. Letter of Comment No: lo%" File Reference: 1204-001 October 28, 2005 Mr. Robert Herz Chairman Financial Accounting Standards Board 40 I Merritt 7 P.O. Box 5116 Norwalk, CT 06856-5116 File Reference No.

More information

CENTRAL GOVERNMENT ACCOUNTING STANDARDS

CENTRAL GOVERNMENT ACCOUNTING STANDARDS CENTRAL GOVERNMENT ACCOUNTING STANDARDS NOVEMBER 2016 STANDARD 4 Requirements STANDARD 5 INTANGIBLE ASSETS INTRODUCTION... 75 I. CENTRAL GOVERNMENT S SPECIALISED ASSETS... 75 I.1. The collection of sovereign

More information

OPERATIONS MANUAL CHAPTER 3 ACQUISITION AND PROPERTY MANAGEMENT

OPERATIONS MANUAL CHAPTER 3 ACQUISITION AND PROPERTY MANAGEMENT OPERATIONS MANUAL CHAPTER 3 ACQUISITION AND PROPERTY MANAGEMENT REVISED NOVEMBER 14, 2016 TABLE OF CONTENTS Sec 1. Scope and Applicability... 3 Sec 2. Purpose of Property Management... 3 Sec 3. Definitions...

More information

EARLY LEARNING COALITION OF OSCEOLA COUNTY

EARLY LEARNING COALITION OF OSCEOLA COUNTY Page of 1 of 9 POLICY STATEMENT The Coalition shall adhere to Federal and state laws, regulations, and rules requiring the implementation of proper controls related to the management, maintenance, reporting,

More information

RSP-Initiated Sub-Agreement Process

RSP-Initiated Sub-Agreement Process Detailed Step-by-Step Description of the New Sub-Agreement Process RSP-Initiated Sub-Agreement Process Step 1. PI / Department prepares the proposal for submission 1. PI and staff prepare a project proposal

More information

2016 Resource - FG Fixed Assets 3/29/2016

2016 Resource - FG Fixed Assets 3/29/2016 On the Fixed Assets panel, select Maintenance and Asset Maintenance Entering Assets 1 Entering Assets The required fields to enter an asset on the Asset Maint screen are: Dept, Class, Asset #, Description,

More information

R/W PREQUALIFICATION ODOT, 3/14/2018 PROPERTY MAP SHEET

R/W PREQUALIFICATION ODOT, 3/14/2018 PROPERTY MAP SHEET R/W PREQUALIFICATION ODOT, 3/14/2018 3A Title Block 3B Sheet Heading 3C Station Limit Flags 3D Revision Block 3E Ownership Name and Number 3F Centerline Stationing 3G Proposed R/W and Pavement 3H Structures

More information

TEXAS GENERAL LAND OFFICE PROCUREMENT GUIDANCE FOR RECIPIENTS AND SUBRECIPIENTS UNDER 2 CFR PART 200 (UNIFORM RULES)

TEXAS GENERAL LAND OFFICE PROCUREMENT GUIDANCE FOR RECIPIENTS AND SUBRECIPIENTS UNDER 2 CFR PART 200 (UNIFORM RULES) TEXAS GENERAL LAND OFFICE COMMUNITY DEVELOPMENT & REVITALIZATION PROCUREMENT GUIDANCE FOR RECIPIENTS AND SUBRECIPIENTS UNDER 2 CFR PART 200 (UNIFORM RULES) This checklist will assist the Texas General

More information

The list below shows the errors that can occur during submission, as well as some details about each one.

The list below shows the errors that can occur during submission, as well as some details about each one. Identifying s Version: 1.5 Publish Date: 09/09/2013 When an appraisal is submitted to UCDP, the XML data will immediately be checked for errors. Some of these errors can cause the submission to fail, while

More information

Frequently Asked Questions From the Certification of R/W Training Sessions

Frequently Asked Questions From the Certification of R/W Training Sessions Frequently Asked Questions From the Certification of R/W Training Sessions 1. There are differences between appropriations of vacant land and appropriations of structures. What is a structure? A structure

More information

Due diligence - Hits & Misses. CA Rajesh S Shetty January 2018

Due diligence - Hits & Misses. CA Rajesh S Shetty January 2018 Due diligence - Hits & Misses CA Rajesh S Shetty January 2018 Contents Need of due diligence What is due diligence? Types of due diligence The process Focus areas Key benefits Limitations 2 Need of Due

More information

REQUEST FOR PROPOSALS Solicitation Number: RE AM

REQUEST FOR PROPOSALS Solicitation Number: RE AM REQUEST FOR PROPOSALS Solicitation Number: RE-16-001-AM REAL ESTATE PROPERTY ACQUISITION SERVICES Addendum 1 December 1, 2016 This Addendum provides responses to questions and changes to the RFP. I. Questions

More information

CALIFORNIA INSTITUTE OF TECHNOLOGY BUILDING AND LAND IMPROVEMENT CAPITALIZATION POLICY

CALIFORNIA INSTITUTE OF TECHNOLOGY BUILDING AND LAND IMPROVEMENT CAPITALIZATION POLICY THRESHOLD LIMITS: Generally, the dollar threshold for capitalizing buildings, land improvements and building improvements at California Institute of Technology (Caltech) is $100,000 per building or location.

More information

2018 SCCAI RESIDENTIAL SYMPOSIUM USPAP OF THE FUTURE. Paula Konikoff, JD, MAI, AI GRS

2018 SCCAI RESIDENTIAL SYMPOSIUM USPAP OF THE FUTURE. Paula Konikoff, JD, MAI, AI GRS USPAP OF THE FUTURE Paula Konikoff, JD, MAI, AI GRS WHERE WE ARE NOW 2 Joint task force for Improvement of USPAP Appraisal Institute and Appraisal Foundation develop USPAP Optimization Concept 3 When unnecessary

More information

Property Rights Acquisition and Mitigation Plan v.4

Property Rights Acquisition and Mitigation Plan v.4 DRAFT Property Rights Acquisition and Mitigation Plan v.4 ADA Accessible Version August 13, 2018 This is a draft Property Rights Acquisition and Mitigation Plan and the Diversion Authority requests MDNR

More information

CAPITAL ASSET POLICY

CAPITAL ASSET POLICY CAPITAL ASSET POLICY POLICY STATEMENT Morningside College, through each of its operating departments acquires and disposes of capital assets. Each department is responsible for following College procedures

More information

Table of Contents SECTION 1. Overview... ix. Schedule...xiii. Part 1. Origins of Eminent Domain

Table of Contents SECTION 1. Overview... ix. Schedule...xiii. Part 1. Origins of Eminent Domain Table of Contents Overview... ix Schedule...xiii SECTION 1 Part 1. Origins of Eminent Domain Preview Part 1... 1 Origins of Eminent Domain... 3 Definitions... 4 Sources of Eminent Domain Law... 6 Agencies

More information

DWR REAL ESTATE COORDINATION PLAN

DWR REAL ESTATE COORDINATION PLAN DWR REAL ESTATE COORDINATION PLAN Exhibit E DWR PROPERTY ACQUISTION PLAN EXHIBIT E Revised Date: 5 10 18 DWR PROPERTY ACQUISTION PLAN EXHIBIT E Revised Date: 5-10-2018 California WaterFix Real Estate Coordination

More information

The ecrv Submit application opens with the following important warning message on privacy:

The ecrv Submit application opens with the following important warning message on privacy: Submit Form Tabs Buyers and Sellers Property Sales Agreement Supplementary Submitter The ecrv form is a single Web-page form with entry fields, choices and selections in multiple tabs for submitting a

More information

Request for Proposals

Request for Proposals Request for Proposals On Call Right-of-Way and Easement Acquisition and Related Services Requested by: Charter Township of Shelby Department of Public Works 6333 23 Mile Road Shelby Township, MI 48316

More information

STANDARD DEVELOPER WORKS ENTRY ONTO THIRD PARTY PROPERTY SEPTEMBER 2016 VERSION: 1.0

STANDARD DEVELOPER WORKS ENTRY ONTO THIRD PARTY PROPERTY SEPTEMBER 2016 VERSION: 1.0 STANDARD DEVELOPER WORKS ENTRY ONTO THIRD PARTY PROPERTY SEPTEMBER 2016 VERSION: 1.0 TABLE OF CONTENTS Document Information... 3 Version History... 3 Summary of Changes in this Version... 3 Document Control...

More information

Table of Contents SECTION 1. Overview... ix. Schedule...xiii. Part 1. Origins of Eminent Domain

Table of Contents SECTION 1. Overview... ix. Schedule...xiii. Part 1. Origins of Eminent Domain Table of Contents Overview... ix Schedule...xiii SECTION 1 Part 1. Origins of Eminent Domain Preview Part 1... 1 Origins of Eminent Domain... 3 Definitions... 4 Sources of Eminent Domain Law... 5 Agencies

More information

2007/2008 H [ON-LINE REAL ESTATE MANAGEMENT SYSTEM PROPOSAL] Proposal for the final year project

2007/2008 H [ON-LINE REAL ESTATE MANAGEMENT SYSTEM PROPOSAL] Proposal for the final year project 2007/2008 H [ON-LINE REAL ESTATE MANAGEMENT SYSTEM PROPOSAL] Proposal for the final year project A proposal for On-line Real Estate Management System (Maintain advertising, purchasing, selling real estates)

More information

University Policy UNIVERSITY PROPERTY AND EQUIPMENT INVENTORY

University Policy UNIVERSITY PROPERTY AND EQUIPMENT INVENTORY University Policy 700.02 UNIVERSITY PROPERTY AND EQUIPMENT INVENTORY Responsible Administrator: Vice President of Administration Responsible Office: Auxiliary Services Originally Issued: September 2010

More information

NOTICE OF INTENT TO ACQUIRE AND GOOD FAITH OFFER

NOTICE OF INTENT TO ACQUIRE AND GOOD FAITH OFFER Rev. 01/2011 NOTICE OF INTENT TO ACQUIRE AND GOOD FAITH OFFER June 19, 2010 Mike A. Smith, unmarried 1234 Main Street Columnus, Ohio 43223 Re: FRA-123-3.45 Parcel Number: 4 Interest Acquired: WL THE NOTICE

More information

Fixed Asset Policy and Procedure Manual

Fixed Asset Policy and Procedure Manual UNIVERSITY OF OREGON Fixed Asset Policy and Procedure Manual Draft Rob Freytag, Brett Giles, Bob Swanson, Teri Rowe, Shereé Johnson, George Baiting, Jennifer Creighton Neiwert 4/22/2010 In compliance with

More information

FLORIDA DEPARTMENT OF TRANSPORTATION

FLORIDA DEPARTMENT OF TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 1 DATE: 5/15/2015 RE: BID/RFP #: ITN-DOT-15/16-1012BT BID/RFP TITLE: District Wide Appraisal and Appraisal Review Services OPENING DATE: June 22, 2015

More information

Resettlement Policy Framework

Resettlement Policy Framework Republic of Turkey Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework Background 1. The Second Renewable Energy and Energy Efficiency Project will fund private sector investments

More information

JOB DESCRIPTION MANAGEMENT EXCLUSION

JOB DESCRIPTION MANAGEMENT EXCLUSION 1. Position No. Various 2. Descriptive Working Title SENIOR DEVELOPMENT MANAGER JOB DESCRIPTION MANAGEMENT EXCLUSION 3. Present Classification Excluded Mgmt 4. Branch DEVELOPMENT AND ASSET 5. Department

More information

The Uniform Act. CDBG Disaster Recovery Regional Training Acquisition Rehabilitation Demolition Displacement August 2015

The Uniform Act. CDBG Disaster Recovery Regional Training Acquisition Rehabilitation Demolition Displacement August 2015 The Uniform Act CDBG Disaster Recovery Regional Training Acquisition Rehabilitation Demolition Displacement August 2015 Introductions Minnesota Wisconsin Illinois Indiana Michigan - Ohio Maureen Thurman,

More information

Preparing for the new ASC 842 Leasing Standard Challenges and Solutions. August 24, 2017

Preparing for the new ASC 842 Leasing Standard Challenges and Solutions. August 24, 2017 Preparing for the new ASC 842 Leasing Standard Challenges and Solutions August 24, 2017 Learning objectives Define leasing implications related to recently revised FASB standard Differentiate between new

More information

Internal Controls and Best Practices for Appraisal Departments

Internal Controls and Best Practices for Appraisal Departments CR Credit Risk Internal Controls and Best Practices for Appraisal Departments Since the credit crisis began in 2008, the regulators have made appraisal departments a major focus of bank examinations. How

More information

BLUEPRINT REAL ESTATE POLICY

BLUEPRINT REAL ESTATE POLICY DATE September 19,2007 TITLE BLUEPRINT REAL ESTATE POLICY ORG. AGENCY Blueprint Intergovernmental Agency APPROVED.01 STATEMENT OF POLICY The purpose of this administrative regulation is to establish a

More information

DESIGN BUILD PROJECTS

DESIGN BUILD PROJECTS DESIGN BUILD PROJECTS Michele Palicka FHWA Real Estate Specialist Troy Byers GDOT Asst. State R/W Administrator Agenda Federal Oversight on Design Build Projects State of Georgia Oversight on Design Build

More information

Implementing GASB s Lease Guidance

Implementing GASB s Lease Guidance The effective date of the Governmental Accounting Standards Board s (GASB) new lease guidance is drawing nearer. Private sector companies also have recently adopted significantly revised lease guidance;

More information

Neighborhood Stabilization Program Frequently Asked Questions

Neighborhood Stabilization Program Frequently Asked Questions Neighborhood Stabilization Program Frequently Asked Questions Q: Are the insurance requirements (in XVIII) uniform to all applicants, including the non-profits? Yes, the insurance requirements are required

More information

VIP SELLER PROGRAM. 146 Step System to get your home sold fast and for top dollar. Lisa Elly-Nicholson, Realtor. Keller Williams Realty Chesterfield

VIP SELLER PROGRAM. 146 Step System to get your home sold fast and for top dollar. Lisa Elly-Nicholson, Realtor. Keller Williams Realty Chesterfield 146 Step System to get your home sold fast and for top dollar Lisa Elly-Nicholson, Realtor Keller Williams Realty Chesterfield Cell: 636-227-9093 Office: 636-534-8100 Email: Lisa.Nicholson@kw.com Elly-NicholsonTeam.com

More information

MEMO. Hon. Carter Borden, Chair Gloucester County Board of Supervisors. Brenda G. Garton County Administrator. HMA Grants Coordinator

MEMO. Hon. Carter Borden, Chair Gloucester County Board of Supervisors. Brenda G. Garton County Administrator. HMA Grants Coordinator COMMONWEALTH OF VIRGINIA County of Gloucester FEMA Hazard Mitigation Program 6504 Main Street, P.O. Box 329 Gloucester, Virginia 23061-0329 Office: 804-693-1390 Cell: 804-832-2401 Fax: 804-693-0559 Michael

More information

FASB s 2013 Proposal on Accounting for Leases

FASB s 2013 Proposal on Accounting for Leases FASB s 2013 Proposal on Accounting for Leases Frequently Asked Questions September 2013 The project on lease accounting is a joint project of the FASB and the International Accounting Standards Board.

More information

Across-the-Fence Value and Hostage Occupancy Agreements

Across-the-Fence Value and Hostage Occupancy Agreements Across-the-Fence Value and Hostage Occupancy Agreements EUCI Conference: Electric Transmission Projects San Diego, California September 19, 2016 John T. Schmick Shenehon Company 2 What is the goal of valuation

More information

State Revolving Fund Loan Programs Guidance for Project Land Acquisition For SRF Financed Projects

State Revolving Fund Loan Programs Guidance for Project Land Acquisition For SRF Financed Projects Revised November 30, 2006 State Revolving Fund Loan Programs Guidance for Project Land Acquisition For SRF Financed Projects I. Introduction: If an SRF financed project requires access to or acquisition

More information

REAL ESTATE TOPICS JUNE 1, 2008 NEGOTIATING AND STRUCTURING JOINT VENTURE AND LLC AGREEMENTS

REAL ESTATE TOPICS JUNE 1, 2008 NEGOTIATING AND STRUCTURING JOINT VENTURE AND LLC AGREEMENTS BENNETT VALLEY LAW REAL ESTATE TOPICS JUNE 1, 2008 NEGOTIATING AND STRUCTURING JOINT VENTURE AND LLC AGREEMENTS Parties negotiate joint venture agreements in the spirit of optimism. Anxious to combine

More information

WHEN A PUBLIC AGENCY IS INTERESTED IN ACQUIRING AN EASEMENT

WHEN A PUBLIC AGENCY IS INTERESTED IN ACQUIRING AN EASEMENT Form 6-H When a Public Agency is interested in Acquiring an Easement Booklet WHEN A PUBLIC AGENCY IS INTERESTED IN ACQUIRING AN EASEMENT Introduction This booklet describes important features of the Uniform

More information

Appendix B. North Carolina Parks and Recreation Trust Fund. Submitting Requests for Reimbursement for Land Acquisition

Appendix B. North Carolina Parks and Recreation Trust Fund. Submitting Requests for Reimbursement for Land Acquisition Appendix B North Carolina Parks and Recreation Trust Fund Submitting Requests for Reimbursement for Land Acquisition 41 N. C. Parks and Recreation Trust Fund Reimbursement Request for Land Acquisition

More information

What/Who Determines that an Appraiser is Qualified in our Program?

What/Who Determines that an Appraiser is Qualified in our Program? What/Who Determines that an Appraiser is Qualified in our Program? Mike Jones, SR/WA, Maryland Certified General Appraiser Realty Specialist, FHWA Office of Real Estate Services Is it becoming tougher

More information

Mass Appraisal of Income-Producing Properties

Mass Appraisal of Income-Producing Properties Chapter 10 Mass Appraisal of Income-Producing Properties Whether valuing income-producing property or residential property, you can use similar information and methods for collecting and analyzing data

More information

Edison Electric Institute and American Gas Association New Lease Standard

Edison Electric Institute and American Gas Association New Lease Standard Edison Electric Institute and American Gas Association New Lease Standard May 16, 2016 Disclaimer The information contained herein is of a general nature and is not intended to address the circumstances

More information

RESIDENTIAL & COMMERCIAL PROPERTY MANAGEMENT

RESIDENTIAL & COMMERCIAL PROPERTY MANAGEMENT Property Management and Leasing RESIDENTIAL & COMMERCIAL PROPERTY MANAGEMENT Our philosophy is simple, we take care of your property as if it were our own! Providing a unique experience for our customers

More information

ASC 842 Lease Accounting Quantitative Disclosure Requirements for Tenants You Need to Know. AUTHOR: Michael Nichols, Chief Financial Officer

ASC 842 Lease Accounting Quantitative Disclosure Requirements for Tenants You Need to Know. AUTHOR: Michael Nichols, Chief Financial Officer ASC 842 Lease Accounting Quantitative Disclosure Requirements for Tenants You Need to Know AUTHOR: Michael Nichols, Chief Financial Officer The Current State of ASC 842 CURRENT IMPACT OF THE NEW FASB REGULATIONS

More information

December 13, delivery: To: Subject: File Reference No

December 13, delivery: To: Subject: File Reference No Email delivery: To: director@fasb.org Subject: File Reference No. Technical Director File Reference No. Financial Accounting Standards Board 401 Merritt 7 PO Box 5116 Norwalk, CT 06856-5116 Ladies and

More information

DATE: June 25, 2014 TO:

DATE: June 25, 2014 TO: DATE: June 25, 2014 TO: Board of Commissioners FROM: Patrick Quinton, Executive Director SUBJECT: Report Number 14-25 Authorizing the Executive Director to Execute a Purchase and Sale Agreement Granting

More information

CHECKLIST Sale & Purchase of Business

CHECKLIST Sale & Purchase of Business CHECKLIST Sale & Purchase of Business Buying a business isn t as easy as it sounds. Whether you re buying or selling, make sure you deal with these essential tasks. Our team of commercial lawyers have

More information

Residential MANAGING BROKER APPLIED PRACTICE COURSE TOOLKIT. component three

Residential MANAGING BROKER APPLIED PRACTICE COURSE TOOLKIT. component three Residential MANAGING BROKER APPLIED PRACTICE COURSE TOOLKIT component three DISCLAIMER The government has recently made some significant changes to the Real Estate Services Act, Regulations under the Act

More information

Asset. Capital Asset Management Module. Asset Lookup Form

Asset. Capital Asset Management Module. Asset Lookup Form Capital Asset Management Module Asset Under KFS Modules, Capital Asset Management, Reference, select the Lookup button in the Asset row. The next screen allows you to search the CAM system for assets that

More information

Welsh Government Housing Policy Regulation

Welsh Government Housing Policy Regulation www.cymru.gov.uk Welsh Government Housing Policy Regulation Regulatory Assessment Report August 2015 Welsh Government Regulatory Assessment The Welsh Ministers have powers under the Housing Act 1996 to

More information

Plan Presentation Guide SECTION 60. Chapter 3 RIGHT-OF-WAY SECTION PRESENTATION

Plan Presentation Guide SECTION 60. Chapter 3 RIGHT-OF-WAY SECTION PRESENTATION Chapter 3 RIGHT-OF-WAY SECTION PRESENTATION Right of Way plans are necessary for the acquisition of the required right of way and easements for projects. Proper representation of the right of way and easements

More information

AVA. Accredited Valuation Analyst - AVA Exam.

AVA. Accredited Valuation Analyst - AVA Exam. NACVA AVA Accredited Valuation Analyst - AVA Exam TYPE: DEMO http://www.examskey.com/ava.html Examskey NACVA AVA exam demo product is here for you to test the quality of the product. This NACVA AVA demo

More information

Facts on Metro Nashville s Development of a Hazard Mitigation Home Buyout Program in Response to the May 2010 Flood June 3, 2010

Facts on Metro Nashville s Development of a Hazard Mitigation Home Buyout Program in Response to the May 2010 Flood June 3, 2010 Facts on Metro Nashville s Development of a Hazard Mitigation Home Buyout Program in Response to the May 2010 Flood June 3, 2010 Summary: The Metropolitan Government of Nashville is currently working to

More information

Organizational Project Management

Organizational Project Management Organizational Project Management March 19, 2019 Lotfy Saleh: PMP, PgMP, PfMP, OPM3-CP, PMI-SP, PMI-RMP, PMI-ACP, PMI-PBA, CAPM TERMINOLOGIES Project Management Program Management Portfolio Management

More information

Meetinghouse Facilities Department Real Estate Acquisition Process Instructions - Meetinghouse

Meetinghouse Facilities Department Real Estate Acquisition Process Instructions - Meetinghouse Instructions: This document 1) for selected steps in the process, contains explanatory guidelines for the Real Estate Acquisition Process Instructions Meetinghouse and 2) may be adapted to the acquisition

More information

Pre-Listing Activities. Listing Appointment Presentation

Pre-Listing Activities. Listing Appointment Presentation The True Value of a Realtor: 184 Tasks Surveys show that many homeowners and homebuyers are not aware of the true value of a Realtor. Realtors perform the following 184 tasks, and while the list may differ

More information

Allegheny County Sanitary Authority REQUEST FOR QUALIFICATIONS. for

Allegheny County Sanitary Authority REQUEST FOR QUALIFICATIONS. for Allegheny County Sanitary Authority REQUEST FOR QUALIFICATIONS for PROPERTY AND RIGHT OF WAY ACQUISITION SERVICES CLEAN WATER PLAN CAPITAL PROJECT S-451 November 2017 1.0 INTRODUCTION ALCOSAN has agreed

More information

Audit Rent... 3 Calculate Rent... 3 Verify and Accept Rent... 4 Print Tenant Rent Report... 4 Print Revised Tenant Rent Report...

Audit Rent... 3 Calculate Rent... 3 Verify and Accept Rent... 4 Print Tenant Rent Report... 4 Print Revised Tenant Rent Report... Rent Calc Rent Calculation Tabs Prompt Tab... 1 Family Tab... 1 Income Tab... 1 Assets Tab... 1 Detail Tab... 2 Summary Tab... 2 History Tab... 2 Audit Tab... 2 Comments Tab... 2 Amounts Tab... 2 Control

More information

Special Purpose Properties. Special Valuation Considerations

Special Purpose Properties. Special Valuation Considerations Special Purpose Properties Special Valuation Considerations 2017 Case Study in Ottawa: New Automobile Dealership Many brand-specific specialties Cost: $4,000,000 (including land and a developer fee) Sales

More information

Leases make their way onto the balance sheet

Leases make their way onto the balance sheet February 2016 IFRS Practical Matters France Leases make their way onto the balance sheet Navigating the journey for a smooth landing What you need to know The IASB issued a new standard for leases that

More information

FASB Proposed Accounting Standards Update (Revised), Leases (Topic 842) and IASB Exposure Draft ED/2013/6, Leases

FASB Proposed Accounting Standards Update (Revised), Leases (Topic 842) and IASB Exposure Draft ED/2013/6, Leases September 13, 2013 Technical Director, File Reference No. International Accounting Standards Board Financial Accounting Standards Board 30 Cannon Street 401 Merritt 7 London, EC4M 6XH P.O. Box 5116 United

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name. Land Registry and Cadastre Modernization Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name. Land Registry and Cadastre Modernization Project Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name Land Registry and Cadastre Modernization Project Region EUROPE AND CENTRAL ASIA Sector Central government administration

More information