POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000
|
|
- Diana Hodges
- 6 years ago
- Views:
Transcription
1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LAO PDR: AGRICULTURAL DEVELOPMENT PROGRAM RP-59 POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS A. The Project November The Lao People's Democratic Republic (Lao PDR) is one of the poorest and least developed countries in East Asia. Rural poverty, found primarily in farming households who live at the subsistence level, is a major concern. At the same time, agriculture remains the major sector of the economy. Against this background, and based on discussions with the Government, the proposed project should be designed to initiate a program of investments and institutional capacity building needed to support agricultural growth, and thereby reduce rural poverty. A strong emphasis on community involvement and participation will be an integral feature of the proposed project. 2. Four provinces - Khammouane, Champasak, Saravane and Attapeu, all located in the southern half of the country - have been proposed by the Government, based on several criteria, for the project. Poverty is widespread in all four provinces; its incidence is particularly high in the latter two. Attapeu, to the extreme south, is difficult to reach, and is isolated due to the lack of good roads. 3. The magnitude of adverse impact from the Project is anticipated to be very marginal (based on available information, no land acquisition and involuntary resettlement is expected) as the infrastructure components will focus on rehabilitation of existing irrigation systems and access tracks and the construction of hand pumps and open wells. However, it is possible that during the course of implementation some land may need to be acquired and some compensation may need to be paid to project affected persons (PAPs). To adequately address the rehabilitation and compensation of the people who could possibly be affected by the acquisition of land under the Project, the Government of the Lao PDR and LADP has adopted this Policy Framework for Land Acquisition, Involuntary Resettlement and Rehabilitation of Project Affected Persons (the Resettlement Policy). It will be implemented by the respective units (e.g., Department of Irrigation for irrigation systems, Department of Transport and Communications for access tracks, and Department of Public Health for water supply) together with the Provincial Project Implementation Office under the coordination of the MAF National Project Office. B. Resettlement Policy 4. The Resettlement Policy will adopt the principles of previous resettlement policies prepared for Bank-assisted projects in the country. The principle objective of the Policy is to ensure that all (PAPs) will be compensated for their losses at replacement costand provided with rehabilitation measures to assist them to improve, or at least maintain, their pre-project living standards and income earning capacity. 1
2 5. The Policy lays down the principles and objectives, eligibility criteria of PAPs, entitlements/compensation, legal and institutional framework, modes of compensation and rehabilitation, peoples participation features and grievances procedures that will guide the compensation, resettlement and rehabilitation of the PAPs. C. Project Affected People 6. The project affected people (PAP) include the following persons to be identified by the baseline information collected for each of the sub-projects where there are land, property or asset acquisition: (a) (b) (c) (d) (e) persons whose houses and other structures are in part or in total affected (temporarily or permanently) by the project; persons whose agricultural/residential and commercial land is in part or in total affected (permanently or temporarily) by the project; persons whose businesses are affected in part or in total (temporarily or permanently) by the project; persons whose crops (annual and perennial) and trees are affected by the Project; and person whose other assets are affected by the project. D. Principles and Objectives 7. The principles outlined in the World Bank's Operational Directives 4.30 on Involuntary Resettlement have been adopted in preparing this Policy framework. In this regard the following principles and objectives would be applied: (a) Acquisition of land and other assets, and resettlement of people will be minimized as much as possible. (b) All PAPs are identified in the project impacted areas as of the date of thebaseline surveys (see paragraph 17). They are entitled to be provided with rehabilitation measures sufficient to assist them to improve or at least maintain their pre-project living standards, income earning capacity and production levels. Lack of legal rights to the assets lost will not bar the PAP from entitlement/compensation to such rehabilitation measures. (c) The rehabilitation measures to be provided are: (i) cash compensation at replacement cost without deduction for depreciation or salvage materials for houses and other structures; (ii) agricultural land for land of equal productive capacity acceptable to the PAP;I (iii) replacement of residential and commercial land of equal size acceptable to the PAP; (iv) and transfer and subsistence allowances. (d) Replacement residential and agricultural land will be as nearby as possible to the land that was lost, and acceptable to the PAP. "Agricultural land for land of equal productive capacity" means that the land provided as compensation should be able to produce the same or better yield the PAP was producing on his/her previous land. The production should be in the planting season inmediately following the land acquisition. It can be for a future period if transitional allowanc equal to the household's previous yield is provided to the PAP household while waiting for the land to get back to the same productivity as the previous land. 2
3 (e) Plans for acquisition of land and other assets and provision of rehabilitation measures will be carried out in consultation with the PAPs, to ensure minimal disturbance. (f) The compensation, resettlement and rehabilitation activities will be satisfactorily completed before a no objection from the World Bank will be provided for award of contract of civil works under each sub-project See section on Institutional Arrangements for responsibilities. (g) The sources of funding for the compensation and rehabilitation of PAPs will be funded as follows: compensation for productive, residential and commercial land will come from the village land through the approval of the Governor's Office; and cash compensation for structures, trees, crops, income loss and rehabilitation assistance will come from the provincial counterpart fund in the Project. (h) The MAF-National Project Office will see that institutional arrangements are in place to ensure effective and timely design, planning, consultation and implementation of the compensation program. E. Partial Resettlement Plan 8. In case where the impact of land and property acquisition by the each sub project 2 component are minor, a partial Resettlement Plan for each such project component will be prepared by the respective Provincial Project Implementation Office (PPIO) and submitted to the World Bank for its concurrence. 9. Each partial Resettlement Plan will include: (a) an inventory; (b) a socioeconomic survey; (c) detailed compensation and entitlement information; (d) payment and rehabilitation schedule; and (e) cost estimate and funding source. The forms are found in the attachments. The implementation arrangements are discussed in paragraph The partial Resettlement Plan will be implemented and compensation completed satisfactorily before an approval can be provided by the NPO for award of civil works contract under each sub-project. F. Full Resettlement Plans 11. In case where the impact of land and property acquisition by the each sub project component are significant3, a full Resettlement Action Plan for each sub project component will be prepared by the respective PPIO in accordance with the provisions of this Policy. The full plan will be submitted by the National Project Office (NPO) to the World Bank for its concurrence. 12. Each Plan will include: (a) an inventory; (b) a socioeconomic survey; (c) detailed compensation and entitlement information; (d) implementation and rehabilitation activities; (e) 2 Impacts are considered minor if no affected people are physically displaced and less than 10 % of their productive assets are lost. Impacts are considered significant if the following conditions apply: * the affected people are physically displaced and more than 10 % of a household's productive assets are lost; or * 200 or more people are affected for each sub-project (as per OD 4.30). 3
4 grievance procedures; (f) arrangements for monitoring and evaluation, (g) implementation schedule and; and (h) cost estimate and funding source. The implementation arrangements are discussed in paragraph The MAF-National Project Office will ensure that the compensation, resettlement and rehabilitation activities will be satisfactorily completed before a no objection from the World Bank will be provided for award of contract of civil works under each sub-project. 14. The sources of funding for compensation and rehabilitation of the PAPs will be funded as follows: compensation for productive, residential and commercial land will come from the village land through the approval of the Governor's Office; and cash compensation for structures, trees, crops, income loss and rehabilitation assistance will come from the provincial counterpart fund in the Project. See paragraph 17 for implementing arrangements. G. Village Investment for the Poor 15. The Project will have a community-driven development component known as Village Investment for the Poor (VIP). This component will have a menu which will include activities related primarily to agricultural production, livestock and livelihood activities. Should a VIP subproject be approved which requires land and/or property acquisition, this policy will apply and the cost will be borne by the proponent group and the village. H. Legal Framework 16. The legal context in Lao PDR has been changing rapidly over the last few years. A constitution was introduced in 1991, forestry and water resources laws in 1996, and land law in While they are subject to interpretation, the various legislative initiatives provide a legal foundation for the consideration of resettlement and compensation. The Constitution (August 14, 1991) Article 8: Article 22: All ethnic groups have the right to protect, preserve and promote their fine customs and culture. All acts of division and discrimination among ethnic groups are prohibited. Lao citizens are all equal before the law. On Forestry, No. 001 (October 11,1996) Article 7: Article 59: Individuals and organizations having received forest and forest land allocations from the State for their preservation and management shall be entitled to compensation and interest, such as the use of wood, gathering of forestry produce, etc. The forest and forestry operations management agencies include the Ministry of Agriculture and Forestry, the Provincial/Municipal Agriculture-Forestry Services, the District Agriculture-Forestry Offices and the Village administrative authorities. 4
5 On Water and Water Resources, No. 006 (October, 1996) Article 28: When resettlement is necessary from the area and vicinity of water sources development projects, project owners shall provide assistance in providing appropriate shelters and livelihoods for the resettled population. The funds used to finance resettlement assistance or compensation to the population shall be included in the projects' investment. Preservation of Cultural Heritage Notice No 943, implementing Article 19 of the Constitution of Lao PDR, Decrees No. 99, 174, 194 of the Prime Minister of Lao PDR (19 December 1992, 13 December 1993 and 12 November 1994 respectively) covers preservation of historic sites, traditional and artistic heritage, traditional architecture and places of worship (more than 50 years old). The regulations prohibit removal, destruction or alteration of these items without authorization of GOL. On Land, No. 001 (April 2, 1997) Article 5: Article 18: Article 21: Article 22: Article 63 Article 70: Article 71: The State protects the legal rights and benefits of those who have effectively received the right to use land including the right to transfer it. The district... may grant the right to use agricultural land within its administration... The State authorizes individuals to use forests lands (defoliated or degraded) not to exceed three hectares per one laborer in a family The district... may grant the right to use forest land within its administration... The right of an individual to use land shall terminate when the State takes back the land in the public interest. When it is necessary to use an individual's land in the public interest, the State must make appropriate compensation for damages. In determining damages, there must be a Committee comprised of representatives of interested parties to determine the value of the damages. I. Institutional Arrangements 17. The responsibility for implementing the Policy and Resettlement Plans are as follows: (a) The National Project Office (NPO) under the MAF has the overall responsibility for implementing the Policy and ensuring that all compensation, resettlement and rehabilitation activities are satisfactorily completed before providing approval for award of civil works contracts in the case of Partial Resettlement Plans or for submitting requests for no objection from the World Bank for award of civil works contracts in the case of full Resettlement Action Plans. 4 4 NPO will be assisted by World Bank staff in review and approval of Partial Resettlement Plans in the first year of the project after which it will take over the responsibility on its own. 5
6 (b) It will facilitate the discussions between the province and the Governor's Office regarding compensation for land acquired for the sub-projects. (c) It will monitor the PPIO's work to ensure that the activitiesare carried out in a satisfactory manner. (d) It will ensure that reports are submitted to the World Bank Office in Vientiane on a regular basis. (e) The Provincial Project implementation Office (PPIO) is responsible for obtaining all relevant completed PAP inventory and socio-economic surveys for the infrastructure subproject in its province. It will prepare the compensation package for PAPs according to the Project's Resettlement Policy and in cooperation with the appropriate provincial agencies and the Governor's Office. (f) It will send a copy of the completed forms (inventory, socio-economic survey and compensation information) to DAFO in the district. It will ensure that the compensation in land or in cash is available for the DAFO to pay the PAPs. (Refer to paragraph 7c for types of compensation). (g) It will monitor the proper implementation of DAFO regarding consultation with PAPs and the payment of compensation and other entitlements. (h) It is also responsible for organizing the orientation and training on this policy for the concemed DAFO staff and the Village Head so that they can carry out the Resettlement Plans, consultation with PAPs and implement the payment of compensation and other rehabilitation entitlement to PAPs in a timely manner and as agreed. (i) The DAFO, under the guidance of the PPIO is responsible for the following activities under the Resettlement Plans: information dissemination about the Project and the Resettlement Policy, consultation with PAPs, payment of compensation and other rehabilitation entitlements to PAPs in a timely manner. (j) It should report to the PPIO if there are any problems with the Resettlement Plans and implementation.. J. Entitlement/Compensation Policy 18. PAPs will be entitled to the following types of compensation and rehabilitation measures: (a) PAPs losing agricultural land and crops i) Compensation of lost agricultural land will be through provision of "land for land" arrangements of equal productive capacity of the lost land and satisfactory to the PAPs. ii) PAPs will be compensated for the loss of standing crops, fruits and trees at market price. iii) PAPs whose land is temporarily taken by the works under the Project will be compensated for their loss of income, standing crops and for the cost of soil 6
7 restoration and damaged infrastructure based on the temporarily impacted period. If this period is more than two years, the impact is to be permnanently considered. (b) PAPs losing residential land and structures i) The mechanism for compensating loss of residential land and structures will be: (1) the provision of replacement residential land of equivalent size, satisfactory to the PAPs; and (2) cash compensation reflecting full replacement cost of the structures, without deduction for depreciation or salvage materials. ii) If the impact on residential land and/or structure is minor, cash compensation at replacement cost acceptable to the PAP will be provided.5 iii) If the residential land and/or structure is partially affected by the Project and the remaining residential land is not sufficient to rebuilt the residential structure lost, then at the request of the PAP the entire residential land and structure will be acquired at full replacement cost, without depreciation. The threshold of insufficient remaining residential land is to be determined based on the consultation with PAPs. (c) PAPs losing commercial land, structures and business i) The mechanism for compensating loss of business will be: (I) the provision of alternative business or commercial site of equal size and accessibility to customers, satisfactory to the PAP; (2) cash compensation for lost business structure reflecting full replacement cost of the structures, without depreciation; and (3) cash compensation for the loss of income during the transition period. ii) PAPs will also be provided compensation at full replacement cost, without deduction for depreciation and salvage materials for any other fixed assets affected in part or in total by the Project. K. People's Participation 19. The PAPs will participate throughout the various stages of the planning and implementation of the partial or full Resettlement Plans. For these purposes and prior to the preparation of the Resettlement Plans, the PAP will be informed of the provisions of this Policy at public meetings held by the respective PPIO, DAFO and Village Committees. (See Annex 4 for Steps in Land/Property Acquisition and Compensation). 20. Each household PAP will be fully informed by the relevant DAFO and/or Village Committees of their entitlements/compensation and rehabilitation choices under the Resettlement Plans. After compensation, each PAP household will sign an acceptance letter 21. For the community driven development VIP sub-projects, the community proponent group will, if necessary, plan and decide among themselves how to deal with land and/or property acquisition based on the Policy. The Village Committee will be responsible for informing PAPs of the provisions of this Policy and to ensure that they are satisfied with the outcome. Minor impact on residential land is defined as less than 20% of the total residential land holding and the remaining area is not less than 200 m2. 7
8 22. Provincial monitoring will obtain feedback from PAPs to see if there has been compliance with Resettlement Policy. The World Bank team will also monitor these activities in its regular supervision missions during the period of project implementation; consultation with PAPs and beneficiaries will be conducted. L. Implementation Arrangements Implementation Schedule 23. A detailed implementation schedule of the various activities to be undertaken will be included in each Resettlement Plan. 24. Satisfactory payment of compensation and provision of other rehabilitation entitlements, and relocation if that be the case, will be completed before a no objection from the World Bank can be provided for award of civil works contract under each sub-project. Complaints and Grievances 25. Complaints and grievances related to any aspect of the Resettlement Plans, including the determined quantities and price of the lost assets, will be handled as follows: (a) As a first stage, PAPs will present their complaints and griwvances to the Village Committee, and the Committee will have to provide a written response to the PAP within fifteen calendar days of receiving the complaint. If the PAP is not satisfied with the decision of the village, the PAP may present the case to the DAFO within fifteen calendar days of receiving the written response from the Village Committee. The decision of the District should be rendered within fifteen calendar days of receipt of the PAP's appeal and if the PAP is not satisfied with the decision of district, the PAP may present the case to the PPIO and the same procedure as at the district level will be applied. (b) Another option, after the village and district appeals have been tried, is for the PAP to appeal to the representative of the National Assembly at the provincial level. This representative acts like an ombudsperson and can initiate results quickly. 26. PAPs will be exempted from all taxes, administrative and legal fees. Supervision, Monitoring and Evaluation 27. Implementation of the Resettlement Plans will be regularly supervised and monitored by the respective DAFO and PPIO. The findings will be recorded in quarterly reports to be fumished to NPO. The World Bank team will also monitor these activities in its regular supervision missions during the period of project implementation. M. Costs and Budget 28. Each Resettlement Plan will include detailed cost of compensation and other rehabilitation entitlements and relocation of PAPs, if that be the case, with a breakdown by agricultural land, residential land, business land, houses, other structures, businesses, other assets and cost for compensation or Resettlement Plan implementation. The cost estimates will make adequate provision for contingencies. 8
9 29. The Resettlement Plans will also include information on how the funds will flow and the compensation schedule. 30. It will clearly state from where the sources of fund will come. For the infrastructure components, compensation for productive, residential and commercial land will come from the village land through the approval of the Governor's Office. Cash compensation for structures, trees, crops, income loss and rehabilitation assistance will come from the provincial counterpart fund of the Project. 31. For VIP sub-projects, all compensation will be the responsibility of the proponent community group and the village. ANNEX 1. Steps in Land/Property Acquisition and Compensation FORMS: I. Inventory (Census) of Project Affected People 2. Socio-Economic Household Data of Project Affected People 3. Compensation/Entitlements of Project Affected People 9
10 ANNEX 1: STEPS IN LAND/PROPERTY ACQUISITION AND COMPENSATION For Each Sub-Project Involving Land and Property Acquisition Activity Responsible When Orientation and training the Compensation, Resettlement NPO and PPIO Introduction of Project and Rehabilitation policy and procedures will be provided to districts and communes 1. District works with villagers to select and prioritize development VDC, DDC and DAFO During planning period activities including infrastructure for construction and/or improvement 2. VDC consults and discuss potential land and structure VDC During planning period acquisition impact with affected head of household 3. Provincial and District engineers design infrastructure and Provincial and District During start of finalizes exact amount of land and structure to be affected Engineers implementation 4. Complete inventory and socio-economic survey of affected Provincial and District During start of households Engineers and DAFO implementation 5. Hold another consultation with affected households and agrees DAFO and VDC During start of on compensation and provide contact names and address for implementation grievance/complaints 6. Complete entitlement form and set schedule and funding PPIO and DAFO. During start of source for payment implementation 7. PPIO submits all completed forms to NPO for review PPIO Three months before award of contract for construction 8. NPO reviews and approves Partial Resettlement Plans and NPO Three months before submits full Resettlement Action Plan to World Bank award of contract for construction 9. World Bank reviews and approves Full Resettlement Action World Bank Three months before Plans award of contract for construction 10. PPIO pays cash compensation to affected households from PPIO One month before provincial budget for affected structures, trees, crops and award of contract for rehabilitation assistance. construction for Partial Village provides compensation for affected agricultural and and Full Resettlement roductive land from village land bank. Action Plans 11. World Bank provide 'no objection letter (NOL) for award of World Bank contract for construction work in the case of sub-projects with full RAP. VDC DDC DAFO PPIO NPO - Village Development Committee - District Development Committee - District Agriculture and Forestry Office - Provincial Project Implementation Office - National Project Office 10
11 Form I LAO PDR: AGRICULTURAL DEVELOPMENT PROJECT Inventory of Project Affected People Province: District: Village: Survey Name of Head No. of Total Land- Land to be Land Use Loss as Loss of No. of Household Persons holding of Acquired Type * % of Total Loss of Assets Loss of Crops Other Other Losses in Hhold Hhold-M 2 (M 2 ) Assets Structures Structures Area of Fruitrees Eg., permanent temporary residential land lost Type Paddy area Other graveyards, Residence Business Income (M2) (M2) lost and Number (M2) (Specify) wells, etc. (rented) Lost Loss (M2) (Type& No.) *Land Types are as follows (change land type as appropriate for the Dstrict): 1. Irrigated rice land 4. Forest land 7. Garden land 2. Rainfed rice land 5. Wasteland Dry land (foothills) for cultivation 6. Residential land
12 Form 2 Socio-Economic Household Data of Project Affected People LAO PDR: AGRICULTURAL DEVELOPMENT PROJECT Province:. District: Village: Name of Household Member Sex A Ethn Edti Occupation and EmEstimated Survey Address of (please put name of Head of Household first) ge mc ucation Sources of mployment Total Income No. Household up Income per Year (KIP) 12
13 Form 3 LAO PDR: AGRICULTURAL DEVELOPMENT PROJECT Entitlements of Project Affected People Province: District: Village: Name of Compensation for Land Compensation for Structures Compensation for Crops & Trees Compensation for Other Assets Survey Head of CmestofrLadand Losses No. Household (e.g., graveyards, wells, businesses, etc.) Quantity Unit Price Entitlement Quantity Unit Price Entitlement Quantity Unit Price Entitlement Quantity Unit Price Entitlement (M 2 ) (KIP per (KIP) (M 2 ) (KIP per (KIP) Unit (KIP) (KIP) Unit (KIP) (KIP) M 2 ) M 2 ). Total (KIP) 13
RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT
Village Roads Component on the GAUNGXI ROADS DEVELOPMENT II PROJECT in THE PEOPLE S REPUBLIC OF CHINA (PRC) Guangxi Comnications Department Nanning, PRC This report was prepared by the Borrower and is
More informationSocialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION
More informationLIVESTOCK WASTE MANAGEMENT IN EAST ASIA
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LIVESTOCK WASTE MANAGEMENT IN EAST ASIA Project preparation under the PDF-B grant RP337
More informationRP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PIP annex 9 - C of GEF Hai Basin Integrated Water and Environment Management Project
More informationPOLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT, AND REHABILITATION OF DISPLACED PERSONS
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP275 Socialist Republic of Vietnam Ministry of Transport and National Traffic Safety
More informationResettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project
Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project I. Introduction The overall length of the road network in Albania totals
More information(DRAFT) LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND
(DRAFT) Public Disclosure Authorized RP337 v2 LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND Public Disclosure Authorized Public
More informationVIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4. Vietnam: Trung Son Hydropower Project Transmission Line Component
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4 Vietnam: Transmission
More informationResettlement Policy Revised Vol. 3 METRO MANILA URBAN TRANSPORT INTEGRATED PROJECT POLICY FRAMEWORK FOR
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP47 Resettlement Policy Revised Vol. 3 METRO MANILA URBAN TRANSPORT INTEGRATED PROJECT
More informationRP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Summary of Land Acquisition Policy Framework JAMAICA: JM Hurricane Dean ERL Project RP607
More informationRESETTLEMENT POLICY FRAMEWORK (RPF)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized JANUARY 2013 Republic of Mozambique Mozambique Climate Resilience: Transforming Hydro-Meteorological
More informationDecree on State Land Lease or Concession
Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity ~~~~~~~~~~~~~ Prime Minister s Office No. 135/PM VCC, Date 25/05/2009 Decree on State Land Lease or Concession - Pursuant
More informationLAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PT PLN (Persero) INDONESIA POWER SECOND TRANSMISSION DEVELOPMENT PROJECT (IPTD-2) RP1232
More informationRepublic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency
More informationSummary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015
Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015 Vision Contribute to overall development of the nation and its citizens by creating conducive
More informationExpropriation. Recommended Policy Wordings (full): Lao National Land Policy. Context. Policy. Standard of Public Purpose
Expropriation Context Following from the goal of the National Land Policy, to promote and ensure a secure land tenure system that is transparent, effective, non-discriminative, equitable and just ; it
More informationREPUBLIC OF MACEDONIA
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REPUBLIC OF MACEDONIA Municipal Services Improvement Project (MSIP) LAND ACQUISITION
More informationRESSETTLEMENT POLICY FRAMEWORK
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Department of Water Resources and Land Improvement of the Kyrgyz Republic Project Implementation
More informationMARKETILED SMALLHOLDER
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GOVERNMENT OF THE REPUBLIC OF MOZAMBIQUE MINISTRY OF PLANNING AND DEVELOPMENT RP428 MARKETILED
More informationRESETTLEMENT ACTION PLAN
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIALIST REPUBLIC OF VIETNAM HO CHI MINH CITY PEOPLE S COMMITTEE INVESTMENT MANAGEMENT
More informationKoridori Srbije Corridor X Highway Project Land Acquisition and Resettlement Framework LARF
Land Acquisition and Resettlement Framework LARF Issue 1 June 2018 PREPARED BY Contents List of Abbreviations 2 Glossary 3 1 Introduction 7 1.1 Principles and Objectives 12 2 Gaps Between RS Legislation
More informationPAPUA NEW GUINEA. ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Additional Financing
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Additional Financing
More informationJAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK
JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK I. Introduction The Jamaica Social Investment Fund (JSIF) was established in 1996 under the Government of Jamaica s National
More informationSUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors.
SUMMARY LAND ACQUISITION PLAN Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the RURAL ROADS SECTOR I PROJECT in INDIA Ministry of Rural Development
More informationSCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS
SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS MINISTRY OF EDUCATION GOVERNMENT OF NEPAL August 2011 2 A. Introduction 1.
More informationCambodia Health Equity and Quality Improvement Project (H-EQIP) (P157291) Resettlement Policy Framework (RPF) (DRAFT)
Cambodia Health Equity and Quality Improvement Project (H-EQIP) (P157291) Resettlement Policy Framework (RPF) (DRAFT) Date: December 2, 2015 Contents 1. Introduction... 1 2. Project Description... 2 Project
More informationDhaka Water Supply and Sanitation Project
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VOL. 1 Dhaka Water Supply and Sanitation Project Resettlement Policy Framework Dhaka
More informationPAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Land Acquisition
More informationInstruction As regards the implementation of decree on state-owned land approval for lease or concession
Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity --------------------------- Instruction As regards the implementation of decree on state-owned land approval for lease or
More informationENTITLEMENT MATRIX. Gujarat State Highway Project - II. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ROADS AND BUILDINGS DEPARTMENT GOVERNMENT OF GUJARAT Gujarat State Highway Project -
More informationI U B Reddy The World Bank New Delhi, India
IAIA15 India s New Land Acquisition Act Right To Fair Compensation and Transparency in Land Acquisition and Rehabilitation and Resettlement Act, 2013 I U B Reddy The World Bank New Delhi, India Challenging
More informationDhaka Water Supply and Sanitation Project Resettlement Policy Framework
1. BACKGROUND Dhaka Water Supply and Sanitation Project Resettlement Policy Framework The Dhaka Water and Sewerage Authority (DWASA) currently supplies water to about 70% of the population of the Dhaka
More informationPRC: Fujian Soil Conservation and Rural Development II Project
Resettlement Monitoring Report Project Number: 33439-013 July 2012 PRC: Fujian Soil Conservation and Rural Development II Project Prepared by Research Institute of Agricultural Economy, Fujian Academy
More informationCOAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN. CMM and CBM Production for Power Generation
COAL MINE METHANE DEVELOPMENT PROJECT (SHANXI PROVINCE) RESETTLEMENT PLAN CMM and CBM Production for Power Generation Shanxi Jincheng Coal Mining Group Co., Ltd. September 2004 THIS IS NOT AN ADB BOARD
More informationBIOMASS-BASED DISTRICT HEATING PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Biomass-Based District Heating Project BIOMASS-BASED DISTRICT HEATING PROJECT Construction
More informationAzerbaijan Second National Water Supply and Sanitation Project (SNWSSP) Resettlement Policy Framework (RPF) Land Acquisition
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Azerbaijan Second National Water Supply and Sanitation Project (SNWSSP) Resettlement
More informationDECREE GENERAL PROVISIONS DETAILED REGULATIONS ON COMPENSATION, SUPPORT, AND RESETTLEMENT UPON LAND EXPROPRIATION BY THE STATE
THE GOVERNMENT -------- SOCIALIST REPUBLIC OF VIETNAM Independence Freedom - Happiness ---------------- No.: 47/2014/NĐ-CP Hanoi, May 15, 2014 DECREE REGULATIONS ON COMPENSATION, SUPPORT, AND RESETTLEMENT
More informationIn light of this objective, Global Witness is providing feedback on key sections of the 6 th draft of the national land policy:
Summary Global Witness submission on the 6 th draft of Myanmar s draft national land policy June 2015 After a welcome extension to public participation on the 5 th draft of the national land policy, in
More informationRESETTLEMENT POLICY FRAMEWORK
Ministry of Agriculture and Environmental Protection Directorate for Water Management 11070 Belgrade, Blvd. Umetnosti 2a ELEKTROPRIVREDA SRBIJE FLOODS EMERGENCY AND RECOVERY PROJECT (FERP) RESETTLEMENT
More informationKazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy Framework
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy
More informationAFG: Water Resources Development Investment Program Tranche 1- Construction of Northern Basin Development Main Canals
Due Diligence Report April 2013 AFG: Water Resources Development Investment Program Tranche 1- Construction of Northern Basin Development Main Canals Prepared by for the Ministry of Finance and the Asian
More informationResettlement Planning Document
Resettlement Planning Document June 2012 Pakistan: Sindh Cities Improvement Investment Program (SCIP) Prepared by North Sindh Urban Services Corporation Limited for the Asian Development Bank. PFR-2 Annex-11
More informationLegal Analysis of Memorandum of Understanding between the Government of Timor Leste and GTLeste Biotech. Legal issues concerning land and evictions
Legal Analysis of Memorandum of Understanding between the Government of Timor Leste and GTLeste Biotech Legal issues concerning land and evictions A Memorandum of Understanding (MOU) was signed between
More informationGreater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action
More informationRESETTLEMENT ACTION PLAN
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Mongolia Municipality of Ulaanbaatar city Community based infrastructure development
More informationSummary: Resettlement Action Plan for the Thwake Multi- Purpose Dam-Kenya
Summary: Resettlement Action Plan for the Thwake Multi- Purpose Dam-Kenya 1. Introduction and Background The proposed Thwake water supply and sanitation Dam is a project conceived and intended to be constructed
More informationSFG kv İzmir Substation Abbreviated Resettlement Action Plan (ARAP) Turkish Electricity Transmission Company. Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Turkish Electricity Transmission Company 380 kv İzmir Substation Abbreviated Resettlement
More informationRESETTLEMENT POLICY FRAMEWORK
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized HAI PHONG DEPARTMENT OF TRANSPORT RP1035 V. 3 PROJECT MANAGEMENT UNIT OF REGIONAL TRANSPORT
More informationALBANIA - VLORA BYPASS RESETTLEMENT ACTION PLAN REPORT
ALBANIA - VLORA BYPASS RESETTLEMENT ACTION PLAN REPORT February 2013 TABLE OF CONTENTS Page 1. INTRODUCTION AND SCOPE OF THE DOCUMENT 1 2. PROJECT DESCRIPTION 2 3. POLICY AND REGULATORY BACKGROUND 4 3.1.
More informationRP1313. AZERBAIJAN Health Sector Reform Project (HSRP) Resettlement Policy Framework (RPF) May 03, I. Project Background
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Project Background A. Country and Sector Context AZERBAIJAN Health Sector Reform Project
More informationTHE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP)
THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP) Resettlement Action Plan Update Report for the ARUSHA
More informationResettlement Planning Document
Resettlement Planning Document Land Acquisition and Resettlement Plan (LARP) for Mirishkor Subproject Document Stage: Final Project Number: UZB: 2208 July 2009 UZB: Kashkadarya and Navoi Rural Water Supply
More informationKYRGYZ REPUBLIC COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY THIRD RURAL WATER SUPPLY AND SANITATION PROJECT
SFG1940 REV KYRGYZ REPUBLIC COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY THIRD RURAL WATER SUPPLY AND SANITATION PROJECT RESETTLEMENT POLICY FRAMEWORK JUNE 2016 Public Disclosure Authorized Public Disclosure
More informationRP-24 VOL. 1 (Revised)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Department of Public Works and Highways National Roads Improvement and Management Program
More informationFRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATIONS OR WILLING BUYER/WILLING SELLER PROCESSES
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SCHOOL SECTOR REFORM PROGRAM (SSRP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY
More informationResettlement Compensation Framework Railway Corridor VIII - Eastern section
Republic of Macedonia February 2012 Resettlement Compensation Framework Railway Corridor VIII - Eastern section Contract No: C21196/EBSF-2010-07-101 Macedonian Railways: Feasibility Study for Corridor
More informationPOYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION
POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION RP762 v30 1. Information About Project Name &Location of Subproject Project Sponsor Project Cost Installed Generation
More informationResettlement Policy Framework
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ministry of Regional Development and Infrastructure of Georgia Roads Department of Georgia
More informationDRAFT EXECUTIVE SUMMARY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DRAFT EXECUTIVE SUMMARY IPUH - BANTAL (LINK 015.1) KABUPATEN MUKO-MUKO YEAR 2010 EXECUTIVE
More informationABBREVIATED RESETTLMENT PLAN LEZHA MUNICIPALITY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Background ABBREVIATED RESETTLMENT PLAN LEZHA MUNICIPALITY Abbreviated Resettlement
More informationMini-Thesis Siam University (International Master of Business Administration), Bangkok, Thailand 2015 CHAPTER IV
CHAPTER IV 4. Land Issues: 4.1 Land Ownership: In Vietnam, land cannot be owned either by individuals or by entities, whether they are Vietnamese or foreign. The Constitution provides that land is owned
More informationResettlement Policy Framework
Republic of Turkey Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework Background 1. The Second Renewable Energy and Energy Efficiency Project will fund private sector investments
More informationAndhra Pradesh Rural Roads Connectivity Project The Asian Infrastructure Investment Bank assisted
GOVERNMENT OF ANDHRA PRADESH PANCHAYAT RAJ ENGINEERING DEPARTEMNT The (RPF) July 2018 Samaj Vikas Development Support Organisation Table of Contents List of Acronyms... 3 Glossary of Resettlement & Rehabilitation
More informationSerbia Corridor X Highway Project E-75 and E-80. Resettlement Policy Framework. Final Version June 4, 2009
Public Disclosure Authorized Serbia Corridor X Highway Project E-75 and E-80 Resettlement Policy Framework RP789 rev Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
More informationLegislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011
Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 was introduced in the Lok Sabha by the Minister for Rural
More informationHALSEMA HIGHWAY RESETTLEMENT ACTION PLANI. National Roads Improvement and Management Program. November 1999
Public Disclosure Authorized National Roads Improvement and Management Program Public Disclosure Authorized Department of Public Works and Highways RP-24 VOL. 3 (Revised) World Bank Public Disclosure Authorized
More informationThe Bill is called the Land Acquisition, Rehabilitation and Resettlement Act, 2011
The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 was introduced in Lok Sabha on September 7, 2011. On December 17, 2012, during the winter session of Parliament, the government circulated
More informationSOCIAL ASSESSMENT OF BANGALORE METRO RAIL PROJECT LINE R6
SOCIAL ASSESSMENT OF BANGALORE METRO RAIL PROJECT LINE R6 1. Socio Economic Profile of the Project Area 1.1 General Profile Bangalore officially known as Bengaluru, is the capital of the Indian state of
More informationLand Acquisition and Compensation Plan. Lao PDR: Small Towns Water Supply and Sanitation Sector Project
Land Acquisition and Compensation Plan Lao PDR: Small Towns Water Supply and Sanitation Sector Project Songkhone July 2008 Prepared by: Lao Ministry of Public Works and Transport The Land Acquisition and
More informationDECREE PROVIDING FOR IMPLEMENTATION OF LAW ON LAND. The Government. Pursuant to the Law on Land dated 26 November 2003;
GOVERNMENT No. 181-2004-ND-CP SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness ------******------ Hanoi, 29 October 2004 DECREE PROVIDING FOR IMPLEMENTATION OF LAW ON LAND The Government
More informationLAND ACQUISITION FRAMEWORK
LAND ACQUISITION FRAMEWORK (This framework was prepared in accordance to the ADB requirements for preparing Resettlement Framework as described in the ADB Safeguards Policy Statement, 2009) Project Number:
More informationRESETTLEMENT POLICY FRAMEWORK FOR KENYA POWER PROJECTS
RESETTLEMENT POLICY FRAMEWORK FOR KENYA POWER PROJECTS REVISED SEPTEMBER - 2012 i EXECUTIVE SUMMARY The Kenya power and Lighting Company Ltd (KPLC) falls under the Ministry of Energy (MoE). KPLC, which
More informationLand Acquisition and Resettlement Plan Corrective Action Plan
Land Acquisition and Resettlement Plan Corrective Action Plan Faizabad Baharak Road Project Prepared in February 2018 Grant 0261/0262-AFG: Transport Network Development Investment Program Tranche 1 Prepared
More informationWorld Bank Loan. Hohhot-Zhangjiakou Rapid Railway. Resettlement Policy Framework
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized World Bank Loan Hohhot-Zhangjiakou Rapid Railway Resettlement Policy Framework The Foreign
More informationKEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA Jalan Pattimura No 20, Kebayoran Baru, Jakarta Selatan 12110
KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA Jalan Pattimura No 20, Kebayoran Baru, Jakarta Selatan 12110 LARP IMPLEMENTATION REPORT For Regional Roads Development Project West Kalimantan
More informationSubproject: Nhat Trai pumping station in Bac Ninh province
External Resettlement Monitoring Report Semi annual Report Mission 3 Octocber, 2013 VIE: STRENGTHENING WATER MANAGEMENT AND IRRIGATION SYSTEMS REHABILITATION PROJECT Subproject: Nhat Trai pumping station
More informationPrepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal
Tanahu Hydropower Project (RRP NEP 43281) Resettlement Framework October 2012 NEP: TANAHU HYDROPOWER PROJECT Prepared by Nepal Electricity Authority and Tanahu Hydropower Limited of the Government of Nepal
More informationISLAMIC REPUBLIC OF AFGHANISTAN. Ministry of Rural Rehabilitation and Development (MRRD) And. Independent Directorate of Local Governance (IDLG)
Public Disclosure Authorized SFG2396 Public Disclosure Authorized Public Disclosure Authorized ISLAMIC REPUBLIC OF AFGHANISTAN Ministry of Rural Rehabilitation and Development (MRRD) And Independent Directorate
More informationNational Land Use Policy
Government of the Republic of the Union of Myanmar National Land Use Policy (6 th Draft) 2015, May CONTENT Sr. Content Page 1. Introduction 1-2 2. Part-I Objectives and Basic Principles Chapter-I Objectives
More informationVietnam Land Administration - the Past, Recent and for the Future
Mr. Ton Gia Huyen, Former Director General of General Department of Land Administration and Mrs. Tran Thi Minh Ha, Director of International Relation Department, Ministry of Natural Resources and Environment,
More informationLaw on Expropriation
Law on Expropriation Chapter 1 General Provisions Article 1: This law aims to define an expropriation in the Kingdom of Cambodia by defining the principles, mechanisms, and procedures of expropriation,
More informationRP779. Community Driven Development Programme. RESETTLEMENT POLICY FRAMEWORK : National. January, Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP779 RÉPUBLIQUE DU CAMEROUN Paix Travail Patrie ----------- Ministère de l Economie,
More informationMUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK
BACKGROUND MUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK The objective of the above project is to support municipal development in a sustainable manner. To this end, the project will a) support
More informationFIG/FAO International Seminar on State and Public Land Management
FIG/FAO International Seminar on State and Public Land Management State Land Distribution for the Poor: State Land Identification, Mapping, Classification and Registration By Dr. Sareth Boramy Deputy General
More informationSOCIAL INVESTMENT AND LOCAL DEVELOPMENT PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Armenia SOCIAL INVESTMENT AND LOCAL DEVELOPMENT PROJECT RESETTLEMENT POLICY
More informationDA NANG QUANG NGAI EXPRESSWAY PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ministry of Transport Vietnam Expressway Corporation DA NANG QUANG NGAI EXPRESSWAY PROJECT
More informationMinerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175)
Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175) ARRANGEMENT OF REGULATIONS Regulations 1. Claims for compensation 2. Assessment of compensation 3. Compensation principles
More informationChittagong Water Supply Improvement and Sanitation Project. Resettlement Policy Framework
Chittagong Water Supply Improvement and Sanitation Project Resettlement Policy Framework Chittagong Water Supply & Sanitation Authority Government of Bangladesh February 2010 Table of Contents 1. BACKGROUND
More informationResettlement Policy Framework (RPF) for the Sustainable Rural Water and Sanitation Project
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Resettlement Policy Framework (RPF) for the Sustainable Rural Water and Sanitation Project
More informationNATIONAL LAND POLICY ON AGRICULTURE DEVELOPMENT
NATIONAL LAND POLICY ON AGRICULTURE DEVELOPMENT Prepared by: J.M.Kami Director of Land Use Coordination and Policy Presented by: NATIONAL LAND USE PLANNING COMMISSION Towards a New National Land Policy
More informationLand Acquisition and Resettlement Framework. Date: May 2016 Status: Update. FIJI: Transport Infrastructure Investment Sector Project
Land Acquisition and Resettlement Framework Date: May 2016 Status: Update FIJI: Transport Infrastructure Investment Sector Project CURRENCY EQUIVALENTS (as of August 2014) Fiji Dollar (FJD) FJD 1.00 =
More information4fri. rl F RP200 RESETTLEMENT POLICY FRAMEWORK (RPF) INTEGRATED COMMUNITY-BASED ECOSYSTEM MANAGEMENT PROJECT (ICEMA) NAMIBIA.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF ENVIRONMENT AND TOURISM REPUBLIC OF NAMIBIA RP200 INTEGRATED COMMUNITY-BASED
More informationNATIONAL GANGA RIVER BASIN AUTHORITY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL GANGA RIVER BASIN AUTHORITY (Ministry of Environment and Forests, Government
More informationLAND REFORM IN MALAWI
LAND REFORM IN MALAWI Presented at the Annual Meeting for FIG Commission 7 In Pretoria, South Africa, Held From 4 th 8 th November, 2002 by Daniel O. C. Gondwe 1.0 BACKGROUND Malawi is a landlocked country
More informationRural Reconstruction and Rehabilitation Sector Development Program
Government of Nepal Ministry of Local Development Department of Local Infrastructure Development & Agricultural Roads District Development Committee/District Technical Office Kavre Rural Reconstruction
More informationVOLUNTARY LAND DONATION FRAMEWORK
Community-Managed Irrigated Agriculture Sector Project Additional Financing (RRP NEP 33209) A. The Project and Context 1. Project Description VOLUNTARY LAND DONATION FRAMEWORK 1. The proposed Community
More informationLAO PEOPLE S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY. Concluding Report
LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY Concluding Report On JICA Region-Focused Training Course on Flood Hazard Mapping JFY 2006 From 29 th, October to 2 nd, December
More information2014 OFFICIAL GAZETTE
5 THE NATIONAL ASSEMBLY THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 65/2014/QH13 (*) Công Báo Nos 1169-1170 (29/12/2014) HOUSING LAW (*) Pursuant to the Constitution of the
More informationLand Administration and Management in Nepal" Krishna Raj B.C. Joint Secretary Ministry of Land Reform and Management Nepal
Land Administration and Management in Nepal" Krishna Raj B.C. Joint Secretary Ministry of Land Reform and Management Nepal Presentation Outline Country Context Current Situation Available Infrastructure
More informationSocial Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis:
Code No: 1.9 Social Screening and Impact Assessment for Sub Projects A. Sub Project Description: Proposed Activity Walkability and Parking Improvements Lotus Road Implementing Agency: Colombo Municipal