1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Textual Procurement Plan (This is ly a sample with the minimum ctent that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure the Bank s website in accordance with the guidelines. The initial procurement plan will cover the first 18 mths of the project and then updated annually or earlier as necessary). I. General 1. Bank s approval Date of the procurement Plan [Original: December 2015]: Revisi of decentralized PP by provinces, starting from Jan.2016 until now] 2. Date of General Procurement Notice: July Period covered by this procurement plan: from July 2017 to June 2019 II. Goods and Works and n-csulting services. 1. Prior Review Threshold: Procurement Decisis subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Risk Rating - High Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 3 milli All 2. NCB (Goods) Above US$ 1.5 milli All above threshold 3. ICB (Works) Above US$ 20 milli All 4. NCB (Works) Above US$ 5 milli All above threshold 5. Shopping for Works (below US$ Ne 200,000) 6. Shopping for Goods (below US$ Ne 100,000) 7. N-csulting services Above US$ 1.5 milli 2. Prequalificati. Bidders for _Not applicable_ shall be prequalified in accordance with the provisis of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Compents (as per paragraph of the Guidelines: not applicable 4. Reference to (if any) Project Operatial/Procurement Manual: Project Implementati Manual for World Bank Loan issued by the CPMU for VN-DRaSIP Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 02 NCB works packages may be subject to advance procurement 7. Summary of the Procurement Packages planned during the first 18 mths after project effectiveness ( including those that are subject to retroactive financing and advanced
2 procurement) [List the Packages which require Bank s prior review first and then the other packages] Ref. No. Descripti Summary of the ICB (Works) Summary of the ICB (Goods) Summary of the NCB (Works) Summary of the NCB (Goods) Summary of the ICB (N- Services) Estimated Cost US$ milli Packages Domest ic Prefere nce (yes/no) Review by Bank (Prior / ) Comments 0 0 No Prior No ICB Works ctracts expected 0 0 No N/A To be counted annual PP No Prior Only for Works ctracts at Highrisk estimated above US$ 5 milli 0 0 No N/A 0 0 No N/A In accordan ce with Bank Procedur e for Prior review threshold (riskbased) III. Selecti of s 1. Prior Review Threshold: Selecti decisis subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selecti and Employment of s: Selecti Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 0.5 milli QCBS, FBS, LCS packages above US$ 500, Single Source (Firms) Above US$ 0.5 milli SSS 3. Individual Above US$ 200,000 IC
3 2. Short list comprising entirely of natial csultants: Short list of csultants for services, estimated to cost less than $_300,000_equivalent per ctract, may comprise entirely of natial csultants in accordance with the provisis of paragraph 2.7 of the Guidelines. 3. Any Other Special Selecti Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable]: 06 QCBS packages may be subject to advance procurement and retroactive financing. 4. Csultancy Assignments with Selecti Methods and Time Schedule Ref. No. Descripti of Assignment Summary of number of ctracts that will be let under QCBS Summary of number of ctracts that will be let under other methods for firms Summary of number of ctracts with Individual s Estimated Cost US$ milli Packages Review by Bank (Prior / ) Comments Prior Prior review of QCBS ctracts above 0.5 milli per each CQS Prior/Po st Prior review of IC ctracts above 0.2 milli per each
4 Page 1 PROCUREMENT PLAN Vietnam : Vietnam Dam Rehabilitati and Safety Improvement Project General Informati Country: Vietnam Bank s Approval Date of the Original Procurement Plan: Revised Plan Date(s): (comma delineated, leave blank if n Project ID: P GPN Date: Project Name: Vietnam Dam Rehabilitati and Safety Improvement Project Loan / Credit No: Executing Agency(ies) Central Project Management Unit for DRSIP, Quang Ngai Province Project Management Unit for DRSIP, Khanh Hoa Province Project Management Unit for DRSIP, Binh Thuan Province Project Management Unit for DRSIP, Binh Dinh Province Project Management Unit of Cstructi Investment Works for Agriculture a WORKS Activity Reference No. / Loan / Credit Descripti No. Compent Review Type Method Market Approach Procurement Process Prequalificati Actual (Y/N) Amount (US$) Process Status Draft Prequalificati Documents Prequalificati Evaluati Report Draft Bidding Document / Justificati Specific Procurement Notice / Invitati Bidding Documents as Issued Proposal Submissi / Opening / Minutes Bid Evaluati Report and Recommendati for Award Signed Ctract Ctract Completi Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C1-QN-DL-W1 / The first NCB Works ctract for Dap Lang Reservoir Rehabilitati and Safety 778, Signed Improvement C1-BT-SQ-W-01 / This CW package comprises 03 lots, including: Lot 1: Spillway 2, estimated at USD 3,843,875; Lot 2: Main dam, auxiliary dam, cstructi road, management house, estimated at USD 2,937,848; Lot 3: Dan Sach Dam headworks; estimated at USD 986,456. C1-BT-SQ-W-03 / Dan Sach dam headworks Request for Bids Open - Natial 0.00 Canceled C1-BD-TB-W1 / Thach Ban reservoir rehabilitati and safety improvement. 871, Signed C1-LD-DT-W1 / Da Teh Dam Rehabiliti and Safety improverment (The first NCB package in Lam Dg 3,027, Implementati the first-year province) C1-TQ-NL2-W1 / Ngoi La 2 reservoir Rehabilitati and Safety improvement 1,518, Signed C1-HB-DT-W1 / Dai Thang Reservoir Rehabilitati and Safety Improvement (This is first NCB of the year subproject) C1-QB-PV-W1 / Rehabilitati and Safely Improvement of Phu Vinh (This is first NCB of the 0.00 Canceled year-1 subproject) C1-QB-GD1-W1 / Rehabilitati and Safely Improvement of Phu Vinh (Include: Build, insurance works and Supply and 2,876, Signed installati of SCADA) - This is first NCB of the year-1 subproject C1-QB-GD2-W2 / Rehabilitati and Safely Improvement of Thanh S and Vung Mo and Dap Request for Bids Open - Natial Lang (Phase 2) C1-QB-GD2-W3 / Rehabilitati and Safely Improvement of Lg Dai and Dg Su (Phase 2) Request for Bids Open - Natial C1-QB-GD2-W4 / Rehabilitati and Safely Improvement of Thach Trug and Dg Vat and Cay Bom and Buoi Roi Request for Bids Open - Natial (Phase 2)
5 Page 2 C2-MONRE-CW1 / Cstructi of water resources, hydro and meteorology mitoring statis in the Ca and Vu Request for Bids Open - Natial Gia - Thu B river basin C1-DAKNONG-W2 / Civil works: Repair 9 lakes, inclu ding 2 lots: Lot 1: 2 lakes i n Đắk R'lấp and Tuy Đức d Request for Bids Open - Natial istricts, estimated amount U S$ 1,089,000. Lot 2: 7 lakes in Đắk Glg district, estim ated amount US$ 3,267,000. C1-QN-KC-W1 / Khe Che reservoir rehabilitati and safety improvement Request for Bids Open - Natial C1-TH-DB-W1 / The first n cb work ctract for Rehabil Request for Bids Open - Natial itati and Safety Improvem ent of Đồng Bể Dam. 1,456, Signed C1-PT-B-W1 / Repairs and safety upgrades reservoirs Ban and Insurance of works. (The first NCB 483, Review package in Phu Tho - the first-year province). C1-DAKNONG-W1 / Civil works: Repair 9 lakes, Inclu ding 2 plots: Lot 1: 6 lakes in Đắk Mil district, estimate d amount US$ 2,719,200, Lo Request for Bids Open - Natial t 2: 3 lakes in Đắk Sg di strict, estimated amount US $ 1,812,800 (the first NCB c tract of first-year subproje ct) C1-GL-W2 / Repair 3 reser voirs, including 03 lots: Lot 1: Buôn Lưới Reservoir, esti mated cost US$ 493,000, Lot 2: Plei Tô Kôn Reservoir, e Request for Bids Open - Natial stimated cost US$ 309,000, Lot 3: Ia Năng and Làng M e Reservoir, estimated cost US$ 635,000 C1-GL-W1 / Repair 4 reser voirs, including 04 lots:lot 1 :Iaring,estimated cost US$1,3 70,000,Lot 2:Ayun Hạ,estima ted cost US$ 850,000,Lot 3: Request for Bids Open - Natial Ea Dreh,estimated cost US$ 210,000,Lot 4:Hà Tam, estim ated cost US$ 449,000 (The first NCB ctract of first-ye ar subproject) C1-NA-KG-W1 / The package includes 02 lots: Lot 1: Rehabilitati and upgrading Khe Gang Reservoir. Lot 2: Request for Bids Open - Natial Rehabilitati and upgrading Khe San Reservoir. The lots include work, equipment, insurance and general items. C1-LANGSON-W2 / Cstructi of 5 reservoirs: Bo Chug, Tham Sinh, Request for Bids Open - Natial Khau Pieu, Khuoi Man, Coc Lung C1-LANGSON-W1 / Cstructi of 5 reservoirs: Request for Bids Open - Natial Ban Cuom, Ba S, Ky Na, Khu Pinh, Phai Lug C1-SONLA-W1 / Civil work package - Rehabilitati and safety improvement of Bản Ỏ, Nog Chạy, Huổi Nhả - Khơ Mú, Xa Căn, Xum Lo, Bản Củ, Nà Bó Reservoirs
6 Page 3 C1-LAMDONG-W1 / Cstr ucti of 8 reservoirs: inter -reservoir Suối Đỉa - Cây X oài, Đạ Sa, R'Lôm, Ma Poh, Thanh Bạch, Hồ Số 4, Lộc Thắng, Đạ Bo B C1-QN-GD1-W3 / Repair and improve the safety of 04 water reservoirs. Including 02 lots: Lot 1: Hoc Khe, Ho Hieu. Lot 2: Request for Bids Open - Natial An Phg, Hoc Co C1-QN-GD1-W2 / Repair and improve the safety of 02 water reservoirs: Liet S, Cay Khe Request for Bids Open - Natial C1-QN-GD1-W1 / Repair and improve the safety of 04 water reservoirs. Request for Bids Open - Natial Including 02 lots: Lot 1: Go Lang, Hoc Bua. Lot 2: Lien Tri, Ho Da C1-QN-W1 / Rehabilitati and safety improvement of 0 6 reservoirs, divided into 03 lots, including: Lot 1: Đập Request for Bids Open - Natial Đá and Hố Lau reservoirs, Lot 2: Hóc Két and Hóc Bầ u reservoirs, Lot 3: Đồng N hơn and Hố Mây reservoirs. C1-QUANGTRI-W1 / Rehabilitati and Safely Improvement of Kinh M and Dap Hoi Reservoirs Request for Bids Open - Natial C1-QUANGTRI-W3 / Rehabilitati and Safely Improvement of Khe Mug Request for Bids Open - Natial and Km6 and Da Cua and Khom 7 and Tan Vinh Reservoirs C1-QUANGTRI-W2 / Rehabilitati and Safely Improvement of Duc Duc and Khe Na and Khom 2 and Co Kieng 2 and Tram Request for Bids Open - Natial Reservoirs C1-BT-TDA2-W-01 / Rehabil itati and Safety Improvem ent for 06 reservoirs, includi ng 03 lots: Lot 1: Đá Bạc, Cẩm Hang and Hộc Tám Reservoirs, Lot 2: Tà M a nd Tân Lập Reservoirs, Lot 3: Trà Tân Reservoir C1-KHANH HOA-W1 / Reh abilitati and Safety Impro vement for 04 reservoirs, div ided into 02 lots, icluding: L Request for Bids Open - Natial ot 1: Láng Nhớt and Cây s ung reservoirs, Lot 2: Đồng Bò and Đá Mài reservoirs C1-HB-GD2-W1 / Rehabilita ti and safety improvement of 5 reservoirs, divided into 2 lots, including: Lot 1: Đồn Request for Bids Open - Natial g Bến, Rả and Rộc Kháo reservoirs, Lot 2: Mền 1, M ền 2 reservoirs. C1-VINHPHUC-W1 / Rehab ilitati and safety improve ment of 8 reservoirs, divided into 3 lot, including: Lot 1: Bò Lạc reservoir, Lot 2: Su Request for Bids Open - Natial ối Sải, Đá Ngang and Khuô n reservoirs, Lot 3: Rừng V àu, Đá Bạc 2, Đồng Mồ an d Đa Mang reservoirs.
7 Page 4 C1-VINHPHUC-W2 / Rehab ilitati and safety improve ment of 3 reservoirs, divided into 3 lots, including: Lot 1: Vĩnh Thành reservoir, Lot 2: Request for Bids Open - Natial Tân Bình and Trại Trâu res ervoirs, Lot 3: Treatment of termite for reservoirs under subproject. C1-TTH-W1 / Rehabilitati and safety improvement of 03 reservoirs Including 02 Request for Bids Open - Natial lots: Lot 1: Phu Bai 2 reservoir-lot 2: Phu Nu and Cay Coi reservoir C1-TTH-W2 / Rehabilitati and safety improvement of 06 reservoirs Including 03 lots: Lot 1: Cua and Khe Request for Bids Open - Natial Rung reservoir-lot 2: Ka Tu and Ta Rinh reservoir-lot 3: Nam Lang and Ba Cua reservoir C1-YB-W1 / Cstructi 5 of reservoirs, divided into 2 lots, including: Lot 01: Tu Request for Bids Open - Natial Do, Chop Du reservoirs - Lot 02: Goc Nhoi, Khe Hoai, Hang Lu reservoirs C1-YB-W2 / Cstructi 5 of reservoirs, divided into 2 lots, including: Lot 01: Ng trug nghia lo, th 26-3 Request for Bids Open - Natial reservoirs - Lot 02: Lang At, Khe Hop, Khe Ngang reservoirs C1-YB-W3 / Cstructi 6 of reservoirs, divided into 3 lots, including: Lot 01: Khe Dua, Khe Vai reservoirs - Request for Bids Open - Natial Lot 02: Khe Chinh, Phu Nham reservoir - Lot 03: Tang An, Rog Đen reservoirs C1-BD-GD2-W1 / Cstructi of 03 reservoirs Request for Bids Open - Natial Cu Le, Lo M and Ho Cung C1-BD-GD2-W2 / Cstructi of 05 reservoirs (Including 2 lot: Lot 01: Hoc Request for Bids Open - Natial Tranh, Kim S and My Duc, lot 02: Da Ban, Giao Hoi) C1-BD-GD2-W3 / Cstructi of 05 reservoirs (Including 2 lot: Lot 01: An Tug, Nui Mieu and Request for Bids Open - Natial mitoring equipment, lot : Trinh Van, Suoi Run and Hung Lg) C1-LC-W1 / Rehabilitati and safety improvement of 6 reservoirs, divided into 2 lots, including: Lot 1: Ta Xin, Phg Niên and Pho rang reservoirs, Lot 2: Phu Request for Bids Open - Natial Nhuan, Sung Lang and Tan An reservoirs. C1-KONTUM-W1 / Rehabili tati and safety improveme nt of 04 reservoirs including Request for Bids Open - Natial Lot 1: Đăk Hơ Niêng, Đăk Tin reservoir- Lot 2: K T u Zốp, Thôn 9 reservoir. C1-KONTUM-W2 / Rehabili tati and safety improveme nt of 04 reservoirs and cs tructi of new 04 managem ent house including Lot 1: Request for Bids Open - Natial Ya Xăng, Đăk Ngót reservoi r- Lot 2: Đội 5, Cà Sâm re servoir- Lot 3: 04 Manageme nt house
8 Page 5 C1-KHANH HOA-W2 / Reh abilitati and Safety Impro vement for 04 reservoirs, div ided into 02 lots, icluding: L ot 1: Suối Trầu and Bến G he reservoirs, Lot 2: Suối L uồng and Suối Lớn reservoi rs C1-KONTUM-W3 / Rehabili tati and safety improveme nt of 06 reservoirs including Lot 1: C2, A1 đội 4 reservoi Request for Bids Open - Natial r- Lot 2: C3, C4 reservoir Lot 3: C3 (704), Ia Bang Th ượng reservoir. C1-QN-TDAGD2-W1 / Repair and improve the safety of 03 water Request for Bids Open - Natial reservoirs. Including 02 lots: Lot 1: Ong Tho, Hoc Cay Lot 2: S Rai C1-QN-TDAGD2-W2 / Repair and improve the safety of 05 water reservoirs. Including 02 lots: Request for Bids Open - Natial Lot 1: Hoc Mua, Pho Tinh, Tuyen Tung. Lot 2: Gia Hoi, Ho Vang. C1-QN-TDA2-W2 / Cstructi of 8 reservoirs: Sau Lang, Roc Cung, Da Trang, Roc Chay, Dg Do 1, Quat Dg, Chuc Bai S, Khe Tau C1-DL-TDAI-W1 / Rehabilit ati and safety improvemen t of 03 reservoirs in sub-pro ject 1 including Lot 1: Ea U Request for Bids Open - Natial y thượng reservoir- Lô 2: Đ ội 11, Buôn Dung II reservo ir. C1-DL-TDAI-W2 / Rehabilit ati and safety improvemen t of 07 reservoirs in sub-pro ject 1 including lot1: 725, C19 reservoir - Lot 2: Ea B Request for Bids Open - Natial lg Thượng, Ea Kmiên 3 r eservoir -Lot 3: Ea Nao Dar, Ea Ngách, Ea Brơ 2 reser voir C1-THAINGUYEN-W1 / C1- THAINGUYEN-W1 Cstructi of 06 reservoirs - Lot 1: Suoi Lanh, Ghenh Che (Estimate: 786,667 US$) Request for Bids Open - Natial - Lot 2: Na Tac, Khu Nanh (Estimate: 1,137, US$) - Lot 3: Ho Chuoi, Na Khao (Estimate: 1,142,222 US$) C2-THAINGUYEN-W2 / Cstructi of 04 reservoirs - Lot 1: Dam Chieu, Ben Dg (Estimate: 404,444 US$) Request for Bids Open - Natial Lot 2: Nui Che, Ho Coc (Estimate: 564,445 US$) C1-DL-TDAI-W3 / Treatment of termite for cstructi work under subproject I Request for Quotatis Open - Natial C3-THAINGUYEN-W3 / Termite treatment (Dam Chieu, Ben Dg, Nui Che, Ho Coc, Suoi Lanh, Ghenh Request for Quotatis Open - Natial Che, Khu Nanh reservoir) C1-HAGIANG-W2 / Rehabilitati and safety improvement of 4 reservoirs Request for Bids Open - Natial - Lot 1: Khuoi Pha, Tan Bang Lot 2: Coc Bo, Na Pg
9 Page 6 C1-HAGIANG-W1 / Rehabili tati and safety improveme nt of 10 reservoirs - Lot 1: Nam Vac, Thom L ug, Th Thia reservoirs - Lot 2: Na Tam, Th Lai, Thg Nhat, Thom Ta res ervoirs - Lot 3: Đội 1, Đoi 2, Trun g reservoir GOODS Activity Reference No. / Loan / Credit Descripti No. Compent Review Type Method Market Approach Procurement Process Prequalificati Actual (Y/N) Amount (US$) Process Status Draft Prequalificati Documents Prequalificati Evaluati Report Draft Bidding Document / Justificati Specific Procurement Notice / Invitati Bidding Documents as Issued Proposal Submissi / Opening / Minutes Bid Evaluati Report and Recommendati for Award Signed Ctract Ctract Completi Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C1-QB-PV-G2 / Supply and Installati of SCADA Request for Quotatis Open - Natial 0.00 Canceled C2-MONRE-GO2 / Procurement of equipments for mitoring rainfall in the Ca and Vu Gia - Thu Request for Bids Open - Natial B river basin C2-MONRE-GO1 / Procurement of equipments for mitoring water level, water discharge and water quality in the Ca and Vu Prior Request for Bids Open - Internatial Gia - Thu B river basin NON CONSULTING SERVICES Activity Reference No. / Loan / Credit Descripti No. Compent Review Type Method Market Approach Procurement Process Prequalificati Actual (Y/N) Amount (US$) Process Status Draft Prequalificati Documents Prequalificati Evaluati Report Draft Bidding Document / Justificati Specific Procurement Notice / Invitati Bidding Documents as Issued Proposal Submissi / Opening / Minutes Bid Evaluati Report and Recommendati for Award Signed Ctract Ctract Completi Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Loan / Credit Descripti No. Compent Review Type Method Market Approach Ctract Type Actual Amount (US$) Process Status Terms of Reference Expressi of Interest Notice Short List and Draft Request for Proposals Opening of Technical Request for Proposals as Issued Proposals / Minutes Evaluati of Technical Proposal Combined Evaluati Report and Draft Negotiated Ctract Signed Ctract Ctract Completi Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C2-MARD-CS1 / Support for database development Qualificati Selecti Open - Natial 0.00 Implementati C2-MARD-CS2 / Improving the legal framework for dam safety management Qualificati Selecti Open - Natial 0.00 Implementati C3-CPMU-CS1 / Project Implementati (PIC) Prior Quality And Cost- Open - Based Selecti Internatial 0.00 Review C1-QN-DL-CS1 / cstructi supervisi Qualificati Open - Natial 13, Signed csultants Selecti C1-KHANH HOA-CS1 / Envirmental and Social Csutant. Prior Qualificati Selecti Open - Natial 96, Signed C1-BT-SQ-CS-01 / Csulting services for investigatis, cstructi drawing design and cost Qualificati Selecti Open - Natial 0.00 Implementati estimate C3-CPMU-CS3 / Audit of financial statements for the first 3 years Qualificati Selecti Open - Natial 0.00 Implementati C1-CPMU-CS1 / Internatial Mitoring and Evaluati (M&E) csultant Prior Quality And Cost- Open - Based Selecti Internatial 1,313, Signed
10 Page 7 C3-CPMU-CS2 / Third party Independent Supervisi and Internal Prior Quality And Cost- Open - Based Selecti Internatial 1,366, Signed audit (ISC) C1-DL-TDA1-CS1 / Envirmental and Social Qualificati Selecti Open - Natial 0.00 Canceled C1-BD-GD2-CS1 / feasibility study report and dam safety report year - 2 of Binh Dinh province Dam Quality And Cost- Based Selecti Open - Natial 289, Completed rehabilitati and safety improvement project C1-LD-DT-CS1 / Cstructi Supervisi and Preparati of Emergency Preparedness Plan (EPP) Qualificati Selecti Open - Natial 0.00 Implementati C1-QN-GD1-CS1 / Csultancy service for preparati of feasibility study and dam safety report Qualificati Selecti Open - Natial 263, Signed C1-QN-GD1-CS3 / Report envirmental Iimpact assessment, envirmental and social impact assessment, resettlement Qualificati Selecti Open - Natial 111, Signed acti plan C1-GL-CS1 / for developing feasibility study and dam safety report Qualificati Selecti Open - Natial 0.00 Implementati C1-GL-CS2 / for developing social and envirmental safeguards reports Qualificati Selecti Open - Natial 0.00 Implementati C1-QN-CS1 / for developing feasibility Qualificati Open - Natial 278, Signed study and dam safety report Selecti C1-QN-CS2 / for developing social and Qualificati Open - Natial 85, Signed envirmental safeguards Selecti C1-LC-CS1 / for developing feasibility study Qualificati Open - Natial 112, Signed and dam safety report Selecti C1-LC-CS2 / for developing safeguards Qualificati Open - Natial 51, Signed reports Selecti C1-KONTUM-CS1 / Feasibility Study and Dam Safety Report Preparing Qualificati Selecti Open - Natial 228, Signed C1-HB-GD2-CS1 / for developing feasibility Study and Dam Safety Reports - Phase 2 Qualificati Selecti Open - Natial 0.00 Implementati C1-HB-GD2-CS2 / for developing envirmental and Social Safeguard Report - Phase 2 Qualificati Selecti Open - Natial 0.00 Implementati C1-BG-CS1 / for developing feasibility study and dam safety report Qualificati Selecti Open - Natial 0.00 Implementati C1-BG-CS2 / for developing social and envirmental safeguards reports Qualificati Selecti Open - Natial 0.00 Implementati
11 Page 8 C1-QB-PV-CS4 / for developing feasibility study and dam safety report of subproject: Improvement of Dam safety in Quang Qualificati Selecti Open - Natial 0.00 Canceled Binh Province (Phase 2) C1-QB-PV-CS03 / for Emergency Preparedness Plan of Phu Vinh (EPP) Qualificati Selecti Open - Natial 0.00 Canceled C1-QB-GD2-CS1 / services for Feasible Study report establishment Dam safety Qualificati Open - Natial 224, Signed of subproject: Improvement Selecti of Dam safety in Quang Binh province (Phase 2) C1-QB-GD2-CS2 / Envirmental and Social of subproject: Qualificati Open - Natial 96, Signed Improvement of Dam safety Selecti in Quang Binh province (Phase 2) C2-MONRE-CS4 / Development of real-time multi-reservoir operati scenarios in the Ca and Vu Qualificati Selecti Open - Natial 0.00 Implementati Gia - Thu B river basin C2-MONRE-CS1 / Survey and design for cstructi Qualificati Selecti Open - Natial 0.00 Implementati C2-MONRE-CS3 / Development of database, hydrology and hydraulic models to serve for the management of the multi- Quality And Cost- Open - Natial 0.00 Based Selecti Implementati reservoir operati in the Ca and Vu Gia- Thu B river basin C2-MONRE-CS2 / Development of maps river bed topography in the Ca and Vu Gia - Thu B Prior Quality And Cost- Open - Natial 0.00 Based Selecti Implementati river basin C1-PT-CS3 / services for Feasible Study report establishment Dam safety of subproject: Improvement of Dam safety Qualificati Selecti Open - Natial 0.00 Implementati in Phu Tho Province (Phase 2) C1-PT-CS2 / services report establishment social envirmental safety policies of subproject: Improvement of Dam safety Qualificati Selecti Open - Natial 0.00 Canceled in Phu Tho Province (Phase 2) C1-QUANGTRI-CS2 / Preparati of envirmental and social safeguards instruments. Qualificati Selecti Open - Natial 168, Completed C1-QB-CS3 / engineering design (phase 2) and Planning for Emergency Preparedness (EPP) of the subproject: Improving Dam Safety in Quang Binh Province Quality And Cost- Based Selecti Open - Natial 0.00 Canceled C1-DAKNONG-CS1 / Envirmental and Social Csutant Qualificati Selecti Open - Natial 85, Signed C1-DAKNONG-CS2 / Csulting services for survey, cstructi drawing design and cost estimate Qualificati Selecti Open - Natial 234, Signed
12 Page 9 C1-TTH-CS1 / for developing feasibility Qualificati Open - Natial 158, Signed study and dam safety report Selecti C1-TTH-CS2 / for developing social and Qualificati Open - Natial 69, Signed envirmental safeguards Selecti C1-PHUYEN-CS1 / Feasibility Study and Dam Safety Reports Preparing Qualificati Selecti Open - Natial 0.00 Implementati C1-QUANGTRI-CS1 / Preparati of feasibility study and dam safety reports for phase-2 dams. Qualificati Selecti Open - Natial 224, Completed C1-BD-GD2-CS2 / Tu van cac chinh sach an toan Qualificati Selecti Open - Natial 122, Signed C1-PT-B-CS1 / Csulting supervisi for cstructi works and installati of equiment Qualificati Selecti Open - Natial 12, Signed C1-DAKNONG-CS3 / Cstructi supervisi csultant Qualificati Selecti Open - Natial 0.00 Implementati C1-TQ-NL2-CS1 / Cstructi supervisi and Preparati of Emergency Preparedness Plan (EPP) Qualificati Selecti Open - Natial 0.00 Canceled C1-TQ-CS3 / Preparati of Emergency Preparedness Plan for 2 Projects (Subproject 1: Ngoi La 2 reservoir, Subproject 2: Trung Lg, Hai Mo, Khe Qualificati Open - Natial 194, Signed Thuyen, Cay Gao, Minh Selecti Cam, Na Vang, Ao Buc, Khuoi Thung, Hoang Khai, Na Heng, O Ro, Cay Dau and Nog Mo reservoir) VN-DRSIP MOIT CS- LCS / Project audit annually (2017, 2018, 2019, 2020, 2021) Qualificati Selecti Open - Natial 0.00 Implementati C1-THAINGUYEN-CS1 / Feasibility Study and Dam Safety Reports preparing csultant. Qualificati Selecti Open - Natial 0.00 Implementati C2-THAINGUYEN-CS2 / Envirmental and social safeguard reports preparing csultant. Qualificati Selecti Open - Natial 0.00 Implementati VN-DRSIP MOIT CS- CQS / service for assessment apply of standards and regulatis system in design, cstructi, operati and Qualificati Selecti Open - Natial 0.00 Canceled management of hydropower projects C1-GL-CS3 / to survey, prepare cstructi drawing design and cost estimates and to prepare Emergency Qualificati Selecti Open - Natial 0.00 Implementati Preparedness Plan (EPP) VN-DRSIP MOIT CS- QCBS / Improve standards and regulatis system for hydropower dams in periods Prior Quality And Cost- Open - Natial 0.00 Based Selecti Implementati of design, cstructi, operati and management C1-PHUYEN-CS2 / Envirmental and Social Qualificati Selecti Open - Natial 0.00 Implementati
13 Page 10 C1-TQ-NL2-CS2 / Supervisi csultant for Ngoi La 2 reservoir subproject Qualificati Selecti Open - Natial 30, Signed C1-DL-TDAII-CS2 / Feasibility Study and Dam Safety Reports preparing csultant, subproject phase Qualificati Selecti Open - Natial 0.00 Implementati II VN-DRSIP MOIT CS- CQS / Csulting Company for Project Mitoring and Evaluati (M&E) Qualificati Selecti Open - Natial 0.00 Implementati C1-VINHPHUC-CS1 / Envirmental and Social Csutant Qualificati Selecti Open - Natial 0.00 Implementati C1-VINHPHUC-CS2 / Survey, design cstructi drawing, cost estimates csultant Qualificati Selecti Open - Natial 0.00 Implementati C1-HB-GD3-CS1 / for developing feasibility Study and Dam Safety Reports - Phase 3 Qualificati Selecti Open - Natial 0.00 Implementati C1-HB-GD3-CS2 / Envirmental and Social -Phase 3 Qualificati Selecti Open - Natial 0.00 Implementati C1-TQ-GD2-CS1 / Feasibility study and dam safety reports preparing csultant (Subproject 2: Trung Lg, Hai Mo, Khe Thuyen, Cay Gao, Minh Cam, Na Vang, Ao Buc, Qualificati Selecti Open - Natial 218, Signed Khuoi Thung, Hoang Khai, Na Heng, O Ro, Cay Dau and Nog Mo reservoir) C1-TQ-GD2-CS2 / Envirmental and Social (Subproject 2: Trung Lg, Hai Mo, Khe Thuyen, Cay Gao, Minh Cam, Na Vang, Ao Buc, Qualificati Selecti Open - Natial 114, Signed Khuoi Thung, Hoang Khai, Na Heng, O Ro, Cay Dau and Nog Mo reservoir) C1-BK-CS1 / Csulting package of Feasibility Study and Dam Safety Report Qualificati Selecti Open - Natial 0.00 Implementati C1-BK-CS2 / Csulting package of Social and Social Envirmental Safety Reports Qualificati Selecti Open - Natial 0.00 Implementati C1-NT-CS04 / Envirmental and social safeguard reports preparing csultant Qualificati Selecti Open - Natial 0.00 Implementati C1-NT-CS05 / Cstructi supervisi csultancy package Qualificati Selecti Open - Natial 0.00 Implementati C1-LANGSON-CS1 / Csultati preparati of safety policy reports including: Envirmental Impact Assessment Report, Social Envirment Impact Assessment Report, Qualificati Selecti Open - Natial 0.00 Implementati Resettlement Acti Plan Report, Social Impact Assessment Report, ethnic minority development plan C1-LANGSON-CS2 / Csultancy of cstructi drawing design - total cost estimate Qualificati Selecti Open - Natial 0.00 Implementati
14 Page 11 C1-LANGSON-CS3 / Cstructi supervisi csultant Qualificati Selecti Open - Natial 0.00 Implementati C1-SONLA-CS1 / Cstructi supervisi, Emergency Preparedness Plan (EPP) Qualificati Selecti Open - Natial 0.00 Implementati C1-KONTUM-CS2 / Envirmental and Social Safeguard Documents Preparing Csutant Qualificati Selecti Open - Natial 72, Signed C1-PT-CS2-2 / services report establishment social envirmental safety policies of subproject: Improvement Qualificati Selecti Open - Natial 0.00 Implementati of Dam safety in Phu Tho Province (Phase 2) C1-LAMDONG-CS1 / Envirmental and Social Qualificati Selecti Open - Natial 0.00 Implementati C1-LAMDONG-CS2 / Csultancy of cstructi drawing design - total cost estimate + Emergency Preparedness Plan Qualificati Selecti Open - Natial 0.00 Implementati Preparati C1-LAMDONG-CS3 / Cstructi supervisi csultant Qualificati Selecti Open - Natial 0.00 Implementati C1-NB-CS1 / Csulting services for Feasibility Study and Dam Safety report Qualificati Selecti Open - Natial 0.00 Implementati C1-NB-CS2 / Envirmental and Social Safeguard Reports Preparing Qualificati Selecti Open - Natial 0.00 Implementati C1-NB-CS3 / Csultancy of cstructi drawing design - total cost estimate Qualificati Selecti Open - Natial 0.00 Implementati C1-DL-TDAI-CS4 / cstructi supervisi for sub-project 1 Qualificati Selecti Open - Natial 0.00 Implementati C1-KHANH HOA-CS2 / to survey, prepare cstructi drawing design and cost estimates Qualificati Selecti Open - Natial 0.00 Implementati C1-KHANH HOA-CS3 / to prepare Emergency Preparedness Plan (EPP) Qualificati Selecti Open - Natial 0.00 Implementati C1-BT-TDA2-CS-01 / for developing feasibility study and dam safety report for subproject Qualificati Selecti Open - Natial 0.00 Implementati C1-BT-TDA2-CS-02 / for developing social and envirmental safeguards reports for Qualificati Selecti Open - Natial 0.00 Implementati subproject 2 C1-BT-TDA2-CS-03 / to survey, prepare cstructi drawing design and cost estimates Qualificati Selecti Open - Natial 0.00 Implementati for subproject 2 C1-BT-TDA2-CS-04 / to cstructi supervisi for subproject 2 Qualificati Selecti Open - Natial 0.00 Implementati
15 Page 12 C1-QN-GD1-CS4 / Survey, design cstructi drawing and emergency respse planning csultant Qualificati Selecti Open - Natial 209, Signed C1-QN-GD1-CS5 / Cstructi, envirment and society supervisi csultant Qualificati Selecti Open - Natial 0.00 Implementati C1-QUANGTRI-CS3 / Csultancy cstructi drawing design, Operatial and Maintenance Plan (O&M), Emergency Qualificati Selecti Open - Natial 237, Signed Preparedness Plan (EPP) C1-QN-CS3 / Csultancy f or survey, cstructi drawi ng design and cost estimates for 06 reservoirs, including: Đập Đá, Hố Lau, Hóc Két, Qualificati Selecti Open - Natial 0.00 Implementati Hóc Bầu, Đồng Nhơn and Hố Mây Reservoirs. C1-QUANGTRI-CS4 / Csultancy service for cstructi supervisi and envirmental mitoring Qualificati Selecti Open - Natial 108, Signed C1-QN-CS4 / Csultancy f or prepare Emergency Prepa redness Plan (EPP) for 06 r eservoirs, including: Đập Đá, Hố Lau, Hóc Két, Hóc Bầu, Qualificati Selecti Open - Natial 0.00 Implementati Đồng Nhơn, Hố Mây reserv oirs C1-KONTUM-CS5 / Cstru cti supervisi csultant of 14 reservoirs C3, C4, Đội 5, Cà Sâm, Ia Bang Thượng,Đăk Hơ Niêng,K Tu Zốp, Đăk Tin, C2, A1 đội 4, Thô Qualificati Selecti Open - Natial 0.00 Implementati n 9, Ya Xăng, C3(704), Đăk Ngót and 04 management h ouse C1-VINHPHUC-CS3 / to cstructi supervisi Qualificati Selecti Open - Natial 0.00 Implementati C1-VINHPHUC-CS4 / to prepare Emergency Preparedness Plan. Qualificati Selecti Open - Natial 0.00 Implementati C1-TTH-CS4 / Csulting service for investigati, design of cstructi drawings, termite Qualificati Selecti Open - Natial 0.00 Implementati investigati and EPP C1-TTH-CS5 / Supervisi csultant Qualificati Selecti Open - Natial 0.00 Implementati C1-YB-CS6 / Survey, Preparati of termite treatment documents for all dams under Subproject Qualificati Selecti Open - Natial 0.00 Implementati C1-YB-CS7 / Cstructi Supervisi for all dams under Subproject Qualificati Selecti Open - Natial 0.00 Implementati C1-BD-GD2-CS3 / for surveying, cstructi drawing design and cost estimati for 10 reservoirs (Kim S, My Duc, Hoc Tranh, Hung Lg, Giao Hoi, Da Ban, Quality And Cost- Based Selecti Open - Natial 0.00 Canceled Suoi Run, Trinh Van, An Tug, Nui Mieu) and Emergency preparedness plan for 4 large reservoirs C1-BD-GD2-CS4 / for cstructi supervisi and equipment of 13 reservoirs Qualificati Selecti Open - Natial 0.00 Implementati
16 Page 13 C1-LC-CS3 / Csultancy of cstructi drawing design - total cost estimate: Sung Lang, Phu Nhuan, Tan An, Pho Rang, Phg Nien, Ta Qualificati Selecti Open - Natial 0.00 Implementati Xin reservoirs. C1-YB-CS5 / Csultancy fo r survey, cstructi drawi ng design, cost estimates of 16 reservoirs: Tặng An, Ro g Đen, Làng Át, Gốc Nhộ i, Khe Hoài, Hang Luồn, K he Vải, Khe dứa, Khe Hóp, Qualificati Selecti Open - Natial 0.00 Implementati Khe Ngang, Khe Chinh, Tự Do, Chóp Dù, Phù Nham, N ông trường Nghĩa Lộ, Thôn 26 C1-KONTUM-CS3 / Csult ing services for design of co nstructi drawings of 14 re servoirs C3, C4, Đội 5, Cà Sâm, Ia Bang Thượng,Đăk Hơ Niêng,K Tu Zốp,Đăk Qualificati Selecti Open - Natial 0.00 Implementati Tin, C2, A1 đội 4, Thôn 9, Ya Xăng, C3(704), Đăk Ngót and 04 management house C1-KONTUM-CS4 / Csulting services for Preparing of Emergency Preparedness Plan (EPP) of Qualificati Selecti Open - Natial 0.00 Implementati Ya Xăng reservoirs C1-DL-CS1 / Envirmental and Social Safeguard Reports Preparing Qualificati Selecti Open - Natial 0.00 Implementati C1-DL-TDAI-CS3 / Csulting services for Cstructi Drawing Designs and Cost Estimates Qualificati Selecti Open - Natial 0.00 Implementati for sub-project 1 C1-BD-GD2- CS3 / for surveying, cstructi drawing design and cost estimati for 10 reservoirs (Kim S, My Duc, Hoc Tranh, Hung Qualificati Open - Natial 213, Signed Lg, Giao Hoi, Da Ban, Selecti Suoi Run, Trinh Van, An Tug, Nui Mieu) and Emergency preparedness plan for 4 large reservoirs C1-QN-GD2-CS1 / Csultancy service for preparati of feasibility study and Dam safety check Qualificati Selecti Open - Natial 0.00 Implementati C1-QN-GD2-CS2 / Report envirmental Iimpact assessment, envirmental and social impact assessment, resettlement Qualificati Selecti Open - Natial 0.00 Implementati acti plan C1-QN-GD2-CS3 / Survey, design cstructi drawing, cost estimates csultant Qualificati Selecti Open - Natial 0.00 Implementati C1-QN-GD2-CS4 / Cstructi, envirment and society supervisi csultant Qualificati Selecti Open - Natial 0.00 Implementati C1-QN-GD2-CS5 / Independent audit csultant Qualificati Selecti Open - Natial 0.00 Implementati C1-HAGIANG-CS1 / Csul tant for cstructi drawin g design - total cost estimat e and Emergency Preparedn Qualificati Selecti Open - Natial 0.00 Implementati ess Plan for Đội 2 reservoir
17 Page 14 C1-NA-CS01 / Selecti of csultants for cstructi drawing design and cost esti mati of subproject 03 (13 reservoirs: D Hung, Ke Sa t, H Mat, Khe Dua, Khe Qualificati Selecti Open - Natial 0.00 Implementati Du, Ho Tuan, Hoc Nghet, T hanh Thủy, Ho 271, Ho 3/9, La Nga, Khe Dung) C3-THAINGUYEN-CS3 / for survey and ctructi drawing design - total cost estimate Qualificati Selecti Open - Natial 0.00 Implementati C4-THAINGUYEN-CS4 / for preparati of Emergency Preparedness Plan Qualificati Selecti Open - Natial 0.00 Implementati C1-HAGIANG-CS2 / Cstructi supervisi csultant (14 reservoir: Nam Vac, Na Tam, Th Lai, Thg Nhat, Thom Ta, Thom Lug, Th Thia, Qualificati Selecti Open - Natial 0.00 Implementati Đoi 1, Đoi 2, Trung, Khuoi Pha, Tan Bang, Coc Bo, Na Pg) C1-QB-GD2-CS3 / engineering design (phase 2) and Planning for Emergency Preparedness (EPP) of the subproject: Improving DAm Qualificati Selecti Open - Natial 0.00 Implementati safety in Quang Binh province INDIVIDUAL CONSULTANTS
Textual Procurement Plan
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Textual Procurement Plan (This is ly a sample with the minimum ctent that is required
More informationSample Procurement Plan
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Sample Procurement Plan 2. Bank s approval Date of the procurement Plan Original:
More informationPrior Review Thresholds
Public Disclosure Authorized Prior Review Thresholds I. Goods and Works and n-csulting services. Prior Review Threshold: Decisis subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines
More informationProcurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Procurement Plan Mozambique: P125120 - Greater Maputo Water Supply Expansi Project 1. Bank s approval Date
More informationProcurement Plan Governance and Policy Project for Federally Administered Tribal Areas (P156412)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Plan Governance and Policy Project for Federally Administered Tribal Areas (P156412) I. General 1. Bank s approval
More informationWATER AND SANITATION DEVELOPMENT PROJECT (WSDP) SUMMARY PROCUREMENT PLAN (first eighteen months)
WATER AND SANITATION DEVELOPMENT PROJECT (WSDP) SUMMARY PROCUREMENT PLAN (first eighteen mths) I. General The following procurement plan has been developed for project implementati during the first eighteen
More informationProcurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods
I. General Procurement Plan 1. Project Informati Country: Tanzania Project Name: Secd Water Sector Support Project (WSSP II) Project ID: P150361 2. Project Implementati Agency: Ministry of Water and Irrigati
More informationPROCUREMENT PLAN (Textual Part)
PROCUREMENT PLAN (Textual Part) Project informati: [country] [Project name] [P-number] Project Implementati agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this
More informationProcurement Plan. I. General
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan 2. Date of General Notice:
More informationProject: Rwanda Stunting Prevention and Reduction Project: P
Public Disclosure Authorized Procurement Plan Project: Rwanda Stunting Preventi and Reducti Project: P 164845. Project Implementati agency: Rwanda Biomedical Centre (RBC) Date of General Procurement Notice
More informationProcurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: To Be Initiated.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Procurement Plan 1. Bank s approval Date of the procurement Plan Original:
More informationYESSO 18 Months Procurement
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General YESSO 18 Mths Procurement 2. Bank s approval Date of the procurement Plan
More informationPROCUREMENT PLAN (Textual Part)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROCUREMENT PLAN (Textual Part) Project informati: Republic of Liberia Liberia Land Administrati
More informationPublic Disclosure Authorized
PROCUREMENT PLAN Project informati: Zambia: Mining and Envirment remediati and improvement Project [P154683] Project Implementati agency: Ministry of Mines and Mineral Development Date of the Plan: February
More informationProcurement Plan. I. General
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Procurement Plan 1. Bank s approval Date of the procurement Plan [Original: April 3, 2015]: Revisi 9 of
More informationPROCUREMENT PLAN (Textual Part)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project informati: Country: Bangladesh PROCUREMENT PLAN (Textual Part) Project name:
More information3 and above Less than 3 Less than 1 Recommended to advertise for 7 days for RFQ above 0.5
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Natial Electrificati Project (P152936) Detailed Plan I. General 1. Project informati:
More informationJhelum & Tawi Flood Recovery Project (Project ID: P154990) Procurement Summary
Public Disclosure Authorized I. General Jhelum & Tawi Flood Recovery Project (Project ID: P154990) Procurement Summary Public Disclosure Authorized 1. Project Informati : Project Name: Jhelum & Tawi Flood
More informationChương 7 KIẾN TRÚC MÁY TÍNH TIÊN TIẾN
Kiến trúc máy tính Nội dung giáo trình Chương 7 KIẾN TRÚC MÁY TÍNH TIÊN TIẾN Chương 1. Giới thiệu chung Chương 2. Hệ thống máy tính Chương 3. Số học máy tính Chương 4. Bộ xử lý trung tâm Chương 5. Bộ nhớ
More informationProcurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Procurement Plan 1. Bank s approval Date of the procurement Plan Original:
More informationGv.HVK 1 KIỂU DỮ LIỆU CÓ CẤU TRÚC
Gv.HVK 1 KIỂU DỮ LIỆU CÓ CẤU TRÚC 1. Trong ngôn ngữ lập trình Pascal, về mặt cú pháp câu lệnh nào sau đây là đúng? A. Type 1chieu=array[1..100] of char; B. Type 1chieu=array[1-100] of byte; C. Type mang1c=array(1..100)
More informationProcurement Plan. Prior Review Threshold (US$) 1. ICB and LIB (Goods) USD 3,000,000 All 2. NCB (Goods and Nonconsultant prior review by the bank
Public Disclosure Authorized I. General Procurement Plan Public Disclosure Authorized 1. Project information: Country: Mozambique Borrower: Government of Mozambique Project Name: Mining and Gas Technical
More informationSample Procurement Plan
Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only
More informationSample Procurement Plan
Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to
More informationSample Procurement Plan
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Sample Procurement Plan 1. Bank s approval Date of the procurement Plan Original:
More informationITAXA Building, M Level, 126 Nguyen Thi Minh Khai St., District 3, HO CHI MINH CITY, VIET NAM
Education Representatives Viet Nam ATS (Avenue to Success) Avenue to Success (ATS) Nhi Tran Telephone +84 8 39 333 266 ITAXA Building, M Level, 126 Nguyen Thi Minh Khai St., District 3, HO CHI MINH CITY,
More informationBài tập 4 C# Mục tiêu:
TRƯỜNG ĐH KỸ THUẬT CÔNG NGHỆ Khoa Công Nghệ Thông Tin Môn: Lập trình Windows Bài tập 4 C# Windows Form Application - Basic Mục tiêu: - Sử dụng Visual Studio.NET 2005 (hoặc 2008) tạo ứng dụng dạng Windows
More informationHỢP ĐỒNG MUA BÁN SALE CONTRACT Số / Ref. :../2017/
CỘNG HÒA XÃ HỘI CHỦ NGHĨA VIỆT NAM Độc lập Tự do Hạnh phúc ------------- HỢP ĐỒNG MUA BÁN SALE CONTRACT Số / Ref. :../2017/ Ngày / Date: / / - Căn cứ Luật thương mại năm 2005 / Pursuant to the Commercial
More informationSample Procurement Plan
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Sample Procurement Plan 1. Bank s approval Date of the procurement Plan Original:
More informationREPORT ON PROJECT STATUS AND DEVELOPMENT PROGRESS IN Respectfully submitted to: THE ANNUAL GENERAL MEETING OF SHAREHOLDERS
No. 11 VINGROUP JOINT STOCK COMPANY ----------- ---------- THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness ----------- ---------- Hanoi, 02 April 2015 REPORT ON PROJECT STATUS AND
More informationQuản lý phạm vi (Scope) Chương II
Quản lý phạm vi (Scope) Chương II 1. Quản lý phạm vi (Scope) là gì? 2. Khởi động dự án (Initiating project). Nội dung 3. Lập kế hoạch phạm vi (Planning) và Xác định phạm vi (Definition). 4. Kiểm tra phạm
More informationMô hình Mundell-Fleming
Mô hình Mundell-Fleming IS-LM-CM Small Open Economy Capital Mobility This model must be one of the most influential advances in macroeconomics in recent times. Economic Times It still serves as the default
More informationAn toàn Bảo mật thông tin (Mật mã cổ điển) Giáo viên: Phạm Nguyên Khang
An toàn Bảo mật thông tin (Mật mã cổ điển) Giáo viên: Phạm Nguyên Khang pnkhang@cit.ctu.edu.vn Nội dung Tổng quan về an toàn và bảo mật thông tin Các hệ mật mã cổ điển Mật mã thay thế Mật mã Ceasar Mật
More informationDRAGON HILL CITY HA LONG INTRODUCTION DRAGON HILL CITY INTRODUCTION FACILITIES SITE MAP UNIT FLOOR PLANS ABOUT N.H.O
Land of Prosperity N.H.O INTRODUCES HA LONG INTRODUCTION INTRODUCTION FACILITIES SITE MAP UNIT FLOOR PLANS ABOUT N.H.O 3 7 13 15 17 31 03 HA LONG INTRODUCTION HA LONG INTRODUCTION Ha Long Bay, the UNESCO
More informationSample Procurement Plan
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Sample Procurement Plan 1. Bank s approval Date of the procurement Plan Original:
More informationREPORT ON PROJECT IMPLEMENTATION IN 2011
VINCOM JOINT STOCK COMPANY (VINCOM JSC) ----------- ---------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness ----------- ---------- Hanoi, April 06 2012 REPORT ON PROJECT IMPLEMENTATION
More informationPROCUREMENT PLAN (P162086)
PROCUREMENT PLAN (P162086) Project informati: India, Jharkhand Jharkhand Power System Improvement Project Project Implementati agency: JHARKHAND URJA SANCHARAN NIGAM LIMITED (JUSNL) and JHARKHAND BIJLI
More informationBuhler Vietnam. 16-July Innovations for a better world.
Buhler Vietnam 16-July-2017 Innovations for a better world. Buhler in Vietnam Serving our customers in Vietnam since 1960 Until 1990 Q1 2012 Q4 2012 Q1 2013 Q2 2016 Q4 2016 Active in Vietnam since 1960
More informationỨNG DỤNG MÁY TOÀN ĐẠC ĐIỆN TỬ LEICA VIVA TS15 VÀ PHẦN MỀM GOCA ĐỂ TỰ ĐỘNG QUAN TRẮC BIẾN DẠNG TƯỜNG VÂY NHÀ CAO TẦNG
ỨNG DỤNG MÁY TOÀN ĐẠC ĐIỆN TỬ LEICA VIVA TS15 VÀ PHẦN MỀM GOCA ĐỂ TỰ ĐỘNG QUAN TRẮC BIẾN DẠNG TƯỜNG VÂY NHÀ CAO TẦNG ThS. TRẦN NGỌC ĐÔNG, KS. DIÊM CÔNG HUY Viện KHCN Xây dựng Tóm tắt: Bài báo trình bày
More informationMô hình Mundell-Fleming. IS-LM-CM Small Open Economy Capital Mobility
Mô hình Mundell-Fleming IS-LM-CM Small Open Economy Capital Mobility This model must be one of the most influential advances in macroeconomics in recent times. Economic Times It still serves as the default
More informationSample Procurement Plan
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Sample Procurement Plan 1. Bank s approval Date of the procurement Plan Original:
More informationCông ước STCW 78/95/2012 sữa ñổi bổ xung và công tác ñào tạo tiếng Anh
Công ước STCW 78/95/2012 sữa ñổi bổ xung và công tác ñào tạo tiếng Anh hàng hải Công ước STCW 78/95/2012 sữa ñổi bổ xung và công tác ñào tạo tiếng Anh hàng hải STCW và tiếng Anh hàng hải Giới thiệu Sự
More informationMINISTRY OF HEALTH Transforming Health Systems for Universal Care Project Project Procurement Plan Financial Year 2016/2017 IDA CREDIT No.
Public Disclosure Authorized MINISTRY OF HEALTH Transforming Health Systems for Universal Care Project Project Procurement Plan Financial Year 2016/2017 IDA CREDIT No. 5836-KE GFF Grant Agreement TF0A2561
More informationLEADVISORS TOWER. Render Images Area Schedule Specifications Floor Plan PHAM VAN DONG, BAC TU LIEM, HANOI. Exclusive Leasing Agent
LEADVISORS TOWER PHAM VAN DONG, BAC TU LIEM, HANOI Render Images Area Schedule Specifications Floor Plan Exclusive Leasing Agent BUILDING PERSP E CT I VE LOBBY LIFT LOBBY COMMON AREA ALLEY 234 HQV VO CHI
More informationGIẢI PHÁP QUẢN LÝ DỊCH VỤ CNTT TỔNG QUAN
GIẢI PHÁP QUẢN LÝ DỊCH VỤ CNTT TỔNG QUAN "Các nhà cung cấp các dịch vụ IT cần hướng sự quan tâm đến chất lượng các dịch vụ do họ cung cấp và tập trung vào mối quan hệ với các khách hàng" Quản lý dịch vụ
More informationHướng dẫn sử dụng NukeViet 2.0
Hướng dẫn sử dụng NukeViet 2.0 A. Hướng dẫn sử dụng cpanel Tác giả: Nguyễn Hoàng Dũng Sevencd @ nukeviet.vn Email: SevenCD@gmail.com Website: http://lobs-ueh.net Trong phần này chúng tôi sẽ hướng dẫn các
More informationTAN VIET TIN (TVT) CONSTRUCTION CO., LTD. PROJECTS PRESENTATION
TAN VIET TIN (TVT) CONSTRUCTION CO., LTD. PROJECTS PRESENTATION GENERAL INFORMATION of TVT Const. Co., Ltd: Established and licensed on 19 February 2001 with Registration No. 0302227857, TVT now is in
More informationĐÀ NẴNG. Thành phố đáng sống. nhất thế giới Điểm du lịch mới hấp dẫn nhất hành tinh
ĐÀ NẴNG ơ Nguồn ảnh: Internet Thành phố đáng sống nhất thế giới Điểm du lịch mới hấp dẫn nhất hành tinh One of the world's best cities to live in Favorite holiday destination Tọa lạc trên con đường mang
More informationPhủ UV định hình theo màu in. Ép kim (vàng) Thúc nổi theo hình, ép kim (vàng)
Phủ UV theo họa tiết Phủ UV định hình theo màu in Ép kim (vàng) Thúc nổi theo hình, ép kim (vàng) ĐÀ NẴNG ơ Nguồn ảnh: Internet Thành phố đáng sống nhất thế giới Điểm du lịch mới hấp dẫn nhất hành tinh
More informationBEACH ACTIVITIES PRICE LIST
ACTIVITIES PRICE LIST BẢNG GIÁ HOẠT ĐỘNG THỂ THAO WATER SPORT DỤNG CỤ THỂ THAO JET SKI 700CC MÔ TÔ NƯỚC 700CC JET SKI 700CC MÔ TÔ NƯỚC 700CC JET SKI 700CC MÔ TÔ NƯỚC 700CC JET SKI 1100CC MÔ TÔ NƯỚC 1100CC
More informationSample Procurement Plan
Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only
More informationLý do cần tuần hoàn nước?
GIỚI THIỆU, THIẾT KẾ HỆ THỐNG LỌC SINH HỌC TUẦN HOÀN NƯỚC ThS. Đỗ Quang Tiền Vương Chương trình VIDATEC DHI Vietnam 1 Lý do cần tuần hoàn nước? Bảo tồn nước; Nuôi được mật độ cao với điều kiện hạn chế
More information2. Project Implementation Agency: National Bureau of Statistics. 3. Date of the Procurement Plan Approval: June 12, 2018
Public Disclosure Authorized Plan 1. Project Information Country: United Republic of Tanzania Project Name: Development Support for Tanzania Statistics / Support to Strengthen Statistics in Tanzania Project
More informationProcurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods
I. General Plan 1. Project Information Country: Tanzania Project Name: Second Water Sector Support Project (WSSP II) Project ID: P150361 2. Project Agency: Ministry of Water and Irrigation Dar es Salaam
More informationTHÔNG BÁO TUYỂN SINH ĐÀO TẠO TRÌNH ĐỘ THẠC SĨ NĂM đợt 1 (Địa chỉ trang web: sinh/saudaihoc)
ĐẠI HỌC QUỐC GIA TP.HCM TRƯỜNG ĐH KHOA HỌC TỰ NHIÊN CỘNG HÒA XÃ HỘI CHỦ NGHĨA VIỆT NAM Độc lập Tự do Hạnh phúc Số: 278 /KHTN-SĐH Tp. Hồ Chí Minh, ngày 02 tháng 3 năm 2018 THÔNG BÁO TUYỂN SINH ĐÀO TẠO TRÌNH
More informationORGANIZATION STRUCTURE
CENLAND IN MAJOR CITIES & PROVINCES IN VIETNAM AND ABROAD 4 CEN BAC NINH Address: Floor 9, VNPT Building, 33 Ly Thai To Street, Bac Ninh City 3 CEN VINH PHUC 16 CEN KOREA 6 CEN HA LONG ORGANIZATION STRUCTURE
More information2898 max. ĐH Bách Khoa TP.HCM 1. Phổ của trái đất (288 o K) Phổ điện từ của ánh sáng. Định luật Wien. Dãy phổ phát ra từ mặt trời
ĐH BÁCH KHOA TP.HCM Bài giảng: QUẢN LÝ VÀ SỬ DỤNG NĂNG LƯỢNG Chương 5: Quản lý và sử dụng hiệu quả năng lượng hệ thống chiếu sáng Chương 5: Quản lý và sử dụng hiệu quả năng lượng hệ thống chiếu sáng 1.
More information3Q 2017 ANALYST BRIEFING
3Q 2017 ANALYST BRIEFING November 10, 2017 Key Highlights 1 Business performance of 9M2017 1 1. Vingroup (trading code: VIC) reported that consolidated net revenue reached VND 57.2tn (+65% YoY), gross
More informationHVK Co., Ltd Posco E&C Viet Nam: Chắc nền tảng tài chính. Vững kinh nghiệm lâu bền.
THE EASTERN The Eastern 2 A SOLID FOUNDATION HVK Co., Ltd is a joint venture between Hung Viet Construction- Investment JSC and KRDF03. And KRDF (Korea Real-Estate Development Fund) is a real estate investment
More informationNGHIÊN CỨU PHÁT TRIỂN THƯƠNG MẠI ĐIỆN TỬ TRONG CÁC DOANH NGHIỆP DỊCH VỤ VÙNG KINH TẾ TRỌNG ĐIỂM MIỀN TRUNG
ĐẠI HỌC HUẾ TRƯỜNG ĐẠI HỌC KINH TẾ NGUYỄN XUÂN THỦY NGHIÊN CỨU PHÁT TRIỂN THƯƠNG MẠI ĐIỆN TỬ TRONG CÁC DOANH NGHIỆP DỊCH VỤ VÙNG KINH TẾ TRỌNG ĐIỂM MIỀN TRUNG LUẬN ÁN TIẾN SĨ QUẢN TRỊ KINH DOANH HUẾ -
More informationNguyên lý hệ điều hành. Các hệ thống lưu trữ. Cấu trúc đĩa. Lập lịch đĩa (1) Lập lịch đĩa (3) Lập lịch đĩa (2)
Nguyên lý hệ điều hành Nguyễn Hải Châu Khoa Công nghệ Thông tin Trường Đại học Công nghệ Các hệ thống lưu trữ Cấu trúc đĩa Lập lịch đĩa Quản lý đĩa Quản lý không gian swap Cấu trúc RAID... Cấu trúc đĩa
More informationConsultancy and Feasibility Reports
Consultancy and Feasibility Reports Breaking news Dong Nam International (DNI) is a member of the Southeast Appraisal and Consulting Corporation () which is a professional appraisal company, with 20 offies
More informationVINGROUP NEWSLETTER. 17 November. Investor & Analyst Update
VINGROUP NEWSLETTER 17 November 2016 Investor & Analyst Update Key Highlights 1. For the first nine months of 2016, the Group s consolidated net revenue reached VND34.7 trillion (+75% YoY), gross profit
More informationQUẢN TRỊ HỆ THỐNG GIAO THÔNG
QUẢN TRỊ HỆ THỐNG GIAO THÔNG Chủ tịch, Thạc sĩ : Đỗ Bá Dân Công ty CP Đầu tư phát triển công nghệ Trí Nam VIETNAM TRAFFIC IRAQ WAR VS ~12.000 người chết/năm ~15.000 người chết/năm Tham gia giao thông tại
More informationLÀM VIỆC THÔNG MINH TRONG NGÀNH BÁN LẺ
LÀM VIỆC THÔNG MINH TRONG NGÀNH BÁN LẺ LS Retail NAV 6.4 Giải pháp bán lẻ trên nền tảng Microsoft Dynamics NAV Đã được Kiểm chứng, Thử nghiệm và Khuyên dùng Điểm mạnh của Microsoft Dynamics NAV là có nền
More informationKHOA KINH TẾ BỘ MÔN THẨM ĐỊNH GIÁ LUẬT PHÁP BẤT ĐỘNG SẢN Ở ÚC
KHOA KINH TẾ BỘ MÔN THẨM ĐỊNH GIÁ LUẬT PHÁP BẤT ĐỘNG SẢN Ở ÚC Huỳnh Kiều Tiên Tháng 11, 2014 Lịch báo cáo dự kiến Buổi NÔI DUNG Thời gian (8h30-10h30) 1 Tổng quan về luật pháp BĐS ở Úc T5-13/11 2 Bất động
More informationVẤN ĐỀ LÝ LUẬN VỀ MÔ HÌNH QUẢN TRỊ CHI PHÍ SẢN XUẤT CAPACITY CỦA CAM-I
1. Đặt vấn đề VẤN ĐỀ LÝ LUẬN VỀ MÔ HÌNH QUẢN TRỊ CHI PHÍ SẢN XUẤT CAPACITY CỦA CAM-I ThS. Nguyễn Thị Thanh Vân Khoa Tài chính - Kế toán, Trường Đại học Đông Á TÓM TẮT Bài báo tiến hành phân tích phương
More informationHAGAR JOB DESCRIPTION HOUSE MOTHER (PART TIME)
HAGARJOBDESCRIPTION HOUSE MOTHER(PART TIME) HagarisaninternationalChristiannon governmentalorganizationcommittedtothe recoveryandeconomicempowermentofwomenandchildrenfromextreme disadvantagedbackgrounds;particularlyhumantrafficking,sexualexploitationand
More informationTHE PINNACLE OF CLASS
THE PINNACLE OF CLASS As if determined by natural law, the world s major metropolises such as New York, Tokyo, Seoul and Moscow all have spectacular rivers flowing through and embracing them. A river is
More informationTƯ LIỆU VỤ KIỆN GIỮA PHILIPPINES VÀ TRUNG QUỐC VỀ TRANH CHẤP BIỂN ĐÔNG TẠI TOÀ TRỌNG TÀI
TƯ LIỆU VỤ KIỆN GIỮA PHILIPPINES VÀ TRUNG QUỐC VỀ TRANH CHẤP BIỂN ĐÔNG TẠI TOÀ TRỌNG TÀI Dự án Đại Sự Ký Biển Đông giới thiệu https://daisukybiendong.wordpress.com/ Bộ tư liệu được thực hiện với sự hợp
More informationTÍNH TOÁN TẢI TRỌNG GIÓ TÁC DỤNG LÊN HỆ MẶT DỰNG KÍNH THEO TIÊU CHUẨN VIỆT NAM, HOA KỲ VÀ CHÂU ÂU
TÍNH TOÁN TẢI TRỌNG GIÓ TÁC DỤNG LÊN HỆ MẶT DỰNG KÍNH THEO TIÊU CHUẨN VIỆT NAM, HOA KỲ VÀ CHÂU ÂU ThS. NGUYỄN MẠNH CƯỜNG, ThS. ĐỖ HOÀNG LÂM, ThS. NGUYỄN HỒNG HẢI Viện KHCN Xây dựng TS. Đại úy. ĐẶNG SỸ
More informationBAG CAO TAI CHINH GILKA NIEN DO. 6 THANG OAU CUA NAM TA! CHINH KfiT THUC NGAY 31 THANG 12 NAM 2015
BAKER TILLY A&C CONG TY TNHH KIEM TOAN VA TU" VAN A&C A&C AUDITING AND CONSULTING CO., LTD. BAG CAO TAI CHINH GILKA NIEN DO 6 THANG OAU CUA NAM TA! CHINH KfiT THUC NGAY 31 THANG 12 NAM 2015 CONG TY CO
More informationTỔNG CỤC TIÊU CHUẨN ĐO LƯỜNG CHẤT LƯỢNG VIỆN NĂNG SUẤT VIỆT NAM
TỔNG CỤC TIÊU CHUẨN ĐO LƯỜNG CHẤT LƯỢNG VIỆN NĂNG SUẤT VIỆT NAM Bộ Công Thương, 09 tháng 12 năm 2016 Trình bày: Vũ Hồng Dân Trưởng phòng Tư vấn Cải tiến Năng suất, VNPI, Tổng cục TCĐLCL Nghiên cứu, kiến
More informationLE MERIEN DA NANG RESORT & SPA PROJECT
LE MERIEN DA NANG RESORT & SPA PROJECT . Introduction of the investor: Full Name: INVESTMENT CORPORATION SAIGON - DA NANG Transactions in foreign names: SAIGON - DA NANG INVESTMENT CORPORATION Abbreviation:
More informationHỌC VIỆN TÀI CHÍNH GIẢI PHÁP TÁI CẤU TRÚC TÀI CHÍNH CÁC DOANH NGHIỆP TRONG NGÀNH THÉP
BỘ GIÁO DỤC VÀ ĐÀO TẠO BỘ TÀI CHÍNH HỌC VIỆN TÀI CHÍNH ĐẶNG PHƯƠNG MAI GIẢI PHÁP TÁI CẤU TRÚC TÀI CHÍNH CÁC DOANH NGHIỆP TRONG NGÀNH THÉP Ở VIỆT NAM LUẬN ÁN TIẾN SĨ KINH TẾ HÀ NỘI - 2016 BỘ GIÁO DỤC VÀ
More informationĐỀ CƯƠNG CHI TIẾT HỌC PHẦN Lập trình Visual Basic.Net
HỌC VIỆN KỸ THUẬT QUÂN SỰ KHOA CNTT CỘNG HÒA XÃ HỘI CHỦ NGHĨA VIỆT NAM Độc lập Tự do Hạnh phúc 1. Thông tin về giáo viên ĐỀ CƯƠNG CHI TIẾT HỌC PHẦN Lập trình Visual Basic.Net TT Họ tên giáo viên Học Học
More informationĐÁNH GIÁ HIỆU QUẢ XỬ LÝ BỀ MẶT BẰNG CÔNG NGHỆ PLASMA TRÊN MÀNG NHỰA PP, PE, PVC
Tạp Chí Khoa Học Giáo Dục Kỹ Thuật Số 35B (3/2016 Trường Đại Học Sư Phạm Kỹ Thuật TP. Hồ Chí Minh 59 ĐÁNH GIÁ HIỆU QUẢ XỬ LÝ BỀ MẶT BẰNG CÔNG NGHỆ PLASMA TRÊN MÀNG NHỰA PP, PE, PVC EVALUATING THE EFFICIENCY
More informationVINGROUP NEWSLETTER. 17 August. Investor & Analyst Update
VINGROUP NEWSLETTER 17 August 2017 Investor & Analyst Update Key Highlights 1. In 1H2017, Vingroup s consolidated net revenue reached VND 35.3 trillion (+47% YoY), gross profit was VND 11.7 trillion, (+62%
More informationPHÂN TÍCH RỦI RO VỀ CHI PHÍ CỦA DỰ ÁN ĐẦU TƯ XÂY DỰNG TRONG GIAI ĐOẠN THI CÔNG RISK ANALYSIS FOR BUILDING PROJECT IN CONSTRUCTION PHASE
PHÂN TÍCH RỦI RO VỀ CHI PHÍ CỦA DỰ ÁN ĐẦU TƯ XÂY DỰNG TRONG GIAI ĐOẠN THI CÔNG RISK ANALYSIS FOR BUILDING PROJECT IN CONSTRUCTION PHASE Nguyễn Quốc Tuấn, Lưu Trường Văn* và Hồ Ngọc Phương** ADICO.Co, 1A/27
More informationNƠI CUỘC SỐNG. hăng hoa. Khu tổ hợp du lịch Sonasea Villas & Resort. Dương Tơ, Phú Quốc, Việt Nam.
NƠI CUỘC SỐNG T hăng hoa H o t l i n e 0979 709 088 0913 236 767 Khu tổ hợp du lịch Sonasea Villas & Resort Dương Tơ, Phú Quốc, Việt Nam www.sonasea.com.vn www.sonasea.com.vn NƠI CUỘC SỐNG Một sản phẩm
More informationPROCUREMENT PLAN (Textual Part)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project information: Country: Afghanistan PROCUREMENT PLAN (Textual Part) Project name:
More informationYarmouth County Registry of Deeds
Record Type Volume Dates Indexes Reel Index 1A 1774-1792 18776 not at Archives Index 2 1785-1817 18776 not at Archives Index 3 1817-1832 18776 not at Archives Index 4 1832-1846 18776 not at Archives Index
More informationETABS KIẾN THỨC SỬ DỤNG
KetcauSoft - Phát triển phần mềm thiết kế Kết cấu Việt Nam ETABS KIẾN THỨC SỬ DỤNG Được biên soạn bởi KetcauSoft - Phát triển phần mềm thiết kế Kết cấu Việt Nam Hà Nội - 2014 Hà Nội - 2014 1 LỜI MỞ ĐẦU
More informationQ MARKET INSIGHTS OFFICE SECTOR HANOI
Q4 215 MARKET INSIGHTS OFFICE SECTOR In 215, Vietnam has benefited from stability in the macroeconomic Gross Domestic Product (GDP) in Q4 215 increased 7.1 year on year (y-o-y), bringing the overall GDP
More information243fully-finished units
RichLane Residences is a premier residential tower that offers a preferred location for Work, Live and Play at the heart of the upmarket neighborhood District 7. It is situated within the vibrant Saigon
More information1.2 Vai trò của kế toán quản trị chi phí trong quản trị doanh nghiệp Mô hình lý thuyết cơ bản của kế toán quản trị chi phí 16
LỜI CAM ðoan Tôi xin cam ñoan ñây là công trình nghiên cứu của riêng tôi. Các số liệu trong luận án là trung thực. Những kết quả trong luận án chưa từng ñược công bố trong bất cứ một công trình nào khác.
More informationKẾ TOÁN QUẢN TRỊ CHI PHÍ MÔI TRƯỜNG TRONG CÁC DOANH NGHIỆP CHẾ BIẾN DẦU KHÍ THUỘC TẬP ĐOÀN DẦU KHÍ QUỐC GIA VIỆT NAM
BỘ GIÁO DỤC VÀ ĐÀO TẠO TRƢỜNG ĐẠI HỌC THƢƠNG MẠI ---------------------------------------- HOÀNG THỊ BÍCH NGỌC KẾ TOÁN QUẢN TRỊ CHI PHÍ MÔI TRƯỜNG TRONG CÁC DOANH NGHIỆP CHẾ BIẾN DẦU KHÍ THUỘC TẬP ĐOÀN
More informationINDIVIDUAL CONSULTANT PROCUREMENT NOTICE. for individual consultants and individual consultants assigned by consulting firms/institutions
Date: 26 September 2016 INDIVIDUAL CONSULTANT PROCUREMENT NOTICE for individual consultants and individual consultants assigned by consulting firms/institutions Country: Description of the assignment:
More informationTHE PINNACLE OF CLASS
04 05 THE PINNACLE OF CLASS As if determined by natural law, the world s major metropolises such as New York, Tokyo, Seoul and Moscow all have spectacular rivers flowing through and embracing them. A river
More informationReal Estate Market Report in May 2012
Real Estate Information Portal- CafeF Land Main Contents Macro Economy 2 CPI in May continues low rise Trade deficit returned, FDI attraction remains difficult 29 trillion VND bailout package on tax exemption
More informationTan Hung Investment Joint Stock Co.,
Tan Hung Investment Joint Stock Co., www.tanhungco.com www.hungdiennewtown.com Dale E. Washington Le Thi Giau Brief Introduction! Organization name: Tan Hung Investment Joint Stock Co.,! Head office: 11
More informationSinks & Taps
www.hafele.com.vn Sinks & Taps 2012 Excellent performance. 2 Made in Germany A principle for all of our SILGRANIT sinks. Top quality: intensive research and certified quality management guarantee top quality
More informationCompany Portfolio Wonder Technique Corporation
Company Portfolio Wonder Technique Corporation Add.: L5, 37A Phan Xich Long, W.3, Phu Nhuan dist., HCMC Tel : +84 (8) 39 95 40 91 - Fax : +84 (8) 39 95 42 91 Email : quan.nguyen@wonderscorp.com Website:
More informationChương 4. PHÂN TÍCH HỆ THỐNG: Mô hình luồng(dòng) dữ liệu
Chương 4 PHÂN TÍCH HỆ THỐNG: Mô hình luồng(dòng) dữ liệu 1 Các khái niệm Thiết kế mức khái niệm(conceptual design) Mô hình dữ liệu (Data models) Mô hình chức năng(functional Models) Mô hình dữ liệu(data
More informationDear friends, 2- Friday Nov 11, 2016: Gala diner at Khu du lịch Văn Thánh with live band, singers, dancing, soft drinks.
De : Bach Pham À : Van Envoyé le : Dimanche 18 septembre 2016 Objet : Retrouvailles JJR-MC in Vietnam 2016 Dear friends, This is finally the program we've
More informationPHƯƠNG PHÁP NGHIÊN CỨU. Lý thuyết & thực tiễn. Tháng 8/2016. Kantar Media
PHƯƠNG PHÁP NGHIÊN CỨU Lý thuyết & thực tiễn Tháng 8/2016 Kantar Media Bài 4 Nhập liệu Data entry/data punching Làm sạch dữ liệu & xử lý dữ liệu Data cleaning & data processing Lập bảng phân tích kết quả
More informationPROCUREMENT PLAN (Textual Part)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROCUREMENT PLAN (Textual Part) Project information: Democratic Republic Democratic of
More informationHIỆU LỰC PHÒNG CHỐNG MỐI CỦA GỖ SAU XỬ LÝ LẮNG ĐỌNG SILICA, DUNG DỊCH HỖN HỢP SILICAT VÀ BORIC AXIT
HIỆU LỰC PHÒNG CHỐNG MỐI CỦA GỖ SAU XỬ LÝ LẮNG ĐỌNG SILICA, DUNG DỊCH HỖN HỢP SILICAT VÀ BORIC AXIT Nguyễn Thị Bích Ngọc 1, Nguyễn Duy Vượng 2 TÓM TẮT Gỗ Bồ đề sau khi xử lý lắng đọng silica và dung dịch
More informationGEOTECHNICS FOR SUSTAINABLE INFRASTRUCTURE DEVELOPMENT
The 3 rd International Conference on GEOTECHNICS FOR SUSTAINABLE INFRASTRUCTURE DEVELOPMENT 24-25 November 2016, Hanoi, Vietnam 11 st ANNOUNCEMENT Introduction Originated from October 2011, the first international
More informationXây dựng lớp xử lý dữ liệu
Xây dựng lớp xử lý dữ liệu Bởi: Trung tâm tin học Đại học Khoa học tự nhiên HC< Xây dựng lớp xử lý dữ liệu Khi đọc đến phần này, chắc hẳn các bạn cũng đã thực hiện khá nhiều trang web: trang danh sách
More information