1 Malden River Ecosystem Restoration Detailed Project Report APPENDIX H REAL ESTATE REQUIREMENTS
2
3
4
5 April 2007 Malden River Ecosystem Restoration Real Estate Report 1. PURPOSE: The Detailed Project Report for the Malden River Ecosystem Restoration Study dated January 2007 was prepared by the U.S. Army Corps of Engineers, New England District (USACE) and the Mystic Valley Development Commission (MVDC), the local sponsor of the study. The Coastal Massachusetts Ecosystem Reconnaissance Study (CMERS), the initial authority for the investigation of the Malden River, was authorized by a resolution adopted by the Committee on Transportation and Infrastructure of the United States House of Representatives on 23 July The CMERS identified the restoration of the Malden River ecosystem as one of the ecosystem restoration areas that warranted a full feasibility study. 2. a. PROJECT AREA DESCRIPTION: The Malden River watershed, a Mystic River sub-basin, is approximately 11 square miles and is located in the towns of Wakefield, Stoneham, Melrose, Malden, Medford and Everett, Massachusetts. The Malden River originates from the outflow from Spot Pond in the Fells Reservation and passes beneath the cities of Melrose and Malden in channelized conveyances through much of the upper watershed. The river daylights from two sets of stormwater culverts south of Malden Center and flows for approximately 2 miles as open surface water through the densely populated cities of Malden, Everett and Medford prior to its confluence with the Mystic River, just upstream of the Amelia Earhart Dam. The Study Area is defined where it daylights from underground culverts in Malden to the confluence with the Mystic River with a lower downstream boundary at the Amelia Earhart Dam. Locus Map U.S.G.S. Quad Map H-1
6 April 2007 Malden River Ecosystem Restoration Real Estate Report 2 b. RECOMMENDED PLAN: The primary elements of the recommended National Ecosystem Restoration plan (Figure attached) were developed through the detailed evaluation of the Malden River ecosystem characteristics. The primary elements are as follows: Removal of 36,000 cubic yards of invasive species along 14.9 acres of the riverbank corridor and replanting with native wetland species; Creation of 5.4 acres of emergent wetland within the existing oxbow; Placement of 4,400 cubic yards of gravel/sand substrate to create 2.8 acres of fish spawning habitat; and Operational changes at the Amelia Earhart Dam to improve fish passage for anadromous species. The majority of the recommended restoration improvements are located within sub-areas 3, 4 and 5. These improvements involve wetland restoration, wetland creation and fish habitat restoration, which are highlighted below. The proposed work in sub-area 1 and 6 involves only fish habitat restoration. Wetland Restoration Fish Habitat Restoration with Work by Others Wetland Creation Wetland Restoration Fish Habitat Restoration 26 H-2
7 April 2007 Malden River Ecosystem Restoration Real Estate Report 2. c. OWNERSHIPS: The surrounding lands are owned by multiple property owners, including the city of Malden, the Mystic Valley Development Commission, and private individuals whom have been identified. Plans are being developed which will identify the required construction, staging, and disposal areas. 3. DESCRIPTION OF NON-FEDERAL SPONSOR S EXISITING OWNERSHIP: The ownership interest are referenced above and on attached excel spreadsheets. RECOMMENDED ESTATES: The effects of various wetland and sediment restoration alternatives were investigated for their impact on the acquisition of real estate to support the restoration alternatives. No real estate or real property improvements will be required for the proposed wetland restoration activities, based on the findings identified in the Detailed Project Report dated January However, land areas (Fee Simple Estate) will be needed to construct proposed wetland areas, and temporary construction easements (Estate Number 15) will be required for access and staging areas 4. EXISITING FEDERAL PROJECTS: Within the study area, an authorized Federal navigation project exists. Adopted in 1912 and modified in 1915, the River and Harbor Acts provided Malden River with a channel 6 feet deep and 100 to 150 feet wide extending approximately 1.5 miles from its confluence with the Mystic River to the Medford Street Bridge. 5. EXISTING FEDERAL OWNERSHIPS: There are no federally owned lands in the subject area. 6. NAVIGATION SERVITUDE: Navigational servitude does not apply. 7. REAL ESTATE MAPPING: Planning maps are attached as exhibits. 8. INDUCED FLOODING: No induced flooding is anticipated due to the proposed project. 9. BASELINE COST ESTIMATE: The cost estimate for the real estate required is the estimated value of the land required (Fee Simple Estate) and the temporary easements (two acres of land for two construction season) for the project, The estimated cost for the real estate, including administrative costs, is $500,000, based on land areas identified in the Detailed Project report dated March PUBLIC LAW RELOCATIONS: There are no potential Public Law relocations required in connection with this project. 36 H-3
8 April 2007 Malden River Ecosystem Restoration Real Estate Report 11. MINERAL/TIMBER ACTIVITIES: There is no present or anticipated mineral or timber harvesting activity in the vicinity of the project that may affect the operation thereof. 12. ASSESSMENT OF NON-FEDERAL SPONSOR S REAL ESTATE ACQUISITION CAPABILITIES: The Mystic Valley Development Commission is the local sponsor for this project. There is a need to acquire real estate for temporary and construction, staging purpose, monitoring and maintenance. A capability checklist has been executed with the local sponsor and is included as an attached exhibit. 13. ZONING CHANGES: No zoning changes are proposed in lieu of, or to facilitate, real estate acquisitions. 14. FACILITIES AND UTILITIES RELOCATIONS: The proposed project utility and/or facility relocations. will not require any 15. HAZARDOUS, TOSIC, AND RADIOACTIVE WASTE: The Malden River has heavy sedimentation contamination, which may impact adjoining properties. However, the real estate cost estimate was developed based on an as clean condition in reference to the adjoining properties required for construction and staging efforts. 16. LANDOWNER SENTIMENT: Landowners and local sponsors are generally in favor of this project, due to existing source point pollution, and specifically for the significant benefits of the restoration project will have on the citi es of Malden, Medford and Everett, Massachusetts. 17. ACQUISITION SCHED ULE : The projected schedule has been developed based on the assumption that Federal and non-federal funds will be available. The tentative schedule for project completion is as follows: Estimated Date Project Approval by Division September 2008 Execution of Project Cooper ation Agree ment October 2008 Initiate La nd, Access and Rights-of-Wa y Appraisals October 2009 Obtain State & Local Permits March 2010 Finalization of Detailed Plans and Specifications May 2010 Complete Land, Access and Rights-of-Way Appraisals June 2010 Secure Lands and Easements August 2010 Contract Award December 2010 Initiate Construction March 2011 Completion of Construction June 2013 Monitoring June 2013 thru November H-4
9 April 2007 Malden River Ecosystem Restoration Real Estate Report MALDEN REAL ESTATE COST ESTIMATE Tract No. Ownership Acreage Upland vs Wetland Interest Requir ed R/E Costs *Block 2/3 National Grid 1.37 ac 1.07 ac/0.3 ac Real Estate (Fee) $230,000 *Block 2/5 National Grid 3.33 ac 0 ac/3.33 ac Real Estate (Fee) $ 70,000 *Block 2/5 National Grid 2.0 ac 2.0 ac/0 ac Temporary Const. $110,000 *Block 2/6 General Electric 7.24 ac 0.5 ac/6.74 ac Real Estate (Fee) $ 35,000 *Block 4/18 MVDC** 2.18 ac 0 ac/2.18 ac Real Estate (Fee) $ 25,000 *Block 4/19 MVDC** 0.80 ac 0 ac/0.80 ac Real Estate (Fee) $ 20,000 Totals ac 3.57 ac/13.35 ac $490,000* * Does not include Local Sponsor s Administrative Expenses ** Non-Federal Sponsor 56 H-5
10 April 2007 Malden River Ecosystem Restoration Real Estate Report Intentionally Left Blank 66 H-6
11
12
13
14
15 7/7/2008 City of Medford, Massachusetts Parcel Information Block Parcel Tenant/Common Reference Parcel Address City Assessor Map Assessor Parcel assessed value Land Court Certificate Deed Book Deed Document Page Number Current Owner Contact Name Contact's Firm Contact Phone Square Footage of Parcel acres 3 1 Strogoff 0 Corporation Way (2-7) Medford 7-4 9A 2, Edward M. Strogoff Trust Edward Strogoff 5, Strogoff 0 Corporation Way (2-7) Medford , Edward M. Strogoff Trust Edward Strogoff 10, Atkins Foster Realty 3 3 Haskell 0 Corporation Way (2-9) Medford 7-4 8A 20, Trust, Robert A. Haskell Richard Haskell, Robert Haskell 18, Brantwood Road, Arlington, MA Haskell 0 Corporation Way (3-4) Medford , Atkins Foster Realty Trust, Robert A. Haskell Richard Haskell, Robert Haskell , Brantwood Road, Arlington, MA B/C Berkeley Investments 1 Cabot Road Medford 7-04/ 7/ / / / 30,006, Cabot Road Partners LLC Steve Brooks Berkeley Investments (617) , High Street, Boston, MA Joe Mayo Middlesex Realty Holdings CITIZENS BANK OF MASSACHUSETTS, Corporate 4 XX Citizens Bank 20 Cabot Road Medford 7-04/ 11/ / / / ,541, Group , Tax Dept, 20 Blackstone Valley Pl, Lincoln, RI River's Edge Phase Corporation Way Medford ,000, MVDC Peter Hollands , River's Edge Phase Corporation Way Medford A MVDC 10, River's Edge Phase Corporation Way Medford MVDC 36, River's Edge Phase Corporation Way Medford MVDC 19, River's Edge Phase Corporation Way Medford MVDC 41, River's Edge Phase Corporation Way Medford MVDC 280, River's Edge Phase 1 15 Cooper Street Medford MVDC 80, River's Edge Phase 1 9 Cooper Street Medford MVDC 20, River's Edge Phase Corporation Way Medford MVDC 30, River's Edge Phase Corporation Way Medford MVDC 23, A River's Edge Phase Corporation Way MVDC 23, River's Edge Phase Corporation Way Medford MVDC 16, River's Edge Phase Corporation Way Medford MVDC 25, River's Edge Phase Corporation Way Medford MVDC 25, River's Edge Phase Corporation Way Medford MVDC 19, River's Edge Phase Corporation Way Medford MVDC 249, A River's Edge Phase Corporation Way Medford MVDC River's Edge Phase Corporation Way Medford MVDC 290, River's Edge Phase 1 171R Corporation Way Medford MVDC 28, D River's Edge Phase 1 171R Corporation Way Everett MVDC 318, MVDC 140, River's Edge Phase 1 129A Corporation Way Medford River's Edge Phase 1 Island Medford MVDC 95, River's Edge Phase 1 Island Medford MVDC 35, Property_Info Medford 7/7/2008
16
Appendix G. Non-Federal Letters of Support and Draft Real Estate Plan
Appendix G Non-Federal Letters of Support and Draft Real Estate Plan REAL ESTATE PLAN UPPER DELAWARE RIVER WATERSHED FEASABILITY STUDY LIVINGSTON MANOR, NEW YORK 1. GENERAL 2. REAL ESTATE REQUIREMENTS
More informationDraft Continuing Authorities Program Section 1135 Detailed Project Report and Integrated Environmental Assessment
Appendix G Real Estate Shorty s Island / Meander Reach Ecosystem Restoration Kootenai River, Idaho Draft Continuing Authorities Program Section 1135 Detailed Project Report and Integrated Environmental
More informationREAL ESTATE PLAN APPENDIX G
Pacific Ocean Division REAL ESTATE PLAN APPENDIX G Alaska District UNALASKA (DUTCH HARBOR) CHANNELS UNALASKA, ALASKA Real Estate Division Alaska District U.S. Army Corps of Engineers TABLE OF CONTENTS
More informationAPPENDIX D - REAL ESTATE
APPENDIX D - REAL ESTATE 1. Purpose Real Estate Plan For Feasibility Study For Lake Lou Yaeger Section 206 Aquatic Ecosystem Restoration Continuing Authorities Project Feasibility Study This report is
More informationAPPENDIX M. Real Estate Plan
APPENDIX M Real Estate Plan Poplar Island Environmental Restoration Project September 2005 General Reevaluation Report (GRR) and Supplemental Environmental Impact Statement (SEIS) REAL ESTATE PLAN (REP)
More informationAppendix C. Real Estate. Brazos Island Harbor, Texas Channel Improvement Project Cameron County, Texas
Appendix C Real Estate Brazos Island Harbor, Texas Channel Improvement Project Cameron County, Texas U.S. Army Corps of Engineers, Galveston District 2000 Fort Point Road Galveston, Texas 77550 December
More informationAppendix B Draft Real Estate Plan
Appendix B Draft Real Estate Plan B-1 REAL ESTATE PLAN Prepared for U.S. Army Corps of Engineers Southwestern Division Little Rock District As of December 3, 2012 Prepared by Ronald Bridges Real Estate
More informationAppendix B Real Estate Plan
Appendix B Real Estate Plan B-1 REAL ESTATE PLAN Prepared for U.S. Army Corps of Engineers Southwestern Division Little Rock District As of May 1, 2013 Prepared by Ronald Bridges Real Estate Division ANY
More informationDraft Integrated Feasibility Report and Environmental Assessment and Draft Finding of No Significant Impact
Draft Integrated Feasibility Report and Environmental Assessment and Draft Finding of No Significant Impact APPENDIX F: REAL ESTATE Whittier, Alaska June 2018 Pacific Ocean Division DRAFT REAL ESTATE
More informationAppendix H: Real Estate Plan
APPENDIX H Spring Creek North Ecosystem Restoration Feasibility Study Appendix H: Real Estate Plan New York District U.S. Army Corps of Engineers October 2016 Revised: 13 April 2017 Spring Creek North
More informationAPPENDIX C REAL ESTATE PLAN BOULEVARD RESACA, BROWNSVILLE, TX CAMERON COUNTY, TEXAS
APPENDIX C REAL ESTATE PLAN BOULEVARD RESACA, BROWNSVILLE, TX CAMERON COUNTY, TEXAS November 19, 2016 Table of Contents Purpose... 3 Project Authority... 3 Project Location and Description... 3 Non-Federal
More informationJANUARY 2016 MAMARONECK & SHELDRAKE RIVERS NEW YORK FLOOD RISK MANAGEMENT GENERAL REEVALUATION REPORT FOR THE VILLAGE OF MAMARONECK APPENDIX E
U.S. Army Corps of Engineers New York District MAMARONECK & SHELDRAKE RIVERS NEW YORK FLOOD RISK MANAGEMENT GENERAL REEVALUATION REPORT FOR THE VILLAGE OF MAMARONECK JANUARY 2016 APPENDIX E REAL ESTATE
More informationAPPENDIX G REAL ESTATE
BUBBLY CREEK, SOUTH BRANCH OF THE CHICAGO RIVER, ILLINOIS FEASIBILITY STUDY APPENDIX G REAL ESTATE DRAFT - NOT FOR DISTRIBUTION APRIL 2015 U.S. Army Corps of Engineers Chicago District Appendix G Real
More informationDEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C
DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000 REPLY TO ATTENTION OF: CECW-PM (10-1-7a) THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my report
More informationUPPER MISSISSIPPI RIVER RESTORATION FEASIBILITY REPORT WITH INTEGRATED ENVIRONMENTAL ASSESSMENT
UPPER MISSISSIPPI RIVER RESTORATION FEASIBILITY REPORT WITH INTEGRATED ENVIRONMENTAL ASSESSMENT BEAVER ISLAND HABITAT REHABILITATION AND ENHANCEMENT PROJECT POOL 14, UPPER MISSISSIPPI RIVER MILES 513.0-517.0
More informationHASHAMOMUCK COVE, SOUTHOLD, NEW YORK COASTAL STORM RISK MANAGEMENT FEASIBILITY STUDY APPENDIX F REAL ESTATE PLAN
U.S. Army Corps of Engineers New York District HASHAMOMUCK COVE, SOUTHOLD, NEW YORK COASTAL STORM RISK MANAGEMENT FEASIBILITY STUDY APPENDIX F REAL ESTATE PLAN AUGUST 2016 HASHAMOMUCK COVE, SOUTHOLD, NEW
More informationUPPER MISSISSIPPI RIVER RESTORATION FEASIBILITY REPORT WITH INTEGRATED ENVIRONMENTAL ASSESSMENT
UPPER MISSISSIPPI RIVER RESTORATION FEASIBILITY REPORT WITH INTEGRATED ENVIRONMENTAL ASSESSMENT McGregor Lake HABITAT REHABILITATION AND ENHANCEMENT PROJECT POOL 10, UPPER MISSISSIPPI RIVER MILE 635-634
More informationDredged Material Management Plan Atlantic Intracoastal Waterway Port Royal Sound, South Carolina to Cumberland Sound, Georgia November 2015
Dredged Material Management Plan Atlantic Intracoastal Waterway Port Royal Sound, South Carolina to Cumberland Sound, Georgia November 2015 Appendix H: Real Estate US Army Corps of Engineers South Atlantic
More informationHUNTING BAYOU FLOOD RISK MANAGEMENT, HARRIS COUNTY, TEXAS DRAFT GENERAL REEVALUATION REPORT AND INTEGRATED ENVIRONMENTAL ASSESSMENT
HUNTING BAYOU FLOOD RISK MANAGEMENT, HARRIS COUNTY, TEXAS DRAFT GENERAL REEVALUATION REPORT AND INTEGRATED ENVIRONMENTAL ASSESSMENT APPENDIX 6 REAL ESTATE PLAN June 2014 HARRIS COUNTY FLOOD CONTROL DISTRICT
More informationMAMARONECK AND SHELDRAKE RIVER FLOOD DAMAGE REDUCTION PROJECT MAMARONECK, NEW YORK APPENDIX E REAL ESTATE PLAN
U.S. Army Corps of Engineers New York District MAMARONECK AND SHELDRAKE RIVER FLOOD DAMAGE REDUCTION PROJECT MAMARONECK, NEW YORK APPENDIX E REAL ESTATE PLAN April 2017 MAMARONECK AND SHELDRAKE RIVER FLOOD
More informationDelaware River Basin Comprehensive Flood Risk Management Interim Feasibility Study and Integrated Environmental Assessment for New Jersey
Delaware River Basin Comprehensive Flood Risk Management Interim Feasibility Study and Integrated Environmental Assessment for New Jersey Flooding in the Study Area, April 2005 June 2015 APPENDIX F: Draft
More informationAPPENDIX H REAL ESTATE PLAN
APPENDIX H REAL ESTATE PLAN This page intentionally left blank. APPENDIX H REAL ESTATE PLAN DALLAS FLOODWAY FEASIBILITY STUDY DATE OF REPORT January 31, 2014 PREPARED BY REAL ESTATE DIVISION U.S. ARMY
More informationINDIANA HARBOR AND CANAL CONFINED DISPOSAL FACILITY EAST CHICAGO, INDIANA
INDIANA HARBOR AND CANAL CONFINED DISPOSAL FACILITY EAST CHICAGO, INDIANA APPENDIX J REAL ESTATE Acquisition Branch Real Estate Division Chicago District U.S. Army Corps of Engineers APPENDIX J REAL ESTATE
More informationDRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT
APPENDIX E REAL ESTATE PLAN MT. SINAI MEDICAL CENTER, CONTINUTING AUTHORITIES PROGRAM (CAP) SECTION 14, PROJECT DRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT September 2016 DRAFT APPENDIX
More informationCITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY
CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY Adopted January 3, 2012 PURPOSE: The purpose of the policy statement is to clarify the policies and procedures of the City of Fort
More informationAppendix K. Real Estate Plan
Appendix K. Real Estate Plan REAL ESTATE PLAN DELTA ISLANDS AND LEVEES FEASIBILITY STUDY (DELTA STUDY) 20 June 2018 PREPARED BY THE SACRAMENTO DISTRICT U.S. ARMY CORPS OF ENGINEERS 1 TABLE OF CONTENTS
More informationReal Estate Plan Beaver Lake Water Supply Reallocation White River Rogers, Arkansas. 20 April 2017
Real Estate Plan Beaver Lake Water Supply Reallocation White River Rogers, Arkansas 20 April 2017 Prepared For US Army Corps of Engineers Southwestern Division Little Rock District Prepared By Jeremy R.
More informationWEST SHORE LAKE PONTCHARTRAIN HURRICANE AND STORM DAMAGE RISK REDUCTION STUDY INTEGRATED DRAFT FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT STATEMENT
WEST SHORE LAKE PONTCHARTRAIN HURRICANE AND STORM DAMAGE RISK REDUCTION STUDY INTEGRATED DRAFT FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT STATEMENT REAL ESTATE PLAN APPENDIX C Annex A: Project Maps Annex
More informationDraft Appendix E. Real Estate Plan. Rahway River Basin, New Jersey Flood Risk Management Feasibility Study. November 2016
Draft Appendix E Real Estate Plan Rahway River Basin, New Jersey Flood Risk Management Feasibility Study November 2016 New Jersey Department of Environmental Protection U.S. Army Corps of Engineers New
More informationDEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON. D.C MAR
DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON. D.C. 2031 4-1 000 MAR 3 1 2006 CEMP-NAD (1 0-1-7a) THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my report on the
More informationGENERAL RE-EVALUATION REPORT APPENDIX B: REAL ESTATE SAVANNAH HARBOR EXPANSION PROJECT Chatham County, Georgia and Jasper County, South Carolina
GENERAL RE-EVALUATION REPORT APPENDIX B: REAL ESTATE SAVANNAH HARBOR EXPANSION PROJECT Chatham County, Georgia and Jasper County, South Carolina January 2012 (Revised July 2012) US Army Corps of Engineers
More informationFederal Mandates and Willing Sellers: Real Estate Acquisition for the Missouri River Recovery Program
Federal Mandates and Willing Sellers: Real Estate Acquisition for the Missouri River Recovery Program Brad Thompson, Chief, Civil Works Branch U.S. Corps of Engineers, Omaha District US Army Corps of Engineers
More informationEDISTO BEACH COASTAL STORM DAMAGE REDUCTION GENERAL INVESTIGATION STUDY APPENDIX K REAL ESTATE
EDISTO BEACH COASTAL STORM DAMAGE REDUCTION GENERAL INVESTIGATION STUDY APPENDIX K REAL ESTATE Table of Contents REAL ESTATE APPENDIX... I... i SECTION 1. THE REAL ESTATE REPORT... 1 1.1 Statement of Purpose...
More informationDRAFT REAL ESTATE PLAN APPENDIX D JEFFERSON COUNTY ECOSYSTEM RESTORATION FEASIBILITY STUDY
DRAFT REAL ESTATE PLAN APPENDIX D JEFFERSON COUNTY ECOSYSTEM RESTORATION FEASIBILITY STUDY (NOTE: This page intentionally left blank.) This Real Estate Plan has been prepared in accordance with ER 405-1-12
More informationAT THE INTERSECTION OF LAND CONSERVATION AND RESILIENCE. THE ELIZABETH RIVER S URBAN LAND TRUST
October 19, 2018 AT THE INTERSECTION OF LAND CONSERVATION AND RESILIENCE. THE ELIZABETH RIVER S URBAN LAND TRUST Mary-Carson Stiff Director of Policy, Wetlands Watch Board Member, Living River Restoration
More informationAPPENDIX D REAL ESTATE PLAN
APPENDIX D REAL ESTATE PLAN APPENDIX D REAL ESTATE PLAN TABLE OF CONTENTS 1. STATEMENT OF PURPOSE 2. REFERENCES 3. AUTHORIZATION 4. BACKGROUND 5. LOCATION 6. REAL ESTATE REQUIREMENTS 7. OWNERSHIP OF REAL
More informationDraft Environmental Impact Statement (EIS)/Environmental Impact Report (EIR) APPENDIX H Real Estate Cost
Draft Environmental Impact Statement (EIS)/Environmental Impact Report (EIR) APPENDIX H Real Estate Cost US Army Corps of Engineers Corte Madera Creek Flood Risk Management Project October 2018 APPENDIX
More informationArticle III. Erosion and Sedimentation Control
Article III. Erosion and Sedimentation Control Section 9.6 Erosion and Sedimentation Control Plan Requirements Section 9.6.1 Plan Submission A plan shall be prepared for all land-disturbing activities
More informationSubmittal of the Minutes from the March 9, 2011, April 5, 2011, and April 19, 2011 Cabinet Meetings.
AGENDA BOARD OF TRUSTEES OF THE INTERNAL IMPROVEMENT TRUST FUND JUNE 16, 2011 Attachments to the items below can be viewed at the following link: http://www.dep.state.fl.us/secretary/cab/public_notices.htm
More informationREAL ESTATE PLAN. Final Integrated General Reevaluation Report and Supplemental Environmental Impact Statement
REAL ESTATE PLAN Final Integrated General Reevaluation Report and Supplemental Environmental Impact Statement Mississippi River, Baton Rouge to the Gulf of Mexico Mississippi River-Gulf Outlet, Louisiana,
More informationSkagit River Flood Risk Management General Investigation Skagit County, Washington. Draft Feasibility Report and Environmental Impact Statement
General Investigation Skagit County, Washington Draft Feasibility Report and Environmental Impact Statement May 2014 Real Estate Requirements of Selected Plan This Real Estate Plan Summary (REP) is presented
More informationCURRENT THROUGH PL , APPROVED 11/11/2009
CURRENT THROUGH PL 111-98, APPROVED 11/11/2009 TITLE 10. ARMED FORCES SUBTITLE A. GENERAL MILITARY LAW PART IV. SERVICE, SUPPLY, AND PROCUREMENT CHAPTER 159. REAL PROPERTY; RELATED PERSONAL PROPERTY; AND
More informationTown of Middleborough Conservation Commission 2014 Policy
Approved February 20, 2014 Town of Middleborough Conservation Commission 2014 Policy The Wetland Protection Act under M.G.L. c. 131, sec. 40 and regulations 310 CMR 10.02(1)(a-f) & 310 CMR 10.02 (2)(a)
More informationConstruction Sequencing and Schedule
Construction Sequencing and Schedule The New York State Department of Environmental Conservation (NYSDEC), United States Army Corps of Engineers (USACE) and the Town of Dover Building Inspector (Building
More informationCentral Pennsylvania Conservancy Project Selection Criteria Form
Central Pennsylvania Conservancy Project Selection Criteria Form The following criteria guide the actions of the Central Pennsylvania Conservancy s Land Protection Committee and Board of Directors in selecting
More informationVI. SAFETY ELEMENT I. INTRODUCTION A. PURPOSE B. AUTHORITY. 1. Safety
AB 162 and SB 1241 Amendment to the Safety Element New sections are underlined, deleted sections are shown as strikethrough and the denotes text remaining in place. VI. SAFETY ELEMENT I. INTRODUCTION A.
More informationA.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT
700. 701.A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT SECTION 700 PURPOSE The purpose of this Article is to set forth a streamlined set of Plan Requirements for minor
More informationPublic Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
Public Notice U.S. Army Corps Permit Application No: SWG-2016-00384 Of Engineers Date Issued: 27 December 2018 Galveston District Comments Due: 29 January 2019 U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT
More informationProject File #: SF Project Name: Jackson Ranch Filing No. 4 Parcel Nos.: , and
COMMISSIONERS: DARRYL GLENN (PRESIDENT) MARK WALLER (PRESIDENT PRO TEMPORE) STAN VANDERWERF LONGINOS GONZALEZ PEGGY LITTLETON PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CRAIG DOSSEY, EXECUTIVE DIRECTOR
More informationIRS FORM 8283 SUPPLEMENTAL STATEMENT DONATION OF CONSERVATION EASEMENT
Name(s) shown on income tax return Identifying Number Robert T. Landowner 021-34-1234 Susan B. Landowner 083-23-5555 IRS FORM 8283 SUPPLEMENTAL STATEMENT DONATION OF CONSERVATION EASEMENT On November 12,
More informationU.S. Army Corps of Engineers Charleston District APPENDIX E CHARLESTON HARBOR POST 45 CHARLESTON, SOUTH CAROLINA. Real Estate
U.S. Army Corps of Engineers Charleston District APPENDIX E CHARLESTON HARBOR POST 45 CHARLESTON, SOUTH CAROLINA Real Estate May 2015 Table of Contents REAL ESTATE APPENDIX E... I... i... i SECTION 1.
More informationTools for Conservation: Land Trusts & Easements
Tools for Conservation: Land Trusts & s CSS 235 Dr. Ed Krumpe 2 4 Basic Ways to Protect Land Acquisition the only permanent solution? Regulation Protect sensitive areas Control development patterns Address
More informationAppendix D: Real Estate
Shrewsbury River Basin, Sea Bright, New Jersey Coastal Storm Risk Management Feasibility Study Draft Integrated Feasibility Report & Environmental Assessment Appendix D: Real Estate Shrewsbury River Basin,
More informationBRISTOL CONSERVATION COMMISSION INLAND WETLANDS AGENCY FORM IW-1 (Application for a Wetlands Permit)
APPLICATION NO. BRISTOL CONSERVATION COMMISSION INLAND WETLANDS AGENCY FORM IW-1 (Application for a Wetlands Permit) DATE FILED: APPROVED: DENIED: 1. APPLICANT: Name: Signature: Address: City: State: Zip
More informationGeorgia Conservation Tax Credit Program Frequently Asked Questions
Georgia Conservation Tax Credit Program Frequently Asked Questions What are the minimum requirements for eligibility under the Georgia Conservation Tax Credit Program (GCTCP)? Individual and corporate
More informationEmergency Watershed Program Sandy Recovery Activities and Flood Plain Easement Program
Emergency Watershed Program Sandy Recovery Activities and Flood Plain Easement Program Greg Westfall, Resource Conservationist USDA-Natural Resources Conservation Service (NRCS) Set up by Congress to respond
More informationRESOLUTION NO xx
Attachment 10 RESOLUTION NO. 2015-xx A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MORENO VALLEY, CALIFORNIA, APPROVING TENTATIVE PARCEL MAP 35679 (PA07-0084) FOR DEVELOPMENT OF THE 1,529,498 SQUARE
More informationAppendix J. Real Estate Plan
Appendix J Real Estate Plan Real Estate Plan Louisiana Coastal Area Near-Term Ecosystem Restoration Plan Medium Diversion at White Ditch 1. PURPOSE Title VII of the Water Resources Development Act of 2007
More informationLAND USE APPLICATION
Lincoln County Department of Planning & Development 210 SW 2nd Street, Newport, OR 97365 Phone (541) 265-4192 Fax (541) 265-6945 LAND USE APPLICATION TO BE COMPLETED BY STAFF Conditional Use Non-Conforming
More informationChapter 5. Floodplain Management. 5.0 Introduction. 5.1 Douglas County Comprehensive Master Plan. 5.2 Floodplain Management and Regulation
5.0 Introduction This chapter summarizes the County s rules and regulations regarding floodplain management and development. The requirements presented in this chapter should be used by the design engineer
More informationCENAN-RE 22 May MEMORANDUM FOR Chief, Planning Division, ATTN: CENAN-PL-F (Alek Petersen)
CENAN-RE 22 May 2017 MEMORANDUM FOR Chief, Planning Division, ATTN: CENAN-PL-F (Alek Petersen) SUBJECT: May 2017 Real Estate Plan for the Rahway River (Tidal) Basin, Coastal Storm Risk Management Feasibility
More informationAPPENDIX F REAL ESTATE PLAN. Redwood City Harbor Navigation Improvement Feasibility Study, Redwood City, California
APPENDIX F REAL ESTATE PLAN Redwood City Harbor Navigation Improvement Feasibility Study, Redwood City, California PREPARED FOR THE SAN FRANCISCO DISTRICT SOUTH PACIFIC DIVISION 20 April 2015 PREPARED
More informationBRIDGETON SUBDIVISION APPLICATION CHECKLIST
APPLICATION NAME AND # CHECKLIST COMPLETED BY: DATE: Signature and printed name BRIDGETON SUBDIVISION APPLICATION CHECKLIST TO SUBDIVISION APPLICANTS: The attached checklist is to assist you in the submission
More informationCity Of Attleboro Conservation Commission
City Of Attleboro Conservation Commission GOVERNMENT CENTER, 77 PARK STREET ATTLEBORO, MASSACHUSETTS 02703 (508) 223 2222 FAX 222 3046 GENERAL INSTRUCTIONS AND CHECKLIST FOR COMPLETING STORMWATER MANAGEMENT
More informationTHIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by ("Covenantor"). RECITALS
Model for Use with Permits Without Mitigation Plans STATE OF COUNTY OF DECLARATION OF RESTRICTIVE COVENANTS THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by ("Covenantor"). RECITALS
More informationAppendix A Orleans County Local Law Assessment
Appendix A Orleans County Local Law Assessment Appendix A 0 Albion, Town Does the municipality have: Comprehensive/ Master Local Law Assessment es o Reference: Comments: Town of Albion, Village of Albion,
More informationEasement Grant of Easement for Habitat Protection
Date: Grantor(s): XXXXXXXXXX Grantee: Tri-Basin Natural Resources District, (hereinafter referred to as Tri-Basin NRD)1308 2 nd St., Holdrege NE 68949 Protected Property: See Exhibit A attached for legal
More informationConservation Easement Stewardship
Conservation Easements are effective tools to preserve significant natural, historical or cultural resources. Conservation Easement Stewardship Level of Service Standards March 2013 The mission of the
More informationGrand Mesa, Uncompahgre and Gunnison National Forests Region 2, USDA Forest Service
Decision Memo Taylor River Land Exchange Under the General Exchange Act of March 20, 1922 as Amended, The Federal Land Policy and Management Act of 1976 as Amended and the Federal Land Exchange Facilitation
More informationChestnut Street and Eliot Street
BASELINE DOCUMENTATION REPORT and LAND MANAGEMENT PLAN Massachusetts Executive Office of Energy and Environmental Affairs Local Acquisitions for Natural Diversity (LAND) Grant Program Property name: Warren
More informationPERMITTED ACTS and RURAL ENTERPRISES
PERMITTED ACTS and RURAL ENTERPRISES Pennsylvania s Agricultural Area Security Law, known as Act 43, 3 P.S. 901. et seq., and the Regulations promulgated thereunder by the Pennsylvania Department of Agriculture
More informationPreliminary Subdivision Application (Minor) (Three (3) lots or less)
Gunnison City Offices www.gunnisoncity.org 38 West Center Gunnison, Utah 84634 (435) 528 7969 Date of Application: Preliminary Subdivision Application (Minor) (Three (3) lots or less) APPLICANT INFORMATION
More informationRaines, Melton & Carella, Inc. Cost Estimating PRWFPA Staff Working Group Tim Harrison Lidia Gutierrez, Karen Frye September 15,
PAJARO RIVER WATERSHED FLOOD PREVENTION AUTHORITY Phase 3: Conceptual Design of Soap Lake Preservation Project Phase 4a: Design Level Mapping Technical Support Technical Memorandum No. 3.7 Task: Cost Estimating
More informationCity of Palo Alto (ID # 4882) City Council Staff Report
City of Palo Alto (ID # 4882) City Council Staff Report Report Type: Consent Calendar Meeting Date: 12/15/2014 Summary Title: Easements for San Francisquito Creek Joint Powers Authority Initial Flood Protection
More informationSouthwest Coastal Louisiana Study
REAL ESTATE PLAN Annex 1: Project Maps Annex 2: Assessment of Non-Federal Sponsor s Acquisition Capability Annex 3: Non-Material Deviation from Standard Estate Perpetual Access Easement Annex 4: Baseline
More informationAPPENDIX E REAL ESTATE PLAN
APPENDIX E REAL ESTATE PLAN REAL ESTATE PLAN VILLAGE OF BARBOURSVILLE, WATER STREET, STREAMBANK PROTECTION PROJECT CABELL COUNTY, WEST VIRGINIA SECTION 14 1. Authority/Purpose This Real Estate Plan is
More informationPreliminary Subdivision Application (Major) (Four (4) lots or more)
Gunnison City Offices www.gunnisoncity.org 38 West Center Gunnison, Utah 84634 (435) 528 7969 Date of Application: Preliminary Subdivision Application (Major) (Four (4) lots or more) APPLICANT INFORMATION
More informationCOASTAL CONSERVANCY. Staff Recommendation January 18, Carmel River Parkway Acquisitions. File No Project Manager: Trish Chapman
COASTAL CONSERVANCY Staff Recommendation January 18, 2006 Carmel River Parkway Acquisitions File No. 06-104 Project Manager: Trish Chapman RECOMMENDED ACTION: Authorization to disburse up to $3,500,000
More informationPublic Notice. Applicant: Avere Real Estate Project No.: SWF Date: May 30, Phone Number:
Public Notice Applicant: Avere Real Estate Project No.: SWF-2017-00150 Date: May 30, 2017 Purpose The purpose of this public notice is to inform you of a proposal for work in which you might be interested.
More informationFIRE ISLAND INLET TO MORICHES INLET FIRE ISLAND STABILIZATION PROJECT TECHNICAL SUPPORT DOCUMENT
FIRE ISLAND INLET TO MORICHES INLET FIRE ISLAND STABILIZATION PROJECT TECHNICAL SUPPORT DOCUMENT EVALUATION OF A STABILIZATION PLAN FOR STORM DAMAGE REDUCTION COST APPENDIX U.S. Army Corps of Engineers
More informationSANTA BARBARA COUNTY PLANNING COMMISSION Staff Report for Flood Control Easement Quitclaim
SANTA BARBARA COUNTY PLANNING COMMISSION Staff Report for Flood Control Easement Quitclaim Deputy Director: Steve Chase Staff Report Date: March 10, 2006 Division: Development Review South Case No.: 06GOV-00000-00004
More informationA. General Information
Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. Massachusetts Department of Environmental Protection A. General Information 1. Project
More informationREGENTS POLICY PART V FINANCE AND BUSINESS MANAGEMENT Chapter Real Property
REGENTS POLICY PART V FINANCE AND BUSINESS MANAGEMENT Chapter 05.11 Real Property P05.11.010. Purpose and Scope. A. This chapter establishes guidelines for the prudent management, including trust management,
More informationEvaluating and Processing Road and Utility Easement Proposals on Corps Lands and Flowage Easements
Evaluating and Processing Road and Utility Easement Proposals on Corps Lands and Flowage Easements Don Wiese Natural Resources Manager Fort Worth District September 13, 2017 US Army Corps of Engineers
More informationJOINT PUBLIC NOTICE PUBLIC NOTICE
Albuquerque District JOINT PUBLIC NOTICE PUBLIC NOTICE Application Number: SPA-2012-00299-ABQ Date: October 20, 2014 Comments Due: November 20, 2014 SUBJECT: The U.S. Army Corps of Engineers, Albuquerque
More informationAppendix D Real Estate Plan
Appendix D Real Estate Plan Matagorda Ship Channel, Port Lavaca, Texas Feasibility Report and Environmental Impact Statement, Review of Completed Projects, Calhoun and Matagorda Counties May 2018 (NOTE:
More informationPublic Notice. Notice No Closing Date: August 16, 2018
Public Notice U.S. Army Corps of Engineers Pittsburgh District In Reply Refer to Notice No. below US Army Corps of Engineers, Pittsburgh District 1000 Liberty Avenue Pittsburgh, PA 15222-4186 Application
More information19.12 CLUSTER RESIDENTIAL DISTRICT
Chapter 19.12 CLUSTER RESIDENTIAL DISTRICT (Adopted 12/22/2003; Ordinance #0061970). Amended 7/3/17, Ordinance #079100. Section 19.12.010 - Declaration of Intent. The Cluster Residential District provides
More informationGreen and Barren Lock and Dam Disposition Study Louisville District, US Army Corps of Engineers February Appendix F: Real Estate Interests
Green and Barren Lock and Dam Louisville District, US Army Corps of Engineers February 2014 Appendix F: Real Estate Interests Appendix F. Real Estate 1.0 General In 1991, the USACE conducted a study to
More informationJOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF ARKANSAS Application Number: Date: December 9, 2016 Comments Due: January 3, 2017
US Army Corps of Engineers Little Rock District JOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF ARKANSAS Application Number: 2016-00183-1 Date: December 9, 2016 Comments Due: January 3, 2017 TO WHOM IT
More informationAPPENDIX B COMPLIANCE WITH THE GOVERNMENT CODE
APPENDIX B COMPLIANCE WITH THE GOVERNMENT CODE A. GENERAL PLAN AMENDMENT PROCEDURE In general, local governments may not amend any of the mandatory elements of the General Plan (e.g. Land Use, Open Space,
More informationCONSERVATION EASEMENT INCLUDING MITIGATION
After recording return to: GRANTOR: GRANTEE: GRANTEE (Trustee): LEGAL DESCRIPTION: TAX PARCEL I.D. #: REFERENCE # s: WHATCOM COUNTY N/A CONSERVATION EASEMENT INCLUDING MITIGATION This grant of a conservation
More informationUpper Southampton Township US ACOE USF&WS UNH
Upper Southampton Township US ACOE USF&WS UNH 1 Corps of Engineers Who? Heather Jensen, Project Manager Mark Eberle, Project Biologist Sarah Apperson, Jennifer McGrath, Real Estate Rich Pearsall, public
More informationAPPENDIX D REAL ESTATE DRAFT. MOBILE HARBOR, MOBILE, ALABAMA Integrated General Reevaluation Report With Supplemental Environmental Impact Statement
APPENDIX D REAL ESTATE DRAFT MOBILE HARBOR, MOBILE, ALABAMA Integrated General Reevaluation Report With Supplemental Environmental Impact Statement Table of Contents 1. Purpose of the Real Estate Plan
More informationStormwater Ordinance Appendix APPENDIX K EXAMPLE TAR-PAM CONVERSATION EASEMENT
APPENDIX K EXAMPLE TAR-PAM CONVERSATION EASEMENT Tax Parcel ID # NORTH CAROLINA FRANKLIN COUNTY CONSERVATION EASEMENT Franklin County, North Carolina THIS CONSERVATION EASEMENT (this "Conservation Easement")
More informationSPECIAL PUBLIC NOTICE
SPECIAL PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT APPLICATION FOR PERMIT Coachella Valley In-Lieu Fee Program Public Notice/Application No.: SPL-2013-00324-TOB Project:
More informationLand and Easement Donation Process and Requirements Summary
Land and Easement Donation Process and Requirements Summary Many of the steps involved in donating land or conservation easements to American Friends of Canadian Land Trusts (AF) will be familiar to people
More informationMINOR & MAJOR SUBDIVISION APPLICATION
TOW OF HOOKSETT APPLICATIO # DATE MIOR & MAJOR SUBDIVISIO APPLICATIO Application for: Completeness Map and Lot o. Public Hearing o. of Lots LOCATIO: (Specify Street Address) OWER: APPLICAT: ADDRESS: ADDRESS:
More informationAPPENDIX F REAL ESTATE
APPENDIX F REAL ESTATE Real Estate Plan For Broward County, Florida Shore Protection Project Segments II and III General Reevaluation Report 1. Statement Of Purpose. The Real Estate Plan is tentative in
More informationBackground and Eligibility Information
2013 Conservation Futures Application and Ratings Sheet 2016 Jefferson County Conservation Futures Program Property Acquisition and/or Operations and Maintenance Project Application Please complete the
More information