1 RIGHT-OF-WAY ACQUISITIONS AND RELOCATIONS TECHNICAL MEMORANDUM FOR RTD SOUTHWEST CORRIDOR EXTENSION PROJECT January 2010 Prepared By Southwest Corridor Extension Project Team In some cases, information in this Environmental Technical Report may have been refined or updated as preparation of the Draft EE advanced. In such cases, the information and conclusions presented in the Draft EE supersede all previous background material included in this Technical Report.

2 TABLE OF CONTENTS 1.0 INTRODUCTION REGULATORY ENVIRONMENT AFFECTED ENVIRONMENT IMPACT EVALUATION AND MITIGATION METHODOLOGY IMPACTS Direct Impacts Indirect Impacts Construction Impacts Cumulative Impacts MITIGATION REFERENCES... Error! Bookmark not defined. LIST OF FIGURES Figure 1 Project Location... 2 Appendix A... Right of Way Requirements i

3 1.0 INTRODUCTION This Technical Memorandum focuses on information regarding the land acquisitions (partial or full) and relocations that would occur as a result of the Southwest Corridor Light Rail Extension project. Federal and state laws require that property owners be paid fair market value for their land and improvements, and that they be assisted in finding replacement business sites or dwellings. Relocations result from right-of-way acquisitions that require the use of a property occupied by a residence or business. Partial acquisitions occur when only a portion of an existing land use is required and as such may not result in relocations. Full acquisitions occur when a complete parcel is required and may result in either a residential or business relocation. The study area for land acquisition and relocations is the estimated limits of construction for the alignment and the proposed stations and facilities. 1.1 REGULATORY ENVIRONMENT Under the Uniform Relocation Assistance and Real Property Acquisition Policy Act of 1970, all federal agencies are required to meet certain standards for the fair and equitable treatment of persons displaced by federally supported actions. Relocation assistance guidelines are set forth in Title 49, Part 24, of the Code of Federal Regulations (49 CFR Part 24). RTD intends to follow the intent of the Uniform Act regardless of project funding sources. Between Mineral Station and C-470, the alignment is located within existing UPRR and BNSF rights-of-way. The railroad rights-of-way vary in width, but are generally between 200 and 300 feet wide. RTD owns a 40-foot-wide easement within this right-of-way to accommodate dual light rail tracks. RTD will coordinate with both railroad companies to determine the final location of the new light rail tracks and the relocations as needed for UPRR and/or BNSF facilities. The alignment crosses CDOT s right-of-way over C-470 and returns to grade on a strip of rightof-way deeded to RTD by Douglas County. From there, the Southwest Corridor Light Rail Extension project continues east in a 40-foot-wide strip of right-of-way owned by RTD, crossing Erickson Boulevard and the High Line Canal, just south of the C-470 bike path. RTD will have to acquire a permanent easement from the Denver Water Department for the High Line Canal crossing. The RTD-owned right-of-way ends at a small vacant parcel currently owned by Shea Homes. The Shea Homes parcel is undeveloped at this time. The alignment traverses the northwest corner of the Shea Homes parcel before entering CDOT s right-of-way immediately south of C-470. The alignment then proceeds in CDOT s right-of-way to its terminus near Lucent Boulevard. The 5.6-acre parcel needed to accommodate the potential Intermediate Station and park-n-ride facility is currently owned by Douglas County but has been reserved for RTD. RTD currently owns the 10-acre parcel needed for the Lucent Station and park-n-ride. 1

4 2.0 AFFECTED ENVIRONMENT The Southwest Corridor Extension project would extend light rail service in the Southwest Corridor along the C (Union Station to Mineral) and D (30th and Downing to Mineral) lines by 2.5 miles (Figure 1). The project passes through the City of Littleton and Arapahoe County, between the Mineral Avenue end-of-line station and County Line Road, where it crosses into Douglas County and Highlands Ranch. Between Mineral Avenue and County Line Road, the light rail alignment will run adjacent to Santa Fe Drive, crossing Dad Clark Gulch along the existing UPRR alignment. A new structure is added at Dad Clark Gulch to accommodate a double-tracked light rail crossing. Further south the alignment crosses County Line Road, both freight rail lines and C-470 on a fly-over bridge. The tracks will follow CDOT s right-of-way south of C-470, crosses High Line Canal over an extended box culvert, and continues east to Lucent Boulevard. 2

5 Southbridge e South P la tt k Jac MINERAL ass H ill Rd Ave Ja G e Lin ck as s gh Hi Mine ra l u Southpark W Fe Dr Can al Ci ty Ditc h h lc Southbridge Park n Lo g nt a South Platte Park LITTLETON Jackass Hill Park pa RTD rk n-r id Ri v e er C D Aspen Grove Shopping Center Sa r Ci lch Writers Vista Park Wolhurst Sou thp a rk Cir u rk G d C la Low er D a 85 McLellan Reservoir County Line Rd Eri ck so n B lv d ARAPAHO E CO DOUGLAS CO Cit y of Little to n c Lu en t vd Bl INTERMEDIATE STATION Line Can al Pl az a Dr C-470/ LUCENT Rd Hig h SF Wind Crest BN U PR R (Not part of FasTracks Plan) Vista Highlands Ranch Golf Club ,000 bo ns rou gh Dr Wa y ee Gr Creeksi de Mill HIGH LANDS RAN CH 2,000 Feet Source: Southwest Corridor Extension Project Team, 2009 Stations Existing Southwest Light Rail Line County Boundary Southwest Light Rail Extension City Boundary Freight Railroad Proposed Future Figure 1 Southwest Corridor Extension

6 3.0 IMPACT EVALUATION AND MITIGATION 3.1 METHODOLOGY To identify potential acquisitions and displacements that would occur from implementing the project, mapping of the limits of disturbance for the Southwest Corridor Light Rail Extension project were overlaid onto corridor parcel maps. Each of the parcels was analyzed to determine if an acquisition was necessary and if a relocation would occur. 3.2 IMPACTS The No Action Alternative would not result in any direct, indirect, construction-related, or cumulative impacts as a result of land acquisitions and relocations. The direct, indirect, construction-related, and cumulative impacts of the Build Alternative are described below Direct Impacts All right-of-way needs for the Southwest Corridor Light Rail Extension project will be met through agreements with the UPRR and BNSF Railroads, CDOT, Douglas County, the Highlands Ranch Metro District, and Shea Homes. Further, no relocations will be necessary. No developed residential or business (commercial or industrial) parcels will be acquired. Access to the Lucent Station and park-n-ride will be met through cross-access easements between RTD and the Englewood McLellan Reservoir Foundation, which owns the surrounding 40 acres of land and would like to see transit-oriented development on the site. As plans for development evolve and progress, the necessary easements will be negotiated and acquired. Appendix A details the parcels of land that would need to be acquired by RTD Indirect Impacts Indirect effects are not anticipated Construction Impacts Temporary construction easements may be needed on adjacent property to gain access to the dedicated right-of-way during construction activities. If needed, these construction easements will be obtained for a short period of time and the land will be returned to its original condition prior to the easement lease termination. Further, to access the CDOT right-of-way, special use and occupancy permits would be needed Cumulative Impacts Partial property acquisitions required for the Build Alternative may compound property needs associated with other local actions in the area. The acquired properties are small portions adjacent to the dedicated right-of-way boundary. As a result, no cumulative acquisition impacts are expected from the Build Alternative. 4

7 3.3 MITIGATION Mitigation measures for potential acquisitions and displacements that would occur from implementing the project include returning any adjacent property used during construction activities to original conditions, once construction is complete. Also, special use permits to access CDOT right-of-way, during construction, will be obtained. 5

8 4.0 REFERENCES U.S. Department of Housing and Urban Development. Uniform Relocation Assistance and Real Property Acquisition Policies for Federal and Federally Assisted Programs Act of 1970, as amended. 42 U.S.C. Chapter 61. 6

9 Appendix A

10

11

GOLD LINE FINAL ENVIRONMENTAL IMPACT STATEMENT

GOLD LINE FINAL ENVIRONMENTAL IMPACT STATEMENT GOLD LINE FINAL ENVIRONMENTAL IMPACT STATEMENT 3.3-12 GOLD LINE FINAL ENVIRONMENTAL IMPACT STATEMENT 3.3-13 A market analysis at the time of this evaluation demonstrated adequate availability of replacement

More information

Attachment 22 Railroad Agreements

Attachment 22 Railroad Agreements Attachment 22 Railroad Agreements Contract No. 18FH012 Attachment 22 Railroad Agreements Capitalized terms used but not otherwise defined herein shall have the meaning given to them in the Railroad Agreement

More information

3.3 LAND ACQUISITION, DISPLACEMENTS, AND RELOCATION OF EXISTING USES

3.3 LAND ACQUISITION, DISPLACEMENTS, AND RELOCATION OF EXISTING USES 3.3 LAND ACQUISITION, DISPLACEMENTS, AND RELOCATION OF EXISTING USES 3.3.1 Introduction to Analysis A community would be affected if private property currently being used for another purpose must be acquired

More information

4.2 Real Estate and Acquisitions

4.2 Real Estate and Acquisitions 4.2 4.2.1 Regulatory Framework and Methodology 4.2.1.1 Regulatory Framework The applicable federal, state, and local regulations that are relevant to an analysis of the proposed project s real estate and

More information

5.5 Relocations and Displacements

5.5 Relocations and Displacements I-70 East Final EIS 5.5 Relocations and Displacements 5.5 Relocations and Displacements This section investigates the impacts from the project alternatives resulting from land acquisition of residential

More information

5.5 Relocations and Displacements

5.5 Relocations and Displacements I-70 East Supplemental Draft EIS 5.5 Relocations and Displacements 5.5 Relocations and Displacements This section investigates the impacts to residential units, businesses, and non-profit associations

More information

VTA s BART SILICON VALLEY PROGRAM Phase 1 Berryessa Extension Project

VTA s BART SILICON VALLEY PROGRAM Phase 1 Berryessa Extension Project VTA s BART SILICON VALLEY PROGRAM Phase 1 Berryessa Extension Project Addendum No. 6 to the 2 nd Supplemental Environmental Impact Report Santa Clara Valley Transportation Authority March 2015 1 Table

More information

Denver Union Station: A True Public-Private Partnership

Denver Union Station: A True Public-Private Partnership Denver Union Station: A True Public-Private Partnership Bill Sirois (Moderator) Sr Manager, Transit Oriented Communities, Regional Transportation District Diane Barrett Chief Projects Officer, Office of

More information

3.3 Acquisitions and Displacements/Relocations

3.3 Acquisitions and Displacements/Relocations Chapter 3 Social Effects 3.3 Acquisitions and Displacements/Relocations This section discusses property displacements, relocations, and acquisitions (partial or full) that might occur due to implementation

More information

5. Land Acquisition and Displacement

5. Land Acquisition and Displacement Northern Branch Corridor SDEIS March 2017 5. Land Acquisition and Displacement 5.1. Chapter Overview 5.1.1. Introduction Implementation of the Preferred Alternative would require the acquisition of property

More information

RESOLUTION NO. R To Acquire Real Property Interests Required for the Downtown Redmond Link Extension

RESOLUTION NO. R To Acquire Real Property Interests Required for the Downtown Redmond Link Extension RESOLUTION NO. R2018-07 To Acquire Real Property Interests Required for the Downtown Redmond Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 03/08/2018

More information

Northern Branch Corridor DEIS December Appendix D: Local Tax Base

Northern Branch Corridor DEIS December Appendix D: Local Tax Base Appendix D: Local Tax Base D. LOCAL TAX BASE D.1 Existing Conditions The local tax base is under the jurisdiction of each municipality. Assessed value of property varies based on a number of factors,

More information

Potential Property Impacts Lawrence to Bryn Mawr Modernization

Potential Property Impacts Lawrence to Bryn Mawr Modernization Potential Property Impacts Lawrence to Bryn Mawr Modernization In order to increase train speeds, reduce delays and modernize stations, the agency has identified a minimal number of properties that would

More information

EXHIBIT A Everett Commuter Rail Station Order No. Owner/Contact Parcel # Site Address 500745 BURLINGTON NORTHERN AND SANTA FE RAILWAY COMPANY, A DELAWARE CORPORATION FORMERLY BURLINGTON NORTHERN RAILROAD

More information

Environmental Analysis, Chapter 4 Consequences, and Mitigation

Environmental Analysis, Chapter 4 Consequences, and Mitigation Environmental Analysis, Chapter 4 4.2 Displacement and Relocation This section describes the potential displacements and relocations that could be needed to construct the proposed Regional Connector Transit

More information

SW Denver For Lease 9/1/2015 PREPARED BY: Rare Space Inc th St, Suite M-100 Denver, CO 80202

SW Denver For Lease 9/1/2015 PREPARED BY: Rare Space Inc th St, Suite M-100 Denver, CO 80202 SW Denver For Lease PREPARED BY: Rare Space Inc. 33 7th St, Suite M-00 Denver, CO 80202 Travis Bontrager VP (303) 296-8822 (phone) (303) 296-884 (fax) travis@rarespace.com Page 2345-239 S Delaware St South

More information

FM 1626 Public Hearing - January 14, 2016

FM 1626 Public Hearing - January 14, 2016 FM 1626 Public Hearing - January 14, 2016 Travis County, in conjunction with the Texas Department of Transportation (TxDOT), welcomes you to tonight s public hearing concerning proposed improvements to

More information

I-70 EAST SUPPLEMENTAL DRAFT ENVIRONMENTAL IMPACT STATEMENT AND SECTION 4(F) EVALUATION CONCEPTUAL STAGE RELOCATION TECHNICAL REPORT

I-70 EAST SUPPLEMENTAL DRAFT ENVIRONMENTAL IMPACT STATEMENT AND SECTION 4(F) EVALUATION CONCEPTUAL STAGE RELOCATION TECHNICAL REPORT I-70 EAST SUPPLEMENTAL DRAFT ENVIRONMENTAL IMPACT STATEMENT AND SECTION 4(F) EVALUATION CONCEPTUAL STAGE RELOCATION TECHNICAL REPORT ATTACHMENT G AUGUST 2014 I-70 East Environmental Impact Statement Conceptual

More information

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT CITY OF ELK GROVE CITY COUNCIL STAFF REPORT AGENDA ITEM NO. 8.6 AGENDA TITLE: Adopt resolution authorizing the City Manager to execute an Agreement for Acquisition of Fee Interest, Pedestrian and Utility

More information

3.1.4 Economic Considerations

3.1.4 Economic Considerations 3.1.4 Economic Considerations 3.1.4.1 Introduction to Analysis The area of analysis for economic, fiscal, and demographic conditions extends beyond the study area to include the area within 0.5 mile of

More information

THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE

THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE BOARD AGENDA: 4/27/10 ITEM: 8.1 THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE MEMORANDUM TO: HONORABLE MAYOR, CITY COUNCIL, AND AGENCY BOARD SUBJECT: SEE BELOW FROM: HARRY S. MAVROGENES EXECUTIVE DIRECTOR

More information

REQUEST FOR COUNCIL ACTION

REQUEST FOR COUNCIL ACTION COUNCIL AGENDA ITEM L-7 COUNCIL MEETING OF 11/19/13 REQUEST FOR COUNCIL ACTION SUBJECT: Resolution No. 7347 determining that pursuant to Section 15162 of the State s Guidelines implementing the California

More information

4.0 Basis of Cumulative Analysis

4.0 Basis of Cumulative Analysis 4.0 Basis of Cumulative Analysis 4.0 BASIS OF CUMULATIVE ANALYSIS Section 15355 of the CEQA Guidelines, as amended, provides the following definition of cumulative impacts: Cumulative impacts refer to

More information

4.13 Population and Housing

4.13 Population and Housing Environmental Impact Analysis Population and Housing 4.13 Population and Housing 4.13.1 Setting This section evaluates the impacts to the regional housing supply and population growth associated with implementation

More information

PLANNING AND ZONING COMMISSION AGENDA MEMORANDUM

PLANNING AND ZONING COMMISSION AGENDA MEMORANDUM To: From: Agenda Title Planning and Zoning Commission John Hilgers, Planning Director Anna Bertanzetti, Principal Planner Meeting Date Agenda Category Agenda Item # July 13, 2015 Business 4.b 1. Public

More information

Ridgefield Crossing. New Commercial Development. Site FOR SALE, GROUND LEASE, OR BUILT-TO-SUIT S. 65TH AVE AND PIONEER STREET RIDGEFIELD,WA 98642

Ridgefield Crossing. New Commercial Development. Site FOR SALE, GROUND LEASE, OR BUILT-TO-SUIT S. 65TH AVE AND PIONEER STREET RIDGEFIELD,WA 98642 FOR SALE, GROUND LEASE, OR UILT-TO-SUIT N 65th Ave N 10th St Pioneer St Site S 5th St S 6th Way New Commercial Development Location: Pioneer Street at I-5 Ridgefield Junction Exit 14 Size: Approx 13.2

More information

MOTION NO. M Property Exchange Agreement with the University of Washington for the Northgate Link Extension

MOTION NO. M Property Exchange Agreement with the University of Washington for the Northgate Link Extension MOTION NO. M2012-93 Property Exchange Agreement with the University of Washington for the Northgate Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: PHONE: Board 12/20/12 Final Action Ahmad

More information

RIGHT OF WAY LIFE CYCLE

RIGHT OF WAY LIFE CYCLE EXPEDITING THE RIGHT OF WAY PROCESS RIGHT OF WAY LIFE CYCLE Right of Way planning begins during the Feasibility Phase of a project. Determining the magnitude of the Right of Way Phase allows the LDOTD

More information

U.S. ARMY CORPS OF ENGINEERS

U.S. ARMY CORPS OF ENGINEERS 1 U.S. ARMY CORPS OF ENGINEERS ADVERSE EFFECTS, MITIGATION, AND AGREEMENT DOCUMENTS 255 255 255 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 239 65 53 80 119 27 252 174.59 110 135

More information

Skagit River Flood Risk Management General Investigation Skagit County, Washington. Draft Feasibility Report and Environmental Impact Statement

Skagit River Flood Risk Management General Investigation Skagit County, Washington. Draft Feasibility Report and Environmental Impact Statement General Investigation Skagit County, Washington Draft Feasibility Report and Environmental Impact Statement May 2014 Real Estate Requirements of Selected Plan This Real Estate Plan Summary (REP) is presented

More information

Approval to Negotiate and Execute a Term Sheet at Branch Avenue

Approval to Negotiate and Execute a Term Sheet at Branch Avenue Planning, Program Development and Real Estate Committee Item V-F July 11, 2013 Approval to Negotiate and Execute a Term Sheet at Branch Avenue Washington Metropolitan Area Transit Authority Board Action/Information

More information

7 EXPROPRIATION OF LAND - DAVIS DRIVE, VIVA PROJECT TOWN OF NEWMARKET

7 EXPROPRIATION OF LAND - DAVIS DRIVE, VIVA PROJECT TOWN OF NEWMARKET 7 EXPROPRIATION OF LAND - DAVIS DRIVE, VIVA PROJECT 90760 TOWN OF NEWMARKET The Finance and Administration Committee recommends the adoption of the recommendations contained in the following report dated

More information

4.11 POPULATION AND HOUSING

4.11 POPULATION AND HOUSING 4.11 POPULATION AND HOUSING INTRODUCTION This section of the Draft Environmental Report (Draft EIR; DEIR) describes the current population and demographic characteristics and housing and employment conditions

More information

Approval of Takoma Amended Joint Development Agreement and Compact Public Hearing

Approval of Takoma Amended Joint Development Agreement and Compact Public Hearing Planning, Program Development and Real Estate Committee Item IV - B March 13, 2014 Approval of Takoma Amended Joint Development Agreement and Compact Public Hearing Washington Metropolitan Area Transit

More information

river north Master Plan vision

river north Master Plan vision river north Master Plan vision RETAIL HOTEL RESIDENTIAL MIXED USE OFFICE PUBLIC DOWNTOWN DENVER COORS FIELD ST DOWN ING ST TH ST 19 25 27 29 28 38 24 26 35T 23 3 30 39 31 40 0 32 H 22 2 2 13 16 20 11 9

More information

Paul VI Redevelopment

Paul VI Redevelopment City of Fairfax City Council and Planning Commission Joint Work Session October 3, 2017 Paul VI Redevelopment The IDI Group Companies 1 Site Background Chain Bridge Road Cedar Ave 2 Project History June-October

More information

Consideration of a Redevelopment Area Designation for the Study Area

Consideration of a Redevelopment Area Designation for the Study Area attracts trespassers as has occurred through the past two decades. Absent redevelopment of the property, the abandoned buildings and the two dredge lakes will continue to be attractive nuisances that the

More information

5. Land Acquisition and Displacement

5. Land Acquisition and Displacement Northern Branch Corridor DIS December 2011 5 Land Acquisition and Displacement 51 Chapter Overview 511 Introduction Implementation of the Build Alternatives would require the acquisition of property and

More information

SEPTEMBER 7, 2017 FINAL AGENDA SENIOR CITIZEN AND DISABLED RESIDENT TRANSPORTATION ADVISORY COMMITTEE REPORT (NEXT SCHEDULED REPORT DECEMBER 2017)

SEPTEMBER 7, 2017 FINAL AGENDA SENIOR CITIZEN AND DISABLED RESIDENT TRANSPORTATION ADVISORY COMMITTEE REPORT (NEXT SCHEDULED REPORT DECEMBER 2017) NEW JERSEY TRANSIT CORPORATION NJ TRANSIT BUS OPERATIONS, INC. NJ TRANSIT RAIL OPERATIONS, INC. NJ TRANSIT MERCER, INC. NJ TRANSIT MORRIS, INC. REGULARLY SCHEDULED BOARD OF DIRECTORS MEETINGS SEPTEMBER

More information

Part 5 - Accommodating Utility Facilities Within Public Freeway Rights-of-Way and Public Railroad Rights-of-Way

Part 5 - Accommodating Utility Facilities Within Public Freeway Rights-of-Way and Public Railroad Rights-of-Way 290-RICR-20-00-5 TITLE 290 - DEPARTMENT OF TRANSPORTATION CHAPTER 20 - GOVERNMENT AND UTILITIES SUBCHAPTER 00 - N/A Part 5 - Accommodating Utility Facilities Within Public Freeway Rights-of-Way and Public

More information

APPROVED LONG-RANGE PROPERTY MANAGEMENT PLAN MAJOR APPROVED DEVELOPMENT PROJECT MISSION BAY

APPROVED LONG-RANGE PROPERTY MANAGEMENT PLAN MAJOR APPROVED DEVELOPMENT PROJECT MISSION BAY APPROVED LONG-RANGE PROPERTY MANAGEMENT PLAN MAJOR APPROVED DEVELOPMENT PROJECT MISSION BAY EXECUTIVE SUMMARY The Successor Agency to the Redevelopment Agency of the City and County of San Francisco (the

More information

TRANSMITTAL To: Council From: Municipal Facilities Committee

TRANSMITTAL To: Council From: Municipal Facilities Committee TRANSMITTAL To: date Council 11-07-16 From: Municipal Facilities Committee 0220-05247-0000 COUNCIL FILE NO. 14-0425 COUNCIL DISTRICT 15 At its meeting of October 27, 2016 the Municipal Facilities Committee

More information

Transit-Oriented Development Status Report February 2007

Transit-Oriented Development Status Report February 2007 T r a n s i t Or i e n t e dde v e l o p me n t 2 0 0 6S t a t u sr e p o r t Transit-Oriented Development February 2007 This is a controlled document; please do not duplicate. If additional copies are

More information

Rezoning Petition Pre-Hearing Staff Analysis November 19, 2018

Rezoning Petition Pre-Hearing Staff Analysis November 19, 2018 Rezoning Petition 2018-103 Pre-Hearing Staff Analysis November 19, 2018 REQUEST Current Zoning: R-4 (single family residential) and I-1 (light industrial) Proposed Zoning: I-2(CD) (general industrial,

More information

Displacement and Relocation A. INTRODUCTION B. METHODOLOGY

Displacement and Relocation A. INTRODUCTION B. METHODOLOGY Appendix F: Displacement and Relocation A. INTRODUCTION This appendix provides additional information to support the analyses provided in Chapter 8, Displacement and Relocation. The focus of Chapter 8,

More information

Town of Waxhaw Board of Commissioners. Waxhaw Police Department Community Meeting Room Tuesday January 12, 2016

Town of Waxhaw Board of Commissioners. Waxhaw Police Department Community Meeting Room Tuesday January 12, 2016 Town of Waxhaw Board of Commissioners Waxhaw Police Department Community Meeting Room Tuesday January 12, 2016 Petition RZ-003994-2015 A request by the Town of Waxhaw Planning & Community Development Department,

More information

Creative Approaches to Land Acquisition

Creative Approaches to Land Acquisition 2007 Legislative Session Review CALIFORNIA TRANSIT ASSOCIATION JANUARY/FEBRUARY 2008 Creative Approaches to Land Acquisition Result From Creative Approaches to Land Acquisition It should not surprise anyone

More information

Displacement and Relocation

Displacement and Relocation Chapter 7: and Relocation 7.1 INTRODUCTION This chapter summarizes the displacement and relocation impacts previously identified in the Final Environmental Impact Statement (FEIS) and then evaluates the

More information

MEMORANDUM Main Concepts

MEMORANDUM Main Concepts MEMORANDUM DATE February 5, 2016 TO FROM SUBJECT David Bischoff City of Gilroy Bruce Brubaker and Seung Hong, PlaceWorks Draft Alternative Land Use and Circulation Scenarios This memorandum summarizes

More information

Appendix B. Technical Memoranda and Reports

Appendix B. Technical Memoranda and Reports Cotton Belt Corridor Regional Rail Project Final Environmental Impact Statement Appendix B Technical Memoranda and Reports Technical memoranda and reports were prepared as independent documents to support

More information

Broadway Corridor Framework Plan Pearl District Business Association November 10, 2015

Broadway Corridor Framework Plan Pearl District Business Association November 10, 2015 Broadway Corridor Framework Plan Pearl District Business Association November 10, 2015 Opportunity Central City Growth 2035 ~21,500 new households ~42,500 new jobs USPS Site Redevelopment ~2,400 new households

More information

RESOLUTION NO. R To Acquire Real Property Interests Required for the Federal Way Link Extension

RESOLUTION NO. R To Acquire Real Property Interests Required for the Federal Way Link Extension RESOLUTION NO. R2017-34 To Acquire Real Property Interests Required for the Federal Way Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 09/14/2017 09/28/2017

More information

JANUARY 2016 MAMARONECK & SHELDRAKE RIVERS NEW YORK FLOOD RISK MANAGEMENT GENERAL REEVALUATION REPORT FOR THE VILLAGE OF MAMARONECK APPENDIX E

JANUARY 2016 MAMARONECK & SHELDRAKE RIVERS NEW YORK FLOOD RISK MANAGEMENT GENERAL REEVALUATION REPORT FOR THE VILLAGE OF MAMARONECK APPENDIX E U.S. Army Corps of Engineers New York District MAMARONECK & SHELDRAKE RIVERS NEW YORK FLOOD RISK MANAGEMENT GENERAL REEVALUATION REPORT FOR THE VILLAGE OF MAMARONECK JANUARY 2016 APPENDIX E REAL ESTATE

More information

Approval of Takoma Amended Joint Development Agreement

Approval of Takoma Amended Joint Development Agreement Planning, Program Development and Real Estate Committee Item IV- A October 10, 2013 Approval of Takoma Amended Joint Development Agreement Washington Metropolitan Area Transit Authority Board Action/Information

More information

4.14 Socioeconomics Introduction Environmental and Regulatory Setting Environmental Setting.

4.14 Socioeconomics Introduction Environmental and Regulatory Setting Environmental Setting. 4.14 4.14.1 Introduction This section describes the affected environment and environmental consequences related to socioeconomics from operation of the NEPA Alternatives. Sources of information used in

More information

A. The Preliminary Development Plan consists of five Sheets, as follows:

A. The Preliminary Development Plan consists of five Sheets, as follows: Rezoning from A (Agriculture) to RPD (Residential Planned Development) and Approval of a Preliminary Development Plan and Preliminary Subdivision Plat. Wild Plum Farm. Applicant: JPB Holdings LLC, Property

More information

Staff Report REZONING BOUNDARY OPTIONS FOR NEW DOWNTOWN GATEWAY COMMERCIAL ZONING. April 24, 2018

Staff Report REZONING BOUNDARY OPTIONS FOR NEW DOWNTOWN GATEWAY COMMERCIAL ZONING. April 24, 2018 ITEM # 40C Staff Report REZONING BOUNDARY OPTIONS FOR NEW DOWNTOWN GATEWAY COMMERCIAL ZONING BACKGROUND: April 24, 2018 The area generally described as properties along Lincoln Way and between Grand Avenue

More information

OFFICE OF REAL ESTATE

OFFICE OF REAL ESTATE OFFICE OF REAL ESTATE DATE: October 25, 2017 TO: FROM: RE: Users of the Real Estate Manual Wayne Pace, Manager Acquisition Unit Changes and Updates to the Real Estate Manual The only current and accurate

More information

REZONING GUIDE. Zone Map Amendment (Rezoning) - Application. Rezoning Application Page 1 of 3. Return completed form to

REZONING GUIDE. Zone Map Amendment (Rezoning) - Application. Rezoning Application Page 1 of 3. Return completed form to COMMUNITY PLANNING & DEVELOPMENT REZONING GUIDE Rezoning Application Page 1 of 3 Zone Map Amendment (Rezoning) - Application PROPERTY OWNER INFORMATION* PROPERTY OWNER(S) REPRESENTATIVE** CHECK IF POINT

More information

VILLAGE INN 23 CENTENNIAL BLVD HIGHLANDS RANCH, CO John Sheflin Senior Advisor

VILLAGE INN 23 CENTENNIAL BLVD HIGHLANDS RANCH, CO John Sheflin Senior Advisor VILLAGE INN 23 CENTENNIAL BLVD HIGHLANDS RANCH, CO 80129 John Sheflin Senior Advisor 720.773.8541 john.sheflin@svn.com SVN DENVER COMMERCIAL 710 W. COLFAX, DENVER, CO 80204 SALE BROCHURE Property Summary

More information

RESOLUTION NO. R To Acquire Real Property Interests Required for the Lynnwood Link Extension

RESOLUTION NO. R To Acquire Real Property Interests Required for the Lynnwood Link Extension RESOLUTION NO. R2017-40 To Acquire Real Property Interests Required for the Lynnwood Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 11/09/2017 11/16/2017

More information

RESOLUTION NO. RD:EEH:LCP

RESOLUTION NO. RD:EEH:LCP RD:EEH:LCP 3-29-16 RESOLUTION NO. A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN JOSE VACATING A LANDSCAPE EASEMENT AND PORTION OF STREET EASEMENT RESTRICTING VEHICULAR ACCESS ON PRIVATE PROPERTY LOCATED

More information

2 VISION FOR EDEN AREA 2025

2 VISION FOR EDEN AREA 2025 2 ISI FR D R 2025 his General Plan is guided by the vision that den rea residents expressed in the General Plan update process for how they would like to see the den rea evolve. he policy framework presented

More information

DATE: April 25, Mayor Buol and former Iowa DOT Director Paul Trombino Sign Memorandum of Understanding

DATE: April 25, Mayor Buol and former Iowa DOT Director Paul Trombino Sign Memorandum of Understanding TO: FROM: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer Robert Schiesl, Assistant City Engineer SUBJECT: Southwest Arterial (US Highway 52) Project Status Update DATE: April 25, 2017

More information

Horse Gulch Management Plan Final Draft: April 18, 2013

Horse Gulch Management Plan Final Draft: April 18, 2013 I. INTRODUCTION This Plan provides a framework for the sound stewardship of the City of Durango Horse Gulch open space area. The Plan includes baseline information regarding the area, management objectives

More information

Planning Commission Staff Report Rezone Hearing Date: October 10, 2018

Planning Commission Staff Report Rezone Hearing Date: October 10, 2018 Planning Commission Staff Report Rezone Hearing Date: October 10, 2018 * ITEM 7 Provo Economic Development requests a rezone of portions of the East Bay Golf Course, 1860 South East Bay Boulevard, from

More information

Putting it all together. Presented by: RIGHT OF WAY SERVICES

Putting it all together. Presented by: RIGHT OF WAY SERVICES Putting it all together Presented by: RIGHT OF WAY SERVICES OUTLINE Introduction Purpose Federal & State Laws Project Process and Timeline NEPA Requirements Right of Way Plans Title OUTLINE CONTINUED Survey

More information

CITY PLANNING COMMISSION October 27, 2010 / Calendar No. 13

CITY PLANNING COMMISSION October 27, 2010 / Calendar No. 13 CITY PLANNING COMMISSION October 27, 2010 / Calendar No. 13 N 100294(A) ZRM IN THE MATTER OF an application submitted by CRP/Extell Parcel L, LP and CRP/Extell Parcel N, LP pursuant to Sections 197-c and

More information

Railroads & Title Insurance Issues. Dave Lawson, Fidelity National Title Group

Railroads & Title Insurance Issues. Dave Lawson, Fidelity National Title Group Railroads & Title Insurance Issues Dave Lawson, Fidelity National Title Group Title - currently or formerly in a Railroad? What s the true nature of their ownership? What was first, the railroad or the

More information

HEARINGS. Parcels D, F, G and J as shown on Misc. Plan No

HEARINGS. Parcels D, F, G and J as shown on Misc. Plan No Agenda City Centre Community Committee April 13, 2017 HEARINGS Item No. 3 Closing Part of Winchester Street, Somerville Avenue and the Public Lane East of Fennell Street and Part of Waller Avenue, East

More information

AMENDED COMPLAINT FOR DECLARATORY RELIEF PAGE 1

AMENDED COMPLAINT FOR DECLARATORY RELIEF PAGE 1 Case :-cv-00-mjp Document Filed 0// Page of IN THE UNITED STATES DISTRICT COURT WESTERN DISTRICT OF WASHINGTON AT SEATTLE 0 THOMAS E. HORNISH AND SUZANNE J. HORNISH JOINT LIVING TRUST, TRACY AND BARBARA

More information

City Council Report 915 I Street, 1 st Floor Sacramento, CA

City Council Report 915 I Street, 1 st Floor Sacramento, CA City Council Report 915 I Street, 1 st Floor Sacramento, CA 95814 www.cityofsacramento.org File ID: 2017-00593 May 30, 2017 Public Hearing Item 20 Title: Resolution of Necessity: Ramona Avenue Extension

More information

Ruth M. Borrelli Nevada Department of Transportation Chief Right-of-Way Agent

Ruth M. Borrelli Nevada Department of Transportation Chief Right-of-Way Agent Ruth M. Borrelli Nevada Department of Transportation Chief Right-of-Way Agent The 5 th Amendment to the US Constitution states... nor shall private property be taken for public use, without just compensation.

More information

PLANNING AND ZONING COMMISSION AGENDA MEMORANDUM

PLANNING AND ZONING COMMISSION AGENDA MEMORANDUM To: From: Agenda Title City and County of Broomfield, Colorado PLANNING AND ZONING COMMISSION AGENDA MEMORANDUM Planning and Zoning Commission John Hilgers, Planning Director Lynn Merwin, Principal Planner

More information

August 2, Mr. Eric Keenan, P.E. City of Overland Park 8500 Santa Fe Drive Overland Park, KS 66212

August 2, Mr. Eric Keenan, P.E. City of Overland Park 8500 Santa Fe Drive Overland Park, KS 66212 August 2, 2012 Mr. Eric Keenan, P.E. City of Overland Park 8500 Santa Fe Drive Overland Park, KS 66212 Re: Proposal for Appraisal Services 127 th Street Improvements NEC and SEC 127 th & Pflumm Road Dear

More information

City Of La Mesa Acquisition, Anti-Displacement and Relocation Assistance Plan This Residential Anti-displacement and Relocation Assistance Plan

City Of La Mesa Acquisition, Anti-Displacement and Relocation Assistance Plan This Residential Anti-displacement and Relocation Assistance Plan City Of La Mesa Acquisition, Anti-Displacement and Relocation Assistance Plan This Residential Anti-displacement and Relocation Assistance Plan (RARAP) is prepared by The City of La Mesa in accordance

More information

AGENDA ITEM Public Utilities Commission City and County of San Francisco

AGENDA ITEM Public Utilities Commission City and County of San Francisco WATER WASTEWATER POWER AGENDA ITEM Public Utilities Commission City and County of San Francisco MEETING DATE May 11, 2010 Approve Project - Mitigated Negative Declaration: Regular Calendar Bureau Manager:

More information

LINCOLN CORRIDOR REDEVELOPMENT PROJECT UPDATE FOR DOWNTOWN GATEWAY FOCUS AREA

LINCOLN CORRIDOR REDEVELOPMENT PROJECT UPDATE FOR DOWNTOWN GATEWAY FOCUS AREA ITEM: 51 BACKGROUND: Staff Report LINCOLN CORRIDOR REDEVELOPMENT PROJECT UPDATE FOR DOWNTOWN GATEWAY FOCUS AREA March 27, 2018 The City has been working for two years to develop, adopt, and implement the

More information

Misconceptions about Across-the-Fence Methodology

Misconceptions about Across-the-Fence Methodology Misconceptions about Across-the-Fence Methodology BY JOHN SCHMICK Across-the-fence methodology (ATF) is an appraisal tool frequently used in valuation assignments where the subject is part of railroad

More information

Easements to District of Columbia for Metropolitan Branch Trail

Easements to District of Columbia for Metropolitan Branch Trail Joint Development and Real Estate Committee Item III-A November 18, 2010 Easements to District of Columbia for Metropolitan Branch Trail Washington Metropolitan Area Transit Authority Board Action/Information

More information

Truganina Employment Precinct Development Contributions Plan

Truganina Employment Precinct Development Contributions Plan Amendment C124 to the Wyndham Planning Scheme Truganina Employment Precinct Development Contributions Plan December 2009 SM 20091202 11:05 CONTENTS PURPOSE 3 REPORT STRUCTURE 3 1.0 STRATEGIC BASIS 5 1.1

More information

Frequently Asked Questions From the Certification of R/W Training Sessions

Frequently Asked Questions From the Certification of R/W Training Sessions Frequently Asked Questions From the Certification of R/W Training Sessions 1. There are differences between appropriations of vacant land and appropriations of structures. What is a structure? A structure

More information

These matters are addressed in this report and other technical reports provided with this submission.

These matters are addressed in this report and other technical reports provided with this submission. September 14, 2012 Lorraine Stevens, Planner II City of Ottawa Planning and Growth Management 110 Laurier Ave. West 4th Floor Ottawa, ON K1P 1J1 Re: Jock River Estates Phase 2 Revised Draft Plan - Lot

More information

memorandum To: Owen Kerney EDR Project No: Andrew Obernesser Date: June 26, 2017 Reference: ReZone Syracuse Zoning Map Draft #2 Comments:

memorandum To: Owen Kerney EDR Project No: Andrew Obernesser Date: June 26, 2017 Reference: ReZone Syracuse Zoning Map Draft #2 Comments: memorandum To: Owen Kerney EDR Project No: 15094 From: Andrew Obernesser Date: Reference: ReZone Syracuse Zoning Map Draft #2 Comments: T he City of Syracuse will implement the Land Use & Development Plan

More information

Regional Open Space Study

Regional Open Space Study Regional Open Space Study Midpeninsula Regional Open Space District 330 Distel Circle Los Altos, California 94022-1404 Phone: (650) 691-1200 Fax: (650) 691-0485 E-mail: mrosd@openspace.org Web Site: www.openspace.org

More information

Rezoning Petition Final Staff Analysis May 21, 2018

Rezoning Petition Final Staff Analysis May 21, 2018 Rezoning Petition 2017-182 Final Staff Analysis May 21, 2018 REQUEST LOCATION Current Zoning: R-3 (single family) and no zoning (current NC State right-of-way) Proposed Zoning: B-2(CD) (general business,

More information

WIREGRASS RANCH DRI/MPUD MASTER ROADWAY PLAN CONDITIONS OF APPROVAL PDD DRC

WIREGRASS RANCH DRI/MPUD MASTER ROADWAY PLAN CONDITIONS OF APPROVAL PDD DRC WIREGRASS RANCH DRI/MPUD MASTER ROADWAY PLAN CONDITIONS OF APPROVAL DRC 1. This Master Roadway Plan (the MRP) replaces and supersedes the Roadway Alignment and Construction Phasing Plan (File No. GM06-737)

More information

Sound Wal Overview 1

Sound Wal Overview 1 Sound Wall Overview 1 North Coast Corridor Program A 30-year comprehensive and sustainable solution for the region that integrates: Express Lanes on I-5 Double tracking the coastal rail line Integrated

More information

EXPRESS LANES NORTHERN EXTENSION TECHNICAL REPORT SEPTEMBER 2016

EXPRESS LANES NORTHERN EXTENSION TECHNICAL REPORT SEPTEMBER 2016 I N T E R S TAT E 3 9 5 EXPRESS LANES NORTHERN EXTENSION R I G H T O F W AY TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION Right of Way Technical Report City of Alexandria,

More information

Metro. Board Report. File #: , File Type: Policy Agenda Number: 60.

Metro. Board Report. File #: , File Type: Policy Agenda Number: 60. Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA File #: 2018-0331, File Type: Policy Agenda Number: 60. REGULAR BOARD

More information

MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Recommend to Board. Final Action

MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Recommend to Board. Final Action RESOLUTION NO. R2017-06 Surplus Property Declaration for Tukwila Commuter Rail Station Parcels MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 02/09/2017 02/17/2017

More information

South Park Residential Urban Village Site

South Park Residential Urban Village Site South Park Residential Urban Village Site 8914 14th Ave S Seattle, WA 98108 For more information contact: Andrew P. Langsford Founder & Principal (425)531-7966 andy@vreg.co Brian Suite Broker Director

More information

Effective Date: P:\Work Program\Rail\SALINAS RAIL EXTENSION\Salinas\ITC MOU\MOU_Salinas ITC Expansion_FINAL_DRAFT.docx Page 1

Effective Date: P:\Work Program\Rail\SALINAS RAIL EXTENSION\Salinas\ITC MOU\MOU_Salinas ITC Expansion_FINAL_DRAFT.docx Page 1 MEMORANDUM OF UNDERSTANDING AMONG THE, THE CITY OF SALINAS, AND MONTEREY-SALINAS TRANSIT DISTRICT, REGARDING THE SALINAS INTERMODAL TRANSPORTATION CENTER Effective Date: This Memorandum of Understanding

More information

21 Approval to Expropriate Viva Bus Rapid Transit Corridor Yonge Street from Sawmill Valley Drive/Savage Road to Davis Drive Town of Newmarket

21 Approval to Expropriate Viva Bus Rapid Transit Corridor Yonge Street from Sawmill Valley Drive/Savage Road to Davis Drive Town of Newmarket Clause 21 in Report No. 11 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on June 23, 2016. 21 Approval to Expropriate

More information

Land Use, Transportation, and Infrastructure Committee of the Denver City Council FROM: Scott Robinson, Senior City Planner DATE: March 22, 2018 RE:

Land Use, Transportation, and Infrastructure Committee of the Denver City Council FROM: Scott Robinson, Senior City Planner DATE: March 22, 2018 RE: Community Planning and Development Planning Services 201 W. Colfax Ave., Dept. 205 Denver, CO 80202 p: 720.865.2915 f: 720.865.3052 www.denvergov.org/cpd TO: Land Use, Transportation, and Infrastructure

More information

CITY OF COLORADO SPRINGS 2006 ANNEXATION PLAN CHAPTER 4 ENCLAVES

CITY OF COLORADO SPRINGS 2006 ANNEXATION PLAN CHAPTER 4 ENCLAVES CITY OF COLORADO SPRINGS 2006 ANNEXATION PLAN CHAPTER 4 ENCLAVES As the City has expanded, enclaves, remnants of land that are surrounded by the City, have remained within the jurisdiction of El Paso County.

More information

CITY OF BATAVIA. DATE: September 23, 2016 Committee of the Whole-CD Drew Rackow AICP, Planner

CITY OF BATAVIA. DATE: September 23, 2016 Committee of the Whole-CD Drew Rackow AICP, Planner DATE: September 23, 2016 TO: FROM: Committee of the Whole-CD Drew Rackow AICP, Planner CITY OF BATAVIA SUBJECT: Initial Land Use Proposal Review for Landmeier Farm, North Side of McKee Street at Deerpath

More information

TABLE OF CONTENTS General Legal Authority for Certification of Right of Way Control 24-2

TABLE OF CONTENTS General Legal Authority for Certification of Right of Way Control 24-2 TABLE OF CONTENTS 2400 CERTIFICATION OF RIGHT OF WAY CONTROL PAGE 2401 General 24-1 2402 Legal Authority for Certification of Right of Way Control 24-2 2403 Right of Way Certification and Advertising for

More information

4. Itemized cost data for cost of construction certified by a Professional Engineer.

4. Itemized cost data for cost of construction certified by a Professional Engineer. LATECOMER CONTRACTS Under the authority of the Bellingham Municipal Code (Ch. 14.02) property owners who construct public improvements may be partially reimbursed by benefiting owners if a contract, facilitated