Architectural Process & Standard for Parish Construction Project Canons of the Episcopal Church in the Diocese of Alabama: Canon 6 Section 6

Size: px
Start display at page:

Download "Architectural Process & Standard for Parish Construction Project Canons of the Episcopal Church in the Diocese of Alabama: Canon 6 Section 6"

Transcription

1 Canons of the Episcopal Church in the Diocese of Alabama: Canon 6 Section 6 The Diocese and each of its Parishes and other organization shall submit to the Department, for its review and recommendations, its plans and sketches for proposed major construction, decoration and furnishings for properties prior to contract, construction or purchase. THE DESIGN REVIEW PROCESS The Department of Architecture The Department of Architecture is appointed annually be the Bishop, and charged to fulfill the responsibilities Diocesan Canon cited above. The Department includes members of the Church who are knowledgeable in the areas of architecture, engineering, law, construction, and liturgy. The Department meet quarterly, as needed, and notice of meeting dates is sent to those parishes or other agencies known to be considering major construction, decoration, or furnishing of facilities. Special meetings are scheduled, id necessary, to avoid delays. It is the intention of the department to provide objective consultation that will enable parishes to build better and more cost effective buildings within their financial means. Key Review Points To this end, the Department has identified TWO KEY REVIEW POINTS during the planning process. (1) Review of the Written Architectural Program and Budget An Architectural Program is a written statement, which describes the parish s mission and the architectural implications of that mission. It describes in quantifiable terms the functions parish building are intended to serve. It indicates how much money can be made available for the project. It states

2 the design problem (not the solution) that an architect will be asked to address. This written document is required as the essential first step in the review process. It is to be completed by the parish before an architect is engaged. A copy of the Architectural Program and Budget is to be sent to the Diocesan Office for review by the Department of Architecture before any further consideration of building plans. A written review of the Architectural Program and Budget will be sent to the parish for its consideration. A time will then be set for parish representatives to meet with the Department to finalize the Program and Budget. (2) Review of Schematic Drawings with the Parish Architect Preliminary schematic drawings are to be sent to the Diocesan Office before the architect proceeds with detailed working drawings. This preliminary review is to include the site plan, floor plans, elevations, and a revised and updated project summary. A member of the Department of Architecture, who will prepare a written response, identifying specific architectural, financial, liturgical, and/or functions issues will review these materials. This review will be sent to the parish for consideration. A time will then be scheduled for parish representatives and their architect to meet with the Department to discuss these issues. Additional Assistance In addition to these two key points of contact in the review process, the Department stands ready to respond to specific requests for guidance in relation to initial exploration of conceptual alternatives, selection of and contracting with an architect, preparation of contract documents, parishcontractor agreements, and contract modifications.

3 STEPS IN THE PROCESS When your parish begins consideration of a major construction program, the following outline will help you work your way through the task. Notify the Bishop s office that you are considering a building project. He will notify the Department of Architecture, which will designate one of its members to contact your parish to discuss the resources available, including the paper The Church for Common Prayer: A Statement on Worship Space for the Episcopal Church. Contact of the Episcopal Church Building Fund. Although the Episcopal Church Building Fund can assist in construction financing, the primary concern of its staff is to help congregations design space for their needs. Plans and drawings will be reviewed upon request by Fund staff who will provide written comments. will send you a copy of the church Sites and Buildings, an excellent guide to organizing a construction project. It outlines the following possible committee structure, and makes suggestions for a step by step approach. A Committee Structure Planning Committee Assesses readiness of the parish Coordinates in put from parish Coordinates subcommittees from Initial concept to completion Data Sub Committee Gathers pertinent information Tests unspoken assumptions Finance Sub Committee Determines financial capability Puts together the financial package A Step by Step Approach Getting Organized Education Input Data Gathering Architectural Program Financial Planning Evaluation and Decision Making Selection of Site Evaluating preliminary designs The Financial Package Beginning Construction

4 Architectural Program Sub Committee Writes the architectural program Recommends architect Site Sub Committee Evaluates and/or selects site GUIDELINES The following guidelines have been issued by the Bishop, with the approval of the Diocesan Council, for parish construction in this Diocese. 1. Drawings and specifications will be prepared by or under the supervision of an architect registered in the State of Alabama unless otherwise permitted by the Bishop. 2. All construction shall be in compliance with both local building codes and regulations, and Standard Building Code in effect at the time of construction. 3. If a mortgage on parish property is required for construction financing, a request from the Parish Vestry must be submitted for review by the Diocesan Department of Finance, and then approved by the Diocesan Council. Mortgages or notes encumbering parish property are signed by the Bishop with the approval of Diocesan Council. 4. Funding for parish construction may be provided by any one or a combination of the following means: a. Building Fund contributions accumulated prior to construction b. Capital Fund Campaign, with pledges to be completed over a three or four year period, commencing prior to construction and continuing afterward. c. Short Term Church loans from the Diocese, Episcopal Church Building Fund, etc. d. Long Term commercial bank loans. 5. For preliminary planning purposes, a parish may project a capital funds goal of three times the parish s annual budget. 6. Annual debt service may not normally exceed 25% of a parish s operating budget.

5 RESOURCES 1. The Diocesan Council normally limits loans from the Diocesan Revolving Loan Fund to $ or less. Priority consideration is given to loans, which will be repaid within four year. 2. The Episcopal Church Building Fund considers loan applications for church construction up to a maximum limit of $100, Printed resources available from the Episcopal Building Fund: HIRING AND WORKING WITH AN ARCHITECT 1. SELECTION PROCEDURES (a) Retrain the services of a qualified architect early in the project planning process. (b) Criteria for selection should include: a. Previous experience in designing church facilities b. Good references c. Preferably a good Churchperson d. Financially sound professional practice e. Professional liability and general comprehensive insurance coverage f. Enthusiastic about the project g. Willingness to work with the diocesan Department of Architecture h. Solicit expressions of interest from three to no more that six firms, asking them to submit their qualifications by responding to the questionnaire below and attaching a copy of your Program. i. Planning Committee selects no more than three architects for interviews with the Committee. (NOTE: in smaller projects this selection process may be abbreviated and made less formal).

6 2. WORKING WITH THE ARCHITECT a. Clarify at the outset what the process for input and decision making will be, in regards to the architect, the Planning Committee, the Rector and the Vestry. b. A single person preferably the Chair of the Building or Planning Committee should be authorized by the Rector and Vestry to function as official liaison between the parish and the architect. c. Review the project budget with the architect to reach agreement about construction cost. Request recommendations from the architect for revision in the scope of the project if necessary to reach agreement on budget before proceeding to detailed working drawings. d. Arrange for the architect along with parish representatives to meet with the Department of Architecture to review preliminary drawings. SAMPLE ARCHITECT QUESTIONNAIRE Parish is considering construction of a. Our schedule calls for Completion of planning by (date) and completion of construction by (date). If you (or your firm) are interested in providing architectural services on this project, please provide us with the information below by (date). A representative of our Planning Committee will contact you after we have received your response. 1. Your firm: Individual? Partnership? Corporation? 2. Names and principals: affiliations, colleges, and degrees 3. Brief history of firm. 4. Name of principal in charge of project, and name of project manager or project architect 5. Describe how your firm manages projects, and how you would want to relate to our committee 6. Brief list of firm s experience. 7. Amount of professional liability insurance and name of carrier.

7 1. SELECTION A CONTRACTOR a. Solicit suggestion from parishioners, and the architect, and/or the Department of Architecture. b. Contact recommended list to solicit interest in the project c. Request interested contractors to submit material demonstrating their qualifications. d. Review materials carefully and Check all References e. Select no more than four contractor so submit bids or to be interviewed if the project is to be negotiated. f. Involve your architect fully in the selection process g. The contractor you select must have experience in church construction, a good reputation among previous clients, be duly licensed, be in sound financial condition, and not be over committed to other projects. 2. TYPES OF CONTRATING a. COMPETITIVE BIDS from qualified, invited general contractors i. Advantages: potentially the best price; appearance and fairness ii. Disadvantages: somewhat more time consuming, plans must be complete fore bids can confirm budget, thereby increasing chances for budget problems. b. NEGOTIATED CONTRACT with a pre selected/pre qualified general contractor. i. Advantages: contractor and architect work closely together during design to control costs; costs are confirmed sooner, expediting the financing process; contractor is part of the team. ii. Disadvantages: may not achieve the most competitive price. 3. CONTRACTS a. American Institute of Architects contract form may be used as the basic form. b. Key contract provisions include: payment terms, retainer, liquidated damages (if any), guarantees and warranties, dispute resolution, progress schedules, completion date.

8 c. Architect drafts agreement fro review by parish Building Committee and contractor. (The Diocesan Department of Architecture will review the final contract draft before signing if requested). d. Contract must specify appropriate bonding and complete general liability, workers compensation and builder s risk insurance coverage by the general contractor. 4. CONSTRUCTION PROCEDURES a. A Building Committee must be appointed with full authorization from the Rector and Vestry to administer the construction project for the parish. One person must be clearly identified to act as the conduit for all communication between the parish, the contractor, and the architect. b. If the architect s services include supervision during construction, the architect becomes the agent of the parish in its relationship with the contractor. The architect should meet at least monthly with the committee to review progress, to discuss change orders, monthly payments, status of retainer, and other issues. c. The building Committee should report regularly to the Vestry and parish on progress of the work and coordinate temporary arrangements as may be required to facilitate construction. d. The architect and contractor must document thoroughly all discussions and decisions pertaining to the project. 5. PROJECT COMPLETION a. A final inspection shall be conducted jointly by the Building Committee, the architect, and the contractor. b. The contractor must furnish the parish; i. Warranties ii. Operating instructions (both written and verbal) iii. Equipment maintenance requirement5s iv. Lien releases v. As built record documents

9 c. A warranty inspection should be scheduled at the end of the first twelve months of occupancy. d. A new facility is a sign of growth and development and an occasion for celebration. The Bishop and Department of Architecture would welcome the opportunity to join with the parish on such an occasion. 6. MAINTAINING THE FACILITY a. Reasonable operating costs, including utilities, insurance, cleaning, and maintenance, should be carefully calculated and adequately budgeted. b. Consideration should be given to entering into service contracts for the maintenance of major mechanical equipment. Alternatively, knowledgeable parish personnel should include the following on a regularly scheduled maintenance check list; i. Check fans, motors, belts, pumps, and filters on mechanical equipment every six months ii. Check refrigerant gas, gas burners, thermostat, control calibration, and time clocks every twelve months iii. Check roof exterior, painted surfaces and trim, exterior flashing, and miscellaneous metal annually iv. Maintain termite bond v. Check plumbing fixtures monthly for proper operation

10 PROJECT BUDGET SUMMARY WORKSHEET A. Construction a. Base building cost b. Site utilities and improvement cost c. Escalation to construction start TOTAL PROBABLE CONSTRUCTION COST B. Furnishings and Equipment a. Liturgical furnishings b. Kitchen and laundry equipment c. Furniture TOTAL PROBABLE FURNISHINGS AND EQUIPMENT C. Fees and Expenses a. Site Survey b. Subsurface investigation c. Materials testing d. Legal fees and expenses e. Architect/Engineering fees and expenses f. Miscellaneous expenses TOTAL PROBABLE FEES AND EXPENSES D. Total Probable Cost (A+B+C) a. Contingency (10% of D) b. Land cost, if any c. Financing, interest expenses TOTAL PROJECT BUDGET

EPISCOPAL CHURCH IN VERMONT REAL ESTATE POLICIES, PROCEDURES & BEST PRACTICES FOR PURCHASES, SALES, ENCUMBRANCES, & LOANS

EPISCOPAL CHURCH IN VERMONT REAL ESTATE POLICIES, PROCEDURES & BEST PRACTICES FOR PURCHASES, SALES, ENCUMBRANCES, & LOANS EPISCOPAL CHURCH IN VERMONT REAL ESTATE POLICIES, PROCEDURES & BEST PRACTICES FOR PURCHASES, SALES, ENCUMBRANCES, & LOANS (Approved by Diocesan Council on March 19, 2005) The Standing Committee and the

More information

Town of Waldoboro ADMINISTRATIVE POLICY

Town of Waldoboro ADMINISTRATIVE POLICY Town of Waldoboro ADMINISTRATIVE POLICY Effective Date: December 1, 2010 Regulation No: 2010 001 Revision Date: None Supersedes: None Approved By: Board of Selectmen Subject: SECTION I. PURPOSE This policy

More information

FLOWCHART #3 - NEW BUILDING CONSTRUCTION AND MAJOR RENOVATION PLANNING MILESTONES

FLOWCHART #3 - NEW BUILDING CONSTRUCTION AND MAJOR RENOVATION PLANNING MILESTONES 1 NEW CONSTRUCTION AND MAJOR RENOVATION 2 Letter of Intent (LOI) to Bishop See note 3 Start developing: Financial plan Stakeholder list Communications plan 4 Implement: Financial plan Stakeholder list

More information

Radnor Township Township Solicitor

Radnor Township Township Solicitor GENERAL CONDITIONS AND SPECIFICATIONS BACKGROUND: The Township of Radnor, located in suburban Philadelphia, is a Home Rule Township operating in accordance with the codes and laws of the Commonwealth of

More information

REQUEST FOR PROPOSALS NEW HAMPSHIRE HOUSING FINANCE AUTHORITY FOR ACCESSORY DWELLING UNITS IN NEW HAMPSHIRE: A GUIDE FOR HOMEOWNERS

REQUEST FOR PROPOSALS NEW HAMPSHIRE HOUSING FINANCE AUTHORITY FOR ACCESSORY DWELLING UNITS IN NEW HAMPSHIRE: A GUIDE FOR HOMEOWNERS REQUEST FOR PROPOSALS NEW HAMPSHIRE HOUSING FINANCE AUTHORITY FOR ACCESSORY DWELLING UNITS IN NEW HAMPSHIRE: A GUIDE FOR HOMEOWNERS About New Hampshire Housing Finance Authority (NHHFA): As a self-supporting

More information

EAST BATON ROUGE REDEVELOPMENT AUTHORITY ADMINISTRATIVE POLICY PROCUREMENT CONTRACTING AND DBE POLICY FOR FEDERALLY FUNDED PROJECTS.

EAST BATON ROUGE REDEVELOPMENT AUTHORITY ADMINISTRATIVE POLICY PROCUREMENT CONTRACTING AND DBE POLICY FOR FEDERALLY FUNDED PROJECTS. EAST BATON ROUGE REDEVELOPMENT AUTHORITY ADMINISTRATIVE POLICY PROCUREMENT CONTRACTING AND DBE POLICY FOR FEDERALLY FUNDED PROJECTS February 5, 2013 East Baton Rouge Redevelopment Authority 801 North Blvd,

More information

Request for Proposals for Professional Services. Affordable Housing Administrative Agent

Request for Proposals for Professional Services. Affordable Housing Administrative Agent Request for Proposals for Professional Services Affordable Housing Administrative Agent The Township of Hillsborough, Somerset County, is seeking proposals for an Affordable Housing Administrative Agent.

More information

Date Approved: January 19, 2017 Revision Dates:

Date Approved: January 19, 2017 Revision Dates: Section: FINANCIAL PROCEDURES Policy #: 6040 Policy: Approval of Capital Expenditures Date Approved: January 19, 2017 Revision Dates: POLICY In British Columbia, a Catholic Bishop is recognized in law

More information

Request for Proposal to Develop a Land Use Master Plan

Request for Proposal to Develop a Land Use Master Plan Request for Proposal to Develop a Land Use Master Plan PO Box 141, 400 Centre Road, Lions Bay, BC V0N 2E0 Phone: 604-921-9333 Fax: 604-921-6643 Email: office@lionsbay.ca Web: www.lionsbay.ca TABLE OF CONTENTS

More information

All proposals must include a current Business Registration Certificate, W-9 Form and a Certificate of Employee Information Report

All proposals must include a current Business Registration Certificate, W-9 Form and a Certificate of Employee Information Report Request for Proposals for Professional Services For Affordable Housing Administrative Agent The Township of Union, Union County, is seeking proposals for an Affordable Housing Administrative Agent in compliance

More information

Tenant Improvement Program (TIP) Design Review

Tenant Improvement Program (TIP) Design Review Tenant Improvement Program (TIP) Design Review Process Guidelines 100% Draft Dated 2.1.2011 Tenant Improvement Program Design Review (TIPDR) - Draft 2.1.2011 Page 1 of 11 INTRODUCTION The success of San

More information

REQUEST FOR PROPOSALS (RFP) SECTION 8 CONTRACT ADMINISTRATION SERVICES

REQUEST FOR PROPOSALS (RFP) SECTION 8 CONTRACT ADMINISTRATION SERVICES REQUEST FOR PROPOSALS (RFP) 09-331 SECTION 8 CONTRACT ADMINISTRATION SERVICES FOR THE HOUSING AUTHORITY OF THE CITY OF WINSTON-SALEM WINSTON-SALEM, NORTH CAROLINA 1 TABLE OF CONTENTS 1. Introduction 2.

More information

H. UNIVERSITY PROCUREMENT CODE

H. UNIVERSITY PROCUREMENT CODE Page 1 H. UNIVERSITY PROCUREMENT CODE 3-801 General A. Applicability 1. This Article H ( University Procurement Code ) shall consist of rules prescribing procurement policies and procedures for the Arizona

More information

MORTGAGE OF CHURCH REAL PROPERTY In the Episcopal Diocese of Long Island. Policies, Procedures and Practices

MORTGAGE OF CHURCH REAL PROPERTY In the Episcopal Diocese of Long Island. Policies, Procedures and Practices MORTGAGE OF CHURCH REAL PROPERTY In the Episcopal Diocese of Long Island Policies, Procedures and Practices There are specific procedures that must be followed in order for a parish to mortgage church

More information

SCOTTISH EPISCOPAL CHURCH PROVINCIAL BUILDINGS ADVISORY COMMITTEE GUIDANCE ON QUINQUENNIAL BUILDING CONDITION REPORTS

SCOTTISH EPISCOPAL CHURCH PROVINCIAL BUILDINGS ADVISORY COMMITTEE GUIDANCE ON QUINQUENNIAL BUILDING CONDITION REPORTS SCOTTISH EPISCOPAL CHURCH PROVINCIAL BUILDINGS ADVISORY COMMITTEE GUIDANCE ON QUINQUENNIAL BUILDING CONDITION REPORTS This paper is issued to provide guidance to congregations (and their inspecting Architects

More information

THE TOWN OF BANCROFT REQUEST FOR PROPOSAL (RFP) COMMERCIAL REAL ESTATE BROKERAGE SERVICES

THE TOWN OF BANCROFT REQUEST FOR PROPOSAL (RFP) COMMERCIAL REAL ESTATE BROKERAGE SERVICES THE TOWN OF BANCROFT REQUEST FOR PROPOSAL (RFP) 2016-02 COMMERCIAL REAL ESTATE BROKERAGE SERVICES Proposals will be received at the Town of Bancroft Municipal Office, 24 Flint Ave., Bancroft, Ontario,

More information

Tenant Participation in the Modernization of State Public Housing

Tenant Participation in the Modernization of State Public Housing Tenant Participation in the Modernization of State Public Housing How to Effectively Participate in the Modernization Process A Guide for State-Aided Public Housing Tenants in Massachusetts May 9, 2008

More information

PROCUREMENT CODE. Part A Project Delivery and Selection Methods

PROCUREMENT CODE. Part A Project Delivery and Selection Methods PROCUREMENT CODE ARTICLE 6 CONSTRUCTION AND RELATED SERVICES Part A Project Delivery and Selection Methods 6-101 Project Delivery Methods. 1. Determination. The Director shall make a determination regarding

More information

Tel: (617) Fax: (617) OWNER S PROJECT MANAGER GUIDELINES M.G.L. c. 149, 44A1/2

Tel: (617) Fax: (617) OWNER S PROJECT MANAGER GUIDELINES M.G.L. c. 149, 44A1/2 MITT ROMNEY GOVERNOR KERRY HEALEY LIEUTENANT GOVERNOR The Commonwealth of Massachusetts Executive Office for Administration and Finance Division of Capital Asset Management One Ashburton Place Boston,

More information

Update Land Use Regulations For the Town of Copake, NY

Update Land Use Regulations For the Town of Copake, NY Request for Proposal For Professional Services Update Land Use Regulations For the Town of Copake, NY Prepared and Issued By: The Copake Town Board Copake, NY 1.0 INTRODUCTION The Copake Town Board (referred

More information

ONTARIO S CONDOMINIUM ACT REVIEW ONCONDO Submissions. Summary

ONTARIO S CONDOMINIUM ACT REVIEW ONCONDO Submissions. Summary ONTARIO S CONDOMINIUM ACT REVIEW ONCONDO Submissions Summary PROCESS OVERVIEW As part of the first stage of Ontario s Condominium Act Review, the Ministry of Consumer Services invited the public to send

More information

PLANNING & BUILDING REGULATIONS

PLANNING & BUILDING REGULATIONS SCANDIA-HUS FACT SHEET NO. 10 PLANNING & BUILDING REGULATIONS DATE: 1 ST JANUARY 2018 ISSUE NO: 4 THE PLANNING SYSTEM Scandia-Hus will, as part of the service, handle all aspects of design, planning and

More information

Attachment 2 Civil Engineering

Attachment 2 Civil Engineering A. Phase 1, Programming and Schematic Design: The CONSULTANT shall for each project: 1. Ascertain the project s requirements through a meeting with the COUNTY, and a review of an existing schematic layout

More information

REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington

REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington Issue Date: March 2, 2018 Prepared By: Rural Municipality of Wellington Wellington, PEI

More information

PLANNING AND CONSTRUCTION MANUAL

PLANNING AND CONSTRUCTION MANUAL PLANNING AND CONSTRUCTION MANUAL Diocese of Raleigh As of November 2017 1 TABLE OF CONTENTS PAGE INTRODUCTION / BRE MISSION STATEMENT...3 Step 1 -- Initiate the Process...7 Step 2 -- Building & Real Estate

More information

Allegheny County Sanitary Authority REQUEST FOR QUALIFICATIONS. for

Allegheny County Sanitary Authority REQUEST FOR QUALIFICATIONS. for Allegheny County Sanitary Authority REQUEST FOR QUALIFICATIONS for PROPERTY AND RIGHT OF WAY ACQUISITION SERVICES CLEAN WATER PLAN CAPITAL PROJECT S-451 November 2017 1.0 INTRODUCTION ALCOSAN has agreed

More information

Issue Date: Friday, January 26, Submission Deadline: Friday, March 9, 2018 at 5:00 p.m. CST OVERVIEW:

Issue Date: Friday, January 26, Submission Deadline: Friday, March 9, 2018 at 5:00 p.m. CST OVERVIEW: Request for Proposals Sale and Development of Real Estate Offered by City of Foley, AL 118 West Laurel Avenue (Cactus Café Building) Requisition No. GG-030918 Issue Date: Friday, January 26, 2018 Submission

More information

DISPOSITION OF REAL AND PERSONAL PROPERTY POLICY. SECTION 2. DEFINITIONS a. "Land Bank" shall mean Albany County Land Bank Corporation.

DISPOSITION OF REAL AND PERSONAL PROPERTY POLICY. SECTION 2. DEFINITIONS a. Land Bank shall mean Albany County Land Bank Corporation. DISPOSITION OF REAL AND PERSONAL PROPERTY POLICY SECTION 1. PURPOSE This policy (the "Policy") sets forth guidelines for the Albany County Land Bank Corporation s (Land Bank) disposal of real and personal

More information

SUBJECT: Board Approval: 1/18/07

SUBJECT: Board Approval: 1/18/07 1255 Imperial Avenue, Suite 1000 San Diego, CA 92101-7490 619/231-1466 FAX 619/234-3407 Policies and Procedures No. 18 SUBJECT: Board Approval: 1/18/07 JOINT USE AND DEVELOPMENT OF PROPERTY PURPOSE: It

More information

Request for Proposals General Counsel Services

Request for Proposals General Counsel Services Request for Proposals General Counsel Services I. Summary The Texas State Affordable Housing Corporation ( TSAHC ) is issuing this Request for Proposal ( RFP ) to identify and contract for General Counsel

More information

City of Hays Request for Proposals

City of Hays Request for Proposals City of Hays Request for Proposals Sewer Camera Date of Issue: Proposal Due Date July 9, 2008 Table of Contents 1. INTRODUCTION...3 2. RULES OF PREPARATION...3 3. INQUIRIES...3 4. SUBMISSION OF PROPOSALS...3

More information

DIOCESE OF CHELMSFORD DIOCESAN ADVISORY COMMITTEE

DIOCESE OF CHELMSFORD DIOCESAN ADVISORY COMMITTEE DIOCESE OF CHELMSFORD DIOCESAN ADVISORY COMMITTEE APPOINTMENT OF ARCHITECTS OR SURVEYORS AND THEIR FEES GUIDELINES TO ASSIST PARISHES Updated January 2018 APPOINTMENT OF ARCHITECTS OR SURVEYORS AND THEIR

More information

Below Market Rate Program Administrator. Request for Proposals

Below Market Rate Program Administrator. Request for Proposals Below Market Rate Program Administrator Request for Proposals Housing and Community Development 7351 Rosanna Street Gilroy, CA 95020 Page 1 Introduction and Important Dates The City of Gilroy is seeking

More information

LEASE OF CHURCH REAL PROPERTY In the Episcopal Diocese of Long Island. Policies, Procedures and Practices

LEASE OF CHURCH REAL PROPERTY In the Episcopal Diocese of Long Island. Policies, Procedures and Practices LEASE OF CHURCH REAL PROPERTY In the Episcopal Diocese of Long Island Policies, Procedures and Practices There are specific procedures that must be followed in order for a parish to lease church real property.

More information

Attachment 10 Structural Engineering

Attachment 10 Structural Engineering A. Phase 1, Preliminary Design: The CONSULTANT shall: Attachment 10 Structural Engineering 1. Ascertain the requirements for each project through a meeting with the Capital Projects Division Manager or

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE FORM GEN. 160 CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE Date: June To: Honorable Members of the City Council From: Miguel A. Santana, City Administrative Officer Chair, Municipal Facilities

More information

Chapter 11. Competitive Negotiation: Procedure

Chapter 11. Competitive Negotiation: Procedure Chapter 11. Competitive Negotiation: Procedure Summary This chapter provides an overview of the procedure for procuring goods and services using the competitive negotiation procedure. The competitive negotiation

More information

Attachment 8 Mechanical Engineering

Attachment 8 Mechanical Engineering A. Phase 1, Preliminary Design: The CONSULTANT shall: 1. Ascertain the requirements for each project through a meeting with the Capital Projects Division Manager or his/her designated representative and

More information

RECORDKEEPING PROCESS. All ACEDP grantees are required to develop a recordkeeping system that is comprehensive, well-organized and easy to review.

RECORDKEEPING PROCESS. All ACEDP grantees are required to develop a recordkeeping system that is comprehensive, well-organized and easy to review. RECORDKEEPING PROCESS I. INTRODUCTION All ACEDP grantees are required to develop a recordkeeping system that is comprehensive, well-organized and easy to review. The recordkeeping system below provides

More information

Evaluating your co-op manager

Evaluating your co-op manager June 17, 2013 Evaluating your co-op manager When co-ops sign a contract with a person to be their co-op manager, the contract usually includes a provision to conduct an evaluation of the service. This

More information

Town of North Castle New York REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES

Town of North Castle New York REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES Town of North Castle New York REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES 1. Overview The Town of North Castle, New York is hereby requesting proposals from qualified, real estate brokers to assist

More information

SECTION F: Facilities Development

SECTION F: Facilities Development SECTION F: Facilities Development Section F of the EPS/NSBA policy classification system provides a repository for statements on school construction, remodeling and modernizing, temporary facilities, and

More information

Water System Master Operating Agreement. for the. Marion, Howell, Oceola and Genoa. Sewer and Water Authority

Water System Master Operating Agreement. for the. Marion, Howell, Oceola and Genoa. Sewer and Water Authority Water System Master Operating Agreement for the Marion, Howell, Oceola and Genoa Sewer and Water Authority Dated as of February 1, 2011 TABLE OF CONTENTS Page ARTICLE I DEFINITIONS Section 1.1 Definitions...2

More information

RESIDENTIAL REAL ESTATE AGENT SERVICES FOR NEIGHBORHOOD STABILIZATION PROGRAM

RESIDENTIAL REAL ESTATE AGENT SERVICES FOR NEIGHBORHOOD STABILIZATION PROGRAM Mark A. Cowart Chief Information Officer DEPARTMENT OF ADMINISTRATIVE SERVICES PURCHASING 2222 M Street Merced, CA 95340 (209) 385-7331 (209) 725-3535 Fax www.co.merced.ca.us Equal Opportunity Employer

More information

Church Renovation, Remodeling, Master Planning, Real Estate Transactions, & Construction

Church Renovation, Remodeling, Master Planning, Real Estate Transactions, & Construction Church Renovation, Remodeling, Master Planning, Real Estate Transactions, & Construction Requirements and Guidelines for Congregations Episcopal Diocese of Texas Version 8.0 Revised w/ 2016 Canon Revisions:

More information

Partnering To Develop Affordable Housing

Partnering To Develop Affordable Housing Partnering To Develop Affordable Housing Prepared by: Franke Consulting Group As part of the Development Seminar Series Under contract to: New York State Division of Housing & Community Renewal New York

More information

GENERAL INFORMATION AND SPECIFICATIONS FOR PROSPECTIVE CONTRACTORS SUBMITTING QUALIFICATIONS FOR 2019 CONTRACT FOR POSITION OF TOWNSHIP ENGINEER

GENERAL INFORMATION AND SPECIFICATIONS FOR PROSPECTIVE CONTRACTORS SUBMITTING QUALIFICATIONS FOR 2019 CONTRACT FOR POSITION OF TOWNSHIP ENGINEER GENERAL INFORMATION AND SPECIFICATIONS FOR PROSPECTIVE CONTRACTORS SUBMITTING QUALIFICATIONS FOR 2019 CONTRACT FOR POSITION OF TOWNSHIP ENGINEER I. Invitation to Submit Qualifications. The Township of

More information

Housing Program Application (HOME & HTF) County of Bucks, Pennsylvania Housing Services

Housing Program Application (HOME & HTF) County of Bucks, Pennsylvania Housing Services Housing Program Application (HOME & HTF) County of Bucks, Pennsylvania Housing Services Since 1989, Housing Services has been the comprehensive provider of funding for community development, housing and

More information

Working with Nonprofits, Sponsors and Subrecipients sponsored by Florida Housing Finance Corporation s Catalyst Program

Working with Nonprofits, Sponsors and Subrecipients sponsored by Florida Housing Finance Corporation s Catalyst Program Working with Nonprofits, Sponsors and Subrecipients sponsored by Florida Housing Finance Corporation s Catalyst Program Aida Andujar 954-593-8988 Andujar@flhousing.org Our Thanks to the Florida Housing

More information

Right-of-Way Acquisition and

Right-of-Way Acquisition and Request for Proposals On Call Right-of-Way Acquisition and Appraisal Services Requested by: CityofElCentro Department of Public Works 307 W. Brighton Avenue El Centra, Ca. 92243 Phone: (760) 337-4505 Fax:(760)337-3172

More information

DEVELOPMENT SERVICES AGREEMENT

DEVELOPMENT SERVICES AGREEMENT DEVELOPMENT SERVICES AGREEMENT THIS DEVELOPMENT SERVICES AGREEMENT (the Agreement is made this day of, 2011 by and between, a nonprofit corporation, (the "Partnership;, a nonprofit corporation, as its

More information

Office of the County Auditor. Broward County Property Appraiser Report on Transition Review Services

Office of the County Auditor. Broward County Property Appraiser Report on Transition Review Services Office of the County Auditor Broward County Property Appraiser Report on Transition Review Services January 14, 2005 Table of Contents BACKGROUND AND SCOPE...3 FINDINGS AND RECOMMENDATIONS...3 1. Financial

More information

Redevelopment Authority of Allegheny County

Redevelopment Authority of Allegheny County Request for Proposals Appraisal Services Allegheny County Wide One Chatham Center, Suite 900 112 Washington Place Pittsburgh, PA 15219 OBJECTIVE The ( RAAC ) is issuing a Request for Proposals ( RFP )

More information

Request for Proposals For Village Assessment Services

Request for Proposals For Village Assessment Services Request for Proposals For Village Assessment Services INQUIRIES AND PROPOSALS SHOULD BE DIRECTED TO: Jesse Thyes Village Administrator 860 Badger Circle Grafton, WI 53024 Introduction The Village of Grafton

More information

Riverside County Transportation Commission Rail Station Joint Development Guidelines June 2005

Riverside County Transportation Commission Rail Station Joint Development Guidelines June 2005 Riverside County Transportation Commission Rail Station Joint Development Guidelines June 2005 PURPOSE These guidelines are issued under the authority of the Riverside County Transportation Commission

More information

REQUEST FOR QUALIFICATIONS FOR HOUSING ACQUISITION, RELOCATON, DEMOLITION CONSULTANT/REHABILITATION SPECIALIST WISE COUNTY, VIRGINIA

REQUEST FOR QUALIFICATIONS FOR HOUSING ACQUISITION, RELOCATON, DEMOLITION CONSULTANT/REHABILITATION SPECIALIST WISE COUNTY, VIRGINIA REQUEST FOR QUALIFICATIONS FOR HOUSING ACQUISITION, RELOCATON, DEMOLITION CONSULTANT/REHABILITATION SPECIALIST WISE COUNTY, VIRGINIA Project Description The County of Wise, Virginia has been awarded CDBG

More information

Missouri Housing Development Commission

Missouri Housing Development Commission REQUEST FOR QUALIFICATIONS and PROPOSALS Real Estate Broker Missouri Housing Development Commission Response Deadline: Three copies and one electronic copy on a CD-ROM to MHDC No later than 4:00 p.m. on

More information

GREATER SYRACUSE PROPERTY DEVELOPMENT CORPORATION DISPOSITION OF REAL AND PERSONAL PROPERTY POLICY

GREATER SYRACUSE PROPERTY DEVELOPMENT CORPORATION DISPOSITION OF REAL AND PERSONAL PROPERTY POLICY GREATER SYRACUSE PROPERTY DEVELOPMENT CORPORATION DISPOSITION OF REAL AND PERSONAL PROPERTY POLICY SECTION 1. PURPOSE. This policy (the "Policy") sets forth guidelines for the Land Bank's disposal of real

More information

REQUEST FOR QUALIFICATIONS/PROPOSALS

REQUEST FOR QUALIFICATIONS/PROPOSALS REQUEST FOR QUALIFICATIONS/PROPOSALS HOME/CHDO PROGRAM RENTAL NEW CONSTRUCTION AND/OR ACQUISITION/ REHABILITATION HOME RFP No. 2015-01 September 10, 2015 HOME Program Request for Qualifications/Proposals

More information

Chapter 5. Competitive Sealed Bidding: Procedure

Chapter 5. Competitive Sealed Bidding: Procedure Chapter 5. Competitive Sealed Bidding: Procedure Summary This chapter provides an overview of the procedure for procuring goods and nonprofessional services using the competitive sealed bidding procedure.

More information

REQUEST FOR PROPOSALS APPRAISAL SERVICES

REQUEST FOR PROPOSALS APPRAISAL SERVICES REQUEST FOR PROPOSALS APPRAISAL SERVICES Issued By: Philadelphia Land Bank Proposals Must Be Received No Later Than: Friday, February 5, 2016, 4:00 PM, Local Time at the Offices of the Philadelphia Land

More information

INFORMATION FOR VENDORS DOING BUSINESS WITH THE CITY OF CORAL SPRINGS, FLORIDA FINANCIAL SERVICES DEPT

INFORMATION FOR VENDORS DOING BUSINESS WITH THE CITY OF CORAL SPRINGS, FLORIDA FINANCIAL SERVICES DEPT Updated 11/21/2014 VENDOR HANDBOOK INFORMATION FOR VENDORS DOING BUSINESS WITH THE CITY OF CORAL SPRINGS, FLORIDA FINANCIAL SERVICES DEPT./PURCHASING DIVISION 9551 W SAMPLE RD CORAL SPRINGS, FL 33065 TABLE

More information

Request for Proposal(RFP) for Planning Services

Request for Proposal(RFP) for Planning Services Request for Proposal(RFP) for Planning Services Issued December 18, 2017 Population (2010 census) 2,454 Area.55 square miles No. of Households 731 SUMMARY The Charter Township of Royal Oak requests proposals

More information

PART ONE - GENERAL INFORMATION

PART ONE - GENERAL INFORMATION Corrected Date: Page 7 Date of Submittal Changed to Coincide with Submittal Date on Page 5 PART ONE - GENERAL INFORMATION A. INTRODUCTION B. Background Miami Shores Village is soliciting responses to this

More information

WEST BLOOMFIELD TOWNSHIP INVITATION TO BID. CDBG MINOR HOME REPAIR CONTRACT PROGRAM YEAR 2014 DEADLINE: Wednesday, September 24 th, 2014 at 2:00 p.m.

WEST BLOOMFIELD TOWNSHIP INVITATION TO BID. CDBG MINOR HOME REPAIR CONTRACT PROGRAM YEAR 2014 DEADLINE: Wednesday, September 24 th, 2014 at 2:00 p.m. WEST BLOOMFIELD TOWNSHIP INVITATION TO BID CDBG MINOR HOME REPAIR CONTRACT PROGRAM YEAR 2014 DEADLINE: Wednesday, September 24 th, 2014 at 2:00 p.m. Sealed bids for the following services for West Bloomfield

More information

REQUEST FOR PROPOSALS PROPERTY MANAGEMENT SERVICES RFP#

REQUEST FOR PROPOSALS PROPERTY MANAGEMENT SERVICES RFP# REQUEST FOR PROPOSALS PROPERTY MANAGEMENT SERVICES RFP# 2016-02 Issue Date: November 4, 2016 Due Date and Time: Issuing and Using Organization: December 16, 2016 at 2:00 PM Eastern Standard Time Virginia

More information

BROOKLYN BRIDGE PARK CORPORATION POLICY ON THE ACQUISITION AND DISPOSITION OF REAL PROPERTY. Board of Directors Meeting.

BROOKLYN BRIDGE PARK CORPORATION POLICY ON THE ACQUISITION AND DISPOSITION OF REAL PROPERTY. Board of Directors Meeting. BROOKLYN BRIDGE PARK CORPORATION POLICY ON THE ACQUISITION AND DISPOSITION OF REAL PROPERTY Board of Directors Meeting February 29, 2012 I. Introduction In accordance with the requirements of Title 5 A

More information

Prepared by Office of Procurement and Real Property Management. This replaces Administrative Procedure No. A8.215 dated November 2012 A8.

Prepared by Office of Procurement and Real Property Management. This replaces Administrative Procedure No. A8.215 dated November 2012 A8. Prepared by Office of Procurement and Real Property Management. This replaces Administrative Procedure No. A8.215 dated November 2012 A8.215 A8.215 Definitions A8.200 Procurement October 2013 The words

More information

TOWN OF TROY REQUEST FOR PROPOSALS AND QUALIFICATIONS TOWN ATTORNEY SERVICES

TOWN OF TROY REQUEST FOR PROPOSALS AND QUALIFICATIONS TOWN ATTORNEY SERVICES The Town of Troy, St. Croix County, WI is requesting proposals from legal firms or private practice attorneys to provide contract legal services, prosecutorial services and labor relation services to the

More information

REQUEST FOR PROPOSAL MV COMBERMERE COMMUNITY CENTRE ACCESSIBLE LIFT SYSTEM For The Corporation of the Township of Madawaska Valley

REQUEST FOR PROPOSAL MV COMBERMERE COMMUNITY CENTRE ACCESSIBLE LIFT SYSTEM For The Corporation of the Township of Madawaska Valley REQUEST FOR PROPOSAL MV2015 05 COMBERMERE COMMUNITY CENTRE ACCESSIBLE LIFT SYSTEM For The Corporation of the Township of Madawaska Valley Proposal Closing Date and Time Friday, June 5, 2015 At 3:00 p.m.

More information

NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION POLICY REGARDING THE ACQUISITION AND DISPOSITION OF REAL PROPERTY

NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION POLICY REGARDING THE ACQUISITION AND DISPOSITION OF REAL PROPERTY NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION POLICY REGARDING THE ACQUISITION AND DISPOSITION OF REAL PROPERTY I. Introduction In accordance with the requirements of Title 5-A of Article 9 and Section

More information

REQUEST FOR PROPOSALS LIHTC PROPERTY MANAGEMENT CONSULTING MAKAH TRIBAL HOUSING DEPARTMENT

REQUEST FOR PROPOSALS LIHTC PROPERTY MANAGEMENT CONSULTING MAKAH TRIBAL HOUSING DEPARTMENT REQUEST FOR PROPOSALS LIHTC PROPERTY MANAGEMENT CONSULTING MAKAH TRIBAL HOUSING DEPARTMENT The Makah Tribal Housing Department (MTHD) is pleased to invite you to submit your firm s qualifications and proposal

More information

Unit 53 Arden S.R. 80 & Onsite Earthwork, Roadway, Drainage & Utility Improvement Project for Northern Palm Beach County Improvement District

Unit 53 Arden S.R. 80 & Onsite Earthwork, Roadway, Drainage & Utility Improvement Project for Northern Palm Beach County Improvement District MUST BE SUBMITTED IN TRIPLICATE BIDDER: PROJECT: Unit 53 Arden S.R. 80 & Onsite Earthwork, Roadway, Drainage & Utility Improvement Project for Northern Palm Beach County Improvement District PROJECT NO.:

More information

EASTERN WEST VIRGINIA COMMUNITY & TECHNICAL COLLEGE REGULATION No. AR- 7.10

EASTERN WEST VIRGINIA COMMUNITY & TECHNICAL COLLEGE REGULATION No. AR- 7.10 EASTERN WEST VIRGINIA COMMUNITY & TECHNICAL COLLEGE REGULATION No. AR- 7.10 TITLE: PURCHASE OR ACQUISITION OF MATERIALS, SUPPLIES, EQUIPMENT, SERVICES AND PRINTING General Summary Statement of Administrative

More information

CHAPTER 304 TOWN OF SCARBOROUGH PURCHASING POLICY

CHAPTER 304 TOWN OF SCARBOROUGH PURCHASING POLICY CHAPTER 304 TOWN OF SCARBOROUGH PURCHASING POLICY Adopted 4/20/94 Amended 04/18/01 Amended 09/17/03 Amended 11/01/17 Section 1. Purpose... 1 Section 2. Definitions... 1 1. Approved vendors.... 1 2. Bid

More information

Request for Proposals

Request for Proposals Request for Proposals On Call Right-of-Way and Easement Acquisition and Related Services Requested by: Charter Township of Shelby Department of Public Works 6333 23 Mile Road Shelby Township, MI 48316

More information

To establish the structure and content of contracts.

To establish the structure and content of contracts. Page No: 1 of 7 I. Purpose To establish the structure and content of contracts. II. Scope Applies to all contract procurements. III. Procedure In accordance with the Escambia County Purchasing Ordinance,

More information

a. RIGHTS OF WAY: Utility will own, operate and maintain extension facilities only: ISSUED BY Date Filed: July 2, 1996

a. RIGHTS OF WAY: Utility will own, operate and maintain extension facilities only: ISSUED BY Date Filed: July 2, 1996 SOUTHERN CALIFORNIA WATER COMPANY ORIGINAL Cal. P.U.C. Sheet No. 1005-E Page 1 APPLICABILITY: This rule is applicable to extension of electric Distribution Lines 1 of Utility s standard voltages (less

More information

Due Diligence Checklist and Worksheet

Due Diligence Checklist and Worksheet Due Diligence Checklist and Worksheet I. Client: II. III. IV. Purchase Price: Initial Earnest Money Deposit: Form of Deposit (Wire, LOC or Cash): V. Additional Deposit: VI. VII. VIII. IX. Contract Date:

More information

PERRY CITY UTAH REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES

PERRY CITY UTAH REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES PERRY CITY UTAH REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES Overview The City of Perry, Utah is hereby requesting proposals from qualified, real estate brokers to assist with the sale of approximately

More information

QUESTIONS AND ANSWERS FOR IFBs , , , and Dec 2014

QUESTIONS AND ANSWERS FOR IFBs , , , and Dec 2014 QUESTIONS AND ANSWERS FOR IFBs 39 4603, 39 4006, 39 4604, and 39 4608 16 Dec 2014 Note: The following questions were presented to the Sales Contracting Officer (SCO) about the Invitation For Bid (IFB)

More information

REQUEST FOR PROPOSALS (A )

REQUEST FOR PROPOSALS (A ) CITY OF TUSCALOOSA ) STATE OF ALABAMA ) REQUEST FOR PROPOSALS (A18-1471) TO: FROM: RE: Qualified Firms The City of Tuscaloosa, Alabama Request for Proposals for Development of Analysis of Impediment to

More information

NSP DEVELOPER ARRESALE PROGRAM PROCEDURES

NSP DEVELOPER ARRESALE PROGRAM PROCEDURES NSP DEVELOPER ARRESALE PROGRAM PROCEDURES HERA 2301(c)(3)(B) purchase and rehabilitate homes and residential properties that have been abandoned or foreclosed upon, in order to sell, rent, or redevelop

More information

Minority Business Utilization and Development Plan

Minority Business Utilization and Development Plan Florida Acquisition & Appraisal, Inc. Minority Business Utilization and Development Plan T A B L E O F C O N T E N T S Title Page Introduction... 1 Authority, Objective, Policy, Definitions and Action...

More information

RFP REQUEST FOR PROPOSAL. for TAX CREDIT ADVISOR SERVICES. for BOULDER HOUSING PARTNERS. March 6, 2012 Requested Return: March 15, 2010

RFP REQUEST FOR PROPOSAL. for TAX CREDIT ADVISOR SERVICES. for BOULDER HOUSING PARTNERS. March 6, 2012 Requested Return: March 15, 2010 RFP 06-2012 REQUEST FOR PROPOSAL for TAX CREDIT ADVISOR SERVICES for BOULDER HOUSING PARTNERS March 6, 2012 Requested Return: March 15, 2010 Boulder Housing Partners 4800 Broadway Boulder, CO 80304 (720)

More information

SERVICE CONTRACTS (except for A/E professional services) AND PURCHASE CONTRACTS (purchasing apparatus, supplies, materials, or equipment)

SERVICE CONTRACTS (except for A/E professional services) AND PURCHASE CONTRACTS (purchasing apparatus, supplies, materials, or equipment) Federal Uniform Guidance & FEMA Public Assistance Procurement Requirements for North Carolina Local Governments This document applies the most restrictive rule to procurement requirements for North Carolina

More information

Stockton Port District Job Description

Stockton Port District Job Description Stockton Port District Job Description JOB TITLE: Real Estate and Property Development Manager Department: Property Management Reports to: Deputy Port Director, Real Estate and Port Development FLSA Status:

More information

Capital Improvement Program

Capital Improvement Program METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY POLICY AND PROCEDURES FOR RIGHT OF WAY ACQUISITION 1.0 PURPOSE AND DEFINITIONS Capital Improvement Program The purpose of this Policy is to establish procedures

More information

Request for Proposals HQS Inspection Services May 21,

Request for Proposals HQS Inspection Services May 21, MAILING ADDRESS: Arlington Housing Authority 4 Winslow Street Arlington, MA 02474 ATTENTION: John J. Griffin Executive Director REQUEST FOR PROPOSALS Inspectional Services for Housing Choice Voucher Program

More information

Guidelines for Sale, Lease, Donation or Other Alienation of Real Property

Guidelines for Sale, Lease, Donation or Other Alienation of Real Property Guidelines for Sale, Lease, Donation or Other Alienation of Real Property (Parish Faith Communities) What Steps Need to be Taken to Sell, Lease, Donate or Other Alienation of Real Property? Where to begin:

More information

SENATE BILL 794. By Dickerson BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF TENNESSEE:

SENATE BILL 794. By Dickerson BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF TENNESSEE: HOUSE BILL 464 By Staples SENATE BILL 794 By Dickerson AN ACT to amend Tennessee Code Annotated, Title 4, Chapter 5; Title 5; Title 6 and Title 68, to enact the "Property Assessed Clean Energy Act." BE

More information

Ingham County Land Bank Fast Track Authority RESIDENTIAL REAL ESTATE PROFESSIONALS

Ingham County Land Bank Fast Track Authority RESIDENTIAL REAL ESTATE PROFESSIONALS 3024 Turner Street, Lansing MI 48906 517.267.5221 www.inghamlandbank.org Ingham County Land Bank Fast Track Authority REQUEST FOR QUALIFICATIONS FOR RESIDENTIAL REAL ESTATE PROFESSIONALS RFQ # Real Estate

More information

DISTRICT ADMINISTRATIVE RULE

DISTRICT ADMINISTRATIVE RULE DISTRICT ADMINISTRATIVE RULE FEAE-R Construction on District Property Funded by Others 7/25/16 GSBA Reference: FEAE (Community Involvement in Project Planning) RATIONALE/OBJECTIVE: The Cobb County School

More information

Members of the Discernment Committee. Ms. Elbie Ancona, Co-Op board member from Gwinnett Community Church, Lawrenceville

Members of the Discernment Committee. Ms. Elbie Ancona, Co-Op board member from Gwinnett Community Church, Lawrenceville Final Report and Recommendations of the Discernment Committee of the The Lawrenceville Cooperative Ministry, Inc. Lawrenceville, Georgia (Report issued on April 3, 2015) Members of the Discernment Committee

More information

REQUEST FOR PROPOSAL (RFP) RFP AS. Appraisal Services Valuation of DBHA Properties

REQUEST FOR PROPOSAL (RFP) RFP AS. Appraisal Services Valuation of DBHA Properties REQUEST FOR PROPOSAL (RFP) RFP 2019-01AS Appraisal Services Valuation of DBHA Properties Daytona Beach Housing Authority (DBHA) 211 N Ridgewood Ave Suite 300 Daytona Beach, FL 32114 (386) 253-5653 Terril

More information

VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY POLICY GOVERNING CAPITAL PROJECTS

VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY POLICY GOVERNING CAPITAL PROJECTS MANAGEMENT AGREEMENT BETWEEN THE COMMONWEALTH OF VIRGINIA AND VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY PURSUANT TO THE RESTRUCTURED HIGHER EDUCATION FINANCIAL AND ADMINISTRATIVE OPERATIONS ACT

More information

Rulemaking Hearing Rules of The Tennessee Department of Human Services Tennessee Business Enterprises

Rulemaking Hearing Rules of The Tennessee Department of Human Services Tennessee Business Enterprises Rulemaking Hearing Rules of The Tennessee Department of Human Services Tennessee Business Enterprises Chapter 1240-06-13 Priority for the Establishment of Vending Facilities New Rules Table of Contents

More information

REAL ESTATE BROKER SERVICES : DUPLEXES Request For Proposal # October 30, 2018

REAL ESTATE BROKER SERVICES : DUPLEXES Request For Proposal # October 30, 2018 REAL ESTATE BROKER SERVICES : DUPLEXES Request For Proposal #2018-53 October 30, 2018 Electronic Submittals are due by 2:00 PM on November 21, 2018 Everett Housing Authority (EHA) is requesting proposals

More information

CHIEF REAL ESTATE OFFICER, 1949

CHIEF REAL ESTATE OFFICER, 1949 12-10-93 CHIEF REAL ESTATE OFFICER, 1949 Summary of Duties: A Chief Real Estate Officer plans, organizes, and directs, or assists in the planning and directing of administrative and technical real estate

More information

The Real Estate Transaction in 180 Steps What Your REALTOR Does for You

The Real Estate Transaction in 180 Steps What Your REALTOR Does for You REALTOR ASSOCIATION OF PIONEER VALLEY, INC. The Western New England Center for Real Estate Services 221 Industry Avenue Springfield, MA 01104 413-785-1328 phone 877-854-6978 toll-free 413-731-7125 fax

More information