1 Ruling No Application No. B BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND AND IN THE MATTER OF Sentence (1) and Clause (9)(b) of Regulation 403/97, as amended, the Building Code. IN THE MATTER OF an application by Cathy Lovett, Henderson General Hospital, for the resolution of a dispute with John Spolnik, Chief Building Official, City of Hamilton, to determine whether the vertical and horizontal riser piping for the proposed standpipe system which would not be protected with a two-hour fire rated separation, provides sufficiency of compliance with Sentence (1) and Clause (9)(b) of the 1997 Building Code at Henderson General Hospital Redevelopment, Phase 1, 771 Concession Street, City of Hamilton, Ontario. APPLICANT RESPONDENT PANEL PLACE Cathy Lovett Henderson General Hospital, Hamilton, ON John Spolnik Chief Building Official City of Hamilton Tony Chow, Chair Alison Orr Mina Tesseris Toronto, Ontario DATE OF HEARING January 24, 2008 DATE OF RULING January 24, 2008 APPEARANCES Leszek Muniak Larden Muniak Consulting Inc., Toronto, ON Agent for the Applicant Lisa Simmons Building Engineer City of Hamilton Designate for the Respondent

2 -2- RULING 1. Particulars of Dispute The Applicant has received a permit under the Building Code Act, 1992, and is constructing a 6 storey addition to the east side of the existing building at Henderson General Hospital, 771 Concession Street, City of Hamilton, Ontario. The subject 6-storey building addition contains Group B, Division 2 and Group D major occupancies, is 36, 480 m² in building area, is fully sprinklered and contains a standpipe and hose system. As required by the Building Code, the building is comprised of non-combustible construction, contains floor assemblies with 2 hour fire separations, mezzanines with fire resistance ratings of not less than 1 hour, exit stairs that are separated from the remainder of the building by a 2 hour fire separation, and vertical service shafts that are separated from all other portions of each adjacent storey by a 1 hour fire separation. The structural fire-resistance ratings for the new addition are based on Article , Group B, Division 2, Any Height, Any Area, Sprinklered of the Building Code. The issue in dispute relates to the degree of protection that is required for the standpipe system riser piping in terms of fire-resistance rating of the enclosure surrounding the piping that serves the hose connections according to Sentences (1), (9) of the Building Code and NFPA 14 as referenced by the Code. Sentence (1) of the Building Code states that where a standpipe system is required, the design, construction, installation and testing of the system shall be in conformance with NFPA 14, Installation of Standpipe and Hose Systems. NFPA 14, Installation of Standpipe and Hose Systems requires that standpipes and lateral piping supplied by standpipes be located in enclosed exit stairways or be protected by a degree of fire resistance equal to that required for enclosed exit stairways in the building in which they are located. However, Sentence (9) of the Building Code requires that a standpipe riser be located in either an exit stair shaft or a service space. An exit stair shaft is a protected space that is generally separated from the remainder of the building with a fire-resistance rating. Therefore, when a standpipe riser is located in an exit stair shaft it is implicit that a certain level of protection for the piping will be achieved. Alternatively, a service space, as defined by the Building Code, may not be required, in certain circumstances, to be enclosed with a rated fire separation. The Building Code further defines vertical service space and horizontal service space and sets out the respective fire separation requirements in Article for vertical service spaces and Article for horizontal service spaces. In cases of conflict between the provisions of the Building Code and those of a referenced document, Article of the Code states that the provisions of the Building Code shall govern. The Applicant proposes that the vertical and horizontal riser piping for the subject standpipe system, without the protection of a fire rated separation from the remainder of the building, provides sufficiency of compliance with Sentence (1) and Clause (9)(b) of the 1997 Building Code. The Respondent, however, is of the opinion that the subject standpipe risers (vertical and horizontal runs) are required to be protected by a 2 hour fire rated separation in accordance with NFPA 14.

3 -3-2. Provisions of the Building Code in Dispute Standpipe System Design (1) Except as otherwise provided in this Subsection, if a standpipe system is required, the design, construction, installation and testing of the system shall be in conformance with NFPA 14, Installation of Standpipe and Hose Systems (9) A standpipe riser shall be located in (a) an exit stair, or (b) in a service space. 3. Applicant s Position The Agent for the Applicant submitted that there is no definitive statement in the Building Code as to the actual fire resistance rating or protection required for a standpipe riser and that Article only provides a general reference for the standpipe system to be in conformance with NFPA 14. The Agent stated that NFPA in Section requires that standpipes and lateral piping supplied by standpipes be located in enclosed exit stairways or be protected by a degree of fire resistance equal to that required for the enclosed exit stairways in the building in which they are located. The Agent submitted that Sentence (9) of the Building Code requires a standpipe riser to be located in an exit stair or a service space. He contended that service spaces are not normally provided with a fire resistance rating equal to the rating of exit stairs and further, in various circumstances within sprinklered buildings, service spaces do not require fire resistance ratings. The Agent argued that based on the Building Code definition of a service space, which is defined as a space provided in a building to facilitate or conceal the installation of building service facilities such as chutes, ducts, pipes, shafts or wires, the service space is not required to be separated from the remainder of the building by a fire separation and thus, Clause (9)(b) was not intended to require a standpipe riser to be located in a rated shaft enclosure. The Agent maintained there is a conflict between the provision of the Building Code and NFPA 14. He argued that since Article of the Building Code states that in the case of conflict between the provisions of this Code and those of a referenced document, the provisions of this Code will govern, the provisions of the Building Code govern over the requirements of NFPA 14. The Agent contended that as Sentence (9) only references standpipe risers, service space is sometimes interpreted to mean vertical service space. The Agent argued that even if service space was interpreted to mean vertical service space, a vertical service space in the subject building would be required to have a rating of not more than 1 hour. Further, the Agent submitted that the fire resistance rating implied by the Code is being provided intrinsically through the fire protection of the water filled pipe, which provides sufficient thermal mass to provide the equivalent fire resistance rating to that required for vertical service shafts and therefore, provides sufficiency of compliance with the Code. The Applicant maintained that it is not the intent of the Building Code to require piping for standpipe systems to be separated from the remainder of the building in fire rated construction but rather to indicate where a standpipe riser is to be located i.e. an exit stair shaft or a service space.

4 -4-4. Respondent s Position The Designate for the Respondent submitted that the subject building is required to have a standpipe system as per Clause (1)(b) of the Code and that both 38 mm and 65 mm hose connections are required as per Article of the Building Code. The Designate contended that there were two ways to interpret Sentence (9). of the Code. One interpretation, she maintained, is that this sentence only indicates where the standpipe riser shall be located - an exit stair shaft or a service space. She argued that since there is no prescriptive requirement in Subsection of the Code for the value of protection, the user of the Code must refer to NFPA 14 for conformance. She submitted that Sentence (1) of the Code states, Except as otherwise provided in this Subsection, if a standpipe system is required, the design, construction, installation and testing of the system shall be in conformance with NFPA 14, Installation of Standpipe and Hose Systems. The designate maintained that Article of NFPA requires standpipes to be located in enclosed exit stairways or to be protected by a degree of fire resistance equal to that required for enclosed exit stairways. In the subject building, she pointed out the exit enclosures are required to be protected by a 2 hour fire separation as per Articles and of the Building Code; therefore, it is her position that the standpipe risers are required to be protected by a 2 hour fire separation. The second interpretation of Sentence (9), the Designate explained, was that a user of the Code might again interpret the Sentence to indicate only where the standpipe riser must be located - an exit stair shaft or a service space. In this case, she maintained, a user continues to refer to Section 3.4. Exits of the Building Code for the equivalent rating of an exit stair shaft and Section 3.6. Service Facilities of the Code for the equivalent rating of a service space. The Designate argued that there was a discrepancy in the Code as to which value the user should use as the Code may require only a 1 hour fire separation for a vertical service space but require not less than a 2 hour fire separation for an exit stair shaft. She pointed out, in other cases, the most restrictive requirement of the Building Code would apply and therefore, in this case the standpipe riser would be required to be protected by a 2 hour fire separation. As a result, the Designate maintained, it was the municipality s interpretation that the entire standpipe riser, including both vertical and horizontal runs, be protected by way of either one of the interpretations described. The Designate, although agreeing with the Applicant s position that the Code may not be definitive as to the actual value of protection required for the standpipe riser, maintained that NFPA clearly requires protection, even in a sprinklered building, to ensure that the system is available to fire fighting personnel and building occupants in the event of a fire.

5 -5-5. Commission Ruling It is the Decision of the Building Code Commission that the vertical and horizontal riser piping for the proposed standpipe system which would not be protected with a two-hour fire rated separation provides sufficiency of compliance with Sentence (1) and Clause (9)(b) of the 1997 Building Code at Henderson General Hospital Redevelopment, Phase 1, 771 Concession Street, City of Hamilton, Ontario on condition that: a) The standpipe system riser piping, including all vertical and horizontal portions, with the exception of (b) below, shall be located within a service space. The service space shall be separated by construction having a one hour fire resistance rating on the outside of the service space. b) The horizontal portions of the standpipe system riser piping, located within the mechanical room in the basement level, where it is required to be sprinklered, do not have to be located within a service space. The sprinkler coverage in this room shall be designed to provide and increased density of water. 6. Reasons i. Article of the Building Code outlines the requirements for a standpipe system design. Sentence (1) states except as otherwise provided in this Subsection, if a standpipe system is required, the design, construction, installation and testing of a required standpipe system shall be in conformance with NFPA 14, Standard for the Installation of Standpipe and Hose Systems. Sentence (9) of the Code requires standpipe risers to be located in an exit stair shaft or a service space. This provision of the Building Code supersedes any related requirements contained in the referenced NFPA Standard. ii. Adherence to the above noted conditions will, in the opinion of the Commission, achieve sufficiency of compliance with the provisions of the Code.

6 -6- Dated at Toronto this 24 th day in the month of January in the year 2008 for application number Tony Chow, Chair Alison Orr Mina Tesseris

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 08-03-1177 Application No. 2007-26 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Articles 3.4.4.1.,

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No.: 10-29-1265 Application No.: B-2010-24 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Clause 3.4.4.2.(2)(f)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 05-13-1027 Application No. 2005-05 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentences 3.1.3.2.(2)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 09-10-1222 Application No. 2009-07 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 3.1.2.1 and

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-43-898 Application No. 2002-46 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentences 3.2.1.1.(4),

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 09-03-1215 Application No. B-2009-01 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF with Sentences 3.3.1.3.(9)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 04-33-988 Application No. 2004-28 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentence 3.4.6.3.(2)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 09-05-1217 Application No. 2009-03 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 3.3.1.15. and

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 05-06-1020 Application No. 2004-74 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 1.1.3.2 of

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No.03-10-908 Application No. 2003-06 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentences 3.3.1.8.(1)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling # 01-20-813 Application # 2001-23 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24 (1) of the Building Code Act, 1992. AND IN THE MATTER OF Article 9.5.2.1. and Clause 3.8.1.1.(1)(c) of Regulation

More information

Secondary Suites Changes between the 2006 ABC and the 2014 ABC Requirements

Secondary Suites Changes between the 2006 ABC and the 2014 ABC Requirements Secondary Suites Changes between the 2006 ABC and the 2014 ABC Requirements Alberta Building Code 2006 Alberta Building Code 2014 Change 9.37.2. Construction 9.37.2.1. Height of Rooms and Spaces 1) The

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 01-30-823 Application # 2001-04 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24 (1) of the Building Code Act, 1992. AND IN THE MATTER OF Article 3.2.9.1. of Regulation 403, as amended

More information

COUNCIL ORDER No

COUNCIL ORDER No SAFETY CODES COUNCIL #000, 0665 Jasper Avenue N.W., Edmonton, Alberta, Canada, T5J 389 Tel: 780430099 I 888430099 Fax: 78044534 I 88844534 www.safetycodes.ab.ca COUNCIL ORDER No. 005443 BEFORE THE BUILDINGTECHNICALCOUNCIL

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 03-14-912 Application No. 2003-05 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Clause 10.1.1.2.(1)(a)

More information

(2) Determining Occupant Loads for the Operation of a Building (The Alberta Fire Code)

(2) Determining Occupant Loads for the Operation of a Building (The Alberta Fire Code) (d) (e) (f) (g) (h) if emergency lighting is required if exit signs are required if additional requirements apply for high buildings the type of hardware required on exit and access to exit doors the required

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 03-21-919 Application No. 2003-20 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentence 3.8.3.3. (5)

More information

E1-12: Final Decision AS

E1-12: Final Decision AS BCAC COMPILATION OF GROUP A E1-12: Final Decision AS 202, 1006 (New), 1007 (New), 1014.3, 1015, 1020.1, 1021 (IFC [B] 1006 (New), 1007 (New), 1014.3, 1015, 1020.1, 1021) Proponent: Charles S. Bajnai, Chesterfield

More information

Regional District of Nanaimo Secondary Suite Program

Regional District of Nanaimo Secondary Suite Program Regional District of Nanaimo Secondary Suite Program Secondary suites are recognized for the important role they play in providing affordable housing in the region. They also provide many benefits to homeowners,

More information

Section 9.5. Design of Areas, Spaces and Doorways

Section 9.5. Design of Areas, Spaces and Doorways f):.-"> ~Ontario 2012 Building Code Compendium 9.5.1.5. 9.4.4.5. Reserved 9.4.4.6. Walls Supporting Drained Earth (See Appendix A.) Except where constructed in accordance with Section 9.15., walls supporting

More information

SCHEDULE A TO BY-LAW NUMBER (Amended by By-law ) CLASSES OF PERMITS AND PERMIT FEES

SCHEDULE A TO BY-LAW NUMBER (Amended by By-law ) CLASSES OF PERMITS AND PERMIT FEES SCHEDULE A TO BY-LAW NUMBER 2010-24 (Amended by By-law 2016-40) CLASSES OF PERMITS AND PERMIT FEES 1. Except where a minimum flat fee is indicated for the Occupancy Classification or Type of Construction,

More information

2015 IBC Allowable Heights and Areas

2015 IBC Allowable Heights and Areas 2015 IBC Allowable Heights and Based on the 2015 International Building Code (IBC ) Course Description This seminar addresses the key issues of the 2015 International Building Code (IBC ) Chapter 5 regarding

More information

Sample Questions for Paper 1 Statutory Controls in Building Works

Sample Questions for Paper 1 Statutory Controls in Building Works 1. One of the purposes of usable floor space in building plan submissions is for determining Ans. : A A. the area of the refuse chamber. B. the provision of sanitary fitments. C. the area within a flat,

More information

Purpose. Scope. Stairway Identification Signs. Emergency Evacuation and Stairwell Signage Requirements

Purpose. Scope. Stairway Identification Signs. Emergency Evacuation and Stairwell Signage Requirements TOWN OF BRIGHTON Office of the Fire Marshal 2300 Elmwood Avenue Rochester, New York 14618 (585) 784-5220 Office (585) 784-5207 Fax Emergency Evacuation and Stairwell Signage Requirements The intent of

More information

Suite Permission. Suites complying with shall be permitted to be used to meet the corridor access requirements of

Suite Permission. Suites complying with shall be permitted to be used to meet the corridor access requirements of Categorical Waiver Available: 5. Suites Sections 18/19.2.5 of the 2000 LSC requires every habitable room to have an exit access door leading directly to an exit access corridor; allows for exit access

More information

Vestibule Requirement Intent

Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004] Vestibule Requirement Intent Page 1 of 14 The primary intent behind the requirement for a vestibule is to reduce infiltration into a space

More information

ERRATA AND REVISIONS MEASURES FOR FIRE SAFETY IN HIGH BUILDINGS

ERRATA AND REVISIONS MEASURES FOR FIRE SAFETY IN HIGH BUILDINGS National Research Council Canada Conseil national de recherches Canada Associate Committee on the NATIONAL BUILDING CODE of Canada Comite associe du CODE NATIONAL DU BATIMENT du Canada Ottawa ERRATA AND

More information

A001 DEMOLITION SITE PLAN A001 1:300 ADDITION DICKINSON DRIVE INGLESIDE, ONTARIO CATHOLIC DISTRICT SCHOOL BOARD OF EASTERN ONTARIO

A001 DEMOLITION SITE PLAN A001 1:300 ADDITION DICKINSON DRIVE INGLESIDE, ONTARIO CATHOLIC DISTRICT SCHOOL BOARD OF EASTERN ONTARIO DEMOLITION SITE AS NOTED No J.V.D. A001 1:300 0 10.0 m 50 m J.J. 2016-04-25 A001 ACAD FILE/FICHIER: 1619-A001.DWG SITE 1:300 No J.V.D. J.J. A002 A002 1:300 0 10.0 m 50 m 2016-04-20 ACAD FILE/FICHIER: 1619-A002.DWG

More information

A By-law to amend Zoning and Development By-law No regarding Laneway Houses

A By-law to amend Zoning and Development By-law No regarding Laneway Houses Zoning & Development By-law Amendments regarding Laneway Houses Draft for Public Hearing A By-law to amend Zoning and Development By-law No. 3575 regarding Laneway Houses 1. This By-law amends or adds

More information

22 POTENTIAL ONTARIO BUILDING CODE AMENDMENTS FOR MID-RISE WOOD FRAME BUILDINGS UP TO SIX STOREYS

22 POTENTIAL ONTARIO BUILDING CODE AMENDMENTS FOR MID-RISE WOOD FRAME BUILDINGS UP TO SIX STOREYS Clause No. 22 in Report No. 9 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on May 15, 2014. 22 POTENTIAL ONTARIO BUILDING

More information

CITY OF MOUNT PLEASANT ORDINANCE NO. 1017

CITY OF MOUNT PLEASANT ORDINANCE NO. 1017 CITY OF MOUNT PLEASANT ORDINANCE NO. 1017 AN ORDINANCE TO AMEND SECTIONS 152.004 AND 152.007 OF THE CODE OF ORDINANCES FOR THE CITY OF MOUNT PLEASANT TO ADOPT PROVISIONS OF THE 2012 INTERNATIONAL PROPERTY

More information

Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule: CLASSES OF PERMITS AND PERMIT FEES 1. CALCULATION OF PERMIT FEES FOR CONSTRUCTION: (6) Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule: Permit

More information

BUILDING DIVISION SIMPLIFIED BUILDING PERMIT FEE SCHEDULE January 01st, 2019 to December 31st, 2019

BUILDING DIVISION SIMPLIFIED BUILDING PERMIT FEE SCHEDULE January 01st, 2019 to December 31st, 2019 How to Calculate Permit Fees: To calculate the mit fee required at the time of application the following is used 1. Determine which Class of Work is applicable 2. Determine the Area of Work (i.e. project

More information

Discuss the history of fires that resulted in much of the development of codes related to means of egress. Review mean of egress terminology

Discuss the history of fires that resulted in much of the development of codes related to means of egress. Review mean of egress terminology Discuss the history of fires that resulted in much of the development of codes related to means of egress Review mean of egress terminology Discuss 8 Elements to an Effective Means of Egress. Modern code

More information

Background: 5 th Edition (2014) Florida Building Code, Building

Background: 5 th Edition (2014) Florida Building Code, Building Issue DS 2017-019. The petitioner Robert C Shumake of Shumake Architecture is seeking a declaratory statement on whether FBC 1029.1 require an emergency escape and rescue opening from sleeping units located

More information

West Hastings Street By-law No (Being a By-law to Amend By-law 3575, being the Zoning and Development By-law)

West Hastings Street By-law No (Being a By-law to Amend By-law 3575, being the Zoning and Development By-law) Zoning and Development By-law Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7344 fax 873.7060 planning@city.vancouver.bc.ca CD-1 (316) 526-528 West Hastings Street By-law No. 7209

More information

The New NYC Building Code Chapter 10 Means of Egress. New York City Department of Buildings. Technical Affairs. Fatma M. Amer, P.E.

The New NYC Building Code Chapter 10 Means of Egress. New York City Department of Buildings. Technical Affairs. Fatma M. Amer, P.E. The New NYC Building Code Chapter 10 Means of Egress New York City Department of Buildings Technical Affairs Fatma M. Amer, P.E. Copyright Materials This presentation is protected by US and International

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 03-52-950 Application No. 2003-55 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 1.1.3.2. of

More information

Codes Checklist Document 3

Codes Checklist Document 3 Ohio University Interior Architecture Codes Check p1 of 7 atthew Ziff,.Arch, Associate Professor Codes Checklist Document 3 General Construction Code Requirements Construction type of Building (Table 601)

More information

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS Prepared by: Community Development Standards Branch Town of Innisfil www.innisfil.ca June 2016 Contents 1. Introduction... 1 2. Ontario Building

More information

The UBBL Applications of Fire Safety Provisions

The UBBL Applications of Fire Safety Provisions The UBBL Applications of Fire Safety Provisions Atriums Open Structures and Corridors Fire Appliance Access Ar Chong Lee Siong APAM MIFireE MIArbs PAM-IFEM SEMINAR 2016 ATRIUMS UBBL clause 137 UBBL clause

More information

Ontario Municipal Board Order issued October 22, 2014 in Board File No. PL CITY OF TORONTO. BY-LAW No (OMB)

Ontario Municipal Board Order issued October 22, 2014 in Board File No. PL CITY OF TORONTO. BY-LAW No (OMB) Authority: Ontario Municipal Board Order issued October 22, 2014 in Board File No. PL130888 CITY OF TORONTO BY-LAW No. 1083-2014(OMB) To amend former City of Toronto Zoning By-law No. 438-86 with respect

More information

PART R3-AM-1 and R3-AM-2 ZONES, MID-RISE MULTIPLE DWELLING DISTRICT. Permitted Uses 1. The following uses are permitted:

PART R3-AM-1 and R3-AM-2 ZONES, MID-RISE MULTIPLE DWELLING DISTRICT. Permitted Uses 1. The following uses are permitted: PART 3.10 R3-AM-1 and R3-AM-2 ZONES, MID-RISE MULTIPLE DWELLING DISTRICT Permitted Uses 1. The following uses are permitted: (d) (e) (f) single family dwellings and customary accessory uses, including

More information

TENTS PERMIT APPLICATION & INFORMATION

TENTS PERMIT APPLICATION & INFORMATION TENTS PERMIT APPLICATION & INFORMATION Building Department Anne Lalonde- Planning & Building Information Officer - anne.lalonde@southglengarry.com - ext 258 Permit Application Checklist for Tents Building

More information

TCF SUBMISSION TO MBIE ON LAND ACCESS AND MULTI UNIT COMPLEXES (MUCs) REGIME. 18 February 2016

TCF SUBMISSION TO MBIE ON LAND ACCESS AND MULTI UNIT COMPLEXES (MUCs) REGIME. 18 February 2016 TCF SUBMISSION TO MBIE ON LAND ACCESS AND MULTI UNIT COMPLEXES (MUCs) REGIME 18 February 2016 1. Introduction 1.1. The TCF understands that Cabinet has agreed to a proposal for a new Land Access regime

More information

Presentation By. Chris Poujol. Jeffery Rodriguez. James Rigley

Presentation By. Chris Poujol. Jeffery Rodriguez. James Rigley Means of Egress Presentation By Chris Poujol Jeffery Rodriguez James Rigley Table of Contents I. Means of Egress Definition II. History III. NYC Building Code IV. General Requirements IX. Exit Signs X.

More information

Etobicoke York Community Council Item [#], as adopted by City of Toronto Council on [date] Draft Zoning By-law Amendment (March 20, 2019)

Etobicoke York Community Council Item [#], as adopted by City of Toronto Council on [date] Draft Zoning By-law Amendment (March 20, 2019) Authority: Etobicoke York Community Council Item [#], as adopted by City of Toronto Council on [date] Draft Zoning By-law Amendment (March 20, 2019) CITY OF TORONTO BY-LAW No. XXX-2019 To amend Chapters

More information

ACCESSORY APARTMENTS OLDER THAN FIVE YEARS

ACCESSORY APARTMENTS OLDER THAN FIVE YEARS ACCESSORY APARTMENTS OLDER THAN FIVE YEARS INCLUDED: LIST OF REQUIREMENTS SAMPLE DRAWINGS Planning & Development Services Tel. 905-683-4550 Fax. 905-686-0360 TOWN OF AJAX 65 Harwood Ave South Ajax ON L1S

More information

Authority: Toronto and East York Community Council Item 26.9, as adopted by City of Toronto Council on October 8, 9, 10 and 11, 2013 CITY OF TORONTO

Authority: Toronto and East York Community Council Item 26.9, as adopted by City of Toronto Council on October 8, 9, 10 and 11, 2013 CITY OF TORONTO Authority: Toronto and East York Community Council Item 26.9, as adopted by City of Toronto Council on October 8, 9, 10 and 11, 2013 CITY OF TORONTO BY-LAW No. 1710-2013 To amend former City of Toronto

More information

Andraus high-rise, Sao Paulo, Brazil, February 1972

Andraus high-rise, Sao Paulo, Brazil, February 1972 Andraus high-rise, Sao Paulo, Brazil, February 1972 Of the 450 rescued, 350 were lifted off the roof by a fleet of 11 helicopters over a period of 4 hours 100 were saved at the 14th storey level using

More information

CITY OF TORONTO BY-LAW NO. ~-20~

CITY OF TORONTO BY-LAW NO. ~-20~ Authority: Toronto and East York Community Council Item ~ as adopted by City of Toronto Council on ~, 20~ Enacted by Council: ~, 20~ CITY OF TORONTO BY-LAW NO. ~-20~ To amend the former City of Toronto

More information

THIS CHECKLIST HAS BEEN AMENDED TO INCLUDE ONLY LEVEL ONE CRITERIA AS REQUESTED BY TIR REAL PROPERTY. As such it does not form a complete Checklist.

THIS CHECKLIST HAS BEEN AMENDED TO INCLUDE ONLY LEVEL ONE CRITERIA AS REQUESTED BY TIR REAL PROPERTY. As such it does not form a complete Checklist. Nova Scotia Building Accessibility Checklist Note OTE THIS CHECKLIST HAS BEEN AMENDED TO INCLUDE ONLY LEVEL ONE CRITERIA AS REQUESTED BY TIR REAL PROPERTY. As such it does not form a complete Checklist.

More information

2012 IBC Means of Egress

2012 IBC Means of Egress 12/11/2017 Introductions 2012 IBC Means of Egress Based on the 2012 International Building Code (IBC ) Instructor introduction Exits Cell phones & pagers Schedule & breaks Student introductions 2 Goal

More information

êéëé~êåü=üáöüäáöüí Code Requirements and Costs of Incorporating Accessory Apartments in Houses

êéëé~êåü=üáöüäáöüí Code Requirements and Costs of Incorporating Accessory Apartments in Houses êéëé~êåü=üáöüäáöüí May 2009 Technical Series 09-102 Code Requirements and Costs of Incorporating Accessory Apartments in Houses áåíêççìåíáçå Canada Mortgage and Housing Corporation commissioned a study

More information

FOR SALE 5 STOREY COMMERCIAL BUILDING 247 SPADINA AVENUE (DOWNTOWN WEST) TORONTO OPPORTUNITY

FOR SALE 5 STOREY COMMERCIAL BUILDING 247 SPADINA AVENUE (DOWNTOWN WEST) TORONTO OPPORTUNITY FOR SALE 5 STOREY COMMERCIAL BUILDING (DOWNTOWN WEST) TORONTO OPPORTUNITY An excellent opportunity for a User/Investor to purchase a 5 storey Commercial building in Downtown West, on Spadina Avenue between

More information

The following information is required at submission. Complete submissions can be processed within 10 business days.

The following information is required at submission. Complete submissions can be processed within 10 business days. Building Permit Requirements Temporary Tent Town of Innisfil Building Services (CDSB) 2101 Innisfil Beach Road Innisfil, Ontario L9S 1A1 705-436-3710 A building permit is required for a tent or group of

More information

(1) the adoption of the following report (August 31, 2000) from the Commissioner of Community and Neighbourhood Services; and

(1) the adoption of the following report (August 31, 2000) from the Commissioner of Community and Neighbourhood Services; and Development Proposals for 100 Units of Affordable Housing on Two Sites Owned by Community Groups - (Ward 6 - North York Humber and Ward 10 - North York Centre) (City Council at its regular meeting held

More information

Scarborough Community Council Item SC32.3, as adopted by City of Toronto Council on July 23, 24, 25, 26, 27 and 30, 2018 CITY OF TORONTO

Scarborough Community Council Item SC32.3, as adopted by City of Toronto Council on July 23, 24, 25, 26, 27 and 30, 2018 CITY OF TORONTO Authority: Scarborough Community Council Item SC32.3, as adopted by City of Toronto Council on July 23, 24, 25, 26, 27 and 30, 2018 CITY OF TORONTO BY-LAW 1277-2018 To amend former City of Scarborough

More information

NEW YORK STATE DEPARTMENT OF STATE Division of Building Standards and Codes One Commerce Plaza - 99 Washington Ave Albany, NY 12231

NEW YORK STATE DEPARTMENT OF STATE Division of Building Standards and Codes One Commerce Plaza - 99 Washington Ave Albany, NY 12231 NEW YORK STATE DEPARTMENT OF STATE Division of Building Standards and Codes One Commerce Plaza - 99 Washington Ave Albany, NY 12231 Phone: (518) 474 4073 Fax: (518) 486 4487 www.dos.ny.gov Email: info@dos.ny.gov

More information

Ontario Municipal Board Order issued on February 25, 2005 in Board File Nos. PL and PL CITY OF TORONTO. BY-LAW No.

Ontario Municipal Board Order issued on February 25, 2005 in Board File Nos. PL and PL CITY OF TORONTO. BY-LAW No. Authority: Ontario Municipal Board Order issued on February 25, 2005 in Board File Nos. PL030066 and PL030681 CITY OF TORONTO BY-LAW No. 735-2014(OMB) To amend Chapters 320 and 324 of the Etobicoke Zoning

More information

Pedestrian Bridge connecting Hudson's Bay Company and Toronto Eaton Centre 220 Yonge Street

Pedestrian Bridge connecting Hudson's Bay Company and Toronto Eaton Centre 220 Yonge Street STAFF REPORT ACTION REQUIRED Pedestrian Bridge connecting Hudson's Bay Company and Toronto Eaton Centre 220 Yonge Street Date: February 10, 2016 To: From: Toronto and East York Community Council Manager,

More information

SCHEDULE A. Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

SCHEDULE A. Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule: SCHEDULE A CLASSES OF PERMITS AND PERMIT FEES 1. CALCULATION OF PERMIT FEES FOR CONSTRUCTION: (6) Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

More information

A Brief Overview of the New BOMA Measurement Standards for Lawyers Jan. 20, 2011 By William B. Tracy, MBA, NCARB

A Brief Overview of the New BOMA Measurement Standards for Lawyers Jan. 20, 2011 By William B. Tracy, MBA, NCARB 1) The BOMA Standard for measuring Floor Area in Office Buildings a) Commonly called The BOMA Standard b) Voluntary ANSI consensus standard since 1915 i) Multiple reincarnations (1) To stay relevant to

More information

DATE: 4/24/12 PRESENT AT SITE: Aaron Lobas, Daniel Imlay - URS JOB NAME: Cuyahoga County Huntington Park Garage JOB NUMBER:

DATE: 4/24/12 PRESENT AT SITE: Aaron Lobas, Daniel Imlay - URS JOB NAME: Cuyahoga County Huntington Park Garage JOB NUMBER: HUNTINGTON PARK GARAGE ASSESSMENT May, 2012 APPENDIX A Closed Parking Space Report OBSERVATION REPORT DATE: 4/24/12 PRESENT AT SITE: Aaron Lobas, Daniel Imlay - URS JOB NAME: Cuyahoga County Huntington

More information

UNIVERSITY OF HONG KONG LIBRARY. This book was received in accordance with the Books Registration Ordinance Section 4

UNIVERSITY OF HONG KONG LIBRARY. This book was received in accordance with the Books Registration Ordinance Section 4 UNIVERSITY OF HONG KONG LIBRARY This book was received in accordance with the Books Registration Ordinance Section 4 CODE OF PRACTICE ON PROVISION OF MEANS OF ESCAPE IN CASE OF FIRE AND ALLIED REQUIREMENTS

More information

THE CORPORATION OF THE TOWN OF EAST GWILLIMBURY BY-LAW 2016-

THE CORPORATION OF THE TOWN OF EAST GWILLIMBURY BY-LAW 2016- THE CORPORATION OF THE TOWN OF EAST GWILLIMBURY BY-LAW 2016- TO GOVERN THE ISSUANCE AND ADMINISTRATION OF BUILDING AND DEMOLITION PERMITS, AS WELL AS AN ADDENDUM TO THE CORPORATE CODE OF CONDUCT Whereas

More information

CITY OF TORONTO. BY-LAW No

CITY OF TORONTO. BY-LAW No Authority: Toronto and East York Community Council Item 13.10, as adopted by City of Toronto Council on March 5, 6 and 7, 2012 and MM26.23, moved by Councillor McConnell, seconded by Councillor Milczyn,

More information

Multi-unit residential uses code

Multi-unit residential uses code 9.3.11 Multi-unit residential uses code 9.3.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Multi-unit residential uses code by the tables

More information

Bunker Hill Part II Urban Design. Specific Plan. Case No. CPC SP TABLE OF CONTENTS

Bunker Hill Part II Urban Design. Specific Plan. Case No. CPC SP TABLE OF CONTENTS Bunker Hill Part II Urban Design Specific Plan Case No. CPC-2011-684-SP TABLE OF CONTENTS Section 1. Section 2. Section 3. Section 4. Section 5. Section 6. Section 7. Section 8. Section 9. Section 10.

More information

STAFF REPORT. March 14, Toronto and East York Community Council. Director, Community Planning, South District

STAFF REPORT. March 14, Toronto and East York Community Council. Director, Community Planning, South District STAFF REPORT March 14, 2005 To: From: Subject: Toronto and East York Community Council Director, Community Planning, South District Preliminary Report Official Plan Amendment and Rezoning Application 05

More information

Applicant: ONTARIO INC. JOE NUOSCI. MARK MCCONVILLE Humphries Planning Group Inc.

Applicant: ONTARIO INC. JOE NUOSCI. MARK MCCONVILLE Humphries Planning Group Inc. File: A043/15 Item # 20 Ward #1 Applicant: 2109179 ONTARIO INC. JOE NUOSCI Address: Agent: 3501 King-Vaughan Road, Woodbridge MARK MCCONVILLE Humphries Planning Group Inc. Adjournment Status: Notes: Comments/Conditions:

More information

Authority: Ontario Municipal Board Decisions/Orders issued June 26, 2014, August 24, 2015 and July 13, 2016 in Board File PL CITY OF TORONTO

Authority: Ontario Municipal Board Decisions/Orders issued June 26, 2014, August 24, 2015 and July 13, 2016 in Board File PL CITY OF TORONTO Authority: Ontario Municipal Board Decisions/Orders issued June 26, 2014, August 24, 2015 and July 13, 2016 in Board File PL130285 CITY OF TORONTO BY-LAW 591-2018(OMB) To amend former City of Toronto Zoning

More information

THE CORPORATION OF THE TOWN OF WASAGA BEACH PLANNING DEPARTMENT

THE CORPORATION OF THE TOWN OF WASAGA BEACH PLANNING DEPARTMENT THE CORPORATION OF THE TOWN OF WASAGA BEACH PLANNING DEPARTMENT ZONING BY-LAW AMENDMENT/LIFTING OF HOLD (H)/ TEMPORARY USE BY-LAW APPLICATION FOR APPROVAL OFFICE USE ONLY DATE RECEIVED: FILE NO.: DATE

More information

NEW ACCESSIBILITY CHANGES

NEW ACCESSIBILITY CHANGES NEW ACCESSIBILITY CHANGES TO THE ONTARIO BUILDING CODE An outline of the accessibility changes made to the Ontario Building Code by Ontario Regulation 368/13. May 9, 2014 OAA CONFERENCE Continuing Education

More information

Section Low Density Residential (R1) Land Use District

Section Low Density Residential (R1) Land Use District (1) Application This section applies to the District designated as Low Density Residential (R1) on the Land Use District Map, Schedule A, of this Bylaw. Additional requirements are outlined in the Established

More information

B Application example

B Application example 04 Design tools developed by Hispalyt 04.2 Silensis Tool Software B Application example 0. General data of the building. Building placed in Madrid, in Villaverde (urban area). Residential use. Five floors

More information

PLANNING REPORT Gordon Street City of Guelph. Prepared on behalf of Ontario Inc. March 17, Project No. 1507

PLANNING REPORT Gordon Street City of Guelph. Prepared on behalf of Ontario Inc. March 17, Project No. 1507 PLANNING REPORT 1131 Gordon Street City of Guelph Prepared on behalf of 1876698 Ontario Inc. March 17, 2016 Project No. 1507 423 Woolwich Street, Suite 201, Guelph, Ontario, N1H 3X3 Phone (519) 836-7526

More information

PLANNING REPORT. 33 Arkell Road City of Guelph. Prepared on behalf of OHM Arkell Inc. August 4, Project No. 1327

PLANNING REPORT. 33 Arkell Road City of Guelph. Prepared on behalf of OHM Arkell Inc. August 4, Project No. 1327 PLANNING REPORT 33 Arkell Road City of Guelph Prepared on behalf of OHM Arkell Inc. August 4, 2015 Project No. 1327 423 Woolwich Street, Suite 201, Guelph, Ontario, N1H 3X3 Phone (519) 836-7526 Fax (519)

More information

c 211 Hotel Fire Safety Act

c 211 Hotel Fire Safety Act Ontario: Revised Statutes 1970 c 211 Hotel Fire Safety Act Ontario Queen's Printer for Ontario, 1970 Follow this and additional works at: http://digitalcommons.osgoode.yorku.ca/rso Bibliographic Citation

More information

2014 OSSC CHAPTER 10 - MEANS OF EGRESS TABLE OF CONTENTS

2014 OSSC CHAPTER 10 - MEANS OF EGRESS TABLE OF CONTENTS 2014 OSSC CHAPTER 10 - MEANS OF EGRESS TABLE OF CONTENTS Section 1001 ADMINISTRATIVE 1001.1 General 1001.2 Alterations to existing means of egress 1001.3 Maintenance 1001.4 Fire safety and evacuation plans

More information

rtmy The following must be submitted with the application:

rtmy The following must be submitted with the application: Revision rtmy 7D*tW:N?E Township of Tiny Building Department 130 Balm Beach Road West, Tiny, Ontario, LOL 2J0 Telephone 705-526-4204 or 705-526-5965 Fax 705-526-2372 Requirements for submitting a permit

More information

Rebuilding at a Zero Lot Line after the Wildfire Information Package

Rebuilding at a Zero Lot Line after the Wildfire Information Package Rebuilding at a Zero Lot Line after the Wildfire Information Package Background Issued: April 2017 A zero lot line is a residential development approach in which buildings are permitted to be located immediately

More information

Ontario Municipal Board Decision issued June 19, 2014 and Order issued January 30, 2015 in Board File No. PL CITY OF TORONTO

Ontario Municipal Board Decision issued June 19, 2014 and Order issued January 30, 2015 in Board File No. PL CITY OF TORONTO Authority: Ontario Municipal Board Decision issued June 19, 2014 and Order issued January 30, 2015 in Board File No. PL120328 CITY OF TORONTO BY-LAW No. 780-2016(OMB) To amend former City of Toronto Zoning

More information

DRS RWANDA STANDARD. Code of practice for fire safety. of building. Part 5: Exit requirements and personal hazard.

DRS RWANDA STANDARD. Code of practice for fire safety. of building. Part 5: Exit requirements and personal hazard. RWANDA STANDARD DRS 186-5 Seconde dition Code of practice for fire safety of building Part 5: Exit requirements and personal hazard Reference number DRS 186-5: 2018 RBS yyyy CD RS 186-5:2013 ii Error!

More information

12, 14 and 16 York Street Underground Pedestrian PATH Tunnel

12, 14 and 16 York Street Underground Pedestrian PATH Tunnel REPORT FOR ACTION 12, 14 and 16 York Street Underground Pedestrian PATH Tunnel Date: June 26, 2018 To: Toronto and East York Community Council From: Acting Director, Toronto and East York District, Transportation

More information

FOR SALE 5 STOREY COMMERCIAL BUILDING 247 SPADINA AVENUE (CHINATOWN), TORONTO OPPORTUNITY

FOR SALE 5 STOREY COMMERCIAL BUILDING 247 SPADINA AVENUE (CHINATOWN), TORONTO OPPORTUNITY FOR SALE 5 STOREY COMMERCIAL BUILDING (CHINATOWN), TORONTO OPPORTUNITY The subject property provides an excellent opportunity to purchase a 5 storey, commercial building located just south of the busy

More information

1200 Alberni Street By-law No (Being a By-law to Amend By-law 3575, being the Zoning and Development By-law)

1200 Alberni Street By-law No (Being a By-law to Amend By-law 3575, being the Zoning and Development By-law) Zoning and Development By-law Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7344 fax 873.7060 planning@city.vancouver.bc.ca CD-1 (319) 1200 Alberni Street By-law No. 7224 (Being a

More information

HIGH-RISE BUILDING INVENTORY FORMS (B.I.F.) PRODUCTION AND APPROVAL

HIGH-RISE BUILDING INVENTORY FORMS (B.I.F.) PRODUCTION AND APPROVAL HIGH-RISE BUILDING INVENTORY FORMS (B.I.F.) PRODUCTION AND APPROVAL Only a person authorized by the Los Angeles Fire Department shall approve High-rise Building Inventory Forms. All individuals authorized

More information

Property Development Connection Requirements (Sewer)

Property Development Connection Requirements (Sewer) 1. Purpose These guidelines apply to developed property and outline: (c) (d) what is a satisfactory point of connection; what works must be provided or funded by applicants; what different development

More information

PROCEEDING COMMENCED UNDER section 45(12), subsection 45(1) of the Planning Act, R.S.O. 1990, c. P.13, as amended (the "Act")

PROCEEDING COMMENCED UNDER section 45(12), subsection 45(1) of the Planning Act, R.S.O. 1990, c. P.13, as amended (the Act) Court Services 40 Orchard View Blvd Telephone: 416-392-4697 Toronto Local Appeal Body Suite 211 Fax: 416-696-4307 Toronto, Ontario M4R 1B9 Email: tlab@toronto.ca Website: www.toronto.ca/tlab DECISION AND

More information

130 - General Regulations for Residential Zones and Uses Only

130 - General Regulations for Residential Zones and Uses Only Page 130-1 130 - General Regulations for Residential Zones and Uses Only 130.01 Accessory s and Structures (1) An accessory building or structure shall not be used as a dwelling. (2) An accessory building

More information

CITY OF TORONTO. BY-LAW No

CITY OF TORONTO. BY-LAW No Authority: Toronto and East York Community Council Item 18.7, as adopted by City of Toronto Council on October 2, 3 and 4, 2012 Enacted by Council: November 29, 2012 CITY OF TORONTO BY-LAW No. 1631-2012

More information

PROCEEDING COMMENCED UNDER subsection 45(12), subsection 45(1) of the Planning Act, R.S.O. 1990, c. P.13, as amended

PROCEEDING COMMENCED UNDER subsection 45(12), subsection 45(1) of the Planning Act, R.S.O. 1990, c. P.13, as amended Court Services 40 Orchard View Blvd Telephone: 416-392-4697 Toronto Local Appeal Body Suite 211 Fax: 416-696-4307 Toronto, Ontario M4R 1B9 Email: tlab@toronto.ca Website: www.toronto.ca/tlab DECISION AND

More information

Scarborough Community Council Item SC27.5, as adopted by City of Toronto Council on January 31, February 1 and 2, 2018 CITY OF TORONTO BY-LAW

Scarborough Community Council Item SC27.5, as adopted by City of Toronto Council on January 31, February 1 and 2, 2018 CITY OF TORONTO BY-LAW Authority: Scarborough Community Council Item SC27.5, as adopted by City of Toronto Council on January 31, February 1 and 2, 2018 CITY OF TORONTO BY-LAW 267-2018 To amend Zoning By-law 569-2013, as amended,

More information

Dispute Resolution Services

Dispute Resolution Services Page: 1 DECISION Dispute Codes: AAT Introduction This hearing was scheduled in response to the Tenant s Application for Dispute Resolution, in which the Tenant has made application for an Order requiring

More information

RT-11 and RT-11N Districts Schedules

RT-11 and RT-11N Districts Schedules Districts Schedules 1 Intent The intent of this schedule is to allow a variety of housing options by encouraging development of multiple small houses and duplexes on larger lots and assembled sites, while

More information

1133 West Georgia Street By-law No (Being a By-law to Amend By-law 3575, being the Zoning and Development By-law)

1133 West Georgia Street By-law No (Being a By-law to Amend By-law 3575, being the Zoning and Development By-law) City of Vancouver Zoning and Development By-law Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7000 fax 604.873.7060 planning@vancouver.ca CD-1 (446) 1133 West Georgia Street By-law

More information

Authority: Etobicoke York Community Council Item 25.2, as adopted by City of Toronto Council on April 6, 2009 Enacted by Council: April 30, 2009

Authority: Etobicoke York Community Council Item 25.2, as adopted by City of Toronto Council on April 6, 2009 Enacted by Council: April 30, 2009 Authority: Etobicoke York Community Council Item 25.2, as adopted by City of Toronto Council on April 6, 2009 Enacted by Council: April 30, 2009 CITY OF TORONTO BY-LAW No. 501-2009 To amend Chapters 320

More information

APPLICATION OF SECTION 3.8 OF THE 2012 ONTARIO BUILDING CODE FOR: BARRIER-FREE AUDIT OF SENECA COLLEGE NEWNHAM CAMPUS TORONTO, ONTARIO

APPLICATION OF SECTION 3.8 OF THE 2012 ONTARIO BUILDING CODE FOR: BARRIER-FREE AUDIT OF SENECA COLLEGE NEWNHAM CAMPUS TORONTO, ONTARIO APPLICATION OF SECTION 3.8 OF THE 2012 ONTARIO BUILDING CODE FOR: BARRIER-FREE AUDIT OF SENECA COLLEGE NEWNHAM CAMPUS TORONTO, ONTARIO Prepared by: Rita Cherniavskaya & Elias Frechette Technical Consultants

More information

Revised Decision Issue Date Wednesday, January 24, 2018

Revised Decision Issue Date Wednesday, January 24, 2018 Court Services 40 Orchard View Blvd Telephone: 416-392-4697 Toronto Local Appeal Body Suite 211 Fax: 416-696-4307 Toronto, Ontario M4R 1B9 Email: tlab@toronto.ca Website: www.toronto.ca/tlab DECISION AND

More information