1 NEWBRIDGE DESIGN STATEMENT DDA Architects Ltd. 62 Brighton Square Rathgar Dublin 6 Ph (1)

2 INTRODUCTION In response to the Inspection Report on the Recommended Opinion ABP a revised residential scheme has been developed by the Design Team to respond to issues raised by the Board namely: 1. Residential Density 2. Roads Layout and Parking Provision 3. Foul and Surface water Drainage This document is prepared in support of our submission in response to the above. PLANNING HISTORY. 1. REG REF: 05/2160. Planning permission was granted for a mixed use development of 484 dwellings on the subject site to Patrick Byrne in May 2006 The full description of the development, which later became known as The Meadows is as follows: Planning permission is sought for mixed residential development with communal building, creche and construction of distributor road with roundabout junction on Station Road at Morristownbiller, Newbridge, Co Kildare. The lands subject to this application are located to the north and south of Morristownbiller Road in the townlands of Morristownbiller and Cornelscourt. The northern section of the subject lands front onto Station Road. The development will consist of a mixed use development of 484 dwellings, a single storey creche( m2) and a section of the Northern Newbridge Distributor Road, with roundabout junction on Station Road. The planning application was accompanied by an Environmental Impact Statement(EIS) and granted permission to Mr Patrick Byrne on 30/06/ Dwellings were completed under this permission. 2. REG REF: 11/624. This planning permission was subsequently extended by Kildare County Council under Reg Ref: 11/624. The order was dated 30/08/2011 and was granted to Mazars who were the receivers for the site at the time. 3. REG REF: 16/649. The current owners, Stennock Ltd, purchased the site from the receivers in 2016 and commenced the construction of Phase 2 of the previously approved development comprising 143 dwellings under Reg Ref 11/624. The new owners applied for permission to complete the previously approved development under Reg Ref 16/649. The description of the development was as follows: The development will consist of the completion of Phases 2 and 3 of previously approved mixed residential development (Prev Reg Refs 11/624 and 05/2160) consisting of a total of 244 previously approved residential units and a single storey crèche (c. 516 m2) including 166 no. two and three storey detached, semi-detached and terraced 2,3 and 4 bedroom houses, 78 apartments in 7 No. 3/4 storey blocks, including 22 no. three bedroom duplex units, 22 no two bedrooms over duplex apartments, 27 No. two bedroom apartments and 7 No. one bedroom apartments, underdeck parking for 82 car spaces in a revised design and layout to comply with current apartment standards, minor revisions to previously approved site layout plan, undergrounding of existing overhead power lines, access into the development through Morristown Wood as previously approved and all associated site works, The development has commenced construction under previous Reg Ref 11/624 and 05/2160. Kildare County Council decided to Refuse Permission for completion of Phases 2 and 3 of the previously approved development on 22/06/2016 for 3 reasons. 4. REG REF: 16/1013. On foot of the decision to refuse permission under 16/649, a planning application for retention and completion of 40 No. houses was lodged with Kildare County Council on 23/09/2016. These 40 houses had been commenced under Reg Ref 11/624 listed at 2. above. Kildare County Council decided to grant permission for retention of 39 of the 40 houses subject to 42 conditions on 7/04/ Dwellings were completed under this permission. 5. ABP A revised residential scheme of 164 No. residential units (156 No. houses, 8 no. apartments, creche, 339 no. car parking spaces, 14 no. bicycle parking spaces, open space and all associated site works at The Paddocks residential scheme (Reg ref 16/1013) was submitted to An Board Pleanala for a pre application consultation meeting on the 25th January The recommended opinion issued from An Board Pleanala on the 14th February 2018 stated that the following issues needed to be addressed in the documents submitted. 4. Residential Density 5. Roads Layout and Parking Provision 6. Foul and Surface water Drainage. The following specific information was also requested. 1. A planning report to provide a rationale for the proposed open space provision with regard to the relationship between Phases 1 and 2 2. A noise impact report 3. A Traffic Impact Assessment 4. A planning report providing a detailed rationale for the proposed car parking provision. 5. Specific Flood Risk Assessment 6. Assessment of Potential Impacts on Morristownbiller House. 7. AA Screening Report 8. Part V Proposal. 6. Summary of Previous and Current Dwellings 05/2160 The Meadows 159 Dwellings 16/1013 The Paddocks 39 Dwellings ABP Current 281 Dwellings Application Total 479 Dwellings 2 Newbridge Housing Development

3 CONTENTS 12 Urban Design Criteria NEIGHBOURHOOD 01 Context Regional Context 1.2 Local Context 1.3 Visual Context 1.4 Land Use Zoning Objectives 02 Connections Regional Connections 2.2 Opportunities & Constraints 03 Inclusivity Range of People + Households 3.2 Accessibility and Reachability 04 Variety Dwellings 4.2 Apartments SITE 05 Efficiency Density 5.2 Heights 06 Distinctiveness Site Layout 6.2 Housing 6.3 Apartments 6.4 Site Context Section Section A A 6.5 Site context section 07 Layout Road hierarchy 7.2 Road sections 7.3 Pedestrian + Cycle Connectivity 7.4 Site Survey 08 Public Realm Open Space HOME 09 Adaptability + Accessibility Privacy & Amenity Parking Detailed Design Appendices Phasing Plan Newbridge Housing Development 3

4 Neighbourhood 01 CONTEXT Regional Context This planning application site is situated on the main line Irish Rail line from Dublin Heuston to Limerick Junction. Travel times vary from 50 to 75 mins on a regular service. Newbridge is also well connected to Dublin City Centre via the M7/N7 motorway, with journey times varying between varying between 45 and 60 minutes. The town is also readily accessible to surrounding employment centres at Nass, Sallins, Clane and Celbridge. The site is approximately 70 minutes drive from Dublin Airport. The town is also well connected to numerous smaller towns and employment centres to the south west, with continuous motorway and road connections to Portlaoise, Limerick and Cork. The application site is currently accessed from Station Road through The Meadows Development. A second access point is proposed through the adjoining Leeson Lands ( Reg Ref 18/207). The actual entry point to the site is exactly 1 km from Newbridge Rail Station via The Meadows. This distance will reduce dramatically to 350 metres when the proposed link through the Leeson Lands is opened up as part of Reg Ref 18/207. The entrance to the Meadows is approximately 1.5 km from Newbridge Town Centre via Station Road, with numerous employment, shopping and leisure activities. N 4 Newbridge Housing Development

5 Local Context Neighbourhood The application site bounds the Newbridge Irish Rail line, which is situated on the south eastern boundary of the site. The northern boundary of the planning application site is bounded by the Meadows Development, while the western boundary is formed by adjoining agricultural lands and woodlands around Morristownbiller House. The eastern boundary is formed by Newbridge Town FC and St Marks School and the Leeson Development site. The application site occupies an area of the urban rural divide. The southeastern surroundings are characterised by existing housing developments whereas the western surroundings are characterized by agricultural lands. As such the site forms a transition from higher density apartment development to the south east to lower scale housing development to the north and agricultural lands to the west. N Site Boundary Newbridge Housing Development 5

6 Neighbourhood Visual Context The visual contrast between the urban and rural settings and the visual Impact of the railway line are illustrated in photographs 1-4 below. The existing 4 storey apartments to Photograph 1 are situated on the Leeson lands directly abutting the application site. Photograph 2 illustrates the existing agricultural character of the site looking towards the railway line to the south east. Photograph 3 illustrates the contrasting rural setting to the west of the application site in contrast to the urban sitting to the east. Finally the existing Paddocks development predominantly 2 storey housing with steeply pitched roofs, characterises the approach into the site from the Meadows development. Morristownbiller Railway line 1. View from the bridge bridge on Station Road towards site 2. Construction Site towards railway track 3. Agricultural Lands to the West of site Construction Site Existing Open Space 4. View towards Morristownbiller The existing Paddocks development in the foreground application site to the right 6 Newbridge Housing Development

7 Land Use Zoning Objectives ( Newbridge Local Area Plan, ) Neighbourhood Site Zoning The site contains three different zoning objectives as set out in the Newbridge Local Area Plan The northern part of the site, The Meadows, is zoned B, Existing Residential/Infill. The central part of the site, the current application area is zoned C4 New Residential. There is also a buffer strip against the railway zoned I: Agricultural. N Site Boundary Newbridge Housing Development 7

8 Neighbourhood 02 CONNECTIONS Local Connections How well connected is the new neighbourhood 1. Station Road Station Road abuts the north eastern boundary of the adjoining Meadows development and the Leeson Lands. Station Road provides direct access to Newbridge railway station and Newbridge town centre to the southeast. To the north west Station Road serves Milltown before splitting north and south along the R Morristownbiller Road Morristownbiller Road passes through the adjoining Meadows development and connects to the Southern end of Newbridge (R445) which serves the Curragh Racecourse to the south and Naas to the north east. 3. Morristown Avenue - Link Street The development proposes an internal link street (Morristown Avenue) which joins Station Road via the Leeson Lands to the North East. The link street is in accordance with Newbridge local area plan SR08: c(i) and will eventually link the Morristownbiller Road to Station Road utilising the existing section of street already constructed. Morristown Avenue proposes cycle lanes and footpaths on both sides of the road. Town Center 4. Morristown Crescent Morristown Crescent is another internal link street which will connect Morristown Avenue to Morristown Wood ( The Meadows). It is also in accordance with the Newbridge Local Area Plan. 5. Pedestrian and Cycle connections The development site is currently served only though the Meadows development to the north west which provides vehicular, pedestrian and cycle connections. A new vehicular, cycle and pedestrian connection is proposed to the adjoining Leeson Lands to the north east. The development also allows for the vehicular cycle and pedestrian route to pass through the development to connect to possible future development land to the south west (currently zoned I, Agricultural Use) N Site Boundary Motorway Connection M7 Local Road Connection Railway Connection Future Connectivity 8 Newbridge Housing Development Retail / Commercial Community & Educational Leisure & Amenity Open Space & Amenity Rivers & Lakes

9 Regional Connections Neighbourhood 1. Irish Rail Connections The site is served by Irish Rail connecting Newbridge station to Dublin Heuston, Galway, Portlaoise and Waterford. The commuter train service to Dublin operates at 10 to 20 minute intervals at peak times. Trains to Galway Waterford operate hourly. 2. Motorway Connections. The site is served by the M7 motorway which connects Newbridge to the M50 motorway via the M74 or R445, approximate journey time 30 minutes. Newbridge is connected to Kilkenny and Waterford via the M9 approximate journey times 1 hour and 30 minutes to Waterford. Newbridge is connected to Cork via the M7 and M8 approximate journey time 2 hours. Limerick is accessible via the M7 directly approximate journey time 1 hour and 20 minutes. Galway is accessible via the M52 and M6 approximate journey times 2 hours and 15 minutes. Belfast is accessible via the M7,M50 and M1 approximate time 2 hours and 20 minutes. 3. Irish Rail Journey Times Rail connections to Dublin Heuston approximately every 40 minutes. Galway City journey times approximately 2 hours and 40 minutes. Portlaoise journey time approximately 35 minutes. Waterford journey time approximately 2 hours. [1] Railway Station [ 2] The Meadows [ 3 ] School Site St. Mark s School [4 ] Department of Defense and Existing Building Newbridge Housing Development 9

10 Neighbourhood 03 INCLUSIVITY Range of People + Households How easily can people use and access the development? The Meadows 159 Existing Houses The Paddocks 114 New Houses 2 Bedroom Houses 3 Bedroom Houses 167 Apartments 1 Bedroom Apartment 2 Bedroom Apartment 3 Bedroom Apartment The three phases of development, encompassing the Meadows, the Paddocks and the Apartments are fully integrated and provide a range of dwelling types and sizes that are fully interconnected. The layout is inclusive in allowing each phase of the development to be fully permeable. The development has been designed to ensure that all streets provide for a future connection to adjoining lands. A new connection is proposed to the Lesson Lands and the Morristownbiller agricultural lands. Crèche The proposed development includes for apartments and houses, which are suitable for mobility impaired persons. Landscape Design and detailing of streets and footpaths provide for movement by mobility impaired persons including rollover kerbs and level crossings of all streets. The layout and landscape will comply with the requirements of Part M of the Building Regulations for People with Disabilities. The development will also provide for accessible car parking spaces. The development also includes 10% social housing which is provided in a variety of dwelling types. The creche has been relocated to a focal point of the scheme to allow easy reachability. Future Connections Open Space Site Boundary 10 Newbridge Housing Development

11 Accessibility and Reachability Neighbourhood Universal Design Access and Use of all buildings within the development have been designed to provide universal access to all houses and apartment regardless of age, size, ability or disability. All houses are provided with level access thresholds in accordance with the guidelines contained in the National Disability Authority s Buildings for Everyone All apartments have been designed with both lift and stair access for universal use. Equally internal layouts lobbies etc comply with the requirements of Part M of the Technical Guidance Documents. Parking is generally provided on curtilage and provides really access to dwellings. Open space is centrally located to provide the maximum accessibility to all houses. Streets are passively supervised to ensure a safe environment; extensive landscaping is proposed and street surfaces are varied. [1] Immediate parking space [2 ] Easy accessible Open Space fronting Houses [ 3] Green and overlooked Homezone Level access is arranged to ensure people with disabilities and the elderly can easily access and use the accommodation. The buffer zone along the railway line has been fully designed with the landscape scheme that will allow for its integration with the overall scheme. [ 4] Accessible Entrance avoiding Steps [5 ] Easy accessible Open Space at the Apartment buildings Newbridge Housing Development 11

12 Neighbourhood 04 VARIETY Dwellings How does the development promote a good mix of activities? There is a large variety of different house types provided for within the development. These can be broadly categorized as follows: 1. Apartments 1 bed apartments 2 bed apartments 3 bed apartments 3. Houses FF Area = 53.5 m² Total Floor Area 107 m² GF Area = 53.5 m² Total Floor Area 107 m² GF Area = m² Total Floor Area = m² FF Area = m² Total Floor Area = m² Detached 3 bed houses Semi Detached 2 and 3 bedrooms houses End of terrace 2 and 3 bed houses Terraced 2 and 3 bed houses. HOUSE TYPE A HOUSE TYPE B The design and layout enables easy access to all unit types. FF Area = 43.3m² Total Floor Area 86.6m² GF Area = 43.3m² Total Floor Area 86.6m² Floor Area 64m² Total Floor Area 118.9m² Floor Area 54.9m² Total Floor Area 118.9m² HOUSE TYPE C HOUSE TYPE J 12 Newbridge Housing Development

13 Apartments Neighbourhood There is also a variety of open space through the development arranged around a hierarchy of open spaces ranging from the large central area which is the major open area surrounded by the smaller Open Space to the Southwest and the linear open space joining the railway line. All apartments have been designed in accordance with the Sustainable Urban Housing Design Standards for New Apartments DoHPLG March Total Floor Area 50m² TYPICAL 1 BEDROOM APARTMENT Total Floor Area 102m² TYPICAL 3 BEDROOM APARTMENT View of Apartments from Morristown Avenue Total Floor Area 79m² TYPICAL 2 BEDROOM APARTMENT Newbridge Housing Development 13

14 Housing Site 05 EFFICIENCY Density How does the development make appropriate use of resources, including land? The Site is classified as an intermediate urban location. The proposal looks at the potential of higher densities, taking into account appropriate accessibility by public transport and the objectives of good design. Therefore the higher densities are provided in the more accessible locations at the entrance to the Leeson Lands and fronting onto the Railway line with the lower densities situated in the less accessible locations, ie the Paddocks and the Meadows.. The Site provide a nett density of 50. The average of these densities exceeds the requirement of 45 dwellings per hectare as set out in the guidelines in relation to intermediate urban locations. The housing layout is very efficient with the best use of land, a limited resource, minimizing the amount of wasted space. Quality has been emphasized rather than quantity, with a higher percentage of dual fronted streets in preference to single fronted streets which are only provided when site restrictions demand. The landscaped areas are designed to provide amenity and biodiversity with open spaces arranged around existing landscape features and landscape buffer zones. Buildings, gardens and public open spaces have been laid out to protect the privacy of uses and private spaces. Buildings, gardens and public spaces have also been laid out to exploit the best solar orientations whilst also addressing important public open spaces and road frontages. Phase Gross Site Area Nett Site Area No. of Units Nett Density ha sub total Units per hectare 1 Meadows Paddocks N 14 Newbridge Housing Development

15 Heights Housing Site The heights are generally two stories in the central part of the site with the exception of the single storey creche. The heights increase to 4 stories on the southern side of the Link Street. The apartment buildings generally step down to three stories joining the Link Street. There is a slight lift in the roof profile proposed adjoining the railway line. The Meadows The Paddocks 4 Storey Building 3 Storey 2.5 Storey Building 2 Storey Building Single Storey N Site Boundary Newbridge Housing Development 15

16 Housing Site 06 DISTINCTIVENESS Site Layout How do the proposals create a sense of place? The proposals create a sense of place and this is reinforced by the creation of 2 individual neighbourhood character areas. Each character area has recognisable features so that people can describe where they live and form an emotional attachment to the place. The scheme is a positive addition to the identity of the locality. In this way the materials utilized in the various neighbourhood character areas are designed to create a distinct sense of place for each area. The landscape features, the trees, the hedgerows and the open spaces likewise provide a distinctiveness which is unique to this place. The character established by the 2 storey scale of the Meadows is carried through the central area of the site with a gradual increase in density towards the Link Street. The character changes to a higher density apartment development to the south of the Link Road. This is appropriate to the setting adjacent to the railway line. The Meadows Connection The Paddocks Connection Future Connection N Site Boundary 16 Newbridge Housing Development

17 Housing Character Area Roof detail with Solar Panel Housing Site A rustic mix brick is chosen for the housing neighbourhood. Brick again is proposed to the front entrance and gable ends of the houses with an off white render proposed for the houses that are to be fully rendered. A timber finish door is proposed. A reconstituted stone cap to windows and doors to front and gable elevations of houses is proposed in an off white colour. The brick finishes form bookends to the rendered terraced houses in between. Larger detached houses on the prominent corner are finished in brick on visible elevations. House Type J1 Corner Building Example door Brickwork The architectural treatment is a simple vernacular style of architecture influenced by the existing Meadows development and adjacent buildings. Stone lintels and steeply pitched roofs are used to define the character of the housing area, with a combination of brick and render which is a traditional palette of materials. Example of timber door with glass sidelight Proposed Building Rendered Facade Public Amenity Area Public Amenity Area Newbridge Housing Development 17

18 Housing Site Apartments Character The apartments have been designed in accordance with the Sustainable Urban Housing Design Standards for New: Guidelines for Planning Authorities under the following headings: Location The location is currently 1 kilometre to 1.5 kilometres from Newbridge train station and is considered to be an Intermediate Urban Location under the guidelines. Density The density of the development varies subject to location and is medium to high density and is broadly greater than 50 units to the hectare. The apartment scheme proposes the following aspects: Single Aspect apartments 83 50% Dual Aspect apartments 52 31% Triple Aspect apartments 32 19% No. of Apartments per core. The number of apartments per core per floor varies across the development as follows: Apartments per core per floor Block Left Hand Side Right Hand Side SubTotal/ Floor Total in Block Apartment mix The mix of apartments is as follows: 1 bedroom apartments 17 (10%) 2 bedroom apartments 111 (66.5%) 3 bedroom apartments 39 (23.5%) A B C D E There are no studio apartments proposed. The floor areas exceed the minimum floor area standards. Apartments fronting the Housing Site Dual Aspect Apartments In suburban or intermediate locations, it is an objective that there shall generally be a minimum of 50% dual aspect apartments in a single scheme. Schedule of Dual/Triple Aspect Apartments Block Single Aspect Dual Aspect Triple Aspect Total A B C D E TOTAL % 50% 31% 19% Height of the Development The general height of the apartment buildings is 4 stories, or 13.8 metres measured externally. The clear floor to ceiling heights are 2.7 metres in accordance with Clause 3.22 of the guidelines. Apartment Floor Areas The apartment floor areas exceed the minimum apartment floor areas throughout the development. 1 bedroom apartments 45 m m2 Average provided 2 bedroom apartments 73 m m2 Average provided 3 bedroom apartments 90 m m2 Average provided Apartment Character Area. The architectural treatment changes to a more contemporary style for the apartment area south of the Link Street. Materials used are predominantly brick which is maintenance free on the lowest three levels with aluminum cladding at the top level which is also maintenance free. The buildings are laid out on the North-South axis and the apartments are orientated to the west and to the south. The buildings are designed to address the housing to the north in a 3 storey facade and in response to the reduced scale. To the south the roof profile is increased above a 4 storey facade to address the railway line. Owing to the configuration of the site the length of the individual blocks reduce in length going from east to west. Parking is arranged at surface level with grouped car parking areas between the individual blocks. Parking areas rely on extensive landscaping and surface treatments to soften the impact of the cars. The large buffer zone required along the railway line has been proposed as an amenity area for the apartments, situated on the southern end of the site. It is hoped that this area will act as a communal open space which will encourage inclusivity and interaction. 18 Newbridge Housing Development

19 Residential Area Newbridge beside Railway Line Housing Site Materials A red smooth engineering brick to the apartments has been chosen. This texture and colour has been chosen to define the edge to the railway line. It indicates a more urban context fronting onto the Railway line. A timber finish door is proposed. Roof structure of apartments is grey metal clad or equal approved. The window colour of the apartments will be in keeping with grey roof colour. The balconies will be tinted glass to allow light in but maintaining privacy. Roof Detail Apartment Zinc Coated Architureal Wall Panel Open Space Amenity Gable Apartment Building and Amenity Space Red Brick Elevation to Link Street Elevation to Railway Example of timber door with glass sidelight Newbridge Housing Development 19

20 Housing Site Site Context Section Section A A A contemporary architectural treatment with large balconies and a generous roof terrace overlooks the railway line. A zinc coated aluminium architectural wall panel on the apartment buildings complements the more traditional housing unit. Vertically proportioned windows emphasize the vertical nature of these buildings. 20 Newbridge Housing Development

21 The scale of the apartments presents a four storey façade to the railway line. Surface car parking is arranged between the blocks which are laid out in a perpendicular arrangement. The height of the uppermost floor is heightened slightly to address the railway line and the buffer zone. An active frontage will provide passive supervision over the open space area. A A Newbridge Housing Development 21

22 Housing Site Site context sections The five apartment buildings each present a four storey elevation to the railway line. The surface car parking is arranged between blocks. Communal open space is arranged to the south of the buildings. Section A A Section C C 22 Newbridge Housing Development

23 A These site sections illustrate the reduction in scale from the railway line to the south of the site towards the two storey housing in the middle part of the site. The perpendicular arrangement of the apartment blocks will allow views through the buildings to the Open Space beyond. The apartments present a three storey façade to the link street to reduce the scale approaching the houses, with a set back third floor plan. C D B B A C D Section B B Section D D Newbridge Housing Development 23

24 Housing Site 07 LAYOUT How has this development evolved naturally from its surroundings? Existing Layout The existing layout has been established by the previously permitted and constructed housing layout established under Planning Ref. 05/2160 and 11/624. The as constructed layout informed the remainder of the layout as far as the link road, determined by pre-existing drainage wayleaves, drainage lines and road layouts which are pre-determined. The areas of open space at the centre of the development and on the western boundary were predetermined. The approach to the site from Newbridge is dominated by the Department of Defence building and the adjoining 4 storey apartment building (Pierce Lodge) immediately adjoining the Newbridge Town football club. The northern approach to the development site is characterized by the 2 and 3 storey Meadows development which forms Phase 1 of the subject planning application. The Northern Newbridge distributor road, now known as the Meadows, passes through Phase 1 of the development and connects with Morristownbiller Road further east. Of note to the west are the ruins of Morristownbiller House which are now in ruins and surrounded by dense vegetation and overgrown trees. Further to the north and west, the site context consists of open agricultural fields and intermittent ribbon development along rural roads with no footpaths. The Meadows Existing Layout The Paddocks The immediate context in terms of developed lands is characterized by the partially developed Phase 1 of the overall scheme knows as the Meadows and the more recently constructed Paddocks which occupies the eastern part of the development site. Link Street Newbridge Town Football club adjoins to the East. The Pierce Lodge Apartment development (Reg Ref 18/ apartments) has been designed to provide a new access road into the southern are of the development. This new access road will provide direct access to Newbridge Railway Station from the subject Planning application site. N Site Boundary 24 Newbridge Housing Development

25 Proposed Site layout Housing Site The proposed site layout plan endeavours to complete the housing layout commenced under 05/2160 and 11/624 taking the pre determined open spaces, drainage routes and road layouts into consideration. The Link Road alignment was also determined by the pre-existing public sewer passing through the site. Therefore the housing layout is similar to the layout previously approved with the exception of a slight increase in density where the crescent open space was previously located. To the south east of the Link Road the layout has been changed significantly with the introduction of 5 apartment buildings containing 167 apartments. The apartment buildings have been included to bring the overall density of the development within the applicant s ownership up to 50 units per hectare. The increase in scale is considered to be appropriate in the context of the Newbridge Railway Line. Care has been taken to arrange the apartments buildings to avoid an overbearing impact on the adjoining houses and parking has been contained between the blocks. Car parking is concealed between the buildings. The Meadows The Paddocks N Site Boundary Newbridge Housing Development 25

26 Housing Site Road hierarchy How does the proposal create people friendly streets and spaces? The development consists of a clear navigable routes of internal streets footpaths and cycle routes which will connect the development to the surrounding area. The layout and design of the proposed dwellings ensure passive surveillance of all pedestrian footpaths within the site. The Meadows The Paddocks Link Street 1 The major vehicular link already exists through the Meadows site connecting Morristownbiller Road with Station Road. A new major Link Road identified in the Newbridge local area plan as objective STO 8 ( c), (i) is proposed to connect from the Lesson Lands through the application site to provide further connectivity to the Morristownbiller Road through the agricultural lands west of the site. These two major roads are linked via an internal vehicular connection. The site layout plan aligns routes with desire lines to create a permeable interconnected series of streets that are both legible and easy to navigate around. Side Street Link Street 2 Homezone Link Street Side Street Home Zone N Site Boundary 26 Newbridge Housing Development

27 Road sections Housing Site There is a clear hierarchy of streets for link street to local street to homezone. Link Street 1 Identified in the Newbridge Local Area Plan Policy as SRO 8: C(i) Will provide for future connection to the Station road and future development on adjacent lands to the West. This is a link street but will have considerably more traffic on this compared to internal residential streets, hence the distinction between this and other link streets. Link Street 1 Link Street 2 Identified in the Newbridge Local Area Plan Policy as SRO 8: C(ii) provides the connection from the proposed development to the Morristownbiller Road through the Meadows. These link streets (i & ii) will ensure that movement to/from the Train Station is maximised either as part of existing permitted developments or as part of any revised/future development(s). Link Street 2 Local/ Side Street These are the streets feeding off the link streets and will have low volumes of through traffic Home zones These are smaller streets that only serve a cluster of residential units, and will have very low volumes of traffic at very low speeds, typically between 10km/h and 20km/h. The transition of road types is to create a sense of place from public to private, ensuring security and safety for all. Within the home zone areas, there is a variation in surface material to identify traffic calming. The site layout plan focuses activity on the streets by creating active frontages with front doors directly serving the street. The streets are designed as places instead of roads for cars, helping to reinforce the hierarchy of spaces. Side Street Homezone Newbridge Housing Development 27

28 Housing Site Pedestrian + Cycle Connectivity Existing Morristownbiller Road The existing road is provided with a shared off street cycle/footpath, cyclists must revert to the carriageway at estate boundary to the East and West. Link Street 1 A 3 m wide shared cycle/footpath is to be provided which can connect to the approved development East and possible future developments to the West. Link Street 2 Having a lower volume of traffic it is intended that cyclists use the road carriageway. They will be able to connect to the shared cycle/footpaths along the busier Morristown Road and Link Street 1. The Meadows The Paddocks On Street Cycle Connection Combined Cycle / Footpath Future Connections N Site Boundary 28 Newbridge Housing Development

29 Site Survey Housing Site Site Topography The site slopes gently from north to south, with an uppermost level of 97,0m above sea level to a lowermost level of 90,0 m This results in a fall of approximately 1in 60 across the site. Site Orientation The site is generally orientated north west to south east on its longest dimension(434m) and east to west on its shortest dimension (215m). This allows for a housing layout which takes advantage of the highest number of south west facing back gardens. N Site Boundary Newbridge Housing Development 29

30 Housing Site 08 PUBLIC REALM Open Space How safe, secure and enjoyable are public areas? Included Open Space Area 1. consists of a large rectangular open space (6,142m2) situated in the centre of the Paddocks. This area is continuously overlooked by houses to the north, south and east and is easily accessible to the surrounding houses. The open space contains pedestrian linkages into and through the areas allowing for a completely integrated pedestrian movement. The Meadows The Paddocks 2. (1.571 m2) is a landscaped buffer along the western boundary of the site. The houses to the north and east provide passive surveillance over this area. An animated gable treatment is utilised in order to animate the façades facing this area. In all cases where a gable end is required, these are animated with windows and/or entrance doors providing passive surveillance of adjacent open spaces. 1 [1] m2 [2] m2 Total Area 0.77 Hec (12%) 2 Open Space Area Excluded Area Buffer Zone ( 1,290 m2) is the linear park fronting onto the railway line providing a landscaped buffer to the railway line of 25m in width. In order to provide direct passive surveillance over this area, the apartments have been designed in finger like blocks providing passive surveillance this area, but at the same time providing views into the scheme and further connectivity to the spaces beyond. N Site Boundary 30 Newbridge Housing Development

31 09 ADAPTABILITY + ACCESSIBILITY Home How will the building cope with change? There are a variety of different dwelling types provided for within the development including, multi-storey apartments and a variety of house types. All houses are energy efficient and equipped for the challenges anticipated from climate change. All dwellings are universally accessible and provide necessary access and sanitary facilities to deal with life changes from young families with children to older people with possible disabilities. All of the houses can be extended without compromising the character of the development, with both adequate rear garden area for an extension and convertible attic spaces. The structure of the homes allows for changing life patterns, adaptation and subdivision capable of providing for changes in lifestyle. Whereas the apartments are more restricted in their ability for extension, they are individually adaptable for individuals should the need arise. The apartments provide a variety of tenure which will cater for various household sizes as the population demographics change over time. Ground Floor Plan Indicating Universal Adaptability + Accessibility First Floor Plan demonstration Accessibility Attic Floor Plan Future Adaptability TYPICAL FLOOR PLANS WITH OPTIONS FOR ADAPTABILITY Newbridge Housing Development 31

32 Home 10 PRIVACY & AMENITY How does the scheme provide a decent standard of amenity? The scheme provides for a decent standard of private amenity, with privacy a central tenet of the design concept. All houses are provided with useable outdoor private spaces in the form of private back gardens, private balconies. Minimum separation distances of 22metres between opposing windows have been maintained in all circumstances, with a careful positioning of windows at upper levels to avoid overlooking. The design maximises the number of homes enjoying dual aspect with all houses benefitting from dual aspect. In the case of apartments a minimum 50 % of apartments enjoy dual aspect and there are no apartments facing solely north, north west or north east. Windows are sited to avoid views into the homes from other houses and adequate privacy is afforded to ground floor units. All homes are designed to provide adequate storage including space within the house for storage and sorting of recyclables. Illustration of a typical housing arrangement demonstrating sub-division of front gardens. Private houses are private with fully enclosed private rear gardens. Privacy Amenity Privacy and amenity Illustration showing Houses with their front and rear garden 32 Newbridge Housing Development

33 11 PARKING Home How will the parking be secure and attractive? Secure parking is provided in a variety of measures on this site including: Grouped perpendicular parking mostly for the multi storey apartment buildings. Grouped parallel parking situated alongside link streets. On-curtilage private parking arrangements. Homezone parking arrangements. All car parking spaces provided on street are in easy reach of the houses they serve. For security all car parking spaces are overlooked by the houses they are provided for. Parking arrangements vary across the site with grouped parking being made appropriate in higher density locations. The communal parking areas maximises efficiency and careful consideration has been given to the inclusion of both visitor and disabled parking without the need to provide additional dedicated spaces. Bicycle parking is a big issue for all homes, but particularly the multi storey apartments where secure lock-up bicycle parking is provided centrally and also easily accessible to the units they serve. Visitor bicycle parking is also provided in accordance with the requirements of Design Standards for New Apartments. Typical Homezone Arrangement situated opposite houses with on-curtilage parking Cycle Path and Pavement Detail of Private Parking On-curtilage parking arrangement Newbridge Housing Development 33

34 Home 12 DETAILED DESIGN How well thought through is the building and landscape design? The quality of the detailed design is evidenced by the attention to details and the harmonised proportions and careful consideration to the building design. Only good quality, durable and low maintenance materials have been considered and have been chosen to make a positive contribution to the public realm. The building materials proposed can be summarized as follows: Roofs: Slate Grey concrete roof tiles to housing Aluminium cladding to upper level apartments in multi storey buildings. External Walls: Selected brickwork to principal elevations and exposed gable elevations. Self coloured render to less visible side elevations and rear elevations. Windows: Coloured high performance upvc or aluminium window frames with double glazing. Privacy and amenity Illustration showing Houses with their front and rear garden External Joinery: Panelled hardwood doors with satin anodised ironmongery. Rainwater Goods: High quality upvc coloured gutters and downpipes. Fascia and soffits: Colour coded upvc fascias and soffits. All building materials have been chosen to minimize regular maintenance requirements and care has been taken with the siting of flue vents and external stores. All terrace units are provide with a rear access passage for the storage of bins in rear gardens, avoiding unsightly bin clutter to the front gardens. Boundary materials are to an equally high standard. Housing Site detached Corner House with yellow brick Housing Site Rendered attached Houses 34 Newbridge Housing Development

35 Home View from Lakeside Crescent of the Apartment Building overlooking the Railway Line Newbridge Housing Development 35

36 PHASING It is proposed to complete out the entire development in accordance with the following planning arrangement. The Meadows The Paddocks Phase 1: The Meadows Phase 2: The Paddocks complete 39 Houses completed to date 114 Houses proposed Phase 3: The Apartments 167 Apartments N Site Boundary 36 Newbridge Housing Development

DESIGN, ACCESS & PLANNING STATEMENT

DESIGN, ACCESS & PLANNING STATEMENT (MADRON STREET) LONDON SE1 5UB DESIGN, ACCESS & PLANNING STATEMENT The architectural response for the site has been designed with regard to the following: The New Southwark Plan The London Plan: Spatial

More information

H4. Residential Mixed Housing Suburban Zone

H4. Residential Mixed Housing Suburban Zone H4. Residential Mixed Housing Suburban Zone H4.1. Zone description The Residential Mixed Housing Suburban Zone is the most widespread residential zone covering many established suburbs and some greenfields

More information

H5. Residential Mixed Housing Urban Zone

H5. Residential Mixed Housing Urban Zone H5. Residential Mixed Housing Urban Zone [ENV-2016-AKL-000197: Robert Adams] Addition sought H5.1. Zone description The Residential Mixed Housing Urban Zone is a reasonably high-intensity zone enabling

More information

Multi-unit residential uses code

Multi-unit residential uses code 9.3.11 Multi-unit residential uses code 9.3.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Multi-unit residential uses code by the tables

More information

Urban Design Brief (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London

Urban Design Brief (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London Urban Design Brief 1635 (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London Site Plan Control Application Holding Provision Application April 1, 2015 Prepared for: Rise Real

More information

CASTLES OF CALEDON URBAN DESIGN REPORT

CASTLES OF CALEDON URBAN DESIGN REPORT CASTLES OF CALEDON URBAN DESIGN REPORT PROPOSED RESIDENTIAL DEVELOPMENT CALEDON, ONTARIO 10 JULY, 2015 TABLE CONTENTS: 1.0 DEVELOPMENT 4.0 CONCLUSION 1.1 Introduction 1.2 Castles of Caledon- Urban Design

More information

H5. Residential Mixed Housing Urban Zone

H5. Residential Mixed Housing Urban Zone H5. Residential Mixed Housing Urban Zone H5.1. Zone description The Residential Mixed Housing Urban Zone is a reasonably high-intensity zone enabling a greater intensity of development than previously

More information

H6 Residential Terrace Housing and Apartment Buildings Zone

H6 Residential Terrace Housing and Apartment Buildings Zone H6. Residential Terrace Housing and Apartment Buildings Zone [CIV-2016-404-002333: Franco Belgiorno-Nettis]-Note: The properties affected by this appeal are identified on the Auckland Unitary Plan viewer.

More information

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017 Appendix1,Page1 Urban Design Guidelines DRAFT September 2017 Back to Back and Stacked Townhouses Appendix1,Page2 Table of Contents 1 Introduction 1 1.1 Purpose 1 1.2 Urban Design Objectives 1 1.3 Building

More information

Proposed Demolition of Existing Shop & Erection of New Build Development to Form 11 Flats

Proposed Demolition of Existing Shop & Erection of New Build Development to Form 11 Flats Proposed Demolition of Existing Shop & Erection of New Build Development to Form 11 Flats Wern Goch Hirani Stores, 56 Wern Goch West, Cardiff CF23 7AB Design & Access Statement for Pre-Application Consultation

More information

LITTLE MOUNTAIN ADJACENT AREA REZONING POLICY

LITTLE MOUNTAIN ADJACENT AREA REZONING POLICY LITTLE MOUNTAIN ADJACENT AREA REZONING POLICY JANUARY 2013 CONTENTS 1.0 INTENT & PRINCIPLES...1 2.0 APPLICATION...2 3.0 HOUSING TYPES, HEIGHT & DENSITY POLICIES...3 3.1 LOW TO MID-RISE APARTMENT POLICIES...4

More information

Requirements for accepted development and assessment benchmarks for assessable development

Requirements for accepted development and assessment benchmarks for assessable development 9.3.10 Small Lot Housing Design Code 9.3.10.1 Application (1) This code applies to development identified as requiring assessment against the Small Lot Housing Design Code by the categories of development

More information

PROVIDENCE (BOLLARD BULRUSH SOUTH) LOCAL DEVELOPMENT PLAN. 2263Rep146E

PROVIDENCE (BOLLARD BULRUSH SOUTH) LOCAL DEVELOPMENT PLAN. 2263Rep146E 1 PROVIDENCE (BOLLARD BULRUSH SOUTH) Prepared by: PO Box 796 Subiaco WA 6904 t: 9382 1233 f: 9382 1127 www.cleplan.com.au October 2013 This Local Development Plan has been approved by Council under the

More information

H4. Residential Mixed Housing Suburban Zone

H4. Residential Mixed Housing Suburban Zone H4. Residential Mixed Housing Suburban Zone H4.1. Zone description The Residential Mixed Housing Suburban Zone is the most widespread residential zone covering many established suburbs and some greenfields

More information

Plan Dutch Village Road

Plan Dutch Village Road Plan Dutch Village Road Objective: The lands around Dutch Village Road are a minor commercial area that services the larger Fairview community. Maintaining the vibrancy of the area by planning for redevelopment

More information

Part 9 Specific Land Uses - Multi Dwelling Housing

Part 9 Specific Land Uses - Multi Dwelling Housing 11 MULTI DWELLING HOUSING This section of the DCP only provides Council s specific requirements for Multi Dwelling Housing developments. Other requirements that must be addressed are contained in the relevant

More information

Proposals for the Redevelopment of the Magistrates Court & Police Station, Normandy Street / Orchard Lane, Alton

Proposals for the Redevelopment of the Magistrates Court & Police Station, Normandy Street / Orchard Lane, Alton THE SITE THE SITE The Site in Context WELCOME Welcome to our public exhibition in connection with our draft proposals ahead of a planning application being proposals for the redevelopment of the magistrates

More information

MILL ROAD DEPOT, CAMBRIDGE Design and Access Statement December

MILL ROAD DEPOT, CAMBRIDGE Design and Access Statement December 66 MILL ROAD DEPOT, CAMBRIDGE Design and Access Statement December 2017 67 HOOPER STREET EAGLE GREEN EAGLE FOUNDRY STREET C H I S H O L M T R A I L THE LIMES Headly Street is the first new street encountered

More information

900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1

900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1 50 City of Vancouver Land Use and Development Policies and Guidelines Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7344 fax 873.7060 planning@city.vancouver.bc.ca 900 BURRARD STREET

More information

PREPARED FOR: ADI DEVELOPMENT GROUP INC.

PREPARED FOR: ADI DEVELOPMENT GROUP INC. Acronym Urban Design and Planning/Mark Sterling Consulting Inc. 111 Clendenan Avenue, Toronto, Ontario M6P 2W7 URBAN DESIGN BRIEF PROPOSED DEVELOPMENT 4880 VALERA ROAD, CITY OF BURLINGTON PREPARED FOR:

More information

9.3.5 Dual occupancy code

9.3.5 Dual occupancy code 9.3.5 Dual occupancy code 9.3.5.1 Application (1) This code applies to accepted development and assessable development identified as requiring assessment against the Dual occupancy 1 code by the tables

More information

Design and Access Statement and Planning Statement. Application for Planning Approval. New Shopfront. 58 High Street West Glossop

Design and Access Statement and Planning Statement. Application for Planning Approval. New Shopfront. 58 High Street West Glossop Design and Access Statement and Planning Statement as part of the Application for Planning Approval for a New Shopfront to 58 High Street West Glossop for Atmore Properties Plc 14/12/11 1 1.0 Introduction

More information

8.5.1 R1, Single Detached Residential District

8.5.1 R1, Single Detached Residential District 8.5.1 R1, Single Detached Residential District The purpose of this district is to provide for residential development in the form of single detached dwellings. Dwelling, Single Detached Home Business,

More information

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes 1 Local Area Plan - Project Alignment Overview Directions Report, October 2008 (General Summary Of Selected

More information

apply sustainability principles to all residential developments in Ardee;

apply sustainability principles to all residential developments in Ardee; 3. Housing 3.1 Introduction Ardee is currently experiencing considerable pressure for residential development as improved road infrastructure, together with the availability of serviced land, makes the

More information

Division 8 General Urban (T4) Zone: Assessment Criteria and Assessment Tables

Division 8 General Urban (T4) Zone: Assessment Criteria and Assessment Tables Division 8 General Urban (T4) Zone: Assessment Criteria and Assessment Tables 15.8.1 General Urban (T4) Zone The provisions in this division relate to the General Urban (T4) Zone as follows overall outcomes

More information

No , Crwys Road, Cardiff. Conversion and New Build Student Accommodation Development in Crwys Road, Cardiff

No , Crwys Road, Cardiff. Conversion and New Build Student Accommodation Development in Crwys Road, Cardiff No. 38-48, Crwys Road, Cardiff Conversion and New Build Student Accommodation Development in Crwys Road, Cardiff Contents 1.0 Introduction 2.0 Site Analysis 3.0 Context 4.0 Planning History 5.0 Planning

More information

Urban Design Brief. Proposed Medical / Dental Office 1444 Adelaide Street North. Vireo Health Facility Ltd.

Urban Design Brief. Proposed Medical / Dental Office 1444 Adelaide Street North. Vireo Health Facility Ltd. Urban Design Brief Proposed Medical / Dental Office Vireo Health Facility Ltd. November 27, 2013 TABLE OF CONTENTS Page No. INTRODUCTION... 1 SECTION 1 LAND USE PLANNING CONTEXT... 1 1.1 The Subject Lands...

More information

Division 5 Residential Low Density Zone: Assessment Criteria and Assessment Tables

Division 5 Residential Low Density Zone: Assessment Criteria and Assessment Tables Division 5 Residential Low Density Zone: Assessment Criteria and Assessment Tables 4.5.1 Residential Low Density Zone The provisions in this division relate to the Residential Low Density Zone as follows

More information

Southall Gas Works: Design Statement by URBED with Capita Symonds, WYG, Lovejoys, Jestico and Whiles and RPSDesign Statement. Typologies.

Southall Gas Works: Design Statement by URBED with Capita Symonds, WYG, Lovejoys, Jestico and Whiles and RPSDesign Statement. Typologies. 9 Typologies Page 95 9:1. Approach to typologies 1. 3. 2. 4. Far left: Traditional walk-up flats: With 2 of 4 flats per landing off a core. The bottom plan shows a perimeter block arrangement based on

More information

Planning Rationale in Support of an Application for Plan of Subdivision and Zoning By-Law Amendment

Planning Rationale in Support of an Application for Plan of Subdivision and Zoning By-Law Amendment Planning Rationale in Support of an Application for Plan of Subdivision and Zoning By-Law Amendment The Kilmorie Development 21 Withrow Avenue City of Ottawa Prepared by: Holzman Consultants Inc. Land

More information

5.0 Development Strategy 32

5.0 Development Strategy 32 5.0 Development Strategy 32 Objectives To ensure the long term future of the Bazaar Market building by giving it a higher order retail use, reflecting the development of retail on the Guy s site To ensure

More information

Residential Design Guide Appendices

Residential Design Guide Appendices Residential Design Guide Appendices Appendix 1 Thorndon Appendix 2 Mt Victoria Appendix 3 Aro Valley Appendix 4 Southern Inner Residential Areas Appendix 5 Oriental Bay Appendix 6 Residential Coastal Edge

More information

P. H. Robinson Consulting Urban Planning, Consulting and Project Management

P. H. Robinson Consulting Urban Planning, Consulting and Project Management PLANNING RATIONALE REPORT FOR SITE PLAN AND DRAFT PLAN OF CONDOMINIUM APPLICATIONS 73-75 HARVEY STREET CITY OF OTTAWA PREPARED BY: P H ROBINSON CONSULTING AUGUST 2012 1 This report has been prepared on

More information

Article 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT

Article 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT Article 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT this page left intentionally blank Contents ARTICLE 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT DIVISION 3.1 NEIGHBORHOOD CONTEXT DESCRIPTION...3.1-1 Section 3.1.1

More information

Draft Neighbourhood Plan for the former Land Settlement Association Estate at Great Abington March 2017

Draft Neighbourhood Plan for the former Land Settlement Association Estate at Great Abington March 2017 Draft Neighbourhood Plan for the former Land Settlement Association Estate at Great Abington March 2017 1 Neighbourhood Plan Contents 1 Why a Neighbourhood Plan for the former Abington Land Settlement

More information

SCHEDULE 32 TO CLAUSE DESIGN AND DEVELOPMENT OVERLAY

SCHEDULE 32 TO CLAUSE DESIGN AND DEVELOPMENT OVERLAY --/--/20-- Proposed GC81 SCHEDULE 32 TO CLAUSE 43.02 DESIGN AND DEVELOPMENT OVERLAY Shown on the planning scheme map as DDO32. FISHERMANS BEND WIRRAWAY PRECINCT 1.0 Design objectives --/--/20-- Proposed

More information

PIN , Part 1, Plan SR-713 in Lot 2, Concession 5, Township of McKim (1096 Dublin Street, Sudbury)

PIN , Part 1, Plan SR-713 in Lot 2, Concession 5, Township of McKim (1096 Dublin Street, Sudbury) STAFF REPORT Applicant: Dalron Construction Limited Location: PIN 02124-0103, Part 1, Plan SR-713 in Lot 2, Concession 5, Township of McKim (1096 Dublin Street, Sudbury) Official Plan and Zoning By-law:

More information

5. Housing. Other Relevant Policies & Bylaws. Several City-wide policies guide our priorities for housing diversity at the neighbourhood level: Goals

5. Housing. Other Relevant Policies & Bylaws. Several City-wide policies guide our priorities for housing diversity at the neighbourhood level: Goals 5. Housing Other Relevant Policies & Bylaws Several City-wide policies guide our priorities for housing diversity at the neighbourhood level: Goals 1. Encourage more housing diversity while maintaining

More information

LIBERTY HOUSE. Paul Keogh Architects. Paul Keogh Architects LIBERTY HOUSE HOMES

LIBERTY HOUSE. Paul Keogh Architects. Paul Keogh Architects LIBERTY HOUSE HOMES 150 151 Award: Highly Commended 2015 RIAI Irish Architecture Awards Client: Dublin City Council Liberty House takes its inspiration from the Georgian brick terraces Project Photography: Peter Cook Location:

More information

The underlying zones and Auckland-wide objectives apply in this precinct, in addition to those specified below.

The underlying zones and Auckland-wide objectives apply in this precinct, in addition to those specified below. I454 Opaheke 1 I454.1 Precinct description The Opaheke 1 precinct comprises some 27 hectares of land between Bellfield Road and Opaheke Park, approximately 1.5km south of the Papakura Metropolitan Centre.

More information

Article 6. GENERAL URBAN (G-) NEIGHBORHOOD CONTEXT

Article 6. GENERAL URBAN (G-) NEIGHBORHOOD CONTEXT Article 6. GENERAL URBAN (G-) NEIGHBORHOOD CONTEXT this page left intentionally blank Contents ARTICLE 6. GENERAL URBAN (G-) NEIGHBORHOOD CONTEXT DIVISION 6.1 NEIGHBORHOOD CONTEXT DESCRIPTION...6.1-1 Section

More information

SUBDIVISION AND DEVELOPMENT ADJOINING HIGHWAYS, MAJOR ROADS AND PUBLIC OPEN SPACE

SUBDIVISION AND DEVELOPMENT ADJOINING HIGHWAYS, MAJOR ROADS AND PUBLIC OPEN SPACE SUBDIVISION AND DEVELOPMENT ADJOINING HIGHWAYS, MAJOR ROADS AND PUBLIC OPEN SPACE Policy Type: Council Policy Policy Owner: Director Urban Planning Policy No. CP- 06-PL-009 Last Review Date: Enter review

More information

Sherwood Forest (Trinity) Housing Corporation. Urban Design Brief

Sherwood Forest (Trinity) Housing Corporation. Urban Design Brief Sherwood Forest (Trinity) Housing Corporation Sherwood Place Affordable Housing Apartments Trinity Presbyterian Church Orchard Park Nursery School 590 Gainsborough Road, London Urban Design Brief REVISED

More information

9.3.6 Dwelling house code

9.3.6 Dwelling house code 9.3.6 Dwelling house code 9.3.6.1 Application (1) This code applies to accepted development assessable development identified as requiring assessment against the Dwelling house 3 code by the tables of

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. S/1744/05/F Thriplow House and Garage on land Adjacent 22 Middle Street for S Hurst

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. S/1744/05/F Thriplow House and Garage on land Adjacent 22 Middle Street for S Hurst SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Development and Conservation Control Committee 2 nd November 2005 AUTHOR/S: Director of Development Services S/1744/05/F Thriplow House and Garage on land

More information

PLANNING RATIONALE REPORT CODEAU BUILDING LTD RIDEAU STREET OTTAWA DECEMBER 2013

PLANNING RATIONALE REPORT CODEAU BUILDING LTD RIDEAU STREET OTTAWA DECEMBER 2013 PLANNING RATIONALE REPORT CODEAU BUILDING LTD 541-545 RIDEAU STREET OTTAWA DECEMBER 2013 1 This report has been prepared on behalf of Codeau Building Ltd. in support of a Zoning By-law Amendment Application

More information

Urban Design Brief Dundas Street. London Affordable Housing Foundation. November Zelinka Priamo Ltd.

Urban Design Brief Dundas Street. London Affordable Housing Foundation. November Zelinka Priamo Ltd. Urban Design Brief 1039-1047 Dundas Street London Affordable Housing Foundation November 2017 Zelinka Priamo Ltd. TABLE OF CONTENTS Page No. INTRODUCTION... 3 SECTION 1 LAND USE PLANNING CONTEXT... 3 1.1

More information

Issue 9 January/February 1999

Issue 9 January/February 1999 Issue 9 January/February 1999 Welcome to the Open Day to view the exhibition of the first new homes in the new town. Building the new town of Ballymun is a far bigger undertaking than just demolishing

More information

Jasper 115 Street DC2 Urban Design Brief

Jasper 115 Street DC2 Urban Design Brief Jasper 115 Street DC2 Urban Design Brief Greenlong Construction Ltd. Stantec Consulting Ltd. 2017 Overview The proposed rezoning application supports the development of two mixed-use high-rise buildings

More information

ST. TERESA S GARDENS REGENERATION PARTNERSHIP

ST. TERESA S GARDENS REGENERATION PARTNERSHIP ST. TERESA S GARDENS REGENERATION PARTNERSHIP ST. TERESA S GARDENS REGENERATION - Dublin City Council / DoECLG / Residents / St. Teresa s Regeneration Board St. Teresa s Gardens was initially designed

More information

THE CORPORATION OF THE DISTRICT OF PEACHLAND BYLAW NUMBER 2065, A Bylaw to Amend Zoning Bylaw Number 1375, 1996

THE CORPORATION OF THE DISTRICT OF PEACHLAND BYLAW NUMBER 2065, A Bylaw to Amend Zoning Bylaw Number 1375, 1996 THE CORPORATION OF THE DISTRICT OF PEACHLAND BYLAW NUMBER 2065, 2013 A Bylaw to Amend Zoning Bylaw Number 1375, 1996 WHEREAS the Council of the Corporation of the District of Peachland has adopted Zoning

More information

Accessory Coach House

Accessory Coach House Updated July 2018 Accessory Coach House Development Permit Guidelines 1 Accessory Coach House Development Permit Guidelines Zoning Bylaw, 1995 DIVISION VII C. Contents Part I General Reglations 1 Introduction

More information

Chapter 5 Residential and Community Facilities

Chapter 5 Residential and Community Facilities Chapter 5 Residential and Community Facilities 5.1 Introduction During the years of the economic boom in Ireland, County Louth experienced considerable pressure for residential development. During this

More information

RedStone Private Country Estate architectural guidelines

RedStone Private Country Estate architectural guidelines RedStone Private Country Estate architectural guidelines urban design principles residential design guidelines > RedStone Village > StoneBridge > RiverView July 2007 Page 1 www.redstoneestate.co.za basic

More information

Part 4.0 DEVELOPMENT REGULATIONS

Part 4.0 DEVELOPMENT REGULATIONS M A I N S T R E E T N O R T H Part 4.0 DEVELOPMENT REGULATIONS 4.1 Districts 4.2 Permitted and Prohibited Uses, Standards and Standard Specific Criteria and Other General Provisions 4.3 DPS REGULATIONS

More information

Introduction. General Development Standards

Introduction. General Development Standards Introduction The development standards will set the zoning regulations for the East Park development. This section will illustrate lot standards, approximate open space locations and road standards. The

More information

Flinders Avenue, Lara Planning Scheme Amendment Combined Application for Rezoning and Multi-Lot Subdivision Reference : Decembe

Flinders Avenue, Lara Planning Scheme Amendment Combined Application for Rezoning and Multi-Lot Subdivision Reference : Decembe 143-179 Flinders Avenue, Lara Planning Scheme Amendment Combined Application for Rezoning and Multi-Lot Subdivision Reference: 14134-03 TGM Group Geelong Melbourne Ballarat 1/27-31 Myers Street (PO Box

More information

Planning & Development. Background. Subject Properties

Planning & Development. Background. Subject Properties Planning & Development APPLICATION BRIEFING Prepared For: Planning Advisory Committee Submitted by: Jason Fox, Director of Planning & Development Date: Subject: Application by Meech Holdings Limited to

More information

Planning Justification Report

Planning Justification Report Planning Justification Report Kellogg s Lands City of London E&E McLaughlin Ltd. June 14, 2017 Zelinka Priamo Ltd. Page i TABLE OF CONTENTS Page No. 1.0 2.0 2.1 2.2 3.0 4.0 5.0 5.1 5.2 5.3 5.4 5.5 5.6

More information

Policy and Standards for Public Local Residential Streets And Private Streets

Policy and Standards for Public Local Residential Streets And Private Streets Appendix A City of Toronto Development Infrastructure Policy & Standards Policy and Standards for Public Local Residential Streets And Private Streets November 2005 Policy and Standards For Public Local

More information

SCHEDULE 31 TO CLAUSE DESIGN AND DEVELOPMENT OVERLAY

SCHEDULE 31 TO CLAUSE DESIGN AND DEVELOPMENT OVERLAY --/--/20-- Proposed GC81 SCHEDULE 31 TO CLAUSE 43.02 DESIGN AND DEVELOPMENT OVERLAY Shown on the planning scheme map as DDO31. FISHERMANS BEND SANDRIDGE PRECINCT 1.0 Design objectives --/--/20-- Proposed

More information

Bylaw No , being "Official Community Plan Bylaw, 2016" Schedule "A" DRAFT

Bylaw No , being Official Community Plan Bylaw, 2016 Schedule A DRAFT Bylaw No. 2600-2016, being "Official Community Plan Bylaw, 2016" Schedule "A" Urban Structure + Growth Plan Urban Structure Land use and growth management are among the most powerful policy tools at the

More information

8.14 Single Detached with Granny Flat or Coach House Edgemere

8.14 Single Detached with Granny Flat or Coach House Edgemere 8.14 Single Detached with Granny Flat or Coach House Edgemere [Bylaw 8922, Nov 19/12] (RE1) 8.14.1 Purpose The zone applies to the Edgemere (RE1) neighbourhood and provides for single detached housing

More information

900 ALBERT STREET PLANNING RATIONALE ADDENDUM NO. 2

900 ALBERT STREET PLANNING RATIONALE ADDENDUM NO. 2 900 ALBERT STREET PLANNING RATIONALE ADDENDUM NO. 2 March 26, 2018 Planning Rationale Addendum No. 2 Official Plan and Zoning By-law Amendment Prepared for: TIP Albert GP Inc. 485 Bank Street, Suite 200

More information

There is no Communal Open Space (COS) requirement for condominium developments.

There is no Communal Open Space (COS) requirement for condominium developments. 6 CONDOMINIUM FLATS CONDOMINIUM FLATS 1 Unlike flat developments, condominium housing requires a larger land area. Condominium flats, too, form the bulk of medium to high density housing in Singapore.

More information

FOR SALE. 200 dwellings residential development site. with a resolution to grant planning permission THE STEEDS, GREAT COXWELL, OXFORDSHIRE SN7 7NN

FOR SALE. 200 dwellings residential development site. with a resolution to grant planning permission THE STEEDS, GREAT COXWELL, OXFORDSHIRE SN7 7NN FOR SALE 200 dwellings residential development site with a resolution to grant planning permission THE STEEDS, GREAT COXWELL, OXFORDSHIRE SN7 7NN Outline Planning permission for up to 130 Private and 70

More information

18. Appendix H Urban Design Panel Presentation

18. Appendix H Urban Design Panel Presentation 18. Appendix H Urban Design Panel Presentation new hotel and serviced apartments 12 lakewood court manukau city URBAN DESIGN PANEL PRESENTATION site context plan neighbourhood analysis plan site context

More information

Strategically located commercial development site of approximately 2.37 hectares (5.8 acres).

Strategically located commercial development site of approximately 2.37 hectares (5.8 acres). Auction For sale by Public Auction 3pm Thursday 3rd November 2016 in the Keadeen Hotel, Newbridge (unless previously sold) DEVELOPMENT SITE WITH FULL PLANNING PERMISSION KILDARE INTERCHANGE LANDS AT M7

More information

Ku-ring-gai Local Environmental Plan No 194

Ku-ring-gai Local Environmental Plan No 194 New South Wales Ku-ring-gai Local Environmental Plan No 194 under the Environmental Planning and Assessment Act 1979 I, the Minister Assisting the Minister for Infrastructure and Planning (Planning Administration),

More information

Design and Access Statement Volume III Part 6 of 9 Plot A1. May 2018 Allies and Morrison

Design and Access Statement Volume III Part 6 of 9 Plot A1. May 2018 Allies and Morrison Design and Access Statement Volume III Part 6 of 9 Plot A1 May 2018 Allies and Morrison 6 OFFICE 135 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018 6.1 Introduction The office development

More information

Part 9 Specific Land Uses - Dual Occupancy

Part 9 Specific Land Uses - Dual Occupancy 6 DUAL OCCUPANCY This section of the DCP only provides Council s specific requirements for Dual Occupancy developments. Other requirements are contained in Part 3 Development within Residential Zones as

More information

TOTTENHAM SECONDARY PLAN

TOTTENHAM SECONDARY PLAN TOTTENHAM SECONDARY PLAN AMENDMENT NO. 11 TO THE OFFICIAL PLAN OF THE TOWN OF NEW TECUMSETH The following text and schedules to the Official Plan of the Town of New Tecumseth constitute Amendment No. 11

More information

LOT AREA AND FRONTAGE

LOT AREA AND FRONTAGE LOT AREA AND FRONTAGE Lot Area & Frontage for the R2.1 Zone Lot Area & Frontage for the R2.4 Zone Minimum Lot Minimum Lot Zone Area Width R2.1 700 sq m 18 m R2.4 600 sq m 16 m Lot Area means the total

More information

Composition of traditional residential corridors.

Composition of traditional residential corridors. Page 1 of 7 St. Petersburg, Florida, Code of Ordinances >> PART II - ST. PETERSBURG CITY CODE >> Chapter 16 - LAND DEVELOPMENT REGULATIONS >> SECTION 16.20.060. CORRIDOR RESIDENTIAL TRADITIONAL DISTRICTS

More information

PROPOSED APARTMENT DEVELOPMENT 32 & 34 TENNYSON AVE TAKAPUNA INTEGRATED TRANSPORT ASSESSMENT

PROPOSED APARTMENT DEVELOPMENT 32 & 34 TENNYSON AVE TAKAPUNA INTEGRATED TRANSPORT ASSESSMENT PROPOSED APARTMENT DEVELOPMENT 32 & 34 TENNYSON AVE TAKAPUNA INTEGRATED TRANSPORT ASSESSMENT Prepared by E.R Hebner 30 th November 2016 Z:\2015_Projects\15155-34 Tennyson Ave\doc\34 Tennyson Ave - Traffic

More information

TOWNHOUSE. TYPICAL UNIT SIZE 1,200 to 1,600 square foot average unit (two to three stories) DENSITY dwelling units/acre without cottages

TOWNHOUSE. TYPICAL UNIT SIZE 1,200 to 1,600 square foot average unit (two to three stories) DENSITY dwelling units/acre without cottages TOWNHOUSE Townhouses are typically two to three stories in height. Some townhouses include separate rental units, either on the top or bottom floor of a three-story townhouse unit, or in a cottage above

More information

49 51 Lawrence Avenue East and 84 Weybourne Crescent Official Plan Amendment and Zoning By-law Amendment Application Request for Direction Report

49 51 Lawrence Avenue East and 84 Weybourne Crescent Official Plan Amendment and Zoning By-law Amendment Application Request for Direction Report STAFF REPORT ACTION REQUIRED 49 51 Lawrence Avenue East and 84 Weybourne Crescent Official Plan Amendment and Zoning By-law Amendment Application Request for Direction Report Date: June 8, 2016 To: From:

More information

Development of a temporary grass multisport pitch and associated works (in addition to the previously approved park - Phase A).

Development of a temporary grass multisport pitch and associated works (in addition to the previously approved park - Phase A). To the Lord Mayor and Report No. 163/2018 Members of Dublin City Council Report of the Chief Executive (a) Planning and Development Act 2000 (as amended) & Planning and Development Regulations 2001 (as

More information

York Neighbourhood Area Structure Plan

York Neighbourhood Area Structure Plan York Neighbourhood Area Structure Plan Office Consolidation March 2006 Prepared by: Planning and Policy Services Branch Planning and Development Department City of Edmonton Bylaw 7064 was adopted by Council

More information

Urban Design Brief 6233, 6237, 6241 and 6245 Main Street, Stouffville Pace Savings and Credit Union June 15, 2012

Urban Design Brief 6233, 6237, 6241 and 6245 Main Street, Stouffville Pace Savings and Credit Union June 15, 2012 Pace Savings and Credit Union June 15, 2012 1.0 Introduction 3 2.0 The Proposal 4 3.0 Site and Development Context 5 4.0 Planning Background 7 5.0 Design Rationale 8 5.1 Limited Opportunities 5.2 Overall

More information

WELCOME TIMESCALES. Thank you for attending Anthology s final public exhibition on the emerging plans for Kennington Stage. ANTHOLOGY S COMMITMENTS

WELCOME TIMESCALES. Thank you for attending Anthology s final public exhibition on the emerging plans for Kennington Stage. ANTHOLOGY S COMMITMENTS WELCOME Thank you for attending Anthology s final public exhibition on the emerging plans for Kennington Stage. Since the second consultation in October 2018, which asked your views on the preferred approach,

More information

PLANNING DECISIONS FOR WEEK 2 DATED 07/01/2013 TO 11/01/2013

PLANNING DECISIONS FOR WEEK 2 DATED 07/01/2013 TO 11/01/2013 In deciding a planning application the Planning Authority, in accordance with Section 34 (3) of the Planning and Development Act, 2000, as amended, has had regard to submissions and observations received

More information

Appendix 2: Mt Victoria

Appendix 2: Mt Victoria Appendix 2: Mt Victoria Contents 2.1 Significance of Mt Victoria to the City 2.2 Character Overview 2.3 Areas in Mt Victoria Moir Street Armour Avenue Porritt Avenue Scarborough Terrace Queen Street Elizabeth

More information

Simon Court 2-4 Neeld Crescent London NW4 3RR

Simon Court 2-4 Neeld Crescent London NW4 3RR Location Simon Court 2-4 Neeld Crescent London NW4 3RR Reference: 17/1019/FUL Received: 20th February 2017 Accepted: 23rd February 2017 Ward: West Hendon Expiry 20th April 2017 Applicant: Proposal: Mr

More information

London Legacy Development Corporation Quality Review Panel. Report of Planning Application Review Meeting: Strand East Plot R6

London Legacy Development Corporation Quality Review Panel. Report of Planning Application Review Meeting: Strand East Plot R6 London Legacy Development Corporation Quality Review Panel : Strand East Plot R6 Level 10, 1 Stratford Place, Montfichet Road, London E20 1EJ Panel Peter Studdert (chair) John Lyall Tom Lonsdale Attendees

More information

Pre-Applica on Design Statement : Residen al Development, The Gas Works, 113 Bury Road, The ord, Norfolk 1

Pre-Applica on Design Statement : Residen al Development, The Gas Works, 113 Bury Road, The ord, Norfolk 1 13-188 Pre-Applica on Design Statement: Residen al Development, The Gas Works, 113 Bury Road, The ord, Norfolk Prepared by: Gary Johns Architects Date: October 2015 15-311 Pre-Applica on Design Statement

More information

Montreal Road District Secondary Plan [Amendment #127, October 9, 2013]

Montreal Road District Secondary Plan [Amendment #127, October 9, 2013] [Amendment #127, October 9, 2013] 1.0 General The following policies are applicable to the Montreal Road District as set out in Schedule 1. 1.1 District Objectives The objective of this Plan is to guide

More information

Objectives The objectives are as listed in the relevant underlying zones and Auckland wide provisions, except as specified below:

Objectives The objectives are as listed in the relevant underlying zones and Auckland wide provisions, except as specified below: 6.35 Drury 1 Precinct description The precinct has an area of 84.62 ha and is bordered by Drury Creek in the north, southern motorway to the east SH22(Karaka road) to the south and Jesmond road to the

More information

The demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken.

The demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken. D E S I G N R E V I E W C O M M I T T E E S t a f f R e p o r t 2072 ADDISON STREET PRELIMINARY DESIGN REVIEW For Committee Discussion/ Majority Recommendation JULY 20, 2017 Design Review #DRCP2016-0002

More information

Rezoning Petition Pre-Hearing Staff Analysis April 17, 2017

Rezoning Petition Pre-Hearing Staff Analysis April 17, 2017 Rezoning Petition 2017-041 Pre-Hearing Staff Analysis April 17, 2017 REQUEST Current Zoning: R-5 (single family residential), R-22MF (multifamily residential), and I-1 (light industrial) Proposed Zoning:

More information

PLANNING RATIONALE REPORT

PLANNING RATIONALE REPORT PLANNING RATIONALE REPORT Zoning By-law Amendment Application 2920 Danbury Way Prepared for: Bravar Custom Builders Inc. and Village View Estates Ltd. by: 6393 Roslyn Street Ottawa (Orleans), Ontario K1C

More information

CHESHIRE WEST AND CHESTER COUNCIL

CHESHIRE WEST AND CHESTER COUNCIL Item No. 10 CHESHIRE WEST AND CHESTER COUNCIL Planning Committee 1 st April 2014 APPLICATION NUMBER: 13/05410/FUL DESCRIPTION OF DEVELOPMENT: Residential development of 17 affordable dwellings and associated

More information

The application is being presented to the planning committee as Brentwood Borough Council is the applicant.

The application is being presented to the planning committee as Brentwood Borough Council is the applicant. COMMITTEE REPORT ITEM 09 Reference: 17/00682/FUL Ward: Brentwood South Site: Land Adjacent 3 King Edward Road Brentwood Essex Proposal: Construction of two x 2 bedroomed semi-detached dwellings. Plan Number(s):

More information

Sotheron Place, Fulham

Sotheron Place, Fulham 5 Minute Walk Stamford Bridge BUSES Fulham Broadway Fulham Road King s Road BUSES Harwood Road SITE 5 Minute Walk BUSES Wandsworth Bridge Road Imperial Road River Thames Imperial Wharf Chelsea Harbour

More information

RM-7, RM-7N and RM-7AN Districts Schedules

RM-7, RM-7N and RM-7AN Districts Schedules 1 Intent Districts Schedules The intent of this schedule is to encourage development of ground-oriented stacked townhouses or rowhouses, while continuing to permit lower intensity development. In RM-7AN,

More information

6208 Jeanne D Arc Boulevard North. Planning Rationale. Site Plan Control

6208 Jeanne D Arc Boulevard North. Planning Rationale. Site Plan Control Site Plan Control Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 November / 24 / 2015 Novatech File: 115100 Ref: R-2015-179 November 24, 2015 City of Ottawa 110 Laurier

More information

3.1 Existing Built Form

3.1 Existing Built Form 3.1 Existing Built Form There is a wide variety of built form in the study area, generally comprising 2 and 3 storey buildings. This stretch of Queen Street East is somewhat atypical of Toronto's main

More information

AT Land Adjacent to Tollgate Cottage, Broughton Grounds Lane, Milton Keynes. Parish: Broughton & Milton Keynes Parish Council

AT Land Adjacent to Tollgate Cottage, Broughton Grounds Lane, Milton Keynes. Parish: Broughton & Milton Keynes Parish Council APPLICATION 06 Application Number: 13/00553/FUL Major Revision to plans approved under 11/01760/MKPC for Plots 59-71 to provide 16 affordable one, two and three bedroom apartments with associated parking

More information

71 RUSSELL AVENUE. PLANNING RATIONALE FOR SITE PLAN CONTROL APPLICATION (Design Brief)

71 RUSSELL AVENUE. PLANNING RATIONALE FOR SITE PLAN CONTROL APPLICATION (Design Brief) ` 71 RUSSELL AVENUE Ottawa September 14, 2018 PLANNING RATIONALE FOR SITE PLAN CONTROL APPLICATION (Design Brief) Introduction The intent of this Planning Rationale and Design Brief is to provide planning

More information