Design and Access Statement Volume VI Addendum Plot K1. Morris + Company

Size: px
Start display at page:

Download "Design and Access Statement Volume VI Addendum Plot K1. Morris + Company"

Transcription

1 Design and Access Statement Volume VI Addendum Plot K1 September October 2018 Morris + Company

2

3 CWM-DM-K1-XX-PR-A DATE ISSUE NOTES Oct/2018 P01 Planning Addendum Issue tab.1 Document control register Copyright 2018 Morris+Company Ltd. No part of this document may be reproduced without the prior consent of the client. This document is prepared in support of the Canada Water Masterplan. Duggan Morris Architects (DMA) and its collaborators are not responsible for nor shall be liable for the consequences of any use made of this Report other than that for which it was prepared by DMA for the Client unless DMA provide prior written authorisation for such other use and confirms in writing that the Report is suitable for it. It is acknowledged by the parties that this Report has been produced solely in accordance with the Client s brief and instructions and without any knowledge of or reference to any other parties potential interests in or proposals for the Project.

4 4 CANADA WATER Plot K1 / Design and Access Statement / May 2018

5 Contents 1 INTRODUCTION PLAN LAYOUTS Use & Amount Summary of Changes Ground Floor First to Fourth Floors Fifth Floor Private Amenity Playspace Provision SECURITY STRATEGY Security MATERIALITY Summary of Changes In-Set Balcony Adjustments CANADA WATER Plot K1 / Design and Access Statement / May 2018

6 6 CANADA WATER Plot K1 / Design and Access Statement / May 2018

7 1 INTRODUCTION 7 CANADA WATER Plot K1 / Design and Access Statement / May 2018

8 1 Introduction 1.1 Introduction In May 2018, BL CW Holdings Ltd, a subsidiary of British Land Company Plc (the Applicant ) hereafter referred to as British Land, submitted a hybrid planning application to Southwark Council (planning application reference: 18/ AP/1604) (the Application ) for the Canada Water Masterplan. The hybrid planning application is made in respect of land bounded by Surrey Quays Road to the north, Lower Road (A200) to the west, Redriff Road (B205) to the south and Quebec Way to the east (the Site ). The hybrid planning application is formed of detailed development proposals in respect of Plots A1, A2 and K1 for which no matters are reserved (the Detailed Proposals ) and outline development proposals for the remainder of the Site, with all matters reserved (the Outline Proposals ). The Detailed Proposals and the Outline Proposals together are referred to as the Development. The Development comprises the redevelopment of the Surrey Quays Shopping Centre, former Harmsworth Quays Printworks and Surrey Quays Leisure Park sites, former Dock Offices Courtyard, former Rotherhithe Police Station and land at Roberts Close. The Development will provide new retail, office, leisure and community floorspace along with residential dwellings. The Development will provide significant high quality public realm, including a new Town Square, a new High Street and a public park. Following a period of statutory consultation on the Application, the Applicant is submitting amendments to the proposals for the Development and further details. For Plot K1 these primarily relate to changes to the façade design and materiality, changes to the design of the inset corner balconies and a revised unit mix. 8 CANADA WATER Plot K1 / Design and Access Statement / May 2018

9 9 CANADA WATER Plot K1 / Design and Access Statement / May Introduction

10 10 CANADA WATER Plot K1 / Design and Access Statement / May 2018

11 2 PLAN LAYOUTS 11 CANADA WATER Plot K1 / Design and Access Statement / May 2018

12 4 Proposed scheme 2.1 Use & Amount REVISED UNIT MIX Plot K1 is a part 5-storey, part 6-storey residential (C3) development. Since submission of the application in May, the unit mix has been updated to provide at least 60% 2+ bedroom units, of which 20% are 3+ bedroom units, across the first two detailed plots, A1 and K1. This results in a reduction in the number of units in Plot K1, from 84 as previously, to 79. The proposal includes 8 wheelchair adapted homes; representing 10% of the total units. The table below (Fig.1) provides a breakdown of the revised unit mix: Apartment types Type Total dwellings %Mix / Units Total HAB rooms* 1 bedroom 1B/2P 14 18% 28 2 bedroom 2B/3P 10 13% 30 2B/4P 16 20% 48 3 bedroom 3B/4P 24 30% 96 3B/5P 15 19% 73 Sub-total % 275 fig.1 Table of revised Unit Mix across Plot K1 12 CANADA WATER Plot K1 / Design and Access Statement / May 2018

13 4 Proposed scheme GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR UNIT MIX 2B3P 2B4P 3B5P fig.2 Updated Unit Mix plans 13 CANADA WATER Plot K1 / Design and Access Statement / May 2018

14 2 Unit Mix 2.2 Unit Mix SUMMARY OF CHANGES The tables shown in Fig. 3 illustrate how the overall unit mix has changed since the May 2018 submission pack. Plot K1 now proposes the following. A total of 79 units instead of 84. Ten units have been replaced by five 3B5P units. 5 extra habitable rooms. One additional projecting balcony has been added to each of the First to Fourth floors, to accommodate private amenity. 60% of all units across Plot A1 and K1 are 2B+ in size, as a consequence of the amendments, in line with Southwark Core Strategy Policy CANADA WATER Plot K1 / Design and Access Statement / May 2018

15 2 Unit Mix MAY 2018 SUBMISSION Apartment types Type Total dwellings %Mix / Units Total HAB rooms* 1 bedroom 1B/2P 24 29% 48 2 bedroom 2B/3P 15 18% 45 2B/4P 11 13% 33 3 bedroom 3B/4P 24 29% 96 3B/5P 10 12% 48 Sub-total % 270 * The number of habitable rooms has been calculated in accordance with the London Plan methodology. Apartment types Total dwellings across Plot A1 & K1 %Split Studio 10 4% 1 bedroom % 43% 2 bedroom % 3 bedroom 50 19% 57% Sub-total % 100% OCT 2018 ADDENDUM SUBMISSION Apartment types Type Total dwellings %Mix / Units Total HAB rooms* 1 bedroom 1B/2P % bedroom 2B/3P % B/4P % bedroom 3B/4P 24 30% 96 3B/5P 15 19% 73 Sub-total % 275 * The number of habitable rooms has been calculated in accordance with the London Plan methodology. Apartment types Total dwellings across Plot A1 & K1 %Split Studio 10 4% 1 bedroom % 40% 2 bedroom % 3 bedroom % 60% Sub-total % 100% fig.3 Comparison tables with unit mix distribution across Plots A1 and K1. 15 CANADA WATER Plot K1 / Design and Access Statement / May 2018

16 2 Unit Mix 2.3 Ground Floor SUMMARY OF CHANGES As a result of the changes in unit mix, the following changes have been made to the internal layout at ground floor level (as illustrated in Figure 4.) Two units have been replaced by one 3B5P unit and the location has been amended to accommodate the new 3B5P unit as a corner unit. A 2B3P unit has been relocated and replaced by a 2B4P unit. 8 wheelchair adapted units at ground. 1 extra habitable room on ground floor. Larger internal bike store. Corner terraces have increased in size. UNIT MIX 1 Bed 2 Bed 3 Bed 16 CANADA WATER Plot K1 / Design and Access Statement / May 2018

17 - revision date am 2 Unit Mix AOD ROBERT'S CLOSE AOD NOTES: MAY 2018 SUBMISSION Indicative planting 4# short stay cycle spaces Indicative planting Application boundary 2B3P - 2B4P - 3B5P Services Bike store (01)210 Number Area AOD Vehicle access control Indicative defensible planting Postboxes AOD AOD Refuse 30.4 m² A.GF.06 A.GF.07 2B4P(W) 02 Refuse Postboxes Indicative defensible planting A.GF m² 2 A.GF m² 2 A.GF m² 2 A.GF m² 2 A.GF m² 2 A.GF m² 1 A.GF m² 2 A.GF m² 2 A.GF m² 1 A.GF m² 1 A.GF m² 1 A.GF m² 2 A.GF.05 2B4P(W) Entrance A 43.3 m² Entrance B A.GF.08 2B4P(W) Landscaping shown is for illustra are set out in the Design and Acc strategy will be secured as a plan 18# double stacked 01 Cycle store 13.8 m² - Plant 3.4 m² GL GL Cycle store 51.3 m² 46# double stacked spaces with mobility scooter charging space A.GF.04 2B3P(W) A.GF.09 (W) 1 (01)312 (01)212 1 (01)313 (01)213 A.GF.03 2B3P(W) SHARED COURTYARD AMENITY LONDON SQUARE DEVELOPMENT Indicative landscaping A.GF.10 (W) A.GF.02 2B3P(W) A.GF.11 P01 MAR 2018 P A.GF.01 2B3P(W) Cycle store 03 80# sheffield parking spaces under external canopy A.GF.12 2B3P SCALE BAR AOD Fencing ROBERT'S CLOSE AOD NOTES: Indicative planting OCT 2018 ADDENDUM SUBMISSION 1 (01)311 4# short stay cycle spaces (01)211 (01)210-1 (01)310 Indicative planting Application boundary 2B3P 2B4P 3B5P Services Bike store Fencing Number Area 3 (01)214 (01)214 UKPN AOD (01)214 Vehicle access control A.GF.05 2B4P(W) Indicative defensible planting Postboxes Entrance A (01)214 AOD AOD m² 01 Refuse 30.4 m² 18# double stacked 01 Cycle store A.GF.06 A.GF.07 2B4P(W) 02 Refuse 43.3 m² - Plant 3.4 m² Postboxes Entrance B Indicative defensible planting A.GF.08 2B4P(W) A.GF m² A.GF m² A.GF m² A.GF m² A.GF m² A.GF m² A.GF m² A.GF m² A.GF m² A.GF m² A.GF m² Duggan Morris Architects Ltd Unit 7, Underwood Street, L Tel: +44 (0) Fax: Landscaping shown is for illust are set out in the Design and A - Do strategy not scale will from be secured this drawing as a pl - All dimensions to be checked on - And such dimensions to be their - Report all drawing errors and om - All dimensions in millimeters unl - If in doubt ask Contract Adminis job title CANADA WATER MASTERP GL GL drawing title / location GROUND FLOOR PLAN Plant room status PLANNING ISSUE 02 Cycle store 70.9 m² date scale AUGUST : A1 (01)214 A.GF.04 2B3P(W) 46# double stacked spaces with mobility scooter charging space project originator zone le CWM DMA K1 0 1 (01)312 (01)212 A.GF.09 (W) (01)213 A.GF.03 2B3P(W) SHARED COURTYARD AMENITY Indicative landscaping 1 (01)313 LONDON SQUARE DEVELOPMENT A.GF.10 2B4P A.GF.02 2B3P(W) P02 OCT 2018 P01 MAY 2018 revision date A.GF.01 2B3P(W) A.GF.11 3B5P SCALE BAR Cycle store 03 80# sheffield parking spaces under external canopy Fencing fig.4 Comparison of ground floor plans. 1 (01)311 1 (01)310 (01)211 - Fencing 17 CANADA WATER Plot (01)214 K1 / Design and Access Statement / May 2018

18 2 Unit Mix 2.4 First to Fourth Floors SUMMARY OF CHANGES Fig.5 show the changes on First to Fourth floor levels. Removal of two apartments and the provision of one 3B5P apartment per floor. One 2B3P apartment has been replaced with a 2B4P apartment on each First to Fourth floor level. One extra habitable room per First to Fourth floor level. One additional projecting balcony has been added to each of the First to Fourth floors, to accommodate private amenity to one 2B4P apartment. Unit layout of two apartments facing Roberts close have been reconfigured, to improve relationships to the access gallery, by being accessed directly off the core. This also improves daylighting and creates a more generous arrival point for all residents. UNIT MIX 1 Bed 2 Bed 3 Bed 18 CANADA WATER Plot K1 / Design and Access Statement / May 2018

19 Louvred roof 2 Unit Mix NOTES: MAY 2018 SUBMISSION Application boundary 2B3P - 2B4P - 3B5P Number Area A B5P A A A A A A B5P A m² 3 A m² 3 A m² 3 A m² 3 A m² 3 A m² 3 A m² 1 A m² 1 A m² 1 A m² 3 A m² 3 A m² 1 A m² 2 A m² 2 A m² 1 A m² 2 Landscaping shown is for illustra are set out in the Design and Acc strategy will be secured as a plan FFL FFL A A A B4P A A B4P A A P01 MAR 2018 P revision date am A Brown/green roof over bicycle canopy A B3P SCALE BAR NOTES: OCT 2018 ADDENDUM SUBMISSION Application boundary 2B3P - 2B4P - 3B5P Number Area A B5P A A A A A A B5P A m² 3B A m² 3B A m² 3B A m² 3B A m² 3B A m² 3B A m² 1B A m² 1B A m² 1B A m² 3B A m² 3B A m² 2B Duggan A Morris Architects 70.9 m² Ltd 2B Unit A , Underwood 70.9 m² Street, 2BL Tel: A m² +44 3B Brown/green roof - Do not scale from this drawing - All dimensions to be checked on Landscaping - And such dimensions shown is for to illustrat be their are - Report set out all drawing the Design errors and and Acce om strategy - All dimensions will be secured in millimeters as a plan unl - If in doubt ask Contract Adminis job title CANADA WATER MASTERP FFL FFL drawing title / location FIRST FLOOR PLAN A B4P status date scale PLANNING ISSUE MARCH : A1 A project originator zone le CWM DMA K1 0 A A B4P A B4P A P02 OCT 2018 P P01 MAR 2018 P revision date am A A B5P SCALE BAR Brown/green roof over bicycle canopy fig.5 Comparison of typical floor plans. 19 CANADA WATER Plot K1 / Design and Access Statement / May 2018

20 2 Unit Mix 2.5 Fifth Floor SUMMARY OF CHANGES Fig. 6 show the changes to the Fifth floor level, which comprise of a change in layout to two 2B3P apartments facing Roberts Close. These have been reconfigured to improve relationships to the access gallery, by being accessed directly off the core. This improves daylighting and creates a more generous arrival point for all residents. UNIT MIX 1 Bed 2 Bed 3 Bed 20 CANADA WATER Plot K1 / Design and Access Statement / May 2018

21 A Unit Mix NOTES: MAY 2018 SUBMISSION Application boundary 2B3P - 2B4P - 3B5P Number Area A m² 3 A m² 2 A m² 2 A m² 2 A m² 2 A m² 2 A m² 2 A m² 3 2B4P A B3P A B3P A B3P A B3P A B3P Landscaping shown is for illustra are set out in the Design and Acc strategy will be secured as a plan FFL FFL A B5P A B5P Ladder from L05 roof Ladder from L05 roof Brown roof Paved roof for maintenance access Indicative access spot services distribution Indicative access spot services distribution Paved roof for maintenance access Brown roof P01 MAR 2018 P revision date am SCALE BAR Mansafe system Mansafe system NOTES: OCT 2018 ADDENDUM SUBMISSION Application boundary 2B3P - 2B4P - 3B5P Number Area A B3P A B3P A B3P A B3P A B3P A B3P A m² 3B A m² 2B A m² 2B A m² 2B A m² 2B A m² 2B A m² 2B A m² 3B Duggan Morris Architects Ltd Unit 7, Underwood Street, L Tel: +44 (0) Fax: Do not scale from this drawing - All dimensions to be checked on Landscaping - And such dimensions shown is for to illustrat be their are - Report set out all drawing the Design errors and and Acce om strategy - All dimensions will be secured in millimeters as a plan unl - If in doubt ask Contract Adminis job title CANADA WATER MASTERP FFL FFL drawing title / location FIFTH FLOOR PLAN status date PLANNING ISSUE MARCH 2018 A B5P A B5P scale 1 : A1 project originator zone le CWM DMA K1 0 Ladder from L05 roof Ladder from L05 roof Brown roof Paved roof for maintenance access Indicative access spot services distribution Indicative access spot services distribution Paved roof for maintenance access Brown roof P02 OCT 2018 P P01 MAR 2018 P revision date am SCALE BAR Mansafe system Mansafe system fig.6 Comparison of ground floor plans. 21 CANADA WATER Plot K1 / Design and Access Statement / May 2018

22 DN UP 2 Unit Mix 2.6 Private Amenity CORNER BALCONIES As shown in the comparison of Fig.7 and Fig.8, all four corner balcony balustrade details have been adjusted to maximise the area of the balcony by removing brick upstands and bringing the metal railing down to the balcony s floor level, whilst keeping the brick band wrapping around the edge. This change now offers a minimum of 10sq m private amenity area for all 3 Bedroom apartments. This change also helps to reduce the perceived mass of the building, by creating lighter corners. 22 CANADA WATER Plot K1 / Design and Access Statement / May 2018

23 2 Unit Mix NOTES: revision date amendment SCALE BAR Duggan Morris Architects Ltd Unit 7, Underwood Street, London N1 7JQ Tel: +44 (0) Fax: +44 (0) Do not scale from this drawing - All dimensions to be checked on site by the Contractor - And such dimensions to be their responsibility - Report all drawing errors and omissions to the Architect - All dimensions in millimeters unless noted otherwise - If in doubt ask Contract Administrator job title CANADA WATER MASTERPLAN-PLOT K1 drawing title / location Unnamed status PLANNING ISSUE date 08/17/18 scale fig.7 May 2018 Submission 23 CANADA WATER Plot K1 / Design and Access Statement / May 2018 fig.8 October 2018 Addendum Submission A1 originator zone CWM Designer level type role nu Autho SK

24 2 Unit Mix CORNER UNITS By decreasing the internal NIA of each corner unit, the external private amenity can be increased, whilst staying within the Southwark Council s Residential Design Standards. This change affects units 01, 05 and 08 on ground floor, and 01, 05 and 11 on each floor from First to Fourth. The corner balcony balustrade detail is adjusted to maximise the area of the balcony by removing brick upstands, as shown in Fig. 7 and Fig. 8. The layout allows for an open plan kitchen / living / dining arrangement, or as separate rooms (as shown in Fig. 10), if this is preferable. The habitable room count would remain the same in either arrangement. 24 CANADA WATER Plot K1 / Design and Access Statement / May 2018

25 DN UP Application bou 2B3P - 2B4P - 3B5P Landscaping shown is are set out in the Desi strategy will be secure NOTES: SCALE BAR Duggan Morris Architects Ltd Unit 7, Underwood Street, London N1 7JQ Tel: +44 (0) Fax: +44 (0) Do not scale from this drawing - All dimensions to be checked on site by the Contractor - And such dimensions to be their responsibility - Report all drawing errors and omissions to the Architect - All dimensions in millimeters unless noted otherwise - If in doubt ask Contract Administrator job title CANADA WATER MASTERPLAN-PLOT K1 drawing title / location GA plan Diagram TYP status date scale revision date amendment project CWM FOR INFORMATION 02/05/18 1 : A1 originator zone level type role number Designer Author (01)315 Dugga s 2 Unit Mix NOTES: Number A P A A m 2 A A B5P A A B5P 10m 2 A A A A A A A A A A A A A A A A m 76.4 m 76.4 m 76.4 m 89.3 m 76.4 m 51.3 m 51.3 m 51.3 m 76.4 m 89.3 m 51.3 m 70.9 m 70.9 m 51.3 m 61.1 m FFL FFL B5P NIA 89.3m2 A B5P NIA 87.9m2 A B4P 5 habitable rooms 4hr (3B5P) + 1 hr extra for Kitchen > 11m2 A B4P 5 habitable rooms 4hr (3B5P) + 1 hr extra for Kitchen > 11m2 fig.9 May 2018 Submission fig.10 October 2018 Addendum Submission A B4P A B4P A B4P A P01 MAR 2 revision date FINAL DRA 25 CANADA WATER Plot K1 / Design and Access Statement / May 2018 A B3P Brown/green roof over bicycle canopy A B5P SCALE BAR

26 DN UP NOTES: job title CANADA WATER MASTERPLAN-PLOT K1 status date scale revision date amendment SCALE BAR Duggan Morris Architects Ltd Unit 7, Underwood Street, London N1 7JQ Tel: +44 (0) Fax: +44 (0) Do not scale from this drawing - All dimensions to be checked on site by the Contractor - And such dimensions to be their responsibility - Report all drawing errors and omissions to the Architect - All dimensions in millimeters unless noted otherwise - If in doubt ask Contract Administrator drawing title / location GA plan Diagram TYP project CWM FOR INFORMATION 02/05/18 1 : A1 originator zone level type role number Designer Author (01)315 Dugga s A A Unit Mix A A A A A A Brown/green roof over bicycle canopy 7.1m 2 10m 2 NIA 77.9m2 5 habitable rooms 4hr () + 1 hr extra for KLD> 27.5m2 NIA 75.7m2 5 habitable rooms 4hr () + 1 hr extra for KLD> 27.5m2 fig.11 May 2018 Submission fig.12 October 2018 Addendum Submission een roof Louvred roof Brown/green roof Louvred roof FINAL DRA 26 CANADA WATER Plot K1 / Design and Access Statement / May 2018

27 27 CANADA WATER Plot K1 / Design and Access Statement / May Unit Mix

28 2 Unit Mix 2.7 Playspace provision SUMMARY OF CHANGES Playspace requirements The changes in unit mix result in a slightly increased playspace requirement. The tables in Fig. 13 indicate the revised playspace requirements based on the GLA yield methodology. The central courtyard provides 532 sqm of amenity, of which 392 sqm is dedicated child playspace. This will account for 330msq of doorstep play space for under 5 s, and 62 sqm for 5-11s. In line with the Mayor s Play and Informal recreation SPG, and Southwark s S106 and CIL SPD, the shortfall in 5-11s and 12+ playspace will be met through an off-site contribution. 28 CANADA WATER Plot K1 / Design and Access Statement / May 2018

29 2 Unit Mix MAY 2018 SUBMISSION Age Profile # of children Sqm required Sqm proposed Sqm off-site Under 5s Total Courtyard (532msq) meets on-site requirement for all Under 5s, some 5-11s and 12+ off-site. OCT 2018 ADDENDUM SUBMISSION Age Profile # of children Sqm required Sqm proposed Sqm off-site Under 5s Total Courtyard (532msq) meets on-site requirement for all Under 5s, some 5-11s and 12+ off-site. fig.13 Comparison of playspace requirements for May and OCtober submissions 29 CANADA WATER Plot K1 / Design and Access Statement / May 2018

30 30 CANADA WATER Plot K1 / Design and Access Statement / May 2018

31 3 SECURITY STRATEGY 31 CANADA WATER Plot K1 / Design and Access Statement / May 2018

32 2 Unit Mix 3.1 Security DESIGNING OUT CRIME A number of consultation responses have related to the security measures for Plot K1. This section provides further detail on the security measures proposed for the site. The design security strategy has been developed with the assistance of security consultants QCIC. The security strategy seeks to reduce crime through the security measures explained below and shown on Fig. 14, in addition to incorporating qualitative design measures that provide a greater sense of security around Plot K1. The qualitative design measures include: Secure perimeter of 2.4m fence where building does not provide a natural edge. PAS 24 rated front doors, with two lines of defence for fob access from outer door to inner spaces (creating a secure lobby for post). Secure vehicle gate (2.4m high to access car parking). CCTV on main entrances, courtyard (including bike store) and perimiter locations as shown. Floor by floor controls (access to destination floor only) to limit the number of residences an intruder could access easily. Windows overlooking the site environs significantly improve passive surveillance of the site. The qualitative design measures incorporated will create a significant increase in both passive and active surveillance of the site, while physical security measure will act as a strong deterent to crime and provide an atmosphere of improved security. 32 CANADA WATER Plot K1 / Design and Access Statement / May 2018

33 2 Unit Mix PAS 24 PAS 24 F PAS 24 F F F C F F F F C F London Square 1.8m height F 2.4m height 1.8m height 2.4m height KEY F FOB ACCESS Russia Dock Woodland SECURE LINE - RAILINGS BICYCLE STORE OVERLOOKING WINDOWS fig.14 Proposed Security strategy plan (Illustrated at Ground Floor) CCTV CAMERA LOCATION 33 CANADA WATER Plot K1 / Design and Access Statement / May 2018

34 34 CANADA WATER Plot K1 / Design and Access Statement / May 2018

35 4 MATERIALITY 35 CANADA WATER Plot K1 / Design and Access Statement / May 2018

36 4 Proposed scheme 4.1 Appearance SUMMARY OF CHANGES In response to feedback from local residents and London Borough of Southwark officers, the appearance of the building has been adapted to feel lighter and more varied. Fig.15 and Fig.16 adjacent, summarise the key changes made: A lighter brick is proposed across the building, from a dark purple-red to a more variegated deep red tone. A brick of complementary colour and texture in a lighter tone is proposed to express the fifth floor and all bricks in the window and balcony reveals. KEY (Fig. 16) 1 LIGHTER BRICK TONE 2 PALER BRICK SET-BACKS 3 DARKER TEXTURE ON THE GROUND FLOOR PLINTH 4 CONTINUOUS COPING TO PARAPET 5 METALWORK BALUSTRADE DOWN TO FLOOR LEVEL ON CORNER BALCONIES 6/7 FURTHER DETAIL TO IN-SET BALCONY IS EXPLAINED IN DETAIL STUDY (FIG, 17) More depth of shadow texture has been applied to the ground floor plinth by means of projecting alternate brick courses. This, in combination with the lighter top floor, helps to define a base, middle and top to the building, thus breaking down it s perceived mass. Continuous coping to fifth floor parapet also helps to break down the mass of the building. The corner balconies now have full-height metal balustrades, with only the soldier brick ribbon running continuously round the building. This change also contributes to eroding the perceived massing, and makes the building appear lighter. The articulation of the inset balconies has also been explored and adapted. The detail has been simplified, and now mirrors the same approach that is applied to the courtyard corners. More detail can be found on the following page. fig.15 May 2018 submission 36 CANADA WATER Plot K1 / Design and Access Statement / May 2018

37 4 Proposed scheme fig.16 Now proposed lighter brick colour 37 CANADA WATER Plot K1 / Design and Access Statement / May 2018

38 4 Proposed scheme 4.2 Inset Balcony Study DETAIL STUDY Following further feedback from London Borough of Southwark officers, Fig.17 shows how the same principles from the courtyard can be applied to this loggia condition. The corners to the loggia piers have been simplified, so no recessed brick is used in this condition. KEY (Fig. 17) 1 NO RECESSED BRICK ON CORNERS OF LOGGIA BALCONIES 2 OUTER BRICK AND COURTYARD WHITE BRICK ARE KEYED INTO EACH OTHER - TO DEPTH OF THE WALLS 3 COURTYARD BRICK TO THE INSIDE OF LOGGIA BALCONIES 4 METAL SOFFIT COLOURS TO MATCH DARKER BRICK TONE 5 RAINWATER DOWN PIPES CONCEALED BEHIND PROJECTING BRICK PIERS fig.17 Detail study of loggia proposal 38 CANADA WATER Plot K1 / Design and Access Statement / May 2018

39 4 Proposed scheme fig.18 Updated South East Elevation showing new proposal of in-set loggia balconies 39 CANADA WATER Plot K1 / Design and Access Statement / May 2018

40

41 For further information please contact freepost CANADA WATER MASTERPLAN telephone (request the Canada Water Team)

Design and Access Statement Volume III Part 6 of 9 Plot A1. May 2018 Allies and Morrison

Design and Access Statement Volume III Part 6 of 9 Plot A1. May 2018 Allies and Morrison Design and Access Statement Volume III Part 6 of 9 Plot A1 May 2018 Allies and Morrison 6 OFFICE 135 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018 6.1 Introduction The office development

More information

4.0. Proposals. View from Claremont Park Road (Plot 13 shown illustratively in the background)

4.0. Proposals. View from Claremont Park Road (Plot 13 shown illustratively in the background) 4.0. Proposals Fig. 54 View from Claremont Park Road (Plot shown illustratively in the background) Brent Cross South Plot - Design Statement Maccreanor Lavington 4.. Scheme overview 4... Introduction The

More information

St Johns Road, Isleworth

St Johns Road, Isleworth St Johns Road, Isleworth and Access Statement Concept sketch looking south on St Johns Road rocktownsend.co.uk Date Contents. The Process. Consultations. Use. Amount 5. Layout. Scale. Landscaping 8. Appearance

More information

5.0. Technical Details 5.1. Car parking

5.0. Technical Details 5.1. Car parking 5.. Technical Details 5.1. Car parking Do not scale from this drawing. Verify all dimensions on site. Drawing should be read in conjunction with information from all other design consultants and contractors.

More information

DESIGN, ACCESS & PLANNING STATEMENT

DESIGN, ACCESS & PLANNING STATEMENT (MADRON STREET) LONDON SE1 5UB DESIGN, ACCESS & PLANNING STATEMENT The architectural response for the site has been designed with regard to the following: The New Southwark Plan The London Plan: Spatial

More information

4.5 Residential mix. MARLOWE ROAD DESIGN AND ACCESS STATEMENT May 2015

4.5 Residential mix. MARLOWE ROAD DESIGN AND ACCESS STATEMENT May 2015 4.5 Residential mix Policy WS9 of the London Borough of Waltham Forrest Wood Street Area Action Plan states that development proposals will be required to provide a balanced provision of dwelling sizes

More information

Design and Access Statement Volume III Part 4 of 9 Plot A1. May 2018 Allies and Morrison

Design and Access Statement Volume III Part 4 of 9 Plot A1. May 2018 Allies and Morrison Design and Access Statement Volume III Part 4 of 9 Plot A1 May 2018 Allies and Morrison 4 PROPOSED SCHEME 67 CANADA WATER MASTERPLAN PLOT A1 Design and Access Statement May 2018 4.1 Use Plot A1 is a mixed-use

More information

WELCOME TIMESCALES. Thank you for attending Anthology s final public exhibition on the emerging plans for Kennington Stage. ANTHOLOGY S COMMITMENTS

WELCOME TIMESCALES. Thank you for attending Anthology s final public exhibition on the emerging plans for Kennington Stage. ANTHOLOGY S COMMITMENTS WELCOME Thank you for attending Anthology s final public exhibition on the emerging plans for Kennington Stage. Since the second consultation in October 2018, which asked your views on the preferred approach,

More information

Design & Access Statement 704 Woolwich Road, London SE7 8LQ February 2018

Design & Access Statement 704 Woolwich Road, London SE7 8LQ February 2018 Design & Access Statement 704 Woolwich Road, London SE7 8LQ February 2018 Moji Karami, BA(hons)Arch CONTENTS 1.0 Introduction 2.0 Executive Summary 3.0 Existing Site and Surrounding Area 4.0 Transport

More information

1 AYLESBURY ESTATE Development Specification (Consolidated) November 2015

1 AYLESBURY ESTATE Development Specification (Consolidated) November 2015 AYLESBURY ESTATE Specification (Consolidated) November 2015 Quality Management Issue/revision Version 1 Version 2 Remarks Revised to incorporate changes to Plot 18 floorspace Date 20/02/2015 24/11/2015

More information

Rawlinson House, Lewisham, London SE13 5EL

Rawlinson House, Lewisham, London SE13 5EL Rawlinson House, Lewisham, London SE13 5EL Client: Lewisham Homes Old Town Hall Catford London SE6 4RU Date: 18 February 2016 Job No: 2540-MA-N-RP-0001-D00 Martin Arnold Ltd 4 Gunnery Terrace The Royal

More information

108 Holders Hill Road London NW4 1LJ

108 Holders Hill Road London NW4 1LJ Location 108 Holders Hill Road London NW4 1LJ Reference: 16/4234/FUL Received: 28th June 2016 Accepted: 7th July 2016 Ward: Finchley Church End Expiry 1st September 2016 Applicant: Proposal: Mr b menahem

More information

Sotheron Place, Fulham

Sotheron Place, Fulham 5 Minute Walk Stamford Bridge BUSES Fulham Broadway Fulham Road King s Road BUSES Harwood Road SITE 5 Minute Walk BUSES Wandsworth Bridge Road Imperial Road River Thames Imperial Wharf Chelsea Harbour

More information

1323 High Road London N20 9HR. Reference: 18/0709/FUL Received: 1st February 2018 Accepted: 1st February 2018 Ward: Totteridge Expiry 29th March 2018

1323 High Road London N20 9HR. Reference: 18/0709/FUL Received: 1st February 2018 Accepted: 1st February 2018 Ward: Totteridge Expiry 29th March 2018 Location 1323 High Road London N20 9HR Reference: 18/0709/FUL Received: 1st February 2018 Accepted: 1st February 2018 Ward: Totteridge Expiry 29th March 2018 Applicant: Proposal: Mr M Shah Partial demolition

More information

ST. TERESA S GARDENS REGENERATION PARTNERSHIP

ST. TERESA S GARDENS REGENERATION PARTNERSHIP ST. TERESA S GARDENS REGENERATION PARTNERSHIP ST. TERESA S GARDENS REGENERATION - Dublin City Council / DoECLG / Residents / St. Teresa s Regeneration Board St. Teresa s Gardens was initially designed

More information

34 Carver Street, Jewellery Quarter, Birmingham, B1 3AL

34 Carver Street, Jewellery Quarter, Birmingham, B1 3AL Committee Date: 19/09/2013 Application Number: 2013/02379/PA Accepted: 03/05/2013 Application Type: Full Planning Target Date: 02/08/2013 Ward: Ladywood 34 Carver Street, Jewellery Quarter, Birmingham,

More information

Draft London Plan Review

Draft London Plan Review Draft London Plan Review Briefing Note Date: 04/12/2017 Ref No: 283 Introduction On the 29th November the Mayor of London, Sadiq Khan, published his draft London Plan for consultation (Regulation 19).

More information

apply sustainability principles to all residential developments in Ardee;

apply sustainability principles to all residential developments in Ardee; 3. Housing 3.1 Introduction Ardee is currently experiencing considerable pressure for residential development as improved road infrastructure, together with the availability of serviced land, makes the

More information

Stephen Davy Peter Smith Architects

Stephen Davy Peter Smith Architects Stephen Davy Peter Smith Architects Stephen Davy Peter Smith Architects 21 Stephen Davy Peter Smith Architects Stephen Davy Peter Smith Architects 23 FIFTH FLOOR FOURTH FLOOR FIFTH FLOOR FOURTH FLOOR THIRD

More information

Date: 19 July Address: VARCOE SERVICE STATION 1 VARCOE ROAD, LONDON SE16 3DG

Date: 19 July Address: VARCOE SERVICE STATION 1 VARCOE ROAD, LONDON SE16 3DG Item No. 6.2 Classification: Open Date: 19 July 2017 Meeting Name: Planning Committee Report title: Development Management planning application: Application 16/AP/5235 for: Full Planning Permission Address:

More information

Grosvenor House, Drury Lane, London, WC2. October 2003

Grosvenor House, Drury Lane, London, WC2. October 2003 Grosvenor House, 141-143 Drury Lane, London, WC2 October 2003 The material contained in this document is private and confidential and for issue to and use by the client and the project team only. Acknowledgments

More information

57 Foscote Road London NW4 3SE

57 Foscote Road London NW4 3SE Location 57 Foscote Road London NW4 3SE Reference: 16/0572/FUL Received: 28th January 2016 Accepted: 1st February 2016 Ward: West Hendon Expiry 28th March 2016 Applicant: Mr Dan Tamir Proposal: Part single,

More information

REDEVELOPMENT OF ELEPHANT & CASTLE SHOPPING CENTRE AND LONDON COLLEGE OF COMMUNICATION, SE1 AFFORDABLE HOUSING UPDATE

REDEVELOPMENT OF ELEPHANT & CASTLE SHOPPING CENTRE AND LONDON COLLEGE OF COMMUNICATION, SE1 AFFORDABLE HOUSING UPDATE PL/LJ 10 July 2017 Bridin O Connor London Borough of Southwark 160 Tooley Street London SE1 2TZ Dear Bridin REDEVELOPMENT OF ELEPHANT & CASTLE SHOPPING CENTRE AND LONDON COLLEGE OF COMMUNICATION, SE1 AFFORDABLE

More information

LIBERTY HOUSE. Paul Keogh Architects. Paul Keogh Architects LIBERTY HOUSE HOMES

LIBERTY HOUSE. Paul Keogh Architects. Paul Keogh Architects LIBERTY HOUSE HOMES 150 151 Award: Highly Commended 2015 RIAI Irish Architecture Awards Client: Dublin City Council Liberty House takes its inspiration from the Georgian brick terraces Project Photography: Peter Cook Location:

More information

Ramp. Bikes Ramp. Landing. Lift. Bikes. Stairs. Bedrm 1 Bedrm 2. Living Rm HWC m 2. Utility. Bthrm. Kitchen.

Ramp. Bikes Ramp. Landing. Lift. Bikes. Stairs. Bedrm 1 Bedrm 2. Living Rm HWC m 2. Utility. Bthrm. Kitchen. Farm Street Bdy 18.32 123 o 36' 30" Entry Canopy Above 3.0 Roadside Setback 0-157 Bdy 44.26 33 o 36' 30" -347-492 -496 01 1.5 Boundary Setback Ramp Floor Area 132.82 m 2 1.5 Boundary Setback 150 7,400

More information

T H E Q U A N T B U I L D I N G

T H E Q U A N T B U I L D I N G D E S I G N & A C C E S S S T A T E M E N T T H E Q U A N T B U I L D I N G 6-1 0 C H U R C H H I L L, L O N D O N, E 1 7 3 A G P L A N N I N G A P P L I C A T I O N F O R L O N D O N B O R O U G H W A

More information

The Horizon, 54 New Coventry Road, Sheldon, Birmingham, B26 3BB

The Horizon, 54 New Coventry Road, Sheldon, Birmingham, B26 3BB Committee Date: 17/07/2014 Application Number: 2014/02479/PA Accepted: 22/04/2014 Application Type: Full Planning Target Date: 22/07/2014 Ward: Sheldon The Horizon, 54 New Coventry Road, Sheldon, Birmingham,

More information

Southall Gas Works: Design Statement by URBED with Capita Symonds, WYG, Lovejoys, Jestico and Whiles and RPSDesign Statement. Typologies.

Southall Gas Works: Design Statement by URBED with Capita Symonds, WYG, Lovejoys, Jestico and Whiles and RPSDesign Statement. Typologies. 9 Typologies Page 95 9:1. Approach to typologies 1. 3. 2. 4. Far left: Traditional walk-up flats: With 2 of 4 flats per landing off a core. The bottom plan shows a perimeter block arrangement based on

More information

Indicative Visualisation Bombay Street, Bermondsey, London SE16 3UX Mixed-Use Development Opportunity For Sale

Indicative Visualisation Bombay Street, Bermondsey, London SE16 3UX Mixed-Use Development Opportunity For Sale Indicative Visualisation ENTER Mixed-Use Development Opportunity For Sale HOME DESCRIPTION & LOCATION DEVELOPMENT Workshops and office space (B1 / B8 use) extending to 6,060ft 2 and open storage on a freehold

More information

A mix of uses. Housing:

A mix of uses. Housing: 7 Massing and uses Page 79 7:1. A mix of uses % Total Habitable Occ/ People Rooms HR Studio 6.8% 308 1 0.90 277 1 bed 32.0% 1442 2 0.90 2,595 2 bed 37.6% 1691 3 0.90 4,567 3 bed 21.2% 955 4 0.90 3,438

More information

3 Accommodation Road London NW11 8ED

3 Accommodation Road London NW11 8ED Location 3 Accommodation Road London NW11 8ED Reference: 17/1179/FUL Received: 15th February 2017 Accepted: 28th February 2017 Ward: Childs Hill Expiry 25th April 2017 Applicant: Mr Proposal: Creation

More information

1 Cumbrian Gardens London NW2 1EB

1 Cumbrian Gardens London NW2 1EB Location 1 Cumbrian Gardens London NW2 1EB Reference: 16/0469/FUL Received: 25th January 2016 Accepted: 29th January 2016 Ward: Golders Green Expiry 25th March 2016 Applicant: Mr REZA FARD Proposal: Conversion

More information

Report of: DEVELOPMENT MANAGEMENT SECTION HEAD. 19 Cassiobury Park Avenue PARK

Report of: DEVELOPMENT MANAGEMENT SECTION HEAD. 19 Cassiobury Park Avenue PARK PART A Report of: DEVELOPMENT MANAGEMENT SECTION HEAD Date of Committee: 26 th January 2012 Site address: 19 Cassiobury Park Avenue Reference Number : 11/01079/FULH Description of Development: Erection

More information

Advisory Design Panel Report For the Meeting of February 27, 2019

Advisory Design Panel Report For the Meeting of February 27, 2019 Advisory Design Panel Report For the Meeting of February 27, 2019 To: Advisory Design Panel Date: February 15, 2019 From: Subject: Moira Wilson, Senior Planner - Urban Design 952 Johnson Street and 1400

More information

WELCOME! to the resident consultation on the initial designs for Bessborough Road. Bessborough Road. Your Views Matter

WELCOME! to the resident consultation on the initial designs for Bessborough Road. Bessborough Road. Your Views Matter Your Views Matter WELCOME! to the resident consultation on the initial designs for Bessborough Road The Bessborough Road site will be the first site to be developed for the regeneration of the Alton Estate

More information

PLANNING BRIEF SITE ND7, TEMPLE QUAY, BRISTOL

PLANNING BRIEF SITE ND7, TEMPLE QUAY, BRISTOL PLANNING BRIEF SITE ND7, TEMPLE QUAY, BRISTOL Site Description Plot ND7 is located within the area known as Temple Quay North in central Bristol, north of the Floating Harbour, and is incorporated within

More information

London Legacy Development Corporation Quality Review Panel. Report of Planning Application Review Meeting: Strand East Plot R6

London Legacy Development Corporation Quality Review Panel. Report of Planning Application Review Meeting: Strand East Plot R6 London Legacy Development Corporation Quality Review Panel : Strand East Plot R6 Level 10, 1 Stratford Place, Montfichet Road, London E20 1EJ Panel Peter Studdert (chair) John Lyall Tom Lonsdale Attendees

More information

Former Selly Oak Industrial Estate, Elliott Road, Selly Oak, Birmingham,

Former Selly Oak Industrial Estate, Elliott Road, Selly Oak, Birmingham, Committee Date: 17/10/2013 Application Number: 2013/04225/PA Accepted: 18/09/2013 Application Type: Full Planning Target Date: 18/12/2013 Ward: Selly Oak Former Selly Oak Industrial Estate, Elliott Road,

More information

Selected Experience of Neil Lucas

Selected Experience of Neil Lucas Selected Experience of Neil Lucas Neil Lucas Neil Lucas Partner Direct Line: 0161 831 5889 Mobile: 07734 862 006 Email: neil.lucas@howplanning.com Neil joined HOW as a Partner in February 2017 to oversee

More information

900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1

900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1 50 City of Vancouver Land Use and Development Policies and Guidelines Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7344 fax 873.7060 planning@city.vancouver.bc.ca 900 BURRARD STREET

More information

CAMBERWELL MAGISTRATES' COURT, SE5 PRE-APPLICATION DOCUMENT

CAMBERWELL MAGISTRATES' COURT, SE5 PRE-APPLICATION DOCUMENT CAMBERWELL MAGISTRATES' COURT, SE5 PRE-APPLICATION DOCUMENT MARCH 2018 2 STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 PRE-APPLICATION DOCUMENT CONTENTS 1.0 INTRODUCTION 2.0 SITE CONTEXT 2.1 SITE

More information

erie street hotel WEST ERIE STREET CHICAGO, IL PROJECT DATA SITE AREA BUILDING AREA (FAR) LEVELS HEIGHT GUESTROOM COUNT

erie street hotel WEST ERIE STREET CHICAGO, IL PROJECT DATA SITE AREA BUILDING AREA (FAR) LEVELS HEIGHT GUESTROOM COUNT erie street hotel 12-22 WEST ERIE STREET CHICAGO, IL PROJECT DATA SITE AREA BUILDING AREA (FAR) LEVELS HEIGHT GUESTROOM COUNT PROJECT F.A.R. BASE F.A.R. PROPOSED F.A.R. 13,819 SF 111,933 SF 14 LEVELS+

More information

SHAPING WOOD WHARF CANARY WHARF S NEW PHASE

SHAPING WOOD WHARF CANARY WHARF S NEW PHASE SHAPING WOOD WHARF CANARY WHARF S NEW PHASE Newsletter 01 March 2015 In December 2014, Tower Hamlets Council granted planning permission for the redevelopment of the Wood Wharf site to create a vibrant

More information

Application No: Location: Northfields (Formally Turner Village), Turner Road, Colchester. Scale (approx): 1:1250

Application No: Location: Northfields (Formally Turner Village), Turner Road, Colchester. Scale (approx): 1:1250 Application No: 152268 Location: Northfields (Formally Turner Village), Turner Road, Colchester Scale (approx): 1:1250 The Ordnance Survey map data included within this publication is provided by Colchester

More information

Simon Court 2-4 Neeld Crescent London NW4 3RR

Simon Court 2-4 Neeld Crescent London NW4 3RR Location Simon Court 2-4 Neeld Crescent London NW4 3RR Reference: 17/1019/FUL Received: 20th February 2017 Accepted: 23rd February 2017 Ward: West Hendon Expiry 20th April 2017 Applicant: Proposal: Mr

More information

Masshouse Plot 3, Land at Masshouse Lane/Park Street, Masshouse Plaza, City Centre, Birmingham, B5

Masshouse Plot 3, Land at Masshouse Lane/Park Street, Masshouse Plaza, City Centre, Birmingham, B5 Committee Date: 21/08/2014 Application Number: 2014/02950/PA Accepted: 07/05/2014 Application Type: Full Planning Target Date: 06/08/2014 Ward: Nechells Masshouse Plot 3, Land at Masshouse Lane/Park Street,

More information

Kassner Goodspeed Architects Ltd.

Kassner Goodspeed Architects Ltd. Kassner Goodspeed Architects Ltd. 11 March 2015 Ms Jillian MacLellan, Planner 1 Planning Application, Community Development Halifax Regional Municipality P.O. Box 1749 Halifax, NS B3J 3A5 Re: Case 19281,

More information

PREPARED FOR: ADI DEVELOPMENT GROUP INC.

PREPARED FOR: ADI DEVELOPMENT GROUP INC. Acronym Urban Design and Planning/Mark Sterling Consulting Inc. 111 Clendenan Avenue, Toronto, Ontario M6P 2W7 URBAN DESIGN BRIEF PROPOSED DEVELOPMENT 4880 VALERA ROAD, CITY OF BURLINGTON PREPARED FOR:

More information

Change of use from office (use class B1) to Apart-Hotel (use class C1) with 52 apartments, and including fourth storey extension

Change of use from office (use class B1) to Apart-Hotel (use class C1) with 52 apartments, and including fourth storey extension APP 03 Application Number: 14/01217/FUL Major Change of use from office (use class B1) to Apart-Hotel (use class C1) with 52 apartments, and including fourth storey extension AT Platinum House, 199 North

More information

Tudor Court 2 Crewys Road London NW2 2AA

Tudor Court 2 Crewys Road London NW2 2AA Location Tudor Court 2 Crewys Road London NW2 2AA Reference: 18/3299/S73 Received: 30th May 2018 Accepted: 30th May 2018 Ward: Childs Hill Expiry 25th July 2018 Applicant: Mr Jack Frankel Proposal: Variation

More information

Proposed development at 131 Lyham Road, Lambeth London SW2 5PY

Proposed development at 131 Lyham Road, Lambeth London SW2 5PY Proposed development at 131 Lyham Road, Lambeth London SW2 5PY Planning Application Supporting Document Goldcrest Land (UK) Ltd November 2013 Job No 4474 Paul Brookes Architects The Works 28 Barnes Avenue

More information

69 Cumbrian Gardens London NW2 1ED. Reference: 17/3513/FUL Received: 1st June 2017 Accepted: 1st June 2017 Ward: Golders Green Expiry 27th July 2017

69 Cumbrian Gardens London NW2 1ED. Reference: 17/3513/FUL Received: 1st June 2017 Accepted: 1st June 2017 Ward: Golders Green Expiry 27th July 2017 Location 69 Cumbrian Gardens London NW2 1ED Reference: 17/3513/FUL Received: 1st June 2017 Accepted: 1st June 2017 Ward: Golders Green Expiry 27th July 2017 Applicant: Mrs Heather Meyer Proposal: Conversion

More information

Change of use from therapeutic community residential use (Sui Generis) to 20 bed HMO (Sui Generis)

Change of use from therapeutic community residential use (Sui Generis) to 20 bed HMO (Sui Generis) Committee Date: 16/04/2015 Application Number: 2015/00751/PA Accepted: 04/02/2015 Application Type: Full Planning Target Date: 01/04/2015 Ward: Moseley and Kings Heath 19-21 Park Road, Moseley, Birmingham,

More information

INTRODUCTION This application is brought before committee as Councillor Howell has submitted a red card due to residents concerns.

INTRODUCTION This application is brought before committee as Councillor Howell has submitted a red card due to residents concerns. APPLICATION NO. APPLICATION TYPE SITE ADDRESS APP/15/00608/F Full 41 Green Road, Poole, BH15 1QH PROPOSALS Alterations and extensions to form a flat unit REGISTERED 13 May, 2015 APPLICANT DWP Housing Partnership

More information

76 Queenstown Road, Battersea, London, SW8 3RY

76 Queenstown Road, Battersea, London, SW8 3RY 76 Queenstown Road, Battersea, London, SW8 3RY Residential Development Opportunity CGI of consented scheme Summary Freehold residential development opportunity in the London Borough of Wandsworth. T-shaped

More information

Land at Upper Dean Street/Pershore Street (including Upper Dean Street), City Centre, Birmingham

Land at Upper Dean Street/Pershore Street (including Upper Dean Street), City Centre, Birmingham Committee Date: 19/03/2015 Application Number: 2014/09503/PA Accepted: 22/12/2014 Application Type: Full Planning Target Date: 23/03/2015 Ward: Nechells Land at Upper Dean Street/Pershore Street (including

More information

AT Land Adjacent to Tollgate Cottage, Broughton Grounds Lane, Milton Keynes. Parish: Broughton & Milton Keynes Parish Council

AT Land Adjacent to Tollgate Cottage, Broughton Grounds Lane, Milton Keynes. Parish: Broughton & Milton Keynes Parish Council APPLICATION 06 Application Number: 13/00553/FUL Major Revision to plans approved under 11/01760/MKPC for Plots 59-71 to provide 16 affordable one, two and three bedroom apartments with associated parking

More information

FLOOR PLANS & SPECIFICATION CC Standard floor Plans.indd 1 12/01/ :39

FLOOR PLANS & SPECIFICATION CC Standard floor Plans.indd 1 12/01/ :39 FLOOR PLANS & SPECIFICATION 17258 CC Standard floor Plans.indd 1 12/01/2016 12:39 T H E P L A N S 01 \\ 17258 CC Standard floor Plans.indd 2-1 12/01/2016 12:39 Site plan The greenery and native trees of

More information

FOR SALE BY TENDER / CONDITIONAL OFFER

FOR SALE BY TENDER / CONDITIONAL OFFER FOR SALE BY TENDER / CONDITIONAL OFFER ON BEHALF OF DEVON COUNTY COUNCIL Brookhayes, Pinhoe, Exeter EX1 3RA Site Area Approximately 0.87ha (2.19 acre) POTENTIAL FOR SOCIAL CARE USES OR RESIDENTIAL DEVELOPMENT

More information

Britannia House High Road London N12 9RY

Britannia House High Road London N12 9RY Location Britannia House 958-964 High Road London N12 9RY Reference: 16/2602/FUL Received: 20th April 2016 Accepted: 24th May 2016 Ward: Woodhouse Expiry 19th July 2016 Applicant: Aga Sleczka Proposal:

More information

RedStone Private Country Estate architectural guidelines

RedStone Private Country Estate architectural guidelines RedStone Private Country Estate architectural guidelines urban design principles residential design guidelines > RedStone Village > StoneBridge > RiverView July 2007 Page 1 www.redstoneestate.co.za basic

More information

MAPLE QUAYS LONDON SE16. A Bright New Future. London: +44 (0) Dubai: Hong Kong: Singapore:

MAPLE QUAYS LONDON SE16. A Bright New Future. London: +44 (0) Dubai: Hong Kong: Singapore: MAPLE QUAYS LONDON SE16 A Bright New Future THE DEVELOPMENT The 126 private luxury studios, one and two bedroom apartments at Montreal House occupy a prime location in the development with many offering

More information

16 Sevington Road London NW4 3SB

16 Sevington Road London NW4 3SB Location 16 Sevington Road London NW4 3SB Reference: 18/5641/FUL Received: 19th September 2018 Accepted: 19th September 2018 Ward: West Hendon Expiry 14th November 2018 Applicant: Proposal: Hussaini Conversion

More information

DESIGN CRITERIA Ridegedale Center-Outparcel Restaurant, Minnetonka, MN

DESIGN CRITERIA Ridegedale Center-Outparcel Restaurant, Minnetonka, MN DESIGN CRITERIA January 26, 2018 DESIGN CRITERIA The Outparcel Design Criteria is established as a reference guide for Multi-tenant Outparcel Development projects at Ridgedale Center located in Minnetonka,

More information

51 Conachar Court Isla Road, Perth, PH2 7GZ

51 Conachar Court Isla Road, Perth, PH2 7GZ 51 Conachar Court Isla Road, Perth, PH2 7GZ m 2 EPC 1 1 1 65.6 C 51 Conachar Court Isla Road, Perth, PH2 7GZ Situated beside the river Tay, Conacher Court Is ideally located for those looking for a beautiful

More information

April 9 th, Mayor and Council City of Victoria 1 Centennial Square Victoria BC V8W TP6. Rezoning Application 1010 Fort Street, Victoria, BC.

April 9 th, Mayor and Council City of Victoria 1 Centennial Square Victoria BC V8W TP6. Rezoning Application 1010 Fort Street, Victoria, BC. Stuart Howard Architect AIBC FRAIC AIA Principal W. Neil Robertson Architect AIBC MRAIC Principal April 9 th, 2018 Mayor and Council City of Victoria 1 Centennial Square Victoria BC V8W TP6 RE: Rezoning

More information

Proposals for the Redevelopment of the Magistrates Court & Police Station, Normandy Street / Orchard Lane, Alton

Proposals for the Redevelopment of the Magistrates Court & Police Station, Normandy Street / Orchard Lane, Alton THE SITE THE SITE The Site in Context WELCOME Welcome to our public exhibition in connection with our draft proposals ahead of a planning application being proposals for the redevelopment of the magistrates

More information

CONQUEST TOWER LONDON S NEW RESIDENTIAL QUARTER, SITUATED IN ZONE 1

CONQUEST TOWER LONDON S NEW RESIDENTIAL QUARTER, SITUATED IN ZONE 1 CONQUEST TOWER LONDON S NEW RESIDENTIAL QUARTER, SITUATED IN ZONE 1 T H E P L A N S 2 \\ Site plan Blackfriars Circus will consist of 336 new homes as well as proposed shops, cafés and small businesses,

More information

Accessible Housing Standards 2015

Accessible Housing Standards 2015 Briefing Accessible Housing Standards 2015 Purpose This briefing compares the technical specification provided in the 2015 Building Regulations M4(2), incorporating 2016 amendments, accessible, adaptable

More information

Planning Policy Report for the Proposed Residential Development at The Old Sorting Office

Planning Policy Report for the Proposed Residential Development at The Old Sorting Office Planning Policy Report for the Proposed Residential Development at The Old Sorting Office Greenwich Unitary Development Plan UDP 1. Status of the UDP The current UDP was adopted on 20 July 2006. The UDP

More information

Future Generation The Elite. Student Accommodation

Future Generation The Elite. Student Accommodation Future Generation The Elite Student Accommodation Introduction Future Generation Future Generation designs, builds, manages and operates outstanding student accommodation and networking facilities for

More information

UNIT 1 and 2, 23 SALISBURY GROVE, MYTCHETT, CAMBERLEY, GU16 6BP

UNIT 1 and 2, 23 SALISBURY GROVE, MYTCHETT, CAMBERLEY, GU16 6BP 2014/0764 Reg Date 15/08/2014 Mytchett/Deepcu t LOCATION: PROPOSAL: TYPE: APPLICANT: OFFICER: UNIT 1 and 2, 23 SALISBURY GROVE, MYTCHETT, CAMBERLEY, GU16 6BP Change of Use from Class B1 (Offices) to Class

More information

REFERENCE: F/04452/12 Received: 23 November 2012 Accepted: 23 November 2012 WARD(S): Woodhouse Expiry: 18 January 2013 Final Revisions:

REFERENCE: F/04452/12 Received: 23 November 2012 Accepted: 23 November 2012 WARD(S): Woodhouse Expiry: 18 January 2013 Final Revisions: LOCATION: 70 Granville Road, London, N12 0HT REFERENCE: F/04452/12 Received: 23 November 2012 Accepted: 23 November 2012 WARD(S): Woodhouse Expiry: 18 January 2013 Final Revisions: APPLICANT: PROPOSAL:

More information

City of Vancouver Zoning and Development By-law Planning, Urban Design and Sustainability Department

City of Vancouver Zoning and Development By-law Planning, Urban Design and Sustainability Department Zoning and Development By-law Planning, Urban Design and Sustainability Department 453 West 12th Avenue, Vancouver, BC V5Y 1V4 tel: 3-1-1, outside Vancouver 604.873.7000 fax: 604.873.7100 website: vancouver.ca

More information

SANTINA FACT SHEET MORE LONDON. MORE STYLE

SANTINA FACT SHEET MORE LONDON. MORE STYLE SANTINA FACT SHEET Computer generated image is indicative only MORE LONDON. MORE STYLE With a prime position in the heart of town, Morello could not be better placed for living, leisure and work. A superb

More information

NST DESIGN AND ACCESS STATEMENT The British Queen, 34 Picton Street, Camberwell SE5 7QH, London Borough of Southwark Revision 2, March 2017

NST DESIGN AND ACCESS STATEMENT The British Queen, 34 Picton Street, Camberwell SE5 7QH, London Borough of Southwark Revision 2, March 2017 NST-0328 - DESIGN AND ACCESS STATEMENT The British Queen, 34 Picton Street, Camberwell SE5 7QH, London Borough of Southwark Revision 2, March 2017 1. CONTENTS 1. Contents 2. Introduction 3. Site description

More information

Planning Application 16/4008/F Rockwell 771 units off Anchor and Hope Lane SE7

Planning Application 16/4008/F Rockwell 771 units off Anchor and Hope Lane SE7 Annex (6 pages) Planning Application 16/4008/F Rockwell 771 units off Anchor and Hope Lane SE7 Evidence from Charlton Riverside Masterplan Summary (NB This is the Short Annex see also Long Annex for more

More information

New Riviera Estates 4-24 Torwood Street, Torquay

New Riviera Estates 4-24 Torwood Street, Torquay Introduction Welcome Original design concept Welcome to this exhibition which provides an update about the redevelopment of 4-24 Torwood Street. Previous plans previously received full planning consent

More information

Open Space, Landscape, Parking & Security by Design. Central Hill Estate 2016

Open Space, Landscape, Parking & Security by Design. Central Hill Estate 2016 Open Space, Landscape, Parking & Security by Design Central Hill Estate 2016 Recap.. Density is not just about how many homes but what housing mix / no. of people Current density on Central Hill Estate

More information

5.0 Development Strategy 32

5.0 Development Strategy 32 5.0 Development Strategy 32 Objectives To ensure the long term future of the Bazaar Market building by giving it a higher order retail use, reflecting the development of retail on the Guy s site To ensure

More information

Royal Pier Waterfront, Southampton. Financial Viability Assessment

Royal Pier Waterfront, Southampton. Financial Viability Assessment Royal Pier Waterfront, Southampton Financial Viability Assessment August 2015 1. INTRODUCTION CBRE has been instructed by Royal Pier Waterfront (Southampton) Limited ( RPW ), a company owned by the Lucent

More information

'Grand Design' Project. The Courtyard Gaulby Lane Stoughton Leicestershire LE2 2FL

'Grand Design' Project. The Courtyard Gaulby Lane Stoughton Leicestershire LE2 2FL 'Grand Design' Project The Courtyard Gaulby Lane Stoughton Leicestershire LE2 2FL Property at a glance Superb Building Plot Situated within a Highly Desirable Village Planning Consent For Over 4,400 Sq.

More information

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes 1 Local Area Plan - Project Alignment Overview Directions Report, October 2008 (General Summary Of Selected

More information

Design and Access Statement and Planning Statement. Application for Planning Approval. New Shopfront. 58 High Street West Glossop

Design and Access Statement and Planning Statement. Application for Planning Approval. New Shopfront. 58 High Street West Glossop Design and Access Statement and Planning Statement as part of the Application for Planning Approval for a New Shopfront to 58 High Street West Glossop for Atmore Properties Plc 14/12/11 1 1.0 Introduction

More information

SCHEDULE 32 TO CLAUSE DESIGN AND DEVELOPMENT OVERLAY

SCHEDULE 32 TO CLAUSE DESIGN AND DEVELOPMENT OVERLAY --/--/20-- Proposed GC81 SCHEDULE 32 TO CLAUSE 43.02 DESIGN AND DEVELOPMENT OVERLAY Shown on the planning scheme map as DDO32. FISHERMANS BEND WIRRAWAY PRECINCT 1.0 Design objectives --/--/20-- Proposed

More information

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017 Appendix1,Page1 Urban Design Guidelines DRAFT September 2017 Back to Back and Stacked Townhouses Appendix1,Page2 Table of Contents 1 Introduction 1 1.1 Purpose 1 1.2 Urban Design Objectives 1 1.3 Building

More information

Introduction and site history

Introduction and site history Background Introduction and site history Taylor Wimpey has now purchased the land formerly known as andata House, Station oad, Hook. The site has been vacant for many years despite the grant of residential

More information

An Bord Pleanála. Inspector s Report. Single storey extension to rear at 26 Fitzroy Avenue, Drumcondra, Dublin 3.

An Bord Pleanála. Inspector s Report. Single storey extension to rear at 26 Fitzroy Avenue, Drumcondra, Dublin 3. An Bord Pleanála Inspector s Report Appeal Reference No. Development: Planning Application Planning Authority: PL29N.245590 Single storey extension to rear at 26 Fitzroy Avenue, Drumcondra, Dublin 3. Dublin

More information

Zone 8B Park Central, Spring Street, Birmingham, B15 2GD

Zone 8B Park Central, Spring Street, Birmingham, B15 2GD Committee Date: 08/05/2014 Application Number: 2014/01127/PA Accepted: 18/02/2014 Application Type: Full Planning Target Date: 20/05/2014 Ward: Ladywood Zone 8B Park Central, Spring Street, Birmingham,

More information

Jasper 115 Street DC2 Urban Design Brief

Jasper 115 Street DC2 Urban Design Brief Jasper 115 Street DC2 Urban Design Brief Greenlong Construction Ltd. Stantec Consulting Ltd. 2017 Overview The proposed rezoning application supports the development of two mixed-use high-rise buildings

More information

16 May 2017 PLANNING COMMITTEE. 5i 16/1244 Reg d: Expires: Ward: HE. of Weeks on Cttee Day:

16 May 2017 PLANNING COMMITTEE. 5i 16/1244 Reg d: Expires: Ward: HE. of Weeks on Cttee Day: 5i 16/1244 Reg d: 19.11.16 Expires: 14.01.17 Ward: HE Nei. Con. Exp: 08.02.17 BVPI Target Minor Number of Weeks on Cttee Day: 24/8 On Target? No LOCATION: PROPOSAL: TYPE: Belfairs, Pond Road, Woking, Surrey,

More information

Multi-unit residential uses code

Multi-unit residential uses code 9.3.11 Multi-unit residential uses code 9.3.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Multi-unit residential uses code by the tables

More information

H4. Residential Mixed Housing Suburban Zone

H4. Residential Mixed Housing Suburban Zone H4. Residential Mixed Housing Suburban Zone H4.1. Zone description The Residential Mixed Housing Suburban Zone is the most widespread residential zone covering many established suburbs and some greenfields

More information

Committee Date: 17/07/2014 Application Number: 2014/02259/PA Accepted: 28/04/2014 Application Type: Full Planning Target Date: 23/06/2014

Committee Date: 17/07/2014 Application Number: 2014/02259/PA Accepted: 28/04/2014 Application Type: Full Planning Target Date: 23/06/2014 Committee Date: 17/07/2014 Application Number: 2014/02259/PA Accepted: 28/04/2014 Application Type: Full Planning Target Date: 23/06/2014 Ward: Selly Oak 101 Hubert Road, Selly Oak, Birmingham, B29 6ET

More information

Proposed Demolition of Existing Shop & Erection of New Build Development to Form 11 Flats

Proposed Demolition of Existing Shop & Erection of New Build Development to Form 11 Flats Proposed Demolition of Existing Shop & Erection of New Build Development to Form 11 Flats Wern Goch Hirani Stores, 56 Wern Goch West, Cardiff CF23 7AB Design & Access Statement for Pre-Application Consultation

More information

Submission 1 - April 21, 2015

Submission 1 - April 21, 2015 383 Herring Cove Road - MPS Amendment Rationale and Changes Submission 1 - April 21, 2015 7 storeys/70 high, with a 24 streetwall 82 residential units 5,790 sqf of commercial space 21,405 sqf of amenity

More information

The demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken.

The demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken. D E S I G N R E V I E W C O M M I T T E E S t a f f R e p o r t 2072 ADDISON STREET PRELIMINARY DESIGN REVIEW For Committee Discussion/ Majority Recommendation JULY 20, 2017 Design Review #DRCP2016-0002

More information

Phase V the Quant, 6-10 Church Hill, E17 3AG. Planning Statement

Phase V the Quant, 6-10 Church Hill, E17 3AG. Planning Statement Phase V the Quant, 6-10 Church Hill, E17 3AG Planning Statement Hiltongrove March 2016 CONTENTS bptw partnership is a UK industry leader in urban regeneration and an award winning practice. We are exemplary

More information

th Avenue NW Early Design Guidance Meeting - SDCI # EDG Meeting

th Avenue NW Early Design Guidance Meeting - SDCI # EDG Meeting - Proposed New Residential Construction Project (SDCI #3024352) 1 SEATTLE DESIGN REVIEW Date of EDG Meeting Early Design Guidance Meeting 1 PROJECT SUMMARY The proposed project consists of 74 residential

More information

Urban Design Brief (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London

Urban Design Brief (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London Urban Design Brief 1635 (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London Site Plan Control Application Holding Provision Application April 1, 2015 Prepared for: Rise Real

More information