First Deposit Proposed Alterations to the Bristol Local Plan, including Minerals and Waste Policies FEBRUARY 2003 CHAPTER 8 HOUSING

Size: px
Start display at page:

Download "First Deposit Proposed Alterations to the Bristol Local Plan, including Minerals and Waste Policies FEBRUARY 2003 CHAPTER 8 HOUSING"

Transcription

1 First Deposit Proposed Alterations to the Bristol Local Plan, including Minerals and Waste Policies FEBRUARY 2003 (DRAFT FOR CONSULTATION) CHAPTER 8 Planning ahead to meet the housing requirements of the whole community

2 286 CHAPTER 8

3 Contents 8.1 Introduction 8.2 Policy Context 8.3 Objectives and Initiatives 8.4 Policies H1 Retention of Residential Accommodation H2 Providing sufficient housing Land allocated for Housing Development H3 H4 H5 H6A H7 H8 H9 H10 H11 H12 H13 H14 Maintaining a supply of housing Sites Identified for Development Backland Sites Accessible and Adaptable Housing Community Benefit from DevelopmentMixed housing and communities Conversion/ Sub-Division of Existing Housing Houses Upper Floors Over Commercial Premises Shops and Offices Planning for Affordable Housing to Meet Local Needs Non self-contained bedsitting rooms (shared accommodation), large households, cluster units and hostels Residential Care Homes and Nursing Homes Gypsies and other Travelling People Travelling Showground People Houseboats Schedule to Policy H3: Sites for Housing Development Part 1 Sites identified Available for Housing Development only Schedule to Policy H3: Part 2 Sites identified for Mixed Use development including Housing Schedule to Policy H3: Part 3 Mixed Use Sites in Regeneration Areas including housing development Schedule to Policy H5: Sites identified for Very Sheltered Housing Schedule to Policy H11: Sites identified for Care Homes Schedule to Policy H12: Sites identified for Gypsies and Other Travelling People Schedule to Policy H13: Sites identified for Travelling Showground People Appendix H1: Housing Renewal Areas CHAPTER 8 287

4 288 CHAPTER 8

5 8.1 INTRODUCTION Housing Supply 8.1.1a The Government intends that everyone should have the opportunity of a decent home. Its aim is to widen housing choice, and secure a better mix in the size and type of housing than is currently available, including for those in need of affordable and supported housing b In 2002, there were about 170,700 dwellings in Bristol. Of these, about 131,000 dwellings (77% of the total) are privately owned or privately rented. The remaining 39,700 (23%) are local authority or housing association properties rented with subsidy; these are referred to as social housing These 2002 estimates suggest a 6,600 (4%) increase in the dwelling stock in Bristol between 1991 and 2002 (see Table 8.1). This is broadly consistent with figures derived from Bristol City Council s annual Bristol Residential Development Survey, which monitors the implementation of planning permissions. Yet Bristol, in common with many cities in the country, faces a continuing increase in the number of people who are homeless, as well as a growing city council housing waiting list, and a widening differential between house prices and earnings from employment. Between 1996 and 2002, average property prices in Bristol increased by 121%. Average earnings for Bristol employees have increased at a much slower pace up 34% between 1996 and Although low interest rates have helped to keep the mortgage repayments:earnings ratio stable at a national level, locally there is an urgent need to improve the range of housing available in the city, particularly housing which is accessible 8.1.1c to those who cannot afford to rent or buy on the open market. Such housing is defined in the plan as affordable housing. Planning policy is just one mechanism the city council can use to bring about improved housing in Bristol in the 2000s 1990 s. This Plan cannot satisfy the full range of housing needs of the city, which must be addressed in conjunction with neighbouring authorities via the Structure Plan. In this respect, the level of housing provision in the adopted Joint Replacement Structure Plan (JRSP) of 50,200 additional dwellings for still falls short of the level considered by the Secretary of State necessary to meet the needs of the whole community, including those in need of affordable and special housing 3. Nevertheless, Bristol s share (13,000 additional dwellings) represents a substantial increase in the Although, by identifying a realistic supply of housing land in the city. and controlling the way this is developed, it is hoped that a range of housing supply will be maintained Government policy in the last ten years has led to a free market approach, with less commitment to provision through public subsidy of the range of housing needed, in particular affordable housing As the supply of new housing has not met the specific needs of various sectors of the community in respect of type and cost, this has led to the use of unsatisfactory temporary housing in bed and breakfast accommodation, overcrowding in hostels and increased homelessness in Bristol 4. The 1980 Housing Act gave tenants the Right to Buy their houses. This combined with the effects of severe restrictions on CHAPTER 8 289

6 Table 8.1 Dwelling stock in Bristol Local Housing Private Total authority Associations sector ,000 6, , , ,400 8, , ,700 % of total in 2002 Change : No. -5,600 2,200 9,900 6,600 % Source: 1991 Census counts, adjusted by Bristol City Council; 2002 HIP Local Authority house limited new building programmes since 1976 has reduced the number of council houses available. This has led to a serious shortage of affordable family housing. Table 8.1 shows that between 1991 and 2002, the total stock of social housing decreased by about 3,400 dwellings The City Council s strategy for meeting housing need in the City is set out in the Housing Strategy 5. This includes lists of partners that the City Council works with, and the various plans and strategies for implementing and managing change. Housing Associations play an increasingly important role in the provision of housing in the city. Recently they have been forced to focus on easy to achieve new build projects to attract funding from the Housing Corporation. There is a danger that this will lead to a serious problem of vacant, older properties with no clear mechanism to secure their improvement. In order to meet the housing need and renewal strategy in the city, these houses are required to be put back into use. There is also a growing concern that Housing Associations are being forced to charge higher rents which are not affordable for some people. The partnership between the City Council, and Registered Social Landlords (RSLs), and private and voluntary sector housing providers Housing Associations is being reinforced helps to secure significant contributions to housing provision in line with local general needs and supported housing. This is outlined in Bristol City Council s annual Enabling Strategy, which provides guidance to partners preparing bids for housing investment in the City It is also important to engage This Plan seeks to direct the nature of private house builders building in the future to ensure the type of homes built are in line with local needs and that there is a contribution to affordable housing. This can be achieved by a partnership between public and private sectors and to maximise ing site opportunities in the City. the use of sites identified in this Plan. This includes the development of brownfield land marginal and backland sites and a commitment to neighbourhood renewal. a strategy for urban renewal. This will help to then reduce pressures on previously undeveloped ( greenfield ) to develop land. allocated for other uses, including open space. 290 CHAPTER 8

7 Housing Need The nature of housing need is particularly complex. and has changed considerably over recent years. The need for additional housing is mainly a consequence of demographic and social factors, such as longer life expectancy, and changes in household structure. There has been, and continues to be, a trend towards smaller households. The average household in Great Britain in 2000 contained 2.30 people, compared to an average of 2.91 in An equally pronounced decline in average household size is apparent in Bristol, down to about 2.24 people per household in 2001, compared to an average of about 2.81 in These changes are reflected in the type of housing currently being provided in the City; about 70% of dwellings with planning permission in 2002 contain less than 3 bedrooms 9. There has also been a subsequent The Bristol Housing Register shows an increase in demand need for small family accommodation and housing for single persons. for single parents, and young couples with small children. and the elderly. In order to satisfy local housing needs clear policies for affordable housing including housing for special needs are required. In addition, there are groups of people in the City for whom housing provision has become difficult eg. students. Despite new purpose-built provision in the 1990s and early 2000s there is a growing problem of insufficient student housing in the City, reflecting the growth in the term-time student population in Bristol since the early 1990s, leading to increased demand for low cost rented accommodation which is in short supply and in competition with other housing demands. It is essential that institutions such as the Universities work with the City Council to identify the most appropriate locations for new purpose-built provision. reduce any future conflicts between the need for student housing and other housing needs. Housing Renewal Policies to protect existing housing and to encourage regeneration and urban renewal are important parts of this Plan. The conversion of existing property, the restoration of derelict and substandard dwellings properties and the redevelopment of existing housing which has reached the end of its useful life may increase the number of habitable homes in the City. There are known to have been were 5,429 vacant dwellings houses in the City in 1991, which has since increased to 5,833 in If brought back into use, there would be of major benefit to all sections of the housing market (ref. Census 1991). There are also opportunities to revitalise and diversify land use in the City to provide new homes on upper floors over shops and offices (see Policy H8) The City currently has two one Housing Renewal Areas, one in Easton, and one in St Werburghs and St Agnes, where grants are available to maintain and improve the condition of the housing stock. A 2001 Bristol House Condition survey suggests significant improvements have occurred in some parts of the City, compared to a previous survey in Other major renewal projects are currently underway in areas of the city containing large numbers of defective However in some other parts of the City, pre-reinforced concrete housing, prefabricated bungalows and also areas of 60 s and 70 s high rise some CHAPTER 8 291

8 flats require investment and/or redevelopment. Priority could be given, on economic and social grounds, to retaining and improving the existing housing stock. Where this is not feasible, it is important that any redevelopment is consistent with the Plan s policies to achieve a greater mix of housing type and tenure. These projects are being led by the city council in conjunction with housing associations The important urban renewal work that has taken place around The regeneration of the former City Docks since the late 1970s through private and public initiatives has produced many opportunities for new housing schemes. The redevelopment for housing of a number of vacant/derelict warehouses and redundant storage yards have provided the opportunity for people to move back into the City Centre, where the population has increased from about 7,500 in 1991 to about 11,700 in This is an established objective of the City Council, reflected in the Bristol City Centre Strategy POLICY CONTEXT This section recognises the importance of public outlines the key elements of existing policy documents. The following section sets out the objectives for housing and associated initiatives which are then developed into and indicates how they relate to the housing policies in this Plan The Commission of the European Communities Green Paper on the Environment, 1990, supports a diversified land use across cities and in particular a reduction in isolation for people living on the edge of cities. It also seeks more environmentally aware cities making good use of derelict and under-used land and achieving sustainable development The Department of the Environment Paper This Common Inheritance, 1990, encourages the revitalisation of urban centres and the use of vacant or redeveloped urban land for housing. It is in these areas that the main opportunities for new housing in Bristol exist. There is very little new land for housing development within the city boundary Government guidance on how housing development should promote urban renaissance, more sustainable patterns of development, and an improved quality of life is set out in Planning Policy Guidance Note No.3 on Housing (PPG3) 13. was published in March This PPG endorses the requirement for a five year supply of land for housing and, in particular that full and effective use of land in existing urban areas should be made whilst also protecting valuable amenity land. This changed emphasis, and protection afforded to green space is welcomed. It is reinforced by the Government s policy statement on housing, and the Urban White Paper, both published in a In the south west, the Housing Corporation, Regional Assembly and Government Office have worked together to produce a Regional Housing Strategy This identifies the key housing issues in the region, and contains action points for local authorities relating to housing demand, housing delivery, regeneration and renewal, and supported housing/supporting people b Regional planning bodies must ensure that sufficient housing is provided in the area. Regional Planning Guidance 292 CHAPTER 8

9 8.2.4c for the South West (RPG10) highlights the economic strength of the Northern sub-region, which includes the Bristol and Bath travel-to-work areas, Gloucestershire and Wiltshire, and the need for commensurate levels of new housing provision 15. This is to be accommodated mainly at the Principal Urban Areas (PUAs), of which Bristol is the largest in the south west region. This strategy reflects a changing economic geography, with the renaissance of urban areas as centres of economic strength, particularly in knowledge-based and consumer-based employment 16, and more locally the particular competitive strength of the Bristol sub-region economy 17. The benefits of an adequate long-term supply of housing are summarised in research published by the House Builders Federation 18. The Regional Assembly will ensure, through a plan, monitor and manage approach, that housing requirements and provision are kept under regular review. The first annual monitoring report for the south west is to be published in PPG3 requires Local Plans to ensure that suitable land is allocated for housing to implement the Structure Plan proposals in ways which take account of local conditions. It also contains welcome advice concerning the provision of affordable housing, and in particular recognises that authorities may now negotiate for the inclusion of an element of affordable housing in new private housing schemes. Policy 35 of the JRSP requires Local Plans to set out policies, targets and locations for the provision of new affordable housing, based upon assessments of local need. This approach is amplified in Policy HO 3 of RPG10. In Bristol, a minimum of 20% affordable housing in new private housing schemes accommodating 15 or more dwellings will be sought. In exceptional circumstances, for example in areas of particular need, a higher figure of 30% may be sought. These proposals are outlined in Policy H9. This was followed in 1996 by Circular 13/96 Planning and Affordable Housing which developed this advice in some detail but stated that it is only applicable to sites over 40 dwellings a Government guidance indicates that priority should be given to the use of previously-developed land and buildings (also known as brownfield sites) in urban areas for new housing, before greenfield sites are released. Since 1996 about 90% of new dwellings in Bristol have been provided on previously-developed land (see Table 8.2). Policy H3 sets out proposals to ensure that this performance is maintained b The Government expects new housing development to make more efficient use of land. Nationally, new housing is in the early 2000s is being built at an average density of 25 dwellings per hectare (dph) 19, compared to the 30 to 50dph recommended in PPG3. Monitoring shows that the average density of residential schemes completed in Bristol in the period is relatively high (nearly 51 dph), although some schemes are below the 30dph threshold 20. Policy B7 indicates that major residential development schemes in Bristol with a net density below 30 dph will be unacceptable c Local planning authorities are also encouraged to provide a better mix of size, type and location of housing 21. In Bristol, this is to be achieved both incrementally through changes to the CHAPTER 8 293

10 Table 8.2 Percentage of new housing completions in Bristol on previously-developed land Source: Bristol Residential Development Survey existing housing stock, and more directly through new development see Policy H6A. Progress towards more mixed communities in Bristol can also be achieved through the use of the locational guidance in this plan for particular types of housing, including: very sheltered housing (Policy H5); care homes (Policy H11); hostel accommodation; student housing (Policy H10); intermediate market housing, such as for key workers (Policy H6A); gypsies (Policy H12), and travelling showground people (H13) Circular 1/94 on gypsy sites proposes that sites should be identified through the local plan process taking account of proven need and site suitability, or criteria for the selection of sites included within the plan Structure plans are required to indicate the scale and of housing provision; to be made for housing within the relevant policy period and local plans set out are required to translate the broad policies of the structure plan into more detailed development control policies and map based allocations for housing development The Structure Plan sets Bristol s housing allocations provision of 13,000 net additional dwellings for is set out in Policy 33 of the JRSP. a policy period of Previous versions of the Structure Plan set housing allocations at both the district and sub district level, but current government guidelines indicate that structure plan housing allocations should not normally be broken down below district level, this being seen as a more appropriate function for local plans. In line with this advice the Structure Plan now sets housing allocations at the district level only In calculating The housing requirement figures in the Structure Plan allowances are made to replace dwellings lost through demolitions and changes of use, and deducts the gains which are expected as a result of modifications to existing residential properties eg. flat conversion schemes. The housing allocation which is set by the Structure Plan does not therefore This represents the net proposed increase in the dwelling stock. in simple terms the allocation includes all new build housing and new dwellings created by conversions from non-residential uses. The housing allocations set out in this local plan conform to this methodology The Structure Plan sets a total allocation of 40,800 new dwellings to be built in the former County between 1989 and In apportioning the county-wide allocation amongst the districts the Structure Plan adheres to the principle that land proposed for housing development is to be concentrated primarily within Bristol, 294 CHAPTER 8

11 Kingswood, the North Fringe and Weston-Super-Mare. The allocation set by the adopted Avon Structure Plan for Bristol stands at 6,300 dwellings The policy areas which were specified in earlier versions of the Avon Structure Plan have now been incorporated into the Bristol Local Plan. The Examination in Public Panel s report recommended sub-division below district level was appropriate for the Local Plan: thus the BLP has incorporated housing allocations at the Policy Area level, fitting within the context of the Structure Plan The definition of Specific housing allocations for central, inner and suburban areas of Bristol, previously the policy area is considered as an important guide to the distribution of housing within the City to encourage the redevelopment and regeneration of the central and inner area whilst restricting pressure on important green field sites, particularly in the suburban area, are now deleted. In their place, a sequential approach to the release of housing land is proposed in Policy H3, to ensure that priority is given to brownfield sites The housing allocation figures proposed in this local plan for the policy areas are derived from the City council s representations on capacity for housing development in Bristol which were presented to the Examination in Public into the Structure Plan Third Alteration. The overall housing allocation proposed by Bristol City council was accepted in the Panel s report on the EIP, the figure for the city as a whole being incorporated into the adopted Structure Plan There are several other changing policy issues which are having a significant effect on housing in Bristol. The changes brought about by the Children Act 1989 and the National Health Service and Community Care Act This legislation requires that wherever possible people are cared for in the community. There has been a recent increase of development of shared houses, small hostels and residential care homes and day care centres as a consequence. This Plan contains policies which recognise the importance of these developments and ensure that they are carefully integrated into existing housing areas The city council has adopted clear housing and planning policies to protect houses in the city, to influence the quality and range of housing supply to achieve urban renewal schemes and to reduce homelessness. 8.3 OBJECTIVES AND INITIATIVES 8.3.1a To ensure that sufficient housing is provided: Protect the existing stock of housing (see Policy H1) Promote the development of identified sites (see Policy H3) Maximise new housing opportunities in conjunction with improvements in public transport accessibility (see Policy H3) Ensure that large publicly-funded institutions play a proactive part in providing housing as part of wider development plans (see Policy H6A and H10) Encourage the conversion of upper floors above commercial uses to residential use, reflecting the capital allowances now available (see Policy H8) CHAPTER 8 295

12 Monitor the effect of Bristol s Wasted Homes Initiative on the stock of vacant residential property (see Policy H2) Take advantage of Urban White Paper regeneration initiatives such as the abolition of Stamp Duty in 2001 for property purchases between 60,000 and 150,000 in the 11 most deprived wards of Bristol 22 Achieve 250 new dwellings per annum on small sites, consistent with Urban Housing Capacity Study assumptions Achieve 50 dwellings (net) per annum from the subdivision/amalgamation of existing dwellings, consistent with Urban Housing Capacity Study assumptions, taking advantage of the reduction in VAT from April 2001 to 5% (see Policy H7) Embrace a Monitoring and Management approach, including annual reports of changes in demand and supply factors, including progress in meeting housing requirements across the Structure Plan area as a whole (see Policy H3) 8.3.1b To ensure that new housing in Bristol is located in the right place, and contributes to the achievement of a sustainable Bristol : Make use of the sequential approach to give priority to brownfield sites (see Policy H3) To inform the sequential approach, annually update estimates of vacant land and buildings that are suitable for housing 8.3.1c Assess all major 23 housing development proposals against a standard set of criteria, including location/accessibility and regeneration factors (see Policy H3) Phasing of priority sites for housing in conjunction with new infrastructure (see Policy H3) Encourage housing development that has good access to local centres, services, jobs and public transport and creates attractive living environments Liaise with house-building industry and infrastructure providers to ensure that identified sites are realistic and deliverable Continue to achieve 90% of new housing on brownfield land (Best Value Performance Plan Indicator BV106) To increase the supply of affordable housing: A minimum of 20% affordable housing to be provided as part of all new private housing developments of 15 or more dwellings, with up to 30% sought in areas of particular need (see Policy H9) Annual assessments of housing needs and affordability Provision of 600 units of Very Sheltered Housing (VSH) for affordable rent in Bristol within five years Achieve a target of 3,330 new affordable dwellings in the period, from schemes funded by the Housing Corporation and from the implementation of Policy H9 together 296 CHAPTER 8

13 8.3.1d To make more efficient use of land: Seek some housing within suitable major commercial developments Tightened parking standards and higher density developments in locations where car ownership is not a necessity (see Policy H8, Local Plan parking standards, and Policy B7) Innovative parking arrangements in new housing developments, minimising on-plot parking (through revised SPG) All major housing development proposals to provide at least 30 dwellings per hectare (see Policy B7) 8.3.1e To achieve mixed and balanced communities: Protection of residential amenity, by preventing over-concentrations of particular types of housing (see in particular Policies H6A, H7, H10, and H11) Enforcement action to control unauthorised subdivision of housing Focus on the mix of affordable housing, in terms of dwelling type and tenure, within private housing developments (see Policy H9) Achieving a mix of housing both within individual developments and across the neighbourhood as a whole (see Policy H1 and H6A) New housing in conjunction with improved community facilities and services as part of wider regeneration policies Further research into the housing needs of specific groups such as the black and minority ethnic population (BME) The publication of supplementary planning guidance for Policy H To protect and improve the quality and range of housing in the city, To set realistic requirements for new housing, and to identify sites for development to fulfil Structure Plan requirements, To increase the supply of a wide range of house types to match identified local need, particularly affordable housing and housing for people with special needs To ensure that all new housing schemes are assessed in line with the guidance on standards achieves a high quality of development To recognise the important contribution that conversion of houses to smaller units of residential accommodation can make to the housing supply. and to ensure that good quality housing is provided To encourage improvement and use of upper floors in shopping and commercial areas where suitable for residential use to increase housing supply To develop a housing strategy with the council, adjoining Authorities, the Health Authorities and Housing Associations to ensure adequate provision for special needs housing in the city To adopt a strategy for urban regeneration in the inner city and outer estates. CHAPTER 8 297

14 8.4 POLICIES Retention of Residential Accommodation Since 1981 Bristol City Council has pursued a policy to resist In order that the loss of residential accommodation in the City has no effect on Bristol s housing supply, the cumulative number of dwellings lost through demolition and changes of use will be monitored, and provision made, through Policy H2, for an equivalent number of new dwellings over and above the Structure Plan housing provision figure. There are situations where the loss of existing housing should be resisted, for example in order to retain a valuable mix of housing types in an area. In view of the high level of demand for homes, as indicated in the council house waiting lists, an increase in the levels of homelessness, the increasing number of small households and the declining opportunities to build on new land without environmental damage it is proposed to adopt this policy in the Local Plan. The existing housing stock must be maintained and further housing provided to meet the city s need for housing. Exceptions will only be However, where an applicant demonstrates an overriding local need for an alternative use for which no other site or buildings are available in the area, for example allowing an existing business to expand, the loss of residential accommodation can be allowed. It is important for applicants to demonstrate the benefits that would accrue, for example new employment opportunities for local residents, (see Chapter 9: Community Services), or to show that where the property is unsuitable for continued residential use, or is such as a listed building that could be better preserved by other uses (see also Policy CC4) a It is to be noted that the majority of dwelling losses in Bristol involve demolition, rather than changes of use. Monitoring shows that losses through changes of use average just 12 dwellings per annum, mainly to nonresidential institutional (D1) uses 24. Demolitions have averaged 125 dwellings per annum in recent years 25, mainly involving former local authority housing. In addition there is a continuing programme of prefabricated bungalow replacement. Policy H1 cannot control demolitions (which are permitted development ), but it is relevant where proposals involve the redevelopment of existing housing. This is to ensure that stock replacement schemes contribute to a mix of housing types in the area 26. H1 (i) (ii) ALL PROPOSALS INVOLVING THE LOSS OF EXISTING RESIDENTIAL ACCOMMODATION (WHICH INCLUDES C2 AND SUI GENERIS USES), SHOULD TAKE ACCOUNT OF THE NEED TO RETAIN OR PROVIDE A MIX OF TYPES IN THE AREA. DEVELOPMENT INVOLVING THE CHANGE OF USE OF EXISTING RESIDENTIAL ACCOMMODATION WILL ONLY BE PERMITTED WHEN:- IT WOULD NOT UNACCEPTABLY ERODE THE CITY S STOCK, OR THERE ARE NO SUITABLE ALTERNATIVE SITES OR PREMISES IN THE AREA FOR THE PROPOSED USE, AND IT CONSISTS OF A COMMUNITY SERVICE USE WHICH PROVIDES BENEFITS FOR THE LOCAL RESIDENTS; OR 298 CHAPTER 8

15 (iii) THE ACCOMMODATION IS UNSUITABLE FOR CONTINUED RESIDENTIAL USE AND THE SITUATION CANNOT BE REMEDIED AT REASONABLE COST. Implementation: Development control and the monitoring of planning permissions Land Allocated for Housing Development Providing sufficient housing Policy 33 of the JRSP requires the City Council will to manage the release of housing sites to ensure that there is an adequate and balanced provision of housing land available in the city to meet housing needs and demand, including opportunities to provide affordable housing. The city council has a duty to identify sufficient housing land to comply with the requirements of the current Structure Plan. In so doing, account must be taken of progress in meeting requirements across the Structure Plan area as a whole. PPG3 advises that The city council also has a duty to identify a at least a five year land supply of housing land be shown on the Local Plan Proposals Map. that is available for development. The sites allocated in the Local Plan have the capacity to meet these requirements. Proposals for Bristol are set out in Policy H3. For the purposes of the Local Plan the requirements are divided into the suburban, inner and central area. This will help to ensure the proper distribution of housing throughout the city. It will restrict development in the outer area, on green field sites and encourage renewal of inner areas. However, land for housing development is now running out within the city boundary and future housing allocations will have to reflect this. New developments which will cause damage to the urban environment will not be allowed. Where appropriate encouragement will be given to schemes that provide new housing by the re-use and renewal of existing buildings Policy 33 also requires the City Council will carefully to monitor the uptake of sites and the types of opportunity presented by land which remains available for development on a consistent annual basis 27. Table 8.3 (row 2) shows that net housing provision in Bristol from 1996 to 2002 totals 4,305 dwellings (an average of 718 per annum). This annual rate of provision is about 17% below the annual rate of 867 p.a. required to meet the 13,000 figure for the period (row 1). Changes within the housing stock, and the availability of any additional windfall sites will be taken into consideration a The shortfall in net housing provision since 1996 is mainly due to the relatively low yield from major sites, particularly in and Another contributory factor is the large number of major housing redevelopment schemes since 1996, some of which have involved a net loss of dwellings. Whilst there has been a substantial increase in housing provision in central Bristol, especially since 1996, some of the outer or suburban parts of Bristol have seen little net change in housing stock in the last decade (see Figure 8.1) The sources to deliver the required increase in provision to 966 dwellings p.a. for the rest of the plan period to 2011 (see Table 8.3, row 3) are considered below The Bristol Local Plan period runs concurrently with the Structure Plan period The consultation CHAPTER 8 299

16 Figure: 8.1 Change in dwelling stock, Change in dwellings: less than or more Source: Bristol Residential Development Survey. Crown Copyright. All rights reserved. Bristol City Council. Licence No. LA 09055L draft version of the Local Plan was produced in April 1992 and the assessment of the housing allocation for Bristol was consequently based on an assessment carried out in 1992 when three years of the policy period had already elapsed. The figures given below for housing provision within the whole policy period are therefore split into (i) the component for completions by March 1992 and (ii) the components anticipated for provision April 1992 onwards. Windfall sites (see Table 8.3, row 5) 8.4.4a In the period, about 45% of housing provision on major sites in Bristol was achieved through windfalls 28. This amounted to an average of 205 dwellings p.a. (net). This relatively high yield from windfalls, nearly all of which were brownfield sites, reflects the dynamic pattern of land use change in Bristol during a period of strength in the housing market. Demand factors, 300 CHAPTER 8

17 the range of site opportunities identified in the Bristol Urban Housing Capacity Study, and a continuing stream of planning applications and permissions for housing suggest that a trend-based allowance for major windfalls should continue to be made, totalling 1,845 dwellings for the period. No allowance is made for greenfield windfalls, in accordance with PPG3. Small sites and conversions of existing dwellings (see Table 8.3, row 6) 8.4.4b Despite a buoyant level of housing completions on small sites since 1998, the combined net supply from small sites and from the conversion of existing dwellings in the period (274 dwellings net p.a.) in Bristol is still a little short of the rate of 300 dwellings p.a. specified in the coordinated Urban Housing Capacity Studies carried out by the four local authorities in the structure plan area 29. The achievement of the required level of provision of 2,700 dwellings in the period will require a supportive policy framework in particular through Policies H4, H7 and H c Major sites identified in the Local Plan The total anticipated supply from unidentified sites, specified in Table 8.3, is thus 4,545 dwellings, comprising 1,845 from major windfalls (row 5) and 2,700 from small sources (row 6). The remainder of the housing requirement to 2011 (4,150 dwellings) can be delivered from sites identified in Policy H d Note that the combined capacity of the sites identified in the Schedule to Policy H3 is about 5,800 dwellings, which is well in excess of the requirement of 4,150. There are two reasons for building this amount of slack into the policy: i) Although housing development schemes for a number of the sites are already well advanced, and for some, planning permission for housing has already been granted (as at 1 April 2002), national research and local trends suggest that not all sites that have a current planning permission will necessarily be built in the plan period 30. ii) A number of the sites identified in Policy H3 are greenfield sites, and on the basis of the sequential approach set out in Policy H3 (to give priority to housing development on brownfield sites), it cannot be assumed that all will come forward for development before Empty Homes 8.4.4e The potential of empty residential properties, and the success of the City Council s Empty Homes Strategy in bringing vacant dwellings back into use to meet housing needs, are recognised in the plan. In the calculation of the Structure Plan housing requirement, it was assumed that a 2,200 reduction in the number of vacant dwellings in the Structure Plan area will be achieved in the period. This reduction is allowed for in Policy 33 of the JRSP f The expected reduction in the number of empty homes in each unitary authority area is not specified in JRSP Policy 33. As over 40% of the vacant stock is in Bristol 31, the City s pro rata share of the -2,200 total might be in the region of 1,000 fewer vacant dwellings. However Council Tax data suggest that recent reductions in the overall number of vacant dwellings in CHAPTER 8 301

18 TABLE 8.3: ESTIMATED PROVISION TO MEET ALLOCATION REQUIREMENT No. of dwellings (net) Per annum Proposed dwelling allocation , Housing requirement , Dwelling completions (all sites) 1, Change in dwelling stock, , Outstanding requirement (row1 row2) 8, Estimated provision from 3,457 large major sites identified in the Local Plan 4, (see Policy H3) 8,695 Capacity of sites with planning permission in , Estimated provision from 420 large major sites not identified in the Local Plan - 1, windfall sites 6. Estimated provision from 720 unidentified small sites and conversions of existing 2, dwellings Source: Bristol Residential Development Survey the city has been negligible 32. The long-term pattern should be a little clearer when 2001 Census data become available in early If reductions in the vacant stock do not materialise, it will be necessary to make provision for additional new housing in any review of the plan. H2 PROVISION WILL BE MADE FOR 13,000 6,300 ADDITIONAL DWELLINGS ARE PROPOSED TO BE BUILT IN THE PERIOD IN THE FOLLOWING AREAS CENTRAL 1,000 INNER 1,700 SUBURBAN 3,600 Implementation: By public, private and voluntary sector including promotion of sites by the city council. Sites identified for development Maintaining a supply of housing 8.4.5a Policy 33 of the JRSP requires Local Plans to set out proposals for controlling the release of sites for housing development. Proposals must: reflect the locational strategy of the Structure Plan; and take account of implementation progress across the Structure Plan area as a whole 8.4.5b It has been established, through Urban Housing Capacity Study work, that 90% of housing provision in Bristol to 2011 can be accommodated on brownfield sites, with the remaining 10% on greenfield sites 34. For the purposes of the Capacity Study, all of the land within the City Council boundary was classified as urban. Therefore by 302 CHAPTER 8

19 8.4.5c definition, housing provision in Bristol is consistent with the urban focus of the locational strategy set out in Policy 2 of the JRSP. In order that a sustainable pattern of housing provision is achieved (within the overall strategy), the suitability of proposals for major housing development 35 will be determined through the development control process. All such proposals will be assessed against the six criteria set out in Policy H d In order to give priority to housing on brownfield sites, and to achieve Bristol s 90% target for brownfield housing, an additional sequential approach test applies for major greenfield sites. Proposals for major housing development on a greenfield site will only be considered when the total capacity of previously-developed vacant land or buildings 36 in the city, that is suitable for major housing development, falls below 3500 dwellings. This mechanism is intended to ensure that: (a) (b) (c) Attention is focused on the development of brownfield land/buildings, suitable for housing, which has been vacant for a year or more; where there is considerable such capacity for housing (as is the case in 2002), then it is this capacity that should be developed first, and if the capacity of such sites starts to dry up, and drops below the pre-determined threshold, then major greenfield sites will be considered for release e The proposed capacity threshold of 3500 is not arbitrary. It represents just over five years supply of housing that is required from major sites (666 dwellings per annum; Table 8.3, row 3 minus row 6). It is less than the 2002 capacity estimate of vacant brownfield land that is suitable for housing (4,118 dwellings), but is not at such an unrealistically low level that might artificially constrain housing land supply in the city. The City Council is committed to annual updates of urban housing capacity in conjunction with housing providers, that can help to ensure that brownfield and greenfield sources are clearly identified and are developed at the appropriate time. Sites identified for development Sites proposed for housing development are identified in the schedule to this policy. There are some sites where there are particular issues relating to their open space value and/or where there are other land use allocations and these are indicated accordingly Within the city centre existing residential areas will be a focus for additional housing, through the allocation of specific sites and the exploitation of windfall opportunities (see Chapter 11: City Centre) Most new housing development in the City Centre will be provided through mixed use schemes. involving other land uses. A number of sites are identified where such an approach is considered appropriate (see part 2 of the schedule) where in general the first priority in these locations will be to provide additional housing. Other uses will normally be supported where they enable physical or financial constraints to residential development to be overcome (see Chapter 11: City Centre). New Mixed use developments including housing should take CHAPTER 8 303

20 particular account of the need to protect residential amenity. will be assessed against the design criteria set out in Policy B It is also essential that opportunities are taken to revitalise the City, improve buildings and maximise the housing supply. This can be achieved by Renewal Schemes. Neighbourhood renewal schemes such as those established at Easton and St Agnes and St Werburghs require a comprehensive approach to regeneration. The need for refurbishment of older areas, the high numbers of sub-standard housing including PRCs (pre-reinforced concrete) and prefabs are all examples of the importance of renewal. Urban renewal projects likely to be considered in the near future are shown on the Proposals Map and listed in Appendix 1. Greenfield exception sites 8.4.8a The schedule to Policy H3 includes priority greenfield sites which will not be unnecessarily constrained by the sequential approach test. For these priority sites, housing development is intended to come forward to assist in the regeneration process, or is phased in conjunction with new public transport infrastructure. This is indicated in the wording of the policy, and is outlined in more detail below b In the Hengrove Park/Hartcliffe Campus Regeneration Area, a major mixed use development is envisaged, including about 740 dwellings. This is an opportunity to accelerate housing development outside central and inner Bristol. It will help to arrest population decline and will provide a greater mix of housing in this part of South Bristol. The development will incorporate improvements in public transport in order to improve the accessibility of 8.4.8c the area. Overall, the regeneration benefits of the proposals are such that the site is proposed as an exception to the sequential approach test. In the Broadmead Regeneration Area, a major mixed use scheme including about 100 dwellings is proposed at Wine Street. This will involve the development of part of Castle Park (currently greenfield ). This development will reflect the historic urban grain of the area, before it was bombed in World War Two and subsequently laid out as open space. This scheme is an important part of the regeneration of the area and hence will not be subject to the sequential approach test. Phasing 8.4.8d The dynamic nature of land use change in a large and relatively prosperous city such as Bristol generates many brownfield windfall opportunities. As a consequence, the plan contains sizeable windfall allowances and only limited use of phasing. There are two greenfield sites (Bonnington Walk; Wallscourt Farm) which will only be released for housing development in conjunction with new public transport infrastructure. For these sites, both in Lockleaze, the implementation of Light Rapid Transit (LRT) Line 1 would make a significant difference in accessibility for an area with an above-average rate of unemployment, which is prioritised for regeneration in the Bristol Neighbourhood Renewal Strategy. The Bonnington Walk site is adjacent to a proposed new Lockleaze station, which would provide much-improved public transport access to major employment centres including the city centre and parts of the North Fringe of Bristol. The land identified at Wallscourt Farm is part of a larger site, most of which 304 CHAPTER 8

21 falls within South Gloucestershire. The land within the Bristol boundary is envisaged as a compact mixed-use edge-of-city development, served by a spur of LRT Line 1 routed to the UWE campus to the north-east. Proposals for the development of either of these sites in advance of the LRT infrastructure will be considered to be premature. But to help to ensure that these two sites are phased in conjunction with new public transport infrastructure, they would not be subject to the sequential approach test. Alderman Moore s allotment 8.4.8e The land at Alderman Moore s allotment at Ashton is adjacent to a potential Electric Railbus link to the City Centre, as shown on the Proposals Map. It is also adjacent to the Portishead rail corridor which was reopened for freight services in 2002, for which there is potential for the reintroduction of passenger services. The site is therefore well placed to take advantage of, and to contribute to, improved access to a range of destinations by public transport. It is proposed that this site will be released for housing development, as an exception to the sequential approach test, if: (a) either of the above public transport infrastructure improvements are implemented, or (b) proposals satisfactorily provide for, and financially contribute to, access to the Electric Railbus link and the Portishead rail corridor. Otherwise the Alderman Moore s site could come forward, like other major greenfield sites, subject to satisfying the sequential approach test f Monitoring and information The rapid pattern of land use change in Bristol highlights the importance of monitoring, as the implementation of a sequential approach to housing provision depends on an up-to-date picture of brownfield opportunities. Bristol City Council intends to annually update estimates of the capacity of previously-developed vacant land/buildings, that are suitable for residential development in the city, to ensure the correct operation of Policy H g The sequential approach also requires a policy framework that takes account of economic change and realistic requirements for land, in determining applications for the change of use of land or buildings to housing. Monitoring shows that in the Central Area of Bristol, land or buildings once in business use has been the main source for recent residential development. For the sites where major residential development has taken place or has started in the period (involving about 2000 dwellings in total): 29% of dwellings have been provided through the conversion of vacant office floorspace (58,400 sq m in total); 54% of dwellings have been accommodated on just over 9 ha of former business or industrial land, and The remaining 17% of dwellings have involved changes of use from miscellaneous non-business uses (less than 1.5 ha in total) h Despite these substantial losses of business land/premises, the number of jobs in the Bristol Central Area is higher CHAPTER 8 305

MAKING THE MOST EFFECTIVE AND SUSTAINABLE USE OF LAND

MAKING THE MOST EFFECTIVE AND SUSTAINABLE USE OF LAND 165 SOC146 To deliver places that are more sustainable, development will make the most effective and sustainable use of land, focusing on: Housing density Reusing previously developed land Bringing empty

More information

Planning Policy Guidance 3: Housing

Planning Policy Guidance 3: Housing Planning Policy Guidance 3: Housing Contents Planning Policy Guidance Note 3: Housing...2 The Governments Objectives...3 Widening Housing Opportunity And Choice...4 Maintaining A Supply Of Housing...8

More information

Note on housing supply policies in draft London Plan Dec 2017 note by Duncan Bowie who agrees to it being published by Just Space

Note on housing supply policies in draft London Plan Dec 2017 note by Duncan Bowie who agrees to it being published by Just Space Note on housing supply policies in draft London Plan Dec 2017 note by Duncan Bowie who agrees to it being published by Just Space 1 Housing density and sustainable residential quality. The draft has amended

More information

NORTH LEEDS MATTER 2. Response to Leeds Sites and Allocations DPD Examination Inspector s Questions. August 2017

NORTH LEEDS MATTER 2. Response to Leeds Sites and Allocations DPD Examination Inspector s Questions. August 2017 NORTH LEEDS MATTER 2 Response to Leeds Sites and Allocations DPD Examination Inspector s Questions August 2017 CLIENT: TAYLOR WIMPEY, ADEL REFERENCE NO: CONTENTS 1.0 INTRODUCTION 2.0 TEST OF SOUNDNESS

More information

UK Housing Awards 2011

UK Housing Awards 2011 UK Housing Awards 2011 Excellence in Housing Finance and Development: Finalist North Lanarkshire Council: Building For The Future Summary North Lanarkshire Council has been proactive in establishing, developing

More information

Regulatory Impact Statement

Regulatory Impact Statement Regulatory Impact Statement Establishing one new special housing area in Queenstown under the Housing Accords and Special Housing Areas Act 2013. Agency Disclosure Statement 1 This Regulatory Impact Statement

More information

2 Marsham Street, London SWlP 3EB

2 Marsham Street, London SWlP 3EB Circular 13/96 (Department of the Environment) Circular from the Department of the Environment 2 Marsham Street, London SWlP 3EB 8 August 1996 Planning and Affordable Housing Introduction 1. This circular

More information

Housing Need in South Worcestershire. Malvern Hills District Council, Wychavon District Council and Worcester City Council. Final Report.

Housing Need in South Worcestershire. Malvern Hills District Council, Wychavon District Council and Worcester City Council. Final Report. Housing Need in South Worcestershire Malvern Hills District Council, Wychavon District Council and Worcester City Council Final Report Main Contact: Michael Bullock Email: michael.bullock@arc4.co.uk Telephone:

More information

ROLE OF SOUTH AFRICAN GOVERNMENT IN SOCIAL HOUSING. Section 26 of the Constitution enshrines the right to housing as follows:

ROLE OF SOUTH AFRICAN GOVERNMENT IN SOCIAL HOUSING. Section 26 of the Constitution enshrines the right to housing as follows: 1 ROLE OF SOUTH AFRICAN GOVERNMENT IN SOCIAL HOUSING Constitution Section 26 of the Constitution enshrines the right to housing as follows: Everyone has the right to have access to adequate housing The

More information

6 Central Government as Initiator: Housing Action Trusts

6 Central Government as Initiator: Housing Action Trusts 6 Central Government as Initiator: Housing Action Trusts The Housing Act 1988 sets up a framework within which the Secretary of State will be able to appoint Housing Action Trusts to take over council

More information

Proposed Strategic Housing and Employment Land Availability Assessment (SHELAA) Methodology 2018

Proposed Strategic Housing and Employment Land Availability Assessment (SHELAA) Methodology 2018 Proposed Strategic Housing and Employment Land Availability Assessment (SHELAA) Methodology 2018 1.1 This section of the report sets out the methodology to be used in preparing the three South Worcestershire

More information

Houses in Multiple Occupation in the Article 4 Direction Area of Selly Oak, Edgbaston and Harborne wards DRAFT FOR PUBLIC CONSULTATION

Houses in Multiple Occupation in the Article 4 Direction Area of Selly Oak, Edgbaston and Harborne wards DRAFT FOR PUBLIC CONSULTATION Planning Policy Document Houses in Multiple Occupation in the Article 4 Direction Area of Selly Oak, Edgbaston and Harborne wards DRAFT FOR PUBLIC CONSULTATION Contents 1. Purpose 2. Aim of the policy

More information

DCLG consultation on proposed changes to national planning policy

DCLG consultation on proposed changes to national planning policy Summary DCLG consultation on proposed changes to national planning policy January 2016 1. Introduction DCLG is proposing changes to the national planning policy framework (NPPF) specifically on: Broadening

More information

Draft London Plan Review

Draft London Plan Review Draft London Plan Review Briefing Note Date: 04/12/2017 Ref No: 283 Introduction On the 29th November the Mayor of London, Sadiq Khan, published his draft London Plan for consultation (Regulation 19).

More information

Qualification Snapshot CIH Level 3 Certificate in Housing Services (QCF)

Qualification Snapshot CIH Level 3 Certificate in Housing Services (QCF) Qualification Snapshot CIH Certificate in Housing Services (QCF) The Chartered Institute of Housing (CIH) is an awarding organisation for national qualifications at levels 2, 3 and 4. CIH is the leading

More information

Yorkshire Dales National Park. Local Plan

Yorkshire Dales National Park. Local Plan Yorkshire Dales National Park Local Plan 2015-2030 Adopted 20th December 2016 C1 Housing in settlements Community Yorkshire Dales Local Plan Adopted version The sites listed in Appendix 4 are allocated

More information

Housing Needs Survey Report. Arlesey

Housing Needs Survey Report. Arlesey Housing Needs Survey Report Arlesey August 2015 Completed by Bedfordshire Rural Communities Charity This report is the joint property of Central Bedfordshire Council and Arlesey Parish Council. For further

More information

Strategic Housing Market Assessment South Essex. Executive Summary. May 2016

Strategic Housing Market Assessment South Essex. Executive Summary. May 2016 Strategic Housing Market Assessment South Essex Executive Summary May 2016 Executive Summary 1. Turley in partnership with specialist demographic consultancy Edge Analytics were commissioned by the Thames

More information

HOUSING AFFORDABILITY

HOUSING AFFORDABILITY HOUSING AFFORDABILITY (RENTAL) 2016 A study for the Perth metropolitan area Research and analysis conducted by: In association with industry experts: And supported by: Contents 1. Introduction...3 2. Executive

More information

North Northamptonshire Authorities Monitoring Report (AMR) 2015/16. Assessment of Housing Land Supply ( )

North Northamptonshire Authorities Monitoring Report (AMR) 2015/16. Assessment of Housing Land Supply ( ) North Northamptonshire Authorities Monitoring Report (AMR) 2015/16 Assessment of Housing Land Supply (2017-22) April 2017 1.0 Introduction Purpose of Report 1.1 The National Planning Policy Framework (NPPF)

More information

Rochford Core Strategy Schedule of Changes

Rochford Core Strategy Schedule of Changes Rochford Core Strategy Schedule of Changes The changes below are expressed either in the conventional form of strikethrough for deletions and underlining for additions of text, or by specifying the change

More information

London Borough of Barnet Temporary Accommodation Procurement Policy

London Borough of Barnet Temporary Accommodation Procurement Policy London Borough of Barnet Temporary Accommodation Procurement Policy Version Control Item Reason for Change Version Author Date 1. 2. 3. 4. 5. Last Review Date: Jan 2016 Next Review Date: April 2017 1 1.

More information

NSW Affordable Housing Guidelines. August 2012

NSW Affordable Housing Guidelines. August 2012 August 2012 NSW AFFORDABLE HOUSING GUIDELINES TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 DEFINITION OF KEY TERMS... 1 3.0 APPLICATION OF GUIDELINES... 2 4.0 PRINCIPLES... 2 4.1 Relationships and partnerships...

More information

Consultation Response

Consultation Response Neighbourhoods and Sustainability Consultation Response Title: New Partnerships in Affordable Housing Lion Court 25 Procter Street London WC1V 6NY Reference: NS.DV.2005.RS.03 Tel: 020 7067 1010 Fax: 020

More information

Choice-Based Letting Guidance for Local Authorities

Choice-Based Letting Guidance for Local Authorities Choice-Based Letting Guidance for Local Authorities December 2016 Contents Page 1. What is Choice Based Lettings (CBL) 1 2. The Department s approach to CBL 1 3. Statutory Basis for Choice Based Letting

More information

POLICY BRIEFING.

POLICY BRIEFING. High Income Social Tenants - Pay to Stay Author: Sheila Camp, LGiU Associate Date: 2 August 2012 Summary This briefing covers two housing consultations; the most recent, the Pay to Stay consultation concerns

More information

Member briefing: The Social Housing Rent Settlement from 2015/16

Member briefing: The Social Housing Rent Settlement from 2015/16 28 May 2014 Member briefing: The Social Housing Rent Settlement from 2015/16 1. Introduction On Friday 23 May Government issued the final policy for Rents for Social Housing from 2015/16, following a consultation

More information

H Benchmark Review of

H Benchmark Review of HBenchmark Review of 1.0 Other Policy Approaches Review 1.1 This section provides a review of six other local planning authorities in Wales and England, strategies and policy frameworks for houses in multiple

More information

Housing White Paper Summary. February 2017

Housing White Paper Summary. February 2017 Housing White Paper Summary February 2017 On Tuesday 7 February, the government published the Housing White Paper, aimed at solving the housing crises in England through increasing the supply of homes

More information

December 2017 Website. Lettings Policy (General Needs Housing)

December 2017 Website. Lettings Policy (General Needs Housing) December 2017 Website Lettings Policy (General Needs Housing) 1. Introduction CHS GROUP (CHS) is a charitable Housing Association which has a duty to ensure its homes are allocated to people in housing

More information

IMPLEMENTATION MASTERPLAN

IMPLEMENTATION MASTERPLAN ROTHERHAM TOWN CENTRE IMPLEMENTATION MASTERPLAN Prepared by WYG for Rotherham Metropolitan Borough Council June 2017 Contents Rotherham Town Centre Masterplan Introduction Town Centre Context Opportunity

More information

Document under Separate Cover Refer to LPS State of Housing

Document under Separate Cover Refer to LPS State of Housing Document under Separate Cover Refer to LPS5-17 216 State of Housing Contents Housing in Halton 1 Overview The Housing Continuum Halton s Housing Model 3 216 Income & Housing Costs 216 Indicator of Housing

More information

Badby Parish. Housing Needs Survey Report

Badby Parish. Housing Needs Survey Report Badby Parish Housing Needs Survey Report February 2013 Contents Introduction Page 3 Methodology Page 4 About Badby Page 5 Survey Results Page 6 Local Housing Market & Affordability Page 11 Section B Analysis

More information

POLICY H1 Meeting the Housing Requirements of the Cornwall Local Plan to 2030

POLICY H1 Meeting the Housing Requirements of the Cornwall Local Plan to 2030 36 A PLACE TO LIVE A PLACE TO LIVE AIMS To Meet the housing targets (as in the Local Plan) up to 2030 in a way that enhances the role of Liskeard as the economic centre of a wider rural hinterland Enhance

More information

Identifying brownfield land suitable for new housing

Identifying brownfield land suitable for new housing Building more homes on brownfield land Identifying brownfield land suitable for new housing POS consultation response Question 1: Do you agree with our proposed definition of brownfield land suitable for

More information

KILKENNY CITY AND ENVIRONS DEVELOPMENT PLAN Variation 3

KILKENNY CITY AND ENVIRONS DEVELOPMENT PLAN Variation 3 KILKENNY CITY AND ENVIRONS DEVELOPMENT PLAN 2014 2020 Variation 3 To alter the zoning in the Western Environs to maximise the potential housing supply in line with the Government s policy outlined in Rebuilding

More information

High Level Summary of Statistics Housing and Regeneration

High Level Summary of Statistics Housing and Regeneration High Level Summary of Statistics Housing and Regeneration Housing market... 2 Tenure... 2 New housing supply... 3 House prices... 5 Quality... 7 Dampness, condensation and the Scottish Housing Quality

More information

apply sustainability principles to all residential developments in Ardee;

apply sustainability principles to all residential developments in Ardee; 3. Housing 3.1 Introduction Ardee is currently experiencing considerable pressure for residential development as improved road infrastructure, together with the availability of serviced land, makes the

More information

Section 106: Appendices

Section 106: Appendices Section 106: Appendices Appendices 1. Extracts of topic-based SPGs 2. Example of Planning Obligations Service Standards 3. Example of Standard Heads of Terms 4. Example Process Map detailing protocol for

More information

Monitoring and Re-use of Brownfield Land in England and Wales Dr Andrew R Harrison 1, LandInform Ltd

Monitoring and Re-use of Brownfield Land in England and Wales Dr Andrew R Harrison 1, LandInform Ltd Monitoring and Re-use of Brownfield Land in England and Wales Dr Andrew R Harrison 1, LandInform Ltd Introduction Brownfield land has been a policy concern in the UK since the 1970s. Brownfield policy

More information

Empty Properties Enforcement Protocol

Empty Properties Enforcement Protocol Empty Properties Enforcement Protocol 1. Introduction 1.1 Ealing Council will take every step it can to assist owners of empty properties in bringing the accommodation back into use. The details of this

More information

Planning Policy Statement 3. Regulatory Impact Assessment

Planning Policy Statement 3. Regulatory Impact Assessment Planning Policy Statement 3 Regulatory Impact Assessment Planning Policy Statement 3 Regulatory Impact Assessment May 2007 Department for Communities and Local Government: London Department for Communities

More information

Rent Setting Policy

Rent Setting Policy Rent Setting Policy 2016-2017 Contents 1. Scope 2. Policy statement 3. Monitoring and evaluation 4. Conditions and exceptions to policy 5. Policy equality and diversity statement 6. Resident/Tenant involvement

More information

Briefing: National Planning Policy Framework

Briefing: National Planning Policy Framework December 2015 Briefing: National Planning Policy Framework DCLG consultation on proposed changes This briefing note: Outlines the policy changes proposed to the NPPF Details the proposed transitional arrangements

More information

City Plan Sub- Committee Report

City Plan Sub- Committee Report AGENDA ITEM: Date: 21 st July 2016 City Plan Sub- Committee Report Classification: Title: Report of: Cabinet Member Portfolio: Wards Affected: City for All Key Decision: Financial Summary: Report Author

More information

Proposed Variation to Stage 1 Proposed District Plan VISITOR ACCOMMODATION DRAFT

Proposed Variation to Stage 1 Proposed District Plan VISITOR ACCOMMODATION DRAFT Proposed Variation to Stage 1 Proposed District Plan VISITOR ACCOMMODATION Prepared by Ian Johnson, Mitchell Daysh Ltd For Bookabach Ltd Version 0.4 Residential Visitor Accommodation The Variation Alternative

More information

TEE FABIKUN. Document Ref: REP.LP Matter 3 Housing

TEE FABIKUN. Document Ref: REP.LP Matter 3 Housing TEE FABIKUN Document Ref: REP.LP.145-01 Matter 3 Housing 1. Bearing in mind the recent Inspector s report following the Further Alterations to the London Plan (FALP) examination (see paragraphs 31-35 of

More information

H 19. Sustainability Policy. April 2017 April 2020

H 19. Sustainability Policy. April 2017 April 2020 H 19 Sustainability Policy Date of Approval Review due April April 2017 April 2020 Contents 1. Introduction Purpose of the Policy 2. Key Policy Issues 3. Tenancy Sustainability Policy 4. Aims and Objectives

More information

Tenancy Policy Introduction Legal Framework Purpose Principles Policy Statement Tenancy Statement...

Tenancy Policy Introduction Legal Framework Purpose Principles Policy Statement Tenancy Statement... 1 Tenancy Policy January 2014 Table of Contents Tenancy Policy... 1 Introduction... 2 Legal Framework... 2 Purpose... 3 Principles... 3 Policy Statement... 4 Tenancy Statement... 4 Tenancy Types... 5 Assured

More information

Capital Assistance Scheme Call for Proposals 2016

Capital Assistance Scheme Call for Proposals 2016 22 June 2016 Circular: Housing 29/2016 To each Director of Service (Housing) Dear Director, 1 P a g e Capital Assistance Scheme Call for Proposals 2016 The Department is now accepting applications for

More information

Table of Contents. Appendix...22

Table of Contents. Appendix...22 Table Contents 1. Background 3 1.1 Purpose.3 1.2 Data Sources 3 1.3 Data Aggregation...4 1.4 Principles Methodology.. 5 2. Existing Population, Dwelling Units and Employment 6 2.1 Population.6 2.1.1 Distribution

More information

City of Winnipeg Housing Policy Implementation Plan

City of Winnipeg Housing Policy Implementation Plan The City of Winnipeg s updated housing policy is aligned around four major priorities. These priorities are highlighted below: 1. Targeted Development - Encourage new housing development that: a. Creates

More information

BOURNEMOUTH/ POOLE HOUSING MARKET AREA

BOURNEMOUTH/ POOLE HOUSING MARKET AREA BOURNEMOUTH/ POOLE HOUSING MARKET AREA 2011 Strategic Housing Market Assessment Update Summary report for: Borough of Poole Council January 2012 in association with Cont ents Contents 1. Background...1

More information

Local Authority Housing Companies

Local Authority Housing Companies Briefing 17-44 November 2017 Local Authority Housing Companies To: All Contacts Key Issues There has been a rise in the number of Local Authority Housing Companies that have been established and APSE has

More information

Persimmon Homes Severn Valley comment St Cuthbert (Out) Neighbourhood Plan Pre-Submission Consultation

Persimmon Homes Severn Valley comment St Cuthbert (Out) Neighbourhood Plan Pre-Submission Consultation 150408 Persimmon Homes Severn Valley comment St Cuthbert (Out) Neighbourhood Plan Pre-Submission Consultation On Wednesday, 8 April 2015, 16:54, "Davis, Paul" wrote: See

More information

AGENDA ITEM: 7 Page nos. 4-6

AGENDA ITEM: 7 Page nos. 4-6 AGENDA ITEM: 7 Page nos. 4-6 Meeting Tackling Crime and Housing Overview and Scrutiny Committee Date 27 th September 2006 Subject Report of Summary Affordable Housing Supplementary Planning Document (SPD)

More information

2. Draft Settlement Boundaries Planning Policy and local principles

2. Draft Settlement Boundaries Planning Policy and local principles Housing Information 1. Cornwall Local Plan policy position: Cornwall Local Plan sets down key targets for the provision of homes where they can best meet need and sustain the role and function of local

More information

Housing Land Monitor. For the period 1 st April 2012to 31 st March 2013

Housing Land Monitor. For the period 1 st April 2012to 31 st March 2013 Housing Land Monitor For the period 1 st April 2012to 31 st March 2013 Published September 2013 Contents Page 1. Introduction 3 2. Worcester City housing completions 2012/13 4 3. Worcester City housing

More information

GWYNEDD AND ANGLESEY JOINT LOCAL DEVELOPMENT PLAN ( )

GWYNEDD AND ANGLESEY JOINT LOCAL DEVELOPMENT PLAN ( ) GWYNEDD AND ANGLESEY JOINT LOCAL DEVELOPMENT PLAN (2011 2026) PUBLIC EXAMINATION: Hearing Session 2 Housing Provision Action Point (S2/PG6), Action Point (S2/PG9) and Action Point (S2/PG10) 1] Action Point

More information

New Homes Bonus: final scheme design

New Homes Bonus: final scheme design New Homes Bonus: final scheme design www.communities.gov.uk New Homes Bonus: final scheme design February 2011 Department for Communities and Local Government Department for Communities and Local Government

More information

Horsham District Council Empty Homes Strategy

Horsham District Council Empty Homes Strategy Horsham District Council Empty Homes Strategy 2016-2020 Purpose of this Strategy Horsham District Council is committed to bringing long-term empty homes back into use across the District. The Empty Homes

More information

Starting points. Starting points Personal interests in the subject Research interests/opportunities International links : eg ENHR, Nova, KRIHS, CCHPR

Starting points. Starting points Personal interests in the subject Research interests/opportunities International links : eg ENHR, Nova, KRIHS, CCHPR Starting points Starting points Personal interests in the subject Research interests/opportunities International links : eg ENHR, Nova, KRIHS, CCHPR The changing emphasis of policy in the UK Housing renewal

More information

Sherston Parish Housing Needs Survey Survey Report February 2012 Wiltshire Council County Hall, Bythesea Road, Trowbridge BA14 8JN

Sherston Parish Housing Needs Survey Survey Report February 2012 Wiltshire Council County Hall, Bythesea Road, Trowbridge BA14 8JN Sherston Parish Housing Needs Survey Survey Report February 2012 Wiltshire Council County Hall, Bythesea Road, Trowbridge BA14 8JN Contents Page Parish summary 3 Introduction 3 Aim 4 Survey distribution

More information

SCOTTISH GOVERNMENT RESPONSE TO PRIVATE RENTED HOUSING (SCOTLAND) BILL STAGE 1 REPORT

SCOTTISH GOVERNMENT RESPONSE TO PRIVATE RENTED HOUSING (SCOTLAND) BILL STAGE 1 REPORT SCOTTISH GOVERNMENT RESPONSE TO PRIVATE RENTED HOUSING (SCOTLAND) BILL STAGE 1 REPORT I am writing in response to the Local Government and Communities Committee s Stage 1 Report on the Private Rented Housing

More information

Leeds City Region Statement of Common Ground. August 2018

Leeds City Region Statement of Common Ground. August 2018 Leeds City Region Statement of Common Ground August 2018 1.0 Introduction 1.1 The Leeds City Region partner councils have prepared this Statement of Common Ground in response to the requirement as set

More information

The introduction of the LHA cap to the social rented sector: impact on young people in Scotland

The introduction of the LHA cap to the social rented sector: impact on young people in Scotland The introduction of the LHA cap to the social rented sector: impact on young people in Scotland Brought to you by the Chartered Institute of Housing Executive Summary About the research This research was

More information

Getting Started With Your Local Housing Market Assessment. A Step by Step Guide

Getting Started With Your Local Housing Market Assessment. A Step by Step Guide Getting Started With Your Local Housing Market Assessment A Step by Step Guide November 2014 2 Getting Started With Your Local Housing Market Assessment Contents Background and Introduction 4 Stage 1a:

More information

CORK COUNTY COUNCIL ALLOCATION SCHEME

CORK COUNTY COUNCIL ALLOCATION SCHEME CORK COUNTY COUNCIL ALLOCATION SCHEME Section 22 of the Housing (Miscellaneous Provisions) Act, 2009 and Social Housing Allocation Regulations 2011 (S.I. No. 198 of 2011) This Scheme was adopted by Members

More information

Cork Planning Authorities Joint Housing Strategy. Managers Joint Report on the submissions received and issues raised.

Cork Planning Authorities Joint Housing Strategy. Managers Joint Report on the submissions received and issues raised. Joint Housing Strategy Managers Joint Report on the submissions received and issues raised. June 2013 Introduction This is a joint report which reviews the submissions received during the public consultation

More information

Riverton Properties Ltd Proposed Special Housing Area

Riverton Properties Ltd Proposed Special Housing Area Riverton Properties Ltd Proposed Special Housing Area Housing Accords and Special Housing Areas Act 2013 Expression of Interest 1 This Expression of Interest is made on behalf of Riverton Properties Ltd,

More information

South East Queensland Growth Management Program

South East Queensland Growth Management Program South East Queensland Growth Management Program Acknowledgements Office of Economic and Statistical Research, Demography and Planning Australian Bureau of Statistics Urban Land Development Authority Brisbane

More information

MARESFIELD PARISH COUNCIL REPRESENTING THE VILLAGES OF MARESFIELD, NUTLEY AND FAIRWARP

MARESFIELD PARISH COUNCIL REPRESENTING THE VILLAGES OF MARESFIELD, NUTLEY AND FAIRWARP MARESFIELD PARISH COUNCIL REPRESENTING THE VILLAGES OF MARESFIELD, NUTLEY AND FAIRWARP Our address Parish Office, Churchfields, Nutley, East Sussex, TN22 3NA Phone 01825 714555 e-mail Clerk@MaresfieldParish.org.uk

More information

UK Housing Awards 2011

UK Housing Awards 2011 UK Housing Awards 2011 Excellence in Housing Finance and Development: Winner Rettie & Co, Springfield Properties and DCHA: Resonance at Moray Apartments, Edinburgh Summary In this climate of constrained

More information

HOUSING ALLOCATIONS SCHEME (Scheme of Letting Priorities)

HOUSING ALLOCATIONS SCHEME (Scheme of Letting Priorities) HOUSING ALLOCATIONS SCHEME (Scheme of Letting Priorities) Housing Allocations Scheme (Scheme of Letting Priorities) Section 1. Introduction 1.1 Introduction 1.2 Housing Areas 1.3 Transfer Applications

More information

All these large regeneration schemes have key factors in common.

All these large regeneration schemes have key factors in common. GRAHAM TOWERS KEY ELEMENTS OF EUROPEAN REGENERATION SCHEMES Most of the cities of Western Europe have carried out regeneration schemes. In the 1950s and 60s these were aimed at making good war damage or

More information

Metropolitan Cork Joint Retail Strategy. March 2015

Metropolitan Cork Joint Retail Strategy. March 2015 Metropolitan Cork Joint Retail Strategy March 2015 Cork City Council Comhairle Cathrach Chorcaí Cork County Council Comhairle Contae Chorcaí 1.0 Introduction 1.1 The Retail Planning Guidelines (RPG's)

More information

Draft for Public Review. The Market and Octavia Neighborhood Plan

Draft for Public Review. The Market and Octavia Neighborhood Plan Draft for Public Review The Market and Octavia Neighborhood Plan San Francisco Planning Department As Part of the Better Neighborhoods Program December 00 . Housing People OBJECTIVE.1 MIXED-USE RESIDENTIAL

More information

Lewisham Green Party. Response to Draft Lewisham Housing Strategy

Lewisham Green Party. Response to Draft Lewisham Housing Strategy Lewisham Green Party Response to Draft Lewisham Housing Strategy Lewisham Green Party welcomes the opportunity to comment on Homes for London: Draft Lewisham Housing Strategy 2015-2020. We feel that the

More information

Representation re: Sullivans Cove Planning Scheme /2015 Amendments - Macquarie Point Site Development: Affordable housing

Representation re: Sullivans Cove Planning Scheme /2015 Amendments - Macquarie Point Site Development: Affordable housing General Manager, Hobart City Council, GPO Box 503, Tas 7001 16 November, 2015 Representation re: Sullivans Cove Planning Scheme 1997-2/2015 Amendments - Macquarie Point Site Development: Affordable housing

More information

PIA would be pleased to meet with the Department to outline any aspect of our submission. Please contact myself or John Brockhoff on

PIA would be pleased to meet with the Department to outline any aspect of our submission. Please contact myself or John Brockhoff on 31 January 2018 Deborah Brill Director, Housing and Infrastructure Policy Department of Planning and Environment PO Box 39 SYDNEY NSW 2001 Dear Deborah, PIA Submission: Affordable Housing SEPP 70 Amendments

More information

The Liverpool Experience: Delivering on Housing Needs. Tony Mousdale Housing Co-ordinator Liverpool City Council

The Liverpool Experience: Delivering on Housing Needs. Tony Mousdale Housing Co-ordinator Liverpool City Council APSE Housing, Construction and Building Maintenance Seminar 2017 The Liverpool Experience: Delivering on Housing Needs Tony Mousdale Housing Co-ordinator Liverpool City Council The Housing Challenge 47%

More information

Change of use from therapeutic community residential use (Sui Generis) to 20 bed HMO (Sui Generis)

Change of use from therapeutic community residential use (Sui Generis) to 20 bed HMO (Sui Generis) Committee Date: 16/04/2015 Application Number: 2015/00751/PA Accepted: 04/02/2015 Application Type: Full Planning Target Date: 01/04/2015 Ward: Moseley and Kings Heath 19-21 Park Road, Moseley, Birmingham,

More information

Updated July Housing Allocation Scheme

Updated July Housing Allocation Scheme Updated July 2011 Housing Allocation Scheme H2 If you would like this information in large print, Braille or another language, please contact 01702 318111. Contents Page 1 Introduction... 4 1.1 Background...

More information

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3A GENERAL STRATEGY FOR THE GROWTH LOCATIONS

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3A GENERAL STRATEGY FOR THE GROWTH LOCATIONS Matter 3A General Strategy for the Growth Locations Representor No. 8826 JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3A GENERAL STRATEGY FOR THE GROWTH LOCATIONS SUBMISSION

More information

REPRESENTATIONS TO SHEPWAY DISTRICT COUNCIL (SDC) PLACES AND POLICIES LOCAL PLAN SUBMISSIONS DRAFT SDC/COZUMEL ESTATES LIMITED

REPRESENTATIONS TO SHEPWAY DISTRICT COUNCIL (SDC) PLACES AND POLICIES LOCAL PLAN SUBMISSIONS DRAFT SDC/COZUMEL ESTATES LIMITED REPRESENTATIONS TO SHEPWAY DISTRICT COUNCIL (SDC) PLACES AND POLICIES LOCAL PLAN SUBMISSIONS DRAFT SDC/COZUMEL ESTATES LIMITED OTTERPOOL PARK 19 MARCH 2018 Quod Limited Contents 1 Introduction 3 2 Site

More information

CONTROLLING AUTHORITY: Head of Housing & Community Services. DATE: August AMENDED: Changes to Starter Tenancies.

CONTROLLING AUTHORITY: Head of Housing & Community Services. DATE: August AMENDED: Changes to Starter Tenancies. TENANCY POLICY CONTROLLING AUTHORITY: Head of Housing & Community Services ISSUE NO: 3 STATUS: LIVE DATE: August 2014 AMENDED: Changes to Starter Tenancies 1 Index 1.0 Purpose of the Policy 2.0 Tenancy

More information

On: 20 April Report by: Director of Development and Housing Services. Heading: Paisley West End - Regeneration Masterplan. 1.

On: 20 April Report by: Director of Development and Housing Services. Heading: Paisley West End - Regeneration Masterplan. 1. To: Council On: 20 April 2017 Report by: Director of Development and Housing Services Heading: Paisley West End - Regeneration Masterplan 1. Summary 1.1 This report sets out proposals for the regeneration

More information

Living City Initiative

Living City Initiative Living City Initiative What is the Living City Initiative and where does it apply? The Living City Initiative is a scheme of property tax incentives designed to regenerate both historic buildings and other

More information

Affordable Homes Service Plan 2016/17 and 2017/18

Affordable Homes Service Plan 2016/17 and 2017/18 Report To: Housing Portfolio Holder 15 March 2017 Lead Officer: Director of Housing Purpose Affordable Homes Service Plan 2016/17 and 2017/18 1. To provide the Housing Portfolio Holder with an update on

More information

POLICY BRIEFING. ! Housing and Poverty - the role of landlords JRF research report

POLICY BRIEFING. ! Housing and Poverty - the role of landlords JRF research report Housing and Poverty - the role of landlords JRF research report Sheila Camp, LGIU Associate 27 October 2015 Summary The Joseph Rowntree Foundation (JRF) published a report in June 2015 "Housing and Poverty",

More information

Reforming the land market

Reforming the land market Reforming the land market How land reform can help deliver the government target of 300,000 new homes per year CPP Working Paper 01/2018 April 2018 Thomas Aubrey Centre for Progressive Policy About the

More information

APPENDIX 7. Housing Enforcement Policy V May 2003

APPENDIX 7. Housing Enforcement Policy V May 2003 Housing Enforcement Policy V1.2 9 May 2003 INTRODUCTION This policy provides guidance on the aims and objectives of the Housing department to make homes on the Island fit and available for occupation.

More information

Tenancy Policy. 1 Introduction. 12 September Executive Management Team Approval Date: Review date: September 2018

Tenancy Policy. 1 Introduction. 12 September Executive Management Team Approval Date: Review date: September 2018 Tenancy Policy Originator: Executive Management Team Approval Date: Policy and Strategy Team 12 September 2017 Review date: September 2018 1 Introduction 1.1 1.2 This Policy sets out how One Vision Housing

More information

METREX Expert Group Affordable Housing

METREX Expert Group Affordable Housing METREX Expert Group Affordable Housing METREX 125 West Regent Street GLASGOW G2 2SA Scotland UK T. +44 (0) 1292 317074 F. +44 (0) 1292 317074 secretariat@eurometrex.org http://www.eurometrex.org 1 METREX

More information

Committee Date: 17/07/2014 Application Number: 2014/02259/PA Accepted: 28/04/2014 Application Type: Full Planning Target Date: 23/06/2014

Committee Date: 17/07/2014 Application Number: 2014/02259/PA Accepted: 28/04/2014 Application Type: Full Planning Target Date: 23/06/2014 Committee Date: 17/07/2014 Application Number: 2014/02259/PA Accepted: 28/04/2014 Application Type: Full Planning Target Date: 23/06/2014 Ward: Selly Oak 101 Hubert Road, Selly Oak, Birmingham, B29 6ET

More information

Cressingham Gardens Estate, Brixton. DRAFT Masterplan Objectives for discussion. September 2015

Cressingham Gardens Estate, Brixton. DRAFT Masterplan Objectives for discussion. September 2015 Cressingham Gardens Estate, Brixton DRAFT Masterplan Objectives for discussion September 2015 Contents Introduction 1 Project objectives 2 Masterplan objectives 4 Draft masterplan objectives for the Cressingham

More information

Land at Sheldon Heath Road and Platt Brook Way, Sheldon, Birmingham, B26 2DS

Land at Sheldon Heath Road and Platt Brook Way, Sheldon, Birmingham, B26 2DS Committee Date: 06/02/2014 Application Number: 2013/08937/PA Accepted: 03/12/2013 Application Type: Full Planning Target Date: 04/03/2014 Ward: Sheldon Land at Sheldon Heath Road and Platt Brook Way, Sheldon,

More information

Welsh Government Housing Policy Regulation

Welsh Government Housing Policy Regulation www.cymru.gov.uk Welsh Government Housing Policy Regulation Regulatory Assessment Report August 2015 Welsh Government Regulatory Assessment The Welsh Ministers have powers under the Housing Act 1996 to

More information

Planning Reform and Housing Viability

Planning Reform and Housing Viability Planning Reform and Housing Viability Colin Wiles colin@wilesconsulting.co.uk National Planning Policy Framework 1,000 pages reduced to 52 Framework for all future development Plan-led Golden thread of

More information

Town Centre Community Improvement Plan

Town Centre Community Improvement Plan 2012 Town Centre Community Improvement Plan City of Greater Sudbury Growth and Development Department 1.0 PLAN BACKGROUND 1.1 Introduction The following Community Improvement Plan (CIP) has been prepared

More information