1 Annual Monitoring Report 2007/2008

2 CONTENTS 1.0 Executive Summary Statutory Context Contact Introduction Contextual Information Key Contextual Characteristics Unimplemented Policies Local Development Scheme Business Development and Town Centres Housing Environmental Quality 37 Annex Housing Trajectories 40 A Annex B Calculation of Outstanding Capacity 41 Tables 1 Progress of the Local Development Scheme 7 2 Employment floorspace completed 2007/ Employment land supply by type 15 4 Employment floorspace completed in Guildford Town Centre /08 5 Approvals for farm diversification 17 6 Net housing completions by year 23 7 Net loss of residential units 29 8 Location of approvals 30 9 Density of approvals Type of approvals 2007/08 (excluding mix of dwellings) Number of affordable housing units approved Sites where affordable housing units have been approved 2007/08 35 Figures 1 % Unemployed Sept 2008 Guildford Borough 13 2 Average Property Selling Prices in Guildford ( 000 s) 20 3 Type of dwelling approved in 2007/ Dwellings Approved in 2007/08 by number of bedrooms 34 5 Number of Affordable Units Approved 34 1

3 1.0 EXECUTIVE SUMMARY 1.1 Guildford Borough Council has produced an Annual Monitoring Report (AMR) in line with the guidance published by Communities and Local Government (CLG) (Local Development Framework Monitoring: A Good Practice Guide, 2005 & Regional Spatial Strategy and Local Development Framework Core Output Indicators Update 2/2008). 1.2 The AMR examines the progress of the Local Development Scheme (LDS) and monitors the objectives of the Guildford Borough Local Plan (2003) and Core Output Indicators provided in the guidance from CLG between 01/04/2007 and 31/03/2008. The updated guidance from CLG introduces some new Core Output Indicators and removes some previously included in recent AMR s. This AMR only monitors live Core Output Indicators as listed in the updated guidance. 1.3 The Housing Trajectory gives a positive indication of progress against the housing targets set out in the Surrey Structure Plan (2004) and the draft South East Plan. If excess completions above the target can be taken into account the following year, the South East Plan housing target can be met for the next five years. This is without the inclusion of windfall projections, in accordance with Planning Policy Statement 3: Housing. 6.1 The AMR confirms continued progress on various components of the Guildford Development Framework, during the monitoring period including a thorough Issues and Options consultation on the Site Allocations DPD and consultation, revision and adoption of the Woodbridge Meadows Supplementary Planning Document. Submission of the Core Strategy was deferred in October 2007, with the agreement of GOSE and the Planning Inspectorate, to address issues arising from others' LDF examination reports and to allow further development of evidence base, to address the more recent research demands of national planning policy. Considerable work was undertaken during the remainder of the monitoring period - and is continuing to finalise - studies such as the Strategic Housing Market Assessment (SHMA), Strategic Flood Risk Assessment (SFRA) and Strategic Housing Land Availability Assessment (SHLAA). 1.4 The majority of the Local Plan objectives are being met. The monitoring of the Core Output Indicators has shown that many associated targets are also being met. The monitoring of the Core Output Indicators and Local Plan objectives has been a very useful exercise to assess the effectiveness of the Local Plan objectives and highlight where improvements are needed to the monitoring system. Improvements will be fed into future AMR s. 1.5 This fourth AMR has been produced before the adoption of the policies in the Guildford Development Framework (GDF). Unlike the Local Plan (2003), the GDF will include indicators to assess the effectiveness of the GDF policies. The AMR is not required to monitor these indicators until the GDF is approved. 1.6 In 2006/07 a preliminary monitoring report was, however, prepared based on the indicators in the Core Strategy; the key strategic Development Plan 2

4 Document (DPD) in the GDF. Once the Core Strategy has been adopted for a full year, the AMR will formally monitor its indicators. The Core Strategy monitoring report 2006/07 can be downloaded from the Council s website at > Guildford Development Framework > Evidence Base. Annual Monitoring Report (AMR) STATUTORY CONTEXT 2.1 The Planning and Compulsory Purchase Act was enacted on 28 September 2004 and introduced a system of Local Development Frameworks (LDFs). Section 35 of the Act requires Local Planning Authorities to prepare an Annual Monitoring Report (AMR) for submission to the Secretary of State. It requires that the AMR must contain information about the implementation of the Local Development Scheme (LDS) and the extent to which policies set out in the Local Development Documents are being achieved. 2.2 This Annual Monitoring Report (AMR) is the fourth to be produced by Guildford Borough Council under the 2004 Planning Act. 3.0 CONTACT 3.1 This report is published by: The Planning Policy Team Planning Services Guildford Borough Council Millmead House Millmead Guildford Surrey GU2 4BB 3.2 The AMR can be viewed at the website address below. 3.3 For advice and information on this AMR, please contact the Planning Policy Team: planningpolicy@guildford.gov.uk Website: > Guildford Development Framework > Evidence Base Telephone:

5 4.0 INTRODUCTION 4.1 Planning Policy Statement 12 (PPS12, 2008) states that monitoring is essential for an effective strategy and will provide the basis on which the contingency plans within the strategy would be triggered (p.18). 4.2 This AMR contains information on the progress of the LDS, the progress made against the Core Output Indicators (supplied by CLG) and, where appropriate, the objectives of the Guildford Borough Local Plan Work on the Core Strategy has progressed since the last AMR, however, until the document is adopted, the AMR will focus on the objectives in the Guildford Borough Local Plan The AMR monitors the period between 01/04/07 and 31/03/ CONTEXTUAL INFORMATION 5.1 The AMR sets out the key contextual characteristics, issues, challenges and opportunities affecting the Borough. This draws upon the spatial portrait vision and objectives that are required to be developed as part of the preparation of the evidence base, the Sustainability Appraisal and the Guildford Community Plan. 5.2 Contextual indicators are used to describe the wider social, environmental and economic background against which to consider the effects of policies and inform the interpretation of Core Output Indicators. This reflects increasing recognition of the importance of taking into account the social, environmental and economic circumstances when developing policies for the Guildford Development Framework (GDF). 5.3 As part of the preparation of the evidence base for the GDF, the Council produced a series of profile documents which provide statistical information about the borough, including past and future trends. These documents are available on the website at > Planning and Building Control > Planning Policy > Evidence Base > Census KEY CONTEXTUAL CHARACTERISTICS 6.1 Guildford Borough is a thriving area with a population of 133,100 people (Nomis, 2006). It comprises two urban areas Ash /Tongham and Guildford and a number of attractive villages and open countryside. The main town of Guildford lies centrally within the borough and, along with many other towns in the South East region, has experienced significant growth over the last ten years, accommodating more residents, visitors and businesses, whilst at the same time maintaining its quality environment and strong heritage. The borough lies largely within the Metropolitan Green Belt and, outside the urban areas, the countryside and villages are subject to restrictive policies that have successfully prevented the spread of the urban areas and the villages and protected the countryside from inappropriate development. 4

6 7.0 UNIMPLEMENTED POLICIES 7.1 The requirement of the Planning and Compulsory Purchase Act (as amended) is that the AMR must report on the extent to which the policies set out in the Local Development Documents (including those in existing Local Plans) are being achieved. Regulation 48 states that the local planning authority must identify any policies it thinks are not being implemented, the reason why the policy is not being implemented and how this will be addressed. 5

7 8.0 LOCAL DEVELOPMENT SCHEME (LDS) 8.1 Timetable and Milestones 8.2 This section considers whether the timetable and milestones to 31 March 2008 for the documents set out in the Local Development Scheme (LDS) have been met or progress is being made towards meeting them. The LDS sets out the timetable and milestones for the production of documents within the Guildford (Local) Development Framework. Table 1 sets out the document, key milestones and a commentary on whether or not the timetable was met. 8.3 In May 2007, an updated version of the LDS was brought into effect by Guildford Borough Council. At the time of writing the previous AMR (2006/07), this approved LDS was still in draft format and awaiting comment from the Government Office for the South East (GOSE). The guidance states that the most recent and relevant version of the LDS should be considered. 8.4 This LDS is available to view or download from the Council s website ( > Local Development Scheme). 6

8 Table 1: Progress of the LDS Document Key Stage Date scheduled in LDS Date Achieved Commentary Development Plan Documents Statement of Community Involvement The SCI was adopted in February Submission to Secretary of State Oct 2007 n/a In liaison with GOSE, a decision was made (Executive, 4 October 2007) to delay submission of the Core Strategy, to amend the Local Development Scheme accordingly and to undertake a second Regulation 26 Preferred Options stage in the light of new evidence. Core Strategy Publish details of Examination Nov/Dec 2007 n/a See above Pre Examination meeting Jan 2008 n/a See above 7

9 Slyfield Area Regeneration Project Early Stakeholder & Community Engagement Dec 2005 August 2008 Dec 2005 August 2008 Background information has been gathered and studies are either completed or currently underway. These include an ecological assessment, visual and landscape impact study, an initial flood risk assessment and a detailed transport study. Work will continue on further studies over the next year to inform the feasibility of redeveloping the site. If it is shown that development is viable all the partners are committed in taking the project forward. As Government guidance on the new LDF process has emerged, it has become apparent that an Area Action Plan is no longer a practical process to follow for the delivery of this project because it can only be advanced when the authority has in place an adopted Core Strategy. This implies a delay, in conflict with the timescales needed to progress the project. An SPD will therefore be produced conforming with policies in the existing Development Plan (the Local Plan 2003 and Surrey Waste Plan 2008). SEA & SA, Hab Reg Asst, flood risk asst seq test Jan-Aug 2008 Flood risk assessment was commenced in accordance with the milestone. Other aspects (SA, SEA, HRA, EIA, finalisation of FRA including sequential test) will follow further work as described above. 8

10 Town Centre Area Action Plan Amendments (following 2006 Preferred Options) Sept 2006 Dec 2007 n/a Work on the Town Centre Area Action Plan has, in accordance with the advice of the Planning Inspectorate, been held back to run behind the timetable of the Core Strategy. The revised LDS will reflect this amendment. Final draft to Committee Jan 2008 n/a See above SEA & SA, Hab Reg Asst, flood risk asst seq test Jan 07 Sept 07 Jan 07 Sept 07 This Site Allocations milestone was met. Site Allocations Consultation on issues and options Nov 07 Jan 08 Nov 07 Jan 08 This Site Allocations milestone was met. This is the first round consultation, it is envisaged that a further similar level consultation will be necessary in the future to consult on those additional sites suggested to us during the first consultation. SEA & SA, Hab Reg Asst, flood risk asst seq test Jan 08 Sept 08 See comment Assessment of sites is now underway as part of preparation of the Strategic Housing Land Availability Assessment (SHLAA). This work will be completed and the Core Strategy taken forward to an advanced stage before the next round of Site Allocations is pursued. The revised LDS will reflect this amendment. 9

11 Supplementary Planning Documents SA/SEA, Hab Reg Asst, flood risk asst seq test May June 2007 May June 2007 This LDS milestone was met. First draft SPD presented to Committee Sept 2007 Sept 2007 This LDS milestone was met. Woodbridge Meadows Public consultation (4 weeks) Oct-Nov 2007 Oct-Nov 2007 This LDS milestone was met. The draft SPD was available for public consultation from 17 October 2007 to 28 November 2007 (6 weeks). Amendments Nov Dec 2007 Nov Dec 2007 This LDS milestone was met. 10

12 Adoption Feb 2008 Feb 2008 This LDS milestone was met. Adoption agreed on 28 February 2008 by the Council s Executive Committee. Woodbridge Meadows Publication March 2008 March 2008 This LDS milestone was met. Adopted SPDs Woodbridge Meadows Date for adoption February 2008 February 2008 See above. The Woodbridge Meadows SPD was adopted in February The document is available to download from the Council s website or to buy from the Planning Reception at the Council offices, Millmead. Sustainable Development & Construction Date for adoption Dec 2005 Dec 2005 The Sustainable Development & Construction SPD was adopted in Dec 2005 and is currently being used to inform the determination of planning applications. The document is available to download from the Council s website or to buy from the Planning Reception at the Council offices, Millmead. Infrastructure Date for adoption Sept 2006 Sept 2006 The Infrastructure SPD was adopted in September The document is available to download from the Council s website or to buy from the Planning Reception at the Council offices, Millmead. 11

13 Vehicle Parking Standards Date for adoption Sept 2006 Sept 2006 The Vehicle Parking Standards SPD was adopted in September The document is available to download from the Council s website or to buy from the Planning Reception at the Council offices, Millmead. 8.5 Table 1 shows that good progress is being made with the preparation of the Guildford Development Framework, with consultations periods meeting the target dates and the adoption of four SPD s; one within this monitoring period. 8.6 The LDS is presently being updated, in consultation with GOSE to update it to reflect revised national planning policy guidance on preparing Local Development Frameworks (set out in PPS12) and other factors. The AMR 2008/09 will monitor progress against this revised LDS. 12

14 9.0 BUSINESS DEVELOPMENT & TOWN CENTRES 9.1 Contextual Indicators Source: all NOMIS Official Labour Market Statistics unless otherwise stated Population of Guildford Borough: 134,400 (2007) All economically active people (age 16-74): 78,100 (87.5%) (Jan 2007 Dec 2007) 92.5% of the male population age in Guildford are economically active 82% of the female population age in Guildford are economically active Of the 12.5% who are economically inactive, 8.9% are not seeking employment. Average Earnings (2007) Full time worker: Guildford - 28,215 (South East - 25,979, Great Britain - 23,868) Male full time worker: Guildford - 33,394 (South East - 29,042, Great Britain - 26,036) Female full time worker: Guildford - 23,072 (South East - 21,923, Great Britain - 20,529) Fig. 1 Unemployment rate (% shows number of Job Seekers Allowance claimants as a proportion of resident workingage people) (September 2008) Guildford: 1.0% South East: 1.6% United Kingdom: 2.5% % unemployed Sept Guildford Borough Guildford South East UK Qualifications NVQ4 and above (Jan 2007 Dec 2007) Guildford: 39.9% South East: 30.8% Great Britain: 28.6% Employment by occupation in Guildford Borough (Jan 2007 Dec 2007) Professionals, managers, senior officials: 58.2% Administration & skilled trade occupations: 19.1% Personal service & sales: 13.3 % VAT registered businesses (2006) in Guildford Borough Registrations: 555 (9.3%) Deregistrations: 450 (7.5%) Stock (at the end of the year): 5,975 Employment floor space (Source: Valuation Office 2007) Total employment floor space in Guildford Borough 759,000 sq m (B1, B2 & B8 use classes) Total vacant employment floor space (Source: Valuation Office 2007) There is a vacancy rate of 9% in Guildford Borough *The contextual indicators listed are the latest figures available. 13

15 9.2 MONITORING OF CORE OUTPUT INDICATORS 9.3 Core Output Indicator BD1: Total amount of additional employment floor space by type Local Plan Objective: To maintain the current supply of employment land. Policy: Local Plan Policy E4 Restraint on Business, Industrial and Warehousing Employment Development. Performance: Table 2: Employment floorspace completed 2007/08 Land use Floorspace (square metres) completed 07/08 B B B Total Commentary: There has been extensive quality checking of the recording of completions on the monitoring database in the last six months. It is possible that some of these completions may have been completed prior to 2007/08. The quality checking has involved site visits to ensure the data is up to date and accurate. The results show that employment floorspace continues to be provided in the borough, supporting the local economy. 9.4 Core Output Indicator BD2: Total amount of employment floor space on previously developed land by type Local Plan Objective: To support the redevelopment of existing employment premises and land for employment uses. Target: Surrey Structure Plan 2004; 80% of employment development will be provided on land previously used for employment purposes. Policy: Local Plan Policy E2 Redevelopment of Existing Business, Industrial and Warehousing Land in Urban Areas and Within Identified Settlements in the Green Belt Performance: Of the 27,872 sq m of employment floorspace completed in the borough, only 38 sq metres have been on greenfield land. This is 0.1% of the total employment floorspace completed in 2007/08. Commentary: The employment floorspace completed on greenfield land is from the conversion of barns in the Green Belt outside of the Settlement Boundary. Planning Policy Statement 3: Housing defines barns as greenfield land (the definition of previously developed land excludes land that is or has been occupied by agricultural buildings p.26). 14

16 The Surrey Structure Plan target has been exceeded and the Local Plan objective met. 9.5 Core Output Indicator BD3: Employment land available by type Local Plan Objective: Maintain the current supply of employment land. Target: None identified Policy: Policy E3 (Safeguarding Existing and Allocated Business, Industrial and Warehousing Land) Performance: Table 3: Employment land supply by type Floor space 2003 (sq m) Floor space 2004 (sq m) Floor space 2005 (sq m) Floor space 2006 (sq m) Floor space 2007 (sq m) % Change ( ) Offices (B1) 305, , , , ,000 5% General 197,000 Industrial (B2) 200, , , , % Warehouses 181,000 (B8) 189, , , , % Retail 296, , , , , % Total 979, , , ,000 1,016,000 2% Source: Valuation Office 2007 Commentary: There is a total of 1,016,000 sq m of commercial floor space in the borough (including retail). There is a total of 759,000 sq m of employment floorspace (excluding retail). There has been a general increase in employment floor space in Guildford Borough over the last 5 years with warehousing experiencing the greatest increase (32% from 2003 to 2007) and a modest increase in B1 office floor space. There has however been an overall slight decrease in the amount of retail floorspace and no overall change in the amount of B2 floorspace. 9.6 Core Output Indicator BD4: Total amount of floor space for town centre uses Local Plan Objective: Maintain the current supply of employment land. Target: Surrey Structure Plan 2004; at least 80% of additional commercial development each year will be located within town centres or at other sites within the urban areas, which have good access. Policy: Policy E3 (Safeguarding Existing and Allocated Business, Industrial and Warehousing Land) 15

17 Performance: Table 4: Employment floorspace completed in Guildford Town Centre 2007/08 Land use Floorspace (square metres) completed in Guildford Town Centre in 07/08 B1 211 B2 0 B8 0 Total 211 Commentary: The majority of the employment floorspace has been provided outside of the Town Centre (as defined by the Guildford Local Plan 2003). Although a large site (over 1000sq m) was completed in the Town Centre in 2007/08, there have been many smaller losses of B1 floorspace, to reduce the overall provision (for example, 05/P/01072 change of use from B1 to D2 fitness centre, 1 Ward Street, Guildford). The Surrey Structure Plan (2004) target has therefore not been met. It is proposed that the Core Strategy will introduce a policy to safeguard key strategic employment sites, which will include all those in the Town Centre. 9.7 MONITORING OF LOCAL PLAN OBJECTIVES 9.8 Objective (1) promoting employment development on existing allocated sites. Objective (2) Resisting the loss of existing employment premises and land for employment uses. 9.9 Objective (3) Support the redevelopment of existing employment premises and land for employment uses Introduction: The maintenance and renewal of Guildford s economy will depend largely on the redevelopment of existing employment land and premises in the urban areas and village settlements. Policies: E2 Redevelopment of Existing Business, Industrial and Warehousing Land in Urban Areas and within Identified Settlements in the Green Belt. Indicator: 3a) Number of approvals for employment redevelopment in the borough. Performance There have been six planning applications approved for the redevelopment of an employment use in 2007/08. 16

18 Commentary: The majority of planning applications approved have been for a change of use to or from employment uses, rather than redevelopment within employment use classifications Objective (4) Support the diversification of the rural economy Introduction: In response to the changing circumstances facing agriculture, farmers are increasingly diversifying into other activities to supplement their incomes. Policies: Local Plan Policy RE8 Farm Diversification (Including Farm Shops) Local Plan Policy RE9 Re-use and Adaptation of Rural Buildings to Employment, Community or Recreational Use Indicator: 4a) Approvals in rural areas that involve the diversification of the rural economy. Target: To support the rural economy. Performance Table 5: Approvals for farm diversification Reference Address Ward Former Use New Use The Homestead 03/P/02347 Farm / Mixed use Wanborough The Pilgrims Agriculture agriculture and Business Centre, office / storage West Flexford Lane, Wanborough 07/P/00091 Suffield Farm, Suffield Lane, Puttenham The Pilgrims Farm buildings B1 and B1(c ) 07/P/00261 Sandy Farm, Sands Road, Farnham The Pilgrims Potato barn Office and storage 07/p/01965 Springfield Place, Bailes Lane, Normandy Normandy Barn Office The Local Plan 2003 includes policies that address this issue and offer guidelines for those farmers wishing to diversify. A planning guide was produced in 2005/2006 to offer further support for farmers wishing to diversify. The Council is therefore meeting this objective and actively supporting farmers who wish to diversify. The planning guide is available to download free from the Guildford Borough Council website ( > planning and building control > publications). 17

19 9.11 Objective (5) Encourage the provision of premises suitable for small firms Introduction: The Borough Council recognises the importance of small business units to Guildford s economy. The Borough Council will encourage the provision of small units when large sites are redeveloped. Policies: Objective to achieve adequate provision for the retailing needs of all sectors of the borough s community. Paragraphs of the Local Plan refer to the importance of small business units and the Borough Council s objective. Indicator: 5a) Number of applications for small units Performance: No small employment units have been approved in 2007/08. Commentary: A conversion of 2 units to 7 live/work units has however been approved (Titan Sheds, Blacksmith Lane, Chilworth - 06/P/01595). These may be suitable for use by smaller firms. The Local Plan objective is not being met, however, the absence of policy to support the objective makes it difficult to achieve Objective (6) Encouraging redevelopment of inappropriately located premises Introduction: The Borough Council recognises that there are some business, industrial and warehousing premises which are inappropriately located in terms of adverse environmental effects. Where the Borough Council considers that the existing use is inappropriate to the location, and where suitable alternative accommodation could be made available for any displaced firms, it will encourage the redevelopment of such sites. Policies: Local Plan Policy E3 Safeguarding existing and allocated business, industrial and warehousing land Indicator: 6a) Evidence Base Performance: An Employment Land Review is currently considering employment land /sites in Guildford Borough, and assessing if any could be released for a change to an alternative use. Commentary: The Council is actively assessing employment land /sites in the borough and is in the process of identifying land/sites to be protected for employment use only. Other sites will be considered for mixed use schemes or released for an alternative suitable use. The draft Core Strategy document proposes a list of strategic employment sites which should be safeguarded. 18

20 10.0 HOUSING 10.1 Contextual Indicators Housing Stock in Guildford Borough (comparative figure Surrey) (Source: 2001 Census) Housing Stock: 53,573 Percentage of detached dwellings: 35% (34%) Percentage of semi-detached dwellings: 33% (33%) Percentage of terraced housing: 14% (16%) Percentage of flats/maisonettes: 18% (19%) Number of vacant dwellings: 1,081 (10,660) The quality of the housing stock is generally good but there are some houses in poor condition (Source: Guildford Borough Local Plan 2003) Housing Tenure and Housing Stock (comparative figure Surrey) (Source: 2001 Census) Percentage of owner occupied households (owned outright): 32% (34%) Percentage of owner occupied households (owns with a mortgage or loan): 41% (43%) Percentage of owner occupied households (shared ownership): 1% (1%) Percentage of households rented from the Council: 10% (7%) Percentage of households in Housing Association/Registered Social Landlords properties: 3% (5%) Percentage of households in private rented or letting agency accommodation: 9% (8%) Household Size (no. of rooms) (comparative figure Surrey) (Source: 2001 Census) Average no. of rooms per household: 5.75 (5.82) Household Composition (comparative figure Surrey) (Source: 2001 Census) Average household size: 2.37 people Number of households: 52,350 One person, pensioner: 14% (14%) One person, other: 15% (14%) One family and no others, all pensioners: 9% (10%) One family and no others, married couple, no children: 14% (14%) One family and no others, married couple, with dependent children: 19% (20%) One family and no others, married couple, all children non-dependent: 6% (6%) One family and no others, cohabiting couple, no children: 6% (5%) One family and no others, cohabiting couple, with dependent children: 2% (3%) One family and no others, cohabiting couple with non dependent children: 0.3% (0.3%) One family and no others, lone parent with dependent children: 4% (4%) One family and no others, lone parent, all children non-dependent: 3% (3%) Other households with dependent children: 2% (2%) Other households: students, pensioners and other: 6% (4%) The housing stock in Guildford Borough has more detached houses than other property types, with the majority of houses being owner occupied. *The contextual indicators listed are the latest figures available. 19

21 House Prices (Source: Figure 2: Average Property Selling Prices in Guildford ( 000's) Apr 2000 Aug 2008 Change Detached 304, , % Semi 154, , % Terraced 138, , % Flat 104, , % All 178, , % Aug 2007 August 2008 Change Detached 651, ,182-32% Semi 327, ,300-13% Terraced 256, , % Flat 200, , % All 359, ,210-11% Number of Properties Sold in Guildford April 2000 July 2008 Change Detached % Semi % Terraced % Flat % Aug 2007 July 2008 Change Detached % Semi % Terraced % Flat % 20

22 Summary of Properties for Sale in Guildford (October 2008) Total properties for sale in Guildford: 1,043 Average price of properties for sale in Guildford: 400,553 Median price: 299,000 Average Time on Market: 109 days Properties for Sale in Guildford by Price (October 2008) No. of properties Average time on market under 100, days 100,000 to 200, days 200,000 to 300, days 300,000 to 400, days 400,000 to 500, days 500,000 to 1,000, days over 1,000, days Source: BBC website: Halifax 4 September Between July 2008 and August 2008, the cost of the average home in the UK dropped by 1.8% to 174,178. Between August 2007 and August 2008, the cost of the average home in the UK dropped by 10.9%, which is the first double digit drop since

23 10.2 MONITORING OF CORE OUTPUT INDICATORS 10.3 Core Output Indicator H1: Plan period and housing targets Purpose: To show the planned housing period and provision. Target: H1(a): 1/4/2001 to 31/03/2016, 4750 dwellings, Surrey Structure Plan (2004) H1(b): 1/4/2006 to 31/03/2026, 8440 dwellings, draft South East Plan (proposed changes: July 2008) H1(a) = 317 net additional units per annum H1(b) = 422 net additional units per annum Comment: The Surrey Structure Plan will be replaced by the South East Plan when it is adopted (estimated to be autumn/winter 2008). Policy H1 of the draft South East Plan originally proposed Guildford be allocated a target of 322 dwellings a year. The Examination in Public recommended an increase to this figure to 422. The Secretary of State published Proposed Changes to the draft South East Plan in July The proposed changes followed the Panel s recommendations for Guildford Borough s proposed figure. The target for housing completions in Guildford is proposed at 422 a year until 2026 which is a total of 8,440 dwellings. However, until the South East Plan is adopted, the latest confirmed housing targets remain those from the Surrey Structure Plan (2004). Guildford Borough Council is preparing a Strategic Housing Land Availability Assessment (SHLAA) as part of the Guildford Development Framework (GDF) Evidence Base to identify suitable, deliverable sites for housing development for the next 15 years. Until the SHLAA is completed, housing figures included in this AMR are based on monitoring data and the Interim Guildford Housing Land Assessment (June 2008, updated August 2008), which sets out the Council s 5 year housing land availability ( > Evidence Base > SHLAA). It remains the ambition of the Council to meet the housing targets in the Urban Areas and Identified Village Settlements of the borough, as set out in the draft Core Strategy spatial strategy. The SHLAA will provide the evidence to show whether this is achievable, informing the Core Strategy publication version Core Output Indicator H2(a): Net additional dwellings in previous years Purpose: To show recent levels of housing delivery Targets: See Core Output Indicator H1 Policy: Surrey Structure Plan Policy LO6 Housing Provision Draft South East Plan Policy H1 Housing Provision 22

24 Performance: Table 6: Net housing completions by year Year Net completions 2001/ / / / / / Commentary: Table 6 shows housing delivery since the start of the plan period (Surrey Structure Plan 2004). Excluding the reporting year (2007/08), an average of 345 units a year have been completed since the start of the plan period. This average is in excess of the requirement of the Surrey Structure Plan 2004 (317) but not that of the draft South East Plan (422). However, the base date of the South East Plan is 1 April It is worth noting that there has been a visible increase in completions in Guildford Borough in the last two years (2005/06 & 2006/07), where the number of completions has been in excess of or very close to the annual target of the draft South East Plan (422). Core Output Indicator H2(b): Net additional dwellings for the reporting year Purpose: To show levels of housing delivery for the reporting year. Target: See Core Output Indicator H1 Policy: Surrey Structure Plan Policy LO6 Housing Provision Draft South East Plan Policy H1 Housing Provision Performance: 636 dwellings have been completed in Guildford Borough during this reporting year (2007/2008). Commentary: This is in excess of the annual Surrey Structure Plan (2004) and draft South East Plan target. The average completions (including the reporting year) since 2001 (the start of the Surrey Structure Plan 2004 period) is 386 dwellings per year. This average is in excess of the requirements of the Surrey Structure Plan (2004). The average completions (including the reporting year) since 2006 (the start of the draft South East Plan period) is 529 dwellings per year. This average is in excess of the requirements of the draft South East Plan. However, it cannot be presumed that a similar amount of completions will be recorded next year, as extensive quality checking of monitoring systems has taken place this reporting year to ensure all historic completions have been accounted for. Extensive sites visits have taken place of all sites recorded with outstanding units (units that have permission to be built but have yet to 23

25 be completed), to check the status of progress on site. It is important that all completions since the start of the plan period have been accounted for. Historic data collection methods cannot always be guaranteed, and thorough quality checking has been required. Site visits have provided updated information on a number of sites with planning permission (approved since the year 2000). If a site visit concluded that a site is completed, then the completions data has been mainly counted in the year 2007/08, although it feasibly may have been completed prior to this date. In the same way, completions that may have been accounted for in the next reporting year, may have been included in the figure reported for 2007/08. Therefore, the most accurate account of completions for this reporting year and the next forthcoming year will be an average of the two years. In conclusion, although the amount of completions reported this year is higher than expected, it is vital, as greater importance is placed on monitoring and accurate data is needed to feed into the SHLAA, that all completions are accounted for. A system of monitoring has been put into place to ensure that site visits are carried out every quarter to maintain up to date accurate monitoring of completions. It is not yet clear from the draft South East Plan or Monitoring Information published by Communities and Local Government (CLG), whether excess completions can be rolled over to the following year. However in the absence of conclusive commentary on this in the South East Plan, it can only be assumed that all completions can be counted, therefore the housing trajectory counts completions cumulatively, including any surplus to the target Core Output Indicator H2(c): Net additional dwellings in future years Purpose: To show likely future levels of housing delivery. Target: See Core Output Indicator H1 Policy: Surrey Structure Plan Policy LO6 Housing Provision Draft South East Plan Policy H1 Housing Provision Performance: See Annex A for the full housing trajectory. Annex A shows three different scenarios as there are many possible accounting methods in this current year of overlap between the current Structure Plan and the Regional Spatial Strategy (the South East Plan). Future projected housing completions Current monitoring year (2008/09) 34 actual units completed so far (April 08 August 08). Current outstanding capacity 1857 (97% implementation rate used for units not yet commenced results in an outstanding capacity of 1812 see Annex B for calculations and further detail). Future development sites listed in the 5 year housing plan = 418 units Future development sites likely to be completed in 6-10 years (as listed in the 5 year housing plan) =

26 This equates to hectares of land (not taking into account the 97% implementation rate). In accordance with PPS3: Housing there can be no allowance for windfall in the projection calculations. Commentary: Housing trajectories attempt to illustrate the number of housing units completed in the past, present and future, in comparison to current housing targets. At present, however, there are many variables and unknowns in this equation that bring forward the possibility for different accounting methods and thus outcomes. Past and present completions have been discussed in Core Output Indicator H2(a,b). Future housing completion projections include the outstanding capacity (with the use of an estimated implementation rate where appropriate see Annex B for more detail). It is recognised that the implementation rate is calculated using historic trends, which in the current economic climate, may no longer be accurate. There is no alternative method of calculation as it can take months for changes in the market to impact on the monitoring figures (sites approved have 3 years for work to start before the planning permission expires). It is possible that an impact on completions may be seen in the next 12 months as development on sites with planning permission is stalled to wait for more favourable economic conditions. Future housing completion projections also include sites from the Interim Guildford Housing Land Assessment (IGHLA updated August 2008). These are sites which are believed will come forward in the next 1-5 years and 6-10 years. Although based on evidence, the availability and developability of these sites has not been assessed by a Strategic Housing Land Availability Assessment (SHLAA). All sites with outstanding planning permission and all those listed in the IGHLA will, along with many others (including all those listed in the Site Allocations Issues and Options consultation), be assessed as part of the SHLAA. This will determine whether the sites are valid to be included in future housing trajectories. Without a completed SHLAA, accurately estimating future housing completions is less certain. Even with a SHLAA, there remains an element of uncertainty, as sites may be deliverable and developable, but just not come forward due to a slow down in the market, or any other reason. It is important to note that a SHLAA is an assessment of the likelihood of the site being developed, not certainty. It is not clear how the results of the SHLAA will be incorporated into a housing trajectory. For instance, the outstanding capacity is factual; the number of outstanding units with planning permission. In theory, all outstanding units could possibly be built. However, the SHLAA may determine that some of those units are not deliverable, due to changes in circumstances for example. This would introduce data ranges into the housing trajectory. The results of the SHLAA could alter the timeframes of the sites listed in the IGHLA. The SHLAA should however identify additional sites to those listed in the IGHLA for future years. The SHLAA will be updated regularly to take into account any changes in deliverability and developability. 25

27 The different scenarios in Annex A are caused by uncertainty in how the known housing targets are used in the housing trajectory and how excess completions are counted. The targets are discussed COI H1. Scenario A shows that the target set out in the Surrey Structure Plan (2004) 4750 dwellings in 15 years from 2001 to is achievable. Scenario B uses the housing target from the Surrey Structure Plan and the draft South East Plan as, when adopted, the South East Plan figures will replace the Structure Plan figures with a base date of Scenario C uses the draft South East Plan figures, starting from 2006 (therefore excluding any completions prior to this date) based on the assumption that the 8,440 units required will be provided equally over the plan period (422 a year). The key determinant in analysing housing trajectories is whether excess completions (those in excess of the target), can be carried over to contribute towards future total completion returns. This has previously been the assumption in housing trajectories published in recent AMR s. It is not however clarified in the recently published update to the COI s, or in the draft South East Plan. The target of 422 is described as a minimum rather than a maximum (policy H1 of draft SE Plan), however, in the absence of clarification, it is assumed that completions can be carried over (i.e. assume that the requirement is to meet the total completions at the end of the plan period 8,440, rather than meet the average target each year - 422). Summary In the absence of a SHLAA, the various housing trajectories are encouraging, with the expectation that a 5 year supply to meet all possible targets is possible if excess units can be carried forward. Further clarification of projected housing figures can be provided when the SHLAA is finalised (anticipated to be summer 2009) and the South East Plan adopted (autumn/winter 2008) Core Output Indicator H2(d): Managed delivery target Purpose: To show how likely levels of future housing are expected to come forward taking into account the previous years performance. Target: See Core Output Indicator H1 Policy: Surrey Structure Plan Policy LO6 Housing Provision Draft South East Plan Policy H1 Housing Provision Performance: See Annex A. Commentary: See COI H2 (c). This COI suggests excess units can be carried over, although this remains unconfirmed. 26

28 10.7 Core Output Indicator H3: New and converted dwellings on previously developed land Purpose: To show the number of gross new dwellings being built upon Previously Developed Land (PDL). Local Plan Objective: To promote sites for residential development primarily within the urban areas and which are already built upon or which are underused, including encouraging the conversion of existing buildings. Target: Surrey Structure Plan % of new housing development will be provided on Previously Developed Land in urban areas. PPS3 by 2008, at least 60% of additional housing should be provided on Previously Developed Land. Policy: Local Plan Policy H4 Housing in Urban Areas Local Plan Policy H12 Affordable Housing for Local Needs Performance: 98% of completions (gross) in 2007/08 were on Previously Developed Land. The 2% of housing completions on greenfield land were primarily barn conversions. Commentary: The Council is achieving a standard significantly higher than the Government s target and the County target. Development on greenfield land in the borough is low, mainly the conversion of barns (agricultural buildings do not count as Previously Developed Land Planning Policy Statement 3: Housing). 98% of completions on Previously Developed Land is, in comparison to the targets, a significant achievement Core Output Indicator H4: Net additional pitches (Gypsy and Traveller) Purpose: To show the number of Gypsy and Traveller pitches delivered. Local Plan Objective: To maintain and provide for a range of house sizes and types, including housing for people who cannot afford to occupy property generally available on the open market. Target: SEERA s first partial review of the South East Plan (Somewhere to Live: Planning for Gypsies, Travellers and Travelling Showpeople in the South East September 2008) proposes provision of 19 pitches in Guildford Borough. Policy: Local Plan Policy H13 Gypsy Caravan Sites Local Plan Policy H14 Sites for Travelling Show People Performance: No public permanent pitches were made available in 2007/08 as there are no vacancies on any Council owned sites. Sites for further pitches are being considered through the Site Allocations DPD. The Council is actively assessing potential new Gypsy and Traveller sites in Guildford Borough. Some possible sites were subject to public consultation as part of the Site 27

29 Allocations Issues and Options consultation (November 2007 January 2008). Commentary: In 2006, Guildford Borough, along with two other neighbouring Local Authorities, completed a Gypsy and Traveller Accommodation Assessment (GTAA). The GTAA will inform the allocation of additional Gypsy and Traveller pitches to each area by SEERA, through the South East Plan Partial Review. The allocations will be made through the Site Allocations DPD, and prior to that, initially tested for suitability through the Strategic Housing Land Availability Assessment (SHLAA) Core Output Indicator H5: Gross affordable housing completions Local Plan Objective: To maintain and provide for a range of house sizes and types, including housing for people who cannot afford to occupy property generally available on the open market. Target: The Local Plan assesses that approximately 400 affordable homes can be provided between 1 October 1998 and 31 March 2006 (80 per year). The Council's Key Delivery Target ( ) is to ensure that 400 new affordable homes are built in the borough by The Infrastructure SPD indicates that at least 35% of new dwellings on sites above qualifying thresholds will be affordable. The qualifying thresholds are; urban areas - 15 or more dwellings or residential sites of 0.5ha or more, settlements in rural areas where there is a population of 3000 or fewer 10 or more dwellings or residential sites of 0.4ha or more. The Surrey Structure Plan (2004), target 10 states that by 2016, an aspirational target of 40% of new housing completed will be affordable housing. Policy: Local Plan Policy H11 Affordable Housing Infrastructure SPD (2006) Performance: 55 affordable units were completed in 2007/08. Of these 55 units, 16 are shared ownership affordable units, and 39 are social rented affordable units. Commentary: The 55 units completed will contribute towards the Council s Key Delivery Target of completing 400 affordable homes by Core Output Indicator H6: Housing Quality Building for Life Assessments Purpose: To show the level of quality in new housing development. Local Plan Objective: There is no specific relevant policy in the Local Plan, however, the General Policies do cover many issues related to ensuring that new development is of a high standard. Target: There is no specific target relating to this indicator. Performance: This information is not currently monitored. 28

30 Commentary: Research is needed to ascertain how this can be monitored in the future MONITORING OF LOCAL PLAN OBJECTIVES Objective (1) To retain the existing stock of dwellings. Introduction: The Guildford Borough Local Plan seeks to maintain the existing housing stock. Policies: Local Plan Policy H5 Retention of Existing Housing Stock Indicator: 1a) Net loss of residential accommodation on approvals in 2007/2008. Table 7: Net loss of residential units Approvals in Net loss of residential units -2 Number of sites 2 Performance: Two permissions were granted for a net loss of residential units in 2007/08. These involved the demolition of 2 dwellings and replacement with 1 dwelling (in the Green Belt, outside of the settlement boundary, with the overall footprint reduced by 10%), and change of use of a managers flat to an ancillary use associated with a public house Commentary: Of all the planning applications approved in 2007/08, there have only been two that have contravened this objective. Therefore, all other applications have met the objective of retaining Guildford Borough s existing stock of dwellings. Objective (2) To make provision for 3,800 additional dwellings between 1991 and 2006 as set out in Surrey Structure Plan Introduction: The 1994 Surrey Structure Plan has now been superseded by the adopted 2004 Surrey Structure Plan. Commentary: As reported in the 2005/06 AMR, Guildford Borough Council has met the earlier Surrey Structure Plan (1994) housing requirement up to The housing trajectory (Annex A) reflects the position in relation to the Surrey Structure Plan 2004 allocation of 4,750 dwellings up to 2016 and the draft South East Plan allocation of 8,440 dwellings up to

31 Objective (3) To ensure that established environmental policies are maintained and enhanced, including the resistance of inappropriate development in the Green Belt, protection of the countryside for its own sake and maintenance and improvement of the quality of the urban area. Introduction: Local Plan policies seek to protect the valued Green Belt in the borough and also aim to strike a balance between making full use of the urban area and protecting and enhancing its character. Policies: Local Plan Policy G1 General Standards of Development Local Plan Policy H4 Housing in Urban Areas Local Plan Policy H6 Replacement of Dwellings in the Countryside Indicators: 3a) Percentage of approvals in 2007/08 in the Green Belt 3b) Density of approvals in the urban area Performance: 3a) Table 8: Location of approvals Net Number of Units Approved % of Units Approved (net) 2006/ / / /08 Green Belt (in settlement % 9% boundary) Green Belt (outside % 7% settlement boundary) Countryside Beyond the 0 0 0% 0% Green Belt Guildford Urban Area % 81% Ash & Tongham Urban Area % 3% 3b) Table 9: Density of approvals 2005/ / /08 Average density of approvals in the Urban Area 73.5 dph 90.3 dph 45.1 dph Average density of approvals in the Guildford 78.4 dph 95.0 dph 47.3 dph Urban Area Average density of approvals in the Ash and 50.8 dph 49.4 dph 37.3 dph Tongham Urban Area Average density of approvals in the Green Belt 30.3 dph 20.4 dph 29.5 dph (in settlement boundary) Average density of approvals in the Green Belt 9.0 dph 9.0 dph 7.9 dph (outside settlement boundary) Average density of approvals in Countryside Beyond the Green Belt 3.71 dph NA NA Commentary: There has not been a significant change in the location of additional dwellings (net) between last year and this reporting year. Over 80% of additional units approved are in the Guildford Urban Area. Only a small proportion of additional units (3%) come from the Ash and Tongham Urban Area. 30

32 There has, however, been a change in the density of approvals since 2006/07. The average density of approvals in urban areas and the Guildford Urban Area has halved. This may be a reflection of the market and local needs, as more planning permissions have been granted this year for applications solely for housing units, than applications solely for flats. Excluding planning permission for a mix of types of housing on site, the following table helps to explain the decrease in densities. Table 10: Type of Approvals 2007/08 (excluding mix of dwellings) % of schemes granted planning permission (07/08) (excluding mix of uses) Bungalow Flat House Total Ash & Tongham Urban Area 2% 0% 3% 5% Green Belt in settlement boundary 2% 3% 20% 24% Green Belt outside settlement boundary 0% 2% 23% 24% Guildford Urban Area 1% 17% 28% 46% Total 4% 22% 74% 100% As can be seen, 74% of schemes granted planning permission were for housing schemes. Although the number of flats granted planning permission is higher than the number of housing units granted planning permission in this reporting year, the greater number of schemes for houses (consisting of many replacement dwellings, even in the urban areas), reduces the densities, as these housing schemes are usually at a much lower density than flatted schemes. This reporting year, in Guildford Urban Area, over 30 developments were granted planning permission for a density lower than 30dph (compared to just over 10 developments last year), and under 10 sites were granted planning permission for a density higher than 100dph this reporting year (compared to 14 last year). This has impacted on the density figures for this year. The Strategic Housing Market Assessment carried out as evidence base to the Guildford Development Framework is showing a need for more family housing in the borough. If flats are no longer as profitable as previously, encouraging developers to pursue housing development (where prices have still increased p.18) rather than flatted development, then densities are likely to be lower, as seen this reporting year. Planning Policy Statement 3: Housing advises that local authorities should encourage densities above a national indicative minimum of 30 dwellings per hectare to avoid the inefficient use of land and seek greater intensity of development at places with good public transport accessibility. This, however, needs to be balanced against the need to protect the character of areas and market demand. 33% of all planning permissions for new dwellings in 2007/08 were for replacement dwellings. Over half of these (54%) were in the Green Belt outside of the Settlement Boundary, but 20% of these replacement dwellings were in the Guildford Urban Area. Alongside the emphasis on the protection of the character of the area, lower densities of approvals may also be a reflection of a change in the market. 31

33 10.14 Objective (4) To promote sites for residential development primarily within the urban areas and which are already built upon or which are under-used, including encouraging the conversion of existing buildings. Introduction: In order to minimise the development of greenfield sites, Planning Policy Statement 3; Housing states that at least 60% of additional housing should be provided on Previously Developed Land and through conversions of existing buildings. Policies: Local Plan Policy H4 Housing in Urban Areas Local Plan Policy H7 Conversions Indicators: 4a) Percentage of approvals in 2007/08 in the urban area 4b) Percentage of units approved on Previously Developed Land 4c) Net number of units approved for conversions in 2007/08. Performance: 4a) See Table 10. 4b) 99% of gross units approved in 2007/08 were on Previously Developed Land. Guildford Borough is achieving a percentage significantly higher than the national guidance target. 4c) 6 units (net) were approved in 2007/08 from the conversion of larger residential units. Commentary: Considerable use is being made of Previously Developed Land in the borough Objective (5) To maintain and provide for a range of house sizes and types, including housing for people who cannot afford to occupy property generally available on the open market. Introduction: Despite the general fall in average household size, a range of housing needs to be maintained in the borough. The high price of housing in Guildford means that a significant proportion of the borough s residents cannot afford to buy their own dwellings. Securing affordable housing is one of the Council s Key Delivery Targets ( ). Policies: Local Plan Policy H11 Affordable Housing Local Plan Policy H12 Affordable Housing for Local Needs in Rural Areas 32

34 Indicators: 5a) The type of dwelling approved in 2007/08 5b) The size of dwelling approved (no. of bedrooms) in 2007/08 5c) The number of affordable units approved in recent years. Performance: 5a) Fig. 3 Type of Dwelling Approved in 2007/08 1% House 45% Flat 54% Bungalow Notably this is the first reporting year where there has not been a significant difference between the proportion of flats and houses approved. Last reporting year (2006/07), 31% of approved units were houses, and 68% were flats. 33

35 5b) Fig. 4 Dwellings Approved in 2007/08 by number of bedrooms 22% 14% 16% 27% 1 bed 2 bed 3 bed 4 bed+ unknown 21% Less 1 bed units have been approved this year than in previous years, with a greater proportion of 2 bed and 3 bed units being approved. When outline planning permission is granted, the specifications of the number of bedrooms are not always required, and are clarified in a reserved matters application at a later date. This accounts for those unknown. 5c) Fig. 5 Number of Affordable Units Approved Number of units / / / / / / / /2008 Year 34

36 Planning Reference Number 07/P/ /P/ /P/ /P/ /P/ /P/ /p/ /P/ /P/00493 Table 11: No. of affordable housing units approved * Approval of 184 affordable units at Queen Elizabeth Barracks Year No. of affordable units approved 2000/ / * 2002/ / / / / / Table 12: Sites where affordable housing units have been approved 2007/08 Total number of units Approval approved Date Address Ward (gross) 25-Feb Mar Feb Jan Aug Sep Jul Nov Jan- 08 Garage site at the back of 24 & 26 Chester Road, Ash Land between 23a-23b and 25 May Crescent, Ash Former DEFRA site, Epsom Road, Guildford, Surrey, GU1 Grove House, Guildford Road, Effingham, Leatherhead, KT24 5QA Bellerby Theatre and adjoining car park, North Place Day Centre and Haydon Place Community Centre, Haydon Place, Guildford, GU Station Road, Shalford, Guildford, GU4 8HB Oak Tree Drive, Guildford, GU1 Stoughton Grange Junior School, Grange Road, Guildford, GU2 9PZ Headway House, North Road, Guildford, GU2 9PU Affordable Units Ash 5 5 Ash 7 7 Christchurch Effingham 20 7 Friary & St Nicolas Shalford 16 6 Stoke Stoughton 24 8 Stoughton Note 70 affordable units have been approved at the DEFRA site (35% affordable housing), and 75 units on a 100% affordable housing site at the Bellerby Theatre, North Place Day Centre and Haydon Place Community Centre. 35

37 A total of 200 affordable units approved in 2007/08 is virtually a 100% increase from the previous year. Nearly half of the units approved (97 in total), are from sites providing 100% affordable housing. Commentary: This objective is being met, with a range of dwelling types being approved in the borough. This will be further emphasised through the completion of the Strategic Housing Market Assessment evidence and the Core Strategy, where the mix of dwellings proposed on larger sites will need to reflect the actual housing need (as shown in the Housing Needs Assessment; part of the Strategic Housing Market Assessment). 36

38 11.0 ENVIRONMENTAL QUALITY 11.1 Contextual Indicators Car Ownership (Source: ONS 2001) 75,757 cars registered to households in Guildford Borough (increase of 23.1% between 1991 & 2001) 7,750 households do not own a car (decrease of 23.3% between 1991 & 2001), however, the number of households that do not own a car is very low in comparison to the average for England. Each household in Guildford Borough owns on average 1.45 cars. This is an increase from 1.27 in Cycling (Source: GBC 2006) 70.9 km of cycle routes 160 cycle stands The total length of cycle routes, the number of cycle stands and the number of Green Transport Plans increases each year. Transport to work (Source: ONS 2001) Over half of year olds in employment travel to work by driving a car or a van (lower than the Surrey average and the South East, but higher than the average for England) Of all the boroughs in Surrey, significantly more people travel to work by foot in Guildford Borough (11.2%) than anywhere else. 31,753 workers commute into the Borough and 30,637 workers commute out of the Borough, with a total of 36,500 people living and working in Guildford. This is a change from the previous pattern, where more people used to commute out than into the Borough. Average travel to work time (minutes, ) (Local Knowledge) Guildford 23 Elmbridge 25 Mole Valley 21 Surrey Heath 21 Waverley 28 Woking - 23 *The contextual indicators listed are the latest figures available. 37

39 11.2 MONITORING OF CORE OUTPUT INDICATORS 11.3 Core Output Indicator E1: Number of planning permissions granted contrary to Environment Agency advice on flooding and water quality grounds Purpose: To show numbers of developments which are potentially located where i) they would be at risk of flooding or increase the risk of flooding elsewhere and ii) adversely affect water quality. Local Plan Objective: Avoid development that would increase the risk to people or property from flooding. Target: None identified. Policy: Local Plan Policy G1(6) Flood Protection Surrey Structure Plan Policy SE3 Performance: No applications have been approved contrary to the advice of the Environment Agency. Commentary: Three applications have been approved for residential development in Flood Zone 2, and five applications have been approved for residential development in Flood Zone 3. All applications given planning permission in Flood Zone 2 or 3 will have provided a Flood Risk Assessment as part of the planning application and meet the requirements of Planning Policy Statement 25: Development and Flood Risk (including showing that development will not increase the risk of flooding on site or elsewhere, and will be safe) Core Output Indicator E2: Change in areas of biodiversity importance Target: None identified. Policy: Surrey Structure Plan Policy SE6 Biodiversity Performance: Data is currently not available to respond to this Core Output Indicator, however, it is important to note that Guildford Borough Council continues to work intensively with Natural England (formerly known as English Nature) and other Local Authorities affected by the Thames Basin Heath Special Protection Areas (TBH SPA) (a habitat for endangered species of ground nesting birds) to ensure an appropriate balance continues between the protection of the birds and accommodating appropriate development. Commentary: At present, this information is not available to the Council. Advice is being sought from Surrey County Council and Natural England on how best to 38

40 obtain this information, however, the Council s commitment to protecting areas and populations of biodiversity importance is evident from its dedication to regular engagement with Natural England and other affected local authorities regarding the TBH SPA and the Interim Avoidance Strategy adopted by Guildford Borough Council in A review of the TBH SPA Interim Avoidance Strategy is planned to take place to take into account the South East Plan and Regional Development Framework, when both are in place Core Output Indicator E3: Renewable energy generation Rationale: To show the amount of renewable energy generation by installed capacity and type. Local Plan Objective: The overall aim of the Local Plan (2003) is to promote development that meets the needs of the present without compromising the ability of future generations to meet their own needs. Target: Surrey Structure Plan (2004) commercial and residential development should be designed such that a minimum of 10% of the energy requirement is provided by renewable resources. Policy: Local Plan Policy G1 (9) Energy Conservation Performance: At present this indicator cannot be measured. Commentary: Although exact results cannot be provided for this indicator, all on site renewable provision on proposed large scale development is discussed in detail with the Principal Climate Change officer before determination. This also includes significant involvement at pre application stage and will continue in the future on large sites, such as the redevelopment of Guildford College of Further and Higher Education (08/P/01708). Software will be purchased to assess the compliance of small scale development with planning policy requirements in relation to renewable energy provision. The software will record the information to enable monitoring of this indicator. 39

41 Annex A Housing Trajectory Scenarios Projections Outstanding capacity (units with planning permission that have not been completed) - see Annex B Sites identified in the 5 year housing plan as likely to be completed in the next 5 years Sites identified as likely to be completed in the next 6-10 years Completions recorded from April 2008 to August A: Surrey Structure Plan 1/4/2001 to 31/03/ provision of 4750 dwellings There is a presumption that roll over of excess completions is permitted 2001/ / / / / / / / / / / / / / /2016 H2a Completions Completions H2b (reporting year) 636 Completions recorded 34 Outstanding capacity year housing plan year housing supply Total completions c) Target H2d Cumulative difference H2c (projections) This shows that the target as set out in the Surrey Structure Plan (2004) has been met in 2007/08 and continued delivery at this level (317/yr) is achievable B: Surrey Structure Plan & draft South East Plan (Proposed Changes, July 2008) 1/4/2001 to 31/03/ provision of 4750 dwellings 1/4/2006 to 31/03/ provision of 8440 dwellings There is a presumption that roll over of excess completions is permitted 2001/ / / / / / / / / / / / / / / / / / / / / / / / /2026 H2a Completions Completions H2b (reporting year) 636 Completions recorded 34 Outstanding capacity year housing plan year housing supply Total completions c) Target Cumulative H2d difference H2c (projections) This shows that the combination of targets from the Surrey Structure Plan and draft SE Plan should be achievable for the next 5 years (excluding the reporting year) The SHLAA process and Site Allocations DPD will also identify sites for the 1-5 year period and 6-10 year period and potentially year period. C: draft South East Plan 1/4/2006 to 31/03/ provision of 8440 dwellings 2006/ / / / / / / / / / / / / / / / / / / /2026 H2a Completions 421 Completions H2b (reporting year) 636 Completions recorded 34 Outstanding capacity year housing plan year housing supply Total completions c) Target Cumulative H2d difference H2c (projections) If excess completions can be taken into account, this shows that the SE Plan housing target can be met for the next 5 years (to 2012/13). If excess completions cannot be carried over to the following year, the SE Plan target of 422 can be met until 2010/11 The SHLAA process and Site Allocations DPD will also identify sites for the 1-5 year period and 6-10 year period and potentially year period.

42 Annex B Total outstanding capacity (August 2008) Total outstanding capacity of which; 386 are on sites which have commenced (it is assumed that all of these will be built) 585 are on sites approved before 1st August 2005 and therefore have 5 years to start work before the planning permission expires 886 are on sites approved after 1st August 2005 and therefore have 3 years to start work before the planning permission expires Implementation rate Using data on the number of sites which have expired historically, it is calculated that 97% of units approved are built. The guidance published by CLG does not specify the need to include the implementation rate, however it was used in previous Housing Trajectories as part of the AMR. To give as accurate figures as possible, an implementation rate of 97% will be applied to those sites with planning permission that have not yet started. Year 1 Year 2 Year 3 Year 4 Year 5 Commencements (once started, there is no limit on the time to complete - realistically expected to happen within 5 years) Approvals with 5 years (97% implementation rate) - total = Approvals with 3 years (97% implementation rate) - total = Total Note: an implementation rate calculated using historic data cannot account for future fluctuations in the market. This is a trend based prediction that has not taken into account any market changes which may cause the completions of housing units to slow down or halt. 41

43 Guildford Borough Council Millmead House Guildford Surrey, GU2 4BB Planning Services telephone (01483)

Leeds City Region Statement of Common Ground. August 2018

Leeds City Region Statement of Common Ground. August 2018 Leeds City Region Statement of Common Ground August 2018 1.0 Introduction 1.1 The Leeds City Region partner councils have prepared this Statement of Common Ground in response to the requirement as set

More information

Proposed Strategic Housing and Employment Land Availability Assessment (SHELAA) Methodology 2018

Proposed Strategic Housing and Employment Land Availability Assessment (SHELAA) Methodology 2018 Proposed Strategic Housing and Employment Land Availability Assessment (SHELAA) Methodology 2018 1.1 This section of the report sets out the methodology to be used in preparing the three South Worcestershire

More information

shortfall of housing land compared to the Core Strategy requirement of 1000 dwellings per 1 Background

shortfall of housing land compared to the Core Strategy requirement of 1000 dwellings per 1 Background WIGAN CORE STRATEGY ADDITIONAL HEARING SESSION ADDRESSING SHORTFALL IN HOUSING SUPPLY- PROCEDURAL AND PRACTICAL IMPLICATIONS RESPONSE BY BARTON WILLMORE ON BEHALF OF PEEL HOLDINGS (LAND AND PROPERTY) LTD

More information

Rochford Core Strategy Schedule of Changes

Rochford Core Strategy Schedule of Changes Rochford Core Strategy Schedule of Changes The changes below are expressed either in the conventional form of strikethrough for deletions and underlining for additions of text, or by specifying the change

More information

Note on housing supply policies in draft London Plan Dec 2017 note by Duncan Bowie who agrees to it being published by Just Space

Note on housing supply policies in draft London Plan Dec 2017 note by Duncan Bowie who agrees to it being published by Just Space Note on housing supply policies in draft London Plan Dec 2017 note by Duncan Bowie who agrees to it being published by Just Space 1 Housing density and sustainable residential quality. The draft has amended

More information

BOURNEMOUTH/ POOLE HOUSING MARKET AREA

BOURNEMOUTH/ POOLE HOUSING MARKET AREA BOURNEMOUTH/ POOLE HOUSING MARKET AREA 2011 Strategic Housing Market Assessment Update Summary report for: Borough of Poole Council January 2012 in association with Cont ents Contents 1. Background...1

More information

DCLG consultation on proposed changes to national planning policy

DCLG consultation on proposed changes to national planning policy Summary DCLG consultation on proposed changes to national planning policy January 2016 1. Introduction DCLG is proposing changes to the national planning policy framework (NPPF) specifically on: Broadening

More information

North Northamptonshire Authorities Monitoring Report (AMR) 2015/16. Assessment of Housing Land Supply ( )

North Northamptonshire Authorities Monitoring Report (AMR) 2015/16. Assessment of Housing Land Supply ( ) North Northamptonshire Authorities Monitoring Report (AMR) 2015/16 Assessment of Housing Land Supply (2017-22) April 2017 1.0 Introduction Purpose of Report 1.1 The National Planning Policy Framework (NPPF)

More information

18/00994/FUL Land at Newton Grange Farm, Sadberge, Darlington

18/00994/FUL Land at Newton Grange Farm, Sadberge, Darlington 18/00994/FUL Land at Newton Grange Farm, Sadberge, Darlington Proposal Erection of 25 dwellings. NPPF (2018) Core Strategy 2011 CS1: Darlington s Sub-Regional Role and Locational Strategy CS2: Achieving

More information

Houses in Multiple Occupation in the Article 4 Direction Area of Selly Oak, Edgbaston and Harborne wards DRAFT FOR PUBLIC CONSULTATION

Houses in Multiple Occupation in the Article 4 Direction Area of Selly Oak, Edgbaston and Harborne wards DRAFT FOR PUBLIC CONSULTATION Planning Policy Document Houses in Multiple Occupation in the Article 4 Direction Area of Selly Oak, Edgbaston and Harborne wards DRAFT FOR PUBLIC CONSULTATION Contents 1. Purpose 2. Aim of the policy

More information

Rochford Core Strategy: Invitation for comments on revised PPS3 and status of Regional Spatial Strategy.

Rochford Core Strategy: Invitation for comments on revised PPS3 and status of Regional Spatial Strategy. Ref: KC/1027 Date 16 July 2010 Lissa Higby Programme Officer Council Offices South Street Rochford Essex, SS4 1BW Dear Lissa Rochford Core Strategy: Invitation for comments on revised PPS3 and status of

More information

Earls Barton. Rural Housing Survey. Authors: A Miles & S Butterworth Date: October 2012

Earls Barton. Rural Housing Survey. Authors: A Miles & S Butterworth Date: October 2012 Earls Barton Rural Housing Survey Authors: A Miles & S Butterworth Date: October 2012 Swanspool House, Doddington Road, Wellingborough, Northamptonshire, NN8 1BP Tel: 01933 229777 DX 12865 www.wellingborough.gov.uk

More information

South Worcestershire Development Plan Examination Representation Form Additional Pages Consultation on Proposed Modifications to SWDP: 6 October 14 November 2014 South Worcestershire Councils Additional

More information

NORTH LEEDS MATTER 2. Response to Leeds Sites and Allocations DPD Examination Inspector s Questions. August 2017

NORTH LEEDS MATTER 2. Response to Leeds Sites and Allocations DPD Examination Inspector s Questions. August 2017 NORTH LEEDS MATTER 2 Response to Leeds Sites and Allocations DPD Examination Inspector s Questions August 2017 CLIENT: TAYLOR WIMPEY, ADEL REFERENCE NO: CONTENTS 1.0 INTRODUCTION 2.0 TEST OF SOUNDNESS

More information

Housing Need in South Worcestershire. Malvern Hills District Council, Wychavon District Council and Worcester City Council. Final Report.

Housing Need in South Worcestershire. Malvern Hills District Council, Wychavon District Council and Worcester City Council. Final Report. Housing Need in South Worcestershire Malvern Hills District Council, Wychavon District Council and Worcester City Council Final Report Main Contact: Michael Bullock Email: michael.bullock@arc4.co.uk Telephone:

More information

PROJECT INITIATION DOCUMENT

PROJECT INITIATION DOCUMENT Project Name: Housing Futures Phase Two Project Sponsor: Steve Hampson Project Manager: Denise Lewis Date Issued: 15 February 2008 Version No: 1 Background: At Full Council on 31 January 2008 the following

More information

Housing White Paper Summary. February 2017

Housing White Paper Summary. February 2017 Housing White Paper Summary February 2017 On Tuesday 7 February, the government published the Housing White Paper, aimed at solving the housing crises in England through increasing the supply of homes

More information

BIRMINGHAM DEVELOPMENT PLAN EXAMINATION 2014 MATTER E: GREEN BELT POLICY & THE LANGLEY SUE

BIRMINGHAM DEVELOPMENT PLAN EXAMINATION 2014 MATTER E: GREEN BELT POLICY & THE LANGLEY SUE BIRMINGHAM DEVELOPMENT PLAN EXAMINATION 2014 MATTER E: GREEN BELT POLICY & THE LANGLEY SUE STATEMENT BY SAVILLS ON BEHALF OF THE LANGLEY SUE CONSORTIUM SEPTEMBER 2014 Question 1.Does policy TP10 set out

More information

MAKING THE MOST EFFECTIVE AND SUSTAINABLE USE OF LAND

MAKING THE MOST EFFECTIVE AND SUSTAINABLE USE OF LAND 165 SOC146 To deliver places that are more sustainable, development will make the most effective and sustainable use of land, focusing on: Housing density Reusing previously developed land Bringing empty

More information

Bulletin Issue 41 Nov 2017 Housing Market Overview

Bulletin Issue 41 Nov 2017 Housing Market Overview STOCKPORT HOUSING STRATEGY Housing Market Quarterly 1 Bulletin Issue 41 Nov 2017 Housing Market Overview UK House prices grew by 5.0% in the year to October 2017. In terms of housing demand the Royal Institution

More information

REPRESENTATIONS TO SHEPWAY DISTRICT COUNCIL (SDC) PLACES AND POLICIES LOCAL PLAN SUBMISSIONS DRAFT SDC/COZUMEL ESTATES LIMITED

REPRESENTATIONS TO SHEPWAY DISTRICT COUNCIL (SDC) PLACES AND POLICIES LOCAL PLAN SUBMISSIONS DRAFT SDC/COZUMEL ESTATES LIMITED REPRESENTATIONS TO SHEPWAY DISTRICT COUNCIL (SDC) PLACES AND POLICIES LOCAL PLAN SUBMISSIONS DRAFT SDC/COZUMEL ESTATES LIMITED OTTERPOOL PARK 19 MARCH 2018 Quod Limited Contents 1 Introduction 3 2 Site

More information

Woldingham Association

Woldingham Association Regulation 18 Sites Consultation Representation Representation on the 2016 Regulation 18 Sites Consultation for the Tandridge Local Plan Part 1 from the Submitted to Tandridge District Council on 20 Dec

More information

London Borough of Hounslow. Annual Monitoring Report 2005/06

London Borough of Hounslow. Annual Monitoring Report 2005/06 London Borough of Hounslow Annual Monitoring Report 2005/06 Contents Page List of Abbreviations 4 List of Figures and Tables.. 5 Executive Summary Key Findings 7 1. Introduction 11 2. The Borough in Context....

More information

City Plan Sub- Committee Report

City Plan Sub- Committee Report AGENDA ITEM: Date: 21 st July 2016 City Plan Sub- Committee Report Classification: Title: Report of: Cabinet Member Portfolio: Wards Affected: City for All Key Decision: Financial Summary: Report Author

More information

Core Strategy Topic Paper 1. PPS25 Sequential Test

Core Strategy Topic Paper 1. PPS25 Sequential Test Core Strategy Topic Paper 1 PPS25 Sequential Test Core Strategy Topic Paper 1 PPS25 sequential test Introduction 1.1 This document has been prepared in response to a representation submitted by the Environment

More information

PLANNING. Cairngorms National Park Local Development Plan POLICY 1 - NEW HOUSING DEVELOPMENT Non-statutory Planning Guidance

PLANNING. Cairngorms National Park Local Development Plan POLICY 1 - NEW HOUSING DEVELOPMENT Non-statutory Planning Guidance PLANNING Cairngorms National Park Local Development Plan POLICY 1 - NEW HOUSING DEVELOPMENT Non-statutory Planning Guidance Cairngorms National Park Local Development Plan Policy 1 New Housing Development

More information

Rochford District Council Rochford Core Strategy - Statement on housing following revocation of East of England Plan

Rochford District Council Rochford Core Strategy - Statement on housing following revocation of East of England Plan Rochford District Council Rochford Core Strategy - Statement on housing following revocation of East of England Plan I write with reference to your letter of 14 th June 2010, seeking Rochford District

More information

Shropshire Local Development Framework. Type and Affordability of Housing Supplementary Planning Document (SPD)

Shropshire Local Development Framework. Type and Affordability of Housing Supplementary Planning Document (SPD) Shropshire Local Development Framework Type and Affordability of Housing Supplementary Planning Document (SPD) Adopted 12th September 2012 Shropshire Type and Affordability of Housing SPD Shropshire Council

More information

Site Allocations Plan

Site Allocations Plan Site Allocations Plan Leeds Local Plan Development Plan Document Note of clarification for Inspector on Matter 2 and inclusion of UDP allocations as HG1 sites July 2018 Page 1 of 6 Note of clarification

More information

West Surrey Strategic Housing Market Assessment

West Surrey Strategic Housing Market Assessment West Surrey Strategic Housing Market Assessment Guildford Summary Report October 2015 Prepared by GL Hearn Limited 280 High Holborn London WC1V 7EE T +44 (0)20 7851 4900 glhearn.com Contents Section Page

More information

BOROUGH OF POOLE BUSINESS IMPROVEMENT OVERVIEW AND SCRUTINY COMMITTEE 17 MARCH 2016 CABINET 22 MARCH 2016

BOROUGH OF POOLE BUSINESS IMPROVEMENT OVERVIEW AND SCRUTINY COMMITTEE 17 MARCH 2016 CABINET 22 MARCH 2016 BOROUGH OF POOLE AGENDA ITEM 7 BUSINESS IMPROVEMENT OVERVIEW AND SCRUTINY COMMITTEE 17 MARCH 2016 CABINET 22 MARCH 2016 DEVELOPING A COMMERCIAL APPROACH TO THE USE OF ASSETS REPORT OF THE STRATEGIC DIRECTOR

More information

2 Marsham Street, London SWlP 3EB

2 Marsham Street, London SWlP 3EB Circular 13/96 (Department of the Environment) Circular from the Department of the Environment 2 Marsham Street, London SWlP 3EB 8 August 1996 Planning and Affordable Housing Introduction 1. This circular

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Hearing held on 25 March 2014 Site visit made on 25 March 2014 by Lesley Coffey BA (Hons) BTP MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government

More information

Housing Needs Survey Report. Arlesey

Housing Needs Survey Report. Arlesey Housing Needs Survey Report Arlesey August 2015 Completed by Bedfordshire Rural Communities Charity This report is the joint property of Central Bedfordshire Council and Arlesey Parish Council. For further

More information

Strategic Housing Market Assessment South Essex. Executive Summary. May 2016

Strategic Housing Market Assessment South Essex. Executive Summary. May 2016 Strategic Housing Market Assessment South Essex Executive Summary May 2016 Executive Summary 1. Turley in partnership with specialist demographic consultancy Edge Analytics were commissioned by the Thames

More information

Wigan Core Strategy Examination Additional Hearing Sessions

Wigan Core Strategy Examination Additional Hearing Sessions Wigan Core Strategy Examination Additional Hearing Sessions Morris Homes & Persimmon Homes Session on Specific Proposals to Meet the Identified Shortfall in Housing Land Golborne & Lowton 6 th March 2013

More information

Housing Need Considerations for the Slinfold Parish Neighbourhood Plan

Housing Need Considerations for the Slinfold Parish Neighbourhood Plan Housing Need Considerations for the Slinfold Parish Neighbourhood Plan Prepared for Prepared by Dale Mayhew BA (Hons) BTP MRTPI December 2015 DOWSETTMAYHEW Planning Partnership Ltd 63a Ship Street Brighton

More information

CHESHIRE WEST AND CHESTER COUNCIL

CHESHIRE WEST AND CHESTER COUNCIL Item No. 10 CHESHIRE WEST AND CHESTER COUNCIL Planning Committee 1 st April 2014 APPLICATION NUMBER: 13/05410/FUL DESCRIPTION OF DEVELOPMENT: Residential development of 17 affordable dwellings and associated

More information

Planning Reform and Housing Viability

Planning Reform and Housing Viability Planning Reform and Housing Viability Colin Wiles colin@wilesconsulting.co.uk National Planning Policy Framework 1,000 pages reduced to 52 Framework for all future development Plan-led Golden thread of

More information

Review of the Plaistow and Ifold Site Options and Assessment Report Issued by AECOM in August 2016.

Review of the Plaistow and Ifold Site Options and Assessment Report Issued by AECOM in August 2016. Review of the Plaistow and Ifold Site Options and Assessment Report Issued by AECOM in August 2016. Our ref: CHI/16/01 Prepared by Colin Smith Planning Ltd September 2016 1.0 INTRODUCTION 1.1 Colin Smith

More information

Cork Planning Authorities Joint Housing Strategy. Managers Joint Report on the submissions received and issues raised.

Cork Planning Authorities Joint Housing Strategy. Managers Joint Report on the submissions received and issues raised. Joint Housing Strategy Managers Joint Report on the submissions received and issues raised. June 2013 Introduction This is a joint report which reviews the submissions received during the public consultation

More information

Housing Land Monitor. For the period 1 st April 2012to 31 st March 2013

Housing Land Monitor. For the period 1 st April 2012to 31 st March 2013 Housing Land Monitor For the period 1 st April 2012to 31 st March 2013 Published September 2013 Contents Page 1. Introduction 3 2. Worcester City housing completions 2012/13 4 3. Worcester City housing

More information

Riverton Properties Ltd Proposed Special Housing Area

Riverton Properties Ltd Proposed Special Housing Area Riverton Properties Ltd Proposed Special Housing Area Housing Accords and Special Housing Areas Act 2013 Expression of Interest 1 This Expression of Interest is made on behalf of Riverton Properties Ltd,

More information

Assets, Regeneration & Growth Committee 17 March Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes )

Assets, Regeneration & Growth Committee 17 March Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes ) Assets, Regeneration & Growth Committee 17 March 2016 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details Development of new affordable homes by Barnet Homes Registered Provider

More information

1.4 The vast majority of all development proposed in the Core Strategy can be accommodated within Flood Zone 1.

1.4 The vast majority of all development proposed in the Core Strategy can be accommodated within Flood Zone 1. Core Strategy Topic Paper 1 PPS25 sequential test Introduction 1.1 This document has been prepared in response to a representation submitted by the Environment Agency in respect to Rochford District Council

More information

Monitoring and Re-use of Brownfield Land in England and Wales Dr Andrew R Harrison 1, LandInform Ltd

Monitoring and Re-use of Brownfield Land in England and Wales Dr Andrew R Harrison 1, LandInform Ltd Monitoring and Re-use of Brownfield Land in England and Wales Dr Andrew R Harrison 1, LandInform Ltd Introduction Brownfield land has been a policy concern in the UK since the 1970s. Brownfield policy

More information

Assets, Regeneration & Growth Committee 11 July Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes )

Assets, Regeneration & Growth Committee 11 July Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes ) Assets, Regeneration & Growth Committee 11 July 2016 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details Development of new affordable homes by Barnet Homes Registered Provider (

More information

Briefing: National Planning Policy Framework

Briefing: National Planning Policy Framework December 2015 Briefing: National Planning Policy Framework DCLG consultation on proposed changes This briefing note: Outlines the policy changes proposed to the NPPF Details the proposed transitional arrangements

More information

Table of Contents. Title Page # Title Page # List of Tables ii 6.7 Rental Market - Townhome and Apart ment Rents

Table of Contents. Title Page # Title Page # List of Tables ii 6.7 Rental Market - Townhome and Apart ment Rents RESIDENTIAL MONITORING REPORT 2013 Table of Contents Title Page # Title Page # List of Tables ii 6.7 Rental Market - Townhome and Apart ment Rents 21 List of Figures iii 7.0 Other Housing Demands and Trends

More information

WORKSHOP Five Year Housing Supply and Calculating Housing Needs

WORKSHOP Five Year Housing Supply and Calculating Housing Needs WORKSHOP Five Year Housing Supply and Calculating Housing Needs Robert Love Senior Planner - Bidwells Roland Bolton Senior Director - DLP Planning Limited/SPRU Organisation of Workshop 79 people Form 12

More information

Draft London Plan Review

Draft London Plan Review Draft London Plan Review Briefing Note Date: 04/12/2017 Ref No: 283 Introduction On the 29th November the Mayor of London, Sadiq Khan, published his draft London Plan for consultation (Regulation 19).

More information

Affordable Homes Service Plan 2016/17 and 2017/18

Affordable Homes Service Plan 2016/17 and 2017/18 Report To: Housing Portfolio Holder 15 March 2017 Lead Officer: Director of Housing Purpose Affordable Homes Service Plan 2016/17 and 2017/18 1. To provide the Housing Portfolio Holder with an update on

More information

Planning Policy Guidance 3: Housing

Planning Policy Guidance 3: Housing Planning Policy Guidance 3: Housing Contents Planning Policy Guidance Note 3: Housing...2 The Governments Objectives...3 Widening Housing Opportunity And Choice...4 Maintaining A Supply Of Housing...8

More information

Viability and the Planning System: The Relationship between Economic Viability Testing, Land Values and Affordable Housing in London

Viability and the Planning System: The Relationship between Economic Viability Testing, Land Values and Affordable Housing in London Viability and the Planning System: The Relationship between Economic Viability Testing, Land Values and Affordable Housing in London Executive Summary & Key Findings A changed planning environment in which

More information

East Hampshire District Council Addendum Report following Consultation into Preliminary Draft Charging Schedule

East Hampshire District Council Addendum Report following Consultation into Preliminary Draft Charging Schedule East Hampshire District Council Addendum Report following Consultation into Preliminary Draft Charging Schedule November 2014 East Hampshire District Council Addendum report following Consultation into

More information

D S P Planning & Development Viability Consultants

D S P Planning & Development Viability Consultants Epping Forest District Council Stage 1 Assessment of the Viability of Affordable Housing, Community Infrastructure Levy and Local Plan Ref: DSP14241 Final Report June 2015 Dixon Searle LLP The Old Hayloft

More information

STRATEGIC HOUSING INVESTMENT PLAN SUBMISSION. 16 October Report by the Service Director Regulatory Services EXECUTIVE COMMITTEE

STRATEGIC HOUSING INVESTMENT PLAN SUBMISSION. 16 October Report by the Service Director Regulatory Services EXECUTIVE COMMITTEE STRATEGIC HOUSING INVESTMENT PLAN 2019-2024 SUBMISSION Report by the Service Director Regulatory Services EXECUTIVE COMMITTEE 16 October 2018 1 PURPOSE AND SUMMARY 1.1 This report seeks approval of the

More information

RYEDALE SITES LOCAL PLAN MATTER 3 PROPOSED HOUSING SITE OPTION REF. 116 LAND AT MIDDLETON ROAD, PICKERING BARRATT HOMES & DAVID WILSON HOMES

RYEDALE SITES LOCAL PLAN MATTER 3 PROPOSED HOUSING SITE OPTION REF. 116 LAND AT MIDDLETON ROAD, PICKERING BARRATT HOMES & DAVID WILSON HOMES RYEDALE SITES LOCAL PLAN MATTER 3 PROPOSED HOUSING SITE OPTION REF. 116 LAND AT MIDDLETON ROAD, PICKERING BARRATT HOMES & DAVID WILSON HOMES REPRESENTOR ID: 1064 INTRODUCTION 1.1 We write on behalf of

More information

Attachment 3. Guelph s Housing Statistical Profile

Attachment 3. Guelph s Housing Statistical Profile Attachment 3 Guelph s Housing Statistical Profile Table of Contents 1. Population...1 1.1 Current Population (26)...1 1.2 Comparative Growth, Guelph and Ontario (21-26)...1 1.3 Total Household Growth (21

More information

Extending the Right to Buy

Extending the Right to Buy Memorandum for the House of Commons Committee of Public Accounts Department for Communities and Local Government Extending the Right to Buy MARCH 2016 4 Key facts Extending the Right to Buy Key facts 1.8m

More information

AFFORDABLE HOUSING SUPPLEMENTARY PLANNING DOCUMENT

AFFORDABLE HOUSING SUPPLEMENTARY PLANNING DOCUMENT Report of Meeting Date Director of Development, Preston City Council Central Lancashire Strategic Planning Joint Advisory Committee 30 January 2017 AFFORDABLE HOUSING SUPPLEMENTARY PLANNING DOCUMENT PURPOSE

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL SELF-COMMISSIONED HOUSING AT ORCHARD PARK

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL SELF-COMMISSIONED HOUSING AT ORCHARD PARK SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: New Communities Portfolio Holder Meeting 20 May 2010 AUTHOR/S: Executive Director Operational Services/ Corporate Manager Planning and New Communities Purpose

More information

Persimmon Homes Severn Valley comment St Cuthbert (Out) Neighbourhood Plan Pre-Submission Consultation

Persimmon Homes Severn Valley comment St Cuthbert (Out) Neighbourhood Plan Pre-Submission Consultation 150408 Persimmon Homes Severn Valley comment St Cuthbert (Out) Neighbourhood Plan Pre-Submission Consultation On Wednesday, 8 April 2015, 16:54, "Davis, Paul" wrote: See

More information

East Riding Of Yorkshire Council

East Riding Of Yorkshire Council East Riding Of Yorkshire Council Affordable Housing Viability Assessment Analysis of increasing S106/CIL Contributions & the potential impact of Affordable Rent Tenures St Pauls House 23 Park Square South

More information

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3A GENERAL STRATEGY FOR THE GROWTH LOCATIONS

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3A GENERAL STRATEGY FOR THE GROWTH LOCATIONS Matter 3A General Strategy for the Growth Locations Representor No. 8826 JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3A GENERAL STRATEGY FOR THE GROWTH LOCATIONS SUBMISSION

More information

Wellington Housing Accord Monitoring Report 4

Wellington Housing Accord Monitoring Report 4 Wellington Housing Accord Monitoring Report 4 July 215 to June 216 Based on: building consent data to month ended June 216 new section data to month ended June 216 Executive Summary This monitoring report

More information

Hurstpierpoint & Sayers Common Neighbourhood Plan. Habitats Regulations Assessment Screening Report. 4 th April 2014

Hurstpierpoint & Sayers Common Neighbourhood Plan. Habitats Regulations Assessment Screening Report. 4 th April 2014 Hurstpierpoint & Sayers Common Neighbourhood Plan Habitats Regulations Assessment Screening Report 4 th April 2014 1.0 Introduction 1.1 This Habitats Regulations Assessment (HRA) screening report has been

More information

Dear Mr Nairn HIA is pleased to provide comments on the recently released Draft Alice Springs Regional Land Use Plan (Draft Plan).

Dear Mr Nairn HIA is pleased to provide comments on the recently released Draft Alice Springs Regional Land Use Plan (Draft Plan). 17 December 2015 Mr G Nairn Chair Northern Territory Planning Commission GPO Box 1680 DARWIN NT 0801 Submitted via email: ntpc@nt.gov.au Dear Mr Nairn HIA is pleased to provide comments on the recently

More information

Flat 3 43 Sunny Gardens Road London NW4 1SL

Flat 3 43 Sunny Gardens Road London NW4 1SL Location Flat 3 43 Sunny Gardens Road London NW4 1SL Reference: 17/5349/FUL Received: 16th August 2017 Accepted: 22nd August 2017 Ward: Hendon Expiry 17th October 2017 Applicant: Proposal: Sunny Trio Limited

More information

Housing Market Partnership for the administrative areas of Hart, Rushmoor and Surrey Heath

Housing Market Partnership for the administrative areas of Hart, Rushmoor and Surrey Heath Housing Market Partnership for the administrative areas of Hart, Rushmoor and Surrey Heath Terms of Reference (Version 3) Purpose 1. To ensure the Strategic Housing Land Availability Assessments are robust

More information

Representation re: Sullivans Cove Planning Scheme /2015 Amendments - Macquarie Point Site Development: Affordable housing

Representation re: Sullivans Cove Planning Scheme /2015 Amendments - Macquarie Point Site Development: Affordable housing General Manager, Hobart City Council, GPO Box 503, Tas 7001 16 November, 2015 Representation re: Sullivans Cove Planning Scheme 1997-2/2015 Amendments - Macquarie Point Site Development: Affordable housing

More information

RYEDALE SITES LOCAL PLAN MATTER 4 PROPOSED HOUSING SITE OPTION REF. 116 LAND AT MIDDLETON ROAD, PICKERING BARRATT HOMES & DAVID WILSON HOMES

RYEDALE SITES LOCAL PLAN MATTER 4 PROPOSED HOUSING SITE OPTION REF. 116 LAND AT MIDDLETON ROAD, PICKERING BARRATT HOMES & DAVID WILSON HOMES RYEDALE SITES LOCAL PLAN MATTER 4 PROPOSED HOUSING SITE OPTION REF. 116 LAND AT MIDDLETON ROAD, PICKERING BARRATT HOMES & DAVID WILSON HOMES REPRESENTOR ID: 1064 INTRODUCTION 1.1 We write on behalf of

More information

CONSULTATION STATEMENT

CONSULTATION STATEMENT October 2016 LB BIR.4109 BLOOR HOMES CONSULTATION STATEMENT Tanworth Lane, Cheswick Green PHASES 2 & 2A TOWN & COUNTRY PLANNING ACT 1990 (AS AMENDED) PLANNING AND COMPULSORY PURCHASE ACT 2004 Pegasus Group

More information

Yorkshire Dales National Park. Local Plan

Yorkshire Dales National Park. Local Plan Yorkshire Dales National Park Local Plan 2015-2030 Adopted 20th December 2016 C1 Housing in settlements Community Yorkshire Dales Local Plan Adopted version The sites listed in Appendix 4 are allocated

More information

2. Draft Settlement Boundaries Planning Policy and local principles

2. Draft Settlement Boundaries Planning Policy and local principles Housing Information 1. Cornwall Local Plan policy position: Cornwall Local Plan sets down key targets for the provision of homes where they can best meet need and sustain the role and function of local

More information

Harlowbury. Land North of Gilden Way. Planning Statement. Barratt Strategic Persimmon Homes Taylor Wimpey. January 2011

Harlowbury. Land North of Gilden Way. Planning Statement. Barratt Strategic Persimmon Homes Taylor Wimpey. January 2011 Harlowbury Land North of Gilden Way Planning Statement Barratt Strategic Persimmon Homes Taylor Wimpey January 2011 LDA DESIGN 14 Wells Mews London W1T 3HF Tel: 020 7467 1470 Fax: 020 7467 1471 www.lda-design.co.uk

More information

HOUSING BACKGROUND PAPER

HOUSING BACKGROUND PAPER HOUSING BACKGROUND PAPER OCTOBER 2018 Header 1 CONTENTS 1. Background and Key Issues 1 2. Legislative and policy context 2 3. Duty to Cooperate 5 4. Evidence Base 5 5. Key changes 6 5.1 Optimising housing

More information

Regulatory Impact Statement

Regulatory Impact Statement Regulatory Impact Statement Establishing one new special housing area in Queenstown under the Housing Accords and Special Housing Areas Act 2013. Agency Disclosure Statement 1 This Regulatory Impact Statement

More information

57 Foscote Road London NW4 3SE

57 Foscote Road London NW4 3SE Location 57 Foscote Road London NW4 3SE Reference: 16/0572/FUL Received: 28th January 2016 Accepted: 1st February 2016 Ward: West Hendon Expiry 28th March 2016 Applicant: Mr Dan Tamir Proposal: Part single,

More information

Document under Separate Cover Refer to LPS State of Housing

Document under Separate Cover Refer to LPS State of Housing Document under Separate Cover Refer to LPS5-17 216 State of Housing Contents Housing in Halton 1 Overview The Housing Continuum Halton s Housing Model 3 216 Income & Housing Costs 216 Indicator of Housing

More information

SCOTTISH GOVERNMENT RESPONSE TO PRIVATE RENTED HOUSING (SCOTLAND) BILL STAGE 1 REPORT

SCOTTISH GOVERNMENT RESPONSE TO PRIVATE RENTED HOUSING (SCOTLAND) BILL STAGE 1 REPORT SCOTTISH GOVERNMENT RESPONSE TO PRIVATE RENTED HOUSING (SCOTLAND) BILL STAGE 1 REPORT I am writing in response to the Local Government and Communities Committee s Stage 1 Report on the Private Rented Housing

More information

BLACK COUNTRY CORE STRATEGY REVIEW ISSUES & OPTIONS CONSULTATION

BLACK COUNTRY CORE STRATEGY REVIEW ISSUES & OPTIONS CONSULTATION Black Country Core Strategy Review c/o Dudley Metropolitan Borough Council Priory Road Dudley DY1 1HL 8 th September 2017 SENT BY E-MAIL AND POST Dear Sir / Madam BLACK COUNTRY CORE STRATEGY REVIEW ISSUES

More information

BLACKBURN WITH DARWEN AUTHORITY MONITORING REPORT 11

BLACKBURN WITH DARWEN AUTHORITY MONITORING REPORT 11 BLACKBURN WITH DARWEN AUTHORITY MONITORING REPORT 11 1 st April 2016 31 st March 2017 Growth Team First Floor, One Cathedral Square Blackburn BB1 1EZ www.blackburn.gov.uk 1. Introduction 1.1. The Authority

More information

Planning Policy Statement 3. Regulatory Impact Assessment

Planning Policy Statement 3. Regulatory Impact Assessment Planning Policy Statement 3 Regulatory Impact Assessment Planning Policy Statement 3 Regulatory Impact Assessment May 2007 Department for Communities and Local Government: London Department for Communities

More information

108 Holders Hill Road London NW4 1LJ

108 Holders Hill Road London NW4 1LJ Location 108 Holders Hill Road London NW4 1LJ Reference: 16/4234/FUL Received: 28th June 2016 Accepted: 7th July 2016 Ward: Finchley Church End Expiry 1st September 2016 Applicant: Proposal: Mr b menahem

More information

Qualification Snapshot CIH Level 3 Certificate in Housing Services (QCF)

Qualification Snapshot CIH Level 3 Certificate in Housing Services (QCF) Qualification Snapshot CIH Certificate in Housing Services (QCF) The Chartered Institute of Housing (CIH) is an awarding organisation for national qualifications at levels 2, 3 and 4. CIH is the leading

More information

Christchurch Housing Accord Monitoring Report. For quarter ending June 2015

Christchurch Housing Accord Monitoring Report. For quarter ending June 2015 Christchurch Housing Accord Monitoring Report For quarter ending June 2015 Executive Summary This report provides an overview of the Christchurch housing market and an update on priority Accord actions.

More information

Cressingham Gardens Estate, Brixton. DRAFT Masterplan Objectives for discussion. September 2015

Cressingham Gardens Estate, Brixton. DRAFT Masterplan Objectives for discussion. September 2015 Cressingham Gardens Estate, Brixton DRAFT Masterplan Objectives for discussion September 2015 Contents Introduction 1 Project objectives 2 Masterplan objectives 4 Draft masterplan objectives for the Cressingham

More information

Multi- Storey Tower Blocks: Options Appraisal

Multi- Storey Tower Blocks: Options Appraisal NORTH AYRSHIRE COUNCIL Cabinet 20 March 2018 Title: Purpose: Recommendation: Multi- Storey Tower Blocks: Options Appraisal To advise Cabinet of future investment options for the seven multistorey blocks

More information

Welsh Government Housing Policy Regulation

Welsh Government Housing Policy Regulation www.cymru.gov.uk Welsh Government Housing Policy Regulation Regulatory Assessment Report August 2015 Welsh Government Regulatory Assessment The Welsh Ministers have powers under the Housing Act 1996 to

More information

R E Q U E S T F O R P R O P O S A L S

R E Q U E S T F O R P R O P O S A L S P.O. Box 3209, Houghton, 2041 Block A, Riviera Office Park, 6-10 Riviera Road, Riviera R E Q U E S T F O R P R O P O S A L S M A R K E T S U R V E Y T O I N F O R M R E S I D E N T I A L H O U S I N G

More information

INTRODUCTION This application is brought before committee as Councillor Howell has submitted a red card due to residents concerns.

INTRODUCTION This application is brought before committee as Councillor Howell has submitted a red card due to residents concerns. APPLICATION NO. APPLICATION TYPE SITE ADDRESS APP/15/00608/F Full 41 Green Road, Poole, BH15 1QH PROPOSALS Alterations and extensions to form a flat unit REGISTERED 13 May, 2015 APPLICANT DWP Housing Partnership

More information

Regeneration and Property Committee. 16 March 2017

Regeneration and Property Committee. 16 March 2017 Regeneration and Property Committee 16 March 2017 Subject: Director/Head of Service: Access rights relating to the compulsory purchase of land to the rear of 7-10 St Margaret's Street, Canterbury, CT1

More information

Nottingham City Council Whole Plan & Community Infrastructure Levy Viability Assessment. January Executive Summary NCS. Nationwide CIL Service

Nottingham City Council Whole Plan & Community Infrastructure Levy Viability Assessment. January Executive Summary NCS. Nationwide CIL Service Nottingham City Council Whole Plan & Community Infrastructure Levy Viability Assessment January 2016 Executive Summary NCS Nationwide CIL Service Contents 1. Executive Summary Page 2 2. Introduction Page

More information

Simon Court 2-4 Neeld Crescent London NW4 3RR

Simon Court 2-4 Neeld Crescent London NW4 3RR Location Simon Court 2-4 Neeld Crescent London NW4 3RR Reference: 17/1019/FUL Received: 20th February 2017 Accepted: 23rd February 2017 Ward: West Hendon Expiry 20th April 2017 Applicant: Proposal: Mr

More information

Warrington Borough Council. Local Plan

Warrington Borough Council. Local Plan Internal Use Only Date Received: Acknowledged by: Recorded by: Warrington Borough Council Local Plan Preferred Development Option Regulation 18 Consultation Standard Response Form July 2017 Contents 1:

More information

Rupert Warren, Landmark Chambers

Rupert Warren, Landmark Chambers PPS3 and Delivering Affordable Housing (DCLG, December 2006) An initial over-view Rupert Warren, Landmark Chambers (Notes of a contribution to LGG s Annual Planning Conference, held at the Royal College

More information

The Ministry of Defence s arrangement with Annington Property Limited

The Ministry of Defence s arrangement with Annington Property Limited A picture of the National Audit Office logo Report by the Comptroller and Auditor General Ministry of Defence The Ministry of Defence s arrangement with Annington Property Limited HC 762 SESSION 2017 2019

More information

Identifying brownfield land suitable for new housing

Identifying brownfield land suitable for new housing Building more homes on brownfield land Identifying brownfield land suitable for new housing POS consultation response Question 1: Do you agree with our proposed definition of brownfield land suitable for

More information

Oxfordshire Strategic Housing Market Assessment

Oxfordshire Strategic Housing Market Assessment Oxfordshire Strategic Housing Market Assessment Summary Key Findings on Housing Need March 2014 Prepared by GL Hearn Limited 20 Soho Square London W1D 3QW T +44 (0)20 7851 4900 F +44 (0)20 7851 4910 glhearn.com

More information