1 April 2017 Community Planning Permits Technical Report Town of Ajax Consultant Team Gladki Planning Associates

2 This page left intentionally blank

3 Contents 1. Introduction Why is the Town Looking at a Community Planning Permit System? Structure of This Report 2 2. What is the Community Planning Permit System? Steps to Implementing a Community Planning Permit System Develop Official Plan Policies Select an Area and Undertake a Visioning Exercise Prepare a Community Planning Permit By-law Consultation Application Review, Approval and Notice Processes Appeals to the Implementation of a Community Planning Permit System and Amendments to a Community Planning Permit By-law or Official Plan Policies Administrative Processes Use of the Community Planning Permit System in Other Municipalities Lake of Bays Carleton Place Gananoque Brampton Approach to the Community Planning Permit System for Ajax Benefits of Using the Community Planning Permit System Approach to the Community Planning Permit System in Ajax Draft Official Plan Policies Conclusion We Want to Hear From You 34 Appendix: Draft Official Plan Amendment 35

4 This page left intentionally blank Community Planning Permit System

5 1. Introduction The Community Planning Permit (CPP) system, formerly referred to as the Development Permit System, is a promising planning tool that offers improved certainty in the development approvals process. It provides for an alternative integrated approach to the existing development approval system, which often results in ad hoc approvals for applications of minor variances, zoning by-law amendments or site plans. The CPP system has the potential to streamline the planning application process by collapsing approval procedures from several steps (zoning by-law amendment, site plan or site plan amendment, and minor variances) into a single step. 1.1 Why is the Town Looking at a Community Planning Permit System? Town of Ajax Official Plan policy that states the Town may implement the Official Plan, in part or in whole, through the use of a Development Permit regime. In addition, the Town s Economic Development and Tourism Strategy proposes that the Town explore the use of the Development Permit System as part of ongoing efforts to ensure an effective and efficient approvals process. Ajax is well situated to explore utilizing the CPP system because the Official Plan has a clearly defined urban structure and growth policies, the Town has demonstrated a progressive planning approach towards meeting growth and economic development priorities and objectives, and the Town has demonstrated experience in streamlined application review through programs like PriorityPath certified sites and through concurrent review of planning and building applications. A review of the Town s current approach to development approvals, assessment of the Provincial Community Planning Permit Regulation (Ontario Regulation 173/16), as well as the approaches taken by other Ontario municipalities who have implemented CPP policies and by-laws was undertaken and presented to the Town s Community Affairs and Planning Committee over two meetings in March and May of On May 16, 2016, Council endorsed the consideration of establishing a CPP system through the development of enabling Official Plan policies and public/stakeholder consultation. This phase of examining the CPP System will only address the establishment of Official Plan policies to enable the future identification of areas within the Town that would be subject to the CPP system and enable the future development of CPP by-laws for those areas. The identification of specific areas that could be subject to the CPP system and the development of CPP by-laws for those specific areas will be undertaken separately in future studies. Section 7 of this Technical Report outlines how you can get involved in the development of Official Plan policies that will enable the establishment of a CPP System in Ajax. Town of Ajax - Technical Report 1

6 1.2 Structure of This Report Section 2 provides an overview of the establishment and implementation of the CPP system and outlines the steps involved for municipalities to implement a CPP system. Section 3 reviews approaches taken by municipalities that have implemented CPP official plan policies and by-laws. Based on the review of Ontario Regulation 173/16 and the approaches taken in other municipalities, Section 4 provides a strategic approach for Ajax. Section 5 presents a draft of the CPP Official Plan policies with explanatory notes. The report concludes with recommended next steps in Section 6 and information on how to get involved in the process in Section 7. 2 Community Planning Permit System

7 2. What is the Community Planning Permit System? The Community Planning Permit (CPP) system, originally referred to as the Development Permit System, was initially introduced in Ontario as a pilot project in 2001 with five Ontario municipalities given the authority to study and enact a CPP system. Hamilton (downtown), Lake of Bays (environmental protection), Oakville (industrial), Toronto (central waterfront) and Waterloo (ground water protection) examined specific issues within their communities to determine if CPP policies, and accompanying bylaws, could prove a useful alternative for implementing the objectives. From these experiences, the Province revised the initial pilot project regulation and as of January 1, 2007, the CPP system was made available to all municipalities in Ontario through Ontario Regulation 608/06. To date, only four municipalities have implemented CPP by-laws. Lake of Bays was the first municipality to enact CPP policies and a by-law and did so under the 2001 pilot project regulation. Under revised Ontario Regulation 608/06, Carleton Place and Gananoque adopted CPP official plan policies and Town-wide CPP by-laws, and Brampton enacted CPP official plan policies and a CPP by-law for a part of their downtown area. Toronto has approved an official plan amendment that allows a CPP anywhere in the city. Innisfill and Niagara-on-the-Lake are also currently exploring the use of a CPP system. In 2016, the Province made further amendments to the Regulation by changing the name from the Development Permit System to the Community Planning Permit System and replaced Ontario Regulation 608/06 with Ontario Regulation 173/16. The CPP system is an alternative to zoning for regulating development on an area specific basis. However, it differs from zoning because it can allow for discretionary uses, conditional approvals, variations to standard requirements, control of exterior design elements, and restrictions on removal of vegetation. The CPP system has the potential to streamline the planning application process by collapsing approval procedures from several steps and types of applications (zoning, minor variance, site plan) into a single Community Planning Permit application. It can also incorporate design criteria typically addressed in urban design guidelines. Table 1 provides a snapshot that compares the processes and elements addressed by zoning, minor variance, site plan control and urban design guidelines versus the CPP system. The CPP system is premised on establishing a shared vision from the outset for a designated area based on studies, conceptual plans and extensive input from stakeholders. The shared vision is codified in a CPP by-law which provides a degree of flexibility for achieving the vision provided that development criteria and conditions are met to ensure that the proposed uses and built form are appropriate for the site and surrounding context. A CPP by-law can also replace a Site Alteration by-law and Tree Cutting by-law within the boundaries of the municipality. The flexibility of the CPP system can provide a degree of discretion to review development proposals and provide approvals without further amendments to the CPP by-law. Town of Ajax - Technical Report 3

8 Table 1: Current Planning System Versus the CPP System Current Planning System CPP System Zoning Legal tool to regulate land use and the intensity of development. Establishes permitted uses and development standards on a property. Legal tool to regulate land use and the intensity of development. Similar to zoning in that it establishes permitted uses and development standards on a property. Minor Variance Legal tool that allows minor changes from specific provisions of the zoning bylaw, such as building height or maximum lot coverage, or permits a minor change to the use of the property. Incorporates the variance process by establishing discretionary uses and variations to development standards (subject to meeting criteria) to allow a degree of flexibility in the type and form of development on a property to meet particular site specific conditions while still achieving the vision for development in the area. The by-law would incorporate the range and extent of the variances that can be considered to address site conditions as part of development approval. Site Plan Control Tool used to shape development through the review of design features to address issues such as landscaping, building elevations, site access and servicing, waste storage, pedestrian circulation, parking, and loading. Design elements subject to Site Plan Control are not subject to the same regulatory provisions of zoning and are usually negotiated with the applicant. Incorporates site plan control matters (landscaping, building elevations, site access and servicing, waste storage, pedestrian circulation, parking, loading, etc.) and urban design guidelines under one process. Provides more regulatory powers by giving site plan control the same level of legal enforceability as zoning. 4 Community Planning Permit System

9 Current Planning System CPP System Tool used to enhance the quality of development within a particular area by outlining specific design criteria that could, for instance, be related to the design of streets, parks, open spaces, landscaping, or the look and performance of buildings. Urban Design Guidelines can be incorporated into a CPP by-law giving the guidelines the strength of law while ensuring adherence to the purpose and intent of the by-law requirements. Urban Design Guidelines Urban design guidelines are typically implemented in conjunction with a site plan application. Even though guidelines are Council adopted documents, they do not have the legal enforceability that zoning bylaws possess. Planning Act Application Review Timeframes Zoning: 120 days Minor Variance: 30 days Site Plan: 30 days Community Planning Permit: 45 days Town of Ajax - Technical Report 5

10 Current Planning System CPP System Amendments to a zoning by-law can be made at any time to request a change to the permitted uses or development standards to accommodate a type of land use or size/configuration of building that is not currently permitted but that could be appropriate. Amendments to a CPP by-law are not permitted within the first 5 years of the by-law coming into effect. This affords some time to have development that reflects the planned vision in a CPP area realized. However, within the first 5 years, municipalities can initiate their own amendments or pass a resolution to allow a privately-initiated amendment application. Amendments An application to amend a zoning by-law would be open to public consultation and appeal by a third party. A decision of whether to approve an application to amend a zoning by-law would be made by Council. Applications to amend a CPP by-law will only be considered in a comprehensive manner within the overall context of the planned vision for the area to determine whether the vision should remain intact or be changed. Flexibility in applying CPP development standards should reduce the need for many amendments while providing a level of certainty regarding permissions and criteria. An application to amend a CPP by-law would be open to public consultation and appeal by a third party. A decision of whether to approve an application to amend a CPP By-law would be made by Council. 6 Community Planning Permit System

11 2.1 Steps to Implementing a Community Planning Permit System Develop Official Plan Policies The first step, which is the subject of this Report, is to develop official plan policies. Enabling official plan policies are required by the Planning Act for Ontario municipalities to implement a CPP system, much in the same way official plan policies are needed to implement other sections of the Planning Act such as Site Plan Control and Community Improvement Plans. These required official plan policies represent a significant step in establishing a CPP framework, which distinguishes it from zoning where there is no requirement for such policies. Under Ontario Regulation 173/16, municipal councils must adopt a number of official plan policies prior to passing a CPP by-law. These policy requirements include: A statement of the municipality s goals, objectives and policies in proposing a community planning permit system; Setting out the type of criteria that may be included in a community planning permit by-law for determining whether any class of development or any use of land may be permitted by a community planning permit; Setting out the types of conditions that may be included in the community planning permit by-law; Identifying the area that may be proposed as a community planning permit area; and Setting out the scope of the authority that may be delegated (to a Committee or staff) and any limitations on the delegation. In addition to these required policy statements, the Regulation allows for optional policy statements related to the effective implementation of the CPP system. These include: Setting out the information and material required as part of a complete application; Exempting any particular class of development (e.g. single detached dwellings) from some or all of the requirements of a complete application; and Policies requiring that, as a condition of approval, the provision of specified facilities, services or matters (public benefits) are provided in exchange for attaining a specific height or density. Draft Official Plan policies, with commentary, to establish a CPP system in Ajax are provided in Section 5 of this Report Select an Area and Undertake a Visioning Exercise Having CPP official plan policies in effect provides the Town with the ability to study a specific area to determine whether implementing a CPP by-law in that area would be appropriate. If it is determined through a comprehensive land use and urban design study that an area would benefit from being Town of Ajax - Technical Report 7

12 subject to a CPP by-law, as part of that study the Town would undertake a visioning exercise and prepare supporting studies and reports. The visioning exercise is intended to create a shared, long-term vision and preferred future for the CPP area based on guiding official plan policies. Depending on the CPP area chosen, the vision may focus on matters including, but not limited to achieving integrated, mixed-use development, heritage conservation, or employment development. A vision for the CPP area, developed through public consultation, would be the basis for a plan that would translate the types of desired land uses and preferred form of future development into CPP by-law provisions. Goals and objectives that would outline how the vision is to be implemented would be supported by a series of background studies and reports. Depending on the area and its vision, the types of background studies and reports that may be undertaken include, but are not limited to: Urban Design/Built Form Guideline Study Sun/Shadow Study Public Realm Study Architectural Control Guideline Study Heritage Impact/Conservation Strategy Phase 1 Archaeological Assessment Community Services and Facilities Study Housing Study - range of housing requirements Environmental Impact Service Capacity Review Stormwater Management Study Transportation/Traffic Parking Study District-based Energy Study A visioning exercise and preparation of the various studies and reports for an area would entail extensive consultation with a range of stakeholders that includes, but is not limited to, residents, landowners, the development community and various municipal departments Prepare a Community Planning Permit By-law Establishing a vision for an area provides the framework needed to develop a CPP by-law that would provide detailed regulations for how development is to happen in an area. A CPP by-law is similar to a zoning by-law in that it would outline what types of uses and related development standards are permitted, but a CPP by-law can also include design criteria and guidelines that are not normally included in a traditional zoning by-law. These design guidelines can provide the framework for establishing the range within which variations to development standards could be considered. A CPP by-law would include provisions that address the following, some of which are familiar elements of a zoning by-law: Description of the geogrpahic area to which the By-law applies; 8 Community Planning Permit System

13 Permitted uses 1 ; Discretionary uses 2 ; Minimum and maximum development standards for height, setbacks to property lines, lot coverage, etc.; Variations from the development standards 3 ; Design criteria used for evaluating discretionary uses and variations from the minimum development standards 3 ; List of conditions of approval 4 ; and Formula for determining whether community benefits are to be provided. The level of effort and steps involved in preparing a CPP by-law will vary depending on the complexity and intensification of development, as well as the type and amount of background studies and work that may have already been undertaken for an area. A CPP by-law is also required to include administrative and general provisions such as: Internal review procedures regarding the review of Community Planning Permit applications; How notice of a decision on a Community Planning Permit application will be given to the applicant and each person or public body that requested to be informed of the decision; How a CPP by-law may be amended (CPP By-law Amendment application); How a Community Planning Permit agreement may be amended; If Council delegates the authority to issue a decision on a Community Planning Permit application, the scope of the authority and any limitations on the delegation; and Statement regarding the exemption of portable classrooms. 1 Similar to a zoning by-law, permitted uses in a CPP by-law are permitted as-of-right, subject to meeting the other provisions of the CPP by-law, such as parking. 2 Discretionary uses are uses that may be permitted if the criteria outlined in the CPP by-law are met. Discretionary uses often require the provision of further information to determine the potential impact of the use and its appropriateness in a given area. For example, a mixed-use zone may list a motor vehicle service station as a discretionary use subject to the submission of technical reports that address noise, odour and other criteria related to land use compatibility. 3 Allowing for variations to development standards such as minimum and maximum building heights incorporates the Minor Variance process into the CPP system. Possible variations could be expressed in percentage terms or as an absolute number. For example, for a particular area, the CPP by-law could establish that the minimum height is 9m and the maximum height is 20m, but also allow a variation of 10 percent subject to meeting certain criteria such as ensuring the building maintains a 45 degree angular plane to reduce shadowing on adjacent properties. 4 Conditions that may be imposed on development for the issuance of a Community Planning Permit can be related to, among other matters, meeting specific exterior architectural design (e.g. for a heritage area); the removal or restoration of vegetation; ongoing monitoring requirements considered necessary for the protection of public health and safety or the natural environment; or the provision of specified facilities, services or matters in exchange for density or height increases. Town of Ajax - Technical Report 9

14 A CPP by-law may also include the following administrative and general matters: Statement that development is prohibited unless a community planning permit is obtained; List of classes of development, including a definition/explanation for each class of development; these can be related to a level of approval authority (e.g. Director of Planning and Development Services versus Council) and/or to the complexity of a community planning permit application (e.g. small building addition versus development of new building or block), and/or the type of application (e.g. residential versus mixed use or employment); and List of exempt classes of development or uses of land (e.g. development of a detached dwelling may be exempt from requiring a Community Planning Permit) Consultation The CPP is a front-ended system where the vision for an area is developed through detailed studies, conceptual plans, and extensive public and agency consultation in order to establish a joint vision and specific development standards for how an area is to develop or redevelop. Each stage in the development of a CPP system requires general and targeted consultation with residents, businesses, landowners, developers, builders, utilities, government agencies and all other stakeholders. The Planning Act outlines the following as minimum consultation requirements: Official Plan Amendment: The municipality is required to hold one public open house and one statutory public meeting. Visioning Exercise and CPP By-law: The municipality is required to hold one public open house and one statutory public meeting. A municipality may wish to go beyond these minimum requirements in the Planning Act by holding additional open houses, public meetings and workshops. For example, Carleton Place, discussed in Section 3.2 of this Report, undertook an extensive public consultation process that resulted in 18 public events (meetings and workshops) Application Review, Approval and Notice Processes The CPP system front ends the land use compatibility, urban design and consultation process for an area in order to provide a streamlined application review and approval process. Once a CPP by-law is in effect, similar to other planning applications, the submission of a Community Planning Permit application is circulated and reviewed by municipal departments and external agencies. Since a vision is established and extensive consultation happens during the initial development of a CPP by-law, if the application fits within the limits of that vision, as stipulated by the CPP by-law, there is no requirement for public notice, public meeting or public consultation process in the review of a Community Planning Permit application. The application is reviewed, a decision is made by Council, or staff if approval is delegated, and a notice of decision is issued to the applicant and any registered person or public body. 10 Community Planning Permit System

15 However, a municipality may wish to establish a process where notice for all or select application types is circulated to adjacent landowners and posted in a local newspaper; such a notice would need to be clear that third party appeals to an application, as noted in Section of this Report, are not permitted. The CPP approval process allows for discretion in how it is administered. For example, Carleton Place and Gananoque, discussed in Sections 3.2 and 3.3 of this Report, established classes of approval based on the complexity of an application; approval for straight forward applications (e.g. where development meets the permitted uses and development standards) is delegated to staff, and approval of more complex applications (e.g. where technical studies or reports are required and/or where discretionary uses and variations to development standards are being sought) is delegated to Council. Brampton, discussed in Section 3.4 of this Report, delegated approval authority for their Main Street North CPP area to staff. A municipality can also establish a process where certain applications, which have staff delegated approval authority, are referred back to Council for approval. The establishment of an appropriate application review, notice and approval processes for a CPP area will be undertaken as part of the development of a CPP by-law Appeals to the Implementation of a Community Planning Permit System and Amendments to a Community Planning Permit By-law or Official Plan Policies The CPP system provides upfront appeal rights and procedures. Official plan policies and by-laws to implement a CPP system can be appealed to the Ontario Municipal Board by anyone at the time they are adopted by Council. Once a CPP by-law is in effect, a decision on a Community Planning Permit application cannot be appealed by a third party; only the applicant can appeal a municipality s decision or non-decision of a Community Planning Permit application. In situations where a proposed development does not fit within the limits of a CPP by-law, a proponent would be required to submit a Community Planning Permit By-law Amendment application. This type of application would be open to public consultation and appeal by a third party. However, Ontario Regulation 173/16 stipulates that a proponent cannot apply to amend a Community Planning Permit by-law or official plan policies within the first 5-years of the by-law or official plan policies coming into effect. Even though privately-initiated amendments are not permitted within the first 5-years, a municipality can initiate its own amendment to a CPP by-law or official plan policies within this time frame. Additionally, municipalities have the authority to pass a resolution to allow a privately-initiated application during the 5-year period Administrative Processes Implementation of a CPP system will also require the development of new administrative procedures and documents, including work instructions, application form(s), a fee structure, and development agreements. The establishment of administrative processes will be undertaken as part of the development of a CPP by-law. Town of Ajax - Technical Report 11

16 3. Use of the Community Planning Permit System in Other Municipalities This section of the report compares Community Planning Permit official plan policies and by-law provisions in Ontario municipalities to identify best practices. Comparing official plan policies and by-law standards is challenging since the policies and certainly the development standards generally reflect local conditions. However, there are requirements in Ontario Regulation 173/16 for Official Plan policies and CPP by-laws that can be used as a template for comparing the different municipal approaches to enacting a CPP system. What follows is a summary of the key features of the official plan policies and the CPP by-laws for Lake of Bays, Carleton Place, Gananoque and Brampton. 3.1 Lake of Bays The Township of Lake of Bays is located in the Muskoka region of Ontario. It has a permanent population of 3,500 and a seasonal population of 18,000. The CPP system in Lake of Bays is rather unique in that it was enacted under the original 2001 Regulation that applied to only the 5 pilot areas. No other municipality, as part of the pilot exercise, went forward with a CPP policy and By-law. As a result, the Lake of Bays Official Plan policies and CPP By-law are somewhat different in approach as compared to the other municipalities. The CPP By-law was enacted in The Official Plan states that the entire Township may be a potential CPP area, but it then identifies only the Waterfront area as where the CPP approach may be applied at this time. The Official Plan allows for delegation of development permit approvals but the extent to which it may occur is left to the CPP Bylaw to determine. A single policy describes the objective of the CPP as preservation of the waterfront character including ecological and social values. There is a policy that allows for discretionary uses, subject to being compatible with surrounding land uses, and variations to development standards, subject to meeting the design principles found in the Official Plan. There is no mention of the types of conditions to be imposed. Another policy allows each individual CPP By-law to determine which types of development may be exempted. The CPP By-law includes eight land use districts (e.g. zones) with each listing the permitted uses and development standards that apply to each of the building types, much like a Zoning By-law. Discretionary uses are permitted in some zones but are subject to meeting the design criteria found in an attached schedule. Variations or variances to development standards are permitted but governed in two ways. In each land use district, each standard lists the percentage variation permitted by staff and by Council, with the latter usually being a larger amount. In addition, an attached schedule includes a listing of criteria that will be used to decide whether to grant the variation. 12 Community Planning Permit System

17 3.2 Carleton Place The Town of Carleton Place is located west of Ottawa along Highway 7. It has an estimated population of just over 10,000 people. The CPP Official Plan policies and By-law were enacted initially in 2008 and were revised in 2014 following a review of the Official Plan. A policy states that the entire Town shall be the subject of a Community Planning Permit By-law. A single policy allows Council to delegate to staff any approvals under the CPP system with the limits on and criteria for delegation being outlined in the CPP By-law. There is no specific reference to goals but the preamble to the CPP policies suggests that the Town is interested in greater flexibility in reviewing development so as to avoid site-specific amendments. There is a policy listing objectives of the CPP system as: preservation of existing small town character; improvement of the waterfront area; preservation and enhancement of neighbourhoods; promotion of rehabilitation of industrial properties; expansion of green spaces and park facilities and provide for their interconnectivity; increase diversity of arts, culture and recreation; and protect the natural environment. There is no separate policy listing the type of criteria to be used for evaluating development but there is a policy explaining the criteria that are used in determining whether to permit discretionary uses and variations to the development standards. The conditions imposed are the same as those listed for Site Plan Control in the Planning Act. The CPP By-law identifies nine land use districts with permitted uses and development standards. Discretionary uses are permitted in most districts subject to further review. Council may vary the development standards as much as 100% subject to compliance with the Built Form Criteria found in a separate section of the By-law. As a result of the Official Plan objectives that call for the preservation of its small town character, the Built Form Criteria are very detailed and specific as to the design of new development. The Carleton Place CPP By-law creates five classes of development for the purposes of determining the extent of the review process and the requirements of approval. These classes include: a residential development that generally meets the requirements; a non-residential proposal that generally meets the requirements; any development that requires variations from the standards; a development that requires Committee approval; and a development that requires conditional approval. Carlton Place staff reported that when compared to the zoning by-law, the CPP By-law is generally more efficient and effective at helping achieve design considerations. Over the last eight years, a few amendments to the CPP By-law have occurred. A 2016 amendment changed wording and schedules to ensure compliance with the County s Source Water Protection Policies. In 2015, three amendments focused on changes to schedules. An earlier amendment added a definition for stacked townhouse units. Town of Ajax - Technical Report 13

18 3.3 Gananoque The Town of Gananoque located off Hwy 401 is in the 1,000 Islands area of the Province. Its population in 2011 was 5,194. The Town adopted CPP policies in its Official Plan in 2009 and passed a CPP By-law in The policies and CPP By-law for Gananoque and Carleton Place are very similar. This section will only touch upon the differences between them. The Gananoque CPP By-law includes three classes of development for the purposes of determining the extent of the review process and the requirements of approval. These classes distinguish development by their complexity and scale as well as approval authority (staff, Committee or Council). The design criteria used to evaluate Community Planning Permit applications are found in each of the twelve land use districts as opposed to in a separate section appended to the By-law as is the case in Carleton Place and Lake of Bays. The design criteria cover a range of site and building specific matters such as: access and parking, landscaping materials, roof lines/slopes, facades, fenestration, building materials, paint colour in heritage significant areas, lighting, storefront design and glazing, fencing, awnings and signs, garbage enclosures, building setbacks, pedestrian walkways and landscaped buffers. The criteria feature illustrations and descriptive language that allow for interpretation of the intent as compared to the more prescriptive language of a zoning by-law. The conditions to be imposed are listed in the CPP By-law and include such things as: Buffering of adjacent properties; Provision of on-site works such as, servicing, road access, grading, fire routes, lighting details, parking facilities and landscape details; Provision of performance securities; Road widenings; Construction of access onto major roads and any upgrading of the roads, if necessary; Easements for access and servicing; Provision of children s play areas; and Cash in lieu of parking. A town-wide CPP By-law made more sense than a combination of zoning and area specific CPP bylaws, given its relatively small size. The Town receives only a handful of Community Planning Permit applications a year and the new process has been generally well received by the public. Some minor amendments have been made to the CPP By-law to clarify procedural issues. 3.4 Brampton Brampton has focused the use of the CPP system to the Main Street North Area of the Downtown, also referred to as the historic downtown. In 2007, a comprehensive urban design study was completed for the Main Street North area. The study incorporated a visioning exercise in which community members 14 Community Planning Permit System

19 and stakeholders were brought together to help establish a vision for the area. The study examined the character of the built form as well as open spaces and rights-of-ways. The existing character analysis and development policies were used to help create a future vision for the area. The study also examined how to achieve the vision. With a vision document in hand, a study was commissioned to examine the potential of using a CPP to implement the vision. Brampton s CPP Official Plan policies and its CPP By-law were passed by Council in The two documents were appealed, although these appeals were mainly site specific. A settlement hearing was held in November 2015 and the Ontario Municipal Board approved the CPP Official Plan policies and CPP By-law. Both are now in full force and effect. Although implementation of the CPP system has been focused on the Main Street North area, the Official Plan policies would allow a CPP By-law to be established elsewhere in the City without the need for an amendment. However, this approach does not preclude the need to augment the Official Plan or any Secondary Plan with respect to development policies applying to that area. The city-wide official plan policy objectives include: facilitating desired high-quality development or protection of areas and streamlining of application approval processes in an effort to implement the intent of the Official Plan. In the Central Area, the CPP system is intended to support the City s objectives: to serve as an incentive for development; to shorten review times; to add flexibility to simplify the regulatory environment; and to establish a comprehensive planning policy basis for the future development and protection of lands within the Central Area. In the Official Plan, criteria include such matters as: streetscape and public realm, provision of open space elements, building design, location and use of materials and colours, lot configuration and assembly, parking and access, site design and layout, landscaping, signage and display areas, site servicing and grading, sustainable site and building design elements, and heritage protection and conservation. Within the CPP By-law there is an extensive section on design criteria. Part 6 of the Main Street North chapter is devoted to the Design Guidelines which include: Streetscape Guidelines; Landscape Guidelines; Built Form Guidelines; Heritage Guidelines; Sustainable Design Guidelines; Signage Guidelines; and Engineering Guidelines. Town of Ajax - Technical Report 15

20 The Official Plan CPP policy includes an extensive list of conditions that may be imposed such as: Entering into a development agreement; Posting of securities; Provision of sustainable design elements; Carrying out improved landscaping elements; Carrying out drainage improvements; Providing cash in lieu of parkland; Use of particular building materials and colours; Satisfying a condition related to site alteration; Requiring the dedication of land for public right of way; Protection, maintenance and enhancement of trees; Monitoring the use of land for the protection of public health and safety; Providing facilities for people with disabilities; Providing easements to allow for shared parking; Facade enhancements that complement and are compatible with existing character; Provision of services or matters in exchange for a specified height or density; and Improve, enhance, restore or provide items which are not explicitly identified in Sections 34, 40, 41 and 42 of the Planning Act. Brampton does not provide any range or limitation on variations to the CPP By-law. Instead, the By-law establishes that any provision may be varied in accordance with five basic criteria. These criteria include the four tests for a variance currently found in the Planning Act: maintaining the general purpose and intent of the Official Plan; maintaining the general purpose and intent of the By-law; must be desirable and appropriate; and must be minor in nature. An additional criterion is that the Development Approval Criteria for the CPP area are achieved. The Brampton Official Plan also includes a policy for requiring the provision of community benefits in exchange for specified height or density increases. The public benefits include: i) the provision of parking for use by the public; ii) the provision of transit infrastructure above standard City requirements in relation to a development permit application; iii) the provision of public art or contribution to a City art program; iv) the dedication of lands to a public authority for active park purposes beyond standard City requirements for dedications or provision of cash-in-lieu; v) preservation and integration of any identified heritage resources beyond standard City requirements; and vi) provision of off-site community improvements to the streetscape, parks and open space and other elements of the public realm. 16 Community Planning Permit System

21 4. Approach to the Community Planning Permit System for Ajax 4.1 Benefits of Using the Community Planning Permit System Efficient - Eliminates Minor Variances The CPP system is a more efficient process than the current planning system because it not only pre-zones 5 lands to implement the established vision for an area, it also removes the need for minor variances to deal with variations regarding development details. This could translate into better application processing times and a more effective use of planning staff time and resources. Since the Town s Zoning By-law was adopted by Council in July 2003, approximately 800 Minor Variance applications have been approved by the Committee of Adjustment. A CPP by-law can provide flexibility through discretionary uses and variations to development standards, provided the intent of the CPP by-law is maintained, which translates into fewer delays and development being realized sooner. Effective Provides Regulatory Powers for Previously Negotiated Matters The CPP system is a process through which matters such as landscaping, building elevations, site access and servicing, waste storage, pedestrian circulation, parking, loading, etc. (i.e. matters that are typically addressed and negotiated as part of site plan control and refined in urban design guidelines) have the force of regulation. This provides the municipality with greater certainty in achieving the land use and urban design vision for a designated area. It can also help create a sense of place and character based on the community s vision. The CPP system requires extensive public engagement at the beginning of the process to formulate the CPP by-law. Public input is an essential part of developing a community vision. By specifying architectural and urban design requirements, the CPP system facilitates certainty and provides developers, the public and the municipality with clear, quantifiable parameters as to what the development outcomes for an area will be from the outset. Conversely, even if an area is pre-zoned in a zoning by-law, the ultimate architectural and urban design vision for the area is not known at the outset; these matters are negotiated through the site plan process where the ultimate built form and design of a site remains uncertain until the end of the approval process. Public Benefits Expanded Range of Conditions Can Be Achieved Through Development Unlike zoning, the CPP system allows conditions to be placed on approvals. Placing conditions on development approvals is not new, as conditions are regularly placed on approvals of site plan applications. However, the range of conditions that can be placed on a Community Planning Permit approval go beyond what the Planning Act currently permits as part of site plan approval. Additionally, conditions imposed through a Community Planning Permit would provide certainty as opposed to conditions imposed through site plan which are negotiated. 5 The intent of pre-zoning is to eliminate the need for zoning by-law amendments which means that a development would proceed directly to site plan and building permit. However, in many cases under this planning system it s determined that minor variances are needed to accommodate the development design part way through the site plan review process. Town of Ajax - Technical Report 17

22 Ontario Regulation 173/16 states that any condition imposed must be a type that is permitted in the Official Plan and must be reasonable and related to the appropriate use of land. As such, the Town could reasonably impose conditions on a Community Planning Permit related, but not limited, to the provision of affordable housing or cash-in-lieu, the provision of sustainability elements such as green roofs, or the provision of infrastructure upgrades or cash-in-lieu. 4.2 Approach to the Community Planning Permit System in Ajax The CPP system is an alternative to the zoning system. Where it is applied, it replaces and combines zoning by-law, minor variance and site plan approval application requirements. This means that the CPP system can be applied anywhere in the Town much like zoning. Since the Town s Zoning By-law came into effect, approximately 120 Zoning By-law Amendments stemming from development applications have been passed by Council and, as noted previously, nearly 800 Minor Variance applications have been approved by the Committee of Adjustment. The structure of the CPP system is intended to eliminate zoning by-law amendments and minor variances where a CPP by-law is in effect. In the review of existing CPP by-law areas, Carleton Place and Gananoque applied a CPP by-law to the entire town; but these are small centres with a very consistent form and character that they are protecting. Lake of Bays applied a CPP by-law to their Waterfront area and Brampton applied a CPP By-law to their old historic downtown. Toronto, although not having passed a CPP by-law, intends to apply the CPP system to particular sub areas to implement a community vision. As noted in the Introduction, Ajax is well situated to explore utilizing the CPP system because the Official Plan has a clearly defined urban structure and growth policies; the Town has demonstrated a progressive planning approach towards meeting growth and economic development priorities and objectives; and, the Town has demonstrated experience in streamlined application review through programs like PriorityPath certified sites and through concurrent review of planning and building applications. In Ajax, the form and character of development varies over the landscape. Consequently, CPP bylaws would be appropriate on an area specific basis and best suited for areas where detailed planning visioning has yet to occur such as the Uptown Regional Centre, Midtown Corridor, or GO Transit Station Mixed Use Area, Prestige Employment area or General Employment area. In fact, it is the Town s intention to initiate land use and urban design studies for the Go Transit Station Mixed Use Area/Central Ajax Employment Area, Midtown Corridor and Uptown Regional Centre that will examine whether it would be beneficial to implement a CPP system. The implementing Official Plan policies should be broad enough to allow for CPP by-laws to be passed anywhere in the Town separately without having to amend the CPP policies in the Official Plan. This was the approach taken by all the municipalities reviewed. This approach does not preclude the Town from introducing area specific Official Plan policies to complement and tailor the use of the CPP system in a given area which was the approach taken by Brampton. 18 Community Planning Permit System

23 The components that need to be addressed in a CPP by-law, if and when the Town decides to proceed with such a by-law for a particular area or areas, are outlined in sections 2.1.2, and of this Report. The Town has two options for formulating a CPP by-law. It can either prepare one comprehensive CPP by-law that has common administrative and general provisions (e.g. parking, accessory structures, definitions, etc.) and individual sections for specific geographic areas which would address specific permitted uses and development standards for each area. Alternatively, the Town could pass separate by-laws for each CPP area with the common administrative and general provisions repeated in each by-law. Town of Ajax - Technical Report 19

24 5. Draft Official Plan Policies The provisions in Ontario Regulation 173/16, outlined in Section 2 of this Report, have informed the formulation of the draft Official Plan policies provided within the text boxes below. The paragraphs preceding the text boxes provide an explanation for each policy section. Appendix 1 to this Report provides the policies in their entirety as a Draft Official Plan Amendment. Policy Community Planning Permit System and Community Planning Permits This introductory policy provides a description of the CPP system by comparing it to the current zoning by-law and site plan control systems of regulation. The community planning permit system is a planning approval process under the Planning Act intended as an alternative to zoning for the purpose of implementing the Official Plan. It provides for a greater degree of flexibility and scope in ensuring predictable outcomes that are consistent with the planned vision for the area to which it applies. It combines zoning, site plan and minor variance approvals into one process with the approval of a community planning permit. Where a community planning permit by-law applies, the Zoning By-law and Site Plan Control By-law do not apply. Approval of development under this process is dependent upon the issuance of a community planning permit. The regulations established in a community planning permit by-law must conform to the Official Plan land use designations and all its other policies. The use of the system is premised on Council passing community planning permit by-laws for parts of the Town which have been studied for this purpose. In addition to conforming with all the policies of the Official Plan, the enactment of community planning permit by-laws shall be consistent with the policies that follow. Policy Goal The goal of the CPP system is the same as the zoning system, that is, to implement the policies of the Official Plan. The policy refers to the CPP system as an integrated regulatory framework alluding to the concept that the CPP system is a singular process combining and including the current processes of zoning, minor variance and site plan control. The goal of the community planning permit system is to provide an integrated regulatory framework for reviewing development that implements the Official Plan and achieves the objectives stated below. Policy Objectives There are several objectives listed as part of this policy, seven in all. These objectives reference the strengths and advantages of the Community Planning Permit system, such as its flexibility and streamlined approval process, as well as some of the requirements of the Regulation. 20 Community Planning Permit System

BROCKVILLE CITY OF BROCKVILLE COMPREHENSIVE ZONING BY-LAW REVIEW DISCUSSION PAPER OCTOBER 2013 FINAL D

BROCKVILLE CITY OF BROCKVILLE COMPREHENSIVE ZONING BY-LAW REVIEW DISCUSSION PAPER OCTOBER 2013 FINAL D BROCKVILLE CITY OF BROCKVILLE COMPREHENSIVE ZONING REVIEW DISCUSSION PAPER OCTOBER 2013 FINAL D14-13-010 TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1 Purpose and Goals of this Project... 1 1.2 Study Process...

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF DECEMBER 11, 2012

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF DECEMBER 11, 2012 CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF DECEMBER 11, 2012 Item 1, Report No. 51, of the Committee of the Whole (Working Session), which was adopted without amendment by the Council of the

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Cambridge West Land Use Planning Matters January 10, 2018 Q1 What is proposed for the undeveloped lands within the Cambridge West area? A. Four separate landowners each own part

More information

A Guide to the Municipal Planning Process in Saskatchewan

A Guide to the Municipal Planning Process in Saskatchewan A Guide to the Municipal Planning Process in Saskatchewan A look at the municipal development permit and the subdivision approval process in Saskatchewan May 2008 Prepared By: Community Planning Branch

More information

Town of Niagara-on-the-Lake Official Plan Review. Discussion Paper: Second Residential Units. Prepared for: The Town of Niagara-on-the-Lake

Town of Niagara-on-the-Lake Official Plan Review. Discussion Paper: Second Residential Units. Prepared for: The Town of Niagara-on-the-Lake Town of Niagara-on-the-Lake Official Plan Review Discussion Paper: Second Residential Units Prepared for: The Town of Niagara-on-the-Lake October 15, 2015 PLANSCAPE Inc. Building Community through Planning

More information

TOTTENHAM SECONDARY PLAN

TOTTENHAM SECONDARY PLAN TOTTENHAM SECONDARY PLAN AMENDMENT NO. 11 TO THE OFFICIAL PLAN OF THE TOWN OF NEW TECUMSETH The following text and schedules to the Official Plan of the Town of New Tecumseth constitute Amendment No. 11

More information

For Vintages of Four Mile Creek Town of Niagara on the Lake, Ontario

For Vintages of Four Mile Creek Town of Niagara on the Lake, Ontario Planning Impact Analysis For Vintages of Four Mile Creek Town of Niagara on the Lake, Ontario Prepared by: Upper Canada Consultants 261 Martindale Road Unit #1 St. Catharines, Ontario L2W 1A1 Prepared

More information

The Corporation of the District of Central Saanich

The Corporation of the District of Central Saanich The Corporation of the District of Central Saanich COMMITTEE OF THE WHOLE REPORT For the Committee of the Whole meeting on November 28, 2016 To: Patrick Robins Chief Administrative Officer File: From:

More information

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes 1 Local Area Plan - Project Alignment Overview Directions Report, October 2008 (General Summary Of Selected

More information

Corporate Services Planning and Economic Development. Memorandum

Corporate Services Planning and Economic Development. Memorandum Corporate Services Planning and Economic Development Memorandum TO: FROM: Committee of the Whole Paul Freeman, Chief Planner DATE: June 21, 2018 RE: York Region C omments on Draft Provinci al Guidance

More information

Update on the Avenues and Mid-Rise Buildings Action Plan

Update on the Avenues and Mid-Rise Buildings Action Plan STAFF REPORT INFORMATION ONLY Update on the Avenues and Mid-Rise Buildings Action Plan Date: May 15, 2009 To: From: Wards: Reference Number: Planning and Growth Management Committee Chief Planner and Executive

More information

density framework ILLUSTRATION 3: DENSITY (4:1 FSR) EXPRESSED THROUGH BUILT FORM Example 1

density framework ILLUSTRATION 3: DENSITY (4:1 FSR) EXPRESSED THROUGH BUILT FORM Example 1 density framework 4 ILLUSTRATION 3: DENSITY (4:1 FSR) EXPRESSED THROUGH BUILT FORM INTRODUCTION The Downtown Core Area contains a broad range of building forms within its relatively compact area. These

More information

PUBLIC OPEN HOUSE September 19, 2018

PUBLIC OPEN HOUSE September 19, 2018 PUBLIC OPEN HOUSE September 19, 2018 Board 1 BACKGROUND Council direction was given to develop a The is looking at new housing in mature and recent communities, as outlined in the City of Winnipeg s planning

More information

Corporate Report. 2. That the Interim Control By-law prohibit within the Low Density Residential Suburban Neighbourhood (R1) zone, the following:

Corporate Report. 2. That the Interim Control By-law prohibit within the Low Density Residential Suburban Neighbourhood (R1) zone, the following: Corporate Report Report from Planning and Building Services, Planning Services Date of Report: November 23,2016 Date of Meeting: December 5, 2016 Report Number: PBS-330-2016 File: 60.35.2.1 Subject: Interim

More information

C Secondary Suite Process Reform

C Secondary Suite Process Reform 2018 March 12 Page 1 of 9 EXECUTIVE SUMMARY On 2017 December 11, through Notice of Motion C2017-1249 (Secondary Suite Process Reform) Council directed Administration to implement several items: 1. Land

More information

Development Approvals

Development Approvals Planning and Development Approvals Martin Rendl, MCIP, RPP 1 Overview What is planning? Why is planning relevant to architects? What planning instruments apply? Successfully navigating the municipal planning

More information

Yonge Street and 3 Gerrard Street East - Zoning Amendment Application - Preliminary Report

Yonge Street and 3 Gerrard Street East - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 363-391 Yonge Street and 3 Gerrard Street East - Zoning Amendment Application - Preliminary Report Date: May 22, 2015 To: From: Wards: Reference Number: Toronto and East York

More information

ATTACHMENT 1: Proposed Official Plan Amendment - Affordable Housing

ATTACHMENT 1: Proposed Official Plan Amendment - Affordable Housing ATTACHMENT 1: Proposed Official Plan Amendment - Affordable Housing AMENDMENT NUMBER (?) TO THE OFFICIAL PLAN FOR THE CORPORATION OF THE CITY OF GUELPH: AFFORDABLE HOUSING AMENDMENT INDEX PART A - THE

More information

25 Leonard Avenue - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

25 Leonard Avenue - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report STAFF REPORT ACTION REQUIRED 25 Leonard Avenue - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report Date: March 8, 2017 To: From: Wards: Reference Number: Toronto and East York

More information

Islington Avenue - Official Plan and Zoning By-law Amendment Application - Preliminary Report

Islington Avenue - Official Plan and Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 3002-3014 Islington Avenue - Official Plan and Zoning By-law Amendment Application - Preliminary Report Date: Febuary 2, 2016 To: From: Wards: Reference Number: Etobicoke York

More information

Staff Report for Council Public Meeting

Staff Report for Council Public Meeting Agenda Item 3.3 Staff Report for Council Public Meeting Date of Meeting: September 27, 2017 Report Number: SRPRS.17.134 Department: Division: Subject: Planning and Regulatory Services Development Planning

More information

Community & Infrastructure Services Committee

Community & Infrastructure Services Committee REPORT TO: DATE OF MEETING: September 12, 2016 Community & Infrastructure Services Committee SUBMITTED BY: Alain Pinard, Director of Planning, 519-741-2200 ext. 7319 PREPARED BY: Natalie Goss, Senior Planner,

More information

Report to: Development Services Committee Report Date: October 5, 2015

Report to: Development Services Committee Report Date: October 5, 2015 SUBJECT: PREPARED BY: REVIEWED BY: INFORMATION REPORT Update on Markham s New Comprehensive Zoning By-law Project, PR 13 128340 Anna Henriques, MCIP, RPP, Senior Planner Zoning & Special Projects, ext.

More information

1.0 INTRODUCTION PURPOSE OF THE CIP VISION LEGISLATIVE AUTHORITY Municipal Act Planning Act...

1.0 INTRODUCTION PURPOSE OF THE CIP VISION LEGISLATIVE AUTHORITY Municipal Act Planning Act... April 2017 TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PURPOSE OF THE CIP... 1 3.0 VISION... 1 4.0 COMMUNITY IMPROVEMENT PROJECT AREA..3 5.0 LEGISLATIVE AUTHORITY... 3 5.1 Municipal Act... 3 5.2 Planning

More information

PLANNING REPORT THE CORPORATION OF THE TOWN OF COBOURG

PLANNING REPORT THE CORPORATION OF THE TOWN OF COBOURG THE CORPORATION OF THE TOWN OF COBOURG PLANNING REPORT TO: Planning & Sustainability Advisory Committee FROM: Desta McAdam, MCIP, RPP Planner I Development DATE OF MEETING: May 8 th, 2018. REPORT TITLE/SUBJECT:

More information

Town Centre Community Improvement Plan

Town Centre Community Improvement Plan 2012 Town Centre Community Improvement Plan City of Greater Sudbury Growth and Development Department 1.0 PLAN BACKGROUND 1.1 Introduction The following Community Improvement Plan (CIP) has been prepared

More information

THE CORPORATION OF THE TOWNSHIP OF KING THE CERTIFICATE PAGE FOR AMENDMENT NO. 89 TO THE OFFICIAL PLAN OF THE TOWNSHIP OF KING

THE CORPORATION OF THE TOWNSHIP OF KING THE CERTIFICATE PAGE FOR AMENDMENT NO. 89 TO THE OFFICIAL PLAN OF THE TOWNSHIP OF KING THE CORPORATION OF THE TOWNSHIP OF KING THE CERTIFICATE PAGE FOR AMENDMENT NO. 89 TO THE OFFICIAL PLAN OF THE TOWNSHIP OF KING (KING CITY COMMUNITY PLAN) The attached text and schedules constituting Amendment

More information

PLANNING PRIMER. Elective: Understanding Residential Intensification and Infill. Planning and Growth Management Department.

PLANNING PRIMER. Elective: Understanding Residential Intensification and Infill. Planning and Growth Management Department. PLANNING PRIMER Elective: Understanding Residential Intensification and Infill Planning and Growth Management Department Amended 2015 Agenda Information re: Infill and Intensification Initiatives Residential

More information

METHODOLOGY GUIDE VALUING LANDS IN TRANSITION IN ONTARIO. Valuation Date: January 1, 2016

METHODOLOGY GUIDE VALUING LANDS IN TRANSITION IN ONTARIO. Valuation Date: January 1, 2016 METHODOLOGY GUIDE VALUING LANDS IN TRANSITION IN ONTARIO Valuation Date: January 1, 2016 August 2017 August 22, 2017 The Municipal Property Assessment Corporation (MPAC) is responsible for accurately assessing

More information

SPORTING AND COMMUNITY LEASING POLICY

SPORTING AND COMMUNITY LEASING POLICY SPORTING AND COMMUNITY LEASING POLICY Classification: Statutory Policy. Trim Container TRIM Container Number Trim Document Number: TRIM Document Number First Issued / Approved: 24 April 2018 Last Reviewed:

More information

SUBJECT: Character Area Studies and Site Plan Approval for Low Density Residential Areas. Community and Corporate Services Committee

SUBJECT: Character Area Studies and Site Plan Approval for Low Density Residential Areas. Community and Corporate Services Committee Page 1 of Report PB-70-16 SUBJECT: Character Area Studies and Site Plan Approval for Low Density Residential Areas TO: FROM: Community and Corporate Services Committee Planning and Building Department

More information

ALC Bylaw Reviews. A Guide for Local Governments

ALC Bylaw Reviews. A Guide for Local Governments 2018 ALC Bylaw Reviews A Guide for Local Governments ALC Bylaw Reviews A Guide for Local Governments This version published on: August 14, 2018 Published by: Agricultural Land Commission #201-4940 Canada

More information

EXCERPTS FROM HALIFAX REGIONAL MUNICIPALITY CHARTER

EXCERPTS FROM HALIFAX REGIONAL MUNICIPALITY CHARTER EXCERPTS FROM HALIFAX REGIONAL MUNICIPALITY CHARTER Municipal planning strategy 227 The Council may adopt a municipal planning strategy for all, or part, of the Municipality and there may be separate strategies

More information

New Comprehensive Zoning

New Comprehensive Zoning New Comprehensive Zoning By-law Project Phase 2: Strategic Directions Development Services Committee June 14, 2016 Task 1: Guiding Principles and Parameters & Trends and Issues in Zoning 1. Drafting of

More information

Planning Rationale in Support of an Application for Plan of Subdivision and Zoning By-Law Amendment

Planning Rationale in Support of an Application for Plan of Subdivision and Zoning By-Law Amendment Planning Rationale in Support of an Application for Plan of Subdivision and Zoning By-Law Amendment The Kilmorie Development 21 Withrow Avenue City of Ottawa Prepared by: Holzman Consultants Inc. Land

More information

Residential Intensification in Established Neighbourhoods Study (RIENS)

Residential Intensification in Established Neighbourhoods Study (RIENS) Residential Intensification in Established Neighbourhoods Study (RIENS) EXECUTIVE SUMMARY In December 2015, the City of Kitchener retained Meridian Planning Consultants to undertake the Residential Intensification

More information

City of Winnipeg Housing Policy Implementation Plan

City of Winnipeg Housing Policy Implementation Plan The City of Winnipeg s updated housing policy is aligned around four major priorities. These priorities are highlighted below: 1. Targeted Development - Encourage new housing development that: a. Creates

More information

PLANNING REPORT Gordon Street City of Guelph. Prepared on behalf of Ontario Inc. March 17, Project No. 1507

PLANNING REPORT Gordon Street City of Guelph. Prepared on behalf of Ontario Inc. March 17, Project No. 1507 PLANNING REPORT 1131 Gordon Street City of Guelph Prepared on behalf of 1876698 Ontario Inc. March 17, 2016 Project No. 1507 423 Woolwich Street, Suite 201, Guelph, Ontario, N1H 3X3 Phone (519) 836-7526

More information

Director, Community Planning, Toronto and East York District

Director, Community Planning, Toronto and East York District STAFF REPORT September 1, 2005 To: From: Subject: Toronto and East York Community Council Director, Community Planning, Toronto and East York District Further Report Applications to amend Official Plan

More information

AMENDMENT NUMBER 38 TO THE OFFICIAL PLAN OF THE TOWNSHIP OF WEST LINCOLN (COMPLIANCE)

AMENDMENT NUMBER 38 TO THE OFFICIAL PLAN OF THE TOWNSHIP OF WEST LINCOLN (COMPLIANCE) AMENDMENT NUMBER 38 TO THE OFFICIAL PLAN OF THE TOWNSHIP OF WEST LINCOLN (COMPLIANCE) 2013 AMENDMENT NUMBER 38 TO THE OFFICIAL PLAN OF THE TOWNSHIP OF WEST LINCOLN PART 1 - THE PREAMBLE 1.1 TITLE This

More information

General Manager of Planning, Urban Design, and Sustainability in consultation with the Director of Legal Services

General Manager of Planning, Urban Design, and Sustainability in consultation with the Director of Legal Services POLICY REPORT DEVELOPMENT AND BUILDING Report Date: October 26, 2016 Contact: Anita Molaro Contact No.: 604.871.6479 RTS No.: 11689 VanRIMS No.: 08-2000-20 Meeting Date: November 15, 2016 TO: FROM: SUBJECT:

More information

Charlottesville Planning Commission, Neighborhood Associations & News Media

Charlottesville Planning Commission, Neighborhood Associations & News Media CITY OF CHARLOTTESVILLE A World Class City Department of Neighborhood Development Services City Hall Post Office Box 911 Charlottesville, Virginia 22902 Telephone 434-970-3182 Fax 434-970-3359 www.charlottesville.org

More information

SUBJECT: Official Plan and Zoning By-law Amendment Applications for 4853 Thomas Alton Boulevard

SUBJECT: Official Plan and Zoning By-law Amendment Applications for 4853 Thomas Alton Boulevard Page 1 of Report PB-100-16 SUBJECT: Official Plan and Zoning By-law Amendment Applications for 4853 Thomas Alton Boulevard TO: FROM: Development and Infrastructure Committee Planning and Building Department

More information

Council Public Meeting

Council Public Meeting Agenda 3.1 a Council Public Meeting Department: Division: Subject: Planning and Regulatory Services Development Planning Request for Comments Zoning By-law Amendment and Draft Plan of Subdivision Applications

More information

Staff Report. October 19, 2016 Page 1 of 17. Meeting Date: October 19, 2016

Staff Report. October 19, 2016 Page 1 of 17. Meeting Date: October 19, 2016 October 19, 2016 Page 1 of 17 Staff Report Report No.: PDSD-P-58-16 Meeting Date: October 19, 2016 Submitted by: Subject: Recommendation: Ben Puzanov, RPP, Senior Planner Application for Zoning By-law

More information

May 5, Highway 7 and Kipling Avenue Northeast Quadrant Land Use Study

May 5, Highway 7 and Kipling Avenue Northeast Quadrant Land Use Study May 5, 2016 Highway 7 and Kipling Avenue Northeast Quadrant Land Use Study To provide an update on the study and obtain feedback on draft scenarios prepared by the consulting team from the public. The

More information

50 and 52 Finch Avenue East - Official Plan and Zoning By-law Amendment Applications - Preliminary Report

50 and 52 Finch Avenue East - Official Plan and Zoning By-law Amendment Applications - Preliminary Report STAFF REPORT ACTION REQUIRED 50 and 52 Finch Avenue East - Official Plan and Zoning By-law Amendment Applications - Preliminary Report Date: August 16, 2016 To: From: Wards: Reference Number: North York

More information

The Honourable Peter Milczyn Minister of Housing/Minister Responsible for the Poverty Reduction Strategy College Park, 17th Floor

The Honourable Peter Milczyn Minister of Housing/Minister Responsible for the Poverty Reduction Strategy College Park, 17th Floor February 2, 2018 Sent via e-mail: Bill.Mauro@ontario.ca Peter.Milczyn@ontario.ca The Honourable Bill Mauro Minister of Municipal Affairs College Park, 17th Floor 777 Bay Street Toronto, Ontario M5G 2E5

More information

General Manager of Planning, Urban Design, and Sustainability, in consultation with the Director of Legal Services

General Manager of Planning, Urban Design, and Sustainability, in consultation with the Director of Legal Services POLICY REPORT DEVELOPMENT AND BUILDING Report Date: September 27, 2016 Contact: Anita Molaro Contact No.: 604.871.6479 RTS No.: 11685 VanRIMS No.: 08-2000-20 Meeting Date: October 18, 2016 TO: FROM: SUBJECT:

More information

Subject Mississauga Housing Strategy: Rental Housing Protection By-law File: CD.06.AFF

Subject Mississauga Housing Strategy: Rental Housing Protection By-law File: CD.06.AFF Date: 2018/05/04 To: Chair and Members of Planning and Development Committee From: Andrew Whittemore, Commissioner Planning and Building Department Originator s files: CD.06. AFF Meeting date: 2018/05/28

More information

CITY OF TORONTO. Response to the Provincial Inclusionary Zoning Consultation

CITY OF TORONTO. Response to the Provincial Inclusionary Zoning Consultation CITY OF TORONTO Response to the Provincial Inclusionary Zoning Consultation August 9, 2016 INTRODUCTION The introduction of the Promoting Affordable Housing Act, 2016 is a welcome step in providing the

More information

CITY OF HAMILTON. PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Economic Development Division

CITY OF HAMILTON. PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Economic Development Division CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Economic Development Division TO: Mayor and Members General Issues Committee WARD(S) AFFECTED: WARD 11 COMMITTEE DATE: May 2, 2012 SUBJECT/REPORT

More information

A Class Environmental Assessment for Provincial Parks and Conservation Reserves. Phase III: Submission to Ministry of the Environment

A Class Environmental Assessment for Provincial Parks and Conservation Reserves. Phase III: Submission to Ministry of the Environment A Class Environmental Assessment for Provincial Parks and Conservation Reserves Phase III: Submission to Ministry of the Environment II CLASS EA FOR PROVINCIAL PARKS AND CONSERVATION RESERVES 2001, Queen

More information

Real Estate Acquisitions Audit (Green Line LRT Stage 1)

Real Estate Acquisitions Audit (Green Line LRT Stage 1) Real Estate Acquisitions Audit (Green Line LRT Stage 1) October 10, 2018 ISC: Unrestricted THIS PAGE LEFT INTENTIONALLY BLANK ISC: Unrestricted Table of Contents Executive Summary... 5 1.0 Background...

More information

LAND USE PROCEDURES (LUP) BYLAW NO. 1235, 2007

LAND USE PROCEDURES (LUP) BYLAW NO. 1235, 2007 TOWN OF OSOYOOS LAND USE PROCEDURES (LUP) BYLAW NO. 1235, 2007 Adopted August 13, 2007 PART 1 PART 2 PART 3 PART 4 PART 5 PART 6 PART 7 PART 8 TABLE OF CONTENTS Index provided for ease of use and was not

More information

IMPACT OF INFILL PROGRAM ON NEIGHBOURHOODS TASK FORCE AGENDA WEDNESDAY, MAY 30, :00 p.m. CHARLIE WARD ROOM, BRANTFORD CITY HALL

IMPACT OF INFILL PROGRAM ON NEIGHBOURHOODS TASK FORCE AGENDA WEDNESDAY, MAY 30, :00 p.m. CHARLIE WARD ROOM, BRANTFORD CITY HALL IMPACT OF INFILL PROGRAM ON NEIGHBOURHOODS TASK FORCE AGENDA WEDNESDAY, MAY 30, 2018 3:00 p.m. CHARLIE WARD ROOM, BRANTFORD CITY HALL ROLL CALL 1. DECLARATIONS OF CONFLICTS OF INTEREST 2. ITEMS FOR CONSIDERATION

More information

12. STAFF REPORT ACTION REQUIRED SUMMARY. Date: September 21, Toronto Public Library Board. To: City Librarian. From:

12. STAFF REPORT ACTION REQUIRED SUMMARY. Date: September 21, Toronto Public Library Board. To: City Librarian. From: STAFF REPORT ACTION REQUIRED 12. Property Redevelopment Feasibility Date: September 21, 2015 To: From: Toronto Public Library Board City Librarian SUMMARY At the meeting on May 25 2015, the Toronto Public

More information

General Manager of Planning, Urban Design, and Sustainability in consultation with the Director of Legal Services

General Manager of Planning, Urban Design, and Sustainability in consultation with the Director of Legal Services POLICY REPORT DEVELOPMENT AND BUILDING Report Date: August 31, 2016 Contact: Anita Molaro Contact No.: 604.871.6489 RTS No.: 11651 VanRIMS No.: 08-2000-20 Meeting Date: October 18, 2016 TO: FROM: SUBJECT:

More information

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building Exhibit 1 Port Credit DATE: TO: FROM: SUBJECT: Chairman and Members of the Planning and Development Committee Thomas S. Mokrzycki, Commissioner of Planning and Building Proposed Heritage Conservation District

More information

Staff Report for Council Public Meeting

Staff Report for Council Public Meeting Agenda Item 3.3 a Staff Report for Council Public Meeting Date of Meeting: April 11, 2018 Report Number: SRPRS.18.087 Department: Division: Subject: Planning and Regulatory Services Development Planning

More information

Town of Saugeen Shores. Date of Passage: Resolution Number: xx-xxxx

Town of Saugeen Shores. Date of Passage: Resolution Number: xx-xxxx 00-00-00 Town of Saugeen Shores 2018 Development Charges Program Department: Infrastructure & Development Services Prepared By: Jay Pausner Date of Passage: Resolution Number: xx-xxxx 1. Background Page

More information

1202 & 1204 Avenue Road Zoning By-law Amendment Application - Preliminary Report

1202 & 1204 Avenue Road Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 1202 & 1204 Avenue Road Zoning By-law Amendment Application - Preliminary Report Date: March 17, 2017 To: From: Wards: Reference Number: North York Community Council Director,

More information

12, 14, 16 and 18 Marquette Avenue and 7 Carhartt Street Zoning By-law Amendment Application - Preliminary Report

12, 14, 16 and 18 Marquette Avenue and 7 Carhartt Street Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 12, 14, 16 and 18 Marquette Avenue and 7 Carhartt Street Zoning By-law Amendment Application - Preliminary Report Date: July 17, 2014 To: From: Wards: Reference Number: North

More information

Part 4.0 DEVELOPMENT REGULATIONS

Part 4.0 DEVELOPMENT REGULATIONS M A I N S T R E E T N O R T H Part 4.0 DEVELOPMENT REGULATIONS 4.1 Districts 4.2 Permitted and Prohibited Uses, Standards and Standard Specific Criteria and Other General Provisions 4.3 DPS REGULATIONS

More information

Townhouse and Low-Rise Apartment Guidelines Project. Planning and Growth Management Committee. Chief Planner and Executive Director, City Planning

Townhouse and Low-Rise Apartment Guidelines Project. Planning and Growth Management Committee. Chief Planner and Executive Director, City Planning PG8.12 STAFF REPORT ACTION REQUIRED Townhouse and Low-Rise Apartment Guidelines Project Date: October 20, 2015 To: From: Wards: Reference Number: Planning and Growth Management Committee Chief Planner

More information

10 Affordable Housing Measuring and Monitoring Guidelines

10 Affordable Housing Measuring and Monitoring Guidelines Clause 10 in Report No. 11 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on June 25, 2015. 10 Affordable Housing Measuring

More information

PLANNING PRIMER: SESSION 2 MARCH 2013

PLANNING PRIMER: SESSION 2 MARCH 2013 PLANNING PRIMER: SESSION 2 MARCH 2013 DEVELOPMENT APPLICATIONS Agenda 6 Most Common Applications Pre-consultation + Submission Notification + Review Break Time Issue Resolution + Report Writing The Decision

More information

Ashcroft Homes Trim Road Development Planning Rationale

Ashcroft Homes Trim Road Development Planning Rationale 18 Antares Drive Ottawa, ON K2E 1A9 Ashcroft Homes Trim Road Development Planning Rationale Proposed Site Plan & Zoning Amendment Applications File No: D02-02-17-0129 & D07-12-17-0175 August 2018 Planning

More information

Implementation Tools for Local Government

Implementation Tools for Local Government Information Note #5: Implementation Tools for Local Government This Information Note is a guide only. It is not a substitute for the federal Fisheries Act, the provincial Riparian Areas Regulation, or

More information

250, 252, 254 and 256 Royal York Road and 8 and 10 Drummond Street - Zoning By-law Amendment Application - Preliminary Report

250, 252, 254 and 256 Royal York Road and 8 and 10 Drummond Street - Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 250, 252, 254 and 256 Royal York Road and 8 and 10 Drummond Street - Zoning By-law Amendment Application - Preliminary Report Date: May 28, 2013 To: From: Wards: Reference

More information

4027 and 4031 Ellesmere Road Zoning Amendment and Draft Plan of Subdivision Applications - Request for Direction Report

4027 and 4031 Ellesmere Road Zoning Amendment and Draft Plan of Subdivision Applications - Request for Direction Report STAFF REPORT ACTION REQUIRED 4027 and 4031 Ellesmere Road Zoning Amendment and Draft Plan of Subdivision Applications - Request for Direction Report Date: August 22, 2013 To: From: Wards: Reference Number:

More information

TRANSFER OF DEVELOPMENT RIGHTS

TRANSFER OF DEVELOPMENT RIGHTS STEPS IN ESTABLISHING A TDR PROGRAM Adopting TDR legislation is but one small piece of the effort required to put an effective TDR program in place. The success of a TDR program depends ultimately on the

More information

CHAIRMAN WOLPERT AND MEMBERS OF THE HOUSE LOCAL AND MUNICIPAL GOVERNMENT AND URBAN REVITALIZATION COMMITTEE

CHAIRMAN WOLPERT AND MEMBERS OF THE HOUSE LOCAL AND MUNICIPAL GOVERNMENT AND URBAN REVITALIZATION COMMITTEE TO: FROM: SUBJECT: CHAIRMAN WOLPERT AND MEMBERS OF THE HOUSE LOCAL AND MUNICIPAL GOVERNMENT AND URBAN REVITALIZATION COMMITTEE LARRY LONG, EXECUTIVE DIRECTOR COUNTY COMMISSIONERS ASSOCIATION OF OHIO (CCAO)

More information

Streamlining the Entitlement Process for Transit-Oriented Development

Streamlining the Entitlement Process for Transit-Oriented Development October 2012 Streamlining the Entitlement Process for Transit-Oriented Development Best Practices Summary Setting Ideas in Motion Introduction and Overview Entitlement Process: The legal method of obtaining

More information

Village of Perry Zoning Ordinance Update Draft Diagnostic Report

Village of Perry Zoning Ordinance Update Draft Diagnostic Report Village of Perry Zoning Ordinance Update Draft Diagnostic Report Background The Village of Perry began work on a new comprehensive plan in 2014. After a year of committee meetings and public outreach,

More information

Director, Community Planning, North York District NNY 10 OZ and NNY 10 RH

Director, Community Planning, North York District NNY 10 OZ and NNY 10 RH STAFF REPORT ACTION REQUIRED 847 873 Sheppard Avenue West - Official Plan Amendment and Zoning By-law Amendment and Rental Housing Demolition and Conversion Applications - Preliminary Report Date: April

More information

CPC CA 3 SUMMARY

CPC CA 3 SUMMARY CPC-2009-3955-CA 2 CONTENTS Summary Staff Report Conclusion 3 4 7 Appendix A: Draft Ordinance A-1 Attachments: 1. Land Use Findings 2. Environmental Clearance 1-1 2-1 CPC-2009-3955-CA 3 SUMMARY Since its

More information

Saskatchewan Municipal Financing Tools

Saskatchewan Municipal Financing Tools Saskatchewan Municipal Financing Tools The following is a list of financing tools currently available to Saskatchewan municipalities. Authority for a municipality to use any of these tools is provided

More information

That the attached background report BE RECEIVED for information; and,

That the attached background report BE RECEIVED for information; and, Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Affordable Housing Planning

More information

Housing Issues Report Shoreline Towers Inc. Proposal 2313 & 2323 Lake Shore Boulevard West. Prepared by PMG Planning Consultants November 18, 2014

Housing Issues Report Shoreline Towers Inc. Proposal 2313 & 2323 Lake Shore Boulevard West. Prepared by PMG Planning Consultants November 18, 2014 Housing Issues Report Shoreline Towers Inc. Proposal 2313 & 2323 Lake Shore Boulevard West Prepared by PMG Planning Consultants November 18, 2014 PMG Planning Consultants Toronto, Canada M6A 1Y7 Tel. (416)

More information

Our Focus: Your Future 2007 YEAR END HOUSING MONITORING AND SUBDIVISION STATUS REPORTS

Our Focus: Your Future 2007 YEAR END HOUSING MONITORING AND SUBDIVISION STATUS REPORTS Town of Fort Erie Community & Development Services Our Focus: Your Future Prepared for Council-in-Committee Report No. CDS-011-08 Agenda Date February 4,2008 File No. 350204/350308 Subject 2007 YEAR END

More information

Community Improvement Plan. Corporation of the City of Owen Sound

Community Improvement Plan. Corporation of the City of Owen Sound Community Improvement Plan Corporation of the City of Owen Sound July 2010 TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 Background... 1.2 Project Area... 1.3 Purpose of a Community Improvement Plan... 1.4 Current

More information

5 to 25 Wellesley Street West and 14 to 26 Breadalbane Street - Zoning Amendment Application - Preliminary Report

5 to 25 Wellesley Street West and 14 to 26 Breadalbane Street - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 5 to 25 Wellesley Street West and 14 to 26 Breadalbane Street - Zoning Amendment Application - Preliminary Report Date: May 16, 2013 To: From: Wards: Reference Number: Toronto

More information

Keele Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report

Keele Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 406-410 Keele Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report Date: September 20, 2017 To: From: Wards: Reference Number: Etobicoke York

More information

Municipal Council has directed staff to report annually on the nature of Variances granted by the Committee of Adjustment.

Municipal Council has directed staff to report annually on the nature of Variances granted by the Committee of Adjustment. Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: George Kotsifas, P. Eng. Managing Director, Development & Compliance Services and Chief Building

More information

3.1. OBJECTIVES FOR RESIDENTIAL LAND USE DESIGNATIONS GENERAL OBJECTIVES FOR ALL RESIDENTIAL DESIGNATIONS

3.1. OBJECTIVES FOR RESIDENTIAL LAND USE DESIGNATIONS GENERAL OBJECTIVES FOR ALL RESIDENTIAL DESIGNATIONS 3. RESIDENTIAL LAND USE DESIGNATIONS INTRODUCTION The Residential land use designations provide for housing and other land uses that are integral to, and supportive of, a residential environment. Housing

More information

Explanatory Notes. for. The Planning and Development Act, 2007

Explanatory Notes. for. The Planning and Development Act, 2007 Explanatory Notes for The Planning and Development Act, 2007 Introduction The purpose of these notes is to explain the provisions of The Planning and Development Act, 2007 (the Act). The explanatory notes

More information

Planning Justification Report - Update Castlegrove Subdivision, Gananoque Draft Plan of Subdivision and Class III Development Permit

Planning Justification Report - Update Castlegrove Subdivision, Gananoque Draft Plan of Subdivision and Class III Development Permit Planning Justification Report - Update Castlegrove Subdivision, Gananoque Draft Plan of Subdivision and Class III Development Permit by IBI Group Table of Contents Executive Summary... 1 1 Introduction...

More information

General Manager, Planning, Urban Design and Sustainability in consultation with the Director of Legal Services

General Manager, Planning, Urban Design and Sustainability in consultation with the Director of Legal Services POLICY REPORT DEVELOPMENT AND BUILDING Report Date: December 12, 2017 Contact: Anita Molaro Contact No.: 604.871.6479 RTS No.: 12322 VanRIMS No.: 08-2000-20 Meeting Date: January 16, 2018 TO: FROM: SUBJECT:

More information

Township of Tay Official Plan

Township of Tay Official Plan Township of Tay Official Plan Draft for Consultation (v.3) March 2016 Contents 1. INTRODUCTION... 1 1.1 Content, Title and Scope... 1 1.2 Basis and Purpose of this Plan... 1 1.3 Plan Structure... 2 2.

More information

Chapter 10 Local Protection Measures

Chapter 10 Local Protection Measures The DPC fully supports the protection of private property rights and the DPC will work to ensure that there will be no negative impacts stemming from NHA activities on private property, should the designation

More information

4 LAND USE 4.1 OBJECTIVES

4 LAND USE 4.1 OBJECTIVES 4 LAND USE The Land Use Element of the Specific Plan establishes objectives, policies, and standards for the distribution, location and extent of land uses to be permitted in the Central Larkspur Specific

More information

M E M O R A N D U M. Origin

M E M O R A N D U M. Origin PO Box 1749 Halifax, Nova Scotia B3J 3A5 Canada M E M O R A N D U M TO: Community Design Advisory Committee CC: Kelly Denty, Acting Director FROM: Carl Purvis, Acting Manager Urban Design, DATE: February

More information

4650 Eglinton Avenue West - Zoning By-law Amendment Application - Preliminary Report

4650 Eglinton Avenue West - Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 4650 Eglinton Avenue West - Zoning By-law Amendment Application - Preliminary Report Date: August 14, 2015 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

Review and Update of Guelph s Parkland Dedication Policies, Practices, Procedures and Bylaw. Key Stakeholder Session No.2 October 5 th, 2017

Review and Update of Guelph s Parkland Dedication Policies, Practices, Procedures and Bylaw. Key Stakeholder Session No.2 October 5 th, 2017 Review and Update of Guelph s Parkland Dedication Policies, Practices, Procedures and Bylaw Key Stakeholder Session No.2 October 5 th, 2017 Agenda o Introductions o Parkland Dedication Background o Guelph

More information

SPECIAL GENERAL COMMITTEE AGENDA Tuesday, February 27, 2018 Immediately following the General Committee Meeting Town Council Chambers Page 1

SPECIAL GENERAL COMMITTEE AGENDA Tuesday, February 27, 2018 Immediately following the General Committee Meeting Town Council Chambers Page 1 SPECIAL GENERAL COMMITTEE AGENDA Tuesday, Immediately following the Meeting Town Council Chambers Page 1 1. CALL TO ORDER 2. DECLARATIONS OF PECUNIARY INTEREST 3. PUBLIC MEETINGS Nil 4. DELEGATIONS AND

More information

CITY OF SASKATOON COUNCIL POLICY

CITY OF SASKATOON COUNCIL POLICY ORIGIN/AUTHORITY Planning and Development Committee Report No. 26-1990; Legislation and Finance Committee Report No. 42-1990; City Commissioner s Report No. 29-1990, and further amendments up to and including

More information

Understanding the Consent Application Process

Understanding the Consent Application Process Understanding the Consent Application Process Your Step-By-Step Guide for Consent-Granting Authorities 1 2 3 4 5 6 7 8 9 10 11 Section 53 of the Planning Act ontario.ca/municipallearning Understanding

More information

2306 St. Clair Avenue West Zoning By-law Amendment Application - Preliminary Report

2306 St. Clair Avenue West Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 2306 St. Clair Avenue West Zoning By-law Amendment Application - Preliminary Report Date: August 10, 2017 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

AMENDMENT NUMBER XX TO THE OFFICIAL PLAN OF THE TOWN OF MILTON. THE PREAMBLE, does not constitute part of this Amendment

AMENDMENT NUMBER XX TO THE OFFICIAL PLAN OF THE TOWN OF MILTON. THE PREAMBLE, does not constitute part of this Amendment AMENDMENT NUMBER XX TO THE OFFICIAL PLAN OF THE TOWN OF MILTON PART 1 PART 2 THE PREAMBLE, does not constitute part of this Amendment THE AMENDMENT, consisting of the following text constitutes Amendment

More information