1 PLANNING BOARD REPORT PORTLAND, MAINE Four-Lot Subdivision 158 Fore Street Portland Gateway Project Level III Subdivision Ara Aftandilian, Portland Norwich Group, LLC Submitted to: Portland Planning Board Public Hearing Date: February 28, 2017 Prepared by: Matthew Grooms Date: February 24, 2017 Planning Board Report Number: I. INTRODUCTION The applicant is proposing to convert an existing two (2)-lot subdivision located at 158 Fore Street into a four (4)-lot subdivision, breaking existing lot 2 into lots 2, 3 and 4. This commercial subdivision is intended to provide additional buildable lots at the southern edge of the India Street Neighborhood and is compatible with the adjacent neighborhood development. The lots are intended for development as mixed-use office, retail and residential. The property is located within the India Street Form Based Code District (IS-FBC), and meets all applicable zoning standards. The total subdivision area is approximately 60,642 square feet in size and includes four separate lots. The existing driveway curb cut along Fore Street is being improved to provide access to lots 1, 2 and 3 via an existing shared access easement that was recorded in July of 2016 following the Planning Board s approval of the AC Hotel site plan. Lot 4 will have direct access along India Street, and it is proposed that all four lots will have long term parking agreements with the Ocean Gateway Parking Garage locate to the north of the subject parcels. Required reviews: The proposal is being reviewed by the Planning Board under the Land Use Code provisions (Subdivisions). Applicant Name: Consultants: Ara Aftandilian, Portland Norwich Group, LLC John Swan, Owen Haskell, INC, Lee Lowry, Jensen Baird Gardner Henry, Matthew Phillips, Carroll Associates A total of one hundred and seventy-four (174) notices were sent to area residents and the city s interested party list. A

2 Planning Board Report # Four-lot Subdivision (Portland Gateway Project Subdivision) February 28 th, 2017 Public Hearing Page 2 notice also appeared in the February 17 th and February 20 th editions of the Portland Press Herald. II. PROJECT DATA Existing Zoning: Existing Use: Proposed Use: Existing number of lots: Proposed number of lots: Parcel Size: Impervious Surface Area: Existing: Total Disturbed Area: Uses in Vicinity: IS-FBC and Shoreland Zone Vacant Land Mixed-Use Office, Retail Residential and Hotel Two Four Lot A 6,005 sq. ft.; Lot B1 6,532 sq. ft.; B2 5,557 sq. ft. 32,102 sq. ft. Mixed-Use Commercial, Residential, Office, Marine Infrastructure, Off-Street Parking III. EXISTING CONDITIONS Lots 1 and 2 are currently undeveloped and have been utilized for temporary parking. Lot 1 is to be the future site of AC Portland Hotel, a Level III site plan that was approved by the Planning Board on 05/24/2016. This 180 room hotel will be six stories tall with a building footprint of 19,403 SF and a floor area of 106,223 SF. It is anticipated that Lots 2, 3 and 4 will be developed as mixed-use projects. There is an existing access easement crossing portions of proposed lots 1, 2 and 3, that shall serve as a shared use driveway for these parcels. This easement has also been set aside for shared utility and drainage infrastructure. This driveway will be 20 feet in width and will serve two-way traffic entering and exiting the site. The easement features a circular round-about that will enable site circulation and improved vehicular maneuvering. O:\PLAN\5 DEVELOPMENT REVIEW\1Dev Rev Projects\Fore St (Portland Gateway\Public Hearing\Portland Gateway Memo.doc

3 Planning Board Report # Four-lot Subdivision (Portland Gateway Project Subdivision) February 28 th, 2017 Public Hearing Page 3 IV. PROPOSED DEVELOPMENT The applicant is proposing a four (4)-lot subdivision located between Fore Street, Thames Street, India Street and Hancock Street. The existing curb cut on Fore Street will serve as primary access to this site with lots 1, 2 and 3 being accessed via an internal shared access easement which shall also contain site utilities and drainage infrastructure. This easement measures 20 feet in width at its narrowest point and features a circular round-about for site circulation. Access to lot 4 will be along its street frontage on India Street. It is anticipated that Lots 2, 3 and 4 will be developed as mixed-use projects, with Lot 2 being office over ground floor retail, Lot 3 being residential condominiums over ground floor retail and Lot 4 being residential apartments over ground floor retail. The applicant has stated that there will be a long-term parking agreement between each lot and the Ocean Gateway Parking Garage. These proposals have not yet been submitted formally and are subject to change. The applicant is seeking the subdivision of the land in order to facilitate the future development and financing. At this time, the applicant has not submitted a grading or drainage plan, a construction management plan, utility capacity letters, a stormwater management plan with associated stormwater calculations or evidence of financial or technical capacity. In discussions with the applicant, it has been agreed that these items will be supplied during the site plan review process for each individual development. V. PUBLIC COMMENT The Planning Division has received one public comment as of the date of preparing this report. This individual is opposed to the proposed subdivision as they feel it will negatively impact traffic, specifically at the intersection of Fore Street and India Street. A Neighborhood Meeting was not held since the proposal of a four-lot subdivision does not require a neighborhood meeting. VI. RIGHT, TITLE AND INTEREST AND FINANCIAL/TECHNICAL CAPACITY a. The owner of the property is Portland Norwich Acquisition, LLC. The applicant has provided a copy of Warranty Deeds, recorded at the Cumberland County Registry of Deeds (Document #32730 Book and Page 138), which demonstrates their right, title and interest in the property. VII. ZONING ASSESSMENT A. ZONING REVIEW City staff have reviewed all submitted documents and feel that all zoning requirements are being met. The applicant O:\PLAN\5 DEVELOPMENT REVIEW\1Dev Rev Projects\Fore St (Portland Gateway\Public Hearing\Portland Gateway Memo.doc

4 Planning Board Report # Four-lot Subdivision (Portland Gateway Project Subdivision) February 28 th, 2017 Public Hearing Page 4 understands that separate permits will be required for the future build-out of the new lots. VIII. DEVELOPMENT REVIEW A. SUBDIVISION PLAN AND RECORDING PLAT REQUIREMENTS (Section ) The draft subdivision plat (Attachment Plan 1) has been submitted for review. Based on discussions with staff, plat will need to be amended to address the following issues: Hancock Street Extension shall be changed to Hancock Street. B. SUBDIVISION (Section ) The proposed development has been reviewed by staff for conformance with the relevant review standards of Portland s Subdivision Ordinance and applicable regulations. Staff comments are listed below. 1. Will Not Result in Undue Water and Air Pollution (Section (a) 1), and Will Not Result in Undue Soil Erosion (Section (a) 4) No detrimental water or air quality impacts are anticipated. Further analysis may be required during the site plan review stage for the development of each lot. 2. Sufficient Water Available (Section (a) 2 and 3) Staff has confirmed with the applicant that capacity letters from the Portland Water District shall be required for any future proposed development at the time of site plan review. 3. Will Not Cause Unreasonable Traffic Congestion (Section (a) 5) The proposed project is not anticipated to have any significant adverse effect on regional traffic. No new curb cuts are being proposed with this plan. The applicant is aware that future traffic analysis in the form of a Traffic Impact Assessment (TIA) or Traffic Movement Permit (TMP) may be required as part of the site plan review process. 4. Will Provide for Adequate Sanitary Sewer and Stormwater Disposal (Section (a) 6), and Will Not Cause an Unreasonable Burden on Municipal Solid Waste and Sewage (Section (a) 7) Staff has confirmed with the applicant that at the time of site plan submittal a stormwater management plan pursuant to the regulations of Maine DEP Chapter 500 Stormwater Management Rules, including conformance with the Basic, General, and Flooding Standards will be provided for each individual development. In addition, the applicant shall submit the sewer capacity information needed for the City s review at time of site plan approval. 5. Scenic Beauty, Natural, Historic, Habitat and other Resources (Section (a) 8) A portion of Lot 4 lies within the Old Port Historic District. The building elevations have been reviewed by the Historic Preservation Program Manager, Deborah Andrews, and no objections have been raised. The application for site plan review has not been submitted yet. At this time, no new development is being proposed. There shall be no impact to the natural beauty of the O:\PLAN\5 DEVELOPMENT REVIEW\1Dev Rev Projects\Fore St (Portland Gateway\Public Hearing\Portland Gateway Memo.doc

5 Planning Board Report # Four-lot Subdivision (Portland Gateway Project Subdivision) February 28 th, 2017 Public Hearing Page 5 area or adverse effects to significant wildlife habitat, rare or irreplaceable natural areas, or any public access to the shoreline. 6. Comprehensive Plan (Section (a) 9) State Goal A encourages orderly growth and development in appropriate areas of each community, while protecting the State s rural character, making efficient use of public services and preventing development sprawl. Through this proposed subdivision, this goal and subsequent policies as seen below are being met in a number of ways. The applicant is seeking to create new, conforming lots on a currently vacant infill site located adjacent to the India Street neighborhood and the Old Port Historic and Commercial district. This project, as proposed, will ultimately lead to a significant increase in housing and job opportunities in a highly walkable location, easily accessible via public transportation. As an infill lot, this subdivision facilitates development opportunities away greenfield sites and in a location, that has already previously been developed. Maximize development where public infrastructure and amenities, such as schools, parks, public/alternative transportation, sewer lines, and roads, exist or may be expanded at minimal cost. Create new housing to support Portland as an employment center and to achieve an improved balance between paying jobs and housing. Encourage neighborhood business centers throughout the city to reduce dependence on the car and to make neighborhood life without a car more practical. Locate and design housing to reduce impacts on environmentally sensitive areas. The first policy of Housing: Sustaining Portland s Future is to ensure an adequate and diverse supply of housing for all. Objectives under that policy include the following: Ensure the construction of a diverse mix of housing types that offers a continuum of options across all income levels, which are both renter and owner-occupied. Encourage higher density housing for both rental and home ownership opportunities, particularly located near services, such as schools, businesses, institutions, employers and public transportation. Encourage housing within and adjacent to the downtown. The Downtown Vision Plan, developed in 1991 and later adopted as an appendix item for the Comprehensive Plan, emphasizes the importance of a diverse built environment, specifically calling out retail, office and residential land-uses as key to the future success of the city s downtown. The proposed subdivision plan will create new buildable lots available for new commercial, office and residential land uses in a location on the periphery of the Old Port Commercial District as well as within the India Street neighborhood. These together may serve to increase downtown s population, strengthen the need for additional retail opportunities and services and attract future jobs. Preserve and enhance the livability of Downtown Portland for residents, workers, shoppers and visitors. Maintain and enhance the Downtown s prominence as the regional center for commerce, human services, historic resources, culture and the arts. Encourage growth and development Downtown while preserving and strengthening the unique identity and character of the Downtown. O:\PLAN\5 DEVELOPMENT REVIEW\1Dev Rev Projects\Fore St (Portland Gateway\Public Hearing\Portland Gateway Memo.doc

6 Planning Board Report # Four-lot Subdivision (Portland Gateway Project Subdivision) February 28 th, 2017 Public Hearing Page 6 Achieve the highest quality urban experience through high standards of excellence for improvements to the physical environment, including new construction, building alterations, and the enhancement of the pedestrian environment. Preserve and enhance the quality and vitality of neighborhoods within and adjacent to the Downtown. 7. Easements The applicant has provided proof of an existing shared access, utility and drainage easement, recorded on July 6, 2016 that shall serve Lots 1, 2 and Financial Capability (Section (a) 10) Staff has confirmed with the applicant that this information will be provided at the time of site plan review. IX. STAFF RECOMMENDATION Subject to the proposed motions and conditions of approval listed below, Planning Division staff recommends that the Planning Board approves the proposed development. X. PROPOSED MOTIONS DEVELOPMENT REVIEW On the basis of the application, plans, reports and other information submitted by the applicant, findings and recommendations contained in Planning Board Report #20-13 for application # relevant to the Subdivision Ordinance and other regulations, and the testimony presented at the Planning Board hearing, the Planning Board finds the following: That the subdivision plan [is or is not] in conformance with the subdivision standards of the land use code, subject to the following conditions of approval: i. The applicant shall submit a final recording plat with the location, width and purpose of all rights-of-way or easements. ii. The applicant shall submit a final recording plat that includes the footprint and associated site improvements for the AC Hotel that was approved by the Planning Board on May 24, iii. The applicant shall submit a final recording plat where Hancock Street Extension is changed to Hancock Street. iv. At the time of site plan review for each individual development, the applicant shall be responsible for providing an amended subdivision plan that meets all applicable requirements as stipulated under Article IV. Subdivisions, of the City s Land Use Code. ATTACHMENTS: PLANNING BOARD MEMO ATTACHMENTS 1. Planning Staff Review Public Comment a. PC1: Paula Foley-Stelmack O:\PLAN\5 DEVELOPMENT REVIEW\1Dev Rev Projects\Fore St (Portland Gateway\Public Hearing\Portland Gateway Memo.doc

7 Planning Board Report # Four-lot Subdivision (Portland Gateway Project Subdivision) February 28 th, 2017 Public Hearing Page 7 APPLICANT S SUBMITTAL A. Cover Letter B. Application C. Deed D. Easement Document PLANS Plan 1 Recording Plat O:\PLAN\5 DEVELOPMENT REVIEW\1Dev Rev Projects\Fore St (Portland Gateway\Public Hearing\Portland Gateway Memo.doc

8 Planning and Urban Development Department Planning Division February 22, 2017 Ara Aftandilian Portland Norwich Group, LLC 2330 Palm Ridge Road Sanibel, FL Matthew Phillips, Carroll Associates 217 Commercial St, Suite 200 Portland, ME RE: Staff Review Comments for Portland Gateway Project Subdivision ( ) Planning Board Review Project Name: Portland Gateway Project Subivision Project ID: ( ) Project Address: 158 Fore Street CBL: 019-B-20 Applicant: Ara Aftandilian Planner: Matthew Grooms Dear Mr. Lachman, Thank you for submitting a Level III Subdivision Plan application for a four lot subdivision located within the India Street Form Based Code District at 158 Fore Street. This proposal is being reviewed as a final plan for Planning Board review subject to the following applicable Land Use Code provisions: Subdivision Ordinance, Article IV Final Plan for Planning Board Review: Staff Review Comments Preliminary Subdivision Plan Comments Section (Matthew Grooms) 1. The location, width and purpose of all rights-of-way or easements shall be included on the proposed subdivision plan. 2. Note. During the site plan review process, a lighting plan, showing the location, design, height and spacing from each other of the support poles, in accordance with standards and specifications established by the public works authority shall be provided (may be on separate plan). 3. All previously approved site plans and approved structures shall be included in the subdivision plan, specifically the AC Hotel. 1

9 4. Hancock Street Extension shall be changed to Hancock Street. Additional Submittals Required: Please upload the digital plans and documents to address staff comments. Upon receipt of the revised material, the City of Portland will review the additional plans and information for conformance with applicable ordinances. Please be aware that an application expires within 120 days of the date upon which this written request for additional information was made and only one set of revised plans may be submitted for review. This item is scheduled to go before the Planning Board as a public hearing item on February 28, 2017 at 7:00 pm where the staff will provide the Planning Board with a recommendation to approve, approve with conditions, or deny the final site plan. If you have any questions, feel free to contact me at (207) or by at mgrooms@portlandmaine.gov. Sincerely, Matthew Grooms Planner Electronic Distribution: Tuck O Brien, Planning Division Director Barbara Barhydt, Development Review Services Manager Victoria Morales, Associate Corporation Counsel Anne Machado, Zoning Administrator Captain Keith Gautreau, Fire Jeff Tarling, City Arborist Tom Errico, P.E., TY Lin Associates Lauren Swett, P.E., Woodard & Curran 2

10 Google Groups Application ID or CBL#019 B aka the vicinity of 158 Fore St. Paula Foley Stelmack Posted in group: Planning Board Feb 10, :18 PM Hello Planning Board, My name is Paula Foley Stelmack and I live with my husband at 207 Fore St. (in a condo over the Hampton Inn). We have been here for 5+ years and I have some information that you should consider prior to your approving the proposed sub division. I can see the proposed subdivision from my window and walk by the site nearly every day and am extremely familiar with this area. As you know, Fore St. is fairly narrow in the India St. area and is extremely narrow in the vicinity of the proposed subdivision. The main route to access the proposed subdivision is from Franklin St (via 295). As you turn left onto Fore St., the vehicular traffic is often at a standstill waiting for vehicles to enter and exit the Hampton Inn or the 200+ vehicle parking lot across the street. Adding more traffic to this already bottlenecked area is a recipe for additional pedestrian and vehicle accidents. The traffic accessing the subdivision would need to travel through the already crowded intersection of Fore and India St. This again is a heavy pedestrian area and adding additional vehicles without a second route of egress is not safety wise. The suggestion of putting a stop light at this intersection would further back up traffic on Fore in front of the Hampton Inn, complicating an already existing problem. India street was not designed for the amount of traffic you are considering. The city has already approved an AC Hotel on this site with parking across the street. This will allow 100+ new vehicle to cross Fore St. back and forth to the hotel at least daily on top of existing traffic. This, in addition to the folks who already use the parking garage, will put too much pressure on an already struggling area. The additional private vehicles is one issue; however, if additional residential and commercial buildings are approve, they will require additional commercial traffic as well. Each weekday, I drive through this area and the Old Port and each and every day, come across a tractor trailer delivering goods to restaurants, stores and hotels. Once tractor trailer stopped on Fore St. caused blind spots for drivers and pedestrians. I am not in favor of dividing this vacant lot into 3 lots. I realize that Portland is growing heck, I moved here 5 years ago myself from Gorham. But I do want us together to build where it make sense with appropriate consideration of traffic and pedestrians. This does not appear to be the right place for further subdivision. Thanks you for your time in considering my comments. Sincerely

11 Paula Foley Stelmack 207 Fore St. Unit 1 Portland, ME (c )

12 17 Main Street, P.O. Box 394 Topsfield, Massachusetts January 27, 2017 Ms. Barbara Barhydt Mr. Tuck O Brien City of Portland Planning Division 389 Congress Street, 4th Floor Portland, ME Re: Portland Gateway Project Subdivision Plan Fore/Thames/India Streets Dear Barbara & Tuck, On behalf of Portland Norwich Group LLC and Portland Norwich Acquisition LLC, I am submitting a Level III Final Site Plan Application for the subdivision of the remainder lot adjacent to the AC Hotel Portland project. A Recording Plat has been prepared by Owen Haskell and is dated January 12, The subject property is shown as Lot 2 on the Recording Plat dated March 11, 2016 and recorded in Plan Book 216, Page 185. The property is 32,102 SF of vacant land. Lot 1 on this Plat is the AC Hotel Portland lot. Portland Norwich Group LLC conveyed Lot 2 to Portland Norwich Acquisition LLC on July 6, 2016, and this deed is recorded in Book 32730, Page 337. This conveyance was necessary to create a single purpose entity for construction financing for the AC Hotel Portland project. The new subdivision plan creates three new lots, Lots #2, #3 and #4, within the previous Lot 2, for future residential and commercial buildings. The previous Lot 2 and the three new lots will have the benefit of the Access, Drainage and Utility Easement Agreement recorded in Book 55979, Page 82 on October 20, I have included a copy of this easement with this application. Please let me know if you have any questions or require additional information. Thank you. Sincerely, Ara Aftandilian Ara Aftandilian

13 Level III Preliminary and Final Site Plans Development Review Application Portland, Maine Planning and Urban Development Department Planning Division Portland s Planning and Urban Development Department coordinates the development review process for site plan, subdivision and other applications under the City s Land Use Code. Attached is the application form for a Level III: Preliminary or Final Site Plan. Please note that Portland has delegated review from the State of Maine for reviews under the Site Location of Development Act, Chapter 500 Stormwater Permits, and Traffic Movement Permits. Level III: Site Plan Development includes: New structures with a total floor area of 10,000 sq. ft. or more except in Industrial Zones. New structures with a total floor area of 20,000 sq. ft. or more in Industrial Zones. New temporary or permanent parking area(s) or paving of existing unpaved parking areas for more than 75 vehicles. Building addition(s) with a total floor area of 10,000 sq. ft. or more (cumulatively within a 3 year period) except in Industrial Zones. Building addition(s) with a total floor area of 20,000 sq. ft. or more in Industrial Zones. A change in the use of a total floor area of 20,000 sq. ft. or more in any existing building (cumulatively within a 3 year period). Multiple family development (3 or more dwelling units) or the addition of any additional dwelling unit if subject to subdivision review. Any new major or minor auto business in the B-2 or B-5 Zone, or the construction of any new major or minor auto business greater than 10,000 sq. ft. of building area in any other permitted zone. Correctional prerelease facilities. Park improvements: New structures greater than 10,000 sq. ft. and/or facilities encompassing 20,000 sq. ft. or more (excludes rehabilitation or replacement of existing facilities); new nighttime outdoor lighting of sports, athletic or recreation facilities not previously illuminated. Land disturbance of 3 acres or more (includes stripping, grading, grubbing, filling or excavation). Portland s development review process and requirements are outlined in the Land Use Code (Chapter 14) which is available on our website: Land Use Code: Design Manual: Technical Manual: Planning Division Office Hours Fourth Floor, City Hall Monday thru Friday 389 Congress Street 8:00 a.m. 4:30 p.m. (207) planning@portlandmaine.gov

14 PROJECT NAME: PORTLAND GATEWAY PROJECT SUBDIVISION PROPOSED DEVELOPMENT ADDRESS: FORE, INDIA, THAMES STREETS PROJECT DESCRIPTION: LAND SUBDIVISION: DIVIDE VACANT LAND PARCEL (ADJACENT TO THE AC HOTEL PORTLAND) INTO THREE SEPARATE LOTS. CHART/BLOCK/LOT: MAP 19, BLOCK B, LOT 20 PRELIMINARY PLAN (date) 019-B-20 FINAL PLAN (date) CONTACT INFORMATION: Applicant must be owner, Lessee or Buyer Name: ARA AFTANDILIAN Applicant Contact Information Work #: Business Name, if applicable: PORTLAND NORWICH GROUP, LLC PORTLAND NORWICH ACQUISITION, LLC Address: 2330 PALM RIDGE ROAD Home #: Cell #: Fax#: City/State : SANIBEL, FL Zip Code: AA.SUMMIT@PRODIGY.NET Owner (if different from Applicant) Name: SAME AS APPLICANT Address: Owner Contact Information Work #: Home #: City/State : Zip Code: Cell #: Fax#: Agent/ Representative Name: SAME AS APPLICANT Address: Agent/Representative Contact information Work #: Home #: City/State : Zip Code: Cell #: Fax#: Billing Information Billing Contact Information Name: Work #: Home #: Address: P.O. BOX 394 Cell #: Fax#: City/State : TOPSFIELD, MA Zip Code:

15 Engineer Engineer Contact Information Name: NOT APPLICABLE Work #: Address: Home #: City/State : Zip Code: Cell #: Fax#: Surveyor Name: JOHN SWAN, OWEN HASKELL, INC. Address: 390 US ROUTE ONE City/State : FALMOUTH, ME Zip Code: Surveyor Contact Information Home #: Work #: Cell #: Fax#: Architect Name: Address: NOT APPLICABLE JSWAN@OWENHASKELL.COM Architect Contact Information Work #: Home #: City/State : Zip Code: Cell #: Fax#: Attorney Name: LEE LOWRY, JENSEN BAIRD GARDNER HENRY Address: 10 FREE STREET, PO BOX 4510 City/State : PORTLAND, ME Zip Code: Designated person/person(s) for uploading to e-plan: Name: ARA AFTANDILIAN AA.SUMMIT@PRODIGY.NET Attorney Contact Information Work #: Home #: Cell #: LLOWERY@JBGH.COM Fax#: Name: MATTHEW PHILLIPS, CARROLL ASSOCIATES MPHILLIPS@CARROLL-ASSOC.COM Name:

16 APPLICATION FEES: Level III Development (check applicable reviews) Less than 50,000 sq. ft. ($750.00) 50, ,000 sq. ft. ($1,000) 100, ,000 sq. ft. ($2,000) 200, ,000 sq. ft. ($3,000) over 300,00 sq. ft. ($5,000) Parking lots over 11 spaces ($1,000) After-the-fact Review ($1, plus applicable application fee) Plan Amendments (check applicable reviews) Planning Staff Review ($250) Planning Board Review ($500) _ The City invoices separately for the following: Notices ($.75 each) Legal Ad (% of total Ad) Planning Review ($50.00 hour) Legal Review ($75.00 hour) Third party review fees are assessed separately. Any outside reviews or analysis requested from the Applicant as part of the development review, are the responsibility of the Applicant and are separate from any application or invoice fees. Other Reviews (check applicable reviews) X Traffic Movement ($1,500) Stormwater Quality ($250) Subdivisions ($500 + $25/lot) # of Lots x $25/lot = Site Location ($3,500, except for residential projects which shall be $200/lot) # of Lots x $200/lot = Other Change of Use Flood Plain Shoreland Design Review Housing Replacement Historic Preservation 3 $75 = $575 INSTRUCTIONS FOR ELECTRONIC SUBMISSION: Please refer to the application checklist (attached) for a detailed list of submission requirements. 1. Fill out the application completely and the application only to planning@portlandmaine.gov (Please be sure to designate a person who will be responsible for uploading documents and drawings.) This step will generate the project ID number for your project. 2. An invoice for the application fee will be to you. Payments can be made on-line at Pay Your Invoice, by mail or in person at City Hall, 4 th Floor. Please reference the Application Number when submitting your payment which is located in the upper left hand corner of the invoice. 3. The designated person responsible for uploading documents and drawings will receive an from eplan@portlandmaine.gov with an invitation into the project. At this time, you will upload all corresponding documents and plans into the project. For first time users you will receive a temporary password which you must change on entry. Make note of your username and password for any future projects. Reminder: Before the project can move forward, the application fee shall be paid in full and all required documents and drawings shall be uploaded into e-plan correctly. 4. Follow the link below (Applying Online Instructions) for step by step instructions on how to do the following: Tab 1 - Setting up the appropriate compatibility settings for your PC and getting started in e-plan. Tab 2 - Preparing your drawings, documents and photos for uploading using the correct naming conventions Tab 3 - Preparing and uploading revised drawings and documents Applying Online Instructions 5. When ready, upload your files and documents into the following folders: "Application Submittal Drawings" "Application Submittal Documents"

17

18 PROJECT DATA The following information is required where applicable, in order to complete the application. 32,102 Total Area of Site sq. ft. Proposed Total Disturbed Area of the Site sq. ft. If the proposed disturbance is greater than one acre, then the applicant shall apply for a Maine Construction General Permit (MCGP) with DEP and a Stormwater Management Permit, Chapter 500, with the City of Portland. Impervious Surface Area Impervious Area (Total Existing) Impervious Area (Total Proposed) Building Ground Floor Area and Total Floor Area Building Footprint (Total Existing) Building Footprint (Total Proposed) Building Floor Area (Total Existing) Building Floor Area (Total Proposed) 32,102 sq. ft. sq. ft. sq. ft. sq. ft. sq. ft. sq. ft. Zoning Existing Proposed, if applicable Land Use Existing Proposed Residential, If applicable # of Residential Units (Total Existing) # of Residential Units (Total Proposed) # of Lots (Total Proposed) # of Affordable Housing Units (Total Proposed) Proposed Bedroom Mix # of Efficiency Units (Total Proposed) # of One-Bedroom Units (Total Proposed) # of Two-Bedroom Units (Total Proposed) # of Three-Bedroom Units (Total Proposed) Parking Spaces # of Parking Spaces (Total Existing) # of Parking Spaces (Total Proposed) # of Handicapped Spaces (Total Proposed) Bicycle Parking Spaces # of Bicycle Spaces (Total Existing) # of Bicycle Spaces (Total Proposed) Estimated Cost of Project INDIA STREET FORM BASED CODE AND SHORELAND SAME VACANT, SINGLE LOT VACANT, 3 LOTS

19 Applicant Checklist X X X X X Planner Checklist FINAL PLAN - Level III Site Plan GENERAL WRITTEN SUBMISSIONS CHECKLIST # of (* If applicant chooses to submit a Preliminary Plan, then the * items were Copies submitted for that phase and only updates are required) 1 * Completed Application form 1 * Application fees 1 * Written description of project 1 * Evidence of right, title and interest 1 * Evidence of state and/or federal permits 1 * Written assessment of proposed project's specific compliance with applicable Zoning requirements * Summary of existing and/or proposed easements, covenants, public or 1 private rights-of-way, or other burdens on the site 1 * Evidence of financial and technical capacity 1 Construction Management Plan A traffic study and other applicable transportation plans in accordance with 1 Section 1 of the technical Manual, where applicable. Written summary of significant natural features located on the site (Section (b) (a)) 1 Stormwater management plan and stormwater calculations 1 Written summary of project's consistency with related city master plans 1 Evidence of utility capacity to serve Written summary of solid waste generation and proposed management of solid waste A code summary referencing NFPA 1 and all Fire Department technical standards Where applicable, an assessment of the development's consistency with any applicable design standards contained in Section and in City of Portland Design Manual Manufacturer s verification that all proposed HVAC and manufacturing equipment meets applicable state and federal emissions requirements. Updated: October 6,

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

Level III Preliminary and Final Site Plans Development Review Application Portland, Maine Planning and Urban Development Department Planning Division

Level III Preliminary and Final Site Plans Development Review Application Portland, Maine Planning and Urban Development Department Planning Division Level III Preliminary and Final Site Plans Development Review Application Portland, Maine Planning and Urban Development Department Planning Division Portland s Planning and Urban Development Department

More information

PLANNING BOARD REPORT PORTLAND, MAINE

PLANNING BOARD REPORT PORTLAND, MAINE PLANNING BOARD REPORT PORTLAND, MAINE India Newbury Residences Subdivision & Conditional Use Review 2016-096 India Newbury Residences, LLC Submitted to: Portland Planning Board Date: May 20, 2016 Public

More information

249 A001 & A002; 250 A001; 251 A005& A009; 255 A002 Applicant: City of Portland Economic Development Department Jean Fraser

249 A001 & A002; 250 A001; 251 A005& A009; 255 A002 Applicant: City of Portland Economic Development Department Jean Fraser CITY OF PORTLAND, MAINE PLANNING BOARD Carol Morrissette, Chair Stuart G. O Brien, Vice Chair Joe Lewis Lee Lowry, III Michael J. Patterson David Silk Bill Hall February 3 rd, 2012 Gregory Mitchell City

More information

PLANNING BOARD REPORT PORTLAND, MAINE

PLANNING BOARD REPORT PORTLAND, MAINE PLANNING BOARD REPORT PORTLAND, MAINE, 636 Riverside Street Level III Subdivision and Site Plan Review 2016-047 Submitted to: Portland Planning Board Date: June 23, 2016 Public Hearing Date: June 28, 2016

More information

SUBDIVISION APPLICATION

SUBDIVISION APPLICATION SUBDIVISION APPLICATION Community Planning and Economic Development Development Services Division 250 South 4 th Street, Room 300 Minneapolis MN 55415-1316 612-673-3000 This application packet is used

More information

CITY OF PORTLAND, MAINE PLANNING BOARD

CITY OF PORTLAND, MAINE PLANNING BOARD CITY OF PORTLAND, MAINE PLANNING BOARD Elizabeth Boepple, Chair Sean Dundon, Vice Chair Carol Morrissette David Eaton Kristien Nichols Lisa Whited Maggie Stanley July 29, 2016 Andrew Kraus M & A Lowcountry

More information

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

Town of Windham. Planning Department 8 School Road Windham, ME voice fax Town of Windham Planning Department 8 School Road Windham, ME 04062 voice 207.894.5960 fax 207.892.1916 MEMO DATE: September 3, 2013 TO: Tony Plante, Town Manager FROM: Ben Smith, Assistant Town Planner

More information

ARTICLE 15 - PLANNED UNIT DEVELOPMENT

ARTICLE 15 - PLANNED UNIT DEVELOPMENT Section 15.1 - Intent. ARTICLE 15 - PLANNED UNIT DEVELOPMENT A PUD, or Planned Unit Development, is not a District per se, but rather a set of standards that may be applied to a development type. The Planned

More information

Financial Impact Statement There are no immediate financial impacts associated with the adoption of this report.

Financial Impact Statement There are no immediate financial impacts associated with the adoption of this report. STAFF REPORT Planning and Development Department Subject: Application by RYC Property to rezone a portion of lands on John Murray Dr. and Megan Lynn Dr. from R2 to R3 and to enter into a Development Agreement

More information

ARTICLE FIVE FINAL DRAFT

ARTICLE FIVE FINAL DRAFT ARTICLE FIVE 021218 FINAL DRAFT Sec. 503.6 Open Space Preservation Option Open Space Preservation Option Open Space Preservation developments may be approved in the AR, R-1, R-2 and R-3 zoning districts,

More information

Application for Sketch Plan Review

Application for Sketch Plan Review Town of Standish 175 Northeast Road Standish, ME - 04084 Phone: (207)642-3461 Fax: (207) 642-5181 Application for Sketch Plan Review Applicant & Owner Information 1) Name of Applicant: Address: Phone:

More information

May 21, ACHD Board of Commissioners Stacey Yarrington, Planner II DRH /DRH

May 21, ACHD Board of Commissioners Stacey Yarrington, Planner II DRH /DRH Development Services Department May 21, 2013 TO: FROM: SUBJECT: ACHD Board of Commissioners Stacey Yarrington, Planner II DRH13-00106/DRH13-00108 Executive Summary: This is a design review application

More information

Condominium Unit Requirements.

Condominium Unit Requirements. ARTICLE 19 CONDOMINIUM REGULATIONS Section 19.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019 DEVELOPMENT NAME SUBDIVISION NAME Springhill Village Subdivision Springhill Village Subdivision LOCATION 4350, 4354, 4356, 4358,

More information

Chapter 100 Planned Unit Development in Corvallis Urban Fringe

Chapter 100 Planned Unit Development in Corvallis Urban Fringe 100.100 Scope and Purpose. Chapter 100 Planned Unit Development in Corvallis Urban Fringe (1) All applications for land divisions in the Urban Residential (UR) and Flood Plain Agriculture (FPA) zones within

More information

APPLICATION PROCEDURE

APPLICATION PROCEDURE ANTRIM PLANNING BOARD P. O. Box 517 Antrim, New Hampshire 03440 Phone: 603-588-6785 FAX: 603-588-2969 APPLICATION FORM AND CHECKLIST FOR MINOR OR MAJOR SITE PLAN REVIEW File Date Received By APPLICATION

More information

PUD Ordinance - Cascade Lakes Plat #10 of 1995

PUD Ordinance - Cascade Lakes Plat #10 of 1995 PUD Ordinance - Cascade Lakes Plat #10 of 1995 CASCADE CHARTER TOWNSHIP Ordinance #10 of 1995 AN ORDINANCE TO AMEND THE CASCADE CHARTER TOWNSHIP ZONING ORDINANCE AND ZONING MAP TO ESTABLISH THE CASCADE

More information

CHARLOTTE PLANNING COMMISSION FINDINGS OF FACT AND DECISION IN RE APPLICATION OF. George R. Aube 1450 Dorset Street

CHARLOTTE PLANNING COMMISSION FINDINGS OF FACT AND DECISION IN RE APPLICATION OF. George R. Aube 1450 Dorset Street CHARLOTTE PLANNING COMMISSION FINDINGS OF FACT AND DECISION IN RE APPLICATION OF George R. Aube 1450 Dorset Street Final Plan Review For A Two-Lot Subdivision Application # PC-13-19 Background The Planning

More information

CONDOMINIUM REGULATIONS

CONDOMINIUM REGULATIONS ARTICLE 37 CONDOMINIUM REGULATIONS SECTION 37.01. Purpose The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

PLANNING RATIONALE REPORT

PLANNING RATIONALE REPORT PLANNING RATIONALE REPORT Zoning By-law Amendment Application 2920 Danbury Way Prepared for: Bravar Custom Builders Inc. and Village View Estates Ltd. by: 6393 Roslyn Street Ottawa (Orleans), Ontario K1C

More information

THE CITY OF MOBILE, ALABAMA

THE CITY OF MOBILE, ALABAMA THE CITY OF MOBILE, ALABAMA LETTER OF DECISION March 9, 2018 Byrd Surveying, Inc. 2609 Halls Mill Road Mobile, AL 36606 Re: 4439 Rangeline Road (Northwest corner of Rangeline Road and Halls Mill Road).

More information

TENTATIVE PARCEL MAP APPLICATION GUIDE TENTATIVE PARCEL MAP APPLICATION REQUIREMENTS

TENTATIVE PARCEL MAP APPLICATION GUIDE TENTATIVE PARCEL MAP APPLICATION REQUIREMENTS TENTATIVE PARCEL MAP APPLICATION GUIDE SISKIYOU COUNTY PLANNING DIVISION 806 South Main Street, Yreka CA 96097 Phone: (530) 841-2100 / Fax: (530) 841-4076 TENTATIVE PARCEL MAP APPLICATION REQUIREMENTS

More information

PLANNING BOARD Major Development Review DRAFT Findings of Fact January 24, 2017 REVISED JANUARY 24, 2017

PLANNING BOARD Major Development Review DRAFT Findings of Fact January 24, 2017 REVISED JANUARY 24, 2017 PLANNING BOARD Major Development Review DRAFT Findings of Fact January 24, 2017 REVISED JANUARY 24, 2017 Project Location: Thomas Point Road Tax Map: Map 42, Lot 16 Zoning District: R6 (Cooks Corner Neighborhood)

More information

CHARLOTTE PLANNING COMMISSION FINDINGS OF FACT AND DECISION IN RE APPLICATION OF

CHARLOTTE PLANNING COMMISSION FINDINGS OF FACT AND DECISION IN RE APPLICATION OF Background CHARLOTTE PLANNING COMMISSION FINDINGS OF FACT AND DECISION IN RE APPLICATION OF Henrietta Ober 2296 Greenbush Road and Stephen and Margaret Foster 1259 Lime Kiln Road Final Plan Review For

More information

DRAFT Findings of Fact Major Development Review Final Subdivision Plan September 10, 2015

DRAFT Findings of Fact Major Development Review Final Subdivision Plan September 10, 2015 DRAFT Findings of Fact Major Development Review Final Subdivision Plan September 10, 2015 Project Name: Meadow Rose Farm Subdivision Case Number: 15-015 Tax Map: Map 17, Lot 126 Applicant: Two Clarks,

More information

FINAL DRAFT 12/1/16, Rev. to 7/18/17

FINAL DRAFT 12/1/16, Rev. to 7/18/17 FINAL DRAFT 12/1/16, Rev. to 7/18/17 (As Adopted 8/8/17 Effective 9/1/17) SHELTON PLANNING AND ZONING COMMISSION Proposed Amendments to Zoning Regulations I. Amend Section 23 PERMITTED USES by inserting

More information

Town of Shelburne, Vermont

Town of Shelburne, Vermont Town of Shelburne, Vermont CHARTERED 1763 P.O. BOX 88 5420 SHELBURNE ROAD SHELBURNE, VT 05482 www.shelburnevt.org 802-985-5118 * * Also available in alternate formats in accordance with the Americans With

More information

STATE OF MICHIGAN COUNTY OF MARQUETTE, TOWNSHIP OF NEGAUNEE LAND DIVISION, SUBDIVISION AND CONDOMINIUM ORDINANCE

STATE OF MICHIGAN COUNTY OF MARQUETTE, TOWNSHIP OF NEGAUNEE LAND DIVISION, SUBDIVISION AND CONDOMINIUM ORDINANCE STATE OF MICHIGAN COUNTY OF MARQUETTE, TOWNSHIP OF NEGAUNEE LAND DIVISION, SUBDIVISION AND CONDOMINIUM ORDINANCE Adopted: August 8 th, 2008 Effective: August 28 th, 2008 Sec.100. Title ARTICLE I GENERAL

More information

Committed to Service

Committed to Service Committed to Service Paul Woods, President Rebecca W. Arnold, Vice President Sara M. Baker, Commissioner Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner August 25, 2017 Development Services TO:

More information

UPPER MOUNT BETHEL TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA

UPPER MOUNT BETHEL TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA UPPER MOUNT BETHEL TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA JOINDER DEED / LOT CONSOLIDATION TOWNSHIP REVIEW PROCESS When accepting proposed Joinder Deeds / Lot Consolidations, review the Joinder Deed

More information

Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION

Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION Date Received: Fee Paid (amount): Applicant: Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION Subdivision Name/Title: This application must be received at the Town Office by close of business on the

More information

APPLICATION FOR SUBDIVISION APPROVAL OF A SKETCH PLAN with checklist

APPLICATION FOR SUBDIVISION APPROVAL OF A SKETCH PLAN with checklist Prior to filing any application for SUBDIVISION approval, the applicant shall request in writing that the zoning administrator schedule a pre-submission conference. APPLICATION TO THE PLANNING BOARD TOWN

More information

Site Plan Application

Site Plan Application Site Plan Application City of St. Pete Beach Community Development Department 155 Corey Avenue St. Pete Beach, Florida 33706 (727) 367-2735 www.stpetebeach.org Case Number: PROPERTY OWNER: Name: Address:

More information

SUBDIVISION, PLANNED UNIT DEVELOPMENT, ZONING AMENDMENT, & SIDEWALK WAIVER STAFF REPORT Date: July 19, 2018

SUBDIVISION, PLANNED UNIT DEVELOPMENT, ZONING AMENDMENT, & SIDEWALK WAIVER STAFF REPORT Date: July 19, 2018 SUBDIVISION, PLANNED UNIT DEVELOPMENT, ZONING AMENDMENT, & SIDEWALK WAIVER STAFF REPORT Date: July 19, 2018 NAME SUBDIVISION NAME LOCATION West Mobile Properties, LLC U.S. Machine Subdivision 556, 566,

More information

In order to permit maximum applicability of the PUD District, PUD-1 and PUD-2 Districts are hereby created.

In order to permit maximum applicability of the PUD District, PUD-1 and PUD-2 Districts are hereby created. ARTICLE III. PUD ned Unit Development Overlay District 205-128. Purpose. The PUD ned Unit Development Overlay District is intended to provide flexibility in the design of planned projects; to encourage

More information

DAUPHIN CREEK ESTATES SUBDIVISION

DAUPHIN CREEK ESTATES SUBDIVISION # 12 SUB-000076-2017 DAUPHIN CREEK ESTATES SUBDIVISION Engineering Comments: FINAL PLAT COMMENTS (should be addressed prior to submitting the FINAL PLAT for review and/or signature by the City Engineer):

More information

THE CITY OF MOBILE, ALABAMA MOBILE Crry PLANNING COMMISSION

THE CITY OF MOBILE, ALABAMA MOBILE Crry PLANNING COMMISSION THE CITY OF MOBILE, ALABAMA MOBILE Crry PLANNING COMMISSION LETTER OF DECISION MLK Avenue Redevelopment Corp. Attn: Michael Pierce P.O. Box 2204 Mobile, AL 36652 Re: Case #SUB2014-00040 (Subdivision) MLK

More information

Nassau County Department of Planning & Economic Opportunity Nassau Place Yulee, Florida 32097

Nassau County Department of Planning & Economic Opportunity Nassau Place Yulee, Florida 32097 Nassau County Department of Planning & Economic Opportunity 96161 Nassau Place Yulee, Florida 32097 APPLICATION AND INSTRUCTIONS FOR FUTURE LAND USE MAP AMENDMENT (TEN (10) ACRES OR MORE) NOTICE: Florida

More information

Residential Major Subdivision Review Checklist

Residential Major Subdivision Review Checklist Residential Major Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

Final Plats for Major Residential and Commercial Subdivisions Checklist

Final Plats for Major Residential and Commercial Subdivisions Checklist Project Name: : This form is a checklist of Zoning Ordinance requirements for major residential and commercial subdivision plats to assist the applicant in their submittal. It is not intended to be a comprehensive

More information

APPLICATION FOR MINOR SUBDIVISION INSTRUCTION TO APPLICANTS

APPLICATION FOR MINOR SUBDIVISION INSTRUCTION TO APPLICANTS Planning Services Division 3675 Mt. Diablo Boulevard, Suite 210 Lafayette, CA 94549 Tel. (925) 284-1976 Fax (925) 284-1122 http://www.ci.lafayette.ca.us APPLICATION FOR MINOR SUBDIVISION INSTRUCTION TO

More information

Residential Minor Subdivision Review Checklist

Residential Minor Subdivision Review Checklist Residential Minor Subdivision Review Checklist Plan Submittal Requirements: 2 full sets of stamped plans Electric submittal - all plans contained in a single PDF 3 full sets if commercial kitchen or dining

More information

COMMERCIAL SITE DEVELOPMENT GUIDE FOR UNINCORPORATED ST. CHARLES COUNTY

COMMERCIAL SITE DEVELOPMENT GUIDE FOR UNINCORPORATED ST. CHARLES COUNTY COMMERCIAL SITE DEVELOPMENT GUIDE FOR UNINCORPORATED ST. CHARLES COUNTY GENERAL INFORMATION: This brochure is to be used as a guide and is not intended to amend or supersede the corresponding County ordinances

More information

2030 General Plan. December 6, 7 pm

2030 General Plan. December 6, 7 pm 2030 General Plan GPAC Meeting #9 GPAC Meeting #9 December 6, 7 pm City Council Input on Working Draft Land Use Map Council discussed GPAC & PC versions of the working draft land use map 11/28 Council

More information

ARTICLE 13 CONDOMINIUM REGULATIONS

ARTICLE 13 CONDOMINIUM REGULATIONS ARTICLE 13 CONDOMINIUM REGULATIONS Section 13.01 Purpose. The purpose of this Article is to regulate projects that divide real property under a contractual arrangement known as a condominium. New and conversion

More information

I. Requirements for All Applications. C D W

I. Requirements for All Applications. C D W 108-16.1. Application checklists. Checklist for Required Submissions to the Planning Board or Zoning Board of Adjustment of Monroe Township All required submissions are to be made to the Administrative

More information

ARTICLE SINGLE FAMILY SITE CONDOMINIUM DEVELOPMENT STANDARDS

ARTICLE SINGLE FAMILY SITE CONDOMINIUM DEVELOPMENT STANDARDS ARTICLE 28.00 SINGLE FAMILY SITE CONDOMINIUM DEVELOPMENT STANDARDS Section 28.01 PURPOSE The purpose of this Article is to recognize that conventional single family developments, traditionally developed

More information

PUD Ordinance - Caravelle Village #7 of 1995

PUD Ordinance - Caravelle Village #7 of 1995 PUD Ordinance - Caravelle Village #7 of 1995 CASCADE CHARTER TOWNSHIP Ordinance #17 of 1995 AN ORDINANCE TO AMEND THE CASCADE CHARTER TOWNSHIP ZONING ORDINANE AND ZONING MAP TO ESTABLISH THE CARAVELLE

More information

Guide to Combined Preliminary and Final Plats

Guide to Combined Preliminary and Final Plats Guide to Combined Preliminary and Final Plats Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested

More information

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513)

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513) CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT 11700 SPRINGFIELD PIKE SPRINGDALE, OHIO 45246 TELEPHONE: (513) 346-5730 SUBMISSION REQUIREMENTS AND INSTRUCTIONS FOR FINAL PUD/TRANSITION DISTRICT

More information

MINUTE ORDER BONNER COUNTY COMMISSIONERS PUBLIC HEARING MINUTES AUGUST 6, 2015

MINUTE ORDER BONNER COUNTY COMMISSIONERS PUBLIC HEARING MINUTES AUGUST 6, 2015 MINUTE ORDER BONNER COUNTY COMMISSIONERS PUBLIC HEARING MINUTES AUGUST 6, 2015 CALL TO ORDER: Chair Cary Kelly called the Bonner County Commissioners hearing to order at 1:00 p.m. in the 3rd floor meeting

More information

Staff Report PLANNED DEVELOPMENT. Salt Lake City Planning Commission. From: Lauren Parisi, Associate Planner; Date: December 14, 2016

Staff Report PLANNED DEVELOPMENT. Salt Lake City Planning Commission. From: Lauren Parisi, Associate Planner; Date: December 14, 2016 Staff Report PLANNING DIVISION COMMUNITY & NEIGHBORHOODS To: Salt Lake City Planning Commission From: Lauren Parisi, Associate Planner; 801-535-7932 Date: December 14, 2016 Re: 1611 South 1600 East PLANNED

More information

Guide to Preliminary Plans

Guide to Preliminary Plans Guide to Preliminary Plans Introduction The Douglas County is committed to providing open, transparent application processes to the public. This Guide is provided to assist anyone interested in the procedures

More information

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513)

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513) CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT 11700 SPRINGFIELD PIKE SPRINGDALE, OHIO 45246 TELEPHONE: (513) 346-5730 SUBMISSION REQUIREMENTS AND INSTRUCTIONS FOR DEVELOPMENT PLAN APPROVAL An

More information

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: August 8, 2013

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: August 8, 2013 ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: August 8, 2013 NAME SUBDIVISION NAME PV-Magnolia, LLC Twelve Trees Subdivision LOCATION 2860, 2862 and 2866 Pleasant Valley Road

More information

TOWN OF ELIOT PLANNING BOARD SUBDIVISION APPLICATION

TOWN OF ELIOT PLANNING BOARD SUBDIVISION APPLICATION TOWN OF ELIOT PLANNING BOARD SUBDIVISION APPLICATION This application shall conform in all respects to the Land Subdivision Standards of Chapter 41 of the Planning Board of the Town of Eliot code of ordinances.

More information

Conditional Use Permit / Standard Subdivision Application

Conditional Use Permit / Standard Subdivision Application Conditional Use Permit / Standard Subdivision Application Name of Proposed Subdivision: Total Area (Acres) Is Proposed Subdivision to be built in phases? Number of Lots If yes, how many phases? Applicant/Owner

More information

Medical Marijuana Special Exception Use Information

Medical Marijuana Special Exception Use Information Medical Marijuana Special Exception Use Information The Special Exception Use information below is a modified version of the Unified Development Code. It clarifies the current section 5:104 Special Exceptions

More information

New Private Way Ordinance Westbrook Planning Board Workshop , Planning Board Public Hearing Definitions

New Private Way Ordinance Westbrook Planning Board Workshop , Planning Board Public Hearing Definitions 201 Definitions Private Right of Way; Private way A strip of land at least fifty feet wide, meeting the minimum standards for the construction of a gravel base for a public road, over which abutters may

More information

ARTICLE XI CONDITIONAL USE PERMITS

ARTICLE XI CONDITIONAL USE PERMITS ARTICLE XI CONDITIONAL USE PERMITS 11.1 Purpose. The City of Hailey recognizes that certain uses possess unique and special characteristics with respect to their location, design, size, method of operation,

More information

ARTICLE VII TDR. 701 Purpose.

ARTICLE VII TDR. 701 Purpose. ARTICLE VII TDR 701 Purpose. The primary purpose of establishing a TDR program is to permanently preserve prime farmland, sensitive natural areas, and rural community character that would be lost if the

More information

1. The owner of the property is Richmond Contract Manufacturing. 2. The property is located at 307 Front Street.

1. The owner of the property is Richmond Contract Manufacturing. 2. The property is located at 307 Front Street. RICHMOND PLANNING BOARD TUESDAY, FEBRUARY 24, 2015 TOWN OFFICE MEETING ROOM 6:00P.M. MINUTES 1.0 CALL TO ORDER Present: Russ Hughes, Jeff Severance, Larry Srock, Jessica Alexander and Tom Nugent. Others

More information

BOUNDARY LINE ADJUSTMENT

BOUNDARY LINE ADJUSTMENT DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street, Port Townsend, WA 98368 Tel: 360.379.4450 Fax: 360.379.4451 Web: www.co.jefferson.wa.us/communitydevelopment E-mail: dcd@co.jefferson.wa.us BOUNDARY

More information

RESIDENTIAL AND RECREATIONAL

RESIDENTIAL AND RECREATIONAL Energy, Mines & Resources Land Management Branch 320-300 Main Street Whitehorse, Yukon Y1A 2B5 667-5215 Fax 667-3214 www.emr.gov.yk.ca RESIDENTIAL AND RECREATIONAL Lot Enlargement Policy OBJECTIVE To facilitate

More information

CHAPTER 3 PRELIMINARY PLAT

CHAPTER 3 PRELIMINARY PLAT 10-3-1 10-3-3 SECTION: CHAPTER 3 PRELIMINARY PLAT 10-3-1: Consultation 10-3-2: Filing 10-3-3: Requirements 10-3-4: Approval 10-3-5: Time Limitation 10-3-6: Grading Limitation 10-3-1: CONSULTATION: Each

More information

MULTI-FAMILY DWELLING UNIT SUBDIVISION ORDINANCE TOWN OF SIDNEY, MAINE

MULTI-FAMILY DWELLING UNIT SUBDIVISION ORDINANCE TOWN OF SIDNEY, MAINE MULTI-FAMILY DWELLING UNIT SUBDIVISION ORDINANCE TOWN OF SIDNEY, MAINE I. GENERAL A. Title B. Purpose C. Administration D. Scope II. DEFINITIONS A. Building Height B. Dwelling Unit C. Family D. Multi-Unit

More information

SANDOVAL COUNTY PLANNING AND ZONING COMMISSION DECEMBER 10, 2015 PUBLIC HEARING

SANDOVAL COUNTY PLANNING AND ZONING COMMISSION DECEMBER 10, 2015 PUBLIC HEARING SANDOVAL COUNTY PLANNING AND ZONING COMMISSION DECEMBER 10, 2015 PUBLIC HEARING To: Sandoval County Planning and Zoning Commission From: Sandoval County Planning and Zoning Division Staff Date: December

More information

PLANNING AND ZONING DEPARTMENT

PLANNING AND ZONING DEPARTMENT Town of Minturn Development Review Process: Guide To Planned Unit Developments (Concept Plan) This guide describes the Planned Unit Development Process. This guide should be utilized in conjunction with

More information

A GUIDE TO PROCEDURES FOR: SUBDIVISIONS & CONDOMINIUM CONVERSION

A GUIDE TO PROCEDURES FOR: SUBDIVISIONS & CONDOMINIUM CONVERSION A GUIDE TO PROCEDURES FOR: SUBDIVISIONS & CONDOMINIUM CONVERSION A GUIDE TO PROCEDURES FOR: SUBDIVISIONS (TENTATIVE MAPS) PURPOSE Definition: A subdivision is defined as the division of any improved or

More information

REZONING APPLICATION INSTRUCTIONS

REZONING APPLICATION INSTRUCTIONS REZONING APPLICATION INSTRUCTIONS All required information, as stated on the Rezoning Application Checklist, must be included to qualify as a complete application. Upon receipt, staff will review the application

More information

4. facilitate the construction of streets, utilities and public services in a more economical and efficient manner;

4. facilitate the construction of streets, utilities and public services in a more economical and efficient manner; PVPC MODEL BYLAW BY-RIGHT CLUSTER ZONING BYLAW Prepared by Pioneer Valley Planning Commission Revised: October 2001 1.00 Development 1.01 Development Allowed By Right Development in accordance with this

More information

PLANNING COMMISSION REPORT REGULAR AGENDA. PC Staff Report 08/25/10 ITEM NO 6: PRELIMINARY PLAT; HALLMARK ADDITION; ACRES; 151 MCDONALD DR (MKM)

PLANNING COMMISSION REPORT REGULAR AGENDA. PC Staff Report 08/25/10 ITEM NO 6: PRELIMINARY PLAT; HALLMARK ADDITION; ACRES; 151 MCDONALD DR (MKM) PP-6-6-10 Item No. 6-1 PLANNING COMMISSION REPORT REGULAR AGENDA PC Staff Report 08/25/10 ITEM NO 6: PRELIMINARY PLAT; HALLMARK ADDITION; 5.252 ACRES; 151 MCDONALD DR (MKM) PP-6-6-10: Consider a Preliminary

More information

Committed to Service

Committed to Service Committed to Service Kent Goldthorpe, President Paul Woods, Vice President Rebecca W. Arnold, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner July 18, 2016 Development Services TO:

More information

City of East Orange. Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST

City of East Orange. Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST COMPLETE: Applicant Information: Type of Proposal: OFFICE USE ONLY: New Residential Case #: Date: New Accessory

More information

MAJOR SUBDIVISION APPLICATION

MAJOR SUBDIVISION APPLICATION Revised 2.26.18 The Department is here to assist you with your development application pursuant to the Community Development Code (CDC). This publication outlines the Major Subdivision Development Application

More information

APPLICATION REVIEW CHECKLISTS

APPLICATION REVIEW CHECKLISTS APPLICATION REVIEW CHECKLISTS The following must be submitted with and are part of each application. No application is complete until all required documentation has been submitted to the Community Development

More information

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513)

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513) CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT 11700 SPRINGFIELD PIKE SPRINGDALE, OHIO 45246 TELEPHONE: (513) 346-5730 SUBMISSION REQUIREMENTS AND INSTRUCTIONS FOR REVISIONS TO APPROVED DEVELOPMENT

More information

Understanding the Conditional Use Process

Understanding the Conditional Use Process Understanding the Conditional Use Process The purpose of this document is to explain the process of applying for and obtaining a conditional use permit in the rural unincorporated towns of Dane County.

More information

Planning and Zoning Commission STAFF REPORT

Planning and Zoning Commission STAFF REPORT TO: FROM: Planning and Zoning Commission STAFF REPORT CASA GRANDE PLANNING AND ZONING COMMISSION James Gagliardi, AICP, City Planner MEETING DATE: September 1, 2016 REQUEST AGENDA # Request by Marshall

More information

Mount Airy Planning Commission March 26, Staff Report

Mount Airy Planning Commission March 26, Staff Report Mount Airy Planning Commission March 26, 2018 Staff Report Special Exception Request Mixed Use Development in CC District Recommendation to Board of Appeals CASE MA-A-18-01 Applicant: Location: Zoning:

More information

Village of Port Jefferson Urban Renewal Plan

Village of Port Jefferson Urban Renewal Plan Urban Renewal Plan Village of Port Jefferson Urban Renewal Plan Port Jefferson, New York PREPARED FOR Village of Port Jefferson Village Board 121 West Broadway Port Jefferson, NY 11777 631.473.4724 PREPARED

More information

Waseca County Planning and Zoning Office

Waseca County Planning and Zoning Office Waseca County Planning and Zoning Office 300 North State Street Waseca, Minnesota 56093 Phone: 507-835-0650 Fax: 507-837-5310 Form no. PZ 081009 Web Site: www.co.waseca.mn.us FEES: 1) CUP FEE- $400.00

More information

PLAINFIELD CHARTER TOWNSHIP COMMUNITY DEVELOPMENT DEPARTMENT PLANNING, ZONING & BUILDING SERVICES MEMORANDUM

PLAINFIELD CHARTER TOWNSHIP COMMUNITY DEVELOPMENT DEPARTMENT PLANNING, ZONING & BUILDING SERVICES MEMORANDUM PLAINFIELD CHARTER TOWNSHIP COMMUNITY DEVELOPMENT DEPARTMENT PLANNING, ZONING & BUILDING SERVICES 6161 BELMONT AVENUE N.E. BELMONT, MI 49306 PHONE 616-364-1190 FAX: 616-364-1170 www.plainfieldchartertwp.org

More information

City of Peachtree City. Annexation Review Process

City of Peachtree City. Annexation Review Process City of Peachtree City Annexation Review Process Page 1 Annexation Review Process Step One: Initial annexation information The following information is to be completed by the property owner and/ or their

More information

3.1 PZ / 20 W. Northwest Highway / Nicholas & Associates / Plat of subdivision and conditional use for a final planned unit development

3.1 PZ / 20 W. Northwest Highway / Nicholas & Associates / Plat of subdivision and conditional use for a final planned unit development Agenda Item Details Meeting Category Subject Access Type Feb 22, 2018 - MOUNT PROSPECT PLANNING AND ZONING COMMISSION 3. NEW BUSINESS 3.1 PZ-01-18 / 20 W. Northwest Highway / Nicholas & Associates / Plat

More information

GENERAL POLICIES GOVERNING LAND USE AND CITY LAND SALES IN WAUSAU WEST BUSINESS AND INDUSTRIAL PARK

GENERAL POLICIES GOVERNING LAND USE AND CITY LAND SALES IN WAUSAU WEST BUSINESS AND INDUSTRIAL PARK GENERAL POLICIES GOVERNING LAND USE AND CITY LAND SALES IN WAUSAU WEST BUSINESS AND INDUSTRIAL PARK Introduction: Wausau West Business and Industrial Park is recognized as an important asset to the City

More information

Article 7: Residential Land Use and Development Requirements

Article 7: Residential Land Use and Development Requirements Article 7: Residential Land Use and Section 701: Statement of Intent (A) (B) (C) The intent of Article 7 is to develop certain land use and development requirements for the residential uses within Cumru

More information

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513)

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513) CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT 11700 SPRINGFIELD PIKE SPRINGDALE, OHIO 45246 TELEPHONE: (513) 346-5730 SUBMISSION REQUIREMENTS AND INSTRUCTIONS FOR MINOR REVISIONS TO PUD/TRANSITION

More information

SUBJECT: Application for Planned Unit Development and Rezoning 1725 Winnetka Road

SUBJECT: Application for Planned Unit Development and Rezoning 1725 Winnetka Road TO: FROM: CHAIRMAN BILL VASELOPULOS AND MEMBERS OF THE PLAN & ZONING COMMISSION STEVE GUTIERREZ DIRECTOR OF COMMUNITY DEVELOPMENT MEETING DATE: September 5, 2017 SUBJECT: Application for Planned Unit Development

More information

Spirit Lake North, LLC

Spirit Lake North, LLC BONNER COUNTY PLANNING DEPARTMENT PLANNING AND ZONING COMMISSION STAFF REPORT FOR March 1, 2018 Project Name: Amendment & Zone Change: Spirit Lake North, LLC File Number,Type: AM 162-18/ZC365-18 Request:

More information

Town of Windham Land Use Ordinance Sec. 900 Subdivision Review SECTION 900 SUBDIVISION REVIEW

Town of Windham Land Use Ordinance Sec. 900 Subdivision Review SECTION 900 SUBDIVISION REVIEW Sections SECTION 900 SUBDIVISION REVIEW 901 Purpose 9-2 902 Statutory Review Criteria 9-2 903 Authority and Administration 9-5 904 Joint Application and Hearing 9-6 905 Classification of Subdivision 9-6

More information

PUD Ordinance - Caravelle #2 of 2002

PUD Ordinance - Caravelle #2 of 2002 PUD Ordinance - Caravelle #2 of 2002 CASCADE CHARTER TOWNSHIP Ordinance # 2 of 2002 AN ORDINANCE TO AMEND THE CASCADE CHARTER TOWNSHIP ZONING ORDINANCE AND ZONING MAP TO ESTABLISH THE Caravelle Village

More information

DIVISION 7. R-6 AND R-6A RESIDENTIAL ZONES* The purpose of the R-6 residential zone is:

DIVISION 7. R-6 AND R-6A RESIDENTIAL ZONES* The purpose of the R-6 residential zone is: Date of Draft: March 6, 2015 DIVISION 7. R-6 AND R-6A RESIDENTIAL ZONES* Sec. 14-135. Purpose. The purpose of the R-6 residential zone is: (a) To set aside areas on the peninsula for housing characterized

More information

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1 Proposed Name of Subdivision: City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1 FOR PRELIMINARY SUBDIVISION APPROVAL This application must be filled out legibly, in

More information

Date: March 16, Jake Centers ERD, LLC P.O. Box 1610 Eagle, ID Elevation Ridge Subdivision (SUB & PUD ) Street Address

Date: March 16, Jake Centers ERD, LLC P.O. Box 1610 Eagle, ID Elevation Ridge Subdivision (SUB & PUD ) Street Address Rebecca W. Arnold, President Sara M. Baker, Vice President John S. Franden, Commissioner Carol A. McKee, Commissioner David L. Case, Commissioner Date: March 16, 2012 To: Jake Centers ERD, LLC P.O. Box

More information

Operating Standards Attachment to Development Application

Operating Standards Attachment to Development Application Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org Operating Standards Attachment to Development Application 1 PLANNED DEVELOPMENT

More information

CHAPTER XVIII SITE PLAN REVIEW

CHAPTER XVIII SITE PLAN REVIEW CHAPTER XVIII SITE PLAN REVIEW Section 18.1 Section 18.2 Description and Purpose. The purpose of this chapter is to provide standards and procedures under which applicants would submit, and the Township

More information

ADDRESS / DESCRIPTION: Northeast corner of Sandbridge Road and Atwoodtown Road ELECTION DISTRICT: PRINCESS ANNE

ADDRESS / DESCRIPTION: Northeast corner of Sandbridge Road and Atwoodtown Road ELECTION DISTRICT: PRINCESS ANNE 10 & 11 March 14, 2012 Public Hearing APPLICANT: MARLYN DEVELOPMENT CORPORATION PROPERTY OWNER: CORAL DEVELOPMENT, LLC STAFF PLANNER: Faith Christie REQUEST: Modification of Conditional Change of Zoning

More information

CONDITIONAL USE PERMIT Application Packet

CONDITIONAL USE PERMIT Application Packet CONDITIONAL USE PERMIT Application Packet Community Development Department 1020 East Pioneer Road, Draper, UT 84020 (801) 576-6539 Fax (801) 576-6526 Dear Applicant, This application packet has been developed

More information

ZONING ORDINANCE: OPEN SPACE COMMUNITY. Hamburg Township, MI

ZONING ORDINANCE: OPEN SPACE COMMUNITY. Hamburg Township, MI ZONING ORDINANCE: OPEN SPACE COMMUNITY Hamburg Township, MI ARTICLE 14.00 OPEN SPACE COMMUNITY (Adopted 1/16/92) Section 14.1. Intent It is the intent of this Article to offer an alternative to traditional

More information