1 Chapter 3 The National Highway Authority of India (NHAI) and the Project Highway 3.1 Introduction. 3.2 Establishment. 3.3 Functions. 3.4 Projects of the NHAI. 3.5 The NHAI and the Project Highway The location of the Project Highway Clearances The Build Operate Transfer (BOT) Project The Model Concession Agreement (MCA) Grant of Concession Construction Aspects of the Project Highway Obligations of the NHAI Completion of the Project Highway Tests of the Project Highway Operation and Maintenance of the Project Highway Financing Arrangements. 3.6 The Provisional Completion Certificate.

2 Chapter 3 The National Highway Authority of India (NHAI) and the Project Highway 3.1 Introduction The National Highway Authority of India (NHAI) is an autonomous agency of the Government of India, responsible for management of a network of over 60,000 km of National Highways in India. The Authority is a nodal agency of the Ministry of Road Transport and Highways (MoRTH). 3.2 Establishment The NHAI, a statutory body, was created under the provisions of the National Highways Authority of India Act, In February 1995, the Authority was formally made an autonomous body. It succeeded the erstwhile Ministry of Surface Transport (MOST). It s principle office is at G-5 and 6, Sector 10, Dwarka, New Delhi Functions It is responsible for the development, maintenance, management and operation of National Highway totalling over 70,548 km in length. 27

3 3.4 Projects of the NHAI The NHAI has the mandate to implement the National Highway Development Project (NHDP). The NHDP is one of the most ambitious projects launched in the independent India. The NHDP comprises following phases: Phase I: Approved in December It includes 5,846 km. Golden Quadrilateral (GQ) connecting the four major cities of Delhi, Mumbai, Chennai and Kolkata, portions of the NS EW corridors and connectivity of four major ports to National Highways. Phase II: Approved in December Estimated cost of Rs. 34,339 Crores (At 2002 prices). It included the completion of the NS EW corridors and other 486 km highways. It links Kashmir in the North to Kanyakumari in the South including spur from Salem to Kochi and Silchar in the East and Porbandar in the West. Phase III A: Approved in March Estimated cost Rs. 22,207 Crores (At 2004 prices). It included up gradation and 4-laning of 4,035 km of National Highways on the BOT basis. Phase III B: Approved in April Estimated cost Rs. 54,339 Crores. It includes up gradation and 4-laning of 8,074 km National Highways. Phase V: Approved in October It includes upgrades to 6-lanes for 6,500 km of which 5,700 km is on Golden Quadrilateral (GQ). This phase is entirely on a Design, Build, Finance and Operate (DBFO) basis. Phase VI: Approved in November It includes development of 1,000 km of Expressways at an estimated cost of Rs. 16,680 Crores. Phase VII: Approved in December It will develop ring roads, by-passes and flyovers to avoid traffic bottlenecks on selected stretches at an estimated cost of Rs. 16,680 Crores. 28

4 3.5 The NHAI and the Project Highway The Location of the Project Highway Mumbai Agra road, National Highway No. 3 is one of the most important highways in the network of National Highways that carries heavy long distance commercial traffic. The Ministry of Road Transport and Highways (MoRTH) decided to improve this road on the BOT basis. The National Highway Authority of India (NHAI) is the implementing authority for this project. For the purpose of project preparation, the selected length of this corridor is divided into convenient sections based on their traffic generation and attraction potential, geographic location and other considerations. One such section that falls in Maharashtra between Vadape (km 539/500) to Gonde (km 440/000) is chosen for implementation. (Ch 0.00 is at Indore and increases towards Mumbai). Village Gonde is about 25 km south of Nashik and Vadape is at the end of 4-lane wide Bhiwandi By-pass toll section, about 20 km. north of Thane. The Ministry appointed Consulting Engineering Services (India) Private Limited (CES) as the Consultant for providing necessary technical service to prepare Detailed Project Report (DPR). The Project Road length runs in North-South direction and passes through Nashik and Thane district. Out of the 100 km road length, 30% lies in the Nashik district and remaining in the Thane district. Alignment traverses through Igatpuri Taluka in Nashik district and Shahapur and Bhiwandi Talukas in Thane district. There are in all 52 number of villages through which the alignment passes. 29

5 The important towns on way are Ghoti (km 453) in Igatpuri Taluka, Igatpuri (km 463), Khardi (km 493) and Shahapur (km 513). There are six major roads (State Highways) that join or cross the National Highway. In addition there are 73 more road junctions of village roads joining the highway Clearances For construction of the Project Highway following clearances were obtained. i) Environment Clearance from Ministry of Environment and Forest (MoEF). ii) iii) iv) Forest Clearance from Regional Forest Office, Bhopal. Road Over Railway Bridge from Central Railway. Permission from Tree Authority for tree cutting. The clearances from above authorities were required because 1) The project affects forest lands. In some places it needed acquisition of the forest land. 2) The Noise level along the Project Road was already high and was expected to increase progressively. It also causes air pollution. 3) For 4-laning, transplanting the existing trees to the extent possible was planed but still cutting the existing trees was unavoidable. 4) The Project Highway crosses various streams, rivers, gorges and railway tracks. 30

6 3.5.3 The Build, Operate, Transfer (BOT) Project The BOT Documents were prepared and offers were called by the Ministry. The BOT i.e. Build, Operate, Transfer arrangement means the private investor (Concessionaire) builds, operates and transfers the project back to the Government at the end of a specified period, called the Concession Period The Model Concession Agreement (MCA) The Model Concession Agreement for this Project Highway was signed on 14 th October 2005 between the National Highway Authority of India (NHAI) and the Concessionaire i.e. M/s. Mumbai Nasik Expressway Limited, a company incorporated under the provisions of the Companies Act It has its registered office at Gammon House, Veer Savarkar Marg, Prabhadevi, Mumbai The NHAI was keen to implement a project envisaging Improvement, Operation and Maintenance, Rehabilitation and Strengthening of the existing 2-lane NH-3 and widening it to 4-lane divided highway of Vadape to Gonde section of NH-3 from km to km in the State of Maharashtra on the BOT basis. The MoRTH invited the Request for Proposals on the BOT basis on 19 th September 2003 and subsequent to that the NHAI issued and prescribed the technical and commercial terms and conditions vide its letter no. NHAI/BOT/11019/1/2003 dated 28 th February, 2004 (the Tender Notice) and invited Bids from the BOT Entrepreneurs. The NHAI received the BID from the Consortium Members, Gammon India Limited (having its registered office at Gammon House, Veer Savarkar Marg, Prabhadevi, Mumbai ) as the Lead Member, Sadbhav Engineering Limited (having its registered office at Sadbhav House, Opposite Law Garden Police Chowki, Ellis Bridge, Ahmadabad) and B.E. Billimoria and Company (having registered office at Wankhede Stadium (North Stand) D Road, Churchgate, Mumbai ). 31

7 After evaluation of the Bids so received, the NHAI accepted the Bid of the Consortium and issued its Letter of Acceptance No. NHAI/BOT/ 11019/1/2003/227 dated 16 th June, 2005 (LOA) to the Consortium, requiring its confirmation of acceptance of LOA, the execution of the Concession Agreement within thirty days of the date of acceptance of LOA and furnishing of Performance Security before signing of the Concession Agreement. The Consortium accepted the said LOA and the terms and conditions therein and issued its acceptance of the LOA vide its Letter No. VG/PKU/VSK/2005/31 dated Subsequently the Consortium has promoted and incorporated the Concessionaire (M/s. Mumbai Nasik Expressway Limited) to enter into the Concession Agreement for undertaking the design, engineering, financing, procurement, construction, operation and maintenance of the Project Highway on the BOT basis. The Consortium also submitted the Performance Security of Rs. Seventeen Crores and Thirty Seven Lakhs for the Project vide its Letter No. VG/PKU/VSK/20O5/43 dated 27 th July, Grant of Concession Subject to and in accordance with the terms and conditions of the Concession Agreement, the concession period of 20 years commencing from the Appointed Date (means the date, 180 days from signing of the Concession Agreement [Date of Signing 14 th October, 2005]) was granted by the NHAI. According to the Concession Agreement, the Concessionaire is entitled to develop, design, engineer, finance, procure, construct, operate and maintain the Project Highway during the Concession Period and after completion of the Project Highway and during the Operations Period to manage, operate and maintain the Project Highway. The Concessionaire according to the MCA is entitled to levy and collect 32

8 Fees from the users of the Project Highway and refuse entry of any vehicle to the Project Highway if the due fee is not paid. The overall estimated cost of the project was estimated approximately Rs. 536 Crores (a base cost including the Kasara Ghat Bypass) and the Financial Internal Rate of Return (FIRR) is worked out to 15.48%. The Concessionaire is entitled to suggest locations of Toll Plazas and the Project Monitoring Unit Complex and pay for acquisition of lands for it. The NHAI and the Concessionaire will jointly appoint Independent Consultant and the Project Monitoring Unit to supervise the progress of the work. The construction programme will be of 5 years, divided into 2 stages. In the 1 st stage of 3 years duration, most of the priority works will be completed. The 2 nd stage of 2 years will attend to residual works like service roads, drains, amenities and arboriculture etc Construction Aspects of the Project Highway As the major work has to be completed within an initial limited period of 3 years, all the sections should remain in progress simultaneously and there are no intersay priorities in between them. Each section will have two major components, that is, improvement of the existing road and construction of second (new) carriageway. It will be necessary to construct the new carriageway, divert traffic on it and then switch over to improvement of the existing highway. For this purpose eccentric widening of the roadway is preferred to symmetrical widening of the existing road, which will ensure minimum hindrance to traffic plying on the existing road. As far as possible, it will be preferable to keep the construction vehicles separated from the main traffic flows. Concessionaire has to use 33

9 his ingenuity in planning and implementing construction methodology and adopt traffic control methods accordingly. The overall prioritization of component sub-works comprise of preconstruction and during construction activities. The sequence of such construction activities is suggested below. A) Pre Construction Activities : 1) Obtaining No Objection Certificates (NOCs). 2) Environment Clearance. 3) Land Acquisition. 4) Relocating Utilities. 5) Felling of Trees. 6) Appointment of the BOT Agencies. B) During Construction : 1) Construction of new road starting with construction of culverts and bridges and service roads, including construction of New Kasara Ghat road. It is possible to take up construction of about 15 km of road length between Ghoti and Kasara within available ROW i.e. till additionally required land is acquired in other stretches. 2) New road embankment and pavement (including Ghat bypass). 3) Diverting traffic to new road (in sub-sections if possible). 4) Construction of culverts and bridges if any, on the existing road. 5) Improvement to existing road, camber correction and pavement. 6) Road furniture, side drains, median. 7) Toll plaza, amenities, land scaping. 34

10 3.5.7 Obligations of the NHAI The NHAI agrees to observe, comply and perform the following: 1) Enable access to the Site to the Concessionaire, free from Encumbrances, in accordance with the MCA. 2) Permit peaceful use of the site by the Concessionaire as licensee under and in accordance with the provisions of the MCA without any let or hindrance from the NHAI or person claiming through or under it. 3) Assist and provide all reasonable support to the Concessionaire in obtaining Applicable Permits. 4) Upon written request from the Concessionaire, assist the Concessionaire in obtaining access to all necessary infrastructure facilities and utilities, including water, electricity and telecommunication facilities at rates and on terms no less favourable to the Concessionaire than those generally available to commercial customers receiving substantially equivalent services. 5) Procure that no barriers are erected or placed by the Government of Maharashtra or any Governmental Agency on the Project Highway except on account of any law and order situation or upon national security considerations. 6) Enter into the State Support Agreement with the Concessionaire and the Government of Maharashtra. 7) Assist the Concessionaire in obtaining necessary assistance to regulate traffic on the Project Highway subject to and in accordance with the Applicable Laws. 8) Assist the Concessionaire in obtaining Police assistance from the Government of Maharashtra against payment of prescribed costs and charges, if any, for 35

11 traffic regulation, patrolling and provisions of security on the Project Highway. 9) Operate and maintain the Project Highway during the Development Period, at its own cost and expenses, in a manner that the level of service is at no time inferior to the level prevailing on the date when bids were received for this Concession. 10) Observe and comply with its obligations set forth in this Agreement. 11) Take all necessary steps towards accomplishment of acquisition of additional land. The NHAI shall bear the cost of additional land. 12) Coordinate with the Government of Maharashtra authorities for completing the legal requirements and maintaining law and order during removal of encroachment by the Concessionaire. 13) Provide necessary support to the Concessionaire in obtaining necessary clearances / permissions / permits in respect of environmental clearances, tree cutting, compensatory afforestation, shifting of all types of utility services, construction of ROB/RUB on Railway lines and rehabilitation and resettlement. 14) Bear all expenses as per demand note raised by the concerned Government or other concerned agencies in respect of environmental clearances, tree cutting, compensatory afforestation, shifting of all types of utility services, construction of ROB/RUB on Railway lines and rehabilitation and resettlement. 15) Arrange to issue fee notification to get legal opinion from a legal counsel to the concessionaire. 36

12 3.5.8 Completion of the Project Highway According to the MCA, the Project shall be deemed to be complete and open to the traffic only when the Completion Certificate or Provisional Certificate is issued. Commercial Operation Date (COD) of the project shall be the date on which the Independent Consultant has issued the Completion Certificate or the Provisional Certificate, as the case may be, under the MCA and the Concessionaire shall not levy and collect any Fee until it has received such Completion Certificate or Provisional Certificate. The Concessionaire guarantees that the Project Completion shall be achieved in accordance with the provisions of the MCA on a date not later than 36 months from the Appointed Date. If the Project Completion is not achieved by the Scheduled Project Completion Date for any reason, the Concessionaire shall pay the NHAI as Weekly Damages for delay in the achievement of Commercial Operation Date [COD] an amount calculated at the rate of 0.01% of the Total Project Cost per week or part thereof. If the COD does not occur within 12 months from the Scheduled Project Completion Date, the NHAI shall be entitled to terminate the MCA Tests of the Project Highway Tests means the tests to be carried out to determine the Project Completion and its certification by the Independent Consultant for commencement of Commercial operation of the Project Highway. The NHAI shall designate a NHAI Representative to witness and observe Tests. 37

13 The Independent Consultant shall monitor the results of the Tests to determine the compliance of the Project Highway with the Specifications and Standards. The Concessionaire shall provide to the Independent Consultant and the NHAI with copies of all Test data including detailed Test results. At least 30 days prior to the likely completion of the Project Highway or each of (a) a continuous stretch of at least 50 km of the Project Highway and (b) the balance stretch of the Project Highway (if the length of the Project Highway is more than 50 km), the Concessionaire shall notify the Independent Consultant and the NHAI of the same and shall give notice of its intent to conduct any final Tests. The Concessionaire shall give to the NHAI and the Independent Consultant at least 10 days prior notice of the actual date or which it intends to commence the Tests and at least 7 days prior notice if the commencement date of any subsequent Tests. The Independent Consultant shall have the right to suspend or delay any Test that the performance of the Project Highway or any part thereof does not meet the Specifications and Standards. Upon the Independent Consultant determining the Tests to be successful, then that stretch of the Project Highway can be legally, safety and reliably placed in commercial operations, the Independent Consultant issues Completion Certificate to the Concessionaire and the NHAI in respect of that stretch. When all the stretches of the Project Highway receives Completion Certificate for all the stretches, a final Completion Certificate certifying the Project Completion is issued. The Concessionaire shall bear all the expenses relating to the Tests. 38

14 Operation and Maintenance of the Project Highway The Concessionaire shall operate and maintain the Project Highway by itself, of through O & M Contractors (O & M Contractor means the person or entity with whom the Concessionaire has entered into an O&M Contract for discharging Operation and maintenance functions for and on behalf of the Concessionaire) or if required modify, repair or otherwise make improvements to the Project Highway to comply with Specifications and Standards such as: Permitting safe, smooth and uninterrupted flow of traffic during normal operating conditions. Charging, collecting and retaining the fees in accordance with the MCA. Minimizing disruption to traffic in the event of accidents or other incidents affecting the safety and use of the Project Highway by providing rapid and effective response and maintaining emergency services. Undertaking routine maintenance including prompt repairs of potholes, crocks, concrete joints, drains, line markings, lighting and signage. Undertaking major maintenance such as resurfacing of pavements, repairs to structures, repairs and refurbishment of tolling system and hardware and other equipments. Carrying out periodic preventive maintenance to Project Highway including tolling system. Preventing with the assistance of concerned law enforcement agencies, unauthorized encroachment on the Project Highway including site and preserve the right of way (ROW) of the Project Highway. Maintaining Public Relations Units to interface with and attend to suggestions from users of the Project Highway, the media, the Government Agencies, and other external agencies. 39

15 In case of unsafe conditions, vehicle breakdowns and accidents; the Concessionaire shall follow up temporary traffic cones and lights, removal of obstructions and debris etc. The Concessionaire shall ensure that any diversion or interruption of traffic is remedied without delay. The Concessionaire s responsibility for rescue operation on the Project Highway shall be limited to the removal of vehicles or debris or any other obstruction, which may endanger or interrupt the smooth traffic flow on the Project Highway. The Concessionaire shall be responsible for the maintenance of the approach roads to and underpasses and overpasses upto 100 meters from the Project Highway Financing Arrangements a) Financial Close : The Concessionaire shall provide to the NHAI, a copy of Financing Package furnished by it to the prospective Senior Lenders. (Senior Lender means the financial institutions, banks, funds and agents or trustees of debenture holders, including their successors and assignees, who have agreed to provide finance or guarantee facility to the Concessionaire under any of the Financing Documents for meeting costs of all or any part of the Project). As and when such Financing Package is approved by the Senior Lenders, with or without modifications, a copy of the same shall be furnished by the Concessionaire to the NHAI. The Concessionaire shall achieve Financial Close within 180 days from the date of the MCA. If the Concessionaire fails to achieve the Financial Close within 180 days period, the Concessionaire shall be entitled to a further period of 180 days subject to an advance weekly payment by the Concessionaire to the NHAI of a sum of 40

16 Rs. 1,00,000/- per week or part thereof for any delay beyond the said first 180 days period as Damages on account of such delays. Financing Close means the date on which the Financing Documents providing for funding by the Senior Leaders have become effective and the Concessionaire has immediate access to such funding under the Financing Documents. Financing Documents means the documents executed by the Concessionaire in respect of financial assistance to be provided by the Senior Lenders by way of loans, guarantees, subscription to non-convertible debentures and other debt instruments, security agreements and other documents relating to the financing (including refinancing) of the Project. Financing Package means financing package of the Project furnished by the Concessionaire along with its Bid indicating the Total Project Cost and the means of financing thereof and shall be deemed to have been modified to the extent as submitted to the Senior Lenders and as approved by the Senior Lender for the purpose of funding of the Projects. Notwithstanding anything to the contrary contained in the MCA, the NHAI shall be entitled to terminate the MCA. b) Grant : The NHAI agrees to provide to the Concessionaire cash support by way of Grant equal to the sum as set forth in the Bid of Consortium and accepted by the NHAI aggregating to Rs Crores and the Concessionaire agrees to provide to the NHAI cash payment (the Negative Grant) equal to the sum as set forth in the Bid of the Consortium and accepted by the NHAI, aggregating Rs Crores during the Concession Period. Negative Grant shall be paid in advance within 90 days of the commencement of the year for which it is due and payable. 41

17 The Grant shall be applied by the Concessionaire for meeting the Capital Cost of the project and expenditure during the Operations period and shall be treated as part of the shareholders Funds i.e. the Equity Support. c) Revenue Shortfall Loan : If the Realisable Fees (means all the Fees due and realisable under the MCA but does not include fees that the Concessionaire has not been able to realise after due diligence and best effort) in any Accounting year during the Concession Period shall fall below the Subsistence Revenue Level (means the total amount of Fee revenue that is required by the Concessionaire in an Accounting Year to meet the sum of (a) the O & M Expense subject to an annual ceiling of 1.5%. Operations year, to be revised each year to reflect the variations in the WPI in each subsequent years and (b) Debt Service Payments due to the Senior Lenders in an Accounting Year) as a result of an Indirect Political Event (i.e. an act of war, invasion, armed conflict or act of foreign enemy blockade, riot, terrorist or military action etc. which prevent collection of Fees by the Concessionaire for a period of exceeding a continuous period of 7 days in an Accounting Year) or a Political Event (means change in law, expropriation or compulsory acquisition by any Government Agency of any Project Assets or rights of the Concessionaire or of the Contractors, etc.) agrees to provide to the Concessionaire such shortfall support by way of a loan called Revenue Shortfall Loan with interest SBI PLR per annum. SBI PLR means the prime lending rate per annum for loans with one year maturity as fixed from time to time by the State Bank of India, and in the absence of such rate, the average of the prime lending rates for loans with one year maturity fixed by the Bank of India and failing that any other arrangement that substitutes such prime lending rate as mutually agreed between the Parties. 42

18 d) Escrow Account : Escrow Account means an Account which the Concessionaire shall open and maintain with a Bank in which all inflows and outflows of cash on account of capital and revenue receipts and expenditure shall be credited and debited, as the case may be, in accordance with the provisions of the MCA. According to the MCA, the Concessionaire shall within 60 days from the date of the MCA open and establish the Escrow Account with a Bank and all funds constituting the Financing Package for meeting the Total Project Cost shall be credited to such Escrow Account. During Operation Period all fees collected by the Concessionaire from the users of the Project Highway shall be exclusively deposited therein. In addition, all fees collected by the NHAI in exercise of its right under this MCA during the Concession Period and all disbursements or payments by the NHAI shall also, subject to the rights of deductions and appropriations therefrom of the NHAI, should be deposited by the NHAI in the Escrow Account. e) The State Support Agreement : The State Support Agreement means the agreement to be entered into between the Government of Maharashtra, the NHAI and the Concessionaire substantially are fully described in the draft State Support Agreement set forth as Schedule R of the Concession Agreement for provision of support, backup and services required from the Government of Maharashtra for the performance of Concessionaire s obligations under this MCA. f) Insurance : The Concessionaire is required to take Insurance during the Construction Period as well as the Operation Period, at no cost to the NHAI up to maximum sums required in accordance with the Financing Documents and Applicable Laws. 43

19 g) Accounts and Audit : The Concessionaire shall maintain full accounts of all Fees including Realisable Fees (means all the Fees due and realisable under the MCA but does not include fees that Concessionaire has not been able to realise after due diligence and best efforts) and other revenues derived / collected by it from and on account of use of the Project Highway and of O&M Expenses and other costs paid out of the Project Escrow Account and shall provide to the NHAI copies of these accounts duly audited and certified by the Concessionaire s Statutory Auditors within 120 days of the close of each Accounting Year. The Statutory Auditors means an independent, recognized and reputable firm of Chartered Accountants duly licensed to practice in India acting as independent statutory auditors of the Concessionaire under the provisions of the Companies Act The Provisional Completion Certificate Sheladia Associates Inc. in association with M/s. Artefact Projects acted as Independent Consultants on the Project 4 laning of Vadape to Gonde from km 440/000 to km 539/500, section of NH-3 in the State of Maharashtra, India on the BOT basis. M/s. Mumbai Nasik Expressway Limited is the Concessionaire in the Project which signed the Concession Agreement dated 14 th October, 2005 with the NHAI. The Independent Consultants provided the Provisional Completion Certificates, one on 23 rd December, 2009, the second on 11 th May, 2010 and the third on 11 th July, The first Provisional Certificate dated 23 rd December, 2009 mentioned that 4 numbers of ROB s and 2 numbers of major bridges along with approaches are still incomplete 44

20 and competent Authority of the NHAI has approved their deletion from 1 st Milestone COD. Approximately 3 km. length is incomplete between km 440/000 to km 490/000. In this regard the Concessionaire has completed upto km to compensate for the incomplete 3 km between km 440/000 and 490/000 and to complete the required 50 km length for the 1 st Milestone. The second Provisional Completion Certificate dated 11 th May, 2010 was issued for the stretch from km 493/000 to 508/000 deducting 1.00 km length on account of incomplete status of ROB at resulted in a total completed length of 14 km. The Third Provisional Completion Certificate dated 11 th July, 2011 was issued for the stretch from km to km (2 nd Milestone) and for excluded sectional lengths of Milestone 1. The certificate certifies that all works have been completed on 31 st May, 2011, excluding 2 numbers ROBs and items appended in Punch list. It also states that the Competent Authority in NHAI HQ has approved the deletion of these two numbers of ROBs from 2 nd Milestone COD. Receiving such Provisional Completion Certificate, the Concessionaire is permitted that all parts of the Project Highway can be legally, safely and reliably placed in Commercial Operations. 45

21 Chapter 4 Financing Procedures and Rules for the Road Projects of the National Highway Authority of India (NHAI) Using the Public Private Partnership (PPP) Scheme 4.1 Introduction. 4.2 Meaning and Definition of the PPP Project. 4.3 Reasons for opting to use the PPP Scheme. 4.4 The PPPs in National Highways. 4.5 Framework for the PPPs in National Highways. 4.6 The PPP Database. 4.7 The Model Concession Agreements (MCA). 4.8 The Public Private Partnership Approval Committee (PPPAC). 4.9 Finance for the PPP Projects Meaning of India Infrastructure Project Development Fund (IIPDF) Purpose of the IIPDF The Viability Gap Funding Scheme Eligibility Criteria for getting support under VGF Scheme Procedure for getting the VGF Disbursement of the VGF India Infrastructure Finance Company Limited (IIFCL) the BOT variants used in National Highways Projects Meaning and Definition of the BOT Parties to the BOT Projects The BOT (Toll) Model The BOT (Annuity) Model Applicability of the BOT Models Advantages of the BOT Projects Issues Limiting Greater Participation of the Private Sector in the PPP.

Architects, Engineer & Consultant Pvt. Ltd.

Architects, Engineer & Consultant Pvt. Ltd. Operation & Maintenance Inspection Report Month of July 2015 Project: - Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Jaipur to Deoli section of NH 12 (Km 18.700

More information

Presentation at Asian Highways Investment Forum Bangkok, 8-9, October 2013 United Nations Economic & Social Commission For Asia & The Pacific

Presentation at Asian Highways Investment Forum Bangkok, 8-9, October 2013 United Nations Economic & Social Commission For Asia & The Pacific Presentation at Asian Highways Investment Forum Bangkok, 8-9, October 2013 United Nations Economic & Social Commission For Asia & The Pacific Investment Opportunities in Asian Highways/Highways Projects

More information

Revised translation by legal affairs Department CIB/CDC

Revised translation by legal affairs Department CIB/CDC Revised translation 26.08.07 by legal affairs Department CIB/CDC Law on Concessions CHAPTER I GENERAL PROVISIONS Article 1. The purpose of this Law is to promote and facilitate the implementation of privately

More information

Community Occupancy Guidelines

Community Occupancy Guidelines Community Occupancy Guidelines Auckland Council July 2012 Find out more: phone 09 301 0101 or visit www.aucklandcouncil.govt.nz Contents Introduction 4 Scope 5 In scope 5 Out of scope 5 Criteria 6 Eligibility

More information

DEVELOPMENT OF BOUTIQUE HOTEL & CONVENTION CENTRE AT SHILPARAMAM, VISAKHAPATNAM ON PPP BASIS BID SUMMARY. October 2018

DEVELOPMENT OF BOUTIQUE HOTEL & CONVENTION CENTRE AT SHILPARAMAM, VISAKHAPATNAM ON PPP BASIS BID SUMMARY. October 2018 DEVELOPMENT OF BOUTIQUE HOTEL & CONVENTION CENTRE AT SHILPARAMAM, VISAKHAPATNAM ON PPP BASIS BID SUMMARY October 2018 Andhra Pradesh Shilparamam Arts, Crafts & Cultural Society (APSACCS) Vijayawada, Andhra

More information

APPENDIX B1 EXECUTION OF PROJECT AGREEMENTS

APPENDIX B1 EXECUTION OF PROJECT AGREEMENTS APPENDIX B1 EXECUTION OF PROJECT AGREEMENTS 1. Project Agreements The Concessionaire shall enter into directly or through any Major Subcontractor, all such agreements as are necessary for the proper and

More information

Validation Report. India: Surat Manor Tollway Project. Operations Evaluation Department

Validation Report. India: Surat Manor Tollway Project. Operations Evaluation Department Validation Report Reference Number: PCV: IND 2008 13 Project Number: 29250 Loan Number: 1747 July 2008 India: Surat Manor Tollway Project Operations Evaluation Department ABBREVIATIONS ADB Asian Development

More information

Workshop on Public Private Partnerships in Vietnam. PPP An Indian Experience

Workshop on Public Private Partnerships in Vietnam. PPP An Indian Experience June 25, 2008 Workshop on Public Private Partnerships in Vietnam PPP An Indian Experience Infrastructure Leasing and Financial Services Ltd Hanoi Contents Section I : Infrastructure Leasing & Financial

More information

LIHPRHA, Pub. L. No , Title VI (1990), codified at 12 U.S.C et seq.

LIHPRHA, Pub. L. No , Title VI (1990), codified at 12 U.S.C et seq. LIHPRHA, Pub. L. No. 101-625, Title VI (1990), codified at 12 U.S.C. 4101 et seq. TITLE VI--PRESERVATION OF AFFORDABLE RENTAL HOUSING Subtitle A--Prepayment of Mortgages Insured Under National Housing

More information

DELHI DEVELOPMENT AUTHORITY OFFICE OF PR.COMMISSIONER(H,LD&CWG)

DELHI DEVELOPMENT AUTHORITY OFFICE OF PR.COMMISSIONER(H,LD&CWG) 1 DELHI DEVELOPMENT AUTHORITY OFFICE OF PR.COMMISSIONER(H,LD&CWG) Sub: Draft Slum Rehabilitation Policy based on Mumbai s Slum Rehabilitation Policy One of the major challenges that face DDA is to handle

More information

Ring-fencing Transfer Scheme

Ring-fencing Transfer Scheme IN THE HIGH COURT OF JUSTICE CLAIM NO: FS-2017-000004 BUSINESS AND PROPERTY COURTS OF ENGLAND AND WALES BUSINESS LIST (ChD) Financial Services and Regulatory LLOYDS BANK PLC - and - BANK OF SCOTLAND PLC

More information

BEFORE THE BIHAR ELECTRICITY REGULATORY COMMISSION VIDYUT BHAWAN II, PATNA

BEFORE THE BIHAR ELECTRICITY REGULATORY COMMISSION VIDYUT BHAWAN II, PATNA BEFORE THE BIHAR ELECTRICITY REGULATORY COMMISSION VIDYUT BHAWAN II, PATNA Petition For Determination of Annual Revenue Requirement (ARR) and SLDC operating charges for FY 2018-19 For State Load Despatch

More information

Government Emergency Ordinance No. 54/2006 on the regime of the concession contracts for public assets ( GEO No. 54/2006 );

Government Emergency Ordinance No. 54/2006 on the regime of the concession contracts for public assets ( GEO No. 54/2006 ); 219 Chapter 16 PPP & Concessions 1. General Public-private partnership ( PPP ) refers to forms of cooperation between public authorities and the world of business which aim to ensure the design, funding,

More information

RNB PROPERTY MANAGEMENT

RNB PROPERTY MANAGEMENT O-RUA THIS IS INTENDED TO BE A LEGALLY BINDING AGREEMENT (PLEASE READ CAREFULLY) This Express Rent-Up Agreement and Authorization (this Agreement ) is made this day of, 20 by and between RNB PROPERTY MANAGEMENT

More information

Master Repurchase Agreement

Master Repurchase Agreement Master Repurchase Agreement Dated as of Between: and Regions Bank 1. Applicability From time to time the parties hereto may enter into transactions in which one party ( Seller ) agrees to transfer to the

More information

Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011

Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 was introduced in the Lok Sabha by the Minister for Rural

More information

No. M-18012/14/2017/SMD/NMCG National Mission for Clean Ganga Ministry of Water Resources, River Development & Ganga Rejuvenation TENDR NOTICE

No. M-18012/14/2017/SMD/NMCG National Mission for Clean Ganga Ministry of Water Resources, River Development & Ganga Rejuvenation TENDR NOTICE No. M-18012/14/2017/SMD/NMCG National Mission for Clean Ganga Ministry of Water Resources, River Development & Ganga Rejuvenation 1 st Floor, Major Dhyan Chand National Stadium, India Gate, New Delhi-110002.

More information

Practice Followed by APIIC in Land Acquisition & Industrial Area Management

Practice Followed by APIIC in Land Acquisition & Industrial Area Management Practice Followed by APIIC in Land Acquisition & Industrial Area Management Acquisition, Allotment and Disposal of Land for Industrial Purpose Gives highest priority to creation of quality infrastructure

More information

As Introduced. 132nd General Assembly Regular Session H. B. No

As Introduced. 132nd General Assembly Regular Session H. B. No 132nd General Assembly Regular Session H. B. No. 368 2017-2018 Representative Lepore-Hagan Cosponsors: Representatives Holmes, Ingram, O'Brien, Reece, Sheehy A B I L L To amend sections 1343.01, 3781.10,

More information

ESCROW AGREEMENT. by and among HARBOR DEPARTMENT OF THE CITY OF LOS ANGELES. and. U.S. BANK NATIONAL ASSOCIATION, as Trustee and as Escrow Agent

ESCROW AGREEMENT. by and among HARBOR DEPARTMENT OF THE CITY OF LOS ANGELES. and. U.S. BANK NATIONAL ASSOCIATION, as Trustee and as Escrow Agent NP Draft 6/25/14 ESCROW AGREEMENT by and among HARBOR DEPARTMENT OF THE CITY OF LOS ANGELES and U.S. BANK NATIONAL ASSOCIATION, as Trustee and as Escrow Agent Dated 1, 2014 relating to: Harbor Department

More information

THE INSTITUTE OF MATHEMATICAL SCIENCES (An autonomous institution under the Dept. of Atomic Energy, Govt. of India) CHENNAI NOTICE INVITING TENDER

THE INSTITUTE OF MATHEMATICAL SCIENCES (An autonomous institution under the Dept. of Atomic Energy, Govt. of India) CHENNAI NOTICE INVITING TENDER THE INSTITUTE OF MATHEMATICAL SCIENCES (An autonomous institution under the Dept. of Atomic Energy, Govt. of India) CHENNAI NOTICE INVITING TENDER Sealed tenders in TWO parts are invited on behalf of the

More information

ORDINANCE NO AN ORDINANCE AMENDING THE CODE OF ORDINANCES OF THE CITY OF PORT ARANSAS, TEXAS, BY ADOPTING A NEW CHAPTER

ORDINANCE NO AN ORDINANCE AMENDING THE CODE OF ORDINANCES OF THE CITY OF PORT ARANSAS, TEXAS, BY ADOPTING A NEW CHAPTER ORDINANCE NO. 2008-09 AN ORDINANCE AMENDING THE CODE OF ORDINANCES OF THE CITY OF PORT ARANSAS, TEXAS, BY ADOPTING A NEW CHAPTER TWENTY-SIX CONCERNING IMPACT FEES FOR ROADWAY FACILITIES; INCORPORATING

More information

Replies to Queries of the Bidders

Replies to Queries of the Bidders Date: 07.12.2018 Replies to Queries of the Bidders SUB: Replies to queries of the bidders against Tender for carrying out survey works, opening of ROU & Manmad in Nashik GA to Dhule GA (approx. 300 km)

More information

DEVELOPMENT OF AMUSEMENT PARK WITH WATER RIDES AT SHILPARAMAM, TIRUPATI ON PPP BASIS BID SUMMARY

DEVELOPMENT OF AMUSEMENT PARK WITH WATER RIDES AT SHILPARAMAM, TIRUPATI ON PPP BASIS BID SUMMARY DEVELOPMENT OF AMUSEMENT PARK WITH WATER RIDES AT SHILPARAMAM, TIRUPATI ON PPP BASIS BID SUMMARY October 2018 Andhra Pradesh Shilparamam Arts, Crafts & Cultural Society (APSACCS) Vijayawada, Andhra Pradesh

More information

DEPARTMENT OF HUMAN SERVICES SENIORS AND PEOPLE WITH DISABILITIES DIVISION OREGON ADMINISTRATIVE RULES CHAPTER 411

DEPARTMENT OF HUMAN SERVICES SENIORS AND PEOPLE WITH DISABILITIES DIVISION OREGON ADMINISTRATIVE RULES CHAPTER 411 DEPARTMENT OF HUMAN SERVICES SENIORS AND PEOPLE WITH DISABILITIES DIVISION OREGON ADMINISTRATIVE RULES CHAPTER 411 DIVISION 310 DEVELOPMENTAL DISABILITIES COMMUNITY HOUSING 411-310-0010 Statement of Purpose

More information

Accounting for Amalgamations

Accounting for Amalgamations Accounting Standard (AS) 14 (revised 2016) Accounting for Amalgamations Contents INTRODUCTION Paragraphs 1-3 Definitions 3 EXPLANATION 4-27 Types of Amalgamations 4-6 Methods of Accounting for Amalgamations

More information

DEVELOPMENT OF CONVENTION CENTRE WITH GUEST ROOMS & SPA AT SHILPARAMAM, TIRUPATI ON PPP BASIS BID SUMMARY. October 2018

DEVELOPMENT OF CONVENTION CENTRE WITH GUEST ROOMS & SPA AT SHILPARAMAM, TIRUPATI ON PPP BASIS BID SUMMARY. October 2018 DEVELOPMENT OF CONVENTION CENTRE WITH GUEST ROOMS & SPA AT SHILPARAMAM, TIRUPATI ON PPP BASIS BID SUMMARY October 2018 Andhra Pradesh Shilparamam Arts, Crafts & Cultural Society (APSACCS) Vijayawada, Andhra

More information

NALCO S STANDARD TERMS & CONDITIONS OF SALE FROM PLANT.

NALCO S STANDARD TERMS & CONDITIONS OF SALE FROM PLANT. NALCO S STANDARD TERMS & CONDITIONS OF SALE FROM PLANT. All orders are accepted subject to NATIONAL ALUMINIUM COMPANY LIMITED s (hereinafter referred to as Seller) standard conditions of sale given below.

More information

CONNECTED TRANSACTIONS

CONNECTED TRANSACTIONS OVERVIEW We have entered into a number of continuing transactions with our connected persons in our ordinary and usual course of business. Upon the [REDACTED] of our Shares on the Stock Exchange, the transactions

More information

CHAPTER VII MAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY

CHAPTER VII MAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY CHAPTER VII MAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY Maharashtra Housing and Area Development Authority (MHADA) has been established by the Maharashtra Housing and Area Development Act, 1976.

More information

UNITED NATIONS CONVENTION ON THE ASSIGNMENT OF RECEIVABLES IN INTERNATIONAL TRADE

UNITED NATIONS CONVENTION ON THE ASSIGNMENT OF RECEIVABLES IN INTERNATIONAL TRADE UNITED NATIONS CONVENTION ON THE ASSIGNMENT OF RECEIVABLES IN INTERNATIONAL TRADE The Contracting States, PREAMBLE Reaffirming their conviction that international trade on the basis of equality and mutual

More information

MEMORANDUM OF ENCUMBRANCE

MEMORANDUM OF ENCUMBRANCE MEMORANDUM OF ENCUMBRANCE It is a requirement that a Memorandum of Encumbrance (as per the sample attached) be registered on the titles of the affected properties. The Memorandum of Encumbrance is to include

More information

INVITATION FOR BID (IFB) (LOCAL COMPETETIVE BIDDING)

INVITATION FOR BID (IFB) (LOCAL COMPETETIVE BIDDING) INVITATION FOR BID (IFB) (LOCAL COMPETETIVE BIDDING) T-6 SRM E-Tender No. : MSETCL/EHV PROJECTS DN./KOP/TSS/PKG-C/T-6/S/s (RFx. No. 7000007227) 1.0 The Maharashtra State Electricity Transmission Company

More information

DELHI DEVELOPMENT AUTHORITY NOTIFICATION

DELHI DEVELOPMENT AUTHORITY NOTIFICATION DELHI DEVELOPMENT AUTHORITY NOTIFICATION S. O.... - In exercise of the powers conferred by sub-section (1) of Section 57 of the Delhi Development Act, 1957, the Delhi Development Authority, with the previous

More information

DRAFT LEASE DEED Office premises (LIC as a tenant)

DRAFT LEASE DEED Office premises (LIC as a tenant) DRAFT LEASE DEED Office premises (LIC as a tenant) THIS DEED OF LEASE made on this.. day of 20.. at... Between. D/S/o... residing.. hereinafter referred to as the Lessor (which term shall mean and include

More information

Subject: Clarification on CA Certificates

Subject: Clarification on CA Certificates Emblem MahaREA MAHARASHTRA REAL ESTATE REGULATORY AUTHORITY No.MahaRERA/Secy/FileNo.27/115/2017 Circular No.7/2017 Dated: 4 th July 2017 Subject: Clarification on CA Certificates Whereas, under section

More information

CHAPTER Committee Substitute for Committee Substitute for House Bill No. 437

CHAPTER Committee Substitute for Committee Substitute for House Bill No. 437 CHAPTER 2013-83 Committee Substitute for Committee Substitute for House Bill No. 437 An act relating to community development; amending s. 159.603, F.S.; revising the definition of qualifying housing development

More information

Public-private Partnerships in the Road Sector. Caroline Visser International Road Federation 18 April 2008

Public-private Partnerships in the Road Sector. Caroline Visser International Road Federation 18 April 2008 Public-private Partnerships in the Road Sector Caroline Visser International Road Federation 18 April 2008 Overview PPP session General part: PPP: what are we talking about? Overviews of PPP activity and

More information

Tender Document for Sale of Non Performing Assets of Bank of India

Tender Document for Sale of Non Performing Assets of Bank of India Tender Document for Sale of Non Performing Assets of Bank of India November, 2017 Contents I II III IV Disclaimer and Important Notice Invitation for Participation in Bidding Process Schedule of Sale Process

More information

PACKAGE DEAL AGREEMENT FOR SALE OF FLATS IN BULK TO A PURCHASER. THIS AGREEMENT made at... on... this

PACKAGE DEAL AGREEMENT FOR SALE OF FLATS IN BULK TO A PURCHASER. THIS AGREEMENT made at... on... this PACKAGE DEAL AGREEMENT FOR SALE OF FLATS IN BULK TO A PURCHASER THIS AGREEMENT made at... on... this... day of..., 2000, Between (1) A, son of... resident of... (2) B, son of... resident of... and (3)

More information

Accounting for Amalgamations

Accounting for Amalgamations 198 Accounting Standard (AS) 14 (issued 1994) Accounting for Amalgamations Contents INTRODUCTION Paragraphs 1-3 Definitions 3 EXPLANATION 4-27 Types of Amalgamations 4-6 Methods of Accounting for Amalgamations

More information

REAL PROPERTY IN GERMANY

REAL PROPERTY IN GERMANY REAL PROPERTY IN GERMANY LEGAL AND TAX ASPECTS OF DEVELOPMENT AND INVESTMENT Edited by WOLFGANG USINGER and HANS-JOSEF SCHNEIDER Seventh completely revised English Edition of the book originally conceived

More information

NATIONAL INDUSTRIAL PARKS

NATIONAL INDUSTRIAL PARKS NATIONAL INDUSTRIAL PARKS DEVELOPMENT AND MANAGEMENT COMPANY TERMS AND CONDITIONS FOR PLOT OF LAND AT BIN QASIM INDUSTRIAL PARK THE FOLLOWING TERMS AND CONDITIONS APPLY TO AND ARE BINDING ON THE PERSON

More information

This Escrow Agreement and Instructions, entered into this day of, 20, by and between

This Escrow Agreement and Instructions, entered into this day of, 20, by and between This Escrow Agreement and Instructions, entered into this day of, 20, by and between NAME(S) (Type/Print) MAILING ADDRESS: Address City State Zip hereinafter referred to as Payor (Buyer); and NAME(S) (Type/Print)

More information

JHANSI CANTONMENT BOARD MINISTRY OF DEFENCE, GOVT OF INDIA

JHANSI CANTONMENT BOARD MINISTRY OF DEFENCE, GOVT OF INDIA JHANSI CANTONMENT BOARD MINISTRY OF DEFENCE, GOVT OF INDIA Subhash Marg, Jhansi Cantt. (U.P.) 284001 Phone : 0510-2370048, FAX : 0510-2370832, Email : jhansicantt@gmail.com Website : www.jcb.org.in June

More information

ACCESS AND OPTION AGREEMENT TEMPLATE FOR REAL PROPERTY PARTNERSHIP PROJECTS

ACCESS AND OPTION AGREEMENT TEMPLATE FOR REAL PROPERTY PARTNERSHIP PROJECTS ACCESS AND OPTION AGREEMENT TEMPLATE FOR REAL PROPERTY PARTNERSHIP PROJECTS Appendix 3 This ACCESS AND OPTION AGREEMENT (this Agreement ) is entered into as of, 201 (the Execution Date ), by and between

More information

Voluntary Right to Buy Policy. Dan Gray, Executive Director, Property

Voluntary Right to Buy Policy. Dan Gray, Executive Director, Property Policy title: Scope: Policy owner & job title: Approver: Voluntary Right to Buy Policy Aspire Housing Alice Newman, Land and Stock Intelligence Manager Dan Gray, Executive Director, Property Date: 07/2018

More information

CHARTER OF THE TOWN OF HANOVER, N.H.

CHARTER OF THE TOWN OF HANOVER, N.H. CHARTER OF THE TOWN OF HANOVER, N.H. 1963 N.H. Laws Ch. 374, as amended Section 1. Definitions. The following terms, wherever used or referred to in this chapter, shall have the following respective meanings,

More information

Rule E - Separate Accounts - Records - Accountings - Investigations E-1. Trust accounts; requirements and purposes

Rule E - Separate Accounts - Records - Accountings - Investigations E-1. Trust accounts; requirements and purposes Rule E - Separate Accounts - Records - Accountings - Investigations E-1. Trust accounts; requirements and purposes All "money belonging to others" accepted by a resident or non-resident broker doing business

More information

Appendix A The Homes and Communities Agency Grant Funding Conditions under the Affordable Homes Programme

Appendix A The Homes and Communities Agency Grant Funding Conditions under the Affordable Homes Programme Appendix A The Homes and Communities Agency Grant Funding Conditions under the Affordable Homes Programme Funding Conditions Preamble These Funding Conditions apply to both committed programme schemes

More information

Classification: EXTERNAL DRAFT THE COMPANIES ACT, 2013 (COMPANY LIMITED BY SHARES)

Classification: EXTERNAL DRAFT THE COMPANIES ACT, 2013 (COMPANY LIMITED BY SHARES) DRAFT THE COMPANIES ACT, 2013 (COMPANY LIMITED BY SHARES) MEMORANDUM OF ASSOCIATION OF NASHIK MUNICIPAL SMART CITY DEVELOPMENT COMPANY LIMITED (NMSCDCL) 1 st The Name of the Company is NASHIK MUNICIPAL

More information

The Bill is called the Land Acquisition, Rehabilitation and Resettlement Act, 2011

The Bill is called the Land Acquisition, Rehabilitation and Resettlement Act, 2011 The Land Acquisition, Rehabilitation and Resettlement Bill, 2011 was introduced in Lok Sabha on September 7, 2011. On December 17, 2012, during the winter session of Parliament, the government circulated

More information

Pre-Bid cum Investors Conference

Pre-Bid cum Investors Conference DEVELOPMENT OF RESIDENTIAL & COMMERCIAL PROJECTS IN PATNA ON PPP BASIS Pre-Bid cum Investors Conference 12 th August 2013 Changing Urban Landscape of Bihar Agenda Background Project key features and provisions

More information

This is a product ruling made under section 91F of the Tax Administration Act This Ruling has been applied for by StockCo Limited (StockCo).

This is a product ruling made under section 91F of the Tax Administration Act This Ruling has been applied for by StockCo Limited (StockCo). PRODUCT RULING - BR Prd 11/01 This is a product ruling made under section 91F of the Tax Administration Act 1994. Name of the person who applied for the Ruling This Ruling has been applied for by StockCo

More information

The Cantonments (Requisitioning of Immovable Property) Ordinance,1948.

The Cantonments (Requisitioning of Immovable Property) Ordinance,1948. The Cantonments (Requisitioning of Immovable Property) Ordinance,1948. THE CANTONMENTS (REQUISITIONING OF IMMOVABLE PROPERTY) ORDINANCE 1948. (Ordinance No. IV of 1948) (28th January 1948) Whereas an emergency

More information

Direction for General Regulation Concerning Jointly Owned Properties. Chapter One Definitions and General Provisions

Direction for General Regulation Concerning Jointly Owned Properties. Chapter One Definitions and General Provisions Direction for General Regulation Concerning Jointly Owned Properties Chapter One Definitions and General Provisions Article (1) Terms used in the Law In these Regulations, the terms and expressions defined

More information

The parties, intending to be legally bound, hereby agree as follows:

The parties, intending to be legally bound, hereby agree as follows: Exhibit 2.4(c) Escrow Agreement ESCROW AGREEMENT This Escrow Agreement, dated as of, 199_ (the "Closing Date"), among, a corporation ("Buyer"),, an individual resident in, ("A"), and, an individual resident

More information

MINES AND MINERALS MANAGEMENT ACT 1995 CHAPTER I PRELIMINARY. 1. This Act shall be called the Mines and Minerals Management Act 1995.

MINES AND MINERALS MANAGEMENT ACT 1995 CHAPTER I PRELIMINARY. 1. This Act shall be called the Mines and Minerals Management Act 1995. MINES AND MINERALS MANAGEMENT ACT 1995 CHAPTER I PRELIMINARY 1. This Act shall be called the Mines and Minerals Management Act 1995. 2. The Act shall come into force on the First Day of September 1995.

More information

GOVERNMENT OF KARNATAKA INDIA

GOVERNMENT OF KARNATAKA INDIA GOVERNMENT OF KARNATAKA INDIA DEVELOPMENT OF BENGALURU INTERNATIONAL CONVENTION CENTRE WITHIN THE BENGALURU SIGNATURE BUSINESS PARK SITUATED ADJOINING THE KEMPEGOWDA INTERNATIONAL AIRPORT AT BENGALURU,

More information

ESCROW AGREEMENT. Dated, Relating to

ESCROW AGREEMENT. Dated, Relating to CITY OF ANAHEIM, CALIFORNIA and U.S. BANK NATIONAL ASSOCIATION, Escrow Agent ESCROW AGREEMENT Dated, 2014 Relating to Certificates of Participation (1993 Land Acquisition Refinancing Project) Evidencing

More information

ALAMEDA S COOPERATIVE SHAREHOLDER OCCUPANCY AND RESIDENT AGREEMENT!

ALAMEDA S COOPERATIVE SHAREHOLDER OCCUPANCY AND RESIDENT AGREEMENT! ALAMEDA S COOPERATIVE SHAREHOLDER OCCUPANCY AND RESIDENT AGREEMENT THIS AGREEMENT, DATED BY AND BETWEEN ALAMEDA S COOPERATIVE (hereinafter referred to as) THE COOPERATIVE and (herein after referred to

More information

MORTGAGE PART 1 (This area for Land Title Office use) Page 1 of pages

MORTGAGE PART 1 (This area for Land Title Office use) Page 1 of pages LAND TITLE ACT FORM B (Section 219.1) Province of British Columbia MORTGAGE PART 1 (This area for Land Title Office use) Page 1 of pages 1. APPLICATION: (Name, address, phone number and signature of applicant,

More information

DECLARATIONS OF COVENANTS, RESTRICTIONS, CONDITIONS AND RESERVATIONS

DECLARATIONS OF COVENANTS, RESTRICTIONS, CONDITIONS AND RESERVATIONS THIS DECLARATION, made this 30 th day of December, 1969, by Jasper Valley Development Corporation, hereinafter called the Developer. WITNESSETH: Whereas, Developer is the owner of the real property described

More information

Business Combinations

Business Combinations Business Combinations Indian Accounting Standard (Ind AS) 103 Business Combinations Contents Paragraphs OBJECTIVE 1 SCOPE 2 IDENTIFYING A BUSINESS COMBINATION 3 THE ACQUISITION METHOD 4 53 Identifying

More information

In light of this objective, Global Witness is providing feedback on key sections of the 6 th draft of the national land policy:

In light of this objective, Global Witness is providing feedback on key sections of the 6 th draft of the national land policy: Summary Global Witness submission on the 6 th draft of Myanmar s draft national land policy June 2015 After a welcome extension to public participation on the 5 th draft of the national land policy, in

More information

Improvement District (T.I.D.) Document Last Updated in Database: November 14, 2016

Improvement District (T.I.D.) Document Last Updated in Database: November 14, 2016 Land Use Law Center Gaining Ground Information Database Topic: Resource Type: State: Jurisdiction Type: Municipality: Year (adopted, written, etc.): 1999 Community Type applicable to: Impact Fees; Transportation

More information

Industries Department, Haryana Template regarding Commercial Contracts

Industries Department, Haryana Template regarding Commercial Contracts *Disclaimer This legal form and document is for reference only. Any document that you enter into, should be in consultation with an Advocate or a Solicitor. The Government will not be responsible for any

More information

RECITALS. WHEREAS, the GMA requires counties to adopt county-wide planning policies in cooperation with cities within the County; and

RECITALS. WHEREAS, the GMA requires counties to adopt county-wide planning policies in cooperation with cities within the County; and AN INTERLOCAL AGREEMENT FOR THE IMPLEMENTATION OF A DEMONSTRATION PROJECT TO TRANSFER DEVELOPMENT RIGHTS FROM RURAL UNINCORPORATED KING COUNTY TO THE DENNY TRIANGLE IN DOWNTOWN SEATTLE This Agreement is

More information

THE INSTITUTE OF MATHEMATICAL SCIENCES

THE INSTITUTE OF MATHEMATICAL SCIENCES THE INSTITUTE OF MATHEMATICAL SCIENCES (An autonomous institution under the Dept. of Atomic Energy, Govt. of India) CHENNAI NOTICE INVITING TENDER Sealed tenders are invited on behalf of the Director of

More information

Housing & Community Development Rental Rehabilitation Program

Housing & Community Development Rental Rehabilitation Program Housing & Community Development Rental Rehabilitation Program The Rental Rehabilitation Program is offered by the City of St. Petersburg (City), Housing and Community Development (HCD) Department to Investors/Owners

More information

Preliminary Performance

Preliminary Performance 1 Preliminary Performance 2 Preliminary Estimation of Revenue and Traffic 8,000 80 6,000 60 THB M 4,000 40 PCU 2,000 20 0 2566 2567 2568 2569 2570 2571 2572 2573 2574 2575 2576 2577 2578 2579 2580 2581

More information

NC General Statutes - Chapter 116 Article 21B 1

NC General Statutes - Chapter 116 Article 21B 1 Article 21B. The Centennial Campus, the Horace Williams Campus, and the Millenial Campuses Financing Act. 116-198.31. Purpose of Article. The purpose of this Article is to authorize the Board of Governors

More information

Standard Information / Document Request List. Application for the Authority s Consent to the Merger of MPF Schemes

Standard Information / Document Request List. Application for the Authority s Consent to the Merger of MPF Schemes The applicant should note that a person who in any document given to the Authority makes a statement that the person knows to be false or misleading in a material respect, or recklessly makes a statement

More information

THE INSTITUTE OF MATHEMATICAL SCIENCES (An autonomous institution under the Dept. of Atomic Energy, Govt. of India) CHENNAI NOTICE INVITING TENDER

THE INSTITUTE OF MATHEMATICAL SCIENCES (An autonomous institution under the Dept. of Atomic Energy, Govt. of India) CHENNAI NOTICE INVITING TENDER THE INSTITUTE OF MATHEMATICAL SCIENCES (An autonomous institution under the Dept. of Atomic Energy, Govt. of India) CHENNAI NOTICE INVITING TENDER Sealed tenders are invited on behalf of the Director of

More information

GOVERNMENT OF JAMMU & KASHMIR Chief Minister s Monitoring Cell

GOVERNMENT OF JAMMU & KASHMIR Chief Minister s Monitoring Cell 1 GOVERNMENT OF JAMMU & KASHMIR Chief Minister s Monitoring Cell Physical verification report of the project namely WIDENING OF ROAD FROM QAMARWARI CHOWK TO PARIMPORA BYE-PASS JUNCTION AS FOUR LANE District

More information

Annexure XI: Summary of Correspondence with Client and Concessionaire

Annexure XI: Summary of Correspondence with Client and Concessionaire Annexure XI: Summary of Correspondence with Client and Concessionaire INCOMING LETTERS FROM THE CONCESSIONAIRE SL. NO. SUBJECT REFERENCE NO. 1. Deteriorating condition of existing Junagadh Bypass DATE

More information

ASSEMBLY, No. 326 STATE OF NEW JERSEY. 217th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2016 SESSION

ASSEMBLY, No. 326 STATE OF NEW JERSEY. 217th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2016 SESSION ASSEMBLY, No. STATE OF NEW JERSEY th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 0 SESSION Sponsored by: Assemblyman TROY SINGLETON District (Burlington) SYNOPSIS Requires municipalities to share certain

More information

Registration of Cooperative Housing Society

Registration of Cooperative Housing Society Lecture on Registration of Cooperative Housing Society under Maharashtra Cooperative Societies Act, 1960 By Shri Sunil Deshmukh Important Provisions of MSC Act, 1960 4. Societies which may be registered.

More information

SCHEME OF AMALGAMATION BETWEEN FUTURE AGROVET LIMITED WITH FUTURE CONSUMER ENTERPRISE LIMITED AND THEIR RESPECTIVE SHAREHOLDERS

SCHEME OF AMALGAMATION BETWEEN FUTURE AGROVET LIMITED WITH FUTURE CONSUMER ENTERPRISE LIMITED AND THEIR RESPECTIVE SHAREHOLDERS SCHEME OF AMALGAMATION BETWEEN FUTURE AGROVET LIMITED WITH FUTURE CONSUMER ENTERPRISE LIMITED AND THEIR RESPECTIVE SHAREHOLDERS (A) PREAMBLE This Scheme of Amalgamation ( Scheme ) is presented under Sections

More information

NATIONAL HIGHWAYS AUTHORITY OF INDIA

NATIONAL HIGHWAYS AUTHORITY OF INDIA Wilbur Smith Associates Inc. In Joint Venture with Wilbur Smith Associates Pvt. Ltd. Independent Engineer for Four Laning of Talegaon-Amravati Section of NH-6 from km 00.000 to km 66.725 (Length - km 66.73)

More information

City of Melissa, Texas Plat Dedication Language

City of Melissa, Texas Plat Dedication Language City of Melissa, Texas Plat Dedication Language [INCLUDE THE FOLLOWING DEDICATION LANGUAGE FOR INDIVIDUALS (MODIFY APPROPRIATELY TO REFLECT EXACTLY AS SHOWN ON PROPERTY DEED)]: NOW THEREFORE, KNOW ALL

More information

The following is a list of assumptions on which this Term Sheet is based:

The following is a list of assumptions on which this Term Sheet is based: NONBINDING TERM SHEET BETWEEN CITY OF LAS VEGAS, CITY PARKWAY V, THE CORDISH COMPANIES, AND FINDLAY SPORTS AND ENTERTAINMENT, LLC This Nonbinding Term Sheet ( Term Sheet ) dated this day of September,

More information

Land: Detail about Land of Amelia Coal Mine is as follows:

Land: Detail about Land of Amelia Coal Mine is as follows: AMELIA COAL MINES (Under Construction) Background: In order to meet out fuel requirement of the Khurja STPP, Ministry of Coal, Govt. of India has allocated Amelia Coal Mine to THDCIL on 29.08.16. The Allotment

More information

This is a sample form for information ONLY. UTILITY INFRASTRUCTURE CONVEYANCE AND SERVICE AGREEMENT

This is a sample form for information ONLY. UTILITY INFRASTRUCTURE CONVEYANCE AND SERVICE AGREEMENT This is a sample form for information ONLY. A CSA will be tailored to your project at the appropriate time during the development process. Please contact the Development Services Team for additional information.

More information

SOFTWARE LICENSE FINANCING ADDENDUM

SOFTWARE LICENSE FINANCING ADDENDUM SOFTWARE LICENSE FINANCING ADDENDUM dated as of : May, 2004 between : Get Well Hospital ( Customer ) located at : and : SoftwareVendor, Inc. ( SoftwareVendor ) located at : and : Pantheon Capital LLC,

More information

TEXAS GENERAL LAND OFFICE PROCUREMENT GUIDANCE FOR RECIPIENTS AND SUBRECIPIENTS UNDER 2 CFR PART 200 (UNIFORM RULES)

TEXAS GENERAL LAND OFFICE PROCUREMENT GUIDANCE FOR RECIPIENTS AND SUBRECIPIENTS UNDER 2 CFR PART 200 (UNIFORM RULES) TEXAS GENERAL LAND OFFICE COMMUNITY DEVELOPMENT & REVITALIZATION PROCUREMENT GUIDANCE FOR RECIPIENTS AND SUBRECIPIENTS UNDER 2 CFR PART 200 (UNIFORM RULES) This checklist will assist the Texas General

More information

[RECIPIENT] and NEW YORK STATE DIVISION OF HOUSING AND COMMUNITY RENEWAL LOW-INCOME HOUSING CREDIT REGULATORY AGREEMENT.

[RECIPIENT] and NEW YORK STATE DIVISION OF HOUSING AND COMMUNITY RENEWAL LOW-INCOME HOUSING CREDIT REGULATORY AGREEMENT. [RECIPIENT] and NEW YORK STATE DIVISION OF HOUSING AND COMMUNITY RENEWAL LOW-INCOME HOUSING CREDIT REGULATORY AGREEMENT Dated as of, 201_ This instrument affects real and personal property situated in

More information

ISDA. International Swaps and Derivatives Association, Inc. CREDIT SUPPORT ANNEX. between. ... and... relating to the

ISDA. International Swaps and Derivatives Association, Inc. CREDIT SUPPORT ANNEX. between. ... and... relating to the ISDA International Swaps and Derivatives Association, Inc. CREDIT SUPPORT ANNEX between... and... ("Party A") ("Party B") relating to the [1992/2002] ISDA Master Agreement dated as of... between Party

More information

ESCROW AGREEMENT RELATING TO THE DEFEASANCE OF PORTIONS OF

ESCROW AGREEMENT RELATING TO THE DEFEASANCE OF PORTIONS OF ESCROW AGREEMENT RELATING TO THE DEFEASANCE OF PORTIONS OF $168,838,667.35 CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT (Alameda and Contra Costa Counties, California) General Obligation Bonds, Election

More information

CHAPTER 154 RIGHTS OF WAY

CHAPTER 154 RIGHTS OF WAY CHAPTER 154 RIGHTS OF WAY 154.01 Purpose and Rule of Interpretation 154.09 City Construction and Paving 154.02 Franchise, License or Lease Required 154.10 Design Notice to City 154.03 Fees Required 154.11

More information

will not unbalance the ratio of debt to equity.

will not unbalance the ratio of debt to equity. paragraph 2-12-3. c.) and prime commercial paper. All these restrictions are designed to assure that debt proceeds (including Title VII funds disbursed from escrow), equity contributions and operating

More information

General Assignment Of Leases And Rents

General Assignment Of Leases And Rents Page 1 of 8 General Assignment Of Leases And Rents This Agreement made as of the day of, 2, between: (the Assignor ) of the first part, and Canadian Imperial Bank of Commerce (the Assignee ) of the second

More information

MAHARASHTRA METRO RAIL CORPORATION LTD.

MAHARASHTRA METRO RAIL CORPORATION LTD. MAHARASHTRA METRO RAIL CORPORATION LTD. Development and Operation of Part of land demarcated for Property Development at Kh. 98, 99,100,101 at Mz. Dhantoli near Sitaburdi Interchange Station of Nagpur

More information

NOTICE FOR PREQUALIFICATION OF CONTRACTOR

NOTICE FOR PREQUALIFICATION OF CONTRACTOR 301, Centre Point, Dr. Babasaheb Ambedkar Road, Parel, Mumbai 400 012 Phone No. 6177 9400 09 Fax No.61779058 Website: www.stockholding.co.in NOTICE FOR PREQUALIFICATION OF CONTRACTOR Pre-qualification

More information

ESCROW DEPOSIT AGREEMENT WIT N E SSE T H:

ESCROW DEPOSIT AGREEMENT WIT N E SSE T H: ESCROW DEPOSIT AGREEMENT This ESCROW DEPOSIT AGREEMENT, dated as of March 1, 2015, by and between the LOUISIANA LOCAL GOVERNMENT ENVIRONMENTAL FACILITIES AND COMMUNITY DEVELOPMENT AUTHORITY, a political

More information

Companies Act 2006 COMPANY HAVING A SHARE CAPITAL. Memorandum of Association of. PM SPV [XX] Limited

Companies Act 2006 COMPANY HAVING A SHARE CAPITAL. Memorandum of Association of. PM SPV [XX] Limited Companies Act 2006 COMPANY HAVING A SHARE CAPITAL Memorandum of Association of PM SPV [XX] Limited Each subscriber to this memorandum of association wishes to form a company under the Companies Act 2006

More information

Case Study 2: Risk Allocation and Mitigation in a Road Toll Project. Thursday, 10:45 to 12:00

Case Study 2: Risk Allocation and Mitigation in a Road Toll Project. Thursday, 10:45 to 12:00 Case Study 2: Risk Allocation and Mitigation in a Road Toll Project Thursday, 10:45 to 12:00 Session agenda 1. Road concessions 2. The Tribasa Toll Road 3. Risks and mitigation 4. Performance and failure

More information

DECREE GENERAL PROVISIONS DETAILED REGULATIONS ON COMPENSATION, SUPPORT, AND RESETTLEMENT UPON LAND EXPROPRIATION BY THE STATE

DECREE GENERAL PROVISIONS DETAILED REGULATIONS ON COMPENSATION, SUPPORT, AND RESETTLEMENT UPON LAND EXPROPRIATION BY THE STATE THE GOVERNMENT -------- SOCIALIST REPUBLIC OF VIETNAM Independence Freedom - Happiness ---------------- No.: 47/2014/NĐ-CP Hanoi, May 15, 2014 DECREE REGULATIONS ON COMPENSATION, SUPPORT, AND RESETTLEMENT

More information

RULES AND REGULATIONS FOR ADMINISTRATION OF AREA DRAINAGE PLANS

RULES AND REGULATIONS FOR ADMINISTRATION OF AREA DRAINAGE PLANS RIVERSIDE COUNTY RULES AND REGULATIONS FOR ADMINISTRATION OF AREA DRAINAGE PLANS ADOPTED JUNE 10, 1980 BY RESOLUTION NO. 80-244 AMENDMENTS RESOLUTION NO. May 26, 1981 81-148 Nov. 9, 1982 82-320 July 3,

More information

ASSEMBLY COMMITTEE SUBSTITUTE FOR. ASSEMBLY, Nos. 326 and 1475 STATE OF NEW JERSEY. 217th LEGISLATURE ADOPTED MARCH 7, 2016

ASSEMBLY COMMITTEE SUBSTITUTE FOR. ASSEMBLY, Nos. 326 and 1475 STATE OF NEW JERSEY. 217th LEGISLATURE ADOPTED MARCH 7, 2016 ASSEMBLY COMMITTEE SUBSTITUTE FOR ASSEMBLY, Nos. and STATE OF NEW JERSEY th LEGISLATURE ADOPTED MARCH, 0 Sponsored by: Assemblyman TROY SINGLETON District (Burlington) Assemblyman MICHAEL PATRICK CARROLL

More information